Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
979 Autumn Cir
Da Use BLUE or BLACK Ink 1 C3 1 ~4~ ~(/tJ,c~•- i For Office Use-----I---- I U✓ I City of Eap 101 C07 ! q i Permit 13 3830 Pilot Knob Road I Eagan MN 55122 I Date Received: Phone: (651) 675-5675 I 1 Fax: (651) 675-5694 1 Staff: I I I 2012 RESIDENTIAL BUILDING PERMIT APPLICATION Date: - , Site Address: 7 Unit Name: /V4 co/"o RESIDENT / 6 OWNER Address / City / Zip:-Z-/ 0~ Applicant is: Owner Contractor L~ TYPE OF WORK Description of work: G✓ GO~tJS"~`/'GC~ la•J J~ Construction Cost: Multi-Family Building: (Yes /No ) Company: Z 6AAA1 2 r~a/ Contact: ~r✓ ~Y.~/'! cJa~+ f 'J Address: /#4city: La" CONTRACTOR Stater zip: Phone: (J ~o~ CfPO,' "'e_7eO;~Y- License lol/W Lead Certificate If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In t7es st 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? -No If yes, date and address of master plan: G✓ Licensed Plumber: - 14X I (e/L WPr l Phone: ~~J;?) T cS' Jai , Mechanical Contractor: 1 ee Phone: / Sewer & Water Contractor: /'/c fi Phone(6f/J NOTE; Plans and supporting documents at you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.ora I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan In the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued In accordance with the Minnesota State Building Code must be completed within 180 days of permit Issuance.. x ~r► /TriG/C2/~'lC /~S dL✓ x Applic nt's toted Name Applicant' gnature Page 1 of 3 DO NOT WRITE BELOW THIS LINE SUB TYPES _ Foundation - Fireplace - Porch (3-Season) _ Storm Damage j Single Family - Garage _ Porch (4-Season) _ Exterior Alteration (Single Family) _ Multi - Deck _ Porch (Screen/Gazebo/Pergola) _ Exterior Alteration (Multi) _ 01 of _ Plex _ Lower Level - Pool _ Miscellaneous Accessory Building WORK TYPES New _ Interior Improvement _ Siding _ Demolish Building* _ Addition _ Move Building _ Reroof Demolish Interior _ Alteration _ Fire Repair _ Windows _ Demolish Foundation _ Replace _ Repair _ Egress Window _ Water Damage Retaining Wall *Demolition of entire building - give PCA handout to applicant DESCRIPTION Valuation Occupancy MCES System Plan Review Code Edition SAC Units (25%- 100%~ Zoning rij City Water Cens Code Stories Booster Pump # of Units Square Feet PRV # of Buildings- Length _ sy Fire Sprinklers Type of Construction ~r Width REQUIRED INSPECTIONS Footings (New Building) Meter Size: Footings (Deck) Final / C.O. Required Footings (Addition) Final / No C.O. Required Foundation HVAC _ Gas Service Test Gas Line Air Test Drain Tile Other: Roof: -,Ice & Water -Final Pool: -Footings Air/G ests -Final Framing Siding: -Stucco Lath Sto -Brick Fireplace: Rough In it Test Final Windows Insulation Retaining Wall: - Footings Backfill _ Final Sheathing *it Radon Control Sheetrock Erosion Control Reviewed By:, Building Inspector RESIDENTIAL FEES Base Fee ri Surcharge A/ lot ~V-j Plan Review Y w L1q 34 CityESAC C ~r Q ( aI Utility Connection Charge S&W Permit & Surcharge Treatment Plant Copies0 . lot TOTAL I t ~T- a' +Page2of3 I l c)- fit qq New Construction Energy Code Compliance Certificate Per NI 101.8 Building Certificate. A building certificate shall be posted in a permanently visible location inside Date Certificate Posted the building. The certificate shall be completed by the builder and shall list information and values of components listed in Table NI 101.8. atntling Addreas of the Dwelling or Duelling Unit City 979 AUTUMN CIRCLE EAGAN Name oraesidendal Contmclor MN License Numher THERMAL ENVELOPE RADON SYSTEM Type: Check All That Apply X Passive (No Fan) Active (Willi fan and mono teteror a a otliersystent monitoring device) ea ~ ~ ~a v u _ 8 o J U o -o o es V a ma ~ m m Insulation Location ? z ~ u C) W oa :o g u. n a Other Please Describe Here Below Entire Slab X Foundation Wall 10 INTERIOR Perimeter of Slab on Grade X Rim Joist (Foundation) 10 INTERIOR Rim Joist (1St Floor+)' 10 INTERIOR Wall 21 Ceiling, flat : 44 . Ceiling, vaulted 44 Bay Windows or cantilevered areas 3$ 21 10 5 Bonus room over garage X Describe other insulated areas . Windows & Doors Heating or Cooling Ducts Outside Conditioned Spaces Average U-Factor (excludes skylights and one door) U: 0.29 Not applicable, all ducts located in conditioned space Solar Heat Gain Coefficient (SHGC): 0.29 r-8 R value MECHANICAL SYSTEMS Make-up Air Select a Type Appliances Heating System Domestic Water Heater Cooling System X Not required per mech. code Fuel Type Natural Gas Natural Gas Electric Passive Manufacturer Lennox AO Smith Lennox Powered Interlocked with exhaust device. Model ML193UH11OP48C GPVH50N ; 13ACX-048-230 Describe: Input in Capacity in Output in Other, describe: Rating or Size BTUS: 110,000 Gallons: 'I'ons: 4 Heat Loss: Heat Gain: Location of duct or system: Structure's Calculated 85,009: 32,447 AME or SEER: 13 HSPF°m 93 Calculated I 39,251 Efficiency cooling load: CCm's PLAN 4015 " round duct OR Mechanical Ventilation System " metal duct Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air Combustion Air Select a Type source heat pump with gas back-up furnace): Not required per mech. code Select Type X Passive Heat Recover Ventilator (HRV) Capacity in cfms: Low: High: Other, describe: Energy Recover Ventilator (ERV) Capacity in cfms: Low: High: Location of duct or system: X Continuous exhausting fan(s) rated capacity in cfms: 3 fans cont low, total 100cfm Mechanical Room Location of fan(s), describe: Owners bath, Main Bath, J&J Bath Cfm's Capacity continuous ventilation rate in cfms: 100 6e Insulated Flex Total ventilation (intermittent + continuous) rate in cfms: 475 " metal duct Created by BAM version 052009 DEAN REVIEW FOR COMPLIANCE WITH AIRCRAFT NOISE ORDINANCE Compliance with Procedures to Ensure Submitter: Noise Impact Area Adequate Noise Attenuation: Lennar Airport - MSP International Exterior wall construction: 16305 36th Ave. No. Noise Zone - 4 LP Smart Board Suite 600 15/32" sheathing Plymouth, MN 55446 New Infill Residence is a "CONY Tyvek wrap 952-249-3000 use in Noise Zone 4 2x6 studs 16" O.C. R-21 batt insulation with 1/2" gypsum board Roof Construction: Plan Reviewed: Peaked roof with manufactured trusses 24" O.C. T10i ,~„M Roof vents r"+''+ ly Shingles Information Submitted: 15# felt Annotated architectural drawings including: 1/2" sheathing Blown insulation R-44 Windows: Atrium 5/8" gypsum board Swinging Patio Doors: Atrium Entry Doors: Therma Tru Mechanical Ventilation System: Skylights: N/A 3-ton central air conditioning unit Compliance with STC Requirements: Window, Door Frame, Perimeter and Other Seals: All window and door openings are to be caulked Average window/wall area for exterior wall: with butyl-based caulk With this window/wall area ratio and STC 40 walls, windows Fireplace Chimney Cap: with an STC 30 can be used to meet the noise reduction Built-in flue damper, chimney cap, glass enclosed requirements; Ventilation Duct Exterior Wall Penetrations: Summary: All exterior ducts will have bends as required by the ordinance Other measures including duct bends and caulking are being taken to ensure minimum transmission of noise through the Door and Window Construction: exterior building shell so that the construction should meet Windows: Atrium (30 STC) the compatibility guidelines. Sliding Patio Doors: Atrium (30 STC) Therefore, the materials and construction as proposed should meet the requirements of the Eagan aircraft noise ordinance. Entry Doors: Therma Tru (29 STC) Skylights: N/A Review Completed (date): Other Exterior Wall Penetrations: Review Completed by: Tom Tamte Sill sealer between plates and blocks Ventilation, Makeup and Combustion Air Calculations Submittal Form For New Dwellings These blank submittal forms and Instructions are available at the CityAlMiUMILIM website and at City Hall. The completed form must be submit- ted in duplicate at the time of application of a mechanical permit for new construction. Additional forms may be downloaded and printed at: Site address 7 7T 4t, mjj le Date Contractor Completed /Gr,rJ!r~ o//Clhe ~ BY CU Section A Ventilation Quantity (Determine quantity by using Table N1104.2 or Equation 11-1) Square feet (Conditioned area including Basement-finished or unfinished) QO 5v 3(, Total required ventilation Number of bedrooms Continuous ventilation 166 Directions - Determine the total and continuous ventilation rate by either using Table N1104.2 or equation 11-1. The table and equation are below. Table N1104.2 Total and Continuous Ventilation Rates (in cfm) Number-of Bedrooms 1 2 3 4 5 6 .,z. Conditioned space (in Total/ Total/ Total/ Total/ Total/ Total/ sq. ft.) continuous continuous continuous continuous continuous continuous 1000-1500 60/40 75/40 90/45 105/S3 120/60 135/68 1501-2000 70/40 85/43 100/50 115/58 130/65 145/73 2001-2500 80/40 95/48 110/55 125/63 140/70 155/78 2501-3000 90/45 105/53 120/60 135/68 150/75 16S/83 3001-3500 100/50 115/58 130/65 145/73 160/80 175/88 3501-4000 110/55 125/63 140/70 155/78 170/85 185/93 4001-4500 120/60 135/68 150/75 165/83 180/90 195/98 4501-5000 130/65 145/73 160/80 175/88 190/95 205/103 5001-5500 140/70 155/78 170/85 185/93 200/100 215/108 5501-6000 150/75 165/83 180/90 195/98 210/105 225/113 Equation 11-1 (0.02 x square feet of conditioned space) + [15 x (number of bedrooms + 1)] = Total ventilation rate (cfm) Total ventilation - The mechanical ventilation system shall provide sufficient outdoor air to equal the total ventilation rate average, for each one-hour period according to the above table or equation. For heat recovery ventilators (HRV) and energy recovery ventila- tors (ERV) the average hourly ventilation capacity must be determined in consideration of any reduction of exhaust or out outdoor air intake, or both, for defrost or other equipment cycling. Continuous ventilation - A minimum of 50 percent of the total ventilation rate, but not less than 40 cfm, shall be provided, on a con- tinuous rate average for each one-hour period. The portion of the mechanical ventilation system intended to be continuous may have automatic cycling controls providing the average flow rate for each hour is met. GASAFETYWK1Vent-makeup-comb air submittal (2).docx Page 1 of 6 Section B Ventilation Method (Choose either balanced or exhaust only) Balanced, HRV (Heat Recovery Ventilator) or ERV (Energy Recov- lAl Exhaust only j Gns /a~ ery Ventilator) - cfm of unit In low must not exceed continuous venti- Continuous fan rating In cfm ~ / lation rating by more than 100%. / y Low cfm: I I High cfm: Continuous fan rating in cfm (capacity must not exceed / continuous ventilatlon rating by more than 10040 Directions -Choose the method of ventilation, balanced or exhaust only. Balanced ventilation systems are typically HRV or ERV's. Enter the low and high cfm amounts. Low m airflow must be equal to or greater than the required continuous ventilation rate and less than 100% greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the ventilation fan must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. Section C Ventilation Fan Schedule Descri tion Location Continuous Intermittent c. ~4. L V r,. T 'T 41,10 Flo -74) 30 CP& Directions - The ventilation fan schedule should describe what the fan is for, the location, cfm, and whether It is used for continuous or intermittent ventilation. The fan that is chase for continuous ventilation must be equal to or greater than the low c m air rating and less than 100% greater than the continuous rate. (For instance, if the low cfm Is 40 cfm, the continuous ventilation fan must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. Section D Ventilation Controls (Describe operation and control of the continuous and intermittent ventilation Directions -Describe the operation of the ventilation system. There should be adequate detail for plan reviewers and inspectors to verify design and installation compliance. Related trades also need adequate detail for placement of controls and proper operation of the building ventilation. If exhaust fans are used far building ventilation, describe the operation and location of any controls, indicators and legends. 1f an ERV or HRV is to be installed, describe haw it will be installed. If ft will be connected and interfaced with the air handling equipment, please describe such connections as detailed in the manufactures' lnstallation instructions. If the installation instructions require or recommend the equipment to be interlocked with the air handling equipment for proper operation, such interconnection shall be made and described. Section E Make-up air Passive (determined from calculations from Table 501.3.1) Powered (determined from calculations from Table 501.3.1) Interlocked with exhaust device (determined from calculation from Table 501.3.1) Other, describe: Location of duct or system ventilation make-up air: Determined from make-up air opening table Cfm Size and type (round, rectangular, flex or rigid) (NR means not required) Page 2of6 Directions - in order to determine the makeup air, Table 501.3.1 must be filled out (see below). For most new installations, column A will be appropriate, however, if atmospherically vented appliances or solid fuel appliances are installed, use the appropriate column. For existing dwellings, see IMC 501.3.3. Please note, if the makeup air quantity Is negative, no additional makeup air will be re- quired for ventilation, if the value is positive refer to Table 501.3.2 and size the opening. Transfer the cfm, size of opening and type (round, rectangular, flexor rigid) to the last line of section D. The make-up air supply must be installed per 1MC501.3.2.3. Table 501.3.1 PROCEDURE TO DETERMINE MAKEUP AIR QUANITY FOR EXHAUST EQUIPMENT IN DWELLINGS (Additional combustion air will be required for combustion appliances, see KAIR method for calculations) One or multiple power One or multiple fan- One atmospherically vent Multiple atmospherical- vent or direct vent ap• assisted appliances and gas or oil appliance or ly vented gas or oil pliances or no combus- power vent or direct vent one solid fuel appliance appliances or solid fuel tion appliances appliances appliances Column C Column D Column A Column B 1. a) pressure factor 0.15 0.09 0.06 0.03 (cfm/sf) b) conditioned floor area (sf) (including unfinished basements) ✓r CO Estimated House infiltration (cfm): (la x 1b) 2. Exhaust Capacity a) continuous exhaust-only ventilation - system (cfm); (not applicable to ba- lanced ventilation systems such as lJ VV HRV b) clothes dryer (cfm) 135 135 135 135 c) 80% of largest exhaust rating (cfm);Q K Kitchen hood typically (not applicable if recirculating system or If powered makeup air is electrically 2 Y p interlocked and match to exhaust) d) 80% of next largest exhaust rating (cfm); bath fan typically Not (not applicable if recirculating system or if powered makeup air is electrically Applicable interlocked and matched to exhaust) Total Exhaust Capacity (cfm); f2a + 2b +2c + 2d] 3. Makeup Air Quantity (cfm) ZJ 7 e- 71 a) total exhaust capacity (from above) J b) estimated house infiltration (from 7 S5- above) Makeup Air Quantity (cfm); [3a - 3b) (if value is negative, no makeup air is ec needed) 4. For makeup Air Opening Sizing, refer , to Table 501.4.2 /(I A. Use this column if there are other than fan-assisted or atmospherically vented gas or oil appliance or if there are no combustion appliances. (Power vent and direct vent appliances may be used.) 8. Use this column if there is one fan-assisted appliance per venting system. (Appliances other than atmospherically vented appliances may also be in- cluded.) C. Use this column if there is one atmospherically vented (other than fan-assisted) gas or oil appliance per venting system or one solid fuel appliance. D. Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically vented gas or oil appliances and solid fuel appliances. Page 3 of 6 I Makeup Air opening Table for New and Existing Dwelling Table 501.3.2 One or multiple power One or multiple fan- One atmospherically Multiple atmospherically vent, direct vent ap- assisted appliances and vented gas or oil ap- vented gas or oil ap- Duct di- phances, or no combus- power vent or direct pliance or one solid fuel pliances or solid fuel ameter tion appliances vent appliances appliance appliances Column A Column a Column C Column D Passive opening 1-36 1-22 1-15 1-9 3 Passiveopening 37-66 23-41 16-28 10-17 4 Passive opening 67-109 42 - 66 29-46 18 - 28 5 Passive opening 110-163 67-100 47-69 29-42 6 Passive opening 164-232 101-143 70-99 43-61 7 Passive opening 233-317 144-195 100-135 62-83 8 Passive opening 318-419 196-258 136-179 84-110 9 w/motorized damper Passive opening 420-S39 259 - 332 180 - 230 111-142 30 w/motarized damper Passive opening 540 - 679 333 - 419 231-290 143-179 11 w/motorized damper Powered makeup air >679 >419 >290 >179 NA Notes. A. An equivalent length of 100 feet of round smooth metal duct is assumed. Subtract 40 feet for the exterior hood and ten feet for each 90- degree elbow to determine the remaining length of straight duct allowable. B. If flexible duct is used, increase the duct diameter by one Inch. Flexible duct shall be stretched with minimal sags. Compressed duct shall not be accepted. C. Barometric dampers are prohibited In passive makeup air openings when any atmospherically vented appliance is installed. D. Powered makeup air shall be electrically interlocked with the largest exhaust system. Sections F Combustion air Not required per mechanical code (No atmospheric or power vented appliances) k Passive (see IFGC Appendix E, Worksheet E-1) Size and type Other, describe: Explanation - If no atmospheric or power vented appliances are installed, check the appropriate box, not required. If a power vented or atmospherically vented appliance Installed, use IFGCAppendix E, Worksheet E-1 (see below). Please entersize and type. Combus- tion air vent supplies must communicate with the appliance or appliances that require the combustion air. Section F calculations follow on the next 2 pages. Page 4 of 6 Directions -The Minnesota Fuel Gas Code method to calculate to size of a required combustion air opening, is called the Known Air Infiltration Rate Method. For new construction, 4b of step 4 is required to be filled out. IFGC Appendix E, Worksheet E-1 Residential Combustion Air Calculation Method (for Furnace, Boiler, and/or Water Heater in the Same Space) Step 1: Complete vented combustion appliance Information. Furnace/Boiler: _ Draft Hood _ Fan Assisted )(Direct Vent Input: Btu/hr or Power Vent Water Heater. _ Draft Hood !l Fan Assisted _ Direct Vent Input: ±0_LQ22_Btu/hr or Power Vent Step 2: Calculate the volume of the Combustion Appliance Space (CAS) containing combustion appliances. j The CAS includes all spaces connected to one another by code compliant openings. CAS volume: 1, Y It, LxWxH L W H Step 3: Determine Air Changes per Hour (ACH)1 Default ACH values have been incorporated into Table E-1 for use with Method 4b (KAIR Method). if the year of construction or ACH is not known, use method 4a (Standard method). Step 4: Determine Required Volume for Combustion Air. (DO NOT COUNT DIRECT VENT APPLIANCES) 4a. Standard Method Total Btu/hr input of all combustion appliances Input: Btu/hr Use Standard Method column in Table E-1 to find Total Required TRV: W Volume (TRV) If CAS Volume (from Step 2) is greater than TRV then no outdoor openings are needed. If CAS Volume (from Step 2) Is less than TRV then go to STEP 5...- 4b. Known Air Infiltration Rate (KAIR) Method (DO NOT COUNT DIRECT VENT APPLI NCES) Total Btu/hr input of all fan-assisted and power vent appliances Input: t7, L1LK) Btu/hr Use Fan-Assisted Appliances column in Table E-1 to find RVFA: 3,A~ C~ ft' Required Volume Fan Assisted (RVFA) Total Btu/hr input of all Natural draft appliances Input: Btu/hr Use Natural draft Appliances column in Table E-1 to find RVNFA: ft' Required Volume Natural draft appliances (RVNDA) Total Required Volume (TRV) = RVFA+ RVNDA TRV = + - 3,6 U TRV ft' if CAS Volume (from Step 2) Is greater than TRV then no outdoor openings are needed. If CAS Volume (from Step 2) Is less than TRV then go to STEP S. Step 5: Calculate the ratio of available interior volume to the total required volume. Ratio = CAS Volume (from Step 2) divided by TRV (from Step 4a or Step 4b) Ratio= 3)i~oa = y Step 6: Calculate Reduction Factor (RF). /l RF = 1 minus Ratio RF = 1- r % - r 5Y Step 7: Calculate single outdoor opening as if all combustion air is from outside. Total Btu/hr input of all Combustion Appliances in the same CAS input: yVi (),00 Btu/hr (EXCEPT DIRECT VENT) Combustion Air Opening Area (CAOA): 3 3 Total Btu/hr divided by 3000 Btu/hr per in' CAOA = V ()e0 / 3000 Btu/hr per ini= in: Step 8: Calculate Minimum CAOA. Minimum CAOA = CAOA multiplied by RF Minimum CAOA = in' Step 9: Calculate Combustion Air Opening Diameter (CAOD) CAOD =1.13 multiplied by the square root of Minimum CAOA CAOD =1,13 J Minimum CAOA = in. diameter go up one Inch in size If using flex duct 1 If desired, ACH can be determined using ASHRAE calculation or blower door test. Follow procedures in Section G304. Page 5 of 6 wrightsofta Project Summary Job: 4015 Date: Feb 13, 2012 Entire House By: Scott M ELANDER MECHANICAL INCORPORATED 591 CITATION DRIVE, SHAKOPEE, MN 55379 Phone: 9524454892 Fax: 952.445.7487 Email: SALESGELANDERMECHANICAL.COM Pro ect Information For: q7 z ~0 Notes: ~'t1 ~~Ui o0b J d Sao r Design Weather: Minneapolis/St. Paul, MN, US Winter Design Conditions Summer Design Conditions Outside db -15 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 85 OF Design TD 13 OF _ Daily range M Relative humidity 50 % Moisture difference 28 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 61274 Btuh Structure 29557 Btuh Ducts 1989 Btuh Ducts 501 Btuh Central vent (100 cfm) 9071 Btuh Central vent (100 cfm) 1366 Btuh Humidification 12676 Btuh Blower 1024 Btuh Piping 0 Btuh Equipment load 85009 Btuh Use manufacturer's data y Rate/swing multiplier 1.00 Infiltration Equipment sensible load 32447 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Tight) Structure 4791 Btuh Ducts 133 Btuh Heating cooling Central vent 100 cfm 1880 Btuh Area (ft2) 5068 5068 Equipment latent load 6804 Btuh Volume (ft3) 32748 32748 Air changes/hour 0.35 0.35 Equipment total load 39251 Btuh Equiv. AVF (cfm) 191 191 Req. total capacity at 0.70 SHR 3.9 ton Heating Equipment Summary Cooling Equipment Summary Make Lennox Make Lennox Trade MERIT 90 Trade 13ACX SERIES - RFC Model ML193UH110P48C-* Cond 13ACX-048-230"10 GAMA ID 4119048 Coil C33-43*++TDR ARI ref no. 3230574 Efficiency 93 AFUE Efficiency 11.0 EER, 13 SEER Heating input 110000 Btuh Sensible cooling 33250 Btuh Heating output 104000 Btuh Latent cooling 14250 Btuh Temperature rise 62 IF Total cooling 47500 Btuh Actual air flow 1583 cfm Actual air flow 1583 cfm Air flow factor 0.025 cfm/Btuh Air flow factor 0.053 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.83 Holdiffalic values have been manually overridden Printout certified by ACCA to meet all requirements of Manual J 8th Ed. -Fl - wriiwi ~tsaYt- Right-SulteO Universal 8.0.04 RSU13410 2012-Oct-0915:27:15 ACCA H. ElandeADesktop\Wrightsoft Heat Loss\Lennar 4015 Eagan.rup Calc = MJ8 Front Door faces: Page 1 Component Constructions Job: 4015 wrightsoft- Date: Feb 13, 2012 Entire House By. Scott M ELANDER MECHANICAL INCORPORATED 591 CITATION DRIVE, SHAKOPEE, MN 55379 Phone: 952445-4692 Fax:952-445.7487 Email: SALES*ELANDERMECHANICAL.COM ~~Proiect Information For: i- • Conditions Location: Indoor: Heating Cooling Minneapolis/St. Paul, MN, US Indoor temperature (°F) 70 75 Elevation: 837 ft Design TD (°F~ 85 13 Latitude: 45°N Relative hums ity 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 54.5 28.5 Dry bulb (°F) -15 88 Infiltration: Daily range (°F) - 19 (M) Method Simplified Wet bulb (°F) - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 ?Tight) Construction descriptions or Area u-value Insul R Htg HTM Loss CIg HTM Gain IF BWh/Itz-°F Itp °F/Stuh Btuh1h. Btuh BtuhNlt Stuh Walls 12F-0sw: Frm wall, vnI ext, r-21 cav ins, 1/2" gypsum board int fnsh, n 755 0.065 21.0 5.52 4172 0.90 677 2"x6" wood frm a 700 0.065 21.0 5.52 3867 0.90 628 s 732 0.065 21.0 5.52 4044 0.90 657 w 1000 0.065 21.0 5.53 5525 0.90 897 all 3187 0.065 21.0 5.53 17609 0.90 2859 15B-10sfc-8: Bg wall, heavy dry or light damp soli, concrete wall, n 352 0.050 10.0 4.25 1496 0 0 r-10 ins, 8" thk a 400 0.050 10.0 4.25 1700 0 0 S 352 0.050 10.0 4.25 1496 0 0 all 989 0.050 10.0 3.93 3884 0 0 Partitions (none) Windows 61A: VINYL Insulated Glass Double Hung; NFRC rated n 25 0.290 0 24.7 611 9.18 228 (SHGC=0.29) a 36 0.290 0 24.6 887 30.8 1107 s 48 0.290 0 24.6 1183 17.2 825 w 209 0.290 0 24.6 5155 30.8 6434 w 74 0.290 0 24.6 1818 30.8 2269 all 392 0.290 0 24.6 9655 27.7 10863 61 A: VINYL Insulated Glass Double Hung; NFRC rated a 72 0.290 0 24.7 1779 28.0 2018 M0 014ft.9 tsulated Glass Double Hung; NFRC rated w 41 0.290 0 24.6 1006 31.7 1293 (SHGC=0.30) w 41 0.290 0 24.6 1006 31.7 1293 all 82 0.290 0 24.6 2011 $1.7 2586 Doors 11 JO: Door, mtl fbrgl type a 42 0.600 6.3 51.0 2142 15.0 630 Ceilings 16CR-44ad: Attic ceiling, asphalt shingles roof mat, r-44 cell Ins, 1868 0.022 44.0 1.87 3493 0.85 1582 5/8" gypsum board int fnsh -tld- wvrightsoft- Right-SuIUM Universal 8.0.04 RSU13410 2012-Oct-0915:27:15 ACCA H. ElandeADesktoplWrightsoft Heat Loss{Lennar 4015 Eagan.rup Calc = MJB Front Door faces: Page 1 Floors 20P-38c: Fir floor, frm fir, 12" thkns, carpet fir fnsh, r-5 ext ins, r-38 206 0.030 38.0 2.55 525 0.26 53 cav ins, gar ovr 20P-38v: Fir floor, frm fir, 12" thkns, vinyl fir fnsh, r-5 ext ins, r-38 26 0.030 38.0 2.55 66 0.26 7 cav ins, gar ovr 21A-32t: Bg floor, heavy dry or light damp soil, B' depth 1636 0.020 0 1.70 2781 0 0 AL. wrightoWt- Right-Sulte®Universal 8.0.04RSU13410 2012-Oct-0915:27:15 ACCA H. ElanderTesktop\Wrightsoft Heat LossNLennar 4015 Eagan.rup Calc - MJ8 Front Door faces: Page 2 M U UcrU s'q CIS n rr m d. z' w x e4i. a; F- E m:' S y y. O (/j cy M r• M r ~n N N r• cl 3: m o H CY Q > o w O `p w LL w LL o o O o o o O a 2 o n d O x a a a U o r a o O o o 2 w a a ° m j a J J J ~ o o a o w w¢ m a O r m w p a a¢¢ z a 0 t 3 w m m m h. Q J cn w co LL 'S A C7 z y g a cn m `.d M h "Q. O O N d N CD O O (dD N 0 h - X X X X U7 00 ,1~( 6 X N X X N N V' X N X N N z m 1 fD g U., m r Y E-m X X M X X M P X X X p~ X 0 Oi 6~ h ~ d v v O v v d h h v M h N N N N v w g 0 h h h v N tD I v h v W J co to 0 w v o u> v w w w w w w w w w w w w w w w w w w w 'n to z z z z z z z z z z z z z z z z z z z o w z ¢ w o o o o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C) 2 rn QO z z z z z z z z z z z z z z z z z z z CLM Z N ¢ Q ¢ j A O W 0 co z n 4 O o X Z LC( U) CF) L! 1 " C7 Cl) U ao W a~ l Co m ro to N vVi U U w u~ (Vn C d vi ~ H A y o o U 19 Cl) to C m b a r cr rai U v L)i v~i u) a u. Z¢ v w n 0 N ~ a ' cc M US V) m o a w o cn v> g g t9 Ir C; sJ~i w m _ ~n~- 0y 1 M J d Q J J U 7 U ~y J ~ O O z Q ~ ~ C) Oj O fn 4 fn o N !A to -j J M J co a g w t`h C! C7 U a a i ¢ Ll! } Q >}2_ 2_ y}2 J taw.) Z J Q Q J F- 1- z J J R' I1I1J C~~J a L1J l~iJ (3~ w a Z . A cn Q c 6 0 0 0 ° ¢ < 0 t7 0 o w z z z? z z z u7 J z z_3 z z J 2 Z LL SO~+'. S S S p Jl 4 r 2 S J S T p x S p p C9 C7 w (7 (7 X X z w w O., 0 C3 0 w U w 0 o o Ix ..J z z z X J A z z z a U> Z z X z z LL LL Q O CO Cl) (W {LLyy cL va p m m m p U v~ ~n u cn 0 . O I^ Z ik 7k # 7: N ¢ N E N N d ¢ n N N N N N N N U1 c9 ` L7 a A a ae a ac as at ~t vk ak < c'ri 0 < S z Li Z ~n Z C7 0 0 0 0 0 o a o 0 0 0 O Z N N N N N N N N N N N y Z C7 Z y i _ S o== o o= Z S¢ S S o S S o 0 w _1 w _ Q) VJ y N V1 (!1 N M N M N fA Ln N CQ UT N N sic ` m r r C O N N N N N LL N M Is. N j~ j T~ Q o d ao d o o m? v d d o r~5 d f.1 L Q : tD IA M U] U) d U7 U} V' V N ~ N iCL d) o v O C a O ` o aXo o aX_D o 0 0 0( v v o O (A M M M N N tf) M M P! ~D N N M V) N N v t~ ¢ v a rn co 5 s LOT SURVEY CHECKLIST FOR RESIDENTIAL BUILDING PERMIT APPLICATION PROPERTY LEGAL: i, SAnd-aa&,t 3rd 411, DATE OF SURVEY: LATEST REVISION: d a~ c R U o z a DOCUMENT STANDARDS ❑ ❑ • Registered Land Surveyor signature and company ❑ 0 • Building Permit Applicant ❑ 0 • Legal description ❑ 0 • Address ,g 0 0 • North arrow and scale ❑ ❑ • House type (rambler, walkout, split w/o, split entry, lookout, etc.) ❑ 0 • Directional drainage arrows with slope/gradient % 0 ❑ • Proposed/existing sewer and water services & invert elevation ❑ ❑ • Street name 0 ❑ • Driveway (grade & width - in R/W and back of curb, 22' max.) JJ ❑ 0 • Lot Square Footage ,~z 0 0 • Lot Coverage ELEVATIONS Existing ❑ ❑ • Property corners 0 0 Top of curb at the driveway and property line extensions 0 • Elevations of any existing adjacent homes ❑ ❑ • Adequate footing depth of structures due to adjacent utility trenches pf ❑ 0 • Waterways (pond, stream, etc.) Proposed ❑ ❑ • Garage floor 0 ❑ • Basement floor p ❑ • Lowest exposed elevation (walkout/window) 0 0 • Property corners J ❑ ❑ • Front and rear of home at the foundation PONDING AREA (if applicable) ❑ 0 • Easement line ❑ ❑ • NWL ❑ 0 • HWL ❑ ❑ • Pond # designation ❑ ❑ • Emergency Overflow Elevation ❑ ~1 0 • Pond/Wetland buffer delineation Y . Shoreland Zoning Overlay District Y = Conservation Easements DIMENSIONS 0 0 • Lot lines/Bearings & dimensions ❑ 0 • Right-of-way and street width (to back of curb) ❑ ❑ • Proposed home dimensions including any proposed decks, overhangs greater than 2', porches, etc. (i.e. all structures requiring permanent footings) ❑ ❑ • Show all easements of record and any City utilities within those easements fd 0 ❑ • Setbacks of proposed structure and sideyard setback of adjacent existing structures ref 0 0 • Retaining wall requirements: Reviewed By: Date G:/FORMS/Building Permit Application Rev. 11-26-04 P18NEERengineering~q CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS 2422 Enterprise Drive, Mendota Heights, MN 55120, Phone: (651) 681 1914 Fax: (651) 681 9488 - Pioneereng.com Certificate of Survey for: LENNAR HOMES Vr L%lmum Stag'es ADDRESS: 979 AUTUMN CIRCLE, EAGAN, MN vi all will BUYER: ROGAN MODEL: SNELLING ELEVATION: E3Lo -e WETLAND NO GRADING LIMIT-- LOT AREA =15887 SF HOUSE AREA = 2295 SF PORCH AREA =132 SF DRIVEWAY AREA = 861 SF 0 COVERAGE = 20.7% L ~BSa.e BUILDING COVERAGE = 15.3% . y 897.6 7t 11 z VACANT 00 0' 0 00 C, --l~ /,0 s z 00 10 (11 o' 1 BENCH MARK: TOP OF SPIKE o ELEV.=908.73 N665~$p o 19N 06) / io 'fco 1 soz.s J?' 0 W I`O~ O I g vz J/ 909.2 N I 52. 1 p 0 \ ~c s e 1 N I c~i N 44.17 902.9 X 90 1 y c to 0 4160 V ie c ~x o) a , 10 N O 90 .5 190 .2 p O . . O, O cZ - 909.2 5 3 vwi w 3 3 > I N W i aim O01~ X0 1 LL: r' N a ^ 2.C0 I 00 ' D i u v 903.5 e I J 03:3 l1~ of -T L5 1 33 a 909.1 ' co o_ cv Q EL 903.4 I a r I J h a o rn~ O I 00 Q 0 / / r 48.33 sos.s p~ JO 909 . 902.8 O X 901.9 / CV . od 0; 9 00 cli I / 902.9 / - - BENCH MARK: A' r!9>>°9~ i L / TOP OF SPIKE 'v62o ELEV.=909.22 30, 4S / 0) ry I / ,N 30 ;V 0) (90, / J0 oM "I"YED 9) VACANT 0 0 a ~Q~/, LAuAl,4 k NGIiNEEIZING DEPT. A V 9oa: BENCH MARK: /a 909.1 TOP NUT HYDRANT LOTS 3-4 BLK 1 ELEV.= NOTE: ADD FOUNDATION LEDGE AS REQUIRED LOWEST ALLOWABLE FLOOR ELEVATION :902.7 NOTE: GRADING PLAN BY PIONEER ENGINEERING LAST DATED WAS USED TO DETERMINE THE PROPOSED ELEVATIONS SHOWN ON THIS CERTIFICATE. HOUSE ELEVATIONS : (PROPOSED) /ASBUILT NOTE: PROPOSED BUILDING DIMENSIONS SHOWN ARE FOR HORIZONTAL / LOCATION OF STRUCTURES ON THE LOT ONLY. CONTACT BUILDER PRIOR TO LOWEST FLOOR ELEVATION 904.4) CONSTRUCTION FOR APPROVED CONSTRUCTION PLANS. / TOP OF FOUNDATION ELEV. (912.4) NOTE: NO SPECIFIC SOILS INVESTIGATION HAS BEEN PERFORMED ON THIS LOT BY THE SURVEYOR. THE SUITABILITY OF SOILS TO SUPPORT THE SPECIFIC GARAGE SLAB ELEV. 0 DOOR . (92.7) / HOUSE PROPOSED IS NOT THE RESPONSIBILITY OF THE SURVEYOR. NOTE: THIS CERTIFICATE DOES NOT PURPORT TO SHOW EASEMENTS OTHER THAN THOSE SHOWN ON THE RECORDED PLAT. X 000.00 DENOTES EXISTING ELEVATION NOTE: CONTRACTOR MUST VERIFY DRIVEWAY DESIGN. ( 000.00 ) DENOTES PROPOSED ELEVATION DENOTES DRAINAGE FLOW DIRECTION NOTE: BEARINGS SHOWN ARE BASED ON AN ASSUMED DATUM A DENOTES SPIKE WE HEREBY CERTIFY TO LENNAR HOMES THAT THIS IS A TRUE AND CORRECT REPRESENTATION OF A SURVEY OF THE BOUNDARIES OF: LOT 3, BLOCK 1, STONEHAVEN 3RD ADDITION DAKOTA COUNTY, MINNESOTA IT DOES NOT PURPORT TO SHOW IMPROVEMENTS OR ENCROACHMENTS, EXCEPT AS SHOWN, AS SURVEYED BY ME OR UNDER MY DIRECT SUPERVISION THIS 30TH DAY OF AUGUST 2012. REVISED: NOTE: 9-3-12 STAKE HOUSE SIGNED: P NEER ENGINEERING, P.A. SCALE : 1 INCH = 30 FEET BY: 7352 112229000 Peter J. Hawkinson License No. 42299 PERMIT City of Eagan Permit Type:Plumbing Permit Number:EA109113 Date Issued:02/11/2013 Permit Category:ePermit Site Address: 979 Autumn Cir Lot:3 Block: 1 Addition: Stonehaven 3rd PID:10-72702-01-030 Use: Description: Sub Type:Residential Work Type:New Description:Water Softener Meter Size Meter Type Manufacturer Serial Number Remote Number Line Size Comments:Bob Sable 5242Quebec Ave N. New Hope, Mn 55428 763-535-4694 Fee Summary:PL - Permit Fee (WS &/or WH)$55.00 0801.4087 Surcharge-Fixed $5.00 9001.2195 $60.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - US Home Corporation 16305 36th Ave N Ste 600 Minneapolis MN 55446 Bob Sable Services 5242 Quebec Ave N New Hope MN 55428 (612) 534-6526 Applicant/Permitee: Signature Issued By: Signature city of Etall Address: 979 Autumn Cir Zip: 55123 Permit #: 107649 The following items were / were not completed at the Final Inspection on: A- AO.../3 Final grade - 6" from siding Permanent steps — Garage D2i,7 pry-: ,/p fzemai 1/ i Permanent steps — Main Entry Permanent Driveway Permanent Gas Retaining Wall or 3:1 Max Slope Sod / Seeded Lawn Trail / Curb Damage Snri'v 4,0vfrit/1•O Porch Lower Level Finish 1r Deck AYA Fireplace 2x /%14e,:/' d Az. • Verify with your builder that roof test caps from the plumbing system have been removed. • Turn off water supply to the outside lawn faucets before freeze potential exists. • CaII the Engineering Department at (651) 675-5646 prior to working in the right-of-way or installing an irrigation system. Building Inspector: G:\Building Inspections\FORMS\Checklists City of Eagan 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 Use BLUE or BLACK Ink For Office Use Permit#: IO531 Permit Fee: G2g9. d Date Received: 5 )15 113 Staff: 2013 RESIDENTIAL BUILDING PERMIT APPLICATION Date: ^5' / 3 Site Address: 4775' ,4(-4-44e.444// e / Unit #: Phone: Address / City / Zip: ` ryoc'�� Applicant is: Owner Contractor Description of work: �� .� ! ' jC C Construction Cost: / C9tjv Multi -Family Building: (Yes / No Company: a, Ad 6 a 64 Contact: 044 Address: k ,e 1,:l_�u a^� 4t� City: G t7t" � J State: 044/ Zip: 5 i Phone: 6 (> - 7 L{ / A 9 License #: JS C. 7 Lead Certificate #: /u A If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) (3 COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? Yes _No If yes, date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer & Water Contractor: Phone: CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.ciooherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuatnce.. x CA + CJC9- :.kAJ x App icant's Printed Name Appant's Signature Page 't`of 3 DO NOT WRITE BELOW THIS LINE {10531 SUB TYPES Foundation Single Family Multi 01 of Plex Accessory Building WORK TYPES 4,New Addition Alteration Replace Retaining Wall DESCRIPTION Valuation Plan Review Fireplace Garage Deck Lower Level Interior Improvement Move Building Fire Repair Repair (25%_ 100% '(J Census Code # of Units # of Buildings Type of Construction Porch (3 -Season) Porch (4 -Season) Porch (Screen/Gazebo/Pergola) Pool Occupancy Code Edition Zoning Stories Square Feet Length Width REQUIRED INSPECTIONS Footings (New Building) . Footings (Deck) Footings (Addition) Foundation Drain Tile Roof: _Ice & Water _Final Framing Fireplace: _Rough In Air Test _Final Insulation Sheathing Sheetrock Reviewed By: r,. Siding Reroof Windows Egress Window _ Storm Damage Exterior Alteration (Single Family) Exterior Alteration (Multi) Miscellaneous Demolish Building* Demolish Interior Demolish Foundation Water Damage *Demolition of entire building — give PCA handout to applicant MCES System WA,A 7 SAC Units i City Water Booster Pump PRV Fire Sprinklers Meter Size: Final / C.O. Required Final / No C.O. Required HVAC _ Gas Service Test Gas Line Air Test Other: Pool: _Footings _Air/Gas Tests _Final Siding: _Stucco Lath _Stone Lath _Brick Windows Retaining Wall: _ Footings _ Backfill _ Final Radon Control Erosion Control , Building Inspector RESIDENTIAL FEES Base Fee Surcharge Plan Review MCES SAC City SAC Utility Connection Charge S&W Permit & Surcharge Treatment Plant Copies TOTAL 006 33C x � Page Page 2 of 3 PIZNEERengineer;ng CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS 2422 Enterprise Drive, Mendota Heights, MN 55120, Phone: (651) 681 1914 Fax: (651) 681 9488 - Pioneereng.com Certificate of Survey for: LENNAR HOMES ADDRESS: 979 AUTUMN CIRCLE, EAGAN, MN BUYER: ROGAN MODEL: SNELLING ELEVATION: E3 LOT AREA =15887 SF HOUSE AREA = 2295 SF PORCH AREA =132 SF DRIVEWAY AREA = 861 SF COVERAGE = 20.7% BUILDING COVERAGE = 15.3% VACANT r J r� BENCH MARK: � TOP OF SPIKE ' ELEV.=908.73 6 6 °09 N6 \ 19,0 r O3 C) A:\ 00 WETLAND NO GRADING LIMIT --J i 1 \ 1 894.8 m =Z r 897.6 e �c �0 ZO 8951 1 909.1 BENCH MARK: TOP OF SPIKE ELEV.=909.22 416 (9„ 60303 %.101' 11 L BENCH MARK: TOP NUT HYDRANT LOTS 3-4 BLK 1 ELEV.= NOTE: ADD FOUNDATION LEDGE AS REQUIRED VACANT '4S NOTE: GRADING PLAN BY PIONEER ENGINEERING LAST DATED WAS USED TO DETERMINE THE PROPOSED ELEVATIONS SHOWN ON THIS CERTIFICATE. NOTE: PROPOSED BUILDING DIMENSIONS SHOWN ARE FOR HORIZONTAL LOCATION OF STRUCTURES ON THE LOT ONLY. CONTACT BUILDER PRIOR TO CONSTRUCTION FOR APPROVED CONSTRUCTION PLANS. NOTE: NO SPECIFIC SOILS INVESTIGATION HAS BEEN PERFORMED ON THIS LOT BY THE SURVEYOR. THE SUITABILITY OF SOILS TO SUPPORT THE SPECIFIC HOUSE PROPOSED IS NOT THE RESPONSIBILITY OF THE SURVEYOR. NOTE: THIS CERTIFICATE DOES NOT PURPORT TO SHOW EASEMENTS OTHER THAN THOSE SHOWN ON THE RECORDED PLAT. NOTE: CONTRACTOR MUST VERIFY DRIVEWAY DESIGN. NOTE: BEARINGS SHOWN ARE BASED ON AN ASSUMED DATUM A <fi 905.4 400, 909.1 LOWEST ALLOWABLE FLOOR ELEVATION :902.7 HOUSE ELEVATIONS LOWEST FLOOR ELEVATION TOP OF FOUNDATION ELEV. GARAGE SLAB ELEV. © DOOR (PROPOSED)/ASBUILT (904.4) / (912.4) / (912.1) / X 000.00 DENOTES EXISTING ELEVATION ( 000.00 ) DENOTES PROPOSED ELEVATION DENOTES DRAINAGE FLOW DIRECTION A DENOTES SPIKE WE HEREBY CERTIFY TO LENNAR HOMES THAT THIS IS A TRUE AND CORRECT REPRESENTATION OF A SURVEY OF THE BOUNDARIES OF: LOT 3, BLOCK 1, STONEHAVEN 3RD ADDITION DAKOTA COUNTY, MINNESOTA IT DOES NOT PURPORT TO SHOW IMPROVEMENTS OR ENCROACHMENTS, EXCEPT AS SHOWN, AS SURVEYED BY ME OR UNDER MY DIRECT SUPERVISION THIS 30TH DAY OF AUGUST, 2012. SCALE : 1 INCH = 30 FEET 7352 112229000 REVISED: NOTE: 9-3-12 STAKE HOUSE SIGNED:PtJNEER, ENGINEERING, P.A. BY: Peter J. Hawkinson License No. 42299 PERMIT City of Eagan Permit Type:Plumbing Permit Number:EA170564 Date Issued:07/09/2021 Permit Category:ePermit Site Address: 979 Autumn Cir Lot:3 Block: 1 Addition: Stonehaven 3rd PID:10-72702-01-030 Use: Description: Sub Type:Residential Work Type:Replace Description:Standard Water Heater Meter Size Meter Type Manufacturer Serial Number Remote Number Line Size Comments:Carbon monoxide detectors are required within 10 feet of all sleeping room openings in residential homes (Minnesota State Building Code). Please call Building Inspections at (651) 675-5675 to schedule a final inspection. Fee Summary:PL - Permit Fee (WS &/or WH)$59.00 0801.4087 Surcharge-Fixed $1.00 9001.2195 $60.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Timothy E & Melissa S Tstes Rogan 979 Autumn Cir Eagan MN 55123 (612) 356-1930 Hero Plumbing Heating & Cooling Inc 10900 Hampshire Ave S Minneapolis MN 55438 (612) 827-4674 Applicant/Permitee: Signature Issued By: Signature PERMIT City of Eagan Permit Type:Mechanical Permit Number:EA174753 Date Issued:02/17/2022 Permit Category:ePermit Site Address: 979 Autumn Cir Lot:3 Block: 1 Addition: Stonehaven 3rd PID:10-72702-01-030 Use: Description: Sub Type:Furnace Work Type:Replace Description: Comments:Carbon monoxide detectors are required within 10 feet of all sleeping room openings in residential homes (Minnesota State Building Code). Questions regarding electrical permit requirements should be directed to State Electrical Inspector, Pete DeGrood at (507) Fee Summary:ME - Permit Fee (Replacements)$59.00 0801.4088 Surcharge-Fixed $1.00 9001.2195 $60.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Timothy E & Melissa S Tstes Rogan 979 Autumn Cir Eagan MN 55123 Hero Plumbing Heating & Cooling Inc 10900 Hampshire Ave S Minneapolis MN 55438 (612) 827-4674 Applicant/Permitee: Signature Issued By: Signature