4579 Maple Leaf Cir CITY OF EAGAN WATER SERVICE PERMIT
3795 Pilot Knob Road PERMIT NO.:
Eagan, /MN 55122 DATE:
Zoning: No. of Units:
Owner:
Address:
Site Address:
Plumber:
Meter No.: Connection Charge:
Size: Account Deposit:
Reader No.: Permit Fee:
agree to comply with the City of Eagan Surcharge:
Ordinances. Misc. Charges: _
Total:
B —� ? Date Paid:
Date of Insp.: 36 J 1 Insp.:
CITY OF EAGAN SEWER SERVICE PERMIT
3795 Pilot Knob Road PERMIT NO.:
Eagan, MN 55122 DATE:
Zoning:
No. of Units:
Owner:
Address:
Site Address:
Plumber:
agree to comply with the City of Eagan Connection Charge:
Ordinances. Account Deposit:
Permit Fee:
Surcharge: _
By Misc. Charges:
Date of Insp.: Total:
Insp.: Date Paid:
PERMIT
City of Eagan Permit Type:Building
Permit Number:EA118098
Date Issued:10/28/2013
Permit Category:ePermit
Site Address: 4579 Maple Leaf Cir
Lot:35 Block: 02 Addition: Ches Mar East 1st
PID:10-17150-02-350
Use:
Description:
Sub Type:Reroof
Work Type:Replace
Description:
Census Code:434 -
Zoning:
Square Feet:0
Occupancy:
Construction Type:
Comments:Please print pictures of ice and water protection and leave on site.
Carbon monoxide detectors are required by law in ALL single family homes .
Ted Mckinney
Fee Summary:BL - Base Fee $4K $103.25 0801.4085
Surcharge - Based on Valuation $4K $2.00 9001.2195
$105.25 Total:
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Contractor:Owner:- Applicant -
Ian Paterson
4579 Maple Leaf Cir
Eagan MN 55122
(612) 747-2835
Cityside Exteriors
1623 Norwood Dr.
Eagan MN 55122
(651) 379-9899
Applicant/Permitee: Signature Issued By: Signature
PERMIT
City of Eagan Permit Type:Building
Permit Number:EA173546
Date Issued:11/16/2021
Permit Category:ePermit
Site Address: 4579 Maple Leaf Cir
Lot:35 Block: 02 Addition: Ches Mar East 1st
PID:10-17150-02-350
Use:
Description:
Sub Type:Reroof & Siding
Work Type:Replace
Description:
Census Code:434 - Residential Additions, Alterations
Zoning:
Square Feet:0
Occupancy:
Construction Type:
Comments:Please print pictures of ice and water protection and leave on site. We encourage you to retain an electronic copy of
photos until the project passes a final inspection.
When installing ventilated soffit material, remove existing material (i.e. debris that could block vents) and take steps to
Valuation: 10,000.00
Fee Summary:BL - Base Fee $10K $191.75 0801.4085
Surcharge - Based on Valuation $10K $5.00 9001.2195
$196.75 Total:
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Contractor:Owner:- Applicant -
Rebecca Degray
4579 Maple Leaf Cir
Eagan MN 55123
(320) 336-8767
Jacobson Woodworking & Remodeling Llc
275 East 4th Street Suite 809
St. Paul MN 55101
(612) 401-9299
Applicant/Permitee: Signature Issued By: Signature