2111 Cedar Grove TrCity of Eapll
Address: 2111 Cedar Grove Tr
Zip: 55122 Permit #: 102540
The following items were / were not completed at the Final Inspection on:
g//,3// 2
Final grade - 6" from siding
Permanent steps — Garage
Permanent steps — Main Entry
Permanent Driveway
Permanent Gas
Retaining Wall or 3:1 Max Slope
Sod / Seeded Lawn
Trail / Curb Damage
4,
Porch
Lower Level Finish
Deck
Fireplace
• Verify with your builder that roof test caps from the plumbing system have been removed.
• Turn off water supply to the outside lawn faucets before freeze potential exists.
• Call the Engineering Department at (651) 675-5646 prior to working in the right-of-way or installing an
irrigation system.
Building Inspector:
L
G:\Building Inspections\FORMS\Checklists
6L/0 two - o'r 6e.. 6r
CityEakallgeof
3830 Pilot Knob Road i f7.:7
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
Y-
2011 COMMERCIAL Cv IGS(/
BUILDING PERMIT APPLICATION
Date:Cf l5 (r Site Address: )64411' tke,vce
Tenant Name:
Use BLUE or BLACK Ink
For Office Use
Permit #: /D 57 O
Permit Fee: 772
Date Received:
Staff:
/1
PROPERTY OWNER
TYPE OF WORK
CONTRACTOR
RCHITEC
Name:
&L/6
(Tenant is:
Former Tenant:
Address / City / Zip: /d,3b5 361
Applicant is: Owner
Description of work:
Construction Cost:
Ak
Contractor
et( 913
Name:
Address: 6f dirt
//
State: P"[i;
Contact:
Name: /
Address: 46)6rr
State: 4144tr Zip: 512,43hone:
T
1 L
Al
New / Existing) Suite #:
Phond
A9,/ Ai - 1I
License #:
etr
7
/L z
L m1L
UU City: /1,21f Q L4 t
Zip: ` r9' l �7d Phone: 64
/2 - L/q®-
Jek5en, Email: l dy kf“d, dek
Contact Person:
Licensed plumber installing new sewer/water service: 4l' Coq
NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of
the information may be classified as non-public if you"provide specific reasons, that would permit the City.to
conclude that the are trade secrets.•
Email:
Registration #:
City: ` / !'t#U o 1
Phone #:401 07 ;i - es e /
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. www .00pherstateonecall org
I hereby acknowledge that this information is complete and accurate;
that
be
conformance with the ordinances and
codes of the City of Eagan; that I understand this isnot a permit, but only an appl c ti nIfor a'n permit, and work is not to start without a
permit; that the work will be in accordance with the approved plan in the case of work w
re�✓iew nd approval of plans.
x rL,
Applicant s Printed Name
'iG �St1'v
Page 1 of 3
ill ( adoc
SUB TYPES
Foundation
7 Single Family
Multi
01 of _ Plex
Accessory Building
WORK TYPES
New
Addition
Alteration
Replace
Retaining Wall
DESCRIPTION
Valuation
Plan Review
(25% ✓ % _)
Census Code
# of Units
# of Buildings
Type of Construction
✓ /Sheathing
Sheetrock
Reviewed By:
RESIDENTIAL FEES
Base Fee
Surcharge
Plan Review 1.5
MCES SAC
City SAC
Utility Connection Charge
S &W Permit & Surcharge
Treatment Plant
Copies
Fireplace
Garage
Deck
Lower Level
— Interior Improvement
Move Building
Fire Repair
Repair
II z/b
K t5
RE9UIRED INSPECTIONS
v/ Footings (New Building)
Footings (Deck)
Footings (Addition)
t *Foundation
Drain Tile
‘7 Roof: /Ice & Water ✓inai
Framing
Fireplace: _Rough In Air Test __Final
Insulation
TOTAL
6/16)(-1. O NOT WRITE BELOW THIS LINE
_ Porch (3- Season) _
Porch (4- Season)
Porch (Screen /Gazebo /Pergola) _
Pool
Occupancy 1 8c fZ
Code Edition
Zoning
Stories
Square Feet
Length
Width
MCES System
SAC Units
City Water
Booster Pump
l78 /, ,d PRV
Fire Sprinklers
32—
Mee 2461
9.
Gitraj(.
Storm Damage
Exterior Alteration (Single Family)
Exterior Alteration (Multi)
Miscellaneous
— Siding _ Demolish Building*
_ Reroof _ Demolish Interior
_ Windows _ Demolish Foundation
_ Egress Window — Water Damage
*Demolition of entire building - give PCA handout to applicant
1 3 D
Meter Size:
Final / C.O. Required
Final / No C.O. Required
HVAC Gas Service Test Gas Line Air Test
Other:
Pool: Footings Air /G). Tests
. Siding: ,___Stucco Lath Stone Lath
Windows
Retaining Wall: _ Footings _ Backfill Final
v/ Radon Control
,/' Erosion Control
, Building Inspector
Final
Brick
Rao/ 4S4,1)(9e.Z3!41 37q. j
upper Flccr 1 101.7 $ 90.23 = 9 40(0, 39
407 x 38,t i = 15;02,43
Tea I I7G / 1.83, %
Page 2 of 3
MULTI - FAMILY
/ o(o
PLAN REVIEW FOR COMPLIANCE WITH AIRCRAFT NOISE ORDINANCE
Submitter:
Lennar
16305 36th Ave. No.
Suite 600
Plymouth, MN 55446
952 - 249 -3000
Noise Impact Area
Airport - MSP International
Noise Zone - 4
New Infill Residence is a "COND"
use in Noise Zone 4
Plan. Reviewed: 429 - Reoe9j 5
Information Submitted:
Annotated architectural drawings including:
Windows: Atrium
Swinging Patio Doors: Atrium
Entry Doors: Therma Tru
Skylights: N/A
Compliance with STC Requirements:
Average window /wall area for exterior wall: ZO, 2 7
With this window /wall area ratio and STC 40 walls, windows
with an STC 30 can be used to meet the noise reduction
requirements;
Summary:
Other measures including duct bends and caulking are being
taken to ensure minimum transmission of noise through the
exterior building shell so that the construction should meet
the compatibility guidelines.
Therefore, the materials and construction as proposed should
meet the requirements of the Eagan aircraft noise ordinance.
Review Completed (date): f • f \ `
Review Completed by: Tom Tamte
Compliance with Procedures to Ensure
Adequate Noise Attenuation:
Exterior wall construction:
Vinyl
15/32" sheathing
Tyvek wrap
2x6 studs 16" O.C.
R -21 batt insulation with 1/2" gypsum board
Roof Construction:
Peaked roof with manufactured trusses 24" O.C.
Roof vents
Shingles
15# felt
1/2" sheathing
Blown insulation R-44
5/8" gypsum board
Mechanical Ventilation System:
2 -ton central air conditioning unit
Window, Door Frame, Perimeter and Other Seals:
All window and door openings are to be caulked
with butyl -based caulk
Fireplace Chimney Cap:
N/A
Ventilation Duct Exterior Wall Penetrations:
AU exterior ducts will have bends as required
by the ordinance
Door and Window Construction:
Windows: Atrium (30 STC)
Sliding Patio Doors: Atrium (30 STC)
Entry Doors: Therma Tru (29 STC)
Skylights: N/A
Other Exterior Wall Penetrations:
Sill sealer between plates and blocks
Date:
T
otEaQau
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
2012 FIRE SUPPRESSION SYSTEMS PERMIto Add "
Use BLUE or BLACK, ink
..ar
Office Use l ,
Remits: 0 4
ai
Permit Fee_ 0(. kJ3
Date Received:
PLICATION*
FIRE
DESCRIPI
FEES
S60.00 (includes State Sure ) OR C Yale
thePer114 is Mss mart $10.010, s
the F' is a $10,010. surcharge S1.000 Petted Fee
a 510,010411.010 Permit Fee
$231.0
&--dcria_Caeotit&
CALL BEFORE YOU MS. can &whey State one c*II at (
Cad 48 hours before you intend to dig to receive locates of underground
2
fnd
PERMIT
City of Eagan Permit Type:Plumbing
Permit Number:EA107809
Date Issued:10/29/2012
Permit Category:ePermit
Site Address: 2111 Cedar Grove Tr
Lot:4 Block: 1 Addition: Nicols Ridge 4th
PID:10-50903-01-040
Use:
Description:
Sub Type:e - Water Softener
Work Type:New
Description:Water Softener
Meter Size Meter Type Manufacturer Serial Number Remote Number Line Size
Comments:Charles Sundean
8201 Old Central Ave
spring Lake Park, MN 55432
763-286-6956
Fee Summary:PL - Permit Fee (WS &/or WH)$55.00 0801.4087
Surcharge-Fixed $5.00 9001.2195
$60.00 Total:
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Contractor:Owner:- Applicant -
Us Home Corp
16305 36th Ave N
Minneapolis MN 55446
Water Doctors Water Treatment Company
8201 Old Central Ave, Suite F & G
Spring Lake Park MN 55432
(763) 535-1800
Applicant/Permitee: Signature Issued By: Signature
C!ty of Ea2aii
3830 Pilot Knob Road
Eagan MN 56122
Phone: (651) 675-5675
Fax: (651) 675.5694
Use BLUE or BLACK Ink
For Office Dee
Permit*_ 1 f t 35
Pemtit Fee: V • 5J
Date Received: / l(i Il
Staff:
2014 RESIDENTIAL BUILDING PERMIT APPLICATION
a /� 2/.2.3-:2/.2.3-:a /off
Cate: 3 7
fo! .Z Site Address: �09j ��/i� ,�i/3� a�i3 - a 0/ 7 r o?%/f/,,,V,A Unit #:
Resident/ Name; c 1'i'd(own wnAP,I4e5 Phone: ?6J-) 2 `-/
-6
Owner Address / City / Zip: a > D 9 t- --o7 6 ro ti / �zt . � , a_ yq - j2Z)
Applicant is: Owner L Contractor 7��
Type of Work
. Contractor
Description of work: (r�� e 44
Construction Cost a O , S-6) 0
Multi -Family Building: (Yes? / No )
Company: .7 Utz 45/c W /-1/ m vo p- l 7 Contact: v /y 4 4 /✓ r�✓d� C! _
Address: /I/ 2R3^ �(�✓. %• /N L SC ✓M7 / . the. /11,'//e
City: �v�
State: /1VU Zip: cS 3 Q 6 Phone: c1 8 7 6 6 3 6
_ /
,� dib /
License #: /�� U 7/5-0 Lead Certificate #.
If the project is exempt from lead certification, please explain why: (see Page 3 for additional information)
COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING
In the last 12 months, has the City of Eagan Issued a permit for a similar plan based on a master plan?
_Yes No If yes, date and address of master plan:
Licensed Plumber:
Phone:
Mechanical Contractor: Phone; _
Sewer & Water Contractor: Phone:
NOTE. Plans and supporting documents that you submit are considered to be public information. Portions of
the hiformatlon may be classified as non-public if you provide specific reasons that would penriit the City to
„_�, conclude that they are trade secrets.
CALL BEFORE YOU DA Call Gopher State One Call at (681) 454-0002 for protection against underground utility damage. Call 48 hours
before you intend to dig to receive to
catea of underground utilities. Brw.gogl erstateonecall.org
I hereby acknowledge that this information is complete and accurate; that the work will be In conformance with the ordinances and codes of the City of
Eagan; that I understand this Is not a permit, but only an application for a permit, and wort Is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
Extador work authorized by a building permit issued In accordance with the Minnesota State Build' Lest be completed within 180
days of permit issuance.
6P c n ; 4.11/e„.
Applicant rinted Name
Appli —lira Sig
re
Page 1 of 3
� r
New Construction Energy Code Compliance Certificate
I'cr NI IOLS I3uildin�Ce�tiliuite.A building cenificate shalll�c�x�sled in a permtinenity visible Iocnlion incide I)u�c(:erl{flcatc Posled
tlye Uuilding. "I'he coitilicnln s1�x11 be complcteA Iry tlie iniilder�nd sl�Eitl lisi infoona�inn flnd valaes n1'
���,�,��F,��,�b�ss�����,�r:�u}�N��0�.8. s�2a��� place you r
T1uiIp�RAddn.KSOhLeUwrilin�;or1)wrklinyihiil City logo here �
2111 CEDAR GROVE TRL EAGAN
� Nanu uf NesiJen�ixl Cou�rnetor A1N lace� ' n�rr �
LENNAR H MES
Canmunily � Plnu IU � .
�(,`i,'� �� �t ° '�� ,�-� ��-��
THERMAL ENVELOPE RADON SYSTEM
;ype:Check All That Appfy X Passivc(No F'arv)
M.
o m
� � � Active(14'ith f'an und mononreler ar
F" � >, olhcr•systen��rrorrrla•Uig derice}
w _ p � � ° u
• a
o a � V v v
a Q o9 a�C s�7' U � �v �
Insulallon Location � ? z � � u °' w � �
a � yu a, � � v � •d I
as o
�° � [ °' °' � �a 5 au an II
t-°. � z u, w u°„ w°, � ix i� ()iher Pleasc Dcscrilx licrc
13ci<�w(.�:tirc Slab I
I�oundafiou Wall �1 , ;"���r��"'�e�/'4�" _ II
�
Perimeter of Slab nn(,��ade
Rirn Ji�itif(FoundAtimi} T�� 1 �
Rim.ioisl(1"i'loor+) J � �,p�/��-t°'Ga�' ,
V4'ail _
Cciling,itat
CciIin�;,v;tulled
l3xy VVindOwx oY CNiltilCVCt�Cd a��cAs
13onu�room ovcr g:irs�ge
1)escril�c uther insulated arcas
Windows&Doors Hoating or Cooling Ducts Qutslde Conditianed Spaaes
Average U-i�actnr(exchules sk7+lights and one clonr)U: U Not upplictible,ali ducts lueaied in conditic�ned s�ace
�olar Iicat Gain('oefficient(511GC): ,� R-value
MECHANICAL SYSTEMS Make-upAir s�h-crcr7}�p��
Appifancos I{eating Syste�n Dumestic Water I lcater Conling Syslcm x Nol requircd per mcch.codc
t����i��',ypr. nat as EL.�C. R-410A r:„y��-�
i11;���«r:��t�����t- LENNOX A. O. SMITH LENNOX Po���cred
Intcrlockcd�vith crh<�usl de4ice.
n�oa�.� ML193UH045P24 13AGX024 r��,�:•;���:
Inpu�in 45,000 C'��I�acity in 5� Output in 2 OlhCr,dCSCCIbC:
Ralin�;nr Sixe 13'{'US: (iaUons: 'fon+:
lieni l.oss: q2,39q lieFit(inin: 9,529 L�>caiion uf duct or sl'stem�
Struchirc's('alculatecl
N�iJI?or 92 SI:I:R: I:i
ItSPI�%
Csiltulaicd 24,f)00
i'sFRric«c�' COOIII}�}(�FIII: C:Pifl�S
"round ducl OR
MechaNca!Ventilation System "metal duci
Describc any addilional or combined hcating or coolinb systems if installed:(e.6.h+,o li�rriaces or air Combustion Air S�alecl n 7ype
sourcc hcat pump wilh gas bsck-up Ii�rnEtce}: x Nol required�x:r mcch.codc
Setrcl T�, i Passivc:
Ilcat iZecover Ventilator(1IItV) Ca r�city in clins: I.ow: 1lfbh: Other,descrihe:
F..nerg,Y Recover Ventilator(t3RV)Capnaity in ctins: Low: l ligh: t.cx:ation of duc�or systcnr.
X (�11111101IbU5 C�ItifUSl{Il}j I,j�,ta�r;�i���ap�,�iry��,�r�,,,: furnace room
Le>efuion of fan(s),ctescribe: MAS'I'@li ANIl MAIN 13A1'H C1m'a
Capuciq�conliauous�cnlilaliar 1'iilC 40 C�111S: 8O "round duct OR
'Coi�l ventii��ion(inlermiucail+continuous)ralc it�cliais: 21U "melal dt�ct
t `
� t/en�i�ation, Niakeup► and Carnbus�ion �ir �alcutatio�s
5ubmi�tal Form �or New Uwellings .
These blank submtttal forms and fnstructions are available at the Clty of thanhassen website and at City Ha(L The cor�pieted form must be submit-
ted in duplfcate at the tlme of applicatlon of a mechanEcal.perm(t for new constructlon. AddEtionat forms may be downloaded and printed at:
��P://WW�•��.�hanhassen.mn.us/serv/bulld.html. • •
Ske address
. Date
Contractor • l
Completed�
f�_.-- lira! / �d B
S@CtIC111 A
Ventllatian Quantity �
(Determine puantity by using Table N1304.2 or Equation 11-1)
Square feet(Conditianed area incfuding •
Basement—finished or unfinishedj � Total required ventilation C��,1
Number of bedrooms Cantinuous ventilation �
Directions-Determine the tota!and continuous ven�`ilativn rate.by eltl�er.using?abte N2104.2 ar equa#fan 11-1.
The tlrble and equation are below. ' � �
7'able N1104.2 .
Total and Continuous Ventiiation Rates(in cfmj'
� Number of Bedrooms �
� � 2 3 4 5 G .
• Conditioned space(in Tota!/ Total/ Total/ 7otai/ Total/ TofiaE/
Sq��•) � continuous continuous continuous continuous continuous continuaus
J.4Q0-1500 50/QO 75/40 90/QS 105/53 120/60 135/68
� iS01-2000 70J4p 85/43 100/SO 115/S8 130/65 145/73
2001-2500 80/40 95/48. 110/55 125/63 140/7p �.�5�yg
2501-3000 94/45 1Q5/53 I20/60 135/68 150/75 • 165/f3g
3d07.-350Q 100/S{J 115/S$ 33Q/fi5 � 7.45/73 160/80 � 175/88
350].-4p0a �� ix0/55 � 125/63 7,40/70 155/78 17p/85 1$5/93 �
4QQ1-�4500 1Z0/60 135/68 150/75 1bS/83 180/90 195/98
4S01-SQ00 � 130/65 145/73 160/80 J.7S/$8 190/95 205/1p3
50�1-5500� I40/70 155/78 170/85 185/93 2p0/100 21S/108
5501-G000 250/75 . 16S/83 1$0/90 195/98 210/105 225/71g
Equation 11-1 • � ~
(U.02 x square feet of condltioned space)+[iS x(number of bedroorns+1)J=Total ventflation rate(cfm}
7otal ventilation—1'he mechanical ventilation system shall provide sufficient outdoor air to equal the totaf vsntilation rate average,
for each one-hour period according to the above Ca61e ar equation. For heat recovery ventilators(HRV}and energy recpvery ventila-
tors{�RV)the average hourly ventiiation capacity must be determined in cansideration of any reduction of exhaust or out outdoar
air intake,or both,for defrost ar other equipment cyc(ing.
Cantinuaus venHiatJoa•A minimum af S�percent af the tatal ventilatian rate,but not less than 40 cfrn, shall be provided, ar�a con-
tinuous rate��erage for each one-hour period. The portion of the mechanicaF ventilation systPm intecided tp be cantinuaus may
have automatic cycling contrals praviding the average flow rate for each hour is rnet. �
G'15A��TYWK1Vent-makeup-,^,omh air submittat(2).docx F,aQe � Oi 8
� `
Seccian B � •
Ventilation Method
(Choose eRher balanced ar exhavst onlyy
Balanced,�}tRV(Heai Recovery Ventllator}'or ERV jEnergy Recpa xhaust onl
ery VentilatotJ-cfm of un it in!ow must not exceed cantinuous venti- Continupus fan�tfng!n cfm
lation ratin b more Yhan l06�.
Low cfm: Hfgh cfm: Contlnuous fan rating in cfm(cepacity must not exceed
. continuous ventilation ratin by more tlian ip0%) ��
.Dlrections-Ghoose ehe method.pf ventilcrtion,kalanced arexhaust only. Balanted"ventliation systems are tyFiccrlly HRV or fRV's.
E'nt�er the!ow pnd high c�m amaunts. 1.ow c m a►r flow must be equal to or greoter than the required continuous ventilation rate ond
/ess fhan 100R5 greater fhan the contlnuovs rate.(�or instance,lf th�!ow cfm is 40 cfm, the ventrlation fan musf nor exceed 84 cfm.j
Automatic controls may allow fhe ase afa largerfan thai is operpted a percentage of each hour.
Section C
Ventilation Fan Schedule .
escription Location
Cantinuous lntermittent
r.- ��v �' Q
• a �i .
�. .'�.-i
�� 4,�.� w i �� G/U
Directions-The ventilacion fan sthedule should d�scrlbe what the fan is fpr,the locatton,cfrn,and whether Jt is used for continuous
or intermtttent ventilation. The fpn that is chose for contlnuaus ventilatian must be equal to or greater than the fow c m alr rating
and less than 10p%greuter than the continuous rate. (For rnstance,if the Jow cfm is 40 cfm,the contlnuous uent-ilption fan mvst not
exceed 80 cfm,J Automatrc cantrols may aliow the use of a larger fpn tha#is operated a percentage af each hour.
Section.D
� � Ventilafian Controls .
�oescribe operatloa and controi of tha continuous and i�termittent ventllation)
r
Dlrectlons-Describe che operation of rhe ventilcrtiorr system, There.should be pdequaee detall for plan reviewers and�nspeci•ors to verrfy design and
lnstallation campllance..Related trades alsa need adequate deta!!for pincement of cnntrols and prnper operation af the bu!lding venttlation. If
exhousr fans are used for buUding vent!lation,describe the opemtlon ond lacation af any controls,tndreators and lege.nds: !f an ERV or fiRV is to be
lnsta!led,descrfbe how If will be tnsta!led,lf tt w!I!be connected and interfaced wfth the alr handiing equipment please descrlbe si�ch r.annecclons ps
detailed in tire manufactures'fnstallption il�sfructions.!f the Installarlon lnsrruc[lons requJre or recomrnend the equlpment ta be interlacked wfih the
air handling equlprrmenr for prope.r operation,such Interconnectlon shall be made and descrlbed, .
Section E
" Make-ap air � . �'�"
Passive (decermined fram calcufations from Table 501.3.1�
Powered(determined from cafculationS ffom Tabte 501.3.1) """"
Interlocked with exhaust device(determined from calculation fram 7abie SO1.B.1j -""'--------
OYher,describe:
LOC2C�011 Of C�UCi pC 5YSt@I'ri V@fltll2tipfl 171aIC2-Up 8it':Determined from make-up alr opening table
CFm �V�~��� Sixe and type(raund,rectangular,flex or rigld)
{NR means not requir�d) �'- -�-°•-•--------
Page 2 of�
DfreG•tions-In order to derermine the makeup alr, Table 5Q1..�.1 must be�1!!ed out(see below). For most new ins�pllarrons, column A
wi/1 be apprapria[e, hawever,iJ'aimospherically vented appliances orsolld,fue!appliances are insratled,use the a�propriate calumn,
fi'ar- � ,Ing dwellfngs,see 1MC 5QI.3.3. Please note,lf the makeup air quantity Is neyative,no addltianal make�,rp c�/�i,t,�l/be re-
quired far ventilation,ff the value!s positive refer to Table 501.3.2'and'siz��ifie opening. 7"ransfer the cfm,�size of Qp�nlny aRd type
(raund, rectangular,fiex or rigidJ to the lusr line of section D. The make-up a1r supply must be fnstalled per7MC 50.Z.�,z.3. .
Table 501.3.1
PR�CEDURE TO DETERMINE MAKEUP AIR QUANITY FOR EXHAUST fiQUIPM�NT•IN RWELLINGS
(Additiana!combustion aIr w1U be requtred for combustlon eppiiances see KAt3t method fo�calculations)
. One or multipfe pouyer dne or multiple fan• . One atmospherically vent Muitiple atmospherical-
vent or direct vent ap• assistcd applfances and gas or ail appffance or !y yentGd gas or ofl
pliances or no combus- . power vent ar direct vent bne soiid fuel appllance applia�ces or solid fue!
tion appliances appliances appliances
Column C Columh D
CokumnA 'Column B
1.
a►pressure factor ��1� 0�D9 � 0•06 0.03
(cfm/sf} '
b�conditioned floor area(sf)�including � ,
unfinished basements}
Estimated House infiitration(cfm}:(la
x SbJ �„�
2.Exhaust Capacity. . •
a)contfnuous exhaust-only ventilat9on .
sysYem(cfm);(not appficabie to ba- �� �
� lanced ventiiatfon systems Such as
NRV)
b)clothes dryer(ctm} �3S ' 135 135
7.35
c}8090 of iargest exhaust rating(cfm); . .
Kttchen hood typically �
(not applicable 3f reci�culaiing system ��
or if powe�ed makeup air is electrically .
interlocked and match ta exhaust} • .
� d)5096 of next Wrgest exhaust rating
(cfm); bath fan typically �
iVot
(not applicable if recirculating system A I�cab
or ff powered makeup air is eiectrlcally Pp� ��
intertoeked and rnatched to exhaust)
7otal Exhaust Capaciry(cfm); �� , .
(2a+2b+2c+2dJ
3.Makeup Air Quantity(cfmj �
a)tatal exhausi capacity(from abave) �/��
!�
b)estimated house infiitration(fram .�-, � �-�,�� �~�� �-� —'
abovej �(�j'
Makeup Air QuanCity(cfm);
[3a—3bj
{if Jalue is negative,no makeup air is „�.- G/ ('"'� '
needed) J
4.For makeup Air Opening Sizing,refer -"�
to Tabfe 501.a1 � � �~
A, Use this cnlumn if Yhere are ather than fan-assisted or atmospherically vented gas or oll appliance ar if.there are no cambustion appiiances,�power veht
and direci vent appliances may 6e used.)
II. Use this column i1 there is one fan-assisted appliance per venting sysCem.(Appliances other than atmospherically vented appliances may also be in-
cluded.)
C. Use tfiis column if there is one atmospherically vented(other than fan-assisted)gas or oil appiiance per venting system or one soltd fuel appliance.
p. Use this calumn.ff there are multiple atmosphericaily vented gas or ofi appiiances using a common vent or if there are atmosphericalfy vented gas or oit
appliances and soiid fuel appliances, ,
, Page 3 0`6
� Makeup Air Opening Table for New and ExistEng pweNtng . �
Table 501.3.2
One or multipfe power One or muitipie fan- One atmosphericaEiy Multiple atmospherically '
vent,direct vent ap- assfsted appilances and vented gas or oll ap- ve4ted gas or otI ap- Duct di-
ptiances,or no combus- power vent ar direct pliance or one salfd fuei ptiances ar soNd fuet
�tipn appliances vent appliances a IlanCe �meter
Column A pp appliances
Caiumn B Column C 'Gofumn D
Passiveopening i-36 l-22
, 1-15 1-9 g
Passive opening 37—66 23—4� 16—28 IO—17
4
, Passlve opening 67--109 qZ_66
29—46 18—28 5
Passtve opening 110-163 67—i00 47-69 29—42
6
Passive opening 184—232 101-143
Passlveopening 233-317 14A-195 ��—�9 • a3�61 7
PassiveopenEng . 3i6-4�9 1�—Z35 • 62-83 g
196—258 136—179
w/motorizeddam er : �'"��0 9
� Passive opening 420—539 259—332 180—230
w/matorized damper . 111-142 �p
Passiveopenin6 54Q-679 333�419 231-290
w/matorized damper i4�"179 11-
Powered makeup air • >674 �qly �29�
>179 �A
� Notes;
A. An equivalent length of 100 feet of round smooth meta{duct[s assumed. Subtract 40 feel for Yhe exCerior hood and ten feet for each 9p_degree elbow to
determine the remaining length af straight duc#ailowabte.
e. IFflextble duct Is used,increase the duct diameter by one inch. Flexibie duct shail be suetched with mintmal sa�s, Compressed duct shall not be accepted.
C. Bar.ometric dampers are prohibited in passive makeup aEr openings when any atmospheripfiq ver�ted apptiance is instalted.
D. Powered makeup air shall be electricai(y Interlocked with the largest exhauat system.
� 5ecfions F .
Combustion atr
Not required per mechanicai code(Mo acmospheric or ppwer vented gppllances)
Passive(see IFGC Appendix E,Worksheet E-1) • Sise and type
Other,describe; Y
Explr�nation-!f no atmospheric or pawer venfed�pppllances are instafled,check the approprrate box,not required. !f p power venred
or atmospherica/ly vented appliance rnstalled,use/FGGAppendix E, Worksheet E-1(see belowj. Please enterslze pnd type. Cambus-
trnn air vent supplies must communicate wlth the applfance or uppliances that require�the combustion air.
Sectian F calculations follow on the next 2 pages.
PagF 4�af 6
pirec'.;ons-7'he Mrnnesota Fuel Gus Code method ta ralculate to slze of a regulred combustion aJr opening, is ca/!ed r•he Known A!r
?nfi/tratlon Rote Method, For new construction,4b of step 41s requlred ta be fflted aut. �
fFGI.Appertdiz Q,Wofkshcet E-3 , -
ResidentiaE Combustion Air CalculaHon MeYhod �
(for Furnace;Boiler,and/or Water Heatar En the Same Space} •
Step Y:Complete vented combustian appfiance information.
Furnace/f3oiler. /
_Dreft Hood _,,,FartAssisted . �pirect Vent input: G�,;�Btu/hr
or Power Vent
Water Heater: -
_Draft Hoad ,_,_ Fan Assisted _pirect Vent lnput: � �� Btu/hr
or Power Veat •
Step 2:Calcufate the,volume of the Combustlon Appliance Space(LAS)coniaining combustian applfances. •
The CAS includes all spaces connected to one another by code compiiant ope�ings: � CAS volume: � {ty
Step 3:Determine Air Changes per Hour(ACH}1
befauft ACH valves have been iocorporated Ynto TaBle E-1 far use wlth Method 4b(KAIR Method). � �
If the year of construction or ACH is noY known,use meYhod 4a(Standard Method�:
Step A:Determine Naqulred Votume for Combustion Alr.(DO NO7 COUN7 DIRECT VENT APPUANCESj
� ,
4a.5tandard Method '
Tatal Btu/hr input of ali combustion appliances i�put: BtuJhr
Use Standard�Method column in Table E-1 to�ind Total Required TRV: ft'
Volume(7RV) ,
If CAS Votume ffrom Step 2)Is greater ihan 7RV then no outdoar apeaings are needed. '
If CAS Volume(trom Step 2)!s!eu than IYtV then go ta STEP 5.
4b.Nnown Air infiltratio�Rbte�KAIRf Methp@(DO Np7 COU DIRECT VENT APPUANC
Tata{Rtu/hr Inpui of aE!fan-asslsted and power vent applianc Ir�put: Btu/hr
Use Fan-ASSisted Appfiances column in Table E-1 tp find � RVPA: ft°
ReqWred Volume Fari Assisted{RVFA� .
. Total Btu/hr input o€all Natural draft appliances I ut: _ Btu/hr
Use Naturat draftAppkiances column in 7able E-1 to find y�pq; Ka �
� Repufred VolumetVaturai draftappliances(RVNpA)
7otal Repuired Volume(TRV)'=RVFA+ftVNOA TRV= + = 7RV fi'
If CAS volume(from Step 2y!s greater than TRV then no out� or openings are n ded. - �
If CAS Volume(from Step 2�is fnss tharrTRV then go to S'TEl�5. . �
Step 5:Calcuiate the ratio of avalfabie interior voiume ta the total requlred volume.
Ratio=CAS Volume(fran Step 2)dJvided byTRV(frqm SCep 4a ar Step 4b)
Ratio= / _
Step 6:Calcuiate Reductian Factor(RF), --
RF=1 m/nus Ratio �
.,w RF=1- _
Step 7:CalculaCe single outdoor apening as if ali combustian air is from outside, �
Totaf Btu/hr input of all Combustion Appliances in the same CAS Input: 8tu/hr
(EXCEPT nIREGT VENF}
Combustion Air Opening Area(t;AOA):
7otal Btu/hr divided by 3p(}p Btu/hr per in= CAqA= /3pOp 8tu/hr per in�= in'
Step 8:Calcu{ate Minimum CAdA.
Minimum CAOA=CAOA muidp!!ed by RF Minimum CAOA= x - in�
Step S;Calculate CombusCien Air Opening Diameter(CAOD} "-�� '
CAOD=1.13 multlplied by the square root nf Minimum CAOA CAOD=1.13 J Minimum CAOA= ' in.d'tameter
go up o�e inch in size if using flex duct
i If desired,ACH can be determtned using ASHRAE calculation or bfower door test.Follow procedures in SecCion
G304.
�age 5 of 6
tFGC Appendix E,Table E-1 �"- -
Residential Combustion air(Required Interior Volume F3ased on lnput Rating of Appliance)
• Input,Rating � SYandard Method Knanin Air infiltration Rate(KAtR)Method(cu ft}
iAt'u/hr) . .
...... .
� Fan Assisted or Power Vent Natural praft
1994 to present Pre-19g4 1994 to present P re-Z994
5,000 250 � 37S 186 52S
' 10,000 S00 7S0 375 � � 2fi3
15,000 A,O50 S25
750 1,125 563 1,575 788
20,OOQ 1,000 1,500 q5�
25,000 Z,100 1,O5Q I
1,254 ' 7.,875 938 . 2,625 1,313
30,000 1,500 2,250 1,125
35,000 3,154 z,57�
1.750 . 2,625 ].,313 3,675 J.,838
40,000 �2,OOQ 3,000 1,500 4,200
45,000 2,250 2,f0�
50,000. 3.375 1,688 4,725 2,3fi3
2,500 3,750 3„675 S,25Q 2 62S
5S,QA0 2.750 4,125 2,063 5,775 2;$88
60,OQ0 3Aq0 4,500 . 2,254 .6,30U 3,J,50
. 6S,fl0� 3,250 4,875 2,438 6,825 3,418
70,000 3,500 �5,250 2,625 7,�50 3,G7S
75,Q00 3,750 �,b2S 2,813 7,875
' SQ000 4,000 3,938
6,000 3,000 8,400 4,20Q
85,Q00 �,250 6,375 3,188 8,925
90,000 4,5p0 4,463
6,750 3,375 9,450 4,725
95,000 4,750 7,i25 3,563 9,975 4,988
lOQ,000 5,000 7,SOD 3,756 10,50Q 5,250
105,000 5,250 7,875 3,938 11,025 5�513
110,000 5,500 8,250 4,125 11,SS0
11S,Q00 5,750 S,77S
8.625 4,313 12,075 fi,038
12QOp0 6,000 9,000 4,500 12,BOd fi,30Q
225,OOU 6,250 9,375 4,688 13.125 6,563
, 130,000 6,500 9,750 4,875 13,650 6,825
135,000 6,750 10;i25 5,063 14,175 7,08$
240,OQ� 7,OOp . 1tl,S40 5�SO 14,700 7,350
145,000 7,25a 10,875 5,438 15,225 7,613
150,000 7,500 11,�50 5,625 1S,)50 7,875
155,Opp 7,75p 11,625 5,813 16,275
7.60,000 8,000 8,A38
12,000 &,000 16,$00 8,400
�.65,000 8,25Q 12,�75 6,188 17,325 8,66� '
170,000 8,50Q 12,750 � 6,375 i7,854 $,925 �
S75,OQ0 8,750 13,125 6,563 18,375
180,000 �+�8�
9,040 13,SQ0 6,75Q 18.900 9,Q50
185,000 9,250 13,875 G,838 ' 19,Q25 9,713
190,000 � �.,. 9,500 J4,250 7,125 19,350 9,975
3.95,000� � 9,750 14,625� 7,313 2Q,475 10,238
zoo,000 io,000 �.s,000 �,sao � a�.,000 �.o,soo
205,000 � Z0,2S0 15,375 7,688 21,525 10,783 -�
210,000 10,500 15,750 7,875 � 22,OS0 11,025
215,000 10,75Q ib,i25 8,063 22,575
220,000. 11,288
l3,OQ0 16,500 8,250 23,IOQ 11,550
225,000 11,250 1b,875 8,438 23,625 11.813
230,000 1].,500 17,250 8,fi25 24,150 ^ 12,d75
1. The 1994 date refers to dweilings constructed under the 7,994 Minnesota Energy Code:The defauft KAIR used in this sectlon of the table is
0.20 ACH.
2. This section of Yhe tab(e is to be used for dwellings constructed pr'ror to 1994.The default KAIR usad in this seGfipn of the tabte is 0.40 ACH.
Pac�e 6 af fi
� � . � ;� q I rU �b �^J (7 I�71 id, �W �N �.'- Lln� :� � t n' o D � � :,�I '�,.
C7 N �
. .R1 - y . ; ..
� ; �C7 __ — ._ __.. ....Y.._.. ,^. '_ _ n „ m � r i �
fA7 � .�� .....��"' � f a �� �+ �� li
c
y ' � �� � �~• 1 "< '� � '' i
' '� ( � 1 � ( � 1 I � � �.
A i _ _._.•�
�. ' t �� � [ ` r� �- i
� � � I� C �f} " 1 `1 `� ��� � �
� � � �� � � G � U w .�„ta.. '�'d ,
� . •
N `Y
l''J . ° Es � .
—�--`— �t:
i r_ k�.
I„� — � .r� c�� i � ;�
. . �" � �, � c " �
� �' " � �:i� � �
�
: _ � _ ._.__r �__. __ ___._ ��,� "0,,�
" o �G J r� 'Y,
. . � z `� �J f � .. � � � �K� I
"• � (�y ! �`�`� L'1 � `: � , �
� ' ' � ! �l l c,� C " '' • � `�.�
� �. C� � i t.p � �, i � � ;.; i i i j�.,'
r �, ,
°� � ,� � �--� � � j� I � �� � � I �
_
� �, � � rn Y_,
L. N ,•
�
.
_ ;.•{
v � ► �. i
�, .- ._._______.�____._ __..__. _.._. _._
. � ! y D/ � � . '� ._..._ __. iy� "� 'D' '' ' .___.._._......�_.__'_
J _ _� ^ �._�_, 1 �
� . �' = � ; � c: � N`(� .�� N�. _;.. .
�. � j �; Q � � � °
N � ' i ; l`a S `� �c ..�i. �f', � y ..�
� �� �
o: '"' m •"•
' � � I I � �� � ;w,. `rT. c, ''k `' t`'�'. � 'fi iu (,� m ca
°� - �.� `° o
, C _ �_.•__ -� ------ �, .
I r� ( o r �: N ;.
' N .__. .�__�_ I ' � -j�' •-�— � C.. - r t .. � � � _ �
N 1 � p �'r
� ro I I � ____�...._..__1..._ � '�; � � � ; � �
X — -r--- i -,--- ; �� ,� � � ��� �,a
y i ; � r i �(� C� W y��_ �� I � f �
� ^ � � �4 4 C c � � �;, �
� q. � I -t
� i I 1 � �`_` !`� I .� j�' � �'� � , � � � �� �
-- � �:� ° � ��'�
" � ) f ( W j ✓� .�' t^ �� ':.(.�, i�� w
� � . � t � I � i G r, '� ` �' � N '� I� ,- v �
. °
�
: �.. � •,� _
. c _.__.._..---....--------• f I � _ � o ..
� r� . �
o ° ° � i � ' ( I ��t R'�' W `
�
�,
� � i I fi � T ,..°� � c.,
� � � � �� �A w
� W � � I I� �� � ±h � o �3 f!7
, I I I � i � (�� r � �� � + � �
'�-� iD � � � �
i ; ' - ; ,�..t,S,-� I -I�'; :` i�� � ; l ! ro .,
� � � � ' j� ' � ' �5 ' � 1 � � ��
I � � '� ' � I ��� I ' �; � � i ' .._.. �
� � �� i �'; � = i `� ' �? :�,4, . C; i r~ I
� l � � �``. . /1 k '
i I E ( i C ; = � 4� ; �' �C.� G .. I
I � ' ; il �� i� C' � I r ry � ., j :U � � ' I
.
, + M
.
� � � � � � i i� � '��5� k ' ( � i '� • I � �
. ' �..
� j !._......_---___...--�---_ .__------..r_...---�------- ...__. �_ �� ...... _ ... _.. _..... ...
� f + � j � � ��__� ..� _�._ �. T^s ;: �' ��� .� '.�.0
� _� I � �n .�_ i � 1 �I I_ I � �" � �� �� " ��
� v I _T ___.. _� —�;� � � �, i_i�
N t� � �' to n
� � N N �� .� ;:� � (((��� �'C� �
0) I�'., '�"�', ,,y �^��•� .�i� �$� � � �.
�,. {'� X, �� N
�' � � •\ � �' ; .
�r'" i�! c-' ' � -'
. �!' � .+
. N G � � ° � � � � (�' y
I � � �J � � �
, . A: �
_...
. , � � , i,,,� I � `r,�, , L-., � I V;a � ;;� � 1 � (`� .� !T
�
;
- . �_-- �-- �} �� �� � 7�
,�...----------.__.._._.__..______ ._._..._.�...__.____ .--..._.__.._____.__.__ �, � G'
� 1 r
Lennar- Model 429 B
HVAC Load Calculations
for
Lennar Homes
��
� '�"�� ��TI�J�`�I"T�'�T.,
H�`�L� I.,C�A1�C�
Prepared By:
!
Sabre Plumbing And Neating
Tuesday,August 23,2011
_____---_---._......._............._.._._______._.---....._..---___-------._.----.___.._...._.._...._..........___.
.._,.._._..___......_.___.---.------------------------....... ...... --___......---.__�._l
a _ v R'� � 9`�
�7�Q Sf,L��.�V � ! �y { �: '� �`k'x"'c`".�"...""..;•R—�s�—.,�
.c . � <fr' {Y �, i
� ....... �,.._...- �.._� . 5 h �.�. .. . �
. ... .�. . ... .. . . .. . .�_..� . � '.
Project Title: Lennar-Model 429 B
Project Date: 8/23/2011
Client Name: Lennar Homes
Company Name: Sabre plumbing And Heating
�
Reference City: Minneapolis, Minnesota
Building Orientation: Front door faces Na�th
Daily Temperature Range: Medium
Latitude: 44 Degrees
Elevation: 834 ft.
Aititude Factor. 0.97Q
Elevation Sensible Adj. �'actor: 1.00Q
Elevation Total Adj. Factor: 1.000
Elevation Heating Adj. Factor: 1.OQ0
Elevation Weating Adj. Factor: 1.000 �
Outdoor Outdoor Outdoor indoor lndoor Grains
Dry Bulb Wet Bulb ReE.Hum Rel.Hum �,Bulb Differenc
e
Winter: -16 -92.38 100% n/a 72 n/a
Summer: 90 73 45% 509'0 75 32
Total Building Supply CFM: 488 CFM Per Square ft.: 0.27
Square ft. of Room Area: 1,787 Square ft. Per Ton: 2,26
Volume(fti)af Cond. Space: 14,775
Total Heating Required Including Ventilation Air: 42,399 Btuh 42.399 MBH
Tatal Sensible Gain: 6,202 Btuh 65 %
Totat Lafent Gain: 3,327 B#uh 35 %
Total Caaling Required Including Ventilafinn Air: 9,529 Btuh 0.79 Tons(Based On
Sensible+ Latent)
Cafculafions are based on 8th editian of ACCA Manual J.
Ail computed results are estimates as building use and weather may vary.
Be sure to sefect a unit#hat meets both sansible and latent loads.
C:1Program FileslEtitelF2hvacw\ProjectslLDK Fairbanks.rhv 7uesday,August 23, 201't, 2:24 PM
_._�..__�_._..`---------------_._--�--------.._...-------------- ------..__.__.-----....______ ---.__.._.._.__
� -'
,�.4.,c'�C�f��"��/)LW����� �.,,, .t.., �; ,�--�--
_ x x
.,, � ,�.�,.. .. :-� ..u.
Min Mln Sys Sys Sys
Has Net Rac k.l Sen Lat Nel �n �� Clg Htg Cig q� Duct
Scope AEO Ton Ton lfon Area Gain Gai� Galrt Loss CFM CFM CPM CEM CPM Size
Building ���_'� 0 79; 1 11� 1,620 1,797i 6 202' 3 327„ 9 529� A2,399; 488� 243s 488j 243t 488:� ��M
..._
System 1 � No Q 79� 1 11 1.620 1 797t 6 202i 3 327 9 529�42 399t .488 243,���$ 243, 488� 8x12
.. , . , �
Ventilat�on . ; 1 012� 3 327 4 339� 5,938 � t i
za�e 1 � j ; � 1 T97 519Q� 0 5'190 3G,A64� 488; 243" �� �t 243 488� 8x12
1 Dimm�g/Living Room ' � ! 373° 2 242 0 2 242' 20 455 27A� 105� �� 1d5F 274? 2--7
.. ,
2 Mud Room/Bath/K�tchen 1 � 400� 475 0 A75� 2 838i 38� 22 22j 383 1 -4
3-MasterBedroom FrontHalt � '. ( 220! 869� 0 869 4042 54f 41= ���. 41� 54� 1--4
4-Bed2And3 � I � t 480� 1262 0 9 262� 7,543 1Q1 59� ` 4
. ... _ � t ...l. . ... _. . 1 .� ���f _..594 101 1 -6
. ...., �...
5-Lofr i Master 8ed I Baths ! ' i = i 384' 349 3 0 i 341 i 1,589� 21� 16,����} 16f 21? 1--3
_._....... .. . ........ . . , ...
� r ..... � .. . ; �. ,__ ,,..
� i ` I I !
�
(
C:1Program FileslElitelRhvacwlProjectslLDK�airbanks.rhv Tuesday,August 23, 2011, 2:24 PM
--...___._.____---�--�..__-_-.----
. _.._...- --- —��.._.__._..._...._._.._._..___.._----------_...---------__................._.--.._._..
---�-��... �` �" .�. . ------
. � ; ; .
�
(�7o��r��r��� � f ry � :s ,
--�.--... ._.�..,_.,
. �.� �utnr�a� ' �oad� � , �l"k�
„_....� _ ... �'_ .....,..... .�..�� ,
\,h.1.ln ~ ��.,��
4A-1v-a: G(azing-Oouble pane low-e{e=0.2Q or less), 35 616 0 740 740
operab(e window, e=p,20 on surface 2, viny!frame, u-
value 0.2,SHGC 0.3
4A-1v-o: Giazing-Double pane low-e(e=0.20 or less), 70 1,848 0 1,164 1,164
operable window,e=0.20 on surface 2, vinyf frame, u-
value p.3, SMGC 0.2
11 P: Door-Metal-Polyurethane Core 31.3 798 0 236 236
12B-Osw: Wall-Frame, R-19 insulation in 2 x 4 stud 422 3,602 Q 986 986
cavity, na board insulation, siding finish,wood studs
17A-12: Roof/Ceiling-Roof Deck(raofing,wood, 50 278 0 132 732
insulation)or SiP Panels Supported on Beams, t]ark
or 8old-Co1ar Asphalt Shingle, Dark Metal, Dark
Membrane, Dark Tar and G�avel, 1.5"wood plus R-
12 insulation
16CR-50: Roof/Ceiling-Under A#tic with Insulation on Attic 384 676 0 307 307
Flaor(also use for Knee Walls and Partition
Ceilings), Vented Attic with Radiant Barrier, Dark
Asphalt Shingles or park Metal,Tar and Gravel or
Membrane, R-50 insulation
20A-Oc: Floor-Overopen crawl space or garage, Passive, 393.3 10,615 0 1,206 1,206
no insulation, carpet or hardwood
20P-19-c: Floor-Over open crawl space or garage, 761.6 3,351 0 381 381
Passive, R 19 blanket insulation carpet caverin�
_ ......... __ _.... ... _ __.. _. ........... ...... ...
Subtotais for structure: 21,784 0 5,152 5,152
Peop(e: p p p p
Equipment: 0 0 0
Lighting: 0 0 0
Duciwork: 94,680 0 0 0
infiltration:Winfer CEM: 0, Summer CFM:0 0 0 0 0
Ventilation: Winter CFM: 158, Summer CFM: 158 5,936 3,327 1,012 4,339
AED Excursion: 0 0 3$ 38
Total Building Load Totals 42,399 3,327 6,202 9,529
Total Building Supply CFM: 488 CFM Per Square ft.: 0.27
Square ft. of Room Area: 1,797 Square ft. Per Ton: 2,26
Volume(fti)of Cond. Space: 14,775
Total Heating Required Including Ventifation Air: 42,399 Btuh 42.399 MBH
Tofal Sensible Gain: 6,202 Btuh 65 %
Total Latent Gain: 3,327 Btuh 35 °!o
Total Cooling Required lncluding Ventilation Air: 9,529 Btuh 0.79 Tons{Based On
S�;nsible+ Latent)
Calculations are based on 8th edition of ACCA Manual J.
All camputed results are estimates as building use and weather may vary.
Be sure fo seleot a unit that meets both sensible and latenf loads.
i
I
�
.__-----_.._._.-----�.---------------.___.----_...__.._...._._.._..______..__._._..__.__._...___....________..__._.___.._,__._.__.__.._..�...�1
C:tt'rogram FileslClitelRhvacwlProjecfs�LDK Fairbanks.rhv Tuesday,August 23, 2011,2:24 PM