3627 Springwood Ct - Permit#98202 Affidavits
3627 Springwood Ct
Permit # 98202
10/3/11 JTW final
- provide the garage door mfg spec for location of the added struts for wind loading
- post Revised energy code compliance sheet in the mech room
- provide an affidavit from each installer, that each of the items listed below were installed as per the
approved plans or engineering that applies
1 install correct amount of concrete anchors 14 or use bolt opp
2 add 2nd floor strapping per plan
3 foam wires in cold air return in the floor by house to garage
sheetrock at designated braced wall panels fastened as per the engineers spec
sheathing at designated braced wall panels fastened as per the engineers spec
Jeffrey Wheeler
From: Matthew Remund [Matthew.Remund@Lennar.com]
Sent: Thursday, December 08, 2011 12:54 PM
To: Jeffrey Wheeler
Cc: Troy Hendrickson
Subject: 3627 Springwood Court Affidavits
Attachments: 20111208125227388.pdf
Jeff,
Here are those affidavits you requested for 3627 Springwood Court's building final.
Thank you,
LE A
Matthew Remund
Construction Manager
Lennar
matthew. remu nd(Nennar. com
www.lennar.com
Cell Phone: 612-998-7796
16305 36th Avenue N, Ste 600
Plymouth, MN 55446-4270
1
i
NORTHLAND CL L R 1 TO r INS..
Blaine Peterson
President/O wner
.80121 136' Street
Princeton, Minnesot* 55371
612-366 3614
763-3.89-4969
Email. n usfamily net
Obtober 10., 2011
'City of Eagan;
In regards to 3,627 Spirigvuood Court ;Eagan, M-N Pxkm T' 9
The following items were installed per the plan:
Added second ffoar strapping
i
Sheathing at
desind braced wall panels
correct amount of'concrete anchors
T1ia Yo
B am..... Peterson
-President/Owner._........ _
To:Matthew Redmund
Lennar
From: Terry Hesli
Sunrise Electric
Date: 11/7/2011
Re: 3627 Springwood Ct Pin %r# 98,zv~
This is to verify that the wires were foamed in return in floor by house togarage at 3627
Springwood Court.
Thanks,
Terry Hesli unrise Electric