3562 Springwood Path - Email Lennar - Sheetrock Permit#98243Jeffrey Wheeler
From: Tom.Tamte @lennar.com
Sent: Monday, April 18, 2011 11:42 AM
To: Jeffrey Wheeler; Troy.Hendrickson @Lennar.com; Jeff.France @lennar.com
Subject: Fw: Braced Wall Engineering
Troy:
Here is the response from Ulteig Engineers, regarding 3562 Springwood Path, the 4006 B3 elevation of the Pillsbury
braced wall engineering.
Please call or email with any questions. of,velir, 98.14/3
Thank You
LIENNAIT
Tom Tamte
Product Development Mgr
Lennar / Minnesota
tom.tamtePlennar.com
www.lennar.com
Office Phone: 952 - 249 -3001
Cell Phone: 612 - 250 -4021
935 East Wayzata Boulevard
Wayzata, MN 55391
Forwarded by Tom Tamte/WAYZATA/CENT /Lennar on 04/18/2011 11:39 AM
Ryan Mack <Ryan.Mack0Ulteig.com>
04/18/2011 11:19 AM
Tom,
It is acceptable to have a break in the sheetrock in the interior braced wall panel at the landing and stair stringer locations. The top
and bottom connections are still to be made and along the panel length and are probably the most important part of the bracing.
Due to the fact that there is actually more than 6 -feet of full height wall available where this 4 -foot panel is and that the landing and
stringers will provide a bit more stiffness to this panel, it is our opinion that the break in the sheetrock is acceptable.
Thanks,
Ryan
Ryan Mack, PE, SE, LEED® AP
Engineer