ZONING PERMIT APPLICATION
❑ Please identify improvements on a scaled site plan drawing that shows lot lines, structures
and existing conditions.
PROPERTY Site Address: 3C64 Pj
INFORMATION
Owner Name:
Name: ~11p` Phone: Ca12 LcO
Address: Jd O LA knR 72 y a , D y-- -City/State/Zip: MiN S
CONTACT
Applicant Signature: Date: ` i ` Sl V2
Email address:
1.4
❑ Retaining Wall <4 feet ❑ Driveway *Dther: 10)Q2 !Siw
TYPE OF ❑ Patio ❑ Sport Court
WORK ❑ Sidewalk ❑ Fence
Description of work: ° ,
PLANNING Setbacks, hard surface coverage, shoreland zoning, bluff zone/setbacks, etc.
Approve / Denied Date: 0-14e -/I Staff: k s 1e-
Notes: Ar i C G~c f j S r GS~uK S i ( r b~il~/ rt ~C 14
y G~v~C
~L7 Property Ines to be "rMed
Revised Plans <
Approved: Yes / No Date: Staff:
ENGINEERING Grading, drainage, utility easements, wetlands, erosion control, improvements in the Right-of-Way, etc.
Approved / Denied Date: Staff:
Notes:
Revised Plans
Approved: Yes / No Date: Staff:
COMMENTS
CALL BEFORE YOU DIG. Call Gopher State One Gall at (651) 454-0002 for protection against underground utility damage. Call
48 hours before you intend to dig to receive locates of underground utilities. www.aopherstateonecall.org
G:\Building InspectionsTERMIT APPLICATIONS12011\2011 Permit Applications
E-Z DO-IT-YOURSELF SHED GUIDE"'
s, E 8710' UNIVERSAL TRUSS
81
10'
41
A 1
s
k
Shown with Shown with
double
Consult local building code requirements for concrete slab on grade specifications
and utility easements.
Lay out perimeter of
shed using string and -
batter boards (See illus- b°its •
Batter r
tration). Set concrete Boards - ~ui0di~~ Anch°
forms, checking for level , - String Lines rox• 4' Approx-
and squareness. Place App
reinforcing mesh and `
Diagonals
other reinforcement as Form Concrete Slab
may be required. Pour, Boards
strike and float finish &Stakes Reinforcing
concrete slab. Place
anchor bolts into slab
with 3" of thread pro- Foundation Slab Layout
truding from slab. Place
1-3/4" from edge of slab and 1' from each corner and wall opening. Then place an
anchor bolt every 4' on center. Open area for door locations need no anchors.
COPYRIGHT BY MIDWEST MANUFACTURING 2007 www.midwestmanufacturing.com
Page 1
Typical •-Wall Framing
Inset top plate 3-1/2" to allow 2x4 Double Top Plate-All Walls
End wall top plate overlap Stagger butt joints when necessary
I ~
Frame walls and apply sheathing
or siding as shown in illustrations. i r
F !
Allow 4 'sheathing joints to fall on T'
studs.
97-1/2"
Personalize your building with the
Treated rf. - ~ F
optional walk door and/or win- 2x4
Bottom
dows and frame accordingly. Plate-
Rough openings according to wads
door manufacturer's directions.
Balance at 16" O.C. (Typical) -
I I~~-48 ~I
Building Length
• Front Wall Framing • Typical Front Wall Framing Walk Door
Extend top plate 3-1/2 to nail onto sidewalk Extend top plate 3-1/2" to nail onto sidewalls
r
~
2 2x4 Header
9
i- Ir 1
2x4 Shorter Stud (2) 2x4 Header
1
2x4 Shorter Stud
2x4 Precut Stud ~s 2x4 Precut Stud
I ,
97-1/2' 97-1
/2
Verify
door
it
rough
opening f`
with
Verify door rough opening with mfg LLWI~
manufacturer's s ecifications p specs. Building Width Minus Building Width Minus
Typical • Framing Wall Typical Comer Assembly
_I--Extend top plate 3-1/2 to nail onto sidewalls End wall top plate and siding overlap
- ~ - sidewall. Nail securely together.
l
C:J
1 ~ I
I
I
97-1/2
End wall 1~ f
Sidewall
Extend 4x8 siding over end stud
I
3-1/2" to allow corner tie in
i
~IINIII
- Balance at 16„ O.C. (Typical)
48"~I !
Building Width Minus 7"
Page 2
Place 10' trusses 24" on center If building an 8'
using a 2x4 temporary brace. wide shed, trim
On 8' wide building, cut truss the tails 1'.
tails to 12" on both sides. This
777
will maintain the 1 overhang 8,
as shown on page 4. 1E 10'
Make sure trusses are plumb and square, then apply roof sheathing. Be sure to stag-
ger end joints at least two truss spaces. Follow edge and joint spacing recommenda-
tions as stamped on sheathing.
Apply felt and shingles after all Shin les Install H-Clips between
the sheathing is secured. g truss spaces at the top
ti~u
of each sheet of
~waferboard
V k
'r q Fd~ S~~w~? , A tJ}~ ' ri
Space trusses` at 2' O.C.'
a
Install Roll-up door or Walk door accord- Apply garage door jamb and brickmold
ing to manufacturer's directions. trim.
RoHup D.. l
sidin 2x4 shoulder stud siding 2x4 End
9
2x4 End 2x4 stud Frame
Double Frame
Top t1iu► I
Plate 1x4 Door 1. (2) 2x4
Header
ovedap~
siding Brig mold
(2) 2x1.2
Header Trim 2x4 door
ckxw.#,
Stiffener 2*4
door siding
Rollup
$WWW
Door
Brickmold 1x4 I 2x4 $04 Imo- , , . _ .
Trim Jamb i siding 1•
2x4 eft
Page 3
Typical Wall Section • 10' Wide Shed
•
Apply soffit and fascia. 4 12
7/16" x 4'x 8' Felt
waferboard Shingles
• roof sheathing
Apply metal drip edge, felt and shingles Galvanized
according to manufacturer's directions. Drip Edge
Truss with
1 x6 Overhang
Typical • • For 8' • - Shed Fascia Plywood
12 Soffit &
7/16" x 4'x 8' Felt 4F___ Nailers 2x4 Double
waferboard Top Plate
roof sheathing Shingles
Galvanized 2x4 Pre-cut Stud 8' 1-1/2"
Drip Edge ~o at 16" O.C.
U6 Fascia Truss with 4'x 8-'
Plywood Soffit Tail Cut Off Siding
Bottom Chord of 2x4 Double
Truss is the Nailer Top Plate
Treated 2x4
Bottom Plate
Apply siding and trim according to manu-
facturer's directions. Paint or stain wood Anchor Bolts
siding, trim, soffit, and fascia to the color at 4' 0. C.
of your choice.
Corner Plan Double Door Framing
1x4 Corner Trim Allow 1" gap around the 36" on 24" on
entire outside door edge. 10' Shed _ 8' Shed
IE~ IE~I
- - - -
17 Hinge 12 L l
31i location
s. y (typical):
Stud j
Walls Sheet
Siding l°I Siding cut I -
y I from door „
opening on~ 83
front wall.
S a~
,',~`Y~ l
Sit back and relax knowing
your belongings are secure- _ F 12~~-,. _
7, f
ly protected by the new stor- Inside View " Outside View
age shed that you built Nail through face of siding to 1x4 Pine Boards, miter corners
yourself. secure 2x4 door braces. 45 degrees. Bend protruding
Toenail 2x4s at joints to stiffen. nails.
PLEASE NQTE- This shed constrtkctigtt aid is intended: oiely, to provide general knowledge as to one of, the many ways ashed
niay bs constructed using Mterials ava~abl from We sucggest'.Vou check with your local building officials regarding
site iodation, permit procedures, safety regulations. and specification$ Of materials used to -construct your new storage shed.'
Builoers who utilize ors aid~,must roceed at their own risk and are solely responsible for, complying with all building codes which
perEairxIn their community.: hereby disclaims all liability for any damages whether consequential, lncidentat-,~peciat
or otherwise, which may re ta.lt from fallowing this do-it-yourself aid,
page '4
Estimate From
ESTIMATE FOR: Estimate # 42495
STORE # 3017 WSTP PHONE: (651) 457-2609 Page I of 2
Building materials 1445 Robert St. South FAX: (651) 457-0421
1445 Robert St South West St.Paul, MN 55118
West Saint Paul, MN 55118
Ph: (651) 450-2401
ESTIMATE BY ESTIMATE DATE
PROJECT DESCRIPTION:
Shed TONY W. 10/08/12
SKU NUMBER DESCRIPTION QTY TO ORDER ADDITIONAL ITEM INFORMATION
192-6620
187-4510 10' GABLE FRAME EZ BUILD 7 EACH Special Order
103-1007 1X4-71" #3 STANDARD BD APPROX LENGTH 2 EACH
102-1101 2X4-8' STUD/#2&BTR SPF CONSTR LUMBER 12 EACH ON SALE THRU 10/14/12
2X4X7
102-1101 2X4-8' STUD/#2&BTR SPF CONSTR LUMBER 4 EACH ON SALE THRU 10/14/12
102-1127 2X4-12' #2&BTR SPF CONSTR LUMBER 1 EACH ON SALE THRU 10/20/12
145-1140 5/8"-(19/32)-4'X8' TEXTRD8" OC SIDING 11 EACH
111-0863 2X4-18' AC2 TREATED GC LIFETIME WTY 3 EACH ON SALE THRU 10/20/12
2X4X12
123-5090 3/41'-(23/32)-4'X8' AC2 PLYWD GC PAD 4 EACH ON SALE THRU 10/20/12
124-2728 7/1611-(14/32)-4'X8' OSB 3-WHITE STRIPES 5 EACH
157-2094 10' STYLE D ROOF EDGE BROWN 5 EACH
151-2979 SUPREME 25YR ESTATE GRAY 5 EACH ON SALE THRU 10/14/12
103-1133 1X6-12' #3 STANDARD BD 2 EACH
103-1133 1X6-12' #3 STANDARD BD 2 EACH
103-1104 1X6-71" #3 STANDARD BD APPROX LENGTH 4 EACH
103-1515 1X2-8' FURRING STRIP S4S PINE/SPRUCE 3 EACH
103-1010 1X4-8' #3 STANDARD BD 15 EACH
103-1007 1X4-71" #3 STANDARD BD APPROX LENGTH 2 EACH
103-1049 1X4-14' #3 STANDARD BD 4 EACH
225-0435 411 HINGE (SQ)-STNLS STEEN225-938 6 EACH
225-1187 4-1/211 SAFETY HASP-ZINC N102-384 1 EACH
This is an estimate. It is given only for general price information. This is not an offer and there can be no legally binding contract between
the parties based upon this estimate. The prices stated herein are subject to change depending upon the market conditions. The prices stated
on this estimate are not firm for any time period unless specifically written otherwise on this form and are not inclusive of taxes, delivery,
packaging or any other charges which may or may not need to be added when ultimately purchasing products from this estimate.
The availability of materials is subject to inventory conditions. MENARDS IS NOT RESPONSIBLE FOR ANY LOSS INCURRED BY
THE GUEST WHO RELIES ON PRICES SET FORTH HEREIN OR ON THE AVAILABILITY OF ANY OF THE MATERIALS
STATED HEREIN. All information on this form, other than price, has been provided by guest and Menards is not responsible for any errors GUEST COPY
in the information on this estimate, including but not limited to quantity, dimension and quality. Please examine this estimate carefully.
MENARDS MAKES NO REPRESENTATIONS, ORAL, WRITTEN OR OTHERWISE THAT THE MATERIALS LISTED ARE
SUITABLE FOR ANY PURPOSE BEING CONSIDERED BY THE GUEST. BECAUSE OF WIDE VARIATIONS IN CODES, PAGE I OF 2
THERE ARE NO REPRESENTATIONS THAT THE MATERIALS LISTED HEREIN MEET YOUR CODE REQUIREMENTS.
Estimate From
ESTIMATE FOR: Estimate # 424955
STORE # 3017 WSTP PHONE: (651) 457-2609 Page 2 of 2
Building Materials 1445 Robert St. South FAX: (651) 457-0421
1445 Robert St South West St.Paul, MN 55118
West Saint Paul, MN 55118
Ph: (651) 450-2401 ESTIMATE BY ESTIMATE DATE
PROJECT DESCRIPTION:
Shed TONY W. 10/08/12
SKU NUMBER DESCRIPTION QTY TO ORDER ADDITIONAL ITEM INFORMATION
230-5540 1-5/8 PREM DECKSCREW GLD COMBO 5LB 1 EACH
229-5538 NAIL 6D GALVANIZED BOX 5 LB BOX 1 BOX
229-5554 NAIL 8D GALVANIZED BOX 5 LB BOX 1 BOX
229-5567 NAIL 10D GALVANIZED'BOX 5 LB BOX 1 BOX
229-5774 NAIL 3/4" GALV ROOFING 5 LB BOX 1 BOX
151-1789 #15 FELT UNDERLAYMENT 31X144' (4 SQ) 1 EACH
103-1515 1X2-8' FURRING STRIP S4S PINE/SPRUCE 8 EACH
If purchased today, you save $15.43
I
This is an estimate. It is given only for general price information. This is not an offer and there can be no legally binding contract between
the parties based upon this estimate. The prices stated herein are subject to change depending upon the market conditions. The prices stated TODAY'S SUB-TOTAL: 1,188.32
on this estimate are not firm for any time period unless specifically written otherwise on this form and are not inclusive of taxes, delivery, REGULAR SUB-TOTAL: 1,203.75
packaging or any other charges which may or may not need to be added when ultimately purchasing products from this estimate.
The availability of materials is subject to inventory conditions. MENARDS IS NOT RESPONSIBLE FOR ANY LOSS INCURRED BY
THE GUEST WHO RELIES ON PRICES SET FORTH HEREIN OR ON THE AVAILABILITY OF ANY OF THE MATERIALS
STATED HEREIN. All information on this form, other than price, has been provided by guest and Menards is not responsible for any errors GUEST COPY
in the information on this estimate, including but not limited to quantity, dimension and quality. Please examine this estimate carefully.
MENARDS MAKES NO REPRESENTATIONS, ORAL, WRITTEN OR OTHERWISE THAT THE MATERIALS LISTED ARE
SUITABLE FOR ANY PURPOSE BEING CONSIDERED BY THE GUEST:' BECAUSE OF WIDE VARIATIONS IN CODES, PAGE 2 OF 2
THERE ARE NO REPRESENTATIONS THAT THE MATERIALS LISTED HEREIN MEET YOUR CODE REQUIREMENTS.
1 D EST
MANUFACTURING
♦f
n ' I IIII
.h'
r Overall Skill Level: Intermediate
Guide for construction of 10x10, 10x12, 10x14, and 10x16 Shed:
Steps
1. Build the Shed
1. General
2. Inventory
3. Frame Preparation
4. Back Wall Frame
5. Front Wall Framing
6. Siding Back Wall
7. Siding Front Wall
8. Siding Front Wall
9. Square the Building
10. Floor Supports '
11. Floor Sheathing
12. Siding Side Walls
13. Fascia Trim
14. Soffit
15. Roof
16. Door Framing
17. Trim
Tools 18. Finishing
19. Finishing Building
• Ha~1bQ~rr~able Shed Window and Door Options
• La'Vel Gable Shed Window and Door Options
• Square
• Saw
• Pencil
• Screwdriver
Materials
• 10' E-Z Frame Shed Kit
Build the Shed
Skill Level: Intermediate
1. General
Prior to beginning construction, the area selected for the shed location must be level and cleared of
obstructions.
2. Inventory
Separate all lumber, hardware, etc. into individual stacks of like items.
3. Frame Preparation
3ti Sa3 lop l0ki
1 iC~~iKa~'t
Fran*
Molrb(H
2"A4
Member
T ~ 2xd I'A4 gosset
tttEx Fc S
Ftwiw Waton
i S [f?
r 1
Unfold each frame, setting aside two frames to
be used as end walls. From 1" x 4" pine boards, cut metal gusset plates 6" long;
20 for a 10' building
* 24 for a 12' building
* 28 for a 14' building
* 32 fora 16' building
Apply gusset plates on each side of the top and bottom fold locations. Use four 8d nails on each gusset plate. -
Frames used as end walls require only one gusset plate at the top and bottom on the side opposite the metal
plates. See Figure 1.
4. Back Wall Frame
- - -
~liPSkKI3:ni<<.
Tpro n
Owe [TYP)
end sv,111 Auds cut
tort.
18- 20- 20- 20- 18-
31, ° 1/2' V2" 112" 314"
1-112";
Using one frame selected as an end wall,
measure and mark stud locations according to dimensions shown in Figure 2. Place the proper length 2" x 4"
stud at those locations. Mark required length and angles. Cut each 2" x 4" to fit. Toe nail studs into place using
(2) 8d nails top and bottom. See Figure 2. Lumber listed as nominal sizes.
5. Front Wall Framing
2"x4" oanter
no0or cut to fill
j
2"x4" door
head Cut to tit
(toe nail in place).
[rts.~ll..th~
~ G
j 2 xW door
uprights.
Measure and
oil to fit„
i
:1ts 1 1r.t1"~
6-4 25" i It-* 25►'s
10y
Using the remaining end wall frame, repeat step
4, using Figure 3 as a guide.
NOTE: In order to keep-moisture from wicking into the siding, keep the bottom of the siding l" above the
bottom of the treated bottom frame member.
6. Siding Back Wall
se sctap pieces to
24" -4 440 10 48' U1
cover al peak,
Cut Lfw$.
C Ut
7fl
r
I' E
Cut one 4'x8' sheet of siding in half, leaving
two pieces 24" wide by 96" long. Place one cut piece face down, side by side next to two full 4'x8' sheets.
Place cut edge at the corner as shown in Figure 4. Place the back wall frame on top and trace roof line.
Remove frame and cut lines. Properly place siding on the frame and nail in place, using 6d nails every 8" on
center. See Figure 4.
7. Siding Front Wall
i Use rap paetes to 48 " 48 " Cover ,it peat.
Tree frame,
Cot lines,
r
Tri t;r,a
x€er d hnos I" out,
r ato rn N1 directions,
Cut mm fines.
E
iE
0
Cut the 24"x96" piece remaining into two
pieces 12"x96 Place these pieces and two full 4'x8' sheets of siding face down, side by side, as shown in
Figure 5. Place the front wall frame on top of the siding, trace the roof line and door opening on the siding and
remove frame. Prior to cutting lines representing the door, extend door outline I" in all directions. Cut "new"
lines. Mark the two cut-outpieces-" door"-and set aside to be used later. Properly place siding on frame and
nail down using 6d nails every 8" on center. See Figure 5.
NOTE: Some siding pieces will need to be butted together, so a clean straight cut is necessary.
NOTE: In order to keep moisture from wicking into the siding, keep the bottom of the siding 1" above the
bottom of the treated bottom frame member.
8. Siding Front Wall
~Tt,,:,~ ~a, o
i
Non* no wa,
,own vv~op*
Treated 2"x4" riin joists (10' building shown
119' for a 10' building, 143" for a3 2' building or 167" for a
14' building and 191" for a 16" budding
From two treated 2" x 4", cut two rim joists:
119" fora 10' building
143 for a 12' building
a 167" for a 14' building
191" for a 16' building
Place the rim joists 10' apart in the area where the shed is to be set. Stand the front and back walls up at the
proper ends of the rim joists. Nail rim joists to the end walls using l Od nails. Temporarily brace both ends. See
Figure 6. Stand the remaining frames up:
4 for a 10' building -
5 for a 12' building
6 for a 14' building
0 7 for a 16building
Nail to rim joists at dimensions shown. Place a temporary brace across the roof frame members.
9. S uare the Building
i B
D
At base of building, measure diagonally. Adjust building until AC=BD. Building is
then square. See Figure 7.
10. Floor Supports
2"x4"
- treated
floor
- supports.
C i r^ doe nail
E in place,
{typical}
r
VX4
gusset
'plates at
top and
bottom
+ fold
{ locations
(Typical)
21-V4° 22• tZ 22=1,Z 22- 1 2 21-V*
3 - 1 From the remaining treated 2"x 4" cut four 21-
1/4" floor supports and the required amount of 22-1/2" floor supports:
6 for a 10' building
10 for a 14' building
8 for a 12' building
0 12 fora 16' building
Install as shown in Figure 8, using I Od nails.
11. Floor Sheathing
10' Building: From two 4'x 8' sheets of floor sheathing, cut two pieces 48" x 95-1/2" long. From another
4'x 8' sheet, cut one piece 24" wide by 95-1/2" long and one piece 24" x 23-1/2". From one 4'x 8' sheet
cut two pieces 48 x 23-1/2". Nail in place using 8d nails 8" on center.
0 12' Building: From two 4'x 8' sheets of floor sheathing, cut two pieces 48" x 95-1/2". From another 4'x
8' sheet, cut two pieces 48" x 47-1/2". From one 4'x 8' sheet, cut one piece 24" x 47-1/2" long and one
piece 24" x 95-1/2". Nail in place using 8d nails 8" on center.
14' Building: From two 4'x 8' sheets of flooring, cut two pieces 48" wide by 95-1/2" long. From two
other 4'x 8' sheets, cut two pieces 48" wide by 71-1/2 long. From one 4x 8' sheet cut one piece 24"
wide by 95-1/2" long and one 24" x 71-1/2" long. Nail in place using 8d nails every 8" on center.
0 16' Building: From four 4'x 8' sheets of flooring, cut four pieces 48" x 95-1/2" long. From one more
sheet cut two pieces 24" x 95-1/2" long. Nail in place using 8d nails every 8" on center.
NOTE: Floor sheathing must be notched to fit around side wall frame members. Stagger end butt joints front
to back.
12. Siding Side Walls
10' Building: Cut five 4'x 8' sheets of siding to 83" long. Cut one 48" x 83" piece into two pieces 23-
1/2" wide, cut two pieces 48" wide to 47-1/2 wide leaving two pieces 48" wide.
12' Building: Cut six 4' x 8' sheets of siding to 83 long. Cut four of those pieces to 47-1/2" wide leaving
the other two pieces 48" wide.
14' Building: Cut seven 4' x 8' sheets of siding to 83" long. Cut one 48" x 83" piece into two pieces 23-
1/2" wide. Cut two pieces 48" wide to 47-1/2" wide leaving four pieces 48" wide.
16' Building: Cut eight 4'x 8' sheets of siding to 83" long. Cut four pieces 48" wide to 47-1/2" wide
leaving four pieces 48" wide.
NOTE: In order to prevent wicking of moisture into the siding, keep the bottom of the siding 1 " above the
bottom of the treated bottom frame member. If T-1-11 siding is used, place cut edges at corners. Make certain
end walls and frames are plumb, (vertically level) and then apply siding using 6d nails. Siding must be notched
at the top to fit around the E-Z frame overhang.
13. Fascia Trim
Raised 1/2"
F i
board
soffit oaro
* 10' Building: Measure two 1" x 6" x 10' trim boards.
0 12' Building: Measure two 1" x 6" x 12' trim boards.
14' Building: Measure two 1" x 6" x 14' trim boards.
16' Building: Measure two 1 " 'x 6" x 16' trim boards.
Nail to the exposed ends of the roof frame members, using 6d nails. Top edge of fascia boards should be 1/2"
above the top of the roof frame member. This will cover the exposed edge of the roof sheathing. See Figure 9.
14. Soffit
0 10' Building: Apply 1" x 6" x 10' soffit boards underneath with 8d box nails.
12' Building: Apply 1 " x 6" x 12' underneath with 8d box nails.
14' Building: Apply 1" x 6" x 14' underneath with 8d box nails.
16' Building: Apply 1" x 6 x 10' and a 1" x 6" x 6' board. See Figure 9.
15. Roof
. t C1'
r "I
f • 114}"
21-1/4" x 72"
x 48"
1 48" 69.114"
X 48" x 961
M
L =I
r.»Maw=0 ~low an No am an a.
21.114" x.96" 2x 4
W x 48"
48*xW
10' Building: From one 4'x 8' sheet of roof sheathing, cut two pieces 21-1/4" x 72". From another sheet,
cut two pieces 24" x 48" and two pieces 21-1/4" x 48". Use two more 48" x 96" sheets. Stagger pieces
and nail with 6d nails 8" O.C.
0 12' Building: From one sheet of roof sheathing, cut two pieces 48" x 48". From another sheet, cut two
pieces 21-1/4" x 48". From another sheet cut two pieces 21-1/4" x 96". Use two more 48" x 96" sheets.
Stagger pieces and nail with 6d nails 8 O.C.
14' Building: From one 4'x 8' sheet of roof sheathing, cut two pieces 21-1/4" x 72". Cut two 4'x 8'
sheets to 72" long. Cut one 4' x 8' sheet into two 21-1/4" x 96" pieces. Use two more 48 x 96" sheets.
Stagger butt ends front to back. Nail into place using 6d nails every 8" O.C.
16' Building: From two 4'x 8' sheets of roof sheathing, cut four pieces 21-1/4" x 96". Cut two pieces of
4'x 8' sheathing into 4 pieces 48 x 48" Use two more sheets 48" x 96". Stagger butt ends and nail into
place.
16. Door Framin
14 36" 36"
atdit~g cut from
door opensng
on front wail.
t~ T 1 " ~A~~` pine
boards, Bond
protfliding nails
5 ,
mound tho entire
edge,
Mail through face
of siding to,
Burrs x d"
door bra s. 'doe
nail Z* x4"at
Joints to stiffen. L H
From 1" x 4" trim boards, cut the trim pieces
for the doors. Attach to the previously cut and marked door pieces of siding. Apply hinges and hasp. See
Figure 10 for dimensions.
17. Trim
- d 4 PCs. JIIX6
Cut to fit .,_.,...M......~,,.,
End Wall Fascia Trim
. ~x4r~ 4 PCs,
Ww 4*-1 -3/16tx
14*-'- ..-Cut to fit
r
Front & Back Wall Corner Trim
The outer door frame will require one 1" x 4"
piece 79" long and two l" x 4 pieces 81" long. Cut four pieces of 1" x 4" x 8' to 80" long for the sidewall
corner trim. See Figure 11 for quantity and dimensions for the balance of trim pieces. NOTE: Tack gable end
pieces in place and check fit. Make any required cut adjustments prior to permanently nailing into place.
18. Finishing Roof
(Apply roof edge & felt) as per instructions apply shingles (printed on bundles).
19. Finishing Building
Paint and/or stain as desired.
20. Gable Shed Window and Door Options
j
^ 7 I
r
--1- 11 41
1 T
I. .
I
1 i
lil 64,
W~f 031,
v 'n.
eT~i c r
rspa Gt i a' w.}a vn 1 e s,l' ~ ~ e
y y. ni ri C,.
I r ti
i
t .1 ~ a
w
r
21. Gable Shed Window and Door Options
-1771; 1
1 it lip 1) p ~,I C z.a
~ r
Mr .y semis : , 5 E
t
rb
Nufo. -w.>•:c•.,G. :kn.n l+;fFw.a T,n'!u »:A>T•,vltvr C:.~r.l,. v
«wwxxx.xxxwmuwwww~www.x«.ni
Y
EL
to ~l•.s~-+y ~~i:~'s' w-
1qTF C.,!Lt,,,ow,•crrU,ntve s': t.w.. s+~.s. s.-.rr«. _
7T` ..rwwrwwWwwwrrrrr~ r^° wCii4 t:= t i
7- 1 :7
L
i
♦ m.m mom-- n P-.rn.... a....., f
Products, materials, techniques, tools, building codes and local regulations are subject to change; therefore, Midwest
Manufacturing assumes no liability for omissions, errors or the outcome of any project. The reader must always
exercise reasonable caution, follow current codes and regulations that may apply, and is urged to consult with a
licensed professional before beginning any project.