Loading...
2985 Ames Crossing Rd - Ltrs re MISO Confidential Plans i Aft, 09 ~Apvs crassll M I S January 17, 2013 City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Attn: Building Commission Subject: Request for exception relative to the confidentiality of building plans and specifications. Dear Sir or Madam: Midwest Independent Transmission System Operator, Inc. (MISO) is currently in the process of constructing a new facility located at 2985 Ames Crossing Road, Eagan, MN, in cooperation with the Boulder Lakes V LLC. MISO respectfully requests that the City of Eagan grant an exception/waiver relative to the condition stated on its 2013 Commercial Building Permit Application form that states: "Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to "conclude that they are trade secrets." MISO, under its role as a Regional Transmission Operator (RTO), is subject to numerous rules, regulations, laws and requirements imposed by such agencies as the Federal Energy Regulatory Commission (FERC), the North American Electric Reliability Corporation (NERC) and the United States Department of Homeland Security (DHS). MISO's operating facilities are included under the NERC Critical Infrastructure Protection program and the DHS Protected Critical Infrastructure Information program (PCII) wich imposerigid security restrictions required to protect both physical and critical cyber assets. Violations are potentially subject to very significant monetary penalties. As a designated Critical Energy Infrastructure facility, it is imperative that MISO's building plans, documents and specifications be treated as highly confidential materials. Please provide a written notification of your confirmation that the plans, supporting documents and specifications provided under the aforementioned Commercial Building Permit Application will be held by the City of Eagan as highly confidential materials and classified as non-public information. 1 ~ v~37 M I S Respectfully yours, Gary E. Erickson Advisor II - Projects & Construction Midwest Independent Transmission Operator, Inc. PO Box 4202 Carmel, IN 46082-4202 (317) 249-5257 gerickson(cD-misoenergy.orq GEE cc: A. Waller (R. J. Ryan); K. Davis (MISO Energy); J. Larson (MISO Energy); A. Simon (Cushman & Wakefield) J. Knetter (Zimmerman Architectural Studios) 2