Loading...
1650 Hickory Lane VILLAGE OF EAGAN WATER SERVICE PERMIT 3795 fOot Knob Road PERMIT NO.: 1449 h, MN 55122 DATE: 4/26/74 Zoning: PUD No. of Units: Owner: Woodgate, New HOrizan Homes Address: Site Address: 1644-46-48-50 Hickory Lane Plumber: Tho>p$Of Plumbing cu. Meter No.• Connection Charge: Size: Account Deposit: Reader No.• Permit Fee: 10.00 pd pd agree to comply with the Village of Eagan Surcharge: .50 Ordinances. Misc. Charges: Total: By Date Paid: Date of Insp.: Insp.: VILLAGE iF EAGAN m SEWER SERVICE PERMIT 3795 m Knob Rood Ean, MN 55122 PERMIT NO.: 2209 Zonings DATE: 4/26/74 Owner: No. of Units:" Hari t $ Address: Site Address: -48 -50 IfiCk0 Dane Plumber: a n "'r' p a Plm* Co. i agree to comply with the Village of Eagan Connection Charge: Ordinances. Account Deposit: Permit Fee: " By: Surcharge: • Misc. Charges: Date of Ins p.: Insp.: Total: Date Paid: Use BLUE or BLACK Ink .- For OfficeUse ' ::::;ee:' ' ''' City of Eaaal 3830 Pilot Knob Road Eagan MN 55122 Date Received: Phone: (651) 675-5675 Fax: (651) 675-5694 L Staff: 2017` RESIDENTIAL PLUMBING PERMIT APPLICATION Date: /1-30 -/ / Site Address: /6 5() ft,' C/'dfzy 4N, Tenant: OAIZ�JR rA- Suite#: Resident/Owner I Name: ,9,ek . 7 AIUsoev Phone: ?5 ?- 5-7-o 3/a? Address/City,/Zip _ , ,v . ___ » _ a, I Name: (/(,/a i2 5 /Gl+�lo4iir/ License#: 0 o 2.- 9/ 9 Contractor Address: Q8- �cfrvc%9/L.e L.4/ City: �� , t State: /X� Zip: 5-5- o. I Phone: /02 (W( 6 6 9 ' l 8 Contact: 0./?.. M.-leg-5 Email: Gl/d9�AC5 , 2 /y!flJJr coo-, New Replacement —Repair —Rebuild —Modify Space Work in R.O.W. i Type of Work 1 — ) �,/ / `� — Description of work: P Afire "/a9�� /��1Xv.94c°/riC ve 4 % sci77'�' RESIDENTIAL XWater Heater t Water Softener Lawn Irrigation ( RPZ/_PVB) Permit Type x Add Plumbing Fixtures ( Main/—Lower Level) I Septic System I 1 —New Water Turnaround Abandonment RESIDENTIAL FEES: $60.00 Water Heater, Water Softener, or Water Heater and Softener(includes State Surcharge) $60.00 Lawn Irrigation (includes State Surcharge) $60.00 Add Plumbing Fixtures, Septic System Abandonment, Water Turnaround*(includes State Surcharge) *Water Turnaround (add$280.00 if a 3/4"meter is required) j $115.00 Septic System New(includes County fee and State Surcharge) TOTAL FEES $ CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.qopherstateonecall.org I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of pla s. x `1�0 4/6- x Applicant's Printed Name Applicant's Signature FOR OFFICE USE Reviewed By:• Date: Required Inspections: Under Ground Rough-in Air Test Gas Test Final Meter Related Items: Meter Size Radio Read Manometer Staff: Use BLUE or BLACK Ink For Office Use ' '' City of Ea��� ::::: i Ili i/X � °s 3830 Pilot Knob Road Eagan MN 55122 MFR 3 12017 Date Received: 3-31'( 7 Phone:(651)675-5675 Fax: (651)675-5694 Staff: J 2017 RESIDENTIAL BUILDING PERMIT APPLICATION 1644, 1646, 1648, 1650 Hickory Lane unit#: Date: 3/31/17 site Address: Name: Woodgate HOA II Phone: 651-214-4654 Resident! Owner Address/City/Zip: Applicant is: Owner X Contractor Type of Work Description of work: Re-Roof 5Osq building Construction Cost: 17,510 Multi-Family Building: (Yes X /No ) Company: JLH Construction, LLC Contact Amanda Hiltner 26293 150th St NWZimm r I ' Address: City.. a man Contractor State: MN Zip:SCJ 'R/ Phone: 763-477-2308 Email: amandahiltner@gmail.com License#: BC641697 Lead Certificate#: If the project is exempt from lead certification, please explain why: COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? I Yes No If yes, date and address of master plan: 1 Licensed Plumber: Phone: , Mechanical Contractor: Phone: ) Sewer&Water Contractor: Phone: I Fire Suppression Contractor: Phone: NOTE:Plans and supporting documents that you submit are considered to be public information. Portions of the information may classified as non-public if you provide specific reasons that would permit the City to conclude that the are trade secrets CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. x 'A`rta u/a-� it. x Applicant's Printed Name Applicant's Signature Page 1 of 3