4478 Woodgate PtVILLA) OF EAGAN
37 Pilot Knob Rood
Bison, MN 55122
Zoning: RII
New Horizon
Owner-
Address-
Site
wner•Address-
WATER SERVICE PERMIT
PERMIT NO •
DATE •
1841
9/26/75
No. of Units: 4
Site Address.
Plumber
4480-82-78-76 Woodgate Point
Thompson Plumbing
Meter No.: Connection Charge: 640.00 pd
Size: Account Deposit -
Reader No.: Permit Fee: 10.00 billed
1 agree to comply with the Village of Eagan Surcharge: • 50 billed
Ordinances. Misc. Charges:
6 Dotal•
By Date Paid:
Date of Insp.: Insp.:
VILu►OJ OF EAOAN SEWER SERVICE PERMIT
3795 Pilot Knob Road PERMIT NO.: 2600
ran, MN 55122 DATE: 9/26/75
Zoning: RZZ No. of Units: 4
Owner: 258 BoriZOO
Address:
Site Address:
Plumber:
4480-82-78-76 WOodgate Point
Thompson Plumbing Co.
I ogre* to comply with th* Village of Eagan Connection Charge: 1700.00 pc!
Ordinances. Account Deposit:
Permit Fee: lo.00 billed
p / / ` I Surcharge: • 50 billed
By: /' Misc. Charges:
Date of Insp. • Total:
Insp.: Date Paid:
CityofEagii
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
Use BLUE or BLACK Ink
For Office Use
Permit #.
Permit Fee:
1 �353a I
I35•1c
13
Date Received:
C)1 14 / 1 i
Staff:
ss
2013 RESIDENTIAL BUILDING PERMIT APPLICATION
Date: " a Site Address: ('—‘4�
Unit#:
Name: Phone:
Address / City / Zip:
Applicant is: Owner 2( Contractor
Multi -Family Building: (Yes / No
Company: l•� � e r C or:LCA— l it (;f Contact:
/� a. rt
Address: `U ‘ Cj 9 3 Cfl -S Mtf W a City: I l i- S -e_ 6
State: Zip: 53(.02 Phone: ks2 Z Ulu 5
License #: "6 c LAT- L (2 t Lead Certificate #: '(�- ' ,� -31 5— - G o1 S
If the project is exempt from lead certification, please explain why: (see Page 3 for additional information)
COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING
In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan?
Yes No If yes, date and address of master plan:
Licensed Plumber Phone:
Mechanical Contractor: Phone:
Sewer & Water Contractor: Phone:
NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of
the information may be classified as non-public if you provide specific reasons that would permit the City to
conclude that the are trade secrets.
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours
before you intend to dig to receive locates of underground utilities. www.gopherstateonecallorg
1 hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
Exterior work authorized by a building permit issued In accordance with the Minnesota State Bu€Iding Code must be completed within 180
days of permit issuance.
x A rtr c �` � o� b 'ems. htky
Applicant's Printed Name Applicant's Signature
Page 1 of 3
4Vkliod 41?) yo)t):ektaW
4?Cityst
3530 Rot Knob Road
Enos EN 65122
Phon: (651) 675.6675
Fa= (051) 6115.5094
2013 RESIDENTIAL BUILDING PERMIT APPLICA'TION
Unit*
octork— ?A-0 2:z,
us. BLUE or BLACK kik
.-17or ;int wok - -I
1
Dote Roodv•O IL
PiNflonscr)f
citY
CityofEaaau0...
JUS. 061010
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
Use BLUE or BLACK Ink
For Office U
Permit #: /Use
76 /9 Ci4
Permit Fee: /q7. 5 43
Date Received: -7' 1 T
Staff: 461
a- J
2016 RESIDENTIAL BUILDING PERMIT APPLICATION
Date: 7/6/2016
Site Address: 4478 Woodgate Point
Unit #:
Resident/
Owner
Name: Woodgate Homeowners Assoc.Phan: 651-331-1979
Address / City / Zip: 4478 Woodgate Point
Applicant is: Owner ✓ Contractor
Type of Work
Descr;prion of work: Replace privacy wall and deck railing
Construction Cost: 3800.00 Multi -Family Building: (Yes ✓ / No )
Contractor
Company: LD Peterson Construction Inc. Contact: Larry Peterson
Address: 20605 Lynn Dr City: Prior Lake
State: MN Zip: 55372Phone: 612-860-3206
Email:
License #: BC210540Lead Certificate #: NAT -118318-1
If the project is exempt
from lead certification, please explain why:e.-R
In the last 12 months,
Yes No
COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING
has the City of Eagan issued a permit for a similar plan based on a master plan?
If yes, date and address of master plan:
Licensed Plumber:
Mechanical Contractor:
Sewer & Water Contractor:
Fire Suppression Contractor:
Phone:
Phone:
Phone:
Phone:
NOTE Plans and supporting documents that you submit are considered to be public information. Portions of
the information may be classified as non-public if you provide specific ;reasons that would permit the City to
conclude that they are trade secrets.
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours
before you intend to dig to receive locates of underground utilities. www.qopherstateonecall.orq
1 hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code mupt be completed within 180
days of permit issuance.
x Larry Peterson
Applicant's Printed Name
App ' ant's ature
Page 1 of 3
SUB TYPES
Foundation
Single Family
Multi
01 of Plex
WORK TYPES
New
Addition
Alteration
Replace
Retaining Wall
DESCRIPTION
Valuation Occupancy
Plan Review Code Edition
(25%_ 100% y ) Zoning
Census Code Stories
# of Units Square Feet
# of Buildings Length
Type of Construction Width
ktY--)
-1
A'46 O NOT WRITE BELOW THIS LINE
_ Fireplace
_ Garage
Deck
Lower Level
_ Porch (3 -Season) _
Porch (4 -Season)
_ Porch (Screen/Gazebo/Pergola)
Interior Improvement
Move Building
Fire Repair
Repair
Pool
REQUIRED INSPECTIONS
Footings (New Building)
)‹. Footings (Deck)
Footings (Addition)
Foundation
Roof: _Ice & Water Final
Framing 30 Minutes 1 Hour
Fireplace: Rough In Air Test Final
Insulation
Sheathing
Sheetrock
Fire Walls
Braced Walls
Shower Pan
Reviewed By:
Siding
Reroof
Windows
_ Egress Window
176/9
Exterior Alteration (Single Family)
Exterior Alteration (Multi)
Miscellaneous
Accessory Building
Demolish Building*
Demolish Interior
Demolish Foundation
Water Damage
"Demolition of entire building - give PCA handout to applicant
MCES System
SAC Units
City Water
Booster Pump
PRV
Fire Suppression Required
Meter Size:
Final / C.O. Required
Final / No C.O. Required
HVAC _ Gas Service Test Gas Line Air Test
Pool: Footings Air/Gas Tests Final
Drain Tile
Siding: _Stucco Lath _Stone Lath _Brick
Windows
_ Retaining Wall: — Footings _ BackfillFinal
Radon Control
Fire Suppression: _Rough In __Final
Erosion Control
Other:
, Building Inspector
RESIDENTIAL FEES
Base Fee
Surcharge
Plan Review
MCES SAC
City SAC
Utility Connection Charge
S&W Permit & Surcharge
Treatment Plant
Copies
TOTAL
06 -/at
Wort.,L, tif b
,2( 579 a
Page 2 of 3
r