Loading...
4131 Meadowlark Pt CITY OF FAGAN WATER SERVICE PERMIT 3830 Pilot Knob Road P.O. Box 21199 PERMIT NO.: Eagan, MN 55121 DATE: Zoning: — No.ofUnits: Owner: Address: Site Addess: Plumber: Meter No.: Connection Charge: Size: Account Deposit: Reader No.: Permit Fee: I agree to comply with the City of Eagan Surcharge: Ordinances. --v Misc. Charges: 41 �� By jL Total: y Date Paid: Date of Insp.: � �� I. / Insp.: • CITY OF EAGAN SEWER SERVICE PERMIT 3830 Pilot Knob Road P.O. Box 21199 // PERMIT NO.: Eagan, MN 55121 Zoning: N . of Units: Owner: 'Prises Address: Site Address: t Plumber: 1 agree to comply with the City of E>igoo C Charge: • • Ordinances. ' Adicount Deposit: Permit Fee: t om-- Surcharge: By Misc. Charges: Date of Insp.: Total: Insp.: Date Paid: 4110ii C!tyofEaaafl Date: 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 Use BLUE or BLACK Ink For Office Use Permit #: ` I t 3i �( U Permit Fee: [X .. Date Received: 9/13/6 Staff: J 2013 RESIDENTIAL BUILDINGj�PERMIT APPLIICATION L ituf Site Address: _111 /�7- 411Cl - 1 I 73 9 I (97 " 4L31 Name: Laki,00001 1,t7Y1141D64t€_ AO& Phone: Address / City / Zip: Applicant is: Owner Contractor Description of work: �P.i o / J% Construction Cost: f3 91 0(70 Company: Aka)( -ler i o rS L y S M A Address: 10701 `13 . it) • State: /1/U Zip:66-3 3 tp Phone: License #: L.-)(�3 7s Lead Ce yoorSCG � s Multi -Family Building: (Yes X. / RS ) Contact: SJ 7.t/ E�+ ^y'i7 rej city: )10/9k©VEJ `7G3 -3 [s- 8'9 0 0 rtificate #: NAT- 671-/ If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? Yes _No If yes, date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer & Water Contractor: Phone: NOTE; lief nat s at you submit are coni, ubllc.if you provide specllilc r + ns- woul'>ll the City tt elude that the are trade secrets: CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.00pherstateonecaltorq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. days of permitExterior work authorized by a building permit issued in accordance with the Minnesota Sta Buii g st be completed within 180 issuance. x 00,k0L. Applicant's Punted Name App n Sign • - re 61 -Ra itiala92I2 Page 1 of 3 Use BLUE or BLACK Ink For Office Use t Permit#: o� City of Eaall , 3830 Pilot Knob Road I Permit Fee: 7' ., — Eagan MN 55122 Date Received: Phone:(651)675-5675 buildinginspectionsecityofeagan,com I Staff: 2017 RESIDENTIAL BUILDING PERMIT APPLICATION Date: [ l" ) Site Address: i/g! , JO(.)(Q/ p Unit#: Name• : Phone: .Y Address/City/Zip: Applicant is: Owner Contractor e o Description of work: n Oue ra l ` - i & „ Construction Cost: IS 5-c>t0 Multi-i-amny Building:(Yes )( /No ) � ICCom any OOf Co&S 4-rut 6A. Contact: /_e r7 r QSfn o tf Ct Address: J Li, _5) 1 1 (L Se-1( I OI City: ea (IA 144464 State: &Zip: 5 ) 2 Z Phone: 1.01Z-2ZI-)3v4Email: OS cOft u, Pt' License#: C (v 5 00 1(# Lead Certificate#: If the project is exempt from lead certification, please explain why: COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months,has the City of Eagan issued a permit for a similar plan based on a master plan? Yes No If yes,date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer&Water Contractor: Phone: Fire Suppression Contractor: Phone: NOTE:"PlansantiS p ring ocumen ate e7.- ee ' �4?`,in « . I a a ftet}/e S@crets. 1�, �ai'. $.✓` ® .4 6 fru'a�3"#aka You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.cityofealtan.com/subscribe. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454.0802 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.Qorherstamonecall.org I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the'work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x z r ( )S ,'vt x Applicant's Pr ra/7 ted Name Appli is : gnature Page 1 of 3 Li/3i 074 ,_ 7/. DO NOT WRITE BELOW THIS LINE /4/ 4.3 SUB TYPES • Foundation _ Fireplace _ Porch(3-Season) _ Exterior Alteration(Single Family) Single Family — Garage _ Porch(4-Season) _ Exterior Alteration(Multi) _ Multi Deck — Porch(Screen/Gazebo/Pergola) _ Miscellaneous ?d 01 of_Plex _ Lower Level _ Pool _ Accessory Building WORK TYPES _ New — Interior Improvement _ Siding _ Demolish Building* _ Addition — Move Building Reroof _ Demolish Interior _ Alteration _ Fire Repair _ Windows _ Demolish Foundation A0 Replace _ Repair _ Egress Window _ Water Damage Retaining Wall 'Demolition of entire building—give PCA handout to applicant DESCRIPTION Valuation `( 3 9t .= Occupancy 1-7Zc-3 MCES System • Plan Review Code Edition f/7 ZG/,� SAC Units (25% )1 100% ) Zoning -3 City Water Census Code Stories Booster Pump #of Units Square Feet PRV #of Buildings Length I Z- Fire Suppression Required Type of Construction V $ Width 2 S REQUIRED INSPECTIONS _ Footings(New Building) Meter Size: lG Footings(Deck) Final/C.O. Required _ Footings(Addition) )d Final/No C.O. Required _ Foundation HVAC_Gas Service Test Gas Line Air Test _ Roof:_Ice&Water _Final Pool: Footings Air/Gas Tests _Final Framing Drain Tile _ Fireplace:_Rough In Air Test Final Siding: Stucco Lath _Stone Lath Brick _ Insulation Windows _ Sheathing Retaining Wall:_Footings Backfill_Final _ Sheetrock Radon Control _ Fire Wails Fire Suppression:_Rough In__Final _ Braced Walls Erosion Control / Other: viewed By: 1 0 Piifn;J</yI'- , Building Inspector !SIDENTIAL FEES . ® ,� Sg , 4C-77 Base Fee pectic.. 3 .9e'® - !c Surcharge /3J , f , T Plan Review N� MCES SAC City SAC �IA C 1 r7 Q 5 P=4/1- Dr/15 ,¢` Utility Connection Charge S&W Permit&Surcharge Treatment Plant Copies TOTAL Page 2 of 3 esnosa+«uan 9unve0no NV-1d X115 .«w rre�-� y--�,� '1�. M`�°,:."..out. cwvao .1� .% /Q� ••••= MISS NW'N`d9V °"r„' .n;w;;°.....,�11..4; S,,,� 1NIOd/aVO >21VHO4i�3W ObI bLb N .3551 Ob K""'''cfo+e t" x+oudc�,tlyq x',°C,ifa" , 6unoA gauopJOW''.1".W511oW S3WOHNM01 QOOI'I�>��OV 1 1 U „1 °-7i sv tILAi kP icaa off6n °o mumw ,i a g om aF5 g Pb 2i § a °� , °= o n6 n .28 3'- qs _ 4yo 3 • • • • • • s € U _ y yam i s bo au - g W 2 26 q f?o°a q-z tai i) 2 • • " i g s o 2g 2,, 4 " a g' 3m �P 6„.-`, $.56.° -g� w Pyayi �` m 6 = o a aF v a a'$ • 9� n ° °ily Ili a� y0- '� dy .1g� } SO s E ° £ as ayl W2Uw U- ��' Q -'�`3u s�� 6-- T 6 �.� N O EaU -� 2 nx a :— °?O� °g o o '. u '1 g, y .g u� usa°g 07'2 F 9W ° „ouF °"a Tia gyy a�_ sg `6 8m - Ko u m ag $4'''g ° 1a gag m-96 • • 2 g 1 T v baa` - �� A"°`,, rg-af II, ga°" -Pv ,-�F z } - > • og x`2m°m . p ou. =,...0g ao9da °^o,_a0 ns of fig . mg9.° vo>;o. oto "1 ,nn yN� m v. uhu�� mr m ,off m v n ys� r - fa ao� U2,�g S 8 sa° SSu;;;; 65N L. mnn“26.201= :vie-, U i:5 IT 2E 0 O U P O O O p O O O 0 O O QW ,° NV' o a g >1g�`o N.g4s” P E 0 3' cog uoga Fao- a`? E d c c c E E E. - E c g= o ., nnu�-�......g - oo .'mg” s�aa a o xU` c� §g �� v .'�." �� 2i€aB 't , s� °iE°o°°:� ?s° oa aaas�o°ug F° iS2a -U6D 60. of `oo �$� ao a _� �, s 5• „t g�, in o °.'` a.°i£ °° ao1$g'yd vo� w �o°°�$�a'y°°. TU. _ S2 ° 8 s g , " 9° "m Ex `off s' N� ao° We0 .'joa Y.g.. I ! 1 P � 9 s 9 Y � o - " a o3 Yafl. 3a g Z4 a .. va m =l �p 0 o § gh $"E°�"'0 .0 o t u ' O 3� r $� gao s siso s F F �LLs �' gau.22o°g? s;3 - °o°° .4 . -;: :dz 's' i =t s i " , a ° " LL �' B V. :4 o,�° ° 28 3b rg tbh� va ao �°»o N "r $ a9" � rcw o �, o � po = ° �n� g "v �� dF QE R S ��.-ao.. �8�> »r S��a��--= » -zzz orcm g §c o„ r e g g.b � got dEc a 8jN S i; Z U Jl S .� 0. S NZ �1 SIL ,11LL.h1 Jl N EU 1 6 • y 4p yy 4 44V11 OD d .66 a t6 8°6 . a°" .go4 -F.2, �- - n m y In m r m v O - “ 0 v a E o o �° �° „ v c wfi Cli taM r 150 IllU rg 1 J /// °bb� � 1 W o,o �by�� a; (N. o/ b7 C e , Q9 O CC may i .. aj Cr! Q\ m ma/ C', c,ry ° 0 LL G/��% Ivo `� 0 %// i 1 /�r P Q Q 4:414 l ♦ y ♦ Py .G. ,,„..., ' rl a % /,Ar r Z ° ,,,s/4 4 `�SPO 1 /%jj � ,e 1� j , J C vv mpQ m Q a a Q oUF NORTH \x CD o #1* o sew o 11 VI 1 2 yb* j/ a e1r C 4> 1 AI J °06� _ j zit, a CE/15 `v — a 9� ♦ w a M : — / avoa)1aV1MOGV3 Hlnos //�/' r �r'- ex d t zoa\� Qr., t: 0 r4041 ; ; / 4110F ict Ilk AN/ al iiialitir A �! 4ft % � % MEADOWLARK PT STREET/PERMIT NUMBERS A B C D E F G H 1 STREET# PERMIT# Description 2 3 4117 145389 Deck& Retaining wall 4 4119 145397 Deck 5 4123 145400 Deck 6 4127 145402 Deck 7 4131 145403 Deck 8 4135 145404 Deck& Retaining wall 9 4137 145408 Deck& Retaining wall 10 4139 145410 Deck 11 4141 145411 Deck 12 4143 145413 Deck& Retaining wall 13 4145 ✓ 145414 Deck 14 4147 145415 Deck II v Mattson Bassett Creek Business Center Macdonald 901 North 3rd Street, #100 Young Minneapolis, MN 55401 structural 612-827-7825 voice engineers 612-827-0805 fax September 29, 2017 Terry Ostrom Ostrom Construction LLC 3786 Nicols Rd St Paul, MN 55122 RE: Lakewood Townhomes Deck Replacement—Pier Alternate 4074-4190 Meadowlark Rd Eagan, MN 55112 MMY Project No. 16329 Dear Terry, The purpose of this letter is to document that Mattson Macdonald Young, Inc. is aware that the as-built conditions of the new decks at the Lakewood Townhomes are different than what is shown on the drawings dated 8/19/2016. The original drawings show the width of the new decks to be 12' off the existing wall of the buildings and 10' off of the cantilevered 2nd floor framing. The as-built condition of the new decks is 10' off the existing wall of the buildings and 8' off of the cantilevered 2nd floor framing. This change is structurally acceptable. If you have any questions or concerns, please feel free to contact me. Sincerely, Mattson Macdonald Young, Inc. Tor Okevad, PE MN License No. 50938 REVIEWED By: �1 Date: ' Zq' .---/ Eagan Building inspections Division PERMIT City of Eagan Permit Type:Building Permit Number:EA174521 Date Issued:02/02/2022 Permit Category:ePermit Site Address: 4131 Meadowlark Pt Lot:2 Block: 4 Addition: Hillandale 3rd PID:10-32952-04-020 Use: Description: Sub Type:Windows/Doors Work Type:Replace Description:Two or More Windows/Doors Census Code:434 - Residential Additions, Alterations Zoning: Square Feet:0 Occupancy: Construction Type: Comments:Improvements to the home require smoke detectors in all bedrooms. If altering window openings or installing Bay or Bow windows, call for framing inspection. Call for final inspection after installation. Carbon monoxide detectors are required within 10 feet of all sleeping room openings in residential homes (Minnesota State Valuation: 5,000.00 Fee Summary:BL - Base Fee $5K $118.00 0801.4085 Surcharge - Based on Valuation $5K $2.50 9001.2195 $120.50 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Alice Juarez 4131 Meadowland Pt Saint Paul MN 55122 Property Claim Solutions Llc 2005 Pin Oak Dr Eagan MN 55122 (651) 994-2028 Applicant/Permitee: Signature Issued By: Signature