Loading...
989 Trillium Ct - Permit#100374 - Email re: Meets & Exceeds Mfg. Requirements Jeffrey Wheeler From: John Roise [John.Roise@lindsaywindows.comj Sent: Wednesday, November 16, 2011 11:18 AM To: Jeffrey Wheeler Cc: dan@craftsmenhomeimprovements.com' Subject: FW: installation inspection Jeff, this relates to the job which Craftsman homes did on this job. Based on how they installed this window, it meets and exceeds the manufacturer requirements for installation. I have copied them on this a mail so they will get you the permit # and job address. Let me know if you need any additional information from me. Thank you, John Roise President From: Dan Bydlon fmaiIto: danC@craftsmenhomeimprovements.comj Sent: Friday, November 04, 2011 10:29 AM To: Terri Budahn Subject: RE: installation inspection Job order # 72814 Blasl/Schwartz This window was installed with an application of Barricade flashing tape over the integrated nail fin that is part of the extruded half round frame. There also is a flexible 1 channel which was caulked to the roundtop window. An additional layer of Barricade flashing tape was installed over that. We have found Barricade flashing tape to be the best and most expensive product available. You may call Jim (Installer) with any questions at 651-248-4296 or you may reach me at 651-430-2244. Thank you, Dan Bydlon 1