Loading...
3970 Cedar Grove Lane I7, 0a (0 Qjt1b~ ~O Use BLUE or BLACK Ink 010 For-Office Use I Cit of Ea Permit i of 59~ j Permit Fee: 1~ I 3830 Pilot Knob Road I Eagan MN 55122 w l 3 Date Received: Phone: (651) 675-5675 ,,q4 Fax: (651) 675-5694 1 Staff: I ----------------1 2013 RESIDENTIAL BUILDING PERMIT APPLICATION 57/)0/13 39 '7 o Ce da V- 6VZ)V2 e Date: Site Address: Unit Name: _ bemwv C.OYp0 IJr2- 2V?-,3G6 Resident/ Phone: Owner Address / City / Zip: I10~0z; V'Y-- AV , Al P6,1WA AIA 55yf 6 Applicant is: Owner Contractor 1' 5 6 S-ill Type of Work Description of work: kgw ~ot~S'~✓'ccG~"iDVt ►~1 Y°~~ ~P~ju~Y Construction Cost: Multi-Family Building: (Yes No x ) Company: _ L in NIQN' Contact: A44 11q_ Contractor Address:_35~79 tr~ha ~ ~ City: _ 50-1ax State: MA) 'zip: 55123 Phone: 12 - 998'" 77f4k License '7 l3 Lead Certificate If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) COMPLETE THIS AREA ONLY IF CONSTRUCTING ANEW BUILDING In the last 12 months, has the City of Eagan Issued a permit for a similar plan based on a master plan? )(Yes _No If yes, date and address of master plan: 3g 7D C Ja-v- 6k-dv-~ LA `Le, Licensed Plumber: _c/andev Meg ~ / 0&tm b(A' J Phone: 952- yy5- a92 t( t~ p T Mechanical Contractor: Phone: Sewer & Water Contractor: r*4 Phone: 1x51 2V& 312 NOTE: Plans and supporting docu ents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gooherstateonecall.org I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued In accordance with the Minnesota State Building Code must be completed within 180 days of permit Issuance. x 1,, 16t-ff 9ePIRX1r7 d x Applicant's Printed Name Applicant's Signature Page 1 of 3 N NOT WRITE ELOW THIS LINE he DO //0,5 vg SUB TYPES Foundation - Fireplace Porch (3-Season) _ Storm Damage - Single Family - Garage _ Porch (4-Season) - Exterior Alteration (Single Family) - Multi _ Deck - Porch (Screen/Gazebo/Pergola) _ Exterior Alteration (Multi) 01 of Plex _ Lower Level _ Pool _ Miscellaneous _ Accessory Building WORK TYPES New _ Interior Improvement _ Siding _ Demolish Building* _ Addition - Move Building _ Reroof _ Demolish Interior Alteration Fire Repair _ Windows _ Demolish Foundation _ Replace - Repair _ Egress Window _ Water Damage _ Retaining Wall *Demolition of entire building - give PCA handout to applicant DESCRIPTION Valuation, Occupancy_._ MCES System Plan Review Code Edition SAC Units (25%-* 100%--- Zoning r City Water Census Code Stories Booster Pump # of Units Square Feet 0 o PRV # of Buildings Length Fire Sprinklers Type of Construction- Width REQUIRED INSPECTIONS Footings (New Building) Meter Size: Footings (Deck) ~G Final / C.O. Required Footings (Addition) Final / No C.O. Required Foundation HVAC _ Gas Service Test Gas Line Air Test Drain Tile Other: Roof: -Ice & Water -Final Pool: -Footings AFraming Siding: -Stucco Lath Stone nKFinal -Brick Fireplace: Rough In '4 Air Test Final Windows Insulation Retaining Wall: _ Footings _ Backfill _ Final Sheathing Radon Control Sheetrock Erosion Control Reviewed By: , Building Inspector RESIDENTIAL FEES Base Fee " f Surcharge 90,23= jobiq ,Q Plan Review MCES SAC 3 l y I ~I l City SAC _ Utility Connection Charge S&W Permit & Surcharge Treatment Plant Copies TOTAL Page 2 of 3 1 ~0~9t~ New Construction Energy Code Compliance Certificate Per N 1101.8 Building Certificnte, A building certificate shall be posted in a permanently visible location inside rate Certificate Posted the building. The certificate shall be completed by the builder and shall list information and values of components listed in Table NI 101.8. Drailing Address of the Dwelling or Dwelling Unit Cite 3970 CEDAR GROVE LANE EAGAN Name of Residential Contractor DIN License Number THERMAL. ENVELOPE RADON SYSTEM Type: Check All That Apply X Passive (No Fan) 0 CL > Aotive (if'ith fair thud mon)neter or E~ ~ n > other system rnonitoring device) : CS V = 'd ~ i U G O M V c7 p y G .fl 2 U o y y c ii o Z Insulation Location U E v :2 = 11 t~o cut F°- Z w w 2 ° 12 2 i2 i2 Other Please Describe Here Below:En€ireSlab:`::: Foundation Wall X INTERIOR Rim Joist (Foundation) X INTERIOR Rtm 36rst Floor+ { INTERIOR.... Wall 21 44 Ceiling, vaulted X Bay Windows or cantilevered areas:. 38 Bonus room over garage 38 21 10 6 bescribe other'►risulafed areas: Windows & Doors Heating or Cooling Ducts Outside Conditioned Spaces Average U-Factor (excludes skylights and one door) U: 0.29 Not applicable, all ducts located in conditioned space Solar Heat Gain Coefficient (SHGC): 0.26 r-8 R.-value MECHANICAL SYSTEMS Make-up Air Select a Type Appliances Heating System Domestic Water Heater Cooling System X Not required per mech. code FttelType Natural Gas Electric.; Electric Passive - - Manufacturer Lennox AO Smith Lennox Powered Interlocked with exhaust device. Model ML193UH045XP24B GPVH50N::: 13ACX=Q18-230: Describe: Input in 000 Capacity in So Output in 1 5 I Other, describe: Rating or Size BTUS: Gallons; Tons: ' Heat Loss:' Heat Gain: Location of duct or system: Structure's Calculated 36,666 13,232. AFUE or SEER: 13 HSPF'/o 93 Calculated 16,014 Efficiency coolin toad: Cfin's PLAN CMS Jefferson " round duct OR Mechanical Ventilation System " metal duct Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air Combustion Air Select a Type source heat pump with gas back-up furnace): X Not required per mech. code Select Type Passive Heat Recover Ventilator (HRV) Capacity in cfins: Low: High: Other, describe: Energy Recover Ventilator (ERV) Capacity in cfins: Low: High: Location of duct or system: X Continuous exhausting fan(s) rated capacity in cfins: 130 Mechanical Room Location of fan(s), describe: Owners bath, main Bath Cfin's Capacity continuous ventilation rate in cfins: SO Insulated Flex Total ventilation (intermittent+ continuous) rate in elms: 185 " metal duct Created by BAM version 052009 MULTI-FAMILY PLAN REVIEW FOR COMPLIANCE WITH AIRCRAFT NOISE ORDINANCE Compliance with Procedures to Ensure Submitter: Noise Impact Area Adequate Noise Attenuation: Lennar Airport - MSP International Exterior wall construction: 16305 36th Ave. No. Noise Zone - 4 Vinyl Suite 600 15/32" sheathing Plymouth, MN 55446 New Infill Residence is a "COND" Tyvek wrap 952-249-3000 use in Noise Zone 4 2x6 studs 16" O.C. R-21 batt insulation with 1/2" gypsum board Roof Construction: Plan. Reviewed: j _ Peaked roof with manufactured trusses 24 O.C. _ Roof vents v ( CO Q.C.o1 [---tJl- Shingles Information Submitted: 15# felt Annotated architectural drawings includin : 1/2" sheathing Blown insulation R-44 Windows: Atrium 5/8" gypsum board Swinging Patio Doors: Atrium Entry Doors: Therma Tru Mechanical Ventilation System: Skylights: N/A 2-ton central air conditioning unit Compliance with STC Requirements: Window, Door Frame, Perimeter and Other Seals: All window and door openings are to be caulked Average window/wall area for exterior wall Ll &j with butyl-based caulk With this window/wall area ratio and STC 40 walls, windows Fireplace Chimney Cap: with an STC 30 can be used to meet the noise reduction N/A requirements; Ventilation Duct Exterior Wall Penetrations: Summa : All exterior ducts will have bends as required by the ordinance Other measures including duct bends and caulking are being taken to ensure minimum transmission of noise through the Door and Window Construction: exterior building shell so that the construction should meet Windows: Atrium (30 STC) the compatibility guidelines. M Sliding Patio Doors: Atrium (30 STC) Therefore, the materials and construction as proposed should meet the requirements of the Eagan aircraft noise ordinance. Entry Doors: Therma Tru (29 STC) Skylights: N/A Review Completed (date): I Other Exterior Wall Penetrations: Review Completed b : Tom Tamte Sill sealer between plates and blocks Ventilation, Makeup and Combustion Air Calculations Submittal Form For New Dwellings These blank submittal forms and instructions are available at the City website and at City Hall. The completed form must be submit- ted in duphcii it the time of application of a mechanical permit for new construction. Additional forms may be downloaded and printed at: Slte address 3 5570 Date tXG~ LQ✓bQ ry'-Zp~ Contractor Completed e tc By G Section A Ventilation Quantity (Determine quantity by using Table N1104.2 or Equation 11-1) Square feet (Conditioned area including Basement- finished or unfinished) Total required ventilation Number of bedrooms 3 Continuous ventilation .576 Directions - Determine the total and continuous ventilation rate by either using Table N1104.2 or equation 11-1. The table and equation are below. Table N1104.2 Total and Continuous Ventilation Rates (in cfm) Number of Bedrooms 1 2 3 4 5 6 Conditioned space (in Total/ Total/ Total/ Total/ Total/ Total/ sq. ft.) _ continuous continuous continuous continuous continuous continuous 10004500 60/40 75/40 90/45 105/53 120/60 135/68 1501-2000 70/40 85/43 100/50 115/58 130/65 145/73 2001=2500 80/40 95/48 110/55 125/63 140/70 155/78 2501-3000 90/45 105/53 120/60 135/68 150/75 165/83 3001-3500 100150 115/58 130/65 145/73 160/80 175/88 3501-4000 110/55 125/63 140/70 155/78 170/85 185/93 .4001-4500 120/60 135/68 150/75 165/83 180/90 195/98 4501=5000 130/65 145/73 160/80 175/88 190/95 205/103 5001-5500` 140/70 155/78 170/85 185/93 200/100 215/108 5501-6000 150/75 165/83 180/90 195/98 210/105 22S/113 Equation 11-1 (0.02 x square feet of conditioned space) + [15 x (number of bedrooms + 1)] = Total ventilation rate (dm) Total ventilation - The mechanical ventilation system shall provide sufficient outdoor air to equal the total ventilation rate average, for each one-hour period according to the above table or equation. For heat recovery ventilators (HRV) and energy recovery ventila- tors (ERV) the average hourly ventilation capacity must be determined in consideration of any reduction of exhaust or out outdoor air intake, or both, for defrost or other equipment cycling. Continuous ventilation - A minimum of 50 percent of the total ventilation rate, but not less than 40 cfm, shall be provided, on a con- tinuous rate average for each one-hour period. The portion of the mechanical ventilation system intended to be continuous may have automatic cycling controls providing the average flow rate for each hour is met. G:ISAFETYWK1Vent-makeup-comb air submittal (2).docx Page 9 of 6 Section B Ventilation Method (choose either balanced or exhaust only Balanced, HRV (Heat Recovery Ventilator) or ERV (Energy Recov- Exhaust only ery Ventilator) - cfm of unit in low must not exceed continuous venti- Continuous fan rating in cfm lation rating by more than 100%. Low cfm: High cfm: Continuous fan rating in cfm (capacity must not exceed ~r- r continuous ventilation rating by more than 100%) J UeXh- Directions -Choose the method of ventilation, balanced or exhaust only. Balanced ventilation systems are typically HRV or ERV's. Enter the low and high cfm amounts. Low c fm airflow must be equal to or greater than the required continuous ventilation rate and less than 10096 greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the ventilation fan must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. Section C Ventilation Fan Schedule Description Location continuous intermittent l_ 4 erbl_ a SQ Directions -The ventilation fan schedule should describe what the fon is for, the location, cfm, and whether It is used for continuous or intermittent ventilation. The fan that is chose for continuous ventilation must be equal to or greater than the low c fm air rating and less than 10095 greater than the continuous rate. (For instance, if the low cfm Is 40 cfm, the continuous ventilation fan must not exceed 80 cfm.) Automatic controls may allow the use of a largerfan that is operated a percentage of each hour. Section D Ventilation Controls (Describe o eration and control of the continuous and intermittent ventilation) Directions -Describe the operation of the ventilation system. There should be adequate detail for plan reviewers and inspectors to verify design and installation compliance. Related trades also need adequate detail for placement of controls and proper operation of the building ventilation. 7f~ exhaust fans are used for building ventilation, describe the operation and location of any controls, indicators and legends. !fan ERV or HRV Is to be installed, describe how it will be installed. If it will be connected and interfaced with the air handling equipment, please describe such connections as detailed in the manufactures' installation instructions, if the installation instructions require or recommend the equipment to be interlocked with the air handling equipment for proper operation, such interconnection shall be made and described. Section E Make-up air Passive (determined from calculations from Table 501.3.1) Powered (determined from calculations from Table 501.3.1) Interlocked with exhaust device (determined from calculation from Table 501.3.1) Other, describe: Location of duct or system ventilation make-up air: Determined from make-up air opening table Cfm Size and type (round, rectangular, flexor rigid) (NR means not required) Page 2 of 6 Directions -In order to determine the makeup air, Table 501.3.1 must be filled out (see below). For most new installations, column A will be appropriate, however, if atmospherically vented appliances orsolid fuel appliances are installed, use the appropriate column. For existing dwellings, see IMC501.3.3. Please note, if the makeup air quantity is negative, no additional makeup air will be re- quired for ventilation, if the value is positive refer to Table 501.3.2 and size the opening. Transfer the cfm, size of opening and type (round, rectangular, flexor rigid) to the last line of section D. The make-up air supply must be installed per IMC501.3.2.3. Table 501.3.1 PROCEDURE TO DETERMINE MAKEUP AIR QUANITY FOR EXHAUST EQUIPMENT IN DWELLINGS (Additional combustion air will be required for combustion appliances, see KAIR method for calculations) One or multiple power One or multiple fan- One atmospherically vent Multiple atmospherical- vent or direct vent ap- assisted appliances and gas or oil appliance or ly vented gas or oil pliances or no combus- power vent or direct vent one solid fuel appliance appliances or solid fuel tion appliances appliances appliances Column C Column D Column A Column B 1. a) pressure factor 0.15 0.09 0.06 0.03 (cfm/sf) b) conditioned floor area (sf) (including unfinished basements) /Q / e Estimated House Infiltration (dm), I1a r~ x 1bJ O~$ 2. Exhaust Capacity a) continuous exhaust-only ventilation system (cfm); (not applicable to ba- lanced ventilation systems such as HRV) b) clothes dryer (cfm) 135 135 135 135 c) 80% of largest exhaust rating (cfm); Kitchen hood typically (not applicable if recirculating system or if powered makeup air is electrically interlocked and match to exhaust) d) 80% of next largest exhaust rating (cfm); bath fan typically Not (not applicable if recirculating system or if powered makeup air is electrically Applicable interlocked and matched to exhaust) Total Exhaust Capacity (cfm); 2a+2b+2c+2dJ 4~-+ 5 3. Makeup Air Quantity (cfm) a) total exhaust capacity (from above) b) estimated house infiltration (from above Makeup Air Quantity (cfm); (3a--3bJ (if value is negative, no makeup air is needed 4. For makeup Air Opening Sizing, refer to Table 501.4.2 N A. Use this column if there are other than fan-assisted or atmospherically vented gas or oil appliance or If there are no combustion appliances. (Power vent and direct vent appliances may be used.) B. Use this column if there is one fan-assisted appliance per venting system. (Appliances other than atmospherically vented appliances may also be in- cluded.) C. Use this column If there is one atmospherically vented (other than fan-assisted) gas or oil appliance per venting system or one solid fuel appliance. D. Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically vented gas or all appliances and solid fuel appliances. Page 3 of 6 Makeup Air Opening Table for New and Existing Dwelling Table 501.3.2 One or multiple power One or multiple fan• One atmospherically Multiple atmospherically vent, direct vent ap- assisted appliances and vented gas or oil ap- vented gas or oil ap- Duct di- pliances, or no combus- power vent or direct pliance or one solid fuel pliances or solid fuel ameter Con appliances vent appliances appliance appliances Column A Column B Column C Column 0 Passive opening 1-36 1-22 1-15 1-9 3 Passive opening 37-66 23-41 16-28 10-17 4 Passive opening 67-109 42 - 66 29-46 18 - 28 5 Passive opening 110-163 67 -100 47 - 69 29 - 42 6 Passive opening 164-232 101-143 70-99 43-61 7 Passive a ening 233 -317 144-195 100-135 62 - 83 8 Passive opening 318-419 196-258 136-179 84-110 9 w/motorized damper - Passive opening 420-539 259-332 180-230 111-142 10 w/motorized damper Passive opening 540 -679 333 -419 231- 290 143-179 11 w/motorized damper Powered makeup air >679 >419 >290 >179 NA Notes: A. An equivalent length of 100 feet of round smooth metal duct is assumed. Subtract 40 feet for the exterior hood and ten feet for each 90- degree elbow to determine the remaining length of straight duct allowable. B. If flexible duct is used, increase the duct diameter by one inch. Flexible duct shall be stretched with minimal sags. Compressed duct shall not be accepted. C. Barometric dampers are prohibited in passive makeup air openings when any atmospherically vented appliance is installed. D. Powered makeup air shall be electrically interlocked with the largest exhaust system. Sections F Combustion air Not required per mechanical code (No atmospheric or power vented appliances) Passive (see IFGC Appendix E, Worksheet E-i) Size and type Other, describe: Explanation - If no atmospheric or power vented appliances are installed, check the appropriate box, not required. If a power vented or atmospherically vented appliance installed, use iFGCAppendix E, Worksheet E-2 (see below). Please enter size and type. Cow=- tion air vent supplies must communicate with the appliance or appliances that require the combustion air. Section F calculations fallow on the next 2 pages. Page 4 of 6 Project Job: Colonial Patriot Jeffers... wrightsoftz Summary Date: MAY 9, 2013 Entire House By: Elander Mechanical Inc. 591 Citation Drive, Shakopee, MN 55379 Phone: 952-4454692 Fax. 952445-7487 Prolect Information For: 5~971t ~zclc.rcrci~ (.,on-C Notes: Ulrtl ~/yd~ 36., Ale, S-eo 16, 0/ c/ Design Information Weather: Minneapolis-St. Paul, MN, US Winter Design Conditions Summer Design Conditions Outside db -15 OF Outside db 88 OF Inside db 70 OF Inside db 72 OF Design TD 85 OF Design TD 16 OF Daily range M Relative humidity 50 % Moisture difference 33 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 29299 Btuh Structure 11419 Stuh Ducts 1097 Btuh Ducts 639 Btuh Central vent (69 cfm) 6272 Btuh Central vent (69 cfm) 1173 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 36668 Btuh Use manufacturer's data y Rate/swin multiplier 1.00 Infiltration Equipmerifsensible load 13232 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Tight) Structure 1173 Btuh Ducts 117 Btuh Heating cooling Central vent (69 cfm) 1492 Btuh Area (ftZ 1852 1852 Equipment latent load 2782 Btuh Volume (ft3) 14816 14816 Air chan~gges/hour 0.14 0.07 Equipment total load 16014 8tuh Equiv. A% (cfm) 35 17 Req. total capacity at 0.70 SHR 1.6 ton Heating Equipment Summary Cooling Equipment Summary Make Lennox Make Lennox Trade MERIT 90 Trade 13ACX Series - RFC Model ML193UH045XP246 * Cond 13ACX-018-230-* AHRI ref 4792130 Coil C33-25*+TDR AHRI ref 1031313 Efficiency 93 AFUE Efficiency 11.9 EER, 13.5 SEER Heating input 44000 MBtuh Sensible cooling 12950 Btuh Heating output 41000 Btuh Latent cooling 5550 Btuh Temperature rise 50 OF Total cooling 18500 Btuh Actual air flow 768 cfm Actual air flow 617 cfm Air flow factor 0.025 cfm/Btuh Air flow factor 0.051 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.83 BoldRfafic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2013-May-08 15:43:06 -t + wrightsdft° Right-Suite® Universal 2012 12.1.06 RSU13410 Page i AC-CA ...p%Heat Losses 20131Lennar Patriot Jefferson.rup Cale = MJS Front Door faces: N Component Constructions Job: Colonial Patriot Jeffers... ' WI'19r11rS0~~ p Date: MAY 9, 2013 Entire House By: Elander Mechanical Inc. 591 Citation Drive, Shakopee, MN 55379 Phone. 952-445-4692 Fax: 952-445-7487 Project Information For: D ' • Conditions Location: Indoor: Heating Cooling Minneapolis-St. Paul, MN, US Indoor temperature (°F) 70 72 Elevation: 837 ft Design TD (°F) 85 -16. Latitude: 45% Relative humidity 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 54.5 32.7 Dry bulb (°F) -15 88 Infiltration: Daily range (°F) - 19 ( M) Method Simplified Wet bulb (°F) - 71 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Tight) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft' Btuh/ft"F A' 'FrB uh Btuhf l 9tuh Btuh/R' Btuh Walls 12F-Osw: Frm wall, vni ext, r-21 cav ins, 1/2" gypsum board int n 555 0.065 21.0 5.52 3066 1.08 601 fnsh, 2"x6" wood frm a 398 0.065 21.0 5.52 2197 1.06 430 s 513 0.065 21.0 5.53 2833 1.08 555 w 444 0.065 21.0 5.52 2452 1.08 480 all 1909 0.065 21.0 5.52 10549 1.08 2066 Partitions (none) Windows 61A: VINYL Insulated Glass Double Hung; NFRC rated a 77 0.290 0 24.6 1906 28.9 2232 (SHGC=0.26) s 42 0.290 0 24.6 1039 16.7 704 w 52 0.290 0 24.6 1286 28.9 1506 all 172 0.290 0 24.6 4232 25.9 _.A4-42 Doors 11,10: boor, mtl fbrgi type n 21 0.600 6.3 51.0 1071 16.7 351 e 21 0.600 6.3 51.0 1071 16.7 351 s 21 0.600 6.3 51.0 1071 16.7 351 all 63 0.600 6.3 51.0 3213 16.7 1053 Ceilings 16CR-44ad: Attic ceiling, asphalt shingles roof mat, r-44 ceil ins, 1116 0.022 44.0 1.87 2087 0.91 1015 5/8" gypsum board int fnsh Floors 20P-38c., Fir floor, frm fir, 12" thkns, carpet fir fnsh, r-5 ext ins, r-38 250 0.030 38.0 2.55 638 0.34 85 cav ins, gar ovr 20P-38v: Fir floor, frm fir, 12" thkns, vinyl fir fnsh, r-5 ext ins, r-38 130 0.030 38.0 2.55 332 0.34 44 cav ins, gar ovr 22B-5tpm: Bg floor, heavy dry or light damp soil, on grade depth, r-5 134 0.449 5.0 38.2 5114 0 0 edge ins 2013-May-08 15:43:06 At. + wrightsoft' Right-Suite® Universal 2012 12.1.06 RSU13410 page 1 .AM ...plHeat Losses 20131Lennar Patriot Jefferson.rup Cal: = MJB Front Door faces: N 17 co N f7 N ` w z x M I F:- I j, m o (`3 o mi Z" Z p of c o cr co > 4)a 000 3E~ra Us o o x m n, CL c> o m z ° w m^ o = M M ~ ;rr m w Q N W ._....._.a lII m T a Q L ~ a ^ a ~ z F' w m t- E- w 00 ~ Q J o ac C7 w m m: U O Q o 0 N 'i co f0 O C v ♦♦hh CU O O X X d' N O X i m ~i V M CD M r d' z co X X X X X X LL U) Z 0 N a M r r N N W vv n CID : 0 a ul Q U 'mot w w w w w w w w w LO z z z z z z z z z o.o O Q u~i rra z z z z z z z z z R W 3' a 0 L W U z co 'm N Q i a Q) U) 70 N w 0) Q I~ a a zif) --3 ch W U w U > a of N vUi U) ? w co N > 41 C V NI (D < N N v Q. N N co o x E -a z 3 w o F a 0 as !i Z Q ~ z N E, = V N, N. U CL Q CL: ww t o N v) rf3 o c` :E :E U) N W i C7 [3 C7 C9 f- v N C9 C7 t- w a a a o o U? o c in a' U U E- V U U m po a J M Q C7 CA Qw j~ k U)~ Ir J v 0 cc w w g ¢ z w _ a¢ z Q Q J CL' Q Ir - t- Q d J J -7 z W w Q! z z a C9 Z Z Z z z ? Z Z + D 2 S T p S Z s z w CO f CLI x (9 C9 a w a 0 a < O EL co U) co vi UU) (a (j) 0 J= X ~Z _ c N N N N O N N N N Q I- F- ~O p ak 4k N qk qk 3t # a zMo s cc Q W M} z tZ N N N N N N N N N a..- o T T 2 z p S Z S T co -j w Q.. O; N UI w M 0 J N td fn fh x Ik. o ~saaaaooao e~ d y a. O M !n M to ~n N co Lo u a o~ c o ~ o v a o a a v O'C N N M M M M N M M V Q L1 n. to to ' y~ wsswY LOMV1 t$VINO'COW ZOM SIGOIN an]nJa]wa auwt ~nro- •~ooa rn ]IUJO 'el ~ ~ , Q +asswY -x]wua ]Isla •tor J119YLLJOa'sn 2It/NN3'7 BNiIR1AOII9 EVdZD ILK ]Nl JD NanHON • L IMJ Rf]uoor IfvarJ 1 qn ~a~ -lug it'1a'f0 4t NMr'a iw~ 03MJi fxU JY N louw~ nrNn Memo JL • ~try~~~ma ry ° .9. JI Y IIt3W. OO y/~.]tglp q/WJ UT4 y ~gq~~},~/1t.~y~. •YHlxa 3 t ~ n P~ ~x t A-FI ~ t f-.f .i/I f-. I c, \ A'.11'.~ & a it' • Llll •y I M ~ y J °3 L Y +auo.. ; rKKe a fi 4a y : Sti a w 4 ~ 3 Pi _ n - y y x ~ S wr a e j ~ L ` ~ 16JJ M . at lyiq i i lr,: l.. .t-.c ' I • A-s A-J .r-F A-.K qY .E F- ~ E rr 3 ~ i r.+•r 4i /r i ~ . I >r is g . b'P g / ` / /mar/ p r l~r. -lip Z ' E 'g e9S 7 M- Bc ~ r r`/ / /i 14 r tl~7~1 r _ y Q I ® /i ~ ~ i rrr rr r / i ~~E~ r / 7 ~ I ]17a ~ R` t r ~ :g y 1 » ggyyfg ♦ r~ fi~ y iSFJ J ` 1 ~ 3Y~~ y F_-t E a ~ V A-"K 1 f A-A A-F A-s - 1 - - - - - - - - - - - - - - - l f---- ---------------1 1 1 1 1 I I P f j I 1 1 ,s-}f 1 6 I I 1 I I` i 1 i 11 1 I . I I~ F 1 I 1 1I k 1 ~ 1 1 e~ i ih 1 1 i i ul.-J y ~ ~'a j I e I o-n I I .f/e a-}I >F i i ~ 11 y .]7 I I i I 1 7 1 1 1 .tl Is ~ 1 I I I Y 1 1 y j ~ 14' ~ I I S yr 1 I ~ 1 I I 1 [~'1 1 - I J!I t-F J/11-.t A-Ft LOT SURVEY CHECKLIST FOR RESIDENTIAL BUILDING PERMIT APPLICATION PROPERTY LEGAL: k6 / V DATE OF SURVEY: 3~I LATEST REVISION: c R U_ DOCUMENT STANDARDS O 'z ❑ 0 • Registered Land Surveyor signature and company ❑ 0 • Building Permit Applicant 0 ❑ • Legal description 0 ❑ • Address ❑ ❑ . North arrow and scale 0 0 • House type (rambler, walkout, split w/o, split entry, lookout, etc.) 0 0 • Directional drainage arrows with slope/gradient % &~z 0 0 • Proposed/existing sewer and water services & invert elevation 5:~ 0 0 • Street name 0 0 • Driveway (grade & width in R/W and back of curb, 22' max.) ,2r 0 ❑ . Lot Square Footage ❑ ❑ • Lot Coverage ELEVATIONS Existin ❑ ❑ Property corners 0 0 Top of curb at the driveway and property line extensions 0 0 Elevations of any existing adjacent homes g ❑ ❑ Adequate footing depth of structures due to adjacent utility trenches 0 ❑ Waterways (pond, stream, etc.) Proposed 0 0 Garage floor ❑ 0 Basement floor ❑ ❑ Lowest exposed elevation (walkout/window) /9' ❑ 0 Property corners 0 0 Front and rear of home at the foundation PONDING AREA (if applicable) ❑ 0 • Easement line 0 X 0 • NWL ❑ W ❑ • HWL 0 0 • Pond # designation 0 0 • Emergency Overflow Elevation ❑ 0 • Pond/Wetland buffer delineation Y1 • Shoreland Zoning Overlay District Y (iJ • Conservation Easements DIMENSIONS 0 ❑ • Lot lines/Bearings & dimensions O .J~ 0 • Right-of-way and street width (to back of curb) ❑ • Proposed home dimensions including any proposed decks, overhangs greater than 2', porches, etc. (i.e. all structures requiring permanent footings) ❑ ❑ • Show all easements of record and any City utilities within those easements 0 ❑ • Setbacks of proposed structure and sideyard setback of adjacent existing structures 0 ❑ . Retaining wall requirements: Reviewed By: Date GJFORMS/Building Permit Application Rev. 11-26-04 ' Surveyors Certificate SURVEY FOR : Lennar DESCRIBED AS :Lots 1-4, Block 4, NICOLS RIDGE 5TH, City of Eagan, Dakota Cour ! Max1mum Sio es Minnesota and reserving easements of record. Or Retaining Weill will Be Required g~ 00 Sediment Basin SCE=808.0 (ice % HWL=813.5 R VV i % % Y / ~1 19.8 o~jFJ 819.4 5D6 °o ~ Dc9 / 10• 6' AI TAB.` 819. S s o 0 820. CONTROL o6'~~s~ p 8 1MET 10% o1~eo Q 819.4 e9 c ~5,, c~ ~p `9''prn N 821. Z J 821.0 e pow 2 E ~D C>a " 60~o ° •9 Z - Q 0 a , , o° O st 20.4 0 821. Soo CP y. 822.0 ~a:AP, o o c° jr % b, ° O 821.4 ~ r > W Oture t°tl 81 0 822.0 9 161. A F aTZnhome ` Y~ Q. ° 822.3 CD r ° 'm J_os o4, % 4 7 O ~A 82 06 r'®~ir 10 1.8 9e co ,OHO 823.0 mac? X699 821.4 'ZI 5 0 ° 6 821. oh~J 10O/ ~0 23.0 BM: NAII 823. 3 (Staked) Townhome ~ -Vacant- By LAGAN ENG ERING L)Ue xe Townhome t PROPOSED ELEVATIONS Lot 1 Lot 2&3 Lot 4 BENCHMARK, Top of Foundation = 821.5 822.5 823.5 Garage Floor = 821.1 822.1 823.1 Basement Floor = n/a n/a n/a Aprox. Sewer Service = Verify Proposed Elev. _ MIN. SETBACK REQUIREMENTS Existing Elev. _ Drainage Directions = Front - House Side - Denotes Offset Stake = • SCALE: 1 inch = 30 feet Rear - Garage Side - JOB NO: HEDLUND I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT REPRESENTATION 13R-049 OF THE BOUNDARIES OF THE ABOVE DESCRIBED PROPERTY AS SURVEYED BY ME OR UNDER MY DIRECT SUPERVISION AND DOES NOT PURPORT TO BOOK: PAGE: PLANNING ENGINEERING SURVEYING SHOW IMPROVEMENTS OR ENCROACHMENTS, EXCEPT AS HOWN. 2005 Pin Oak Drive Eagan, MN 55122 DATE 3 / 21 / 13 CAD FILE: Phone: (651) 405-6600 J R D. LINDGREN, LAND VEYOR Nicols Ride 4th Fax: (651) 405-6606 0 NESOTA LICENSE NUMBE 4376 g ✓ City of Eap Address: 3970 Cedar Grove Lane Zip: 55123 Permit 11/0598 The following items were/ were not completed at the Final Inspection on: iC/~`L r~ Complete Incomplete Comments Final grade - 6" from siding Permanent steps - Garage Permanent steps - Main Entry Permanent Driveway Permanent Gas Retaining Wall or 3:1 Max Slope' Sod / Seeded Lawn Trail / Curb Damage AOA AO- Porch Lower Level Finish e--- Deck Fireplace • Verify with your builder that roof test caps from the plumbing system have been removed. • Turn off water supply to the outside lawn faucets before freeze potential exists. • Call the Engineering Department at (651) 675-5646 prior to working in the right-of-way or installing an irrigation system. Building Inspector: L GABuilding InspectionsTORMWhecklists PERMIT City of Eagan Permit Type:Plumbing Permit Number:EA116261 Date Issued:10/04/2013 Permit Category:ePermit Site Address: 3970 Cedar Grove Lane Lot:1 Block: 4 Addition: Nicols Ridge 5th PID:10-50904-04-010 Use: Description: Sub Type:Residential Work Type:Replace Description:Water Softener Meter Size Meter Type Manufacturer Serial Number Remote Number Line Size Comments:Please call Building Inspections at (651) 675-5675 to schedule a final inspection. Charles Sundean 8201 Old Central Ave Spring Lake Park, MN 55432 Fee Summary:PL - Permit Fee (WS &/or WH)$55.00 0801.4087 Surcharge-Fixed $5.00 9001.2195 $60.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Us Home Corp 16305 36th Ave N Minneapolis MN 55446 Water Doctors Water Treatment Company 8201 Old Central Ave, Suite F & G Spring Lake Park MN 55432 (763) 535-1800 Applicant/Permitee: Signature Issued By: Signature