Loading...
1867 Deer Hills Tr - COCCity: of kali SANITARY SEWER SYSTEM CERTIFICATE OF COMPLIANCE for INFLOW & INFILTRATION City of Eagan, Minnesota pp Property Addr l -1 , _ �' ` S (r COMPLIANCE WITH INITIAL INSPECIION --This is to certify that the property listed above has been inspected by authorized City personnel on 6 - , 201 and found to be in compliance with Section 3.40 of the City Code and no corrective work was required COMPLIANCE AFTER CORRECTIVE WORK PERFORMED n This is to certify that the property listed above has been found to be in compliance with Section 3.44 of the City Code after satisfactorily completing the required corrective repair work under (check all that apply): fl City Sanitary Sewer Permit n City Plumbing Permit NOTE: Applicable only if box is checked: nBased on a review of the Sewer Service video inspection /report on file, it is recommended that periodic cleaning or ,future inspections be performed to minimize a potential blockage due to: Grease Build -up, Root Intrusion, Dip /Settlement in Pipe, Other. City Approved: l CLA-4_ Print name White Copy: Property Owner Signature Yellow Copy: City of Eagan (Parcel File) Date City of Eagan / /. () if rev 2 23 2010