Loading...
3562 Springwood Path - Email Lennar - Sheetrock Permit#98243Jeffrey Wheeler From: Tom.Tamte @lennar.com Sent: Monday, April 18, 2011 11:42 AM To: Jeffrey Wheeler; Troy.Hendrickson @Lennar.com; Jeff.France @lennar.com Subject: Fw: Braced Wall Engineering Troy: Here is the response from Ulteig Engineers, regarding 3562 Springwood Path, the 4006 B3 elevation of the Pillsbury braced wall engineering. Please call or email with any questions. of,velir, 98.14/3 Thank You LIENNAIT Tom Tamte Product Development Mgr Lennar / Minnesota tom.tamtePlennar.com www.lennar.com Office Phone: 952 - 249 -3001 Cell Phone: 612 - 250 -4021 935 East Wayzata Boulevard Wayzata, MN 55391 Forwarded by Tom Tamte/WAYZATA/CENT /Lennar on 04/18/2011 11:39 AM Ryan Mack <Ryan.Mack0Ulteig.com> 04/18/2011 11:19 AM Tom, It is acceptable to have a break in the sheetrock in the interior braced wall panel at the landing and stair stringer locations. The top and bottom connections are still to be made and along the panel length and are probably the most important part of the bracing. Due to the fact that there is actually more than 6 -feet of full height wall available where this 4 -foot panel is and that the landing and stringers will provide a bit more stiffness to this panel, it is our opinion that the break in the sheetrock is acceptable. Thanks, Ryan Ryan Mack, PE, SE, LEED® AP Engineer 5201 East River Road Suite 308 • Minneapolis, MN 55421 Direct: (763)277 -0115 www.ulteig.com To "Tom .Tamte(@lennar.com" <Tom.Tamte(Iennar.com> cc Subject RE: Braced Wall Engineering 1