Loading...
3420 Eagan Oaks Ct*. C!ty of Evan 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 Use BLUE or BLACK Ink For Office Use Permit#: /C /5-7 7 Permit Fee: 75 Date Received: Staff: 2011 RESIDENTIAL BUILDING PERMIT APPLICATION Date: Site Address: Unit #: RESIDENT / OWNER Name: Faalaat ( )Z5 7®+-cunhn:pte, J455 kr Phone: 6 t2.—ZZ I--0' 3a 0,),,k6GT Address / City / Zip: 3q is r.�s !a-7a.+l Applicant is: Owner Contractor TYPE OF WORK Description of work: 1Ct,Y' ®-PP / /twee: Construction Cost: /3l5-00 Multi -Family Building: (Yesx / No ) CONTRACTOR Company: ev� Ascere5 LSC..,, Contact: #f"6i2 p`ff14-i:1 %a'Z Address: t /631 4/ `517 , 1E Chu lur�,l� State: /4/(/ Zip: 7-I341 Phone: 6 fa—Z�i--'O cr 0 C License #: Z b t 3( 5 Lead Certificate #: If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) 464- pre. 7e, In the last 12 months, Yes No If COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING has the City of Eagan issued a permit for a similar plan based on a master plan? yes, date and address of master plan: Licensed Plumber: Mechanical Contractor: Sewer & Water Contractor: Phone: Phone: Phone: NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.qopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code mus days of permit issuance. Applican s Printed Name 4/(,(17" Applicant's Signature be completed within 180 Page 1 of 3 41,11/ City of Bain 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 Use BLUE or BLACK Ink For Office Use Permit#: Permit Fee: /o Date Received: Staff: 2016 RESIDENTIAL BUILDING PERMIT APPLICATION Date: 5/25/2016 Site Address: 3 4 b 0.a Q.. k 0 A -V --S Cr Unit #: J Resident/ Owner Name: Eagan Oaks Town Home Assn/ -1-„, ) Phone: 952-238-1.121 ` c/o Personal Touch PO Box 5233 Hopkins, MN 55343 Address / City / zip: p Applicant is: Owner ✓ Contractor Type of Work Description of work: Garage door replacement Construction Cost: $1 3152.64 Multi -Family Building: (Yes ✓ / No Contractor If the project is exempt Company: Custom Door Sales, Inc Contact: Amy Egan Address: 5005 Hillsboro Ave N City: New Hope State: MN Zip: 55428Phone: 763-535-0042 Email: aegan@customdoorsales.com License #: Lead Certificate #: from lead certification, please explain why: In the last 12 months, Yes No COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING has the City of Eagan issued a permit for a similar plan based on a master plan? If yes, date and address of master plan: Licensed Plumber: Mechanical Contractor: Sewer & Water Contractor: Fire Suppression Contractor: Phone: Phone: Phone: Phone: NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building ade-must be completed within 180 days of permit issuance. x T'11M Applicangs rinsed N me Page 1 of 3