Loading...
2119 Cliffhill Lane - Correction LtrCity of Ea a--fl- Mike Maguire Mayor Paul Bakken yndee Fields Cary Hansen Meg Tilley Council Members Thomas Hedges City Administrator Municipal Center 3830 Pilot Knob Road Eagan, M N 55122-1810 661.676.6000 phone 651.676.6012 fax 661.464.8686 TDD Maintenance Facility 8601 Coachman Point Eagan, MN 65122 861,675,5800 phone 651.675.6860 fax 8 1,464.8585 TDD w r, ityofeagan.00 f The Lone Oak Tree The symbol of strength and growth ; in our community. Brut 1, 2012 Sanitary Sower System —1 1 CORRECTION WORK ORDER PhallyYo 2119 liffHill Lane Eagan IVIN 55123 Thank you for your recent cooperation and participation in completing the inspection of your Seger Service to identify sources of clearwarter flow into the sanitary sewer system. As a result of that inspection, certain aspects of your sewer service were found to be out of compliance with Section 3.40 of the City code regarding inflow & Infiltration (1/1). (A copy of the City code can be found at ww. citvofe.a ga n.-co rr An f l o w) The following issues must be corrected or repaired to comply with City Codes: The s= pump discharges into the laundry tub. The su will need to be disconnected from the la-undry tub and discharged outside the house with rigid (ABS or PVQ-Riaim4. Per the City Code, it is now your responsibility to complete these corrective improvements within 60 dams of the dame of this letter. Please be aware that the City of Eagan has adopted a program whereby the Ci t Pay % of the costs for these required repairs. If so requested, the City will also finance the property owner's share of these costs over a period of up to 5 years at 4% interest by spreading it as a special assessment for collection with your property takes. (NOTE: Permit fees are not considered as part of the repair cost and are not eligible for reimbursement or financing options. OPTIO NS & PROCEDURE To FOLLOW FOR I1 IN YOUR PROPERTY INTO COMPLIANCE ALL REPAIRS REQUIRE UIF E CITY PERMITS. If the repair work involves your surer service located outside your building, you will need to obtain an inflow Infiltration Sewer Permit. If the repair work involves your sump pump., foundation drain or other internal plumbing system, you will need an Inflow & Infiltration Plumbing Permit. Some situations may require both permits. If Vou.p_lan to comp.lete the r p i.r . yourself, you will have to provide an original copy of all receipts for actual material cosh incurred once the work has been completed and a Final Inspection has verified compliance with City Codes. The City will then issue a reimbursement check for its 50 shame. If your share of the costs exceeds $200, you may also elect to have that amount financed by the City. An application form will be provided upon request. This will allow the City to issue a reimbursement ent check to you for 100% of the costs incurred; Ifyo...Plantohire a Contractor/Plumber t complete the work, you must obtain a written itemized bid from two j different Contractors/Plumbers and submit that information when applying for the City Permit; all contractors must be r - ppr v d before a permit can be issued. A large list of Licensed Plumbers is available on the City's web site t: www.cityofeagan.co.m/inflow. After the work has been completed, you must submit a copy of the Contractor/Plumber's Final invoice when scheduling a Final Inspection, Dace the inspection has verified compliance with City Codes, the City will then issue a reimbursement check for its % share made out jointly to you and the contractor/plumber. If your share of the costs exceeds $200, you may also elect to have that amount financed by the City. Are application form will be provided upon request. This will allow the City to provide reimbursement for 100% of the costs incurred. NOTE: before any payment can be processed by the City, ar Final Inspection must be completed and a Certificate of Compliance issued. If you fail to make the noted repairs within the required days, a SURCHARGE of $150 PER MONTH WILL BE ADDED T YOUR UTILITY BILL (Until the repairs are satisfactorily completed) We recognize that this mandatory program is an unexpected inconvenience and expense to you. We want to minimize its impact and help you through this process. Still Have u do Contact Eagan Utilities at (651) 675 -5200 or go to: www.cityofea ga n.co I n f I ow Thank you for your continued cooperation in this very important environmental protection program. City of Eagan Public Works Department Enclosures: Copy of Inspection Report Contractor Lien Waiver Contracting and Payment Options