Loading...
651 Parkside Ct r1 i 10(V,9,~ EOb.o~ )'Vtf '1 10"7 O o 10 J, Use BLUE or BLACK InkGj'7 . r-----------------, For Office Use Q Permit #:Q d City of Ea~dii I J I Permit Fee. ~ ~ I 3830 Pilot Knob Road I ~Z~ 2 I Eagan MN 55122 Date Received: Phone: (651) 675-5675 I 1 Fax: (651) 675-5694 pp l Staff: cy ~ 0 U D 2012 RESIDENTIAL BUILDING PERMIT APPLICATION ' r -!2 iav( Date: 6 °2~ 3 Site Address: I P La! IC-~7 ( (.i Unit M 3 Name: ?2VA I Allide{ wo fi6,K&- Phone: -f 2, RESIDENT / OWNER Address /City/Zip: 467,56 -c1-111 1f L1' J7`~ Ct1'1 1'~-~ J a Applicant is: Owner ✓ Contractor TYPE OF WORK Description of work: <neJ 1 !q/f'_. Faml hl Construction Cost: G~ DSO Multi-Family Building: (Yes / No) Company: ld rrY\[:itrr~06li Lb~me5 Contact: CONTRACTOR Address: L5 r:54-1'r) D I e City: 75:~I, '1 A-fl State: MN /Zip: ( - 01 Phone: 9 sc Z g l a- oa , J c) License A D t',5 6 b Lead Certificate K J- ~S&W - 11 - 0 If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? _Yes )(No If yes, date and address of master plan: Licensed Plumber: I V or h t"1 Q 1 d m u.m b rl ri Phone: 5T t04t 6 05~ 0 1,5 00()47 Mechanical Contractor: Turfy V( I±[C 1+e lPhone: a~ Sewer & Water Contractor: t! l r `Jl' g UC -h Phone: w a--I 13 - q to 4 NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information may be,_classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. ,r work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 -mit issuance. x ,y ed Name J5 rc nd l #~d4-5ee7 NeyKe5 p icant's Signature Page 1 of 3 DO NOT WRITE BELOW THIS LINE SUB TYPES _ Foundation _ Fireplace _ Porch (3-Season) _ Storm Damage Single Family _ Garage Porch (4-Season) _ Exterior Alteration (Single Family) _ Multi _ Deck _ Porch (Screen/Gazebo/Pergola) _ Exterior Alteration (Multi) _ 01 of Plex Lower Level Pool Miscellaneous Accessory Building WORK TYPES . C New _ Interior Improvement _ Siding _ Demolish Building* Addition _ Move Building _ Reroof _ Demolish Interior _ Alteration Fire Repair _ Windows _ Demolish Foundation Replace _ Repair _ Egress Window _ Water Damage Retaining Wall *Demolition of entire building - give PCA handout to applicant DESCRIPTION Valuation 3G7J Occupancy ~G^ MCES System Plan Review Code Edition A'y SAC Units (25%_ 100% Zoning 9-/ City Water Y149 Census Code Stories A_ Booster Pump Ho # of Units / Square Feet 19391 PRV "jed # of Buildings / Length 6!Z Fire Sprinklers yp Type of Construction Width REQUIRED INSPECTIONS Footings (New Building) Meter Size: Footings (Deck) Final / C.O. Required Footings (Addition) Final / No C.O. Required it Foundation HVAC _ Gas Service Test Gas Line Air Test Drain Tile Other: Roof: Ice & Water ,Final Pool: -Footings -Air/Gas Tests -Final Framing Siding: -Stucco Lath Stone Lath -Brick Fireplace: Rough In Air Test ve-Final Windows Insulation Retaining Wall: _ Footings _ Backfill _ Final Sheathing Radon Control Sheetrock Erosion Control -4 Reviewed By: , Building Inspector RESIDENTIAL FEES /G Base Fee ~0 sg ✓ r / y ~ ~ ~33l,1 ?0 A3 ~ $~9eti 59 Surcharge 3 U G3 79 Plan Review l7~' f sr ?/3 q9Q J~ 5 F MCESSAC /3y y4JA City SAC G6 Utility Connection Charge 3~ y 3-2 7 S&W Permit & Surcharge c i~+ 3 3 ~b -Treatment Plant r'/Ir1~Y7 /~tt ?b Copies TOTAL Page 2 RECEIVED 1 ~b NAY 2 0 2013 New Construction Energy Code Compliance Certificate p li `I j Per NI101.8 Building Certificate. A building certificate shall be posted in a pennanently visible location inside Date Certificate Posted the building. The certificate shall be completed by the builder and shall list information and values of 1w/X E components listed in Table NJ 101.8. u Mailing Address of the Dwelling or Dwelling Unit city 651 Parkside Court Eagan Name of Residential Contractor MN License Number Brand) Anderson Homes BC604388 THERMAL ENVELOPE RADON SYSTEM Type: Check All That Apply X Passive (No Fan) o ° Active (Mlh fan and monometer or L, T other system monitoring device ) 0 0 b Insulation Location z v p w ° ° Z w w ° w° cb r.4 Other Please Describe Here Below Entire Slab X Foundation Wall 10 X Interior Perimeter of Slab on Grade X Rim Joist (Foundation) 15 X Exterior 1l - y 1l X 7 x( to /.,r Rim Joist (I" Floor+) 15 X Exterior „ Wall 19 & 5 X X Ceiling, flat 44 X Ceiting, vaulted 44 X Bay Windows or cantilevered areas 38 X Bonus room over garage 38 IX_ 1_ I Describe other insulated areas Windows & Doors Heating or Cooling Ducts Outside Conditioned Spaces Average U-Factor (excludes skylights and one door) U: 0.30 Not applicable, all ducts located in conditioned space Solar Heat Gain Coefficient (SHGC): 0.22 X R-value R-8 in garage area MECHANICAL SYSTEMS Make-up Air Select aType Appliances Heating System Domestic Water Heater Cooling System X Not required per mech. code Fuel Type Gas Gas R41 OA Passive Manufacturer Bryant Rheem Bryant Powered Interlocked with exhaust device. Model 912SB4210OS21 43VP50E2 CA13042 Describe: Input in 100,000 Capacity in 50 Output in 3.5 Other, describe: Rating or Size BTUS: Gallons: Tons: Heat Loss: 73,352 Heat 22,181 Location of duct or system: Structure's Calculated Gain: AFUE or 92a/o SEER: 13 HSPF% Calculated 28,047 Efficient cooling load: Cfm's " round duct OR Mechanical Ventilation System " metal duct Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air Combustion Air Select a Type source heat pump with gas back-up furnace): Not required per mech. code Select Type X Passive Heat Recover Ventilator (HRV) Capacity in cfms: Low: High: Other, describe: Energy Recover Ventilator (ERV) Capacity in cfms: Low: High: Location of duct or system: x Continuous exhausting fan(s) rated capacity in cfms: 110 Basement Location of fan(s), describe: Main Bath Cfm's Capacity continuous ventilation rate in cfms: 110 6" " round duct OR Flex Total ventilation (intermittent + continuous) rate in cfins: 190 " metal duct Created by BAM version 052009 Burnsville Heating & Air Conditioning, Inc. 3451 W. Burnsville Pkwy, Suite 120, Burnsville, MN 55337 Phone 952-894-0005 - Fax 952-894-0925 - Web www.burnsvilleheating.com Ventilation, Makeup and Combustion Air Calculations Submittal Form for New Dwellings Site address 651 Parkside Court Date Contractor Burnsville Heating & Air Conditioning, Inc Completed By Alan Dobson Section A Ventilation Quantity (Determine quantity by using Table N1104.2 or Equation 11-1) Square feet (Conditioned area including 5000 Total required ventilation 160 Basement-finished or unfinished) Number of bedrooms 3 Continuous ventilation 80 Directions - Determine the total and continuous ventilation rate by either using Table N1104.2 or equation 11-1. The table and equation are below. Table N1104.2 Total and Continuous Ventilation Rates (in cfm) Number of Bedrooms 1 2 4 5 6 Conditioned Total/ Total/ Total/ Total/ Total/ Total/ space (in sq. ft. continuous continuous continuous continuous continuous continuous 1000-1500 60/40 75/40 90/45 105/53 120/60 135/68 1501-2000 70/40 85/43 100/50 115/58 130/65 145/73 2001-2500 80/40 95/48 110/55 125/63 140/70 155/78 2501-3000 90/45 105/53 120/60 135/68 150/75 165/83 3001-3500 100/50 115/58 130/65 145/73 160/80 175/88 3501-4000 110/55 125/63 140/70 155/78 170/85 185/93 4001-4500 120/60 135/68 150,75 165/83 180/90 195/98 4501-5000 130/65 145/73 6f80 175/88 190/95 205/103 5001-5500 140/70 155/78 170/85 185/93 200/100 215/108 5501-6000 150/75 165/83 180/90 195/98 210/105 225/113 Equation 11-1 (0.02 x square feet of conditioned space) + [15 x (number of bedrooms + 1)] = Total ventilation rate (cfm) Total ventilation - The mechanical ventilation system shall provide sufficient outdoor air to equal the total ventilation rate average, for each one-hour period according to the above table or equation. For heat recovery ventilators (HRV) and energy recovery ventilators (ERV) the average hourly ventilation capacity must be determined in consideration of any reduction of exhaust or outdoor air intake, or both, for defrost or other equipment cycling. Continuous ventilation - A minimum of 50 percent of the total ventilation rate, but not less than 40 cfm shall be provided, on a continuous rate average for each one-hour period. The portion of the mechanical ventilation system intended to be continuous may have automatic cycling controls providing the average flow rate for each hour is met. G:\SAFETY\JK\Vent-makeup-comb air submittal (2).docx Page 1 of 6 Section B Ventilation Method (choose either balanced or exhaust only) ❑ Balanced, HRV(Heat Recovery Ventilator) or ERV (Energy ❑x Exhaust only Recovery Ventilator) - cfm of unit in low must not exceed Continuous fan rating in cfm continuous ventilation rating by more than 1000 Low cfm: High cfm: Continuous fans rating in cfm (capacity 110 must not exceed continuous ventilation rating by more than 100%) Directions - Choose the method of ventilation, balanced or exhausts only. Balanced ventilation systems are typically HRV or ERV's. Enter the low and high cfm amounts. Low c fm airflow must be equal to or greater than the required continuous ventilation rate and less than 100% greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the ventilation fan must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. Section C Ventilation Fan Schedule Description Location Continuous Intermittent Bath Fan Master Bath 80 Bath Fan Main Bath 110 Directions - The ventilation fan schedule should describe what the fan is for, the location, cfm, and whether it is used for continuous or intermittent ventilation. The fan that is chose for continuous ventilation must be equal to or greater than the low c fm air rating and less than 100% greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the continuous ventilation fan must not exceed 80 cfm. Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. Section D Ventilation Controls (Describe operation and control of the continuous and intermittent ventilation) Dedicated Circut I:::-- Directions- Describe the operation of the ventilation system. There should be adequate detail for plan reviewers and inspectors to verify design and installation compliance. Related trades also need adequate detail for placement of controls and proper operation of the building ventilation. If exhaust fans are used for building ventilation, describe the operation and location of any controls, indicators and legends. If an ERV or HRV is to be installed, describe how it will be installed. If it will be connected and interfaced with the air handling equipment please describe such connections as detailed in the manufactures' installation instructions. If the installation instructions require or recommend the equipment to be interlocked with the air handling equipment for proper operation, such interconnection shall be made and described. Section E Make-up air Passive (determined from calculations from Table 501.3.1) Powered (determined from calculations from Table 501.3.1) Interlocked with exhaust device.(-determined from calculations from Table 501.3.1) Other, describe: Location of duct or system ventilation make-up air: Determined from make-up air opening table NR cfm Size and type (round, rectangular, flex or rigid) 21 Page Directions - In order to determine the makeup air, Table 501.3.1 must be filled out (see below). For most new installations, column A will be appropriate, however, if atmospherically vented appliances or solid fuel appliances are installed, use the appropriate column. For existing dwellings, see IMC 501.3.3. Please note, if the makeup air quantity is negative, no additional makeup air will be required for ventilation, if the value is positive refer to Table 501.3.2 and size the opening. Transfer the cfm, size of opening and type (round, rectangular, flex or rigid) to the last line of section D. The make-up air supply must be installed per IMC 501.3.2.3. Table 501.3.1 PROCEDURE TO DETERMINE MAKEUP AIR QUANITY FOR EXHAUST EQUIPMENT IN DWELLINGS (Additional combustion air will be required for combustion appliances, see KAIR method for calculations) One or multiple One or multiple fan- One atmospherically Multiple power assisted vent atmospherically vent or direct vent appliances and gas or oil appliance vented gas or oil appliances power vent or direct or appliances or solid or no combustion vent one solid fuel fuel appliances appliances appliance appliances Column A Column B Column C Column D 1. 0.15 0.09 0.06 0.03 a) pressure factor (cfm/sf) b) conditioned floor area (sf) (including 5000 unfinished basements) Estimated House infiltration (cfm): [1a 750 x 1b] 2. Exhaust Capacity 110 a) continuous exhaust-only ventilation system (cfm); (not applicable to balanced ventilation systems such as HRV) b) clothes dryer (cfm) 135 135 135 135 c) 80% of largest exhaust rating (cfm); Kitchen hood typically (not applicable if recirculating system or if powered makeup air is electrically interlocked and match to exhaust) d) 80% of next largest exhaust rating Not (cfm); bath fan typically Applicable (not applicable if recirculating system or if powered makeup air is electrically interlocked and matched to exhaust) Total Exhaust Capacity (cfm); 245 [2a + 2b +2c + 2d] 3. Makeup Air Quantity (cfm) 245 a) total exhaust capacity (from above) b) estimated house infiltration (from 750 above) Makeup Air Quantity (cfm); -505 [3a - 3b] (if value is negative, no makeup air is needed) 4. For makeup Air Opening Sizing, refer to Table 501.4.2 A. Use this column if there are other than fan-assisted or atmospherically vented gas or oil appliance or if there are no combustion appliances. (Power vent and direct vent appliances may be used.) B. Use this column if there is one fan-assisted appliance per venting system. (Appliances other than atmospherically vented appliances may also be included.) C. Use this column if there is one atmospherically vented (other than fan-assisted) gas or oil appliance per venting system or one solid fuel appliance. D. Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically' ` vented gas or oil appliances and solid fuel appliances. 31 Page Makeup Air Opening Table for New and Existing Dwelling Table 501.3.2 One or multiple One or multiple One atmospherically Multiple power fanassisted vented gas or oil atmospherically vent, direct vent appliances and appliance vented gas or oil appliances, power vent or direct or one solid fuel appliances Duct diameter or no combustion vent appliances appliance or solid fuel appliances appliances Column A Column B Column C Column D Passive opening 1-36 1-22 1-15 1-9 3 Passive opening 37-66 23-41 16-28 10-17 4 Passive opening 67-109 42-66 29-46 18-28 5 Passive opening 110-163 67-100 47-69 29-42 6 Passive opening 164-232 101-143 70-99 43-61 7 Passive opening 233-317 144-195 100-135 62-83 g Passive opening 318 - 419 196 - 258 136 -179 84-110 9 w/motorized damper Passive opening 420 -539 259 -332 180 -230 111-142 10 w/motorized damper Passive opening 540 -679 333 -419 231- 290 143 -179 11 w/motorized damper Powered makeup air >679 >419 >290 >179 NA Notes: A. An equivalent length of 100 feet of round smooth metal duct is assumed. Subtract 40 feet for the exterior hood and ten feet for each 90- degree elbow to determine the remaining length of straight duct allowable. B. If flexible duct is used, increase the dud diameter by one inch. Flexible duct shall be stretched with minimal sags. Compressed duct shall not be accepted. C. Barometric dampers are prohibited in passive makeup air openings when any atmospherically vented appliance is installed. D. Powered makeup air shall be electrically interlocked with the largest exhaust system. Sections F Combustion air Not required per mechanical code (No atmospheric or power vented appliances) X Passive (see IFGC Appendix E, Worksheet E-1) size and type 4" smooth or 5" Flex Other, describe: Explanation - If no atmospheric or power vented appliances are installed, check the appropriate box, not required. If a power ventedor atmospherically vented appliance installed, use IFGC Appendix E, Worksheet E-1 (see below). Please enter size and type. Combustionair vent supplies must communicate with the appliance or appliances that require the combustion air. Section F calculations follow on the next 2 pages. 4 I Page Directions - The Minnesota Fuel Gas Code method to calculate to size of a required combustion air opening, is called the Known Air Infiltration Rate Method. For new construction, 4b of step 4 is required to be filled out. IFGC Appendix E, Worksheet E-1 Residential Combustion Air Calculation Method (for Furnace, Boiler, and/or Water Heater in the Same Space) Step 1: Complete vented combustion appliance information. Furnace/Boiler: Draft Hood -Fan Assisted or Power Vent _X_Direct Vent Input: 100000 BTU/HR Water Heater: -Draft Hood _X-Fan Assisted or Power Vent -Direct Vent Input:-40000 BTU/HR Step 2: Calculate the volume of the Combustion Appliance Space (CAS) containing combustion appliances. The CAS includes all spaces connected to one another by code compliant openings. CAS Volume: 855 ft LxWxH L W H Step 3: Determine Air Changes per Hour (ACH)1 Default ACH values have been incorporated into Table E-1 for use with Method 41b, (KAIR Method). If the year of construction or ACH is not known, use method 4a (Standard Method). Step 4: Determine Required Volume for Combustion Air. (DO NOT COUNT DIRECT VENT APPLIANCES) 4a. Standard Method Total Btu/hr input of all combustion appliances Input: Btu/Hr Use Standard Method column in Table E-1 to find Tooel Required TRV: ft3 Volume (TRV) If CAS Volume (from Step 2) is greater than TRV then no outdoor openings are needed. If CAS Volume (from Step 2) is less than TRV then go to STEP S. 4b. Known Air Infiltration Rate (KAIR) Method (DO NOT COUNT DIRECT VENT APPLIANCES) Total Btu/hr input of all fan-assisted and power vent appliances Input:_40000 Btu/Hr s-- Use Fan-Assisted Appliances column in Table E-1 to find RFVA:_3000 ft3 Required Volume Fan Assisted (RVFA) Total Btu/hr input of all Natural draft appliances Input: Btu/hr Input: _0 Btu/Hr Use Natural draft Appliances column in Table E-1 to find RVNFA:_none ft3 Required Volume Natural draft appliances (RVNDA) Total Required Volume (TRV) = RVFA+ RVNDA TRV=_3000 + none = 3000 TRV ft3 If CAS Volume (from Step 2) is greater than TRV then no outdoor openings are needed. If CAS Volume (from Step 2) is less than TRV then go to STEP S. Step 5: Calculate the ratio of available interior volume to the total required volume. Ratio = CAS Volume (from Step 2) divided by TRV (from Step 4a or Step 4b) Ratio = 855 / 3000 =.28 Step 6: Calculate Reduction Factor (RF). RF= 1 minus Ratio RF = 1- .28 C=7 2 \ Step 7: Calculate single outdoor opening as if all combustion air is from outside. Total Btu/hr input of all Combustion Appliances in the same CAS Input: 40000 Btu/Hr (EXCEPT DIRECT VENT) 5~Page Combustion Air Opening Area (CAOA): Total Btu/hr divided by 3000 Btu/hr per in2 CAOA = 40000 /3000 Btu/hr per in 13.33 Step 8: Calculate Minimum CAOA. Minimum CAOA = CAOA multiplied by RF Minimum CAOA = 13.33 x .72 = in9.59 Step 9: Calculate Combustion Air Opening Diameter (CAOD) CAOD = 1.13 multiplied by the square root of Minimum CAOA CAOD = 1.13 V Minimum CAOA = 3.49 in. diameter go up one inch in size if using flex duct 1 If desired, ACH can be determined using ASHRAE calculation or blower door test. Follow procedures in Section G304. IFGC Appendix E, Table E-1 Residential Combustion air (Required Interior Volume Based on Input Rating of Appliance) Known Air Infiltration Rate (KAIR) Method (cu ft) Fan Assisted or Power Vent Natural Draft Input Rating Standard Method 1994 to present Pre-1994 1994 to present Pre-1994 (Btu/hr) 5,000 250 375 188 525 263 10,000 500 750 375 1,050 525 15,000 750 1,125 563 1,575 788 20,000 1,000 1,500 750 2,100 1,050 25,000 1,250 1,875 938 2,625 1,313 30,000 1,500 2,250 1,125 3,150 1,575 35,000 1,750 2,625 1,313 3,675 1,838 40,000 2,000 3,000 1,500 4,200 2,100 45,000 2,250 3,375 1,688 4,725 2,363 50,000 2,500 3,750 1,675 5,250 2,625 55,000 2,750 4,125 2,063 5,775 2,888 60,000 3,000 4,500 2,250 6,300 3,150 65,000 3,250 4,875 2,438 6,825 3,413 70,000 3,500 5,250 2,625 7,350 3,675 75,000 3,750 5,625 2,813 7,875 3,938 80,000 4,000 6,000 3,000 8,400 4,200 85,000 4,250 6,375 3,188 8,925 4,463 90,000 4,500 6,750 3,375 9,450 4,725 95,000 4,750 7,125 3,563 9,975 4,988 100,000 5,000 7,500 3,750 10,500 5,250 105,000 5,250 7,875 3,938 11,025 5,513 110,000 5,500 8,250 4,125 11,550 5,775 115,000 5,750 8,625 4,313 12,075 6,038 120,000 6,000 9,000 4,500 12,600 6,300 125,000 6,250 9,375 4,688 13,125 6,563 130,000 6,500 9,750 4,875 13,650 6,825 135,000 6,750 10,125 5,063 14,175 7,088 140,000 7,000 10,500 5,250 14,700 7,350 145,000 7,250 10,875 5,438 15,225 7,613 150,000 7,500 11,250 5,625 15,750 7,875 155,000 7,750 11,625 5,813 16,275 8,138 160,000 8,000 12,000 6,000 16,800 8,400 165,000 8,250 12,375 6,188 17,325 8,663 170,000 8,500 12,750 6,375 17,850 8,925 175,000 8,750 13,125 6,563 18,375 9,188 180,000 9,000 13,500 6,750 18,900 9,450 185,000 9,250 13,875 6,938 19,425 9,713 190,000 9,500 14,250 7,125 19,950 9,975 195,000 9,750 14,625 7,313 20,475 10,238 200,000 10,000 15,000 7,500 21,000 10,500 205,000 10,250 15,375 7,688 22,525 10,783 210,000 10,500 15,750 7,875 22,050 11,025 215,000 10,750 16,125 8,063 22,575 11,288 6~Page 220,000 11,000 16,500 8,250 23,100 11,550 225,000 11,250 16,875 8,438 23,625 11,813 230,000 11,500 17,250 8,625 24,150 12,075 1. The 1994 date refers to dwellings constructed under the 1994 Minnesota Energy Code. The default KAIR used in this section of the table is 0.20 ACH. 2. This section of the table is to be used for dwellings constructed prior to 1994. The default KAIR used in this section of the table is 0.40 ACH. 71 Page 651 Parkside Ct HVAC Load Calculations for Brandl Anderson Homes Es L6m5cft it RHVAC e""AL WAC LoAns Prepared By: Alan Dobson Burnsville Heating & A/C Inc. 3451w Burnsville Pkwy, Suite 120 Burnsville,MN 55337 952-894-0005 Tuesday, April 16, 2013 Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. ReHeating & VIN 55337 sidential &L lnct Commercial HVAC Loads Elite Software De el HmePage Inc., 8Rh ac ill- Burnsville. Prol-ect Report General Project Information Project Title: 651 Parkside Ct Designed By: Alan Dobson Project Date: Monday, April 15, 2013 Project Comment: Client Name: Brandl Anderson Homes Company Name: Burnsville Heating & A/C Inc. Company Representative: Alan Dobson Company Address: 3451w Burnsville Pkwy, Suite 120 Company City: Burnsville,MN 55337 Company Phone: 952-894-0005 Company Fax: 952-894-0925 Company Comment: Design Data Reference City: Minneapolis, Minnesota Building Orientation: Front door faces West Daily Temperature Range: Medium Latitude: 44 Degrees Elevation: 834 ft. Altitude Factor: 0.970 Elevation Sensible Adj. Factor: 1.000 Elevation Total Adj. Factor: 1.000 Elevation Heating Adj. Factor: 1.000 Elevation Heating Adj. Factor: 1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb 'JAkLBulb Rel.Hum Rel.Hum Dry Bulb Difference Winter: -15 15.33 80% n/a 72 n/a Summer: 88 73 50% 50% 75 35 Check Figures Total Building Supply CFM: 974 CFM Per Square ft.: 0.195 Square ft. of Room Area: 5,000 Square ft. Per Ton: 2,139 Volume (ft) of Cond. Space: 46,357 DAdin Loads Total Heating Required Including Ventilation Air: 73,352 tuh 73.352 MBH Total Sensible Gain: Btuh 79 % Total Latent Gain: 866 Btuh 21 % Total Cooling Required Including Ventilation Air: 28,047 tuh 2.34 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\SBS201 1 \Red i rected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM f ♦ Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Burnsville Heating & A/C Inc 651 Parkside Ct' Burnsville MN 55337 __Page 11 Total Building Summary Loads Component Area Sen Lat Sen Total Description Quan Loss Gain Gain_ Gain hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.3, 111 2,898 0 2,502 2,502 SHGC 0.2 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.3, 211 5,510 0 5,553 5,553 SHGC 0.22 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.28, 34 828 0 923 923 SHGC 0.23 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.28, 16 390 0 128 128 SHGC 0.23 ba: Glazing- ba, ground reflectance = 0.23, u-value 0.3, 40.8 1,065 0 1,080 1,080 SHGC 0.22 _ r hbt: Door-hbt 20.4 266 0 73 73 hbt: Door-hbt 19 232 0 64 64 12E-5sw: Wall-Fram , R-19 i sulation in 2 x 6 stud 3563.2 16,117 0 1,982 1,982 cavity, R-5 board on ng finish, wood studs 15B0-10sf-8: Wall-Basement, , R-10 oard insulation to 979.4 4,624 0 99 99 floor, no i t~ erior finish, 8' fl pth 16B-44-ad: Roof/Ceiling-Under Attic with Insulation on 2066.4 3,954 0 2,183 2,183 Attic Floor (also use for Knee Walls and Pn Ceilings), vented attic, no radiant barrier`R-44 insulation, dark asphalt 19A-38p: Floor-Over enclosed unconditioned crawl 2 617.6 1,340 0 201 201 spac e, No insulation on os wa Is, sealed or vented spac sive R-38 lanket 21A-32-v: Floor-Basement, oncrete slab, any thickness, 1678.7 2,921 0 0 0 2 or more feet below grade, no insulation below floor, vinyl covering shortest side of floor slab is 32' wide Subtotals for structure: 40,145 0 14,788 14,788 People: 6 1,380 1,800 3,180 Equipment: 400 1,200 1,600 Lighting: 0 0 0 Ductwork: 4,916 358 2,164 2,522 Infiltration: Winter CFM: 205, Summer CFM: 61 19,005 1,408 841 2,249 Ventilation: Winter CFM• 100, Summer CFM: 100 9,285 2,320 1,387 3,708 Total Building Load Totals: 73,352 5,866 22,181 28,047 Check Figures Total Building Supply CFM: 974 CFM Per Square ft.: 0.195 Square ft. of Room Area: 5,000 Square ft. Per Ton: 2,139 Volume (ft') of Cond. Space: 46,357 _ Building Loads_ Total Heating Required Including Ventilation Air: 73,352 Btuh 73.352 MBH Total Sensible Gain: 2 , 81 Btuh 79 % Total Latent Gain: 5,866 Btuh 21 % Total Cooling Required Including Ventilation Air: C2 ,047 B t u h 2.34 Tons (Based On Sensible + Latent) Not_e-s Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\SBS201 1 \Redirected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM r Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. ksid 1 t Burnsville Heating & a/l. Inc 651 Pa I Burnsville, MN 5533A System 1 Main Floor Summa Loads Component Area Sen Lat Sen TDescription Quan Loss Gain Gain hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.3, 111 2,898 0 2,502 2,502 SHGC 0.2 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.3, 211 5,510 0 5,553 5,553 SHGC 0.22 hbt: Glazing-Mt, ground reflectance = 0.23, u-value 0.28, 34 828 0 923 923 SHGC 0.23 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.28, 16 390 0 128 128 SHGC 0.23 ba: Glazing- , ground reflectance = 0.23, u-value 0.3, 40.8 1,065 0 1,080 1,080 SHGC 0.22 hbt: Door-h t_ 20.4 266 0 73 73 hbt: Door-hbt 19 232 0 64 64 12E-5sw: Wall-Frame, R-19 insulation in 2 x 6 stud 3563.2 16,117 0 1,982 1,982 cavity, R-5 board insulation, siding finish, wood studs 15BO-10sf-8: Wall-Basement, , R-10 board insulation to 979.4 4,624 0 99 99 floor, no interior finish, 8' floor depth 16B-44-ad: Roof/Ceiling-Under Attic with Insulation on 2066.4 3,954 0 2,183 2,183 Attic Floor (also use for Knee Walls and Partition Ceilings), vented attic, no radiant barrier, R-44 insulation, dark asphalt 19A-38p: Floor-Over enclosed unconditioned crawl 617.6 1,340 0 201 201 space, No insulation on exposed walls, sealed or vented space, passive, R-38 blanket 21A-32-v: Floor-Basement, Concrete slab, any thickness, 1678.7 2,921 0 0 0 2 or more feet below grade, no insulation below floor, vinyl covering shortest side of floor slab is 32' wide Subtotals for structure: 40,145 0 14,788 14,788 People: 6 1,380 1,800 3,180 Equipment: 400 1,200 1,600 Lighting: 0 0 0 Ductwork: 4,916 358 2,164 2,522 Infiltration: Winter CFM: 205, Summer CFM: 61 19,005 1,408 841 2,249 Ventilation: Winter CFM: 100, Summer CFM: 100 9,285 2,320 1,387 3,708 System 1 Main Floor Load Totals: 73,352 5,866 22,181 28,047 Check Figures _ Supply CFM: 974 CFM Per Square ft.: 0.195 Square ft. of Room Area: 5,000 Square ft. Per Ton: 2,139 Volume (ft) of Cond. Space: 46,357 System Loads Total Heating Required Including Ventilation Air: 73,352 Btuh 73.352 MBH Total Sensible Gain: 22,181 Btuh 79 % Total Latent Gain: 5,866 Btuh 21 % Total Cooling Required Including Ventilation Air: 28,047 Btuh 2.34 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\SBS201 1 \Redirected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. ville Heating A/C Inc 651 Farkside Ct Ci ns Burnsville e _MR U317Page 17 System 1, zone 1 Summary Loads (Peak Load Procedure for Rooms) Component Area Sen Lat Sen Total [Description Quan Loss Gain Gain Gain! hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.3, 61 1,593 0 1,491 1,491 SHGC 0.22 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.3, 123 3,212 0 3,225 3,225 SHGC 0.22 hbt: Door-hbt 20.4 266 0 73 73 hbt: Door-hbt 19 232 0 64 64 12E-5sw: Wall-Frame, R-19 insulation in 2 x 6 stud 1858.5 8,407 0 1,035 1,035 cavity, R-5 board insulation, siding finish, wood studs 16B-44-ad: Roof/Ceiling-Under Attic with Insulation on 323.6 619 0 343 343 Attic Floor (also use for Knee Walls and Partition Ceilings), vented attic, no radiant barrier, R-44 insulation dark asphalt Subtotals for structure: 14,329 0 6,443 6,443 People: 0 0 0 0 Equipment: 0 1,200 1,200 Lighting: 0 0 0 Ductwork: 1,985 0 890 890 Infiltration: Winter CFM: 103, Summer CFM: 31 9,553 708 423 1,131 System 1, Zone 1 Load Totals: 25,867 708 8,956 9,664 Check Figures Supply CFM: 420 CFM Per Square ft.: 0.266 Square ft. of Room Area: 1,578 Square ft. Per Ton: 1,959 Volume (f?) of Cond. Space: 16,466 Zone Loads Total Heating Required: 25,867 Btuh 25.867 MBH Total Sensible Gain: 8,956 Btuh 93 % Total Latent Gain: 708 Btuh 7 % Total Cooling Required: 9,664 Btuh 0.81 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\SBS201 1 \Redirected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013,11:52 AM f r Rhvac - Residential & Light Commercial HVAC Loads _ Elite Software Development, Inc. Burnsville Heating & A/C Inc 651 Paikside CtI Burnsville MN 55337 Page 18_J S stem 1 Zone 2 Summa Loads Peak Load Procedure for Rooms Component Area Sen Lat Sen Total Description Quan Loss Gain Gain Gain hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.3, 70 1,828 0 1,852 1,852 SHGC 0.22 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.3, 50 1,305 0 1,011 1,011 SHGC 0.2 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.28, 16 390 0 434 434 SHGC 0.23 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.28, 16 390 0 128 128 SHGC 0.23 12E-5sw: Wall-Frame, R-19 insulation in 2 x 6 stud 1316 5,952 0 731 731 cavity, R-5 board insulation, siding finish, wood studs 16B-44-ad: Roof/Ceiling-Under Attic with Insulation on 1742.9 3,335 0 1,840 1,840 Attic Floor (also use for Knee Walls and Partition GA~,y Ceilings), vented attic, no radiant barrier, R-44 3y insulation, dark asphalt 19A-38p: Floor-Over enclosed unconditioned crawl -696- r1l4q'1,340 0 201 201 space, No insulation on exposed walls, sealed or vented space passive R-38 blanket Subtotals for structure: 14,540 0 6,335 6,335 People: 6 1,380 1,800 3,180 Equipment: 400 0 400 Lighting: 0 0 0 Ductwork: 1,768 0 931 931 Infiltration: Winter CFM: 73, Summer CFM: 22 6,735 499 298 797 System 1, Zone 2 Load Totals: 23,043 2,279 9,364 11,643 fiCheck Figures Supply CFM: 439 CFM Per Square ft.: 0.252 Square ft. of Room Area: 1,743 Square ft. Per Ton: 1,796 Volume (f?) of Cond. Space: 13,943 Zone Loads Total Heating Required: 23,043 Btuh 23.043 MBH Total Sensible Gain: 9,364 Btuh 80 % Total Latent Gain: 2,279 Btuh 20 % Total Cooling Required: 11,643 Btuh 0.97 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\SBS201 1\Redi rected Folders \Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM Rhvac - Residential 9ht Commercial l HVAC Loads 651 elite Software Development, Inc. Burnsville Heatin Ct Burnsville MN & 55337 & A/C Li Inc Page - 1 - System 1, Zone 3 Summary Loads (Peak Load Procedure for Rooms) F omponent Area Sen Lat Sen Total escri tion Quan Loss Gain Gain_ Gain ba: Glazing- ba, ground reflectance = 0.23, u-value 0.3, 40.8 1,065 0 1,080 1,080 SHGC 0.22 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.28, 18 438 0 489 489 SHGC 0.23 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.3, 18 470 0 476 476 SHGC 0.22 12E-5sw: Wall-Frame, R-19 insulation in 2 x 6 stud 388.7 1,758 0 216 216 cavity, R-5 board insulation, siding finish, wood studs 15B0-10sf-8: Wall-Basement, , R-10 board insulation to 979.4 4,624 0 99 99 floor, no interior finish, 8' floor depth 21A-32-v: Floor-Basement, Concrete slab, any thickness, 1678.7 2,921 0 0 0 2 or more feet below grade, no insulation below floor, vinyl covering shortest side of floor slab is 32' wide Subtotals for structure: 11,276 0 2,990 2,990 People: 0 0 0 0 Equipment: 0 0 0 Lighting: 0 0 0 Ductwork: 1,163 0 343 343 Infiltration: Winter CFM: 29, Summer CFM: 9 2,717 201 120 321 System 1, Zone 3 Load Totals: 15,156 201 3,453 3,654 Check Figures Supply CFM: 162 CFM Per Square ft.: 0.096 Square ft. of Room Area: 1,679 Square ft. Per Ton: 5,514 Volume (ft') of Cond. Space: 15,948 Zone Loads Total Heating Required: 15,156 Btuh 15.156 MBH Total Sensible Gain: 3,453 Btuh 94 % Total Latent Gain: 201 Btuh 6 % Total Cooling Required: 3,654 Btuh 0.30 Tons (Based On Sensible + Latent) Notes _ _i Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary_ Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\SBS201 1 \Redirected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013,11:52 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development Inc. Burnsville Heating & A/C Inc 651 Parkside Ct I. Burnsville. MN 55337 Pacie_26_ Detailed Room Loads - Room 1 Foyer (Peak Fenestration Gain Procedure, General_ Room is in zone 1, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 22.0 ft. System Number: 1 Room Width: 4.8 ft. Zone Number: 1 Area: 106.0 sq.ft. Supply Air: 29 CFM Ceiling Height: 18.0 ft. Supply Air Changes: 0.9 AC/hr Volume: 1,901.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 6 CFM Runout Air: 29 CFM Percent of Supply.: 19 % Runout Duct Size: 3 in. Actual Summer Vent.: 3 CFM Runout Air Velocity: 589 ft./min. Percent of Supply: 10 % Runout Air Velocity: 589 ft./min. Actual Winter Infil.: 14 CFM Actual Loss: 0.573 in.wg./100 ft. Actual Summer Infil.: 4 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain W -Wall-12E-5sw 4.8 X 18 46 0.052 4.5 208 0.6 0 26 S -Wall-12E-5sw 10 X 10 100 0.052 4.5 452 0.6 0 56 N -Wall-12E-5sw 11 X 8 88 0.052 4.5 398 0.6 0 49 W -Door-hbt 3 X 6.8 20.4 0.150 13.1 266 3.6 0 73 W -GIs-hbt shgc-0.22 0%S 5 0.300 26.1 131 9.6 0 48 W -GIs-hbt shgc-0.2 0%S 15 0.300 26.1 392 9.1 0 136 UP-Ceil-16B-44 22 X 4.8 105.6 0.022 1.9 202 1.1 0 112 Subtotals for Structure: 2,049 0 500 Infil.: Win.: 13.6, Sum.: 4.0 274 4.588 1,259 0.204 93 56 Ductwork: 275 61 Room Totals: 3,583 93 617 I I i \\SBS201 1 \Red i rected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM Bhmscville Heating&1~ GiInc Commercial HVAC Loads Elite Software De65oParksid 27 Detailed Room Loads Room 2 - Dining Peak Fenestration Gain Procedure General Room is in zone 1, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 18.6 ft. System Number: 1 Room Width: 10.4 ft. Zone Number: 1 Area: 193.0 sq.ft. Supply Air: 28 CFM Ceiling Height: 10.0 ft. Supply Air Changes: 0.9 AC/hr Volume: 1,934.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 6 CFM Runout Air: 28 CFM Percent of Supply.: 21 % Runout Duct Size: 4 in. Actual Summer Vent.: 3 CFM Runout Air Velocity: 321 ft./min. Percent of Supply: 10 % Runout Air Velocity: 321 ft./min. Actual Winter Infil.: 15 CFM Actual Loss: 0.114 in.wg./100 ft. Actual Summer Infil.: 4 CFM Item Area -U- Htg Sen Cig Lat Sen Description Quantity Value HTM Loss HTM Gain Gain W -Wall-12E-5sw 10.4 X 10.5 73.2 0.052 4.5 331 0.6 0 41 N -Wall-12E-5sw 18.6 X 10.5 195.3 0.052 4.5 884 0.6 0 109 W -GIs-hbt shgc-0.2 0%S 36 0.300 26.1 940 9.1 0 327 Subtotals for Structure: 2,155 0 477 Infil.: Win.: 15.0, Sum.: 4.5 305 4.588 1,397 0.204 104 62 Ductwork: 295 59 Room Totals: 3,847 104 598 \\SBS201 1 \Red i rected Folders ...\Brand[ 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM Rhvac - Residential & Light Commercial HVAC Lows Elite Software Development, Inc.' Burnsville Heating & A/C Inc 651 Parkside Ct Burnsville MN 55337 _ Page 28 Detailed Room Loads - Room 3 - Wic Peak Fenestration Gain Procedure General Room is in zone 1, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 8.6 ft. System Number: 1 Room Width: 10.4 ft. Zone Number: 1 Area: 89.0 sq.ft. Supply Air: 3 CFM Ceiling Height: 10.0 ft. Supply Air Changes: 0.2 AC/hr Volume: 894.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 3 CFM Percent of Supply.: 39 % Runout Duct Size: 2 in. Actual Summer Vent.: 0 CFM Runout Air Velocity: 155 ft./min. Percent of Supply: 10 % Runout Air Velocity: 155 ft./min. Actual Winter Infil.: 4 CFM Actual Loss: 0.076 in.wg./100 ft. Actual Summer Infil.: 1 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain I N -Wall-12E-5sw 8.6 X 10 86 0.052 4.5 389 0.6 0 48 Subtotals for Structure: 389 0 48 Infil.: Win.: 4.3, Sum.: 1.3 86 4.593 395 0.198 29 17 Ductwork: 65 7 Room Totals: 849 29 72 i \\SBS201 1 \Red i rected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013,11:52 AM FlRhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc_7 Burnsville Heating & .A/C Inc 651 Parkside Ct BurnsviHP MN 55337 Page 29 FDe,ailed Room Loads - Room 4 - Study (Peak Fenestration Gain Procedure General Room is in zone 1, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 12.0 ft. System Number: 1 Room Width: 14.6 ft. Zone Number: 1 Area: 175.0 sq.ft. Supply Air: 50 CFM Ceiling Height: 10.0 ft. Supply Air Changes: 1.7 AC/hr Volume: 1,752.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 6 CFM Runout Air: 50 CFM Percent of Supply.: 11 % Runout Duct Size: 4 in. Actual Summer Vent.: 5 CFM Runout Air Velocity: 574 ft./min. Percent of Supply: 10 % Runout Air Velocity: 574 ft./min. Actual Winter Infil.: 15 CFM Actual Loss: 0.361 in.wg./100 ft. Actual Summer Infil.: 4 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain E -Wall-12E-5sw 14.6 X 10 126 0.052 4.5 570 0.6 0 70 N -Wall-12E-5sw 12 X 10 120 0.052 4.5 543 0.6 0 67 W -Wall-12E-5sw 4 X 10 40 0.052 4.5 181 0.6 0 22 E -GIs-hbt shgc-0.22 0%S 20 0.300 26.1 522 34.6 0 691 UP-Ceil-16B-44 12 X 4 48 0.022 1.9 92 1.1 0 51 Subtotals for Structure: 1,908 0 901 Infil.: Win.: 15.1, Sum.: 4.5 306 4.588 1,404 0.203 104 62 Ductwork: 275 106 Room Totals: 3,587 104 1,069 \\SBS2011\RedirectedFolders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013,,1`1:52 AM $u~ nsvill Residential A C inct Commercial HVAC Loads Elite Software 6511 Parknide Gt Burnsville MN 55337 ---Page 30 Detailed Room Loads - Room 5 - Kitchen (Peak Fenestration Gain Procedure) General Room is in zone 1, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 17.0 ft. System Number: 1 Room Width: 17.0 ft. Zone Number: 1 Area: 289.0 sq.ft. Supply Air: 64 CFM Ceiling Height: 10.0 ft. Supply Air Changes: 1.3 AC/hr Volume: 2,890.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 64 CFM Percent of Supply.: 1 % Runout Duct Size: 5 in. Actual Summer Vent.: 6 CFM Runout Air Velocity: 472 ft./min. Percent of Supply: 10 % Runout Air Velocity: 472 ft./min. Actual Winter Infil.: 2 CFM Actual Loss: 0.179 in.wg./100 ft. Actual Summer Infil.: 1 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain E -Wall-12E-5sw 3 X 10 30 0.052 4.5 136 0.6 0 17 S -Wall-12E-5sw 2 X 10 20 0.052 4.5 90 0.6 0 11 Subtotals for Structure: 226 0 28 Infil.: Win.: 2.5, Sum.: 0.7 50 4.580 229 0.200 17 10 Ductwork: 38 137 Equipment: 0 1.200 Room Totals: 493 17 1,375 \\SBS201 1 \RedirectedFolders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM [iB hvac -Residential 8 Light Comtitercial HVRC Loads Elite Seftw2Fe Development, Inc. u rnsville Heating & NG Inc ddik 651 Parkside Ct Burnsville. MN 55337 _ Page 31 Detailed Room Loads - Room 6 - Morning Room (Peak Fenestration Gain Procedure General Room is in zone 1, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 10.0 ft. System Number: 1 Room Width: 17.0 ft. Zone Number: 1 Area: 170.0 sq.ft. Supply Air: 118 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 4.6 AC/hr Volume: 1,530.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 8 CFM Runout Air: 118 CFM Percent of Supply.: 6 % Runout Duct Size: 6 in. Actual Summer Vent.: 12 CFM Runout Air Velocity: 600 ft./min. Percent of Supply: 10 % Runout Air Velocity: 600 ft./min. Actual Winter Infil.: 16 CFM Actual Loss: 0.223 in.wg./100 ft. Actual Summer Infil.: 5 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain E -Wa11-12E-5sw 17 X 9 99 0.052 4.5 448 0.6 0 55 S -Wall-1 2 E-5sw 10 X 9 90 0.052 4.5 407 0.6 0 50 N -Wall-12E-5sw 10 X 9 90 0.052 4.5 407 0.6 0 50 E -GIs-hbt shgc-0.22 0%S (3) 54 0.300 26.1 1,410 34.5 0 1,863 UP-Ceil-166-44 10 X 17 170 0.022 1.9 325 1.1 0 180 Subtotals for Structure: 2,997 0 2,198 Infil.: Win.: 16.5, Sum.: 4.9 333 4.589 1,528 0.204 113 68 Ductwork: 376 250 Room Totals: 4,901 113 2,516 I \\SBS201 1 \Red i rected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM Rhvac - Residential & Light Commercial HVAC Loads Mite Software Development, Inc. Burnsville Heating & A/C Inc 651 Parkside Ct Burnsville MN 55337 _ Pace ' Detailed Room Loads - Room 7 - Family Room Peak Fenestration Gain Procedure General _ Room is in zone 1, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 18.8 ft. System Number: 1 Room Width: 14.6 ft. Zone Number: 1 Area: 274.0 sq.ft. Supply Air: 109 CFM Ceiling Height: 10.0 ft. Supply Air Changes: 2.4 AC/hr Volume: 2,745.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 7 CFM Runout Air: 109 CFM Percent of Supply.: 7 % Runout Duct Size: 6 in. Actual Summer Vent.: 11 CFM Runout Air Velocity: 553 ft./min. Percent of Supply: 10 % Runout Air Velocity: 553 ft./min. Actual Winter Infil.: 17 CFM Actual Loss: 0.190 in.wg./100 ft. Actual Summer Infil.: 5 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain E -Wall-12E-5sw 14.6 X 10 92 0.052 4.5 416 0.6 0 51 S -Wall-12E-5sw 18.8 X 10 188 0.052 4.5 851 0.6 0 105 E -GIs-hbt shgc-0.22 0%S (3) 54 0.300 26.1 1,410 34.5 0 1,863 Subtotals for Structure: 2,677 0 2,019 Infil.: Win.: 16.5, Sum.: 4.9 334 4.590 1,533 0.204 114 68 Ductwork: 350 230 Room Totals: 4,560 114 2,317 \\SBS2011\RedirectedFolders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM Rhvac - Residential & Light Commercial WAC Loads Elite Software Development, Inc. Burnsville Heating & AiG Inc 651 Parkside Ct Burnsville. MN 55337 Page 33 Detailed Room Loads - Room 8 - Mud Room (Peak Fenestration Gain Procedure) General Room is in zone 1, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 9.4 ft. System Number: 1 Room Width: 30.0 ft. Zone Number: 1 Area: 282.0 sq.ft. Supply Air: 18 CFM Ceiling Height: 10.0 ft. Supply Air Changes: 0.4 AC/hr Volume: 2,820.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 6 CFM Runout Air: 18 CFM Percent of Supply.: 34 % Runout Duct Size: 3 in. Actual Summer Vent.: 2 CFM Runout Air Velocity: 373 ft./min. Percent of Supply: 10 % Runout Air Velocity: 373 ft./min. Actual Winter Infil.: 19 CFM Actual Loss: 0.233 in.wg./100 ft. Actual Summer Infil.: 6 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain E -Wall-12E-5sw 30 X 10 281 0.052 4.5 1,271 0.6 0 156 S -Wall-12E-5sw 9.4 X 10 94 0.052 4.5 425 0.6 0 52 E -Door-hbt 2.8 X 6.8 19 0.140 12.2 232 3.4 0 64 Subtotals for Structure: 1,928 0 272 Infil.: Win.: 19.5, Sum.: 5.8 394 4.589 1,808 0.203 134 80 Ductwork: 311 39 Room Totals: 4,047 134 391 \\SBS2011\RedirectedFolders ...\Brandl 651 Parkside Ct.rhv ' Tuesday, April 16, 2013, 11:52 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc_ Burnsville Heatinq & AfC Inc 651 Parkside Ct Burnsville, MN 55337 Page 34_ Detailed Room Loads - Room 9 - Master Bedroom (Peak Fenestration Gain Procedure General Room is in zone 2, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 17.7 ft. System Number: 1 Room Width: 18.9 ft. Zone Number: 2 Area: 335.0 sq.ft. Supply Air: 109 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 2.4 AC/hr Volume: 2,676.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 5 CFM Runout Air: 109 CFM Percent of Supply.: 4 % Runout Duct Size: 6 in. Actual Summer Vent.: 11 CFM Runout Air Velocity: 556 ft./min. Percent of Supply: 10 % Runout Air Velocity: 556 ft./min. Actual Winter Infil.: 8 CFM Actual Loss: 0.192 in.wg./100 ft. Actual Summer Infil.: 2 CFM Item Area -U- Htg Sen Clg Lat Sen Description _ Quantity Value HTM Loss HTM Gain Gain E -Wal1-12E-5sw 18.9 X 8 121.2 0.052 4.5 548 0.6 0 67 S-Wall-12E-5sw 2 X 8 16 0.052 4.5 72 0.6 0 9 E -GIs-hbt shgc-0.22 0%S (2) 30 0.300 26.1 784 34.5 0 1,036 UP-Ceil-16B-44 17.7 X 18.9 334.5 0.022 1.9 640 1.1 0 353 Subtotals for Structure: 2,044 0 1,465 Infil.: Win.: 8.3, Sum.: 2.5 167 4.587 767 0.203 57 34 Ductwork: 234 232 People: 230 lat/per, 300 sen/per: 2 460 600 Room Totals: 3,045 517 2,331 \\SBS201 1 \Redirected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.l Burnsville Heating & AiG Inc 651 Parkside Ct Burnsville MN 55337 _ Page 35 Detailed Room Loads - Room 10 - Bedroom 2 (Peak Fenestration Gain Procedure ,General Room is in zone 2, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 12.0 ft. System Number: 1 Room Width: 14.6 ft. Zone Number: 2 Area: 175.0 sq.ft. Supply Air: 69 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 3.0 AC/hr Volume: 1,402.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 5 CFM Runout Air: 69 CFM Percent of Supply.: 7 % Runout Duct Size: 5 in. Actual Summer Vent.: 7 CFM Runout Air Velocity: 506 ft./min. Percent of Supply: 10 % Runout Air Velocity: 506 ft./min. Actual Winter Infil.: 11 CFM Actual Loss: 0.205 in.wg./100 ft. Actual Summer Infil.: 3 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain E -Wall-12E-5sw 14.6 X 8 96.8 0.052 4.5 438 0.6 0 54 S -Wall-12E-5sw 12 X 8 96 0.052 4.5 434 0.6 0 53 E -GIs-hbt shgc-0.22 0%S 20 0.300 26.1 522 34.6 0 691 UP-Ceil-166-44 12 X 14.6 175.2 0.022 1.9 335 1.1 0 185 Subtotals for Structure: 1,729 0 983 Infil.: Win.: 10.5, Sum.: 3.1 213 4.586 976 0.202 72 43 Ductwork: 225 146 People: 230 lat/per, 300 sen/per: 1 230 300 Room Totals: 2,930 302 1,472 \\SBS201 1 \Red i rected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Burnsville Heating & A/C Inc 651 Parkside Ct Burnsville, MN 55337 Page 36 Detailed Room Loads - Room 11 - Bedroom 2 (Peak Fenestration Gain Procedure) General Room is in zone 2, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 14.0 ft. System Number: 1 Room Width: 13.0 ft. Zone Number: 2 Area: 182.0 sq.ft. Supply Air: 69 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 2.9 AC/hr Volume: 1,456.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 5 CFM Runout Air: 69 CFM Percent of Supply.: 7 % Runout Duct Size: 5 in. Actual Summer Vent.: 7 CFM Runout Air Velocity: 510 ft./min. Percent of Supply: 10 % Runout Air Velocity: 510 ft./min. Actual Winter Infil.: 11 CFM Actual Loss: 0.208 in.wg./100 ft. Actual Summer Infil.: 3 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM _ Loss HTM Gain Gain E -Wall-12E-5sw 13 X 8 84 0.052 4.5 380 0.6 0 47 S -Wall-12E-5sw 14 X 8 112 0.052 4.5 507 0.6 0 62 E -GIs-hbt shgc-0.22 0%S 20 0.300 26.1 522 34.6 0 691 UP-Ceil-166-44 14 X 13 182 0.022 1.9 348 1.1 0 192 Subtotals for Structure: 1,757 0 992 Infil.: Win.: 10.7, Sum.: 3.2 216 4.588 991 0.204 73 44 Ductwork: 228 147 People: 230 lat/per, 300 sen/per: 1 230 300 Room Totals: 2,976 303 1,483 \\SBS201 1 \Redirected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Burnsville Heatinq & A/C Inc 651 Parkside Ct Burnsville MN 55337 Page 37 [Detailed Room Loads - Room 12 - Bath 1 (Peak Fenestration Gain Procedure General Room is in zone 2, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 7.9 ft. System Number: 1 Room Width: 14.6 ft. Zone Number: 2 Area: 115.0 sq.ft. Supply Air: 9 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 0.6 AC/hr Volume: 923.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 9 CFM Percent of Supply.: 15 % Runout Duct Size: 2 in. Actual Summer Vent.: 1 CFM Runout Air Velocity: 405 ft./min. Percent of Supply: 10 % Runout Air Velocity: 405 ft./min. Actual Winter Infil.: 3 CFM Actual Loss: 0.496 in.wg./100 ft. Actual Summer Infil.: 1 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain S -Wall-12E-5sw 7.9 X 8 63.2 0.052 4.5 286 0.6 0 35 UP-Ceil-166-44 7.9 X 14.6 115.3 0.022 1.9 221 1.1 0 122 Subtotals for Structure: 507 0 157 Infil.: Win.: 3.1, Sum.: 0.9 63 4.589 290 0.206 21 13 Ductwork: 66 19 Room Totals: 863 21 189 I \\SBS201 1 \Red i rected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013,11:52 AM Rhvae - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Burnsville Heating & A/C Inc 651 Parkside Ct Burnsville, MN 55337 Page 38, Detailed Room Loads- Room 13 - Laundry (Peak Fenestration Gain Procedure General Room is in zone 2, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 5.7 ft. System Number: 1 Room Width: 16.0 ft. Zone Number: 2 Area: 91.0 sq.ft. Supply Air: 8 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 0.7 AC/hr Volume: 730.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 8 CFM Percent of Supply.: 16 % Runout Duct Size: 2 in. Actual Summer Vent.: 1 CFM Runout Air Velocity: 382 ft./min. Percent of Supply: 10 % Runout Air Velocity: 382 ft./min. Actual Winter Infil.: 2 CFM Actual Loss: 0.440 in.wg./100 ft. Actual Summer Infil.: 1 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTMGain Gain S -Wall-12E-5sw 5.7 X 8 45.6 0.052 4.5 206 0.6 0 25 UP-Ceil-1613-44 5.7 X 16 91.2 0.022 1.9 175 1.1 0 96 Floor-19A-38p 16 X 5.7 91.2 0.029 2.2 198 0.3 0 30 Subtotals for Structure: 579 0 151 Infil.: Win.: 2.3, Sum.: 0.7 46 4.583 209 0.197 16 9 Ductwork: 65 18 Equipment: 400 0 Room Totals: 853 416 178 \\SBS201 1 \Red i rected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013,11:52 AM Bh nv e ea 55i&1,4 Light Commercial HVAC Loads Elite Software Development, 651 ParPad e Ct Burnsville, 391, Detailed Room Loads - Room 14 - Bedroom 3 Peak Fenestration Gain Procedure General Room is in zone 2, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 11.9 ft. System Number: 1 Room Width: 16.0 ft. Zone Number: 2 Area: 190.0 sq.ft. Supply Air: 47 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 1.9 AC/hr Volume: 1,523.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 5 CFM Runout Air: 47 CFM Percent of Supply.: 12 % Runout Duct Size: 4 in. Actual Summer Vent.: 5 CFM Runout Air Velocity: 538 ft./min. Percent of Supply: 10 % Runout Air Velocity: 538 ft./min. Actual Winter Infil.: 11 CFM Actual Loss: 0.318 in.wg./100 ft. Actual Summer Infil.: 3 CFM Item Area -U- Htg Sen Cig Lat Sen~ Description Quantity Value HTM Loss HTM Gain Gain W -Wall-12E-5sw 16 X 8 128 0.052 4.5 579 0.6 0 71 S -Wall-12E-5sw 11.9 X 8 75.2 0.052 4.5 340 0.6 0 42 S -GIs-hbt shgc-0.22 81%S 20 0.300 26.1 522 9.1 0 182 UP-Ceil-166-44 11.9 X 16 190.4 0.022 1.9 364 1.1 0 201 Floor-19A-38p 16 X 11.9 190.4 0.029 2.2 413 0.3 0 62 Subtotals for Structure: 2,218 0 558 Infil.: Win.: 11.0, Sum.: 3.3 223 4.588 1,024 0.202 76 45 Ductwork: 269 100 People: 230 Iat/per, 300 sen/per• 1 230 300 Room Totals: 3,511 306 1,003 \\SBS201 1 \Redirected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM Rhvac - Residential & Light Commercial HVAC Loads ETite!Software Development, Inc. Burnsville Heating & AiC Inc Alob, 051 Parkside Ct Burnsville. RAN 55337 -_Page40j Detailed Room Loads - Room 15 - Loft (Peak Fenestration Gain Procedure) General Room is in zone 2, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 24.0 ft. System Number: 1 Room Width: 14.0 ft. Zone Number: 2 Area: 336.0 sq.ft. Supply Air: 58 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 1.3 AC/hr Volume: 2,688.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 6 CFM Runout Air: 58 CFM Percent of Supply.: 9 % Runout Duct Size: 4 in. Actual Summer Vent.: 6 CFM Runout Air Velocity: 670 ft./min. Percent of Supply: 10 % Runout Air Velocity: 670 ft./min. Actual Winter Infil.: 7 CFM Actual Loss: 0.490 in.wg./100 ft. Actual Summer Infil.: 2 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain W -Wall-12E-5sw 14 X 8 82 0.052 4.5 371 0.6 0 46 N -Wall-12E-5sw 3 X 8 24 0.052 4.5 109 0.6 0 13 W -GIs-hbt shgc-0.2 0%S 30 0.300 26.1 783 9.1 0 273 UP-Ceil-1613-44 24 X 14 336 0.022 1.9 643 1.1 0 355 Floor-19A-38p 14 X 24 336 0.029 2.2 729 0.3 0 109 Subtotals for Structure: 2,635 0 796 Infil.: Win.: 6.7, Sum.: 2.0 136 4.588 624 0.206 46 28 Ductwork: 271 124 People: 230 lat/per, 300 sen/per: 1 230 300 Room Totals: 3,530 276 1,248 \\SBS201 1 \Redirected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013,11:52 AM Rhvac - Residential & Light Comi" Eia! HVAC Loads Elite Software De65i1oParPage 1t Burnsville Heabn, & NG inc Burnsville, MN 5533 ' Detailed Room Loads - Room 16 Wic (Peak Fenestration Gain Procedure) General Room is in zone 2, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 11.6 ft. System Number: 1 Room Width: 10.4 ft. Zone Number: 2 Area: 121.0 sq.ft. Supply Air: 14 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 0.8 AC/hr Volume: 965.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 3 CFM Runout Air: 14 CFM Percent of Supply.: 23 % Runout Duct Size: 2 in. Actual Summer Vent.: 1 CFM Runout Air Velocity: 622 ft./min. Percent of Supply: 10 % Runout Air Velocity: 622 ft./min. Actual Winter Infil.: 9 CFM Actual Loss: 1.155 in.wg./100 ft. Actual Summer Infil.: 3 CFM Item Area -U Htg Sen Clg Lat Sen Description Quantitv Value HTM Loss HTM Gain Gain W -Wall-12E-5sw 10.4 X 8 83.2 0.052 4.5 376 0.6 0 46 N -Wall-12E-5sw 11.6 X 8 92.8 0.052 4.5 420 0.6 0 52 UP-Ceil-166-44 11.6 X 10.4 120.6 0.022 1.9 231 1.1 0 127 Subtotals for Structure: 1,027 0 225 Infil.: Win.: 8.7, Sum.: 2.6 176 4.591 808 0.205 60 36 Ductwork: 153 29 Room Totals: 1,988 60 290 \\SBS201 1 \Red i rected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013,11:52 AM 1 ~Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Burnsville Heating & A/C Inc 651 Parkside Ct Burnsville. MN 55337 _ Paue 42 Detailed Room Loads - Room 17 - Master Bath (Peak Fenestration Gain Procedure) General Room is in zone 2, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 16.6 ft. System Number: 1 Room Width: 11.9 ft. Zone Number: 2 Area: 198.0 sq.ft. Supply Air: 55 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 2.1 AC/hr Volume: 1,580.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 5 CFM Runout Air: 55 CFM Percent of Supply.: 10 % Runout Duct Size: 4 in. Actual Summer Vent.: 5 CFM Runout Air Velocity: 628 ft./min. Percent of Supply: 10 % Runout Air Velocity: 628 ft./min. Actual Winter Infil.: 11 CFM Actual Loss: 0.431 in.wg./100 ft. Actual Summer Infil.: 3 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain'. E -Wall-12E-5sw 11.9 X 8 79.2 0.052 4.5 358 0.6 0 44 N -Wall-12E-5sw 16.6 X 8 116.8 0.052 4.5 528 0.6 0 65 E -GIs-hbt shgc-0.23 0%S 16 0.280 24.4 390 35.8 0 573 N -GIs-hbt shgc-0.23 0%S 16 0.280 24.4 390 7.3 0 117 UP-Ceil-166-44 16.6 X 11.9 197.5 0.022 1.9 378 1.1 0 209 Subtotals for Structure: 2,044 0 1,008 Infil.: Win.: 11.3, Sum.: 3.3 228 4.588 1,046 0.202 78 46 Ductwork: 257 116 Room Totals: 3,347 78 1,170 k\SBS201 1 \Red i rected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM ~Rhvac - Residential & Light Co nmeceial HVAC Loads Elite Software Development, Inc Burnsville Heating & A/C Inc 651 Parkside Ct Burnsville. MN 55337 Page 431 Detailed Room Loads - Room 18 - Basement (Peak Fenestration Gain Procedure General Room is in zone 3, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 34.3 ft. System Number: 1 Room Width: 49.0 ft. Zone Number: 3 Area: 1,679.0 sq.ft. Supply Air: 162 CFM Ceiling Height: 9.5 ft. Supply Air Changes: 0.6 AC/hr Volume: 15,948.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 24 CFM Runout Air: 162 CFM Percent of Supply.: 15 % Runout Duct Size: 8 in. Actual Summer Vent.: 16 CFM Runout Air Velocity: 463 ft./min. Percent of Supply: 10 % Runout Air Velocity: 463 ft./min. Actual Winter Infil.: 29 CFM Actual Loss: 0.090 in.wg./100 ft. Actual Summer Infil.: 9 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain J E -Wall-12E-5sw 49 X 9.5 388.7 0.052 4.5 1,758 0.6 0 216 W -Wall-1 5BO-10sf-8 49 X 9.5 465.5 0.050 4.8 2,239 0.1 0 58 S -Wall-1 5BO-10sf-8 34.3 X 5.5 188.4 0.050 4.4 820 0.0 0 0 N -Wall-1 5BO-10sf-8 34.3 X 9.5 325.5 0.050 4.8 1,565 0.1 0 41 E -GIs-ba shgc-0.22 0%S 40.8 0.300 26.1 1,065 34.5 0 1,409 E -GIs-hbt shgc-0.23 0%S (3) 18 0.280 24.4 438 35.8 0 645 E -GIs-hbt shgc-0.22 0%S 18 0.300 26.1 470 34.5 0 621 Floor-21A-32 49 X 34.3 1678.7 0.020 1.7 2,921 0.0 0 0 Subtotals for Structure: 11,276 0 2,990 Infil.: Win.: 29.3, Sum.: 8.7 592 4.589 2,717 0.203 201 120 Ductwork: 1,163 343 Room Totals: 15,156 201 3,453 \\SBS201 1 \Red i rected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013,11:52 AM Rhvac - Resiftatial & Light Commercial HVAC Loads Elite Software Development, Inc. I Burnsville Heating & Alt;. Inc 651 Parkside Ct Burnsville MN 55337 Page 48 System 1 Room Load Summary Htg Min Run Run Clg Clg Min Act Room Area Sens Htg Duct Duct Sens Lat Clg Sys No Name SF Btuh CFM Size Vel Btuh Btuh CF CFM ---Zone 1--- 1 Foyer 106 3,583 48 1-3 589 617 93 29 29 2 Dining 193 3,847 51 1-4 321 598 104 28 28 3 Wic 89 849 11 1-2 155 72 29 3 3 4 Study 175 3,587 48 1-4 574 1,069 104 50 50 5 Kitchen 289 493 7 1-5 472 1,375 17 64 64 6 Morning Room 170 4,901 66 1-6 600 2,516 113 118 118 7 Family Room 274 4,560 61 1-6 553 2,317 114 109 109 8 Mud Room 282 4,047 54 1-3 373 391 134 18 18 Zone 1 subtotal 1,578 25,867 346 8,956 708 420 420 ---Zone 2--- 9 Master Bedroom 335 3,045 41 1-6 556 2,331 517 109 109 10 Bedroom 2 175 2,930 39 1-5 506 1,472 302 69 69 11 Bedroom 2 182 2,976 40 1-5 510 1,483 303 69 69 12 Bath 1 115 863 12 1-2 405 189 21 9 9 13 Laundry 91 853 11 1-2 382 178 416 8 8 14 Bedroom 3 190 3,511 47 1-4 538 1,003 306 47 47 15 Loft 336 3,530 47 1-4 670 1,248 276 58 58 16 Wic 121 1,988 27 1-2 622 290 60 14 14 17 Master Bath 198 3,347 45 1-4 628 1,170 78 55 55 Zone 2 subtotal 1,743 23,043 308 9,364 2,279 439 439 ---Zone 3--- 18 Basement 1,679 15,156 203 1-8 463 3,453 201 162 162 Zone 3 subtotal 1,679 15,156 203 3,453 201 162 162 Ventilation 9,285 1,387 2,320 Duct Latent 358 System 1 total 5,000 73,352 858 22,181 5,866 974 974 System 1 Main Trunk Size: 11x16 in. Velocity: 797 ft./min Loss per 100 ft.: 0.098 in.wg Note: Since the system is multizone, the Peak Fenestration Gain Procedure was used to determine glass sensible gains at the room and zone levels, so the sums of the zone sensible gains and airflows for cooling shown.above are not intended to equal the totals at the system level. Room and zone sensible gains and cooling CFM values are for the hour in which the glass sensible gain for the zone is at its peak. Sensible gains at the system level are based on the "Average Load Procedure + Excursion" method. Cooling System Summary Cooling Sensible/Latent Sensible Latent_ Total Tons Split Btuh Bt_uh Btuh_ Net Required: 2.34 79%/21% 22,181 5,866 28,047 \\SBS201 1 \Redirected Folders ...\Brandl 651 Parkside Ct.rhv Tuesday, April 16, 2013, 11:52 AM c. AC ACE Heating And Cooling I L 8724 West Halver St. Heating and Cooling Allentown, PA 18105 (717) 555-HEAT est. 1993 40 Heating and Air Conditioning Proposal Thank you for this opportunity to be of service to you. After a careful inspection and survey of your home, we are pleased to submit the following proposal for the subject location in accordance with the following conditions and specifications. We are confident that the system solutions we have recommended will ensure your ultimate comfort and happiness. Project Information Project title: 651 Parkside Ct Client name: Brandl Anderson Homes HVAC Equipment We propose to install the following HVAC a ui ment. Item S stem 1 Cooling Model T e Cooling Model Number Cooling Capacity 0 Cooling Efficiency 12.4 Heating Model Type Heating Model Number Heatin Capacity 0 Heating Efficiency 0 System 1 - Cooling Equipment Picture System 1 - Heating Equipment Picture t :Y Terms And Conditions We propose hereby to furnish material and labor-complete for the sum of: $4175.00 Payment to be made as follows: Upon completion ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Date: Signature: Pagel Tuesday, April 16, 2013 w ACE Heating And Cooling 8724 West Halver St. Heating and Cooling Allentown, PA 18105 (717) 555-HEAT est. 1993 Terms And Conditions (cont'd) OPTIONAL ACCESSORIES (to approve, circle item number): ITEM QUANTITY OPTIONAL ACCESSORY SALE PRICE 1. 2 Air Cleaner, Elec-Stat $200.00 2. 2 HUMD Aprilaire 445 $287.00 3. 1 T-Stat 7i/5 Day Digital $170.00 Prices shown cover tax, labor, and any necessary permits required. ACCEPTANCE OF ACCESSORIES: You are authorized to include the above indicated accessories with the equipment I have selected for installation. Payment for accessories is to be added to the total installed price. Date: Signature: i i i Page 2 Tuesday, April 16, 2013 LOT SURVEY CHECKLIST FOR RESIDENTIAL BUILDING PERMIT APPLICATION PROPERTY LEGAL: DATE OF SURVEY: 3~Ie I3 LATEST REVISION: rn c ca U O z Q DOCUMENT STANDARDS ❑ ❑ • Registered Land Surveyor signature and company ❑ ❑ • Building Permit Applicant ,e( ❑ ❑ • Legal description 0 0 • Address ❑ ❑ • North arrow and scale ❑ 0 • House type (rambler, walkout, split w/o, split entry, lookout, etc.) ❑ ❑ • Directional drainage arrows with slope/gradient % 0 ❑ • Proposed/existing sewer and water services & invert elevation 0 0 • Street name ❑ 0 • Driveway (grade & width - in R/W and back of curb, 22' max.) 0 0 • Lot Square Footage 0 ❑ • Lot Coverage ELEVATIONS Existing ❑ ❑ • Property corners 0 0 * Top of curb at the driveway and property line extensions ❑ 'e ❑ • Elevations of any existing adjacent homes _,2-0 ❑ • Adequate footing depth of structures due to adjacent utility trenches JZ" ❑ ❑ . Waterways (pond, stream, etc.) Proposed ❑ ❑ • Garage floor .'W ❑ ❑ • Basement floor ❑ ❑ • Lowest exposed elevation (walkout/window) erg' ❑ ❑ • Property comers ❑ 0 • Front and rear of home at the foundation PONDING AREA (if applicable) ❑ 0 . Easement line ❑ ❑ • NWL 0 0 • HWL ❑ ❑ • Pond # designation ❑ 0 • Emergency Overflow Elevation ❑ )2' ❑ • Pond/Wetland buffer delineation Y . Shoreland Zoning Overlay District Y • Conservation Easements DIMENSIONS ❑ ❑ • Lot lines/Bearings & dimensions ❑ ❑ • Right-of-way and street width (to back of curb) ❑ ❑ • Proposed home dimensions including any proposed decks, overhangs greater than 2', porches, etc. (i.e. all structures requiring permanent footings) ❑ ❑ • Show all easements of record and any City utilities within those easements ❑ ❑ • Setbacks of proposed structure and and setback of adjacent existing structures ❑ 0 • Retaining wall requirements: Reviewed By: Date GIFORMS/Building Permit Application Rev. 11-26-04 r P18NEERengineering CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS 2422 Enterprise Drive, Mendota Heights, MN 55120, Phone: (651) 681 1914 Fax: (651) 681 9488 - Pioneereng.com Certificate of Survey for: BRANDL ANDERSON HOMES ADDRESS: 651 PARKSIDE COURT, EAGAN, MN BUYER: MADL MODEL: ELEVATION: LOT AREA =12542 sf 0e 1i` 1g Wall Wig HOUSE AREA =2314 sf Be 1jeqUired , PORCH AREA =75 sf SIDEWALK AREA =63 sf DRIVEWAY AREA =741 sf 588048'32"W 95.50 COVERAGE =25.4 % PROVIDE A~v1) Ir\INTAIN (945.6) - - - (952.5) INLET PROTECTION UNTIL 9457 952.6 - - - FWAL TURF IS ESTABLISH 946.5) I O j DRAINAGE AND UTILITY O (951.3) X EASEMENT PER PLAT s~ I - - - - - - - - - - - - - - - -7 03 II 15 v 951.4 I 5 I t I j I (959,0) I X V7 D I I M d- 06 " 9ss I 8.01 (959.5) Cb - 23_90 ° 0 N m 0 (959.3) I 1 0 17.00 I d. I N ° I I 958.8 9s)9 1959.0 N~- 14.50 I ' I ° I j 0 4,C1~1 -S`r x Pt 0POSED VACANT 0) I i HOUSE I I 00 I CV 9' F.B.W.O. o I i J w i t VACANT o Ld I 3 04 I 1 15.00 j s /GARAGE 1 9d ! / I I CN N j S Porch ° O i I I i I N 8 N 1 I (9 . ) I to w I I I 968.8 10.0 0 20.00 A0o, 1 04 ° 1 d' (962.8) -1 8.00 9 7. (968---.-3) - ~ k. (96e3) N PROPOSED I ~ BENCH MARK: DRIVEWAY w w I rn BOPCOFMSPRKE TOP OF 'SPIKE o 4,5% 15 ELEV.=967.73 ELEV.=968.52 U' 5 I o (966.1 (966,8) 966.7 966.1 28'32 % 966 ~ N8 7 LnC:) r~, CV (0 Lo (10 C) \ - <-----<-----<---- II LO PARKSIDE COURT BENCH MARK: ~O TOP NUT HYDRANT LOTS 3-4 BLK 1 ELEV.=964.34 NOTE: ADD FOUNDATION LEDGE AS REQUIRED DMiC NOTE: GRADING PLAN BY JAMES R HILL LAST DATED 3-11-09 WAS USED C46GAN ENGINEERING D TO DETERMINE THE PROPOSED ELEVATIONS SHOWN ON THIS CERTIFICATE. . HOUSE ELEVATIONS : (PROPOSED) /ASBUILT L NOTE: PROPOSED BUILDING DIMENSIONS SHOWN ARE FOR HORIZONTAL LOCATION OF STRUCTURES ON THE LOT ONLY. CONTACT BUILDER PRIOR TO LOWEST FLOOR ELEVATION :(960.0) / CONSTRUCTION FOR APPROVED CONSTRUCTION PLANS. / TOP OF FOUNDATION ELEV. (968.7) NOTE: NO SPECIFIC SOILS INVESTIGATION HAS BEEN PERFORMED ON THIS LOT BY THE SURVEYOR. THE SUITABILITY OF SOILS TO SUPPORT THE SPECIFIC GARAGE SLAB ELEV. ® DOOR (965.3) / HOUSE PROPOSED IS NOT THE RESPONSIBILITY OF THE SURVEYOR. NOTE: THIS CERTIFICATE DOES NOT PURPORT TO SHOW EASEMENTS OTHER THAN THOSE SHOWN ON THE RECORDED PLAT. X 000.00 DENOTES EXISTING ELEVATION NOTE: CONTRACTOR MUST VERIFY DRIVEWAY DESIGN. ( 000.00 ) DENOTES PROPOSED ELEVATION NOTE: BEARINGS SHOWN ARE BASED ON AN ASSUMED DATUM DENOTES DRAINAGE FLOW DIRECTION EAGAN A- DENOTES SPIKE i.~ V WE HEREBY CERTIFY TO BRANDL ANDERSON HOMES THAT THIS IS A TRUE AND CORRECT REPRESENTATION OF A / WED SURVEY OF THE BOUNDARIES OF: r;Rs, LOT 5, BLOCK 1, DODD PARKSIDE DAKOTA COUNTY, MINNESOTA IT DOES NOT PURPORT TO SHOW IMPROVEMENTS OR ENCROACHMENTS, EXCEPT AS SHOWN, AS SURVEYED BY ME OR UNDER MY DIRECT SUPERVISION THIS 14TH DAY OF MARCH, 2013. REVISED: NOTE: STAKE HOUSE SIGNED: PI NEER ENGINEERING, P.A. 3/18/13 STAK SCALE 1 INCH = 20 FEET BY: 7485 112296002 KKS Peter J. Hawkinson License No. 42299 PERMIT City of Eagan Permit Type:Plumbing Permit Number:EA113232 Date Issued:09/03/2013 Permit Category:ePermit Site Address: 651 Parkside Ct Lot:5 Block: 1 Addition: Dodd Parkside PID:10-20875-01-050 Use: Description: Sub Type:Residential Work Type:Replace Description:Water Softener Meter Size Meter Type Manufacturer Serial Number Remote Number Line Size Comments:Please call Building Inspections at (651) 675-5675 to schedule a final inspection. Bob Sable 5242quebec Ave N. New Hope, MN 55428 Fee Summary:PL - Permit Fee (WS &/or WH)$55.00 0801.4087 Surcharge-Fixed $5.00 9001.2195 $60.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Brandl/anderson Homes Inc 4555 Erin Dr Unit 120 Eagan MN 55122 Bob Sable Services 5242 Quebec Ave N New Hope MN 55428 (612) 534-6526 Applicant/Permitee: Signature Issued By: Signature City of EaTnon a Address: 651 Parkside Ct Zip: 55123 Permit 110698 The following items were /were not completed at the Final Inspection on: (,Vh Complete Incomplete l Comments Final grade - 6" from siding Permanent steps - Garage Permanent steps - Main Entry Permanent Driveway Permanent Gas Retaining Wall or 3:1 Max Slope Sod / Seeded Lawn Trail I Curb Damage Porch Lower Level Finish Deck ~ pyl f ® t Fireplace • Verify with your builder that roof test caps from the plumbing system have been removed. • Turn off water supply to the outside lawn faucets before freeze potential exists. • Call the Engineering Department at (651) 675-5646 prior to working in the right-of-way or installing an irrigation system. Building Inspector: GABuilding InspectionsTORMS\Checklists