Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
4920 Whispering Way - New Energy Calcs & Load Short Form Permit #96095
Par N1101.8 Build ng Vafi6uate. Ab dulls oetttitirate shell be posted in a pamaaltly visible location inside the banding. The oc tfioate Salt he aaepldedby le bander and shall 1141etiaa stioa sad value. of companions listed in Table141101.8. IMae Cornelis l asted nnehjem M IK% Aden= et the Dw,M'eg or Dwelling that 4920 WHISPERING WAY 4'H7 Eagan, MN xam.afR aaarl.tC.aa.amr Vennehn BuildiniCorp. hiNlinat.Ptaeee 20108964 HERMAL ENVELOPE RADON SYSTEM Insulation Location ,4 i ►., 9 Typo Cheek All That Apply Passive (Noun) b at 1 t 7 a Active (With An and maoromeier to ot7eerayatam monitoring efentee) Other Please Describe H orn Below Entire Saab X Foundation Was RIO X htertu Perimeter d Slab on Grade X Rho dolt (Yomdalosi) R13.4 X imetor RJR Met (1" Floori+) R13.4 X a nterior Walt R19 X Ceiling, flat R44 X vaulted R38 X Bay Windows or ca llevered areas X • over Entry R40 X X 2• sprayed roan *R30 Batts Describe other insulates asws Windows $ Doers time teen, Ander !mind Guido Boob N..N.e or Cooling Ducts Outside Cenditienad Spaces Average U- Factor (exrhtdea skyfigh!s and ., , door) U: {0.28 X applicable, all duets located it conditioned space Solar Heat Gain Coefficient (SRQC): 10.43 rot rot CHANICAL SYSTEMS 1 1t►aito -up Air Select aType Applleneos . System Domestic Water Heater Cooling System ► Nat required per melt. code Fuel ,. Ural Gas Electric Electric Pasai Manufacturer LE NOX IND Rheem- Marathon LENNOX Model • 193UH090P : MR102 -245 13ACX-042 ■ ltdalocked with extend device. Desodbe: e ‚1 wI 88,000 81,20 a 1 ° — 105 tOM.tin - 11"Gsi 39,69 Location Other, dosardie: of duct or system; 93% >�R 10.9 � ® Cfmb _ " sound dud OR Moelsaniod Yantllatlen System Describe any additional or combined heating • cooling systems if installed: (e.g. two furnaces or air hue at pump with gas back -up Unlace): Sele!� "mall dart Combustion Air Sek+ct a 1ype ► Not required per meek code Passive Heat Recover Ventilator (HRV) incites Low l l7 High: 208 Other, describe l ecurce Energy Recover Ventilator (ERV) ::..', in cfms: Low J High: Location of dart or system: Inside Horne Continuous exhausting Ws) rated - . ty in cfms: Location ofYan(s1 describe I Ma Capacity continuous ventilation rate in floss: 75 CFM " round duct OR Taal ventilation (intermittent .. , ; ..) in cfms: 1 142 CFM " metal duct Mar 29 2011 3:13PM Better Air, Inc. Hance Certificate (507) 663 -0235 page 2 9&..0Q5 Created by SAM version 052009 ROOM NAME Area (ft) Htg load (Btuh) llg (Btuh) ad l g jV Cllg MAIN LEVEL UPPER LEVEL 2082 1763 35212 26948 17344 12541 745 570 815 589 315 LOWER LEVEL 2037 19043 6699 403 Entire House d 5882 81204 36585 1719 1719 Other equip loads 0 0 Equip. r, 0.93 RSM 33951 Latent cooling 5746 -_- _ . - rnnn sa. -0∎A -44M17 1719 1719 Mar 29 2011 1:53PM Email: kevInbabettereirinc.com For: Outside db ( °F) Inside db ( °F) Design TD ( °F) Daily range Inside humidity ( %) 30 Moisture difference (glib) 32 Efficiency Heating input Heating output Temperature rise Actual air flaw Air flow factor Static pressure Space thermostat Better Air, Inc. Load Short Form Entire House BETTER AIR INC i-/(10710 LAJIT Project Information VENNEHJEM BUILDING CORP. Design Information Htg -15 70 85 HEATING EQUIPMENT Make LENNOX Trade Model ML193UH090P48C LAMA ID 4119047 Cig 88 75 13 M 50 40 93 AFUE 88000 Btuh 83000 Btu* 45 °F 1719 cfm 0.021 cfm/Btuh 0 in H2O Method Construction quality Fireplaces (507) 663 - 0235 page 2 Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio Infiltration Job: 4920 WHISPERING WAY Date: Mar 29, 2011 By: Simplified Average 0 COOLING EQUIPMENT Make LENNOX Trade Cond 13ACX- 042 -230 Coil C33-43 ARI ref no. 3230512 Efficiency 10.9 EER, 13 SEER 29050 Btuh 12450 Btuh 41500 Btuh 1719 cfm 0.047 cfmlBtuh 0 in H2O 0.86 Printout certified by ACCA to meet all requirements of Manual J 8th Ed. . wr lghtsoft• Right -$ulee Universal 8.0.06 RSU11649 a l1/4 C:tUserskjohnlOocumentsl2um Hydronics1PROJECTStProJeatl.rup Cale = MJ8 Front Door faces: N 2011-Mar-29 14:39:48 Page 1 Mar 29 2011 1:53PM Better Air, Inc, • Prmiect infnrrnatinli Email: kevinbebetterair , o.com Design Conditions Location: Minneapolis /Blaine, MN, US Elevation: 912 ft Latitude: 45°N Outdoor: Dry bulb ( Daily range ( °F) Wet bulb ( °F) Wind speed (mph) Current Orientation: Highest Cooling Load: Loads for Multiple Orientations Entire House BETTER AIR INC Heating -15 15.0 Cooling 88 19 (M ) 74 7.5 Building Orientation Cooling Load NE E SE Direction Front Door faces Front Door faces North Front Door faces North Printout certified by ACCA to meet all requirements of Manuel J 8th Ed. at we ghbort" Right-Suite/0 Universal 8.0.00 RSU11649 C:1Users4otanDocumenls1Zum Hydro nicelPROJECTSSProjectl.rup Car. =MJ8 Front Door laces: N (507) 663 -0235 page 3 Indoor: Heating Indoor temperature ( °F) 70 Design TD (°F) 85 Relative humidity ( %) 30 Moisture difference (gr /lb) 31.8 Infiltration: Job: 4920 WHISPERING WAY Date: Mar 29, 2011 BY: Cooling 75 13 50 40.2 East Southeast South Southwest West Northwest NW 2011-Mar-29 14:39:46 Page 1 Component Btuh/ft Btuh % of load Walls Glazing Doors Ceilings Floors Infiltration Ducts Ventilation Internal gains Blower Adjustments Total 0.7 42.9 9.8 1.1 0.7 0.3 3878 21209 1189 3256 2061 1312 0 0 X8 3680 0 0 36585 10.6 58.0 3.2 8.9 5.6 3.6 1 10.1 0 100.0 Component Btuhfft Btuh r % of load Walls 5.4 28853 35.5 Glazing 23.7 11748 14.5 Doors 33.1 4032 5.0 Ceilings 1.9 5692 7.0 Floors 4.8 14659 18.1 Infiltration 3.9 16219 20.0 Ducts Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 81204 100.0 Mar 29 2011 1:53PM Better Air, Inc. Erneik kevinbabeherairinc.COm For: Latent Cooling oad = 5746 Btuh Overall U- val = 0.076 Stuh/ft - °F Data entries checked. Building Analysis Entire House BETTER AIR INC Location: Minneapolls /Blaine, MN, US Elevation: 912 ft Latitude: 45°N Outdoor: Heating Daly ran °F) - Wet bulbl° Wind speed (mph) VENNEHJEM BUILDING CORP. 15.0 (507) 663 -0235 page 4 Pro Information Desi n Conditions Indoor: Heating Indoor temperature ( °F) 70 Design TD ( °F) 3 5 Relative humidity ( %) Cooling Moisture difference (gr /lb) 31.8 89 (M) Infiltration: 74 Construction quality 7.5 Fireplaces •fi wrightsaft• R41- Sulte9 Universal 5.0.06 RSU11649 w'.�.tk C:1Users4phn1Documents\Zum HydronicslPROJECTSTroject Colo = MJ8 Front Door faces: N Job: 4920 WHISPERING WAY Date: Mar 29, 2011 EY: Simplified Average 0 Cooling 13 40.2 Heatinc Cooling 2011-Mar-29 14:39:49 Page 1 Mar 29 2011 1:53PM Better Air, Inc. Email: kevinbGbetterairinc.com Partitions (none) For: Location: Minneapolis/Blaine, MN, US Elevation: 912 ft Latitude: 45°N Outdoor: Dary lbulb ( range Daily rtge Wind speed (mph) Component Constructions Entire House BETTER AIR INC Project information VENNEHJEM BUILDING CORP. Design Conditions Heating 15.0 Construction descriptions Walls 12E -Osw: Frm wall, vnl ext, 1/2" wood shth, r -19 cav ins, 1/2" gypsum board intfnsh, 2'x6" woad frm Cooling 19 (M ) 74 7.5 15B11- Owb-8: Bg wall, light dry soil, 2"x8" wood int frm, trick wall, 12" thk, 1/2" gypsum board Int fnsh Windows 2 glazing, clr outr, air gas, wd *m mat, clr innr,1 /4" gap, 118" thk: 2 glazing, clr autr, air gas, wd frm mat, clr I nnr, 114" gap, 118' thk DftWind: 2 glazing, clr low-e outr, air gas, mtl no brk frm mat clr innr,1/2" gap, 1/8" thk n 12 0.280 0 e 86 0.280 0 s 42 0.280 0 sw 77 0.280 0 sw 14 0.280 0 w 125 0.280 0 w 29 0280 0 nw 55 0.280 0 nw 14 0.280 0 all 453 0.280 0 e 42 0.280 0 wraghtas ft- Righl -8uaee Universal 8.0.06 RSU11649 Awp 0 :IUserelohn1DocumentslZum HydronbstPROJECTSIProJectl.rup Dale = MJB Front Door faces: N (507) 663 -0235 page 5 Indoor: Heating Indoor temperature ( °F) 85 Design TD ( °F) 30 Relative humidity ( %) Moisture difference (glib) 31.8 Infiltration: Method Simplified Construction quality Average Fireplaces 0 Job: 4920 WHISPERING WAY Date: Mar 29, 2011 By: Cooling 75 13 50 40.2 Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 1t' BtufAt' -'F ft'- 'Fatah Btu NIP BNh Ruhle' Ruh n 810 0.068 19.0 5.77 4689 1.08 875 e 902 0.068 19.0 5.77 5200 1.08 975 s 729 0.068 19.0 5.77 4205 1.08 789 sw 318 0.068 19.0 5.77 1823 1.08 342 w 388 0.066 19.0 5.77 2240 1.08 420 nw 293 0.068 19.0 5.77 1689 1.08 317 all 3438 0.068 19.0 5.77 19826 1.08 3717 n 396 0.051 11.0 4.78 1892 0.11 43 e 567 0.051 11.0 4.78 2709 0.11 82 s 396 0.051 11.0 4.78 1892 0.11 43 sw 152 0.051 11.0 4.45 676 0.03 5 w 304 0.051 11.0 4.43 1349 0.03 8 nw 132 0.051 11.0 3.86 510 0 0 all 1947 0.051 11.0 4.64 9027 0.08 181 23.7 285 11.7 140 23.7 2037 43.7 3747 23.7 997 23.7 995 23.7 1834 38.8 2999 23.7 323 38.8 528 23.7 2959 43.7 5441 23.7 684 43.7 1258 23.7 1309 29.4 1622 23.7 323 29.4 400 23.7 10750 37.8 17130 23.7 997 43.7 1834 2011- Mar -29 14:39:49 Page 1 Mar 29 2011 1:53PM Better Air, Inc. (507) 663 -0235 page 6 DiQ DDoor, wd sc type: Door, wd sc type e 42 0.390 0 33.1 1389 9.75 410 e 21 0.390 0 33.1 695 9.75 205 sw 39 0.390 0 33.1 1293 9.75 381 nw 20 0.390 0 33.1 656 9.75 193 all 122 0.390 0 33.1 4032 9.75 1189 Ceilings 168 -44ad: Attic ceiling, asphalt shingles roof mat, r-44 ceil ins, 518" 2392 0.022 44.0 1.87 4462 1.07 2552 gypsum board int fish 168 -44ad: Attic ceiling, asphalt shingles roof mat, r -2 roof ins, r-44 659 0.022 44.0 1.87 1230 1.07 704 cell Ins, 518" gypsum board int fnsh Floors 19A- Obstp: Part floor, frm flr, 12" thkns, 518" gypsum board int fnsh 584 0.368 0 102 5933 1.53 896 19A- 19bstp: Part floor, r -19 ins, frm flr, 12" thkns, 5f8" gypsum 1763 0.049 19.0 3.26 5739 0.49 866 board int fish 20P -19c: Fir floor, frm flr, 6" thkns, carpel flr fnsh, r -19 ext ins, r -19 704 0.050 19.0 424 2987 0.43 299 cav ins, amb ovr z ; 1... ryr . Right- Suite® Universal 8.0.08 RSU11649 2011 -Mar-29 14:89.49 q C: 1UserslahrADocument$ \Zurn Hydroncs\PROJECTS1Propcttsup Cale =MJ8 Front Door faces: N Paget Mar 29 2011 1:53PM Better Air, Inc, Email: kevinb bettereirinc.00rn Outside db Inside db Design TD Project Summary Entire House BETTER AIR INC Project Information For: VENNEHJEM BUILDING CORP. Notes: Desk n Information Winter Design Conditions Weather: Minneapolis/Blaine, MN, US -15 °F 70 °F 85 °F Summer Design Conditions Outside db Inside db Design TD Daily range Relative humidity Moisture difference Printout certified by ACCA to meet all requirements of Manual J 8th Ed. (507) 663 -0235 page 7 Job: 4920 WHISPERING WAY Data: Mar 29, 2011 By: 88 °F 75 °F 13 °F M 50 % 40 gr /lb Heating Summary ` Sensible Cooling Equipment Load Sizing Structure 81204 Btuh Structure 36585 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh H umioification 0 Btuh Blower 0 Btuh 0 Btuh n Piping pment Toad 81204 Btuh Use manufacturer's data 0 .91 93 Rate/swing multiplier 33951 Btuh Infiltration Equipment sensible Toad Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average 5746 Btuh Firepltices 0 Structure 0 Btuh Ducts Heat no Cooling Central vent (0 cfm ) 5746 Btuh ) X40 Btuh Area (ft 5882 ,5882 Equipment latent load Volume ((ft 38511 38511 39697 Btuh Air changes /hour 0.28 0.15 Equipment total load Equiv. AVF (cfm) 180 96 Req. total capacity at 0.70 SHR 4.0 ton Heating Equipment Summary Cooling Equipment Summary Make LENNOX Mss LENNOX Trade Trade 13ACX- 042 -230 Model ML193UH090P48C Coil C33 -43 LAMA ID 4119047 ARI ref no. 3230512 Efficiency 93 AFUE Efficiency 10.9 EER, 13 SEER Heating input 88000 Btuh Sensible cooling 29050 Btuh Heating output, 83000 Btuh Latent coding 12450 Btuh Temperature rise 45 °F Total cooling 41500 Btuh Actual air flow 1719 cfm Actual air flow 1719 cfm Air flow factor 0.021 cfm/Btuh Air flow factor 0.047 cfm /Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0 2011 - Mar -29 14:39:49 -4.- wrightsoft- RightSuitee Universal 8.0.08 RSU11849 IF.CK. C:1Usersljohn\Documents \Zum HydronlcslPROJECT31Projeett.rup Celt MJa Front Doer faces: N Page 1 Mar 29 2011 1:54PM Better Air, Inc. Email: kevinbabetteralrinC.com Project Information Design Conditions Location: Minneapolis/Blaine, MN, US Elevation: 912 ft Latitude: 45 °N Outdoor: Dry bulb ( °F) Daily range °F) Wet bulb ( °F) Wind speed (mph) 29,D00- 24,00 22,000- 20,000- 18,000- 16,000- 14,000 12, 10,000 8,000 8,000 - 4,000 --- 2,000 0 For: • 8 9 AED Assessment Entire House BETTER AIR INC / Howyf VENNEHJEM BUILDING CORP. Heating -15 15.0 (507) 663 -0235 page 8 Indoor: Heating Indoor temperature ( °F) 70 Design TD ( °F) Relative humidity ( %) 30 Cooling Moisture difference (gr /lb) 31.8 88 Infiltration: 19 (M ) 74 7.5 Test for Adequate Exposure Diversity Hourly Glazing Load 10 11 12 13 14 15 18 17 18 19 20 Hour of Day AVuge Maximum hourly glazing Toad exceeds average by 42.7 %. House does not have adequate exposure diversity (AED), based on AED limit of 30 %. AED excursion: 2245 Btuh (PFG - 1.3*AFG) wrlghtseoft- Right-Suite. Universal 8.0.06 RSU 11649 C:1Usersljohn \DocumantstZum Hydrorrics \PROJECTS\Project1.ruP Colo = MJB Front Door faces: N Job: 4920 WHISPERING WAY Date: Mar 29, 2011 Br: Cooling 75 13 50 40.2 2011- Mar-29 14:39:49 Page 1 Mar 29 2011 1:54PM Better Air, Inc. Email: kevinbahetteraiAnc.com Right -J® Worksheet Enttrie House BETTER AIR INC 1 Room name 2 Expmed wall 3 Celing height 4 Room dimensions 5 Room area 15811- Onrb.8 2 al et • 4.78 011 0.099 sw . 4.45_ 0.03 0.211 • lW- _. 'r;1fx'28Ef °kJ;! Anr ?F "< . 0.099 nw 188 0.00 0.280 nw 2174 29.43 O. 4 0M. 33,.07 & 75 ..a te- u t r. . F ' �i�� i t sot 'A4111041] 1r Oar 4.78 ._......_ 0.11 Ty Construction U -value Or HTM number (Btutifft - F) (Btuhift c V.;31 F Mgr J�^ 4 L4 T .i2 Heat Cod Total room bad Air required (cfm) Entire House 844.8 ft 9.3 ft 5881.5 ft' d MAIN LEVEL 219.3 It 9.9 ft 1.0 x 2082 2082.0 ft° Area (B°) or perimeter (ft) Load (Btuh) Load or peril/eter (ft) (Btuh) Area (ft') Grose 185 14 185 14 20 859 ti 8 c) AED excusion 12 13 Less external load Less transfer Rerlistdbulion 14 Subtotal 15 Duct loads 0% N/P /S Heat Cod 132 0 20 �. Gross N/P!S Heat 0 2245 188 28834 15287 8379 678 O 0 1380 0 O 0 0 0 O 0 81204 38585 0% 0 0 35212 17344 0 0 O 0 O 0 35212 17344 0% 0 0 81204 36585 35212 17344 1719 745 815 1719 Printout certified by ACCA to meet all requirements of Manual J 8th Ed. - wrsahe.*cfrt- RIght -Sutee Universal 8.0 08 RSUI1649 C:1UseratjonnlDocuments\Zum Hydronios1PROJECTS1Projecll.rup Celc =MJB Front Door faces: N (507) 663 -0235 page 9 Job: 4920 WHISPERING WAY Date: Mar 29, 2011 By 2011 - Mar -28 14:39:49 Page 1 1 2 3 4 5 Room name Exposed wali Ceiling Room dmensi ons Room area UPPER LEVEL LOWER LEVEL 200.8 fl 224.5 ft 9.0 ft � 9.0 ft heat/cool 1.0 x 1752.5 ft 1.0 x 2037.0 ft 1782.5 ft2 2037.0 ft 2 tt 11 Ty W 3 ! Yv 1 1(1J � ( W • tri.5' t x t . F .'! = ii M , ... ., ._ i I3!It '.i, :.t X -, 1 Coriatn. vtiOn number 1581 . {y § E 3 9 a Iype ,a�tl11 15B 71.0wb 8 3 f 4 I� ,3 15 ]-(Mtb -8 „:-.-.:k., : , [k it i . � - 15811 -owD6 rilli�A 156 a -awb 5 4I {alt 15611 -Owb -8 2 glazing. clr Outr, tkr 1 1 pp a s ' Y 1 „tQ xN .A4� 49r {.,,'i. i :. -:,bye � . , 1 it..�.,x 3� s r ,—. L .. fi ti. i47 n .' 3 �K: .: -F ,..: f p: 1 8f Y-' Fit '- 4y .:'114 a .;b 3 o•e d E, U -vedue (Btuhlft; ° F) AJ y¢ yy 0 099 d ` :. 6 8 , ti� v 0 098 F. � 1�' t i M1M1 Q , { 0 099 "" :f:.,Nri 0 a 099 D 280 0.099 0.280 0}39°11;.:,77,k!.0 t 0, .°� . aO : ", V, 't F . it k a h � f} si?si�'�.i , sh.Ld. dr . +€ f ,'iiR'�;:. .. St. tf C -_.. Itt . :+ , a . s u... .�' y , 1 € .1. t t m Or HTM (Blum/') Area (R=) or perimeter (ft) Load Arm (%/ • (Btuh) or perimeter (ft) Load (Btuh) He n 78 7`t _ s 4 #" ` Marx. v a 4 8 S�➢'3 � f $ a �PWh }t�5 7 7 sw 445 23,7 .....� 3 T w 4.43 23.74 . 7 -.. r1w 388 rnx 23.74 r 347 � a3 .M '. ¢ W,t �F v(l',� 1 Vq x.c>A. iigiff k': .. ai�t,.,::` .'..$3 X11 A -pub ., .. - aL„ .� �:a? •4 '-::.F. Y dl. .; s '. . Fi.,stt r 3 {` ._.i.. d . • k : f : 1i �. ':::r Cod 0.11 n� � ix i' � EL 0.03 3883 .. 0 03 43.67 ,y _ 0.00 29.43 y 9 i .75 1i4 N ''l 0 y� r5 I I: '4,fl: r,.. Liar:, .,.r 1 ::.. 1 : ,., .f..6 g '.: `1 _ > ':; Gross 0 p �5A � 1 r .K � I nl 0 ib J'SY 0 v. 21 0 0 � 1 0 0 0 1tt 010 i . 1 .D i .:: l.t . --. s, ,.. 'ex " - .... ._:..'. '' N /P(S 0 d 1 • T r a 0 D y � 0 0 0 a ,i 0 iQi 1 ,.... . .. n rF;. ., . f ... ... .. '� t : .. . ?. i!t ( Heat 0 3 1 � MfF 2 54 t4 O x � { 0 0 A K } 0 0 �. 0 '578 s0y.. ..i, -: 0 .,... ,6733 .J.... -':!i. . ;. ..: .. .. ... .: `f .: .. i `4 • "' Cool Gross t.' r 1 i 0 395 K r n ° r JrEt k ;ate � �} 0 D 3 '� � ; � t i P t r ..... 1 D 14 0 3 33 0 29 a y i ^ Z � 'p1 " � S 0 185 0 14 0 € r . 2 t '1 1 0 0 559 e 3 X411 iii � i8 , ,... '. .tT '',;: .,. .:;•� �.,. ; .`y of ; _.._' �. .�' i i . . t c < "! sT' � �. :::, ._.. '..' , z.< d Y r 4 . .. ,. . , 5 y NfPIS J C � t ¢ i 395 , .�`d' w i. .. 1 304 i F" �• �" 132 0 n si r A G a fi6 ' j `!"c5$4 .... {G .., _ . .. ',..:,'1 .. :.. ... s ,. ik.r 3 :.... ,.. .. r. ... .. i ., .., Heat � . es .- Qfl: Z. 1 } p{ .s. 1' ! :I0 � 4'i ') I ” zr� e 1349 '� us 510 323 x •' 0 1230 , ii n i d.Std}: . U'4 sfA.:',.‘..!,‘1 .. , ... i ..,... � . � U I �: :'.� tt ... .. .. _ .M .:. Cool r i 0 4 , y i '�' I. ,. < +: 5 8 1258 . , r .. , tii.7 ih_il� 0 400 193 4ti a l0 7 ,, 0. ,4.y . t d rl t} a 893 i` k} " i,g0 M 44.4 ..a ,. ... _... $' 3 _ . ..... .. ..,d _ .. 3t fo-igli 1110 3 c) AEDexarsion Envelope losslgain 11057 18178 5249 12 a) Infiltration b R oam vent at 8973 1 534 0 587 70 0 0 920 6 0 1380 0 13 Internal gains: Occupants 0 230 4 Appflancestother Subtotal (Ines 6 to 13) 26948 12541 19043 8589 Less extemai load Less transfer Redstribulion 14 Subtotal -0% 15 Duct loads 0 0 28945 0 0 0 0 12541 t • 0 0 0 0 0 19043 5690 0 0 Total room load Air required (dm) 2948 12541 19043 43 6899 315 Mar 29 2011 1:56PM Better Air, Inc. Email: kevinbebeterairina00m Right -J® Worksheet Entire House BETTER AIR INC Printout certified by ACCA to meet all requirements of Manual J 8th Ed. Aft v„rregh>r: aft Rig~rt -Sulee Universal 8.0.05 R8U11649 C:1Usenliohn \DCCUmenfelZum HydrONce1PROJECTS \ Project l.rup Cal = MJ8 Front Door faces: N (507) 663 -0235 page 10 Job: 4920 WHISPERING WAY Date: Mar 29, 2011 By 2011- Ma' -29 14 :39:49 Page 2 Mar 29 2011 1:58PM Better Air, Inc. (507) 663 -0235 page 11 MAIN LEVEL Job #: 4920 WHISPERING WAY Performed for: VENNEHJEM BUILDING CORP. BETTER AIR INC kevinb ©betterairinc. com Scale: 1 : 110 Page 1 Right- Suitee Universal 8.0.06 RSU11649 2011- Mar - 2914:40:43 Hydronics PROJECTSIProject1.rup Mar 29 2011 1 :58PM Better Air, Inc. • (507) 663 -0235 page 12 UPPER LEVEL UPPER LEVEL Job #: 4920 WHISPERING WAY Performed for: VEN N EHJEM BUILDING CORP. BETTER AIR INC kevinb@betterairinc.com Scale: 1: 110 Page 2 Right Suite4D Urrversai 8.006 RSU11649 2011 - Mar - 2914:4004 HydranicsPPR OJ ECTSProject1.rup Mar 29 2011 1:58PM Better Air, Inc. (507) 663 -0235 page 13 LOWER LEY EL LOWER LEVEL Job #: 4920 WHISPERING WAY Performed for: VENNEHJEM BUILDING CORP. BETTER AIR INC kevinb betterairinc. com Scale: 1 : 110 Page 3 Right - Suited Universal 8.0.06 RSU11649 2011-Mar-29 14:40:45 HydronicalPROJECTStProjectl.rup