1849 Kathryn Cir - COCSANITARY SEWER SYSTEM
City of Ea Lall CERTIFICATE OF COMPLIANCE fol 411 city of Eapil
INFLOW & INFILTRATION
City of Eagan, Minnesota
Pt oper ty Add r ess: / / 7 k2- (yin .
COMPLIANCE WITH INITIAL INSPECTION
This is to certify that the property listed above has been inspected by authorized City personnel on Zt-d , 201A
and found to be in compliance with Section 3.40 of the City Code and no corrective work was required
COMPLIANCE AFTER CORRECTIVE WORK PERFORMED
This is to certify that the property listed above has been found to be in compliance with Section 3 40 of the City Code
after satisfactorily completing the required corr ective repair work under (check all that apply):
City Sanitary Sewer Permit
City Approved:
Print name
White Copy: Property Owner
City Plumbing Permit
NOTE Applicable only if box is checked: 1 (Based on a review of the Sewer Service video inspection /report on file, it is
recommended that periodic cleaning or future inspections be performed to minimize apotential blockage due to:
Grease Build -up, Root Intrusion, Dip /Settlement in Pipe, Other:
Yellow Copy: City of Eagan (Parcel File)
�ic�� L
Date
rev 2 23 2010