4087 Meadowlark Ct
îú
ÿþ
þýý üûüúú
ùýý÷øñè
ô
æô
þýö
ýüûúùø
÷ Þö õ öüúùø
÷öúùø
÷ Þö á
ÞÝ
ø
î
öø
ü
õ
ü õ
ôôüøù
ó
ýòüö
ñ
îøöð
î
î
ö
òüö
î
ö û
öî ëï
öø
þïöïöî
ý
ø
ëõïöï ø
ï
ö ë
õöûîí
ö ö
ö
òüö
ûù
ïîù
î
ë
ñ
èôçèëëô
õù
ýüö
èëæëæ
éüôþë
ô óú
öòñ
øø
î
ø
î
ý
öð
Ýòü
ÿõöøü
ßßå
ôâå
öõ
ã
é
ùåáôâÿåá
ìâßêôß
ö
ûù
ð
ö
øø
ïöî öö
ö
îøù
øøû
ý
ïå
ýü
õùïÿö
ë
øøÞ
öî
ýüö
ü
ùýüö
VILLAGE `10F EAGAN WATER SERVICE PERMIT
3795 Pilot Knob Road PERMIT NO.:
Eagan, MN 55122 DATE:
Zoning: No. of Units:
Owner:
Address:
Site Address:
Plumber:
Meter No.• Connection Charge:
Size: Account Deposit:
Reader No.• Permit Fee:
I agree to comply with the Village of Eagan Surcharge:
Ordinances. Misc. Charges:
Total:
By . Date Paid:
Date of Insp.: .27rigralir Insp.:
VILLAGE OF EAGAN SEWER SERVICE PERMIT
3795 Pilot Knob Road PERMIT NO.:
Eagan, MN 55122 DATE:
Zoning: No. of Units:
Owner:
Address:
Site Address:
Plumber:
I agree to comply with the Village of Eagan Connection Charge:
Ordinances. Account Deposit:
Permit Fee:
Surcharge:
By: Misc. Charges:
Date of Insp.: Total:
Insp.: Date Paid:
�
Use BLUE or BLACK Ink
r_______________�-^.
I For Office Use �
� � Permit#: l u � I
Clt af ��pa� � k�� �
Y ° � Permit Fee: ��"' �
3830 Pilot Knob Road � i
Eagan MN 55122 � �
I Date Received: I
Phone: (651) 675-5675 � �
Fax: (651) 675-5694 I I
� Staff: �
�-----------------�
2014 COMMERCIAL BUILDING PERMIT APPLICATION
Date: C / ls t Site Address:
Tenant Name: {�� ���v...���� �;�����,/� � v� g�
Tenant is: New/ A Existin Suite#:
Former Tenant:
Name: {� �-e•.cM�,�n� X� �'\�i �� � � Phone:
Property Owner Address/Cit /Zi N��y , ti/^� � �f�, � aj�� I y�q?� {po�s'
Y P�_ '10.P1. `f qk3.�i ��j , ` , •
� �a�
A licant is: Owner ��`^�'v''^'i"`� C'�
pp �Contractor
Type of Wot'k ' Description of work _s�. r.��r�N� h i�w1�.,��
Construction Cost:�t S�2 Y��
Name:��v 1^�v�.�t�� ��� �o v.i`1►�c�iv^ License#: � 3�5� �
Contractor . Address: �� Q'�'� ������,� Q r. city: �/; ��.=.��
State: �`1 -� Zip: �S 3 c�' � Phone: G S� - d �j ° �� b b
Contact: %he �'�'� � e� Email: .�. , ?r.
� � J� �-Q�...;�.�,�.
Name: Registration#:
Architect/Engineer Address: City:
' State: Zip: Phone:
' Contact Person: Email:
Licensed piumber installing new sewer/water service: Phone#:
NOTE:Plans and supporting documents fhat you:submit are considered to be public information. Portions of
the information may be classified as non-public if you provide specific reasons that would permit the City fo
conc/ude#hat the are tracle secrets. ,
CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. www.qoqherstateonecall.orq
I hereby acknowledge that this information is complete and accurate; that the w rk w�l be in conformance with the ordinances and
codes of the City of Eagan; that I understand this is not a permit, but only an ap c tionifor a permit, and work is not to start without a
permit;that the work will be in accordance with the approved plan in the case of r whi h requires a review and approval of plans:
x `/�e ��� g v� s e.^, X
ApplicanYs Printed Name ApplicanYs Sig
Page 1 of 3
r For Office Use
; , Permit#:
OrCc
E AG N
Permit Fee:
n1
Date Received:
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810
(651)675-5675 I TDD: (651)454-8535 I FAX: (651)675-5694 Staff:
bui ldinginspectionsAcityofeagan.com
2019 RESIDENTIAL BUILDING PERMIT APPLICATION
Date: t.ff1 f? Site Address: 7b67 NCO oWL � 67-
Unit#:
Name: /0I?k gge/e /I"r t'v49i //59-)C.rof7' '1 Phone:
Resident/
Owner Address/City/Zip: 107 /14490/AitAfk G
Applicant is: Owner Contractor
T e of Work Description of work: Fe-1?-c)'-)F 3/3�E1
Yp
Construction Cost: ocv Multi-Family Building: (Yes /No )
Company: Ekra71-4ST)i/6 &rigetotZ3 -j,r'rc - Contact: ^^ F-.)liv/9-'z,^-)
Contractor
Address: /17219 � � �1���- City: -STT#V6 5
State: NOV-Zip: 55a3,3 Phone: 01)276-126‘" Email: /471Liere/(4.57r0.3<'_Aler s (u.�
License#: B t 6 3 3 3 Lead Certificate#:
If the project is exempt from lead certification, please explain why:
COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING
in the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan?
Yes No If yes,date and address of master plan:
Licensed Plumber: Phone:
Mechanical Contractor: Phone:
Sewer&Water Contractor: Phone:
Fire Suppression Contractor: Phone:
NOTE:Plans and supporting documents that you submit are considered to be public information. Portions of the information may be
classified as non-•ublic If •u •rovide s•ecific reasons that would •=milt the Ci to conclude that they are trade secrets.
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's
website at www.citvofeaaan.com/subscribe.
Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180
days of permit issuance.
CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you
intend to dig to receive locates of underground utilities. www.aopherstateonecall.org
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and app ,fa • 'lens
x bfift:9- 1\1
Applicant's Printed Name Ap• ca 's Signature
Affidavit
State of Minnesota, County of Dakota
My current legal name is James K Davidson, and my current occupation is President Of
Everlasting Exteriors, Inc.. I am presently 39 years old, and my current address of residence is
17218 Presley Cir, Hastings, Minnesota 55033.
1757 (EA157326, EA157561), 4095 (EA157330, EA157564) & 4097 (EA157565) Meadowlark Ct.
as well as 1737(EA157755, EA157657) 1739 (EA158146, EA157756),
These doors may have been removed and reset as well during new roof installation.
157327, 1755 Meadowlark Ct
157328, 4087 Meadowlark Ct
157329, 4089 Meadowlark Ct
158147, 1741 Meadowlark Rd.
Meadowlark Road had new nail fin sliding glass patio doors installed during roofing installation to
properly lift door off roof deck and create a curb under threshold to sit and seal up to. Everydoor
was backcaulked, nailed in and sealed with butyl tape, and insulated with great stuff spray foam..
I hereby state that the information above is true, to the best of my knowledge. I also confirm that
the information here is both accurate and complete, and relevant information has not been
omitted.
Signature of Individual
Date
1-21-21
Notary Public
Title And Rank
Date Of Commission Expiry
For Office Use
Permit#:
/(2°• 66-
as ! �, Permit Fee:
,„ EAGAN
Payment Recvd: Yes No
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 '.
(651)675-5675 I TDD:(651)454-8535 I FAX:(651)675-56 AUG ' Plans: Electronic Paper
Plan Submittal: a tans ci ofea an.com ' 419 L-
6" A-( BY:
2019 AL BUILD APPLICATION
Date: 9-/Y-/9 Site Address: 7� 7064001-11-4-rek (7 49°4E00
Tenant Name: (Tenant is: New/ Existing) Suite#:
Former Tenant: ��
Name: 7 J`'7 NLfgb 1M/Z4C ) #GGf,q C`.. �`phone:
Property Owner yvb7
Address/City/Zip:
Applicant is: Owner A Contractor
Type of Work Description of work: J ' 4 "
Construction Cost: e2, 000
Name: EVEIZLif5/nn ;sc r 'Zf.�+n scense#: B CC 33 3 c
Contractor
Address: I721 7/teszJj e/• City: e�-577/V6.
State:1441j Zip: 5.- 33 Phone: 657-Z 7e Z
Contact: 0-:••••• 7)i.vipsoc' Email: /A14 tfeverf ir idled-et c.
Name: Registration#:
Architect/Engineer Address: city:
State: Zip: Phone:
Contact Person: Email:
Licensed plumber installing new sewer/water service: Phone#:
NOTE;Plans and supporting documents that you submit are considered to be public information. Portions of the information maybe
classified as nonpublic if you provide specific reasons that would permit the`City to conclude that they are trade secrets.
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's
website at www.citvofeaaan.com/subscribe.
CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you.
intend to dig to receive locates of underground utilities. www.aooherstateonecall.orq
I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a pe, , an. • is no - a without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review nd approval o •Ian
dArl
x Vl.O,
Applicant's Printed Name Appli• . = Signature
. ,
zicg
7 A CF' is-7S . --
DO NOT WRITE BELOW THIS LINE
SUB TYPES
Foundation Fireplace Porch(3-Season) Exterior Alteration(Single Family)
Single Family — Garage Porch(4-Season) Exterior Alteration(Multi)
Multi ____ Deck Porch(Screen/Gazebo/Pergola) Miscellaneous
01 of—Plex Lower Level Pool Accessory Building
WORK TYPES
New Interior Improvement — Siding Demolish Building*
Addition Move Building — Reroof Demolish Interior
4 Alteration Fire Repair Windows Demolish Foundation
Replace Repair _ Egress Window Water Damage
Retaining Wall *Demolition of entire building—give PCA handout to applicant
DESCRIPTION
Valuation 24)111 Occupancy MCES System
Plan Review Code Edition 1, - I S SAC Units
(25%_1004 ) Zoning City Water
Census Code Stories Booster Pump
#of Units Square Feet PRV
#of Buildings Length Fire Suppression Required
Type of Construction Width
REQUIRED INSPECTIONS
Footings(New Building) Meter Size:
Footings(Deck) Final/C.O. Required
Footings(Addition) )( Final/No C.O.Required
Foundation Foundation Before Backfill HVAC Service Test Gas Line Air Test Hood
Roof: Ice&Water Final Pool: Footings Air/Gas Tests Final
Framing 30 Minutes 1 Hour Drain Tile
Fireplace: Rough In Air Test ____Final Siding: Stucco Lath Stone Lath Brick EFIS
Insulation Windows
Sheathing Retaining Wall: Footings Backfill Final
Sheetrock Radon Control
Fire Walls Fire Suppression: Rough In Final
Braced Walls Erosion Control
Shower Pan Other:
Reviewed By: I - , Building Inspector
RESIDENTIAL FEES
Base Fee
Surcharge I Y (L ' , , i' 2 f
r
Plan Review -1,
MCES SAC °` ` c.
c,
City SAC 1s9\4Ar."
Utility Connection Charge
S&W Permit&Surcharge
0 f
Treatment Plant f
Radio Meter Read
Copies
TOTAL
Page 2 of 3
Received
10/23/2020
Affidavit
State of Minnesota, County of Dakota decks replaced on top of flat roofs over the garage
My current legal name is James K Davidson, and my current occupation is President Of
Everlasting Exteriors, Inc.. I am presently 39 years old, and my current address of residence is
17218 Presley Cir, Hastings, Minnesota 55033.
For any new decks that were replaced over new EPDM Roofs at Meadowlark we installed an
additional 60 mil strip of rubber down in between wood sleepers and new rubber as spec'd in the
approved Masterplan and per manufacture requests. .
I hereby state that the information above is true, to the best of my knowledge. I also confirm that
the information here is both accurate and complete, and relevant information has not been
omitted.
Signatur of Indivual
Date
7 permits
Permit #
Addresses
157560
1755 Meadowlark Ct
157561
1757 Meadowlark Ct
157562
4087 Meadowlark Ct
157563
4089 Meadowlark Ct
157564
4095 Meadowlark Ct
157565
4097 Meadowlark Ct
Notary Public
Title And Rank
Date Of Commission Expiry
157566 4086 Meadowlark Lane
3132
Q5lN(,,
V NDIfZ
VVt
(( iC
�gf4CAl} Caen
a i1
C==
ii
'124 i 1 cAA K LV rn tr�L'i'�
3A =F1
Z6c
v,4
of
o, ,Tj& Act
r,,,z5.A�ZO pvtakAy 1'R
t
V, a, To t' D4 0,
�o
WALKING SURFACES GREATER THEN W
ABOVE AREA BELOW REQUIRE GUARDRAILS
MINIMUM 36" IN HEIGHT AND DESIGNED
SUCH THAT A 4" SPHERE WILL NOT PASS THROUGH
13Y'.
D TI. m
Any changoa to these plans
shall be submitted for review
prior to implementation.
Posts for guardrails
SbAL_D_d be notched
REVIEWED PLANS MUST
REMAIN ON JOB WE
August 20, 2019
Everlasting Exteriors
17218 Presley Circle
Hastings, MN 55033
Re: Meadow Lark Project
To whom it may concern;
The installation of a free floating deck on an existing single ply membrane is not
uncommon, however if this is being done there are some basic details that should be
followed.
• Ensure that the point loading of the structure will not exceed the
compressive strength of the underlayment (such as 20 PSI Iso insulation)
• If this value is exceeded the standard practice is to install wood blocing to the
insulation height and make sure the "deck sleepers" are installed over these
"supports"
• There must be protection of the roofing membrane between the deck
sleepers and the roofing membrane.
If these guidelines are followed the roofing assembly should perform as anticipated.
If you have any additional questions or details needing assistance please do not
hesitate to contact us related to our requirements.
Sincerely,
.e-' / e�,4
David Phillip
Technical Service Administrator
David.Phillip@Mulehide.com
Direct: 608-361-6801
Mule -Hide Products Co., Inc. National Support Center 11195 Prince Hall Drive, Beloit, WI 53511-5481 1 tel. 608.365.3111 1 fax. 608.365.7852