Loading...
2161 Cedar Grove Tr )0qj ~~~,Use BLUE or BLACK Ink J I For Office Use I Permit / City of Er~- 07 n 3 3830 Pilot Knob Road q Permit Fee: Eagan MN 55122 1 Phone: (651) 675-5675 I Date Received. Fax: (651) 675-5694 LP 1 I Staff: j -----------------I 2011 COMMERCIAL BUILDING PERMIT APPLICATION' Date: 4-15h-7-- Site Address: vl..p \ r A,,/ Gym gyp, I qae - 1 Tenant Name: (Tenant is: _New/_ Existing) Suite Former Tenant: PROPERTY OWNER Name: Phon Address / City / Zip: 412oJ''- 36 Applicant is: Owner Contractor / TYPE OF WORK Description of work: Construction Cost: % CONTRACTOR Name: / / License Address:1 3G1 ~7r .4a _ S MSC ~/a City: ! lr~I ` 1 State:" Zip:7 Phone: Contact: _ Email: RCHITECT Name: ! ~lrvtt I - Registration Address: Auer City: ~~y~`Lyt•-~ 1 State: Lhtt.- Zip:_ r 'hone: Contact Person: _ CM Email: 0-kl Cis. Licensed plumber installing new sewer/water service: /"{rQ Phone # AVII 'y,C - 'uQ/ NOTE. Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that the are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utili da Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org ty mage. I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work w r iew nd approval of plans. Applicants Printed Name Apx plicant's Si re Page 1 of 3 IV DO NOT WRITE BELOW THIS LINE Q SUB TYPES -Z~1 ( ) Foundation _ Public Facility _ Accessory Building Apartments _ Commercial / Industrial _ Exterior Alteration-Apartments Lodging _ Greenhouse / Tent _ Exterior Alteration-Commercial Miscellaneo s Antennae Exterior Alteration-Public Facility 4' 5,~y ie TPavull - - WO,RKIYPES New _ Interior Improvement Siding _ Demolish Building* Addition _ Exterior Improvement Reroof _ Demolish Interior Alteration Repair Windows _ Demolish Foundation _ Replace _ Water Damage Fire Repair _ Salon Owner Change Retaining Wall *Demolition of entire building - give PCA handout to applicant DESCRIPTION 709✓ar~ Valuation /rJS Occupancy --r-84 P-3 MCES System ye- ~j Plan Review yes Code Edition OG'7 M50 SAC Units T~- (25% ✓100%-) Zoning PP City Water Census Code Stories .Z-- Booster Pump # of Units 8 Square Fegiot A ~/#I PRV # of Buildings / Length Fire Sprinklers -I.&f, 1 XD Type of Construction - Width 7, REQUIRED INSPECTIONS Footings (New Building) ✓ Sheetrock Footings (Deck) ✓Final / C.O. Required Footings (Addition) Final / No C.O. Required V Foundation Other: S1t.ea-t~ii" Drain Tile j Pool: Footings -Air/Gas Tests -Final Roof: -Decking -Insulation ✓ Ice & Water "Final ✓Siding: -Stucco Lath -/Stow Lath -Brick Framing Windows ~l /Lfµ•~. G80 X 90.3 G 1, 35G. ~v Fireplace: -Rough In -Air Test -Final R taining WallP 9d•~= V., P5<2 V Insulation Erosion Control / i 11 as t X07 3,09 ✓ Meter Size: /S, S"o9t . 6 f Final C/O Inspection: Schedule Fire Marshal to be present: -Yes V---No Reviewed By: Building Inspector Reviewed By: , Planning COMMERCIAL FEES Base Fee VZ.. 75'- Water Quality Surcharge $ 7. S~ Water Supply & Storage (WAC) / 2 (op c0 Plan ReviewZS y 70. i Storm Sewer Trunk MCES SACG S. Da Sewer Trunk City SAC 100.00 Water Trunk S&W Permit & Surcharge 11,540 Street Lateral Treatment Plant 7f 8 . 00 Street Treatment Plant (Irrigation) Water Lateral Park Dedication' 790 60 Other: lrPIA.V 36 3 Trail Dedication'-' Water Quality TOT Page 2 of 3 /67y~3 New Construction Energy Code Compliance Certificate Per N1101.9 Rudldinn., C'ertifiaate,-Abuilding ccritficatc shall iie posted iu a peontaleady visibl¢ location inside 1we Cortirwaie Posted the building. The "mficateshall be completed by the builder and shall list information and values of wm uents listed ill *1 able NJ 101,8. Place your Mailing Addressurlh. ttwe111ag ur 6wetrwg NttiC r f,. logo here MODEL 428 A EAGAN Name of Residential Comraelar hiN Liec"A Number LENNAR HOMES - Commuuiiy - PlanJp THERMAL ENVELOPE RADON SYSTEM Type. Check AN That Apply x passive (No halt) a Aeti ve (1Oth jury and rtrortomete r tit, r, other's}'steun utontloorig device) - ~ o m u p Ox CJ y A a G O. f s'f Insulation Location y r z o L11 F" ~ r:, c.. u, u. ~ c~ i~ other l lease'r}escrihe fiesre Below l;'ntireSlah NA Foundation Wall - NA Perimeter bf,Silab on (:grade 10 Rim .loist (Fnundation) N yr~+m nteriocextenororfntaprsl Rim Joist (t" Floor+) 10 iy}rp n nx,aiv., i+dctivr exterior or tni6gr~l Wall 21 Ceiling, net 44 Ceiling, vaulted NA Ray Windows or cantilevered areas 381 1 Honus room over garage 38 21 101 6 Describe other insulated areas Windows & Doors iieatin or Cooling Duns Outside Conditioned Spaces Average 0-Factor (excla+r s lights gruel care door) U: 0.29 Not applicable, 01 (filets located in conditioned space Solar Hi;at (lain C:ueilacivnt(SHGC): 2fx-3(1 R-valtta - MECHANICAL SYSTEMS Make-up Air Schwa Tjpe Appliances IicatingSystern l)omtisti(! Water Neuter 17001i "R s- Not required ermech.code Fuel Type NAT GAS Electric R-41 OA Rlauuructttrer LENNOX A.O, SMITH LENNO?C PUS e.red Irim-lo"edwillrC,,Jt r,stdevice, t1mi~r1 ML193UH045P24 13ACX01 II Describe: laput in 45,000 Capacrry in SO Output in I.i C3thcr, dc7cribc:. Rating; or Sire 13TUS Oallonu_ Tons: riser Cos : 22,196 Hear Lo ,ition of duct ur system: Stractnre's('aicutAtect Gain AF1 T, or 92 Sl3ttK: 13 HSI'F% Calculated 18,000 Ltficlenc sooiin load: cfmis "round duct OR Mechanical Ventilation System " uncial duct Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air Combustion Air Select a Type source heat pump with gas back-up furnace) Not required per mech. code Select Passive - Heat Recover Ventilator (HKV Capacity in elins: t:ow: its r. Other, ddescribe: - Fner r ltecaver Ventilator (T'itV) Ca ,actt td cilns:. Low: -Co'cation or duct or system: !Y 1 y X 1('011fillLIOUScxliattstingiztn(s)ratedcaliacit incfmst JM furnace room Iscotion of fat(s), dcssrihe MAIN IMAS"I-ER BATH Capacity continuous ventilation rate in cfms~ SQ "round duct 012 Yutahvcntilation (intermittent + continuous) tale iu cfms:12 IQ metal duce . Lennar --429-A Revere - Hayfield HVAC Load Calculations for Lennar Homes I Prepared By: Sabre Plumbing And Heating Saturday, August 11, 2012 Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. - - - INS y ~u +~Z Project Title: Lennar - Project Date: 8/11/2012 429-A Revere - Hayfield Client Name: Lennar Homes Company Name: Sabre Plumbing And Heating Reference City: Mfineapolis, Minnesota Building Orientation: Front door faces North Daily Temperature Range: Medium Latitude: 44 Degrees Elevation: 834 ft. Altitude Factor. 0.970 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rei.Hum Rel.Hum U Bulb Difference Winter: -11 -12.38 32% n/a 72 n/a Summer: 88 73 50% 50% 75 35 1!111 11- mgl iffigini Total Building Supply Cl M: 252 CFM Per Square ft.: 0.143 Square ft. of Room Area: 1,758 Square ft. Per Ton: 2 353 Volume (ft') of Cond. Space: 14,734 ' lamillsli-2-M 1: Total Heating Required Including Ventilation Air: 22,196 Btuh 22.196 MBH Total Sensible Gain: 6,572 Btuh 73 % Total Latent Gain: 2,395 Btuh 27 % Total Cooling Required Including Ventilation Air: 8,967 Btuh 0.75 Tons (Based On Sensible + Latent) Rhvac Is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:Irhvac projects\LENNAR - 429-A Revere -Steve.rh9 _ _ _ .~:...Ik~~. •ai•. 11 Scope Net ft.: Sen Lat Net Sen Sys Sys Sys Dud "9 Clg Act Ton /Ton Area Gain Gain Gain Loss CFM ;FM CFM Sie Building 0.75: 2,3531 1,758 6,572 2,395. 8,967 22,196 195 252; 252 System 1 0.75 2.3531i 1,758 € 65722.395_.8 967 22,196 i96 6x9 ~ 252 ventilation . _..1.., _ i., 1 193 1 ,995 3.189 ) 7,618 Zone 1 1 1,758 5,379 400[ 5,779 14,578 195 2521 1-Daning/ Living 442 1,322 0 1322€ 5906 79 62 15 2-Main Floor Foyer/ Bath / Stairs ( 228 3281 0. 328 3,050 41 15, 1-2 34.lpper Floor i 1 088 3,729 400 4,129 5 622 75 175 2-5 r-lrhvar nrniAt tall FMWAR _ A90_A Pmmm ~Ij SIR '111 5~5^!a~a Lennar TH .20: Glazing- 97.5 2,346 0 2,184 2,184 11 P: Door-Metal - Polyurethane Core 40.8 982 0 284 284 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud 603.7 3,256 0 521 521 cavity, no board insulation, siding finish, wood studs 16CR-44: Roof/Ceiling-Under Attic with Insulation on Attic 1088 1,987 0 910 910 Floor (also use for Knee Walls and Partition Ceilings), Vented Attic with Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-44 insulation 22C-10pm-t: Floor-Slab on grade, Horizontal board 54 4,966 0 0 0 insulation extends 4' under slab, tile covering, R-10 insulation, passive, heavy dry or light wet soil Lennar TH c: Floor- 418 1,041 0 100 100 Subtotals for structure. 14,578 Q 3,999 -....._.3,999 People: 2 400 460 860 Equipment: 0 0 0 Lighting: 0 a a Ductwork: 0 0 0 0 Infiltration: Winter CFM: 0, Summer CFM: 0 0 0 0 0 Ventilation: Winter CFM: 86, Summer CFM: 86 7,618 1,995 1,193 3,189 Exhaust: Winter CFM: 86, Summer CFM: 86 .AEI? Excursion 920 920 Total Building Load Totals. 22,196 2,395 6,572 8,967 Total Building Supply CFM: 252 CFM Per Square ft.: 0.143 Square ft. of Room Area: 1,758 Square ft. Per Ton: 2,353 Volume (ft') of Cond. Space: 14,734 Total Heating Required Including Ventilation Air: 22,196 Btuh 22.196 MBH Total Sensible Gain: 6,572 Btuh 73 % Total Latent Gain: 2,395 Btuh 27 % Total Cooling Required Including Ventilation Air: 8,967 Btuh 0.75 Tons (Based On Sensible + Latent) will Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:lrhvac projects\LENNAR - 429-A Revere -Steve.rh9 v _ _ - MULTI-FAMILY PLAN REVIEW FOR COMPLIANCE WITH AIRCRAFT NOISE ORDINANCE Compliance with Procedures to Ensure Submitter: Noise Impact Area Adequate Noise Attenuation: Lennar Airport - MSP International Exterior wall construction: 16305 36th Ave. No. Noise Zone - 4 Vinyl Suite 600 15/32" sheathing Plymouth, MN 55446 New Infill Residence is a " COND" Tyvek wrap 952-249-3000 use in Noise Zone 4 2x6 studs 16" O.C. R-21 batt insulation with 1/2" gypsum board Roof Construction: Plan. Reviewed: k, (Zt . Peaked roof with manufactured trusses 24" O.C. _ Roof vents M j C F-o (ZO V Shingles Information Submitted: 15# felt Annotated architectural drawings includin : 1/2" sheathing Blown insulation R-44 Windows: Atrium 5/8" gypsum board Swinging Patio Doors: Atrium Entry Doors: Therma Tru Mechanical Ventilation System: Skylights: N/A 2-ton central air conditioning unit Compliance with STC Requirements: Window, Door Frame, Perimeter and Other Seals: All window and door openings are to be caulked 0 Average window/wall area for exterior wall: with butyl-based caulk With this window/wall area ratio and STC 40 walls, windows Fireplace Chimney Cap: with an STC 30 can be used to meet the noise reduction N/A requirements; Ventilation Duct Exterior Wall Penetrations: Summary: All exterior ducts will have bends as required by the ordinance Other measures including duct bends and caulking are being taken to ensure minimum transmission of noise through the Door and Window Construction: exterior building shell so that the construction should meet Windows: Atrium (30 STC) the compatibility guidelines. Sliding Patio Doors: Atrium (30 STC) Therefore, the materials and construction as proposed should meet the requirements of the Eagan aircraft noise ordinance. Entry Doors: Therma Tru (29 STC) Skylights: N/A Review Completed (date): Other Exterior Wall Penetrations: Review Completed b : Tom Tamte Sill sealer between plates and blocks • Use BLUE or BLACK Ink F por riffice Use it r, tnut Wn 11 Permit FeV 44 3g?y Pilot Knob Road ~ ?Date Received: Eagan MN 55122 t Phdns: ~6s1) 675.56T5 i staff Fax: (651) 675-5694 i_._...__ - _ 2013 FIRE SUPPRESSION SYSTEMS PERMIT A►PPLICA►TION* s Sate Address: T° c,ace: strlte Mr: *rar<• (3.52'. - 24 - 3 ~ d~ Wlie 3 :property Owner FPA, r7>'D w- !5V Des,-r 4 dry Type of Work 9 _ itc t Z.1 A cat:- n Gate: farm r+ ~3ii'~'t'' Contractor , . n '7 fT etc S5 tAi ' Contc- FIRE PERMIT TAPE WORK TYPE Additrtrt I L1 ~kr SVs;em i rF heads } _ Remodel f. C'..i Educational N OF WORK; r rf Educational rEES contract Value xt°1o T1UfT1 P vaiua *If r ; on, please call for surcharge tlon is ov:- =5 (00- 00 TOTAL FEE ,':-tent l=ire Meter- Ffi Cr pQ l~L i OTAI FEE *Requirements: 7 caamp4ete sets of draarings and specifications cut shoots on m.atcrats and components to be used G - t/7F%"~1Q iW rj - F ,re Cut,.{ ~ G(' 2'^' A r r. m C}f rS t :r ant G h 3 .N. ord.,,.-an es and Y _ ap, i if rc h_r N t $ .3 [?e}r .veG r ~ t era .3.. C ~,4_ f n^ b w ry £ S' 8 verMt t, t a' -e -is And 8,rr-.,4i C, A A.ppt{cants Signature APP{la's Printed Nama u asp .-.......n mrw do « a,.1lp FOR OFFICE USE REQUIRED INSPECTIONS Hydrostatic Flow Alarm Drain Test Rough In i Trip Pump Test Central Station 11 Final e Conditions of Issuance: 6 Permit Reviewed by: Date: r 1L4 9/j 151 l0?153%f55 %r~(5`7/c)(S9 ) I to 1%1(, 3 CnCdarv- 6r0w T►- Surveyor's Certificate SURVEY FOR : Lennar DESCRIBED AS :Lots 1-8, Block 3, NICOLS RIDGE 4TH, City of Eagan, Dakota County, Minnesota and reserving easements of record. 33.0 832.8~~~~ 110 11, trr AM4 8(34.6 ai/ N ¢8 fj 832. ) '00^ O N7 ° 83 833. 73.22 833.7 • 3 5~.e14 3 18.7 8 3.7 833. 8 Potlo~ • 1N v G°r°9e 334 (0 33.7 Patlo'i •8330 p1 Garage 833.7 00 at! 21$5 Gar 3 78.78 h/ V, 00 833.4 2153 °9e 13.2. 75. 63 1 at! 2157 Carp9e O O Pro oaed 2149 833.5 HP of n ~ BM 833.5 2781 21 31p 0~ 0eotle 81 Pati .3 5.00 833.5 0prpge GOfp9e 2758 /5. 32. o°°/ 78. ~g 215 at! 833.7 32.0 Garage o Z 1833.1 833.7 Garage n ~ Patio g 833.73 20 8 78 >8 833. 8 4800 1 32. v Potio$ 833.7 7 '22 9.00 832.4 S7 os Bm' a 2. ~ Ems' ~ 832.1 ^ +832^7~ 831.9 Exlstin . Un7t 9 i TOB'1hoine 8335 PROPOSED ELEVATIONS BENCHMARK, Front Offsets Top of Foundation = 834.2 Garage Floor = 833.8 Aprox. Sewer Service = Verify 0 MIN. SETBACK REQUIREMENTS Proposed Elev. = Existing Elev. _ - Drainage Directions = Front - House Side Denotes Offset Stake = • SCALE: 1 Inch = 30 feet Rear - Garage Side - JOB NO: I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT REPRESENTATION HEDLIiI/ND OF THE BOUNDARIES OF THE ABOVE DESCRIBED PROPERTY AS SURVEYED 12R-0 E: BY ME OR UNDER MY DIRECT SUPERVISION AND DOES NOT PURPORT TO BOOK: PAGE: SHOW IMPROVEMENTS OR ENCROACHMENTS, EXCEPT AS SHOWN. PLANNING ENGINEERING SURVEYING 2005 Pin Oak Drive DATE __L/ 23/12 Eagan, MN 55122 REV. CAD FILE: Phone: (651) 405-6600 J Y D. LINDGREN, L OD SURVEYOR Nicols Ridge 4th Fax : (651) 405-6606 REV. _4 /_24/13 INNESOTA LICENSE NLIBER 14376 Cityofaali Address: 2161 Cedar Grove Tr Zip: 55122 Permit #: 107883 The following items were / were not completed at the Final Inspection on: q'Z40 Final grade - 6" from siding Permanent steps — Garage Permanent steps — Main Entry Permanent Driveway Permanent Gas Retaining Wall or 3:1 Max Slope Sod / Seeded Lawn Trail / Curb Damage Porch Lower Level Finish 14 -471A -- Deck Fireplace • Verify with your builder that roof test caps from the plumbing system have been removed. • Turn off water supply to the outside lawn faucets before freeze potential exists. • Call the Engineering Department at (651) 675-5646 prior to working in the right-of-way or installing an irrigation system. Building Inspector: 144:k l� G:\Building Inspections\FORMS\Checklists