Loading...
4261 Meghan Lane4° City of EaQall 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675 -5675 Fax: (651) 675 -5694 RECEIVED JAN 2 4 2012 2011 RESIDENTIAL BUIL Date: / Address: '� << n Use BLUE or BLACK Ink For Office Use Permit #: Permit Fee: Date Received: Staff: ING PERMIT APPLICATION J Unit #: NOTE Plans and supporting documents that you submit are considered to be public information Portions o1 the information may?be classified as non pu blic i'f y ou provide specific reasons that would p ermit > he City to - � . _. s h., ciudethat they are t rade= secrets; CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454 -0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.qopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Buil in • ' ode st be completed within 180 days of permit issuance. ! i A .„ 44 „..„,„... � ' x / ii,v 11 0. - C�.c. rte LL x _ , �! � '��� Applicant's Pr nted Name • pplican" nure Page 1 of 3 qu-o SUB TYPES Foundation Single Family Multi 01 of Plex Accessory Building WORK TYPES New Addition Alteration Replace Retaining Wall DESCRIPTION Valuation Plan Review (25 %_ 100% Census Code # of Units # of Buildings Type of Construction Fireplace Garage Deck Lower Level Siding Reroof Windows Egress Window Interior Improvement Move Building Fire Repair Repair REQUIRED INSPECTIONS Footings (New Building) Footings (Deck) Footings (Addition) Foundation V Occupancy Code Edition Zoning Stories Square Feet Length Width Drain Tile Roof: Ice & Water _Final Framing Fireplace: _Rough In Air Test _Final Insulation Sheathing Sheetrock Reviewed By: RESIDENTIAL FEES Base Fee Surcharge Plan Review MCES SAC City SAC Utility Connection Charge S &W Permit & Surcharge Treatment Plant Copies DO NOT WRITE BELOW THIS LINE TOTAL Porch (3- Season) _ Porch (4- Season) _ Porch (Screen /Gazebo /Pergola) _ Pool Demolish Interior Demolish Foundation Water Damage *Demolition of entire building - give PCA handout to applicant 3 Demolish Building* MCES System 1/ , v02 SAC Units City Water Booster Pump PRV Fire Sprinklers Meter Size: Final / C.O. Required Final / No C.O. Required aevh-rh, 5aulAi- i-fin 11 00(1#4 ,, K Storm Damage Exterior Alteration (Single Family) Exterior Alteration (Multi) Miscellaneous HVAC _ as S rwi a Te t Gas Line Air Test Other: ( 'L - Pool: _Footings _Air /Gas Tests ,Final Siding: _Stucco Lath _Stone Lath _Brick Windows Retaining Wall: _ Footings Backfill _ Final Radon Control Erosion Control , Building Inspector Page 2 of 3 H 9(4 f o~5~ j t4 a 44,55 Use BLUE or BLACK Ink ~d S7, , a sq ~ i For Office Use I `T I Permit 11~ a c~ City of Ea I Permit Fee: ~3 25 o I 3830 Pilot Knob Road I I Eagan MN 55122 Date Received: Phone: (651) 675-5675 I I Fax: (651) 675-5694 I Staff: I I I 2013 RESIDENTIAL BUILDING PERMIT APPLICATION Date: C Site Address: t` Unit Name:~~ j ~n~?h Phone: Resident/ a Owner Address/ City/ Zip:. 11 F6 Va+ , S S1:JU/ L) Applicant is: Owner Contractor Type of Work Description of work: S1 cx~ J~ Construction Cost S Cam" Multi-Family Building: (Yes_ / No Company: ~A b.-t-T_--\ LL(L Contact: 1 ,emu t V'l Contractor Address: 14SUS U X43 City: 100,`x. ooc. , State: AU _ Zip: __~7s- U'8 Phone: _ (;o I J -11 Cil --7 -7 q O License B L~ 3 ~ a3 C) Lead Certificate If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) s U~ cz,IJ C) d- COMPLETE THIS AREA ONLY IF CONSTRUCTING ANEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? _Yes _No If yes, date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer & Water Contractor: Phone: NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information maybe classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Builds o ' ust be completed within 180 days of permit issuance. x-T r'-ect oo C_ i s x Applicant's Printed Name ature Page 1 of 3 Use BLUE or BLACK Ink r----------------- 1 For Office Use / I '0!0" Permit City of EanQ~(,fl I Permit Fee: 3830 Pilot Knob Road I I Eagan MN 55122 Date Received: Phone: (651) 675-5675 I I Fax: (651) 675-5694 I Staff: I I 2013 RESIDENTIAL BUILDING PERMIT APPLICATION Date: Site Address: 2 = Z(,S I Ltn Unit 1i( Name: -MA o S Phone:kC )--&_70 -(a 1 Resident/ c~ ~ 251- zk-!-- Zw3 Owner ~AaaFss i~city / z2 y Z s-~-yz 5z s~ t1~itoc~ v~ Applicant is: Owner Contractor L Type Of WOTIC Description of work: ~r7 f t+ Il k 1 i Construction Cosf" 3 S; Multi-Family Building: (Yes Y / No Company: Yltj Contact:~'t ~~`(C In n r Contractor Address: S~ (t VA L-1 1 3 City: Oy' _ 00 State-VU) zip: y Phone: tZ -~q I - _-7qt ) [ License ( (a Lead Certificate If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) Qpt~V`1~4 COMPLETE THI AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? i _Yes _No If yes, date and address of master plan: Licensed Plumber: Phone: I Mechanical Contractor: Phone: I Sewer & Water Contractor: Phone: tw _ i NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gol)herstateonecall.org I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. x r I~ n"O_ d":7 r-1 C~J x Applicant's Printed Name - pp mature Page 1 of 3