2161 Cedar Grove Tr
)0qj ~~~,Use BLUE or BLACK Ink
J I For Office Use I
Permit /
City of Er~- 07 n 3
3830 Pilot Knob Road q Permit Fee:
Eagan MN 55122 1
Phone: (651) 675-5675 I Date Received.
Fax: (651) 675-5694 LP 1 I
Staff: j
-----------------I
2011 COMMERCIAL BUILDING PERMIT APPLICATION'
Date: 4-15h-7-- Site Address: vl..p \ r A,,/ Gym gyp, I qae - 1
Tenant Name:
(Tenant is: _New/_ Existing) Suite
Former Tenant:
PROPERTY OWNER Name: Phon
Address / City / Zip: 412oJ''- 36
Applicant is: Owner Contractor /
TYPE OF WORK Description of work:
Construction Cost: %
CONTRACTOR Name:
/ / License
Address:1 3G1 ~7r .4a _ S MSC ~/a City: ! lr~I ` 1
State:" Zip:7 Phone:
Contact: _ Email:
RCHITECT Name: ! ~lrvtt
I - Registration
Address: Auer City: ~~y~`Lyt•-~ 1
State: Lhtt.- Zip:_ r
'hone:
Contact Person: _ CM
Email: 0-kl
Cis.
Licensed plumber installing new sewer/water service: /"{rQ
Phone # AVII 'y,C - 'uQ/
NOTE. Plans and supporting documents that you submit are considered to be public information. Portions of
the information may be classified as non-public if you provide specific reasons that would permit the City to
conclude that the are trade secrets.
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utili da
Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org ty mage.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and
codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a
permit; that the work will be in accordance with the approved plan in the case of work w
r iew nd approval of plans.
Applicants Printed Name
Apx
plicant's Si re
Page 1 of 3
IV DO NOT WRITE BELOW THIS LINE Q
SUB TYPES -Z~1 ( )
Foundation _ Public Facility _ Accessory Building
Apartments _ Commercial / Industrial _ Exterior Alteration-Apartments
Lodging _ Greenhouse / Tent _ Exterior Alteration-Commercial
Miscellaneo s Antennae Exterior Alteration-Public Facility
4' 5,~y ie TPavull - -
WO,RKIYPES
New _ Interior Improvement Siding _ Demolish Building*
Addition _ Exterior Improvement Reroof _ Demolish Interior
Alteration Repair Windows _ Demolish Foundation
_ Replace _ Water Damage Fire Repair _ Salon Owner Change
Retaining Wall *Demolition of entire building - give PCA handout to applicant
DESCRIPTION 709✓ar~
Valuation /rJS Occupancy --r-84 P-3 MCES System ye- ~j
Plan Review yes Code Edition OG'7 M50 SAC Units T~-
(25% ✓100%-) Zoning PP City Water
Census Code Stories .Z-- Booster Pump
# of Units 8 Square Fegiot A ~/#I PRV
# of Buildings / Length Fire Sprinklers -I.&f, 1 XD
Type of Construction - Width 7,
REQUIRED INSPECTIONS
Footings (New Building) ✓ Sheetrock
Footings (Deck) ✓Final / C.O. Required
Footings (Addition) Final / No C.O. Required
V Foundation Other: S1t.ea-t~ii"
Drain Tile j Pool: Footings -Air/Gas Tests -Final
Roof: -Decking -Insulation ✓ Ice & Water "Final ✓Siding: -Stucco Lath -/Stow Lath -Brick
Framing Windows ~l
/Lfµ•~. G80 X 90.3 G 1, 35G. ~v
Fireplace: -Rough In -Air Test -Final R taining WallP 9d•~= V., P5<2
V Insulation Erosion Control / i
11 as t X07 3,09
✓ Meter Size: /S, S"o9t . 6 f
Final C/O Inspection: Schedule Fire Marshal to be present: -Yes V---No
Reviewed By: Building Inspector Reviewed By: , Planning
COMMERCIAL FEES
Base Fee VZ.. 75'- Water Quality
Surcharge $ 7. S~ Water Supply & Storage (WAC) / 2 (op c0
Plan ReviewZS y 70. i Storm Sewer Trunk
MCES SACG S. Da Sewer Trunk
City SAC 100.00 Water Trunk
S&W Permit & Surcharge 11,540 Street Lateral
Treatment Plant 7f 8 . 00 Street
Treatment Plant (Irrigation) Water Lateral
Park Dedication' 790 60 Other: lrPIA.V 36
3
Trail Dedication'-'
Water Quality TOT
Page 2 of 3
/67y~3
New Construction Energy Code Compliance Certificate
Per N1101.9 Rudldinn., C'ertifiaate,-Abuilding ccritficatc shall iie posted iu a peontaleady visibl¢ location inside 1we Cortirwaie Posted
the building. The "mficateshall be completed by the builder and shall list information and values of
wm uents listed ill *1 able NJ 101,8. Place your
Mailing Addressurlh. ttwe111ag ur 6wetrwg NttiC r f,. logo here
MODEL 428 A EAGAN
Name of Residential Comraelar hiN Liec"A Number
LENNAR HOMES
- Commuuiiy - PlanJp
THERMAL ENVELOPE RADON SYSTEM
Type. Check AN That Apply x passive (No halt)
a
Aeti ve (1Oth jury and rtrortomete r tit,
r, other's}'steun utontloorig device)
-
~ o
m u
p Ox CJ y A a
G O. f s'f
Insulation Location y r z o L11
F" ~ r:, c.. u, u. ~ c~ i~ other l lease'r}escrihe fiesre
Below l;'ntireSlah NA
Foundation Wall - NA
Perimeter bf,Silab on (:grade 10
Rim .loist (Fnundation) N
yr~+m nteriocextenororfntaprsl
Rim Joist (t" Floor+) 10
iy}rp n nx,aiv., i+dctivr exterior or tni6gr~l
Wall 21
Ceiling, net 44
Ceiling, vaulted NA
Ray Windows or cantilevered areas 381 1
Honus room over garage 38 21 101 6
Describe other insulated areas
Windows & Doors iieatin or Cooling Duns Outside Conditioned Spaces
Average 0-Factor (excla+r s lights gruel care door) U: 0.29 Not applicable, 01 (filets located in conditioned space
Solar Hi;at (lain C:ueilacivnt(SHGC): 2fx-3(1 R-valtta -
MECHANICAL SYSTEMS Make-up Air Schwa Tjpe
Appliances IicatingSystern l)omtisti(! Water Neuter 17001i "R s- Not required ermech.code
Fuel Type NAT GAS Electric R-41 OA Rlauuructttrer LENNOX A.O, SMITH LENNO?C PUS e.red
Irim-lo"edwillrC,,Jt r,stdevice,
t1mi~r1 ML193UH045P24 13ACX01 II Describe:
laput in 45,000 Capacrry in SO Output in I.i C3thcr, dc7cribc:.
Rating; or Sire 13TUS Oallonu_ Tons:
riser Cos : 22,196 Hear Lo ,ition of duct ur system:
Stractnre's('aicutAtect Gain
AF1 T, or 92 Sl3ttK: 13
HSI'F%
Calculated
18,000
Ltficlenc sooiin load: cfmis
"round duct OR
Mechanical Ventilation System " uncial duct
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air Combustion Air Select a Type
source heat pump with gas back-up furnace) Not required per mech. code
Select Passive -
Heat Recover Ventilator (HKV Capacity in elins: t:ow: its r. Other, ddescribe:
-
Fner r ltecaver Ventilator (T'itV) Ca ,actt td cilns:. Low: -Co'cation or duct or system:
!Y 1 y
X 1('011fillLIOUScxliattstingiztn(s)ratedcaliacit incfmst JM furnace room
Iscotion of fat(s), dcssrihe MAIN IMAS"I-ER BATH
Capacity continuous ventilation rate in cfms~ SQ "round duct 012
Yutahvcntilation (intermittent + continuous) tale iu cfms:12 IQ metal duce
.
Lennar --429-A Revere - Hayfield
HVAC Load Calculations
for
Lennar Homes
I
Prepared By:
Sabre Plumbing And Heating
Saturday, August 11, 2012
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
- - -
INS
y ~u
+~Z
Project Title:
Lennar -
Project Date: 8/11/2012 429-A Revere - Hayfield
Client Name: Lennar Homes
Company Name: Sabre Plumbing And Heating
Reference City: Mfineapolis, Minnesota
Building Orientation: Front door faces North
Daily Temperature Range: Medium
Latitude: 44 Degrees
Elevation: 834 ft.
Altitude Factor. 0.970
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rei.Hum Rel.Hum U Bulb Difference
Winter: -11 -12.38 32% n/a 72 n/a
Summer: 88 73 50% 50% 75 35
1!111 11- mgl iffigini
Total Building Supply Cl M: 252 CFM Per Square ft.: 0.143
Square ft. of Room Area: 1,758 Square ft. Per Ton: 2 353
Volume (ft') of Cond. Space: 14,734 '
lamillsli-2-M 1:
Total Heating Required Including Ventilation Air: 22,196 Btuh 22.196 MBH
Total Sensible Gain: 6,572 Btuh 73 %
Total Latent Gain: 2,395 Btuh 27 %
Total Cooling Required Including Ventilation Air: 8,967 Btuh 0.75 Tons (Based On Sensible + Latent)
Rhvac Is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:Irhvac projects\LENNAR - 429-A Revere -Steve.rh9 _ _ _
.~:...Ik~~. •ai•.
11 Scope Net ft.: Sen Lat Net Sen Sys Sys Sys Dud
"9 Clg Act
Ton /Ton Area Gain Gain Gain Loss
CFM ;FM CFM Sie
Building 0.75: 2,3531 1,758 6,572 2,395. 8,967 22,196 195 252; 252
System 1 0.75 2.3531i 1,758
€ 65722.395_.8 967 22,196 i96 6x9
~ 252
ventilation . _..1.., _
i., 1 193 1 ,995 3.189 ) 7,618
Zone 1
1 1,758 5,379 400[ 5,779 14,578 195 2521
1-Daning/ Living
442 1,322 0 1322€ 5906 79 62 15
2-Main Floor Foyer/ Bath / Stairs ( 228 3281 0. 328 3,050 41 15, 1-2
34.lpper Floor i 1 088 3,729 400 4,129 5 622 75
175 2-5
r-lrhvar nrniAt tall FMWAR _ A90_A Pmmm
~Ij
SIR '111
5~5^!a~a
Lennar TH .20: Glazing- 97.5 2,346 0 2,184 2,184
11 P: Door-Metal - Polyurethane Core 40.8 982 0 284 284
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud 603.7 3,256 0 521 521
cavity, no board insulation, siding finish, wood studs
16CR-44: Roof/Ceiling-Under Attic with Insulation on Attic 1088 1,987 0 910 910
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic with Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-44 insulation
22C-10pm-t: Floor-Slab on grade, Horizontal board 54 4,966 0 0 0
insulation extends 4' under slab, tile covering, R-10
insulation, passive, heavy dry or light wet soil
Lennar TH c: Floor- 418 1,041 0 100 100
Subtotals for structure.
14,578 Q 3,999 -....._.3,999
People: 2 400 460 860
Equipment: 0 0 0
Lighting: 0
a a
Ductwork: 0 0 0 0
Infiltration: Winter CFM: 0, Summer CFM: 0 0 0 0 0
Ventilation: Winter CFM: 86, Summer CFM: 86 7,618 1,995 1,193 3,189
Exhaust: Winter CFM: 86, Summer CFM: 86
.AEI? Excursion
920
920
Total Building Load Totals. 22,196 2,395 6,572 8,967
Total Building Supply CFM: 252 CFM Per Square ft.: 0.143
Square ft. of Room Area: 1,758 Square ft. Per Ton: 2,353
Volume (ft') of Cond. Space: 14,734
Total Heating Required Including Ventilation Air: 22,196 Btuh 22.196 MBH
Total Sensible Gain: 6,572 Btuh 73 %
Total Latent Gain: 2,395 Btuh 27 %
Total Cooling Required Including Ventilation Air: 8,967 Btuh 0.75 Tons (Based On Sensible + Latent)
will
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:lrhvac projects\LENNAR - 429-A Revere -Steve.rh9 v _ _ -
MULTI-FAMILY
PLAN REVIEW FOR COMPLIANCE WITH AIRCRAFT NOISE ORDINANCE
Compliance with Procedures to Ensure
Submitter: Noise Impact Area Adequate Noise Attenuation:
Lennar Airport - MSP International Exterior wall construction:
16305 36th Ave. No. Noise Zone - 4 Vinyl
Suite 600 15/32" sheathing
Plymouth, MN 55446 New Infill Residence is a " COND" Tyvek wrap
952-249-3000 use in Noise Zone 4 2x6 studs 16" O.C.
R-21 batt insulation with 1/2" gypsum board
Roof Construction:
Plan. Reviewed: k, (Zt . Peaked roof with manufactured trusses 24" O.C.
_ Roof vents
M j C F-o (ZO V Shingles
Information Submitted: 15# felt
Annotated architectural drawings includin : 1/2" sheathing
Blown insulation R-44
Windows: Atrium 5/8" gypsum board
Swinging Patio Doors: Atrium
Entry Doors: Therma Tru Mechanical Ventilation System:
Skylights: N/A 2-ton central air conditioning unit
Compliance with STC Requirements: Window, Door Frame, Perimeter and Other Seals:
All window and door openings are to be caulked
0
Average window/wall area for exterior wall: with butyl-based caulk
With this window/wall area ratio and STC 40 walls, windows Fireplace Chimney Cap:
with an STC 30 can be used to meet the noise reduction N/A
requirements;
Ventilation Duct Exterior Wall Penetrations:
Summary: All exterior ducts will have bends as required
by the ordinance
Other measures including duct bends and caulking are being
taken to ensure minimum transmission of noise through the Door and Window Construction:
exterior building shell so that the construction should meet Windows: Atrium (30 STC)
the compatibility guidelines.
Sliding Patio Doors: Atrium (30 STC)
Therefore, the materials and construction as proposed should
meet the requirements of the Eagan aircraft noise ordinance. Entry Doors: Therma Tru (29 STC)
Skylights: N/A
Review Completed (date):
Other Exterior Wall Penetrations:
Review Completed b : Tom Tamte Sill sealer between plates and blocks
• Use BLUE or BLACK Ink
F por riffice Use
it r, tnut Wn 11 Permit FeV
44
3g?y Pilot Knob Road ~ ?Date Received:
Eagan MN 55122 t
Phdns: ~6s1) 675.56T5 i staff
Fax: (651) 675-5694 i_._...__ - _
2013 FIRE SUPPRESSION SYSTEMS PERMIT A►PPLICA►TION*
s
Sate Address: T°
c,ace:
strlte
Mr: *rar<•
(3.52'. - 24 - 3 ~ d~
Wlie
3
:property Owner
FPA, r7>'D w- !5V
Des,-r 4 dry
Type of Work 9 _ itc t
Z.1 A cat:- n Gate:
farm r+ ~3ii'~'t''
Contractor , . n '7 fT etc
S5 tAi '
Contc-
FIRE PERMIT TAPE WORK TYPE
Additrtrt
I L1 ~kr SVs;em i rF heads }
_ Remodel
f.
C'..i
Educational
N OF WORK; r rf Educational
rEES
contract Value xt°1o
T1UfT1 P vaiua
*If r ; on, please call for surcharge
tlon is ov:-
=5 (00- 00 TOTAL FEE
,':-tent l=ire Meter- Ffi Cr pQ l~L i OTAI FEE
*Requirements: 7 caamp4ete sets of draarings and specifications cut shoots on m.atcrats and components to be used
G - t/7F%"~1Q iW rj -
F ,re Cut,.{ ~ G(' 2'^' A r r. m C}f rS t :r ant G h 3 .N.
ord.,,.-an es and Y _ ap, i if rc h_r N t $ .3 [?e}r .veG r ~ t era .3.. C ~,4_
f n^ b w ry £ S' 8 verMt t, t a'
-e -is And 8,rr-.,4i C,
A A.ppt{cants Signature
APP{la's Printed Nama
u asp .-.......n mrw do « a,.1lp
FOR OFFICE USE
REQUIRED INSPECTIONS
Hydrostatic Flow Alarm Drain Test Rough In
i
Trip Pump Test Central Station 11 Final
e
Conditions of Issuance:
6
Permit Reviewed by: Date:
r
1L4 9/j 151 l0?153%f55 %r~(5`7/c)(S9 ) I to 1%1(, 3 CnCdarv- 6r0w T►-
Surveyor's Certificate
SURVEY FOR : Lennar
DESCRIBED AS :Lots 1-8, Block 3, NICOLS RIDGE 4TH, City of Eagan, Dakota County,
Minnesota and reserving easements of record.
33.0 832.8~~~~ 110 11, trr
AM4
8(34.6
ai/ N ¢8 fj
832. )
'00^ O N7 ° 83
833. 73.22 833.7 • 3 5~.e14 3
18.7 8 3.7
833. 8 Potlo~ • 1N
v G°r°9e 334
(0 33.7 Patlo'i •8330
p1 Garage 833.7
00 at! 21$5 Gar 3 78.78 h/
V, 00 833.4 2153 °9e 13.2. 75. 63
1
at! 2157 Carp9e
O
O Pro oaed 2149 833.5
HP of n ~
BM 833.5 2781 21 31p 0~ 0eotle
81 Pati
.3 5.00 833.5 0prpge GOfp9e 2758 /5. 32.
o°°/ 78. ~g 215 at!
833.7 32.0 Garage o Z
1833.1 833.7 Garage
n ~ Patio g 833.73 20
8 78 >8 833.
8
4800 1 32. v Potio$ 833.7 7 '22 9.00
832.4 S7 os Bm'
a 2. ~ Ems' ~
832.1 ^ +832^7~
831.9
Exlstin
. Un7t 9
i TOB'1hoine
8335
PROPOSED ELEVATIONS BENCHMARK,
Front Offsets
Top of Foundation = 834.2
Garage Floor = 833.8
Aprox. Sewer Service = Verify
0 MIN. SETBACK REQUIREMENTS
Proposed Elev. =
Existing Elev. _ -
Drainage Directions = Front - House Side
Denotes Offset Stake = • SCALE: 1 Inch = 30 feet Rear - Garage Side -
JOB NO:
I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT REPRESENTATION
HEDLIiI/ND OF THE BOUNDARIES OF THE ABOVE DESCRIBED PROPERTY AS SURVEYED 12R-0 E:
BY ME OR UNDER MY DIRECT SUPERVISION AND DOES NOT PURPORT TO BOOK: PAGE:
SHOW IMPROVEMENTS OR ENCROACHMENTS, EXCEPT AS SHOWN.
PLANNING ENGINEERING SURVEYING
2005 Pin Oak Drive DATE __L/ 23/12
Eagan, MN 55122 REV. CAD FILE:
Phone: (651) 405-6600 J Y D. LINDGREN, L OD SURVEYOR Nicols Ridge 4th
Fax : (651) 405-6606 REV. _4 /_24/13 INNESOTA LICENSE NLIBER 14376
Cityofaali
Address: 2161 Cedar Grove Tr
Zip: 55122 Permit #: 107883
The following items were / were not completed at the Final Inspection on: q'Z40
Final grade - 6" from siding
Permanent steps — Garage
Permanent steps — Main Entry
Permanent Driveway
Permanent Gas
Retaining Wall or 3:1 Max Slope
Sod / Seeded Lawn
Trail / Curb Damage
Porch
Lower Level Finish
14 -471A --
Deck
Fireplace
• Verify with your builder that roof test caps from the plumbing system have been removed.
• Turn off water supply to the outside lawn faucets before freeze potential exists.
• Call the Engineering Department at (651) 675-5646 prior to working in the right-of-way or installing an
irrigation system.
Building Inspector: 144:k l�
G:\Building Inspections\FORMS\Checklists