Loading...
1898 Gold Tr - COCCity of 1a an COMPLIANCE WITH INITIAL INSPECTION V I— This is to certify that the propetty listed above has been inspected by authorized City personnel on 3--'3 , 201 and found to be in compliance with Section 3 40 of the City Code and no corrective work was required. COMPLIANCE AF I ER CORREC IIVE WORK PERFORMED n This is to certify that the property listed above has been found to be in compliance with Section 3 40 of the City Code after satisfactorily completing the required corrective repair work under (check all that apply): !n Cit Sanitary Sewer Permit City Plumbing Permit NOTES Applicable only if box is checked: 'Based on a review of the Sewer Service video inspection /report on file, it is recommended that periodic cleaning or future inspections be performed to minimize a potential blockage due to Grease Build -up, Root Intrusion, Dip /Settlement in Pipe, Other.: City Approved: i v4N_ 4 t�k,c k•- Print name White Copy: Property Owner SANITARY SEWER SYSTEM CERTIFICATE OF COMPLIANCE for INFLOW & INFILTRATION City of Eagan, Minnesota Propetty Address: }_ � � 0 CA-2 Signature Yellow Copy: City of Eagan (Parcel F ile) 4 City of Eapll Date rev 2 23 2010