Loading...
3627 Springwood Ct - Permit#98202 Affidavits 3627 Springwood Ct Permit # 98202 10/3/11 JTW final - provide the garage door mfg spec for location of the added struts for wind loading - post Revised energy code compliance sheet in the mech room - provide an affidavit from each installer, that each of the items listed below were installed as per the approved plans or engineering that applies 1 install correct amount of concrete anchors 14 or use bolt opp 2 add 2nd floor strapping per plan 3 foam wires in cold air return in the floor by house to garage sheetrock at designated braced wall panels fastened as per the engineers spec sheathing at designated braced wall panels fastened as per the engineers spec Jeffrey Wheeler From: Matthew Remund [Matthew.Remund@Lennar.com] Sent: Thursday, December 08, 2011 12:54 PM To: Jeffrey Wheeler Cc: Troy Hendrickson Subject: 3627 Springwood Court Affidavits Attachments: 20111208125227388.pdf Jeff, Here are those affidavits you requested for 3627 Springwood Court's building final. Thank you, LE A Matthew Remund Construction Manager Lennar matthew. remu nd(Nennar. com www.lennar.com Cell Phone: 612-998-7796 16305 36th Avenue N, Ste 600 Plymouth, MN 55446-4270 1 i NORTHLAND CL L R 1 TO r INS.. Blaine Peterson President/O wner .80121 136' Street Princeton, Minnesot* 55371 612-366 3614 763-3.89-4969 Email. n usfamily net Obtober 10., 2011 'City of Eagan; In regards to 3,627 Spirigvuood Court ;Eagan, M-N Pxkm T' 9 The following items were installed per the plan: Added second ffoar strapping i Sheathing at desind braced wall panels correct amount of'concrete anchors T1ia Yo B am..... Peterson -President/Owner._........ _ To:Matthew Redmund Lennar From: Terry Hesli Sunrise Electric Date: 11/7/2011 Re: 3627 Springwood Ct Pin %r# 98,zv~ This is to verify that the wires were foamed in return in floor by house togarage at 3627 Springwood Court. Thanks, Terry Hesli unrise Electric