Loading...
3580 Lemieux Cir r] Use BLUE or BLACK Ink 101 -78) 10~. / For Office Usie e r 1 I Permit 11 c) ~7 ~7 I!0 ; City of EaEd~ Permit Fee. rl, ?5R 3830 Pilot Knob Road Eagan MN 55122 Date Received: ~3 ; Phone: (651) 675-5675 I I Fax: (651) 675-5694 1 Staff: I ssti- 2013 RESIDENTIAL BUILDING PERMIT APPLICATION Date: ¢f Site Address: . STy8Z Unit Name: <..L Cor>~S'1'r~ f 'SL Phone: 6a.5-4n. w38 Resident/ OWner' Address /City / Zip: Applicant is: Owner Contractor Type of Work Description of work: _ ~Lta "1,r.,11...L JAC*- JJC Construction Cost: Multi-Family Building: (Yes IL' No Company:(' Contact: Contractor Address: City: State: Zip: Phone: License Lead Certificate If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) q 610 L)k - ~p - L"14 COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? _Yes /No If yes, date and address of master plan: Licensed Plumber:'fJL_A_ !!JW4. A , Phone:g 5Z .44-S ACeA2. Mechanical Contractor: '92L =4~ !Z'I Phone: gS2.4ng4. OoCS Sewer 8: Water Contractor: 1=101mQ. Phone: ZLML- F NOTE' Plans and supporting o!oc ments that.you submit are consaalereal to tie public information Portions of jt. the information may be classified as noon public if you proyide specific reasons that would permit the City to cone/uale that hey,are #ra¢e secrets, CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.oopherstateonecall.oro I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. . x~~~' I , Applicant's Printed Name lie t Igna ure Page 1 of 3 DO NOT WRITE BELOW THIS LINE SUB TYPES Foundation _ Fireplace _ Porch (3-Season) _ Storm Damage Single Family _ Garage _ Porch (4-Season) _ Exterior Alteration (Single Family) Multi _ Deck _ Porch (Screen/Gazebo/Pergola) _ Exterior Alteration (Multi) 01 of A-Plex _ Lower Level _ Pool _ Miscellaneous Accessory Building WORK TYPES New _ Interior Improvement _ Siding _ Demolish Building* Addition _ Move Building _ Reroof _ Demolish Interior Alteration _ Fire Repair _ Windows _ Demolish Foundation Replace - Repair _ Egress Window _ Water Damage Retaining Wall *Demolition of entire building - give PCA handout to applicant DESCRIPTION Valuation W o-00, Occupancy -T MCES System Plan Review Code Edition SAC Units (25%100% Zoning City Water /Rf Census Code _ Stories ) Booster Pump /Va # of Units Square Feet 3/ PRV # of Buildings / Length ~3..G Fire Sprinklers A110 Type of Construction _ Width 39, REQUIRED INSPECTIONS Footings (New Building) Meter Size: Footings (Deck) Final / C.O. Required Footings (Addition) Final / No C.O. Required Foundation HVAC _ Gas Service Test Gas Line Air Test Drain Tile Other: Roof: , 4Ice & Water Final Pool: -Footings -Air/Gas Tests -Final Framing Siding: -Stucco Lath Stone Lath -Brick Fireplace: Rough In Air Test Final Windows Insulation Retaining Wall: _ Footings _ Backfill _ Final Sheathing Radon Control Sheetrock Erosion Control Reviewed By: , Building Inspector RESIDENTIAL FEES (f/Y f `/.t! L, / 13 J0 16 ,2. Base Fee 12- L IS13 0Q 90 4Z 3G 517 Surcharge Plan Review /0.10 ~NA+~t",E yc 301 ? 97 y MCES City SAC C DC GK IAY## Q !9 * Utility d Connection Charge ® k o/l,Cy -713 S&W Permit & Surcharge Treatment Plant G ~g G 33 Copies G @ TOTAL Page 2 of 3 New Construction Energy Code Compliance Certificate Per N110 L8 Building Certificate. A building certificate shall be posted in a permanently visible location inside Date Certificate Posted the building. The certificate shall be completed by the builder and shall list information and values of components listed in Table N1101.8. Mailing Address of the Dwelling or Dwelling Unit City 3580 Lemieux Circle Eagan Name of Residential Contractor MN License Number Ron Clark Construction & Design 1220 THERMAL ENVELOPE RADON SYSTEM Type: Check All That Apply X Passive (No Fan) w o ~ Active (Tl ith fan and monometer or others}-'stem rnonitoringdevice) a U 0 v ° U ~ v c V > C, O vi vi O N O Insulation Location s z . U a o E E v Ti E° c Z w w w° w° R R Other Please Describe Here Below Entire Slab X Foundation Wall R-5 X Exterior Foundation Wall At Walk Out R-10 X Interior Rim Joist (Foundation) R-12 X Interior Rim Joist (1" Floor+) X Wan R-19 X Ceiling, flat R-44 X Ceiling, vaulted X Bay Windows or cantilevered areas R-30 X Four Season Porch Above Unconditioned Space R-35 X X F.~ or BiownR30 i i° Rigid R5 Describe other insulated areas I J1 Windows & Doors Heating or Cooling Ducts Outside Conditioned Spaces Average U-Factor (excludes skylights and one door) U: 0.31 x Not applicable, all ducts located in conditioned space Solar Heat Gain Coefficient (SHGC): 0.35 R-value R-8 in garage area MECHANICAL SYSTEMS Make-up Air Select a Type Appliances Heating System Domestic Water Heater Cooling System X Not required per mech. code Fuel Type GAS Electric R-41 OA Passive Manufacturer Bryant Marathon Bryant Powered Interlocked with exhaust device. Model 912SB48080S17 MR1_05245 CAI 3030 Describe: Input in 80,000 Capacity in 105 Output in 2.5 Other, describe: Rating or Size BTUS: Gallons: Tons' Heat Loss: 52;761 Heat 20,855 Location of duct or system: Structure's Calculated Gain. AFUE or 92% SEER: 13 HSPF% Calculated 23,890 Efficiency cooling load: Cfm's " round duct OR Mechanical Ventilation System " metal duct Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air Combustion Air Select a Type source heat pump with gas back-up furnace): Not required per mech. code Select Type X Passive 6" Flex X Heat Recover Ventilator (HRV) Capacity in cfms: Low: 64 High: 150 Other, describe: Energy Recover Ventilator (ERV) Capacity in cfms: Low: High: Location of duct or system: Continuous exhausting fan(s) rated capacity in cf ns: Basement Location of fan(s), describe: Cfm's Capacity continuous ventilation rate in cfins: " round duct OR Flex L Total ventilation (intermittent + continuous) rate in cfms: " metal duct Created by BAM version 052009 Burnsville Heating & Air Conditioning, Inc. 3451 W. Burnsville Pkwy, Suite 120, Burnsville, MN 55337 Phone 952-894-0005 - Fax 952-894-0925 - Web www.burnsvilleheating.com Ventilation, Makeup and Combustion Air Calculations Submittal Form for New Dwellings Site address 3580 Lemieux Circle Date Contractor Burnsville Heating & Air Conditioning, Inc Completed By Alan Dobson Section A Ventilation Quantity (Determine quantity by using Table N1104.2 or Equation 11-1) Square feet (Conditioned area including 3062 Total required ventilation 100 Basement-finished or unfinished) Number of bedrooms 1 Continuous ventilation 50 Directions - Determine the total and continuous ventilation rate by either using Table N1104.2 or equation 11-1. The table and equation are below. Table N1104.2 Total and Continuous Ventilation Rates (in cfm) Number of Bedrooms 2 3 4 5 6 Conditioned Total/ Total/ Total/ Total/ Total/ Total/ space (in sq. ft. continuous continuous continuous continuous continuous continuous 1000-1500 60/40 75/40 90/45 105/53 120/60 135/68 1501-2000 70/40 85/43 100/50 115/58 130/65 145/73 2001-2500 80/40 95/48 110/55 125/63 140/70 155/78 2501-3000 9 105/53 120/60 135/68 150/75 165/83 3001-3500 100/50 115/58 130/65 145/73 160/80 175/88 3501-4000 125/63 140/70 155/78 170/85 185/93 4001-4500 120/60 135/68 150/75 165/83 180/90 195/98 4501-5000 130/65 145/73 160/80 175/88 190/95 205/103 5001-5500 140/70 155/78 170/85 185/93 200/100 215/108 5501-6000 150/75 165/83 180/90 195/98 210/105 225/113 Equation 11-1 (0.02 x square feet of conditioned space) + [15 x (number of bedrooms + 1)] = Total ventilation rate (cfm) Total ventilation - The mechanical ventilation system shall provide sufficient outdoor air to equal the total ventilation rate average, for each one-hour period according to the above table or equation. For heat recovery ventilators (HRV) and energy recovery ventilators (ERV) the average hourly ventilation capacity must be determined in consideration of any reduction of exhaust or outdoor air intake, or both, for defrost or other equipment cycling. Continuous ventilation -A minimum of 50 percent of the total ventilation rate, but not less than 40 cfm shall be provided, on a continuous rate average for each one-hour period. The portion of the mechanical ventilation system intended to be continuous may have automatic cycling controls providing the average flow rate for each hour is met. G:\SAFETY\JK\Vent-makeup-comb air submittal (2).docx Page 1 of 6 Section B Ventilation Method (choose either balanced or exhaust only) ® Balanced, HRV(Heat Recovery Ventilator) or ERV (Energy ❑ Exhaust only Recovery Ventilator) -cfm of unit in low must not exceed Continuous fan rating in cfm continuous ventilation rating by more than 100% Low cfm: 64 High cfm:150 Continuous fans rating in cfm (capacity must not exceed continuous ventilation rating by more than 100%) Directions - Choose the method of ventilation, balanced or exhausts only. Balanced ventilation systems are typically HRV or ERV's. Enter the low and high cfm amounts. Low c fm airflow must be equal to or greater than the required continuous ventilation rate and less than 100% greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the ventilation fan must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. Section C Ventilation Fan Schedule Description Location Continuous Intermittent Bath Fan Master Bath 80 Bath Fan Main Bath 80 Directions - The ventilation fan schedule should describe what the fan is for, the location, cfm, and whether it is used for continuous or intermittent ventilation. The fan that is chose for continuous ventilation must be equal to or greater than the low c fm air rating and less than 100% greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the continuous ventilation fan must not exceed 80 cfm. Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. Section D Ventilation Controls (Describe operation and control of the continuous and intermittent ventilation) Control Located In Mech Room Directions- Describe the operation of the ventilation system. There should be adequate detail for plan reviewers and inspectors to verify design and installation compliance. Related trades also need adequate detail for placement of controls and proper operation of the building ventilation. If exhaust fans are used for building ventilation, describe the operation and location of any controls, indicators and legends. If an ERV or HRV is to be installed, describe how it will be installed. If it will be connected and interfaced with the air handling equipment, please describe such connections as detailed in the manufactures' installation instructions. If the installation instructions require or recommend the equipment to be interlocked with the air handling equipment for proper operation, such interconnection shall be made and described. Section E Make-up air Passive (determined from calculations from Table 501.3.1) Powered (determined from calculations from Table 501.3.1) Interlocked with exhaust device (determined from calculations from Table 501.3.1) Other, describe: Location of duct or system ventilation make-up air: Determined from make-up air opening table NR cfm Size and type (round, rectangular, flex or rigid) 2 1 P a g e Directions - In order to determine the makeup air, Table 501.3.1 must be filled out (see below). For most new installations, column A will be appropriate, however, if atmospherically vented appliances or solid fuel appliances are installed, use the appropriate column. For existing dwellings, see IMC 501.3.3. Please note, if the makeup air quantity is negative, no additional makeup air will be required for ventilation, if the value is positive refer to Table 501.3.2 and size the opening. Transfer the cfm, size of opening and type (round, rectangular, flex or rigid) to the last line of section D. The make-up air supply must be installed per IMC 501.3.2.3. Table 501.3.1 PROCEDURE TO DETERMINE MAKEUP AIR QUANITY FOR EXHAUST EQUIPMENT IN DWELLINGS (Additional combustion air will be required for combustion appliances, see KAIR method for calculations) One or multiple One or multiple fan- One atmospherically Multiple power assisted vent atmospherically vent or direct vent appliances and gas or oil appliance vented gas or oil appliances power vent or direct or appliances or solid or no combustion vent one solid fuel fuel appliances appliances appliance appliances Column A Column B Column C Column D 1. 0.15 0.09 0.06 0.03 a) pressure factor (cfm/sf) b) conditioned floor area (sf) (including 3062 unfinished basements) Estimated House infiltration (cfm): [1a 459.3 x 1b] 2. Exhaust Capacity a) continuous exhaust-only ventilation system (cfm); (not applicable to balanced ventilation systems such as HRV) b) clothes dryer (cfm) 135 135 135 135 c) 80% of largest exhaust rating (cfm); 240 Kitchen hood typically (not applicable if recirculating system or if powered makeup air is electrically interlocked and match to exhaust) d) 80% of next largest exhaust rating Not (cfm); bath fan typically Applicable (not applicable if recirculating system or if powered makeup air is electrically interlocked and matched to exhaust) Total Exhaust Capacity (cfm); 375 [2a + 2b +2c + 2d] 3. Makeup Air Quantity (cfm) 375 a) total exhaust capacity (from above) b) estimated house infiltration (from 459.3 above) Makeup Air Quantity (cfm); -84.3 ✓ Da - 3b] (if value is negative, no makeup air is needed) 4. For makeup Air Opening Sizing, refer to Table 501.4.2 A. Use this column if there are other than fan-assisted or atmospherically vented gas or oil appliance or if there are no combustion appliances. (Power vent and direct vent appliances may be used.) B. Use this column if there is one fan-assisted appliance per venting system. (Appliances other than atmospherically vented appliances may also be included.) C. Use this column if there is one atmospherically vented (other than fan-assisted) gas or oil appliance per venting system or one solid fuel appliance. D. Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically vented gas or oil appliances and solid fuel appliances. 31 Page Makeup Air Opening Table for New and Existing Dwelling Table 501.3.2 One or multiple One or multiple One atmospherically Multiple power fanassisted vented gas or oil atmospherically vent, direct vent appliances and appliance vented gas or oil appliances, power vent or direct or one solid fuel appliances Duct diameter or no combustion vent appliances appliance or solid fuel appliances appliances Column A Column B Column C Column D Passive opening 1-36 1-22 1-15 1-9 3 Passive opening 37-66 23-41 16-28 10-17 4 Passive opening 67-109 42-66 29-46 18-28 5 Passive opening 110-163 67-100 47 - 69 29 - 42 6 Passive opening 164- 232 101-143 70 - 99 43 - 61 7 Passive opening 233- 317 144- 195 100-135 62 - 83 8 Passive opening 318-419 196-258 136-179 84-110 9 w/motorized damper Passive opening 420 -539 259 -332 180- 230 111-142 10 w/motorized damper Passive opening 540 -679 333 -419 231- 290 143- 179 11 w/motorized damper Powered makeup air >679 >419 >290 >179 NA Notes: A. An equivalent length of 100 feet of round smooth metal duct is assumed. Subtract 40 feet for the exterior hood and ten feet for each 90- degree elbow to determine the remaining length of straight duct allowable. B. If flexible duct is used, increase the duct diameter by one inch. Flexible duct shall be stretched with minimal sags. Compressed duct shall not be accepted. C. Barometric dampers are prohibited in passive makeup air openings when any atmospherically vented appliance is installed. D. Powered makeup air shall be electrically interlocked with the largest exhaust system. Sections F Combustion air Not required per mechanical code (No atmospheric or power vented appliances) X Passive (see IFGC Appendix E, Worksheet E-1) Size and type r477;;,2 or 5" Flex Other, describe: Explanation - If no atmospheric or power vented appliances are installed, check the appropriate box, not required. If a power ventedor atmospherically vented appliance installed, use IFGC Appendix E, Worksheet E-1 (see below). Please enter size and type. Combustionair vent supplies must communicate with the appliance or appliances that require the combustion air. Section F calculations follow on the next 2 pages. 4~Page Directions - The Minnesota Fuel Gas Code method to calculate to size of a required combustion air opening, is called the Known Air Infiltration Rate Method. For new construction, 4b of step 4 is required to be filled out. IFGC Appendix E, Worksheet E-1 Residential Combustion Air Calculation Method (for Furnace, Boiler, and/or Water Heater in the Same Space) Step 1: Complete vented combustion appliance information. Furnace/Boiler: -Draft Hood -Fan Assisted or Power Vent _X_Direct Vent Input:_80000 BTU/HR Water Heater: -Draft Hood -Fan Assisted or Power Vent -Direct Vent Input:_Electric BTU/HR Step 2: Calculate the volume of the Combustion Appliance Space (CAS) containing combustion appliances. The CAS includes all spaces connected to one another by code compliant openings. CAS Volume: ft LxWxH L W H Step 3: Determine Air Changes per Hour (ACH)1 Default ACH values have been incorporated into Table E-1 for use with Method 4b (KAIR Method). If the year of construction or ACH is not known, use method 4a (Standard Method). Step 4: Determine Required Volume for Combustion Air. (DO NOT COUNT DIRECT VENT APPLIANCES) 4a. Standard Method Total Btu/hr input of all combustion appliances Input: Btu/Hr Use Standard Method column in Table E-1 to find Total Required TRV: ft3 Volume (TRV) If CAS Volume (from Step 2) is greater than TRV then no outdoor openings are needed. If CAS Volume (from Step 2) is less than TRV then go to STEP S. 4b. Known Air Infiltration Rate (KAIR) Method (DO NOT COUNT DIRECT VENT APPLIANCES) Total Btu/hr input of all fan-assisted and power vent appliances Input:-40000. Btu/Hr Use Fan-Assisted Appliances column in Table E-1 to find RFVA:_3000 ft3 Required Volume Fan Assisted (RVFA) Total Btu/hr input of all Natural draft appliances Input: Btu/hr Input: -0 Btu/Hr Use Natural draft Appliances column in Table E-1 to find RVNFA:none ✓ ft3 Required Volume Natural draft appliances (RVNDA) Total Required Volume (TRV) = RVFA+ RVNDA TRV=_3000 + none = 3000 TRV ft3 If CAS Volume (from Step 2) is greater than TRV then no outdoor openings are needed. If CAS Volume (from Step 2) is less than TRV then go to STEP S. Step 5: Calculate the ratio of available interior volume to the total required volume. Ratio = CAS Volume (from Step 2) divided by TRV (from Step 4a or Step 4b) Ratio = / / 3000 = 0. 3 Step 6: Calculate Reduction Factor (RF). RF= 1 minus Ratio RF = 1- 0-52 Step 7: Calculate single outdoor opening as if all combustion air is from outside. Total Btu/hr input of all Combustion Appliances in the same CAS Input: Btu/Hr (EXCEPT DIRECT VENT) Combustion Air Opening Area (CAOA): Total Btu/hr divided by 3000 Btu/hr per in2 CAOA = 40000 /3000 Btu/hr per in 13.33 Step 8: Calculate Minimum CAOA. Minimum CAOA = CAOA multiplied by RF Minimum CAOA = 13.33 x = in Step 9: Calculate Combustion Air Opening Diameter (CAOD) CAOD = 1.13 multiplied by the square root of Minimum CAOA CAOD = 1.13 V Minimum CAOA =.2-7in. diameter go up one inch in size if using flex duct 1 If desired, ACH can be determined using ASHRAE calculation or blower door test. Follow procedures in Section G304. 5 Page IFGC Appendix E, Table E-1 Residential Combustion air (Required Interior Volume Based on Input Rating of Appliance) Known Air Infiltration Rate (KAIR) Method (cu ft) Fan Assisted or Power Vent Natural Draft Input Rating Standard Method 1994 to present Pre-1994 1994 to present Pre-1994 (Btu/hr) 5,000 250 375 188 525 263 10,000 500 750 375 1,050 525 15,000 750 1,125 563 1,575 788 20,000 1,000 1,500 750 2,100 1,050 25,000 1,250 1,875 938 2,625 1,313 30,000 1,500 2,250 1,125 3,150 1,575 35,000 1,750 2,625 1,313 3,675 1,838 40,000 2,000 3,000 1,500 4,200 2,100 45,000 2,250 3,375 1,688 4,725 2,363 50,000 2,500 3,750 1,675 5,250 2,625 55,000 2,750 4,125 2,063 5,775 2,888 60,000 3,000 4,500 2,250 6,300 3,150 65,000 3,250 4,875 2,438 6,825 3,413 70,000 3,500 5,250 2,625 7,350 3,675 75,000 3,750 5,625 2,813 7,875 3,938 80,000 4,000 6,000 3,000 8,400 4,200 85,000 4,250 6,375 3,188 8,925 4,463 90,000 4,500 6,750 3,375 9,450 4,725 95,000 4,750 7,125 3,563 9,975 4,988 100,000 5,000 7,500 3,750 10,500 5,250 105,000 5,250 7,875 3,938 11,025 5,513 110,000 5,500 8,250 4,125 11,550 5,775 115,000 5,750 8,625 4,313 12,075 6,038 120,000 6,000 9,000 4,500 12,600 6,300 125,000 6,250 9,375 4,688 13,125 6,563 130,000 6,500 9,750 4,875 13,650 6,825 135,000 6,750 10,125 5,063 14,175 7,088 140,000 7,000 10,500 5,250 14,700 7,350 145,000 7,250 10,875 5,438 15,225 7,613 150,000 7,500 11,250 5,625 15,750 7,875 155,000 7,750 11,625 5,813 16,275 8,138 160,000 8,000 12,000 6,000 16,800 8,400 165,000 8,250 12,375 6,188 17,325 8,663 170,000 8,500 12,750 6,375 17,850 8,925 175,000 8,750 13,125 6,563 18,375 9,188 180,000 9,000 13,500 6,750 18,900 9,450 185,000 9,250 13,875 6,938 19,425 9,713 190,000 9,500 14,250 7,125 19,950 9,975 195,000 9,750 14,625 7,313 20,475 10,238 200,000 10,000 15,000 7,500 21,000 10,500 205,000 10,250 15,375 7,688 22,525 10,783 210,000 10,500 15,750 7,875 22,050 11,025 215,000 10,750 16,125 8,063 22,575 11,288 220,000 11,000 16,500 8,250 23,100 11,550 225,000 11,250 16,875 8,438 23,625 11,813 230,000 11,500 17,250 8,625 24,150 12,075 1. The 1994 date refers to dwellings constructed under the 1994 Minnesota Energy Code. The default KAIR used in this section of the table is 0.20 ACH. 2. This section of the table is to be used for dwellings constructed prior to 1994. The default KAIR used in this section of the table is 0.40 ACH. 6~Page RECEIVED MAY 0 9 2013 3580 Lemieux Circle HVAC Load Calculations for Ron Clark s ~IDM M"VACHVACLoADs Prepared By: Alan Dobson Burnsville Heating & A/C Inc. 3451w Burnsville Pkwy, Suite 120 Burnsville,MN 55337 952-894-0005 Wednesday, April 24, 2013 Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. Burnsville Light Commercial HVAC Loads - - - Elite Software Development, Inc. [Burnsville, MIN55337 Page Pro ject Report General Project Information Project Title:' 3580 Lemieux Circle Designed By: Alan Dobson Project Date: Wednesday, April 24, 2013 Project Comment: Client Name: Ron Clark Company Name: Burnsville Heating & A/C Inc. Company Representative: Alan Dobson Company Address: 3451w Burnsville Pkwy, Suite 120 Company City: Burnsville,MN 55337 Company Phone: 952-894-0005 Company Fax: 952-894-0925 Company Comment: Design Data Reference City: Minneapolis, Minnesota Building Orientation: Front door faces West Daily Temperature Range: Medium Latitude: 44 Degrees Elevation: 834 ft. Altitude Factor: 0.970 Elevation Sensible Adj. Factor: 1.000 Elevation Total Adj. Factor: 1.000 Elevation Heating Adj. Factor: 1.000 Elevation Heating Adj. Factor: 1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb ^et Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter: -15v- 15 5.33 80% n/a 72 n/a Summer: 88 73 50% 50% 75 35 Check Figures Total Building Supply CFM: 977 CFM Per Square ft.: 0.319 Square ft. of Room Area: 3,062 Square ft. Per Ton: 1,538 Volume (ft) of Cond. Space: 27,544 Building Loads..... _ Total Heating Required Including Ventilation Air: 52,761 Btu 52.761 MBH Total Sensible Gain: 20,855 Btuh 87 % Total Latent Gain: 3,036 Btuh 13 % Total Cooling Required Including Ventilation Air: 2 83 90 Btu 1.99 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Circle.rhv Wednesday, April 24, 2013, 2:21 PM Rhvac - Residential Light Commercial HVAC Loads Elite Software Development, Inc. Burnsville Heating & A/C Inc 3580 Lemieux Circle Burnsville _MN 55337 Page 11 Total Building Summary Loads Component - Area Sen Lat Sen Total Description Quan Loss Gain Gain _ Gain_ hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 3 76 0 72 72 SHGC 0.3 hbt. Glazing- bt, ground reflectance = 0.23, u-value 0.31, 338.9 9,136 0 10,059 10,059 SHGC 0.35 hbt: azing- , ground reflectance = 0.23, u-value 0.29 8 202 0 76 76 SHGC hbT. lazing-hbt, ground reflectance = 0.23, u-value 0.31, 48 1,294 0 512 512 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 37.5 1,011 0 393 393 SHGC 0.33 Front-D` boor- 20.4 248 0 69 69 hbt: Door-hbt 19 232 0 64 64 12E-Osw: Wall-Frame, -1 sulation in 2 x 6 stud 2118.2 12,532 0 2,219 2,219 cavity, no board ins )ion,siding finish, wood studs R-5 wall: Wall- eOr v 406.4 2,404 0 426 426 RC Rim Joist: Wall-Frame, Custom, RC Rim joist 222.6 1,608 0 284 284 16B-44-ad: Roof/Ceiling-Under Attic with Insulation on 1540.4 2,947 0 1,628 1,628 n Attic Floor (also use for Knee Walls and n-44 Ceilings), vented attic, no radiant barrier, insul ation, dark asphalt 21A-32-v: Floor-Basement, Concrete slab, any thickness, 1520 2,645 0 0 0 2 or more feet below grade, no insulation below floor, vinyl_covering, shortest side of floor slab is 32' wide Subtotals for structure: 34,335 0 15,802 15,802 People: 2 460 600 1,060 Equipment: 400 1,200 1,600 Lighting: 0 0 0 Ductwork: 4,787 366 2,170 2,535 Infiltration: Winter CFM: 147, Summer CFM: 78 13,639 1,810 1,083 2,893 Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0 Total Building Load Totals: 52,761 3,036 20,855 23,890 Check Figures Total Building Supply CFM: 977 CFM Per Square ft.: 0.319 Square ft. of Room Area: 3,062 Square ft. Per Ton: 1,538 Volume (ft3) of Cond. Space: 27,544 ` B u i d n g Loads s _ - g _ `.--..a. 761_>... _ 1 - _ - Total Heating Required Includin Ventilation Air: 52 Btu 52.761 MBH Total Sensible Gain: 20,855 Btuh 87 % Total Latent Gain: 3,036 Btuh 13 % Total Cooling Required Including Ventilation Air: C2 , 90 B-Oh 1.99 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Circle.rhv Wednesday, April 24, 2013, 2:21 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.l Burnsville Heating & A/C Inc 3580 Lemieux Circle) Burnsville N Y1 55337 Page 14 System 1 Main Floor Summary Loads I Component Area Sen Lat Sen Total _Description Quan Loss Ga_in_ Gain Gain hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 3 76 0 72 72 SHGC 0.3 hbt: az'GT ing- bt, ground reflectance = 0.23, u-value _0.31, 338.9 9,136 0 10,059 10,059 SHGC 0.35 hbt: aztin bt, ground reflectance = 0.23, u-value 0 .29, 8 202 0 76 76 SHG~C 0,~, hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 48 1,294 0 512 512 SHGC 0.35 hbt:'Gig- 6t, ground reflectance = 0.23, u-value 0.31, 37.5 1,011 0 393 393 SHGC 0.33 _ FronfMzr-15oor- 20.4 248 0 69 69 hbt: Door-hbt 11 19 232 0 64 64 12E-Osw: Wall-Frame, 19 i ulation in 2 x 6 stud 2118.2 12,532 0 2,219 2,219 cavity, no board insu a ion, siding finish, wood studs R-5 wall: Wall- /~OdA4~L71/ve/ ?if .4 2,404 0 426 426 RC Rim Joist: Wall-Frame, Custom, RC Rim joist n ~./A 2.6 1,608 0 284 284 16B-44-ad: Roof/Ceiling-Under Attic with Insulation on 1540.4 2,947 0 1,628 1,628 Attic Floor (also use for Knee Walls and P 'tion Ceilings), vented attic, no radiant barrie R-44 insulation, dark asphalt 21A-32-v: Floor-Basement, Concrete slab, any thickness, 1520 2,645 0 0 0 2 or more feet below grade, no insulation below floor, vinyl covering, shortest side of floor slab _is. 32' wide Subtotals for structure: 34,335 0 15,802 15,802 People: 2 460 600 1,060 Equipment: 400 1,200 1,600 Lighting: 0 0 0 Ductwork: 4,787 366 2,170 2,535 Infiltration: Winter CFM: 147, Summer CFM: 78 13,639 1,810 1,083 2,893 Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0 _ System 1 Main Floor Load Totals: 52,761 3,036 20,855 23,890 Check Figures Supply CFM: 977 CFM Per Square ft.: 0.319 Square ft. of Room Area: 3,062 Square ft. Per Ton: 1,538 Volume (ft3) of Cond. Space: 27,544 System Loads... . Total Heating Required Including Ventilation Air: 52,761 Btu 52.761 MBH Total Sensible Gain: 0, 5 Btuh 87 % Total Latent Gain: 3,036 Btuh 13 % Total Cooling Required Including Ventilation Air: '23 g90 Btuh 1.99 Tons (Based On Sensible + Latent) _Notes f Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Circle.rhv Wednesday, April 24, 2013, 2:21 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Burnsville Heating & A/C Inc " 3580 LemieLix Cirrle Burnsville, MN 55337 Page 32 Detailed Room Loads - Room 10 - Basement (Peak Fenestration Gain Procedure) General Room is in zone 2, which peaks at 10 am Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 47.5 ft. System Number: 1 Room Width: 32.0 ft. Zone Number: 2 Area: 1,520.0 sq.ft. Supply Air: 443 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 1.9 AC/hr Volume: 13,680.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Runout Air: 443 CFM Percent of Supply.: 0 % Runout Duct Size: 11 in. Actual Summer Vent.: 0 CFM Runout Air Velocity: 672 ft./min. Percent of Supply: 0 % Runout Air Velocity: 672 ft./min. Actual Winter Infil.: 76 CFM Actual Loss: 0.122 in.wg./100 ft. Actual Summer Infil.: 40 CFM Item Area -U- Htg Sen Clg Lat Sen Description m Quantity Value HTM Loss HTM Gain Gain E -Wall-12E-Osw 32 X 9 193 0.068 5.9 1,142 1.0 0 202 S -Wall-12E-Osw 47.5 X 9 405.5 0.068 5.9 2,399 1.0 0 425 W -Wall-R-5 wall 32 X 9 288 0.068 5.9 1,704 1.0 0 302 N -Wall-R-5 wall 10 X 9 90 0.068 5.9 532 1.0 0 94 N -Wall-R-5 wall 7.9 X 3.6 28.4 0.068 5.9 168 1.0 0 30 N -Wall-12E-Osw 7.9 X 5.6 26.7 0.068 5.9 158 1.0 0 28 N -Wall-12E-Osw 29.8 X 9 204.2 0.068 5.9 1,208 1.0 0 214 E -Wall-RC Rim Joist 32 X 1.4 44.8 0.083 7.2 324 1.3 0 57 W -Wall-RC Rim Joist 32 X 1.4 44.8 0.083 7.2 324 1.3 0 57 S -Wall-RC Rim Joist 47.5 X 1.4 66.5 0.083 7.2 480 1.3 0 85 N -Wa1I-RC Rim t 47.5 X 1.4 66.5 0.08 7.2 480 1.3 0 85 E -GIs-hbt hgc-0.35 %S 30 0.310 27.0 809 52.8 0 1,584 E -GIs-hbt hgC-0.35 0%S (2) 44 0.310 27.0 1,186 52.8 0 2,324 E -GIs-hbt hgc-0.35 0%S 21 0.310 27.0 566 52.8 0 1,109 S -GIs-hbt hgc-0.35 0%S 22 0.310 27.0 593 26.3 0 579 N -GIs-hbt shgC-0.350%S(2) 44 0.310 27.0 1,186 10.5 0 460 N -GIs-hbt hgc-0.35 0%S 20 0.310 27.0 539 10.5 0 209 N -GIs-hbt hgc-0.33 0%S 17.5 0.310 27.0 472 9.9 0 174 Floor 2.1A 5.... 1520----._ 020. 1.7..... . 2,645 00 4._..... 0_ Subtotals for Structure: 16,915 0 8,018 Infil.: Win.: 75.5, Sum.: 40.1 1,657 4.233 7,014 0.336 931 557 Ductwork: 2,388 888 Room Totals: 26,317 931 9,463 \\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Circle.rhv Wednesday, April 24, 2013, 2:21 PM Rhvac Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Burnsville Heating & NC Inc 3580 Lemieux Circle Burn~ville. rX1 55337 Pa e 35 System 1 Room Load Summar Htg Min Run Run Cig Clg Min Act Room Area Sens Htg Duct Duct Sens Lat Clg Sys No Name SFBtuh CFM Size Vel _ Btuh Btuh CFM CFM ---Zone 1--- 1 Foyer 63 839 11 1-2 483 225 25 11 11 2 Den 149 3,049 41 1-5 266 775 107 36 36 3 Kitchen 223 2,149 29 1-7 336 1,915 68 90 90 4 Dining 188 2,921 39 1-5 607 1,766 81 83 83 5 Great Room 296 8,623 115 2-6 565 4,739 263 222 222 6 Master Bedroom 231 3,832 51 1-7 556 3,169 590 148 148 7 Master Bath 140 1,188 16 1-2 614 286 45 13 13 8 Laundry 126 1,068 14 1-2 550 256 440 12 12 9 Mud_Room 126._...._ 2,776 37.....__ 1-3 497......... 521 120 24 24.... - - Zone 1 subtotal 1,542 26,444 354 13,651 1,739 640 640 ---Zone 2--- _ 10_Basement 1,52026,317 _ 352__.._.. 1-11 6729,463 931___ _443__ 443 _ - - Zone 2 subtotal_1,520 26,317 352 9,463 931 443 __..443.._ - Duct Latent __System1_.total 3,062___ 52,761 706____ 20,855 31036____ 977 977 System 1 Main Trunk Size: 11x16 in. Velocity: 799 ft./min Loss per 100 ft.: 0.099 in.wg Note: Since the system is multizone, the Peak Fenestration Gain Procedure was used to determine glass sensible gains at the room and zone levels, so the sums of the zone sensible gains and airflows for cooling shown above are not intended to equal the totals at the system level. Room and zone sensible gains and cooling CFM values are for the hour in which the glass sensible gain for the zone is at its peak. Sensible gains at the system level are based on the "Average Load Procedure + Excursion" method. [Coding System Summary Cooling Sensible/Latent Sensible Latent Total Btuh _ Btuh Tons Split Btuh ------Btu h Net Required: 1.99 87%/13% 20,855 3,036 23,890 \\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Circle.rhv Wednesday, April 24, 2013, 2:21 PM LOT SURVEY CHECKLIST FOR RESIDENTIAL BUILDING PERMIT APPLICATION PROPERTY LEGAL: DATE OF SURVEY: 3 LATEST REVISION: a~ c t U o z a DOCUMENT STANDARDS ❑ ❑ • Registered Land Surveyor signature and company ❑ ❑ • Building Permit Applicant ❑ ❑ . Legal description ❑ 0 • Address ❑ 0 • North arrow and scale XJ ❑ ❑ • House type (rambler, walkout, split w/o, split entry, lookout, etc.) ❑ ❑ • Directional drainage arrows with slope/gradient % j' ❑ ❑ • Proposed/existing sewer and water services & invert elevation ❑ ❑ • Street name ❑ ❑ • Driveway (grade & width - in R/W and back of curb, 22' max.) 0 D • Lot Square Footage ❑ 0 • Lot Coverage ELEVATIONS Existing A 0 ❑ • Property corners 0 0 Top of curb at the driveway and property line extensions " d" 0 , " . Elevations of any existing adjacent homes ❑ 0 • Adequate footing depth of structures due to adjacent utility trenches ❑ ❑ . Waterways (pond, stream, etc.) Proposed ❑ ❑ • Garage floor 0 0 • Basement floor ❑ ❑ • Lowest exposed elevation (walkout/window) ❑ 0 • Property corners 0 0 • Front and rear of home at the foundation PONDING AREA (if applicable) 0 0 • Easement line ❑ ❑ • NWL 0 Jd 0 • HWL 0 D 0 • Pond # designation ❑ "ry 0 • Emergency Overflow Elevation ❑ • Pond/Wetland buffer delineation Y Shoreland Zoning Overlay District Y Conservation Easements DIMENSIONS ❑ 0 Lot lines/Bearings & dimensions 0 Right-of-way an reet w'dt to back of curb) ❑ Proposed home dimensions including any& PP-Osed`der-I s, over angs grea er an porches etc. (i.e. all structures requiring permanent footings) ❑ ❑ • Show all easements of record and any City utilities within those easements 0 ❑ • Setbacks of proposed structure an and setback of adjacent existing structures 0 0 • Retaining wall requirements: Reviewed By; Date GJFORMS/Building Permit Application Rev. 11-26-04 v- ~Lunu ri u;c! c~ ~o uv I I I z ~U NU \ I UV i v I ~ uvvy, i1 1C ti Certificate of Survey for: RON CLARK CONSTRUCTION & DESIGN 952.8 Denotes Existing Elevation HOUSE TYPE: TOWNHOUSE FULL BASEMENT WALKOUT Job # B1601.10-124 981.5 Denotes Proposed Elevation ~ Denotes Surface Drainage PROPOSED HOUSE ELEVATIONS: Date: 3/06/13 GARAGE FLOOR ELEVATION = 887.5 Scale: 1"=20' O Denotes 1/2" iron pipe set TOP OF FOUNDATION ELEV = 887.8 • Denotes 1/2" iron pipe found. LOWEST FLOOR ELEVATION = 879.1 REV EWE • maximum p or Aem-InTrio Wr Be Required Date / ro -T -U-) M LEMIEUX CIRCLE INL PROTECTION UNTIL FIN TURF IS ESTABLISHED N C rim! W G ~h 6 PRD SAN. PRD SAN. SERV. 875.5 SERV. 875.5 88s N89°53"33"E M 106.00 4 L - r O 53.010 I N 53.0 I ( o p L0 Q U-) lb I FT. 1 w T°BSrg - CANT. HH7.3 j CANT. _ Q > p~A 32_33 _54.67°P • o 19.0 p^m 21.0 Un 8a ~y~P w q q~/cod 00 & ~~J 1 0 w W 00 py a0 ~ rb. Q o < < 10 Gar. FIr. C~ N 14, 0 Elev.= 887.3 81 887.3 1 2.0 885.47 ort-- c~i y 16.75 9.42 z e$6~ O 886.1 PORCH Q9PORCHai 8F 01 86.1 w O ~ d - - d 88s 18.33 8&~ yh 8.61 Q d ~Olp 885. 885.1 r PROPOSED BUILDING ool 0 1 w 0 882.1 882. I J ANA W z I o~ Lot Area: 6572 S.F. Lot Area: 6572 S.F. M I co 881.6 ca Coverage: 2093 S.F. Coverage: 2057 S.F. oa 881.6 co COI Q 878.6 #3582 #3580 878.6 7 7 CD 0 z I N j Q N~ _ ►jz _ Cn (.0 a o I w I 8~9 I o 0 SSA O a 11.04 0 12.63 10.83 2 4.5 -7. 00 V) 6 4 15.33 ~i 779 1b i~ 878.6 n i 10'x8' 1 Yio r 10 PO CH ~DECK I PATIO' Wlm I STM MH LABOVE~- ABOVE - - ' - 8>> 11.04 15.33 8)) 12 6 16.67 L - - - - - - - - - - - - - - 63.83 878.6 `FZ5.5 PJ s 25.50 ~o 10 d)Q d) \ (98)~ ~j p 8~s 6 '0 0 Cn \ EXISTING CDC N RET. WALL a~ EXISTING RET. WALL ~a10 53.00 $6 53.00 _ ` N89°53'33"E 106.00 Lots 7 and 8, Block 3, PEARLMONT HEIGHTS, _Dak>ota Co'Lffl, MN I hereby certify that this survey, plan, or report was-, prepared by me or under my direct supervision and that I am a duly Licensed 'Eana- Surveyor -U-ndler--the--gl - laws of the state of Minnesota. - V113 Oliver Surveying & Engineering, Inc. Oliver Surveying & Engineering, Inc. By: Rick M. Blom, LS Land Surveying •Civil Engineering •Land Planning License No. 21729 580 Dodge Ave. Elk River, MN 55330. 763.441.2072 fac. 763.441.5665 Date: 3/07/13 Rev.: 5/8/13 city comments Nww.oliver-se.com Rev.: 3/26/13 (restake new plans) rT to 770 RECEIN /FD V/ sz / MAY 31 2013 3580 Lemieux Circle HVAC Load Calculations for Ron Clark "wN`11k11RVACHVAC ftSIOUNMAJ. Lo $ Prepared By: Alan Dobson Burnsville Heating & A/C Inc. 3451w Burnsville Pkwy, Suite 120 Burnsville,MN 55337 952-894-0005 Thursday, May 30, 2013 Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Burnsville Heating & NC Inc ~ 3580 Lemieux Circle Burnsville. MN 55337 Page 2 PrPect Report - - - - L General Project Information Project Title: 3580 Lemieux Circle Designed By: Alan Dobson j V fl~ fl Project Date: Wednesday, April 24, 2013 Project Comment: MAY 3 Client Name: Ron Clark Company Name: Burnsville Heating & A/C Inc. Company Representative: Alan Dobson Company Address: 3451w Burnsville Pkwy, Suite 120 Company City: Burnsville,MN 55337 Company Phone: 952-894-0005 Company Fax: 952-894-0925 Company Comment: Design Data Reference City: Minneapolis, Minnesota Building Orientation: Front door faces West Daily Temperature Range: Medium Latitude: 44 Degrees Elevation: 834 ft. Altitude Factor: 0.970 Elevation Sensible Adj. Factor: 1.000 Elevation Total Adj. Factor: 1.000 Elevation Heating Adj. Factor: 1.000 Elevation Heating Adj. Factor: 1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter: -15 -15.33 80% n/a 72 n/a Summer: 88 73 50% 50% 75 35 Check Figures Total Building Supply CFM: 911 CFM Per Square ft.: 0.297 Square ft. of Room Area: 3,062 Square ft. Per Ton: 1,635 Volume (ft3) of Cond. Space: 27,544 Building Loads Total Heating Required Including Ventilation Air: 51,755 Btuh 51.755 MBH Total Sensible Gain: 19,437 Btuh 86 % Total Latent Gain: 3,036 Btuh 14 % Total Cooling Required Including Ventilation Air: 22,474 Btuh 1.87 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Circle.rhv Thursday, May 30, 2013, 2:49 PM RECEIVED MAY 31 2013 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Burnsville Heating & AIC Inc 3580 Lemieux Circle Burnsville.. MN 55337 Page 11 Total Buildin Summary Loads Component Area Sen Lat Sell Total _Q_uan Loss Gain Gain Gam hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 3 76 0 72 72 SHGC 0.3 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 276.2 7,449 0 8,431 8,431 SHGC 0.35 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 8 202 0 76 76 SHGC 0.3 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 42 1,132 0 448 448 SHGC 0.35 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 58.5 1,577 0 617 617 SHGC 0.35 Front Door: Door- 20.4 248 0 69 69 hbt: Door-hbt 19 232 0 64 64 12E-Osw: Wall-Frame, R-19 insulation in 2 x 6 stud 2165.9 12,813 0 2,268 2,268 cavity, no board insulation, siding finish, wood studs R-5 wall: Wall- 406.4 2,404 0 426 426 RC Rim Joist: Wall-Frame, Custom, RC Rim joist 222.6 1,608 0 284 284 16B-44-ad: Roof/Ceiling-Under Attic with Insulation on 1540.4 2,947 0 1,628 1,628 Attic Floor (also use for Knee Walls and Partition Ceilings), vented attic, no radiant barrier, R-44 insulation, dark asphalt 21A-32-v: Floor-Basement, Concrete slab, any thickness, 1520 2,645 0 0 0 2 or more feet below grade, no insulation below floor, vinyl covering, shortest side of floor slab is 32' wide . Subtotals for structure: 33,333 0 14,383 14,383 People: 2 460 600 1,060 Equipment: 400 1,200 1,600 Lighting: 0 0 0 Ductwork: 4,783 366 2,171 2,538 Infiltration: Winter CFM: 147, Summer CFM: 78 13,639 1,810 1,083 2,893 Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0 Total Building Load Totals: 51,755 3,036 19,437 22,474 Check Figures Total Building Supply CFM: 911 CFM Per Square ft.: 0.297 Square ft. of Room Area: 3,062 Square ft. Per Ton: 1,635 Volume (ft') of Cond. Space: 27,544 Building Loads Total Heating Required Including Ventilation Air: 51,755 Btuh 51.755 MBH Total Sensible Gain: 19,437 Btuh 86 % Total Latent Gain: 3,036 Btuh 14 % Total Cooling Required Including Ventilation Air: 22,474 Btuh 1.87 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\SBS201 1\Redi rected Folders ...\Ron Clark Ea x Circle.rhv Thursday, May 30, 2013, 2:49 PM RECEIVED Burnsville He Mng & A/C Inc Commercial HVAC Loads - Elite Soft e 580 Lepiex Circle' iircl 6urmvillE.. MN P System 1 Main Floor Summary Loads Component Area Sen Lat Sen Total Description Quan Loss Gain Gain Gain hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 3 76 0 72 72 SHGC 0.3 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 276.2 7,449 0 8,431 8,431 SHGC 0.35 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 8 202 0 76 76 SHGC 0.3 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 42 1,132 0 448 448 SHGC 0.35 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 58.5 1,577 0 617 617 SHGC 0.35 Front Door: Door- 20.4 248 0 69 69 hbt: Door-hbt 19 232 0 64 64 12E-Osw: Wall-Frame, R-19 insulation in 2 x 6 stud 2165.9 12,813 0 2,268 2,268 cavity, no board insulation, siding finish, wood studs R-5 wall: Wall- 406.4 2,404 0 426 426 RC Rim Joist: Wall-Frame, Custom, RC Rim joist 222.6 1,608 0 284 284 16B-44-ad: Roof/Ceiling-Under Attic with Insulation on 1540.4 2,947 0 1,628 1,628 Attic Floor (also use for Knee Walls and Partition Ceilings), vented attic, no radiant barrier, R-44 insulation, dark asphalt 21A-32-v: Floor-Basement, Concrete slab, any thickness, 1520 2,645 0 0 0 2 or more feet below grade, no insulation below floor, vinyl covering, shortest side of floor slabs 32' wide - - - Subtotals for structure: 33,333 0 14,383 14,383 People: 2 460 600 1,060 Equipment: 400 1,200 1,600 Lighting: 0 0 0 Ductwork: 4,783 366 2,171 2,538 Infiltration: Winter CFM: 147, Summer CFM: 78 13,639 1,810 1,083 2,893 _Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0 System 1 Main Floor Load Totals: 51,755 3,036 19,437 22,474 Check Figures Supply CFM: 911 CFM Per Square ft.: 0.297 Square ft. of Room Area: 3,062 Square ft. Per Ton: 1,635 Volume (ft3) of Cond. Space: 27,544 System Loads Total Heating Required Including Ventilation Air: 51,755 Btuh 51.755 MBH Total Sensible Gain: 19,437 Btuh 86 % Total Latent Gain: 3,036 Btuh 14 % Total Cooling Required Including Ventilation Air: 22,474 Btuh 1.87 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Circle.rhv Thursday, May 30, 2013, 2:49 PM CFIV9; Rhvac - Residential & Light Commercial HVAC Loads Eli r4 development, Inc. Burnsville ueatmq PJC Inc 3580 Lemieux Circle Burnsville, MN 553:37 Page 17 System 1 Zone 1 Summary Loads Peak Load Procedure for Rooms Description t QuArea Sen anLoss ___Ga n Sen l Gain Gain l hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 3 76 0 72 72 SHGC 0.3 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 159.2 4,294 0 4,762 4,762 SHGC 0.35 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 8 202 0 76 76 SHGC 0.3 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 42 1,132 0 448 448 SHGC 0.35 Front Door: Door- 20.4 248 0 69 69 hbt: Door-hbt 19 232 0 64 64 12E-Osw: Wall-Frame, R-19 insulation in 2 x 6 stud 1313.4 7,771 0 1,375 1,375 cavity, no board insulation, siding finish, wood studs 16B-44-ad: Roof/Ceiling-Under Attic with Insulation on 1540.4 2,947 0 1,628 1,628 Attic Floor (also use for Knee Walls and Partition Ceilings), vented attic, no radiant barrier, R-44 insulation,_dark asphalt Subtotals for structure: 16,902 0 9,129 9,129 People: 2 460 600 1,060 Equipment: 400 1,200 1,600 Lighting: 0 0 0 Ductwork: 2,396 0 1,304 1,304 Infiltration: Winter CFM: 71, Summer CFM: 38 6,625 879 _ 5261 405 System 1, Zone 1 Load Totals: 25,923 1,739 12,759 14,498 Check Figures Supply CFM: 598 CFM Per Square ft.: 0.388 Square ft. of Room Area: 1,542 Square ft. Per Ton: 1,276 Volume (ft') of Cond. Space: 13,864 Zone Loads Total Heating Required: 25,923 Btuh 25.923 MBH Total Sensible Gain: 12,759 Btuh 88 % Total Latent Gain: 1,739 Btuh 12 % Total Cooling Required: 14,498 Btuh 1.21 Tons (Based On Sensible + Latent) Notes Rhvac is an ALGA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\SBS201 1 \Redirected Folders ...\Ron Clark Ea... x Cirele.rhv Thursday, May 30, 2013, 2:49 PM RECEIVED MAY 2 1 A13 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development. Inc I6urnsville Heating & A/C Inc 3580 Lenll, uU : Circle `_♦3urnsville, 1%1N 553,37 _ _ Page 18 System 1, Zone 2 Summary Loads (Peak Load Procedure for Rooms) Component Area Sen Lat Sen Total Description-_-__ Quan Loss __----Gain _ Gain Gain hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 117 3,155 0 3,669 3,669 SHGC 0.35 hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 58.5 1,577 0 617 617 SHGC 0.35 12E-Osw: Wall-Frame, R-19 insulation in 2 x 6 stud 852.4 5,042 0 893 893 cavity, no board insulation, siding finish, wood studs R-5 wall: Wall- 406.4 2,404 0 426 426 RC Rim Joist: Wall-Frame, Custom, RC Rim joist 222.6 1,608 0 284 284 21A-32-v: Floor-Basement, Concrete slab, any thickness, 1520 2,645 0 0 0 2 or more feet below grade, no insulation below floor, vinyl covering, shortest side of floor slab is 32'wide - Subtotals for structure: 16,431 0 7,058 7,058 People: 0 0 0 0 Equipment: 0 0 0 Lighting: 0 0 0 Ductwork: 2,387 0 867 867 Infiltration Winter CFM: 76,._Summer CFM:_40 _ 7,014 931 _ 557 _1,488 System 1, Zone 2 Load Totals: 25,832 931 8,482 9,413 Check Figures _ _ .......i Supply CFM: 397 CFM Per Square ft.: 0.261 Square ft. of Room Area: 1,520 Square ft. Per Ton: 1,938 Volume (W) of Cond. Space: 13,680 Zone Loads Total Heating Required: 25,832 Btuh 25.832 MBH Total Sensible Gain: 8,482 Btuh 90 % Total Latent Gain: 931 Btuh 10 % Total Cooling Required: 9,413 Btuh 0.78 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Cir¢le.rhv Thursday, May 30, 2013, 2:49 PM 4 RECEIVED New Construction Energy Code Compliance Certificate MAY 31 `2013 Per N1101.8 Building Certificate. A building certificate shall be posted in a permanently visible location inside Date Certificate Posted the building. The certificate shall be completed by the builder and shall list information and values of components listed in Table N1101.8. Mailing Address of the Dwelling or Dwelling Unit city 3580 Lemieux Circle Eagan Name of Residential Contractor MN License Number Ron Clark Construction & Design 1220 THERMAL ENVELOPE RADON SYSTEM Type: Check All That Apply X Passive (No Fan) w o ~ Active (With fan and monometer or other system monitoring device) ~ U y W fA abi U -C r. m C O 0 Insulation Location ° z ° cG ~ ~ w o? o a a o 75~ 72 cl: F z w w a: a? Other Please Describe Here Below Entire Slab X , Foundation Wall R-5 X Exterior Foundation Wall At Walk Out R-10 X Interior Rim Joist (Foundation) R-12 X Interior Rim Joist (I" Floor+) X Wall R-19 X Ceiling, flat R-44 X Ceiling, vaulted X Bay Windows or cantilevered areas R-30 X Four Season Porch Above Unconditioned Space R-35 X X F.G or8lownR30 / 1"Rigid R5 Describe other insulated areas Windows & Doors Heating or Cooling Ducts Outside Conditioned Spaces Average U-Factor (excludes skylights and one door) U: 0.31 x Not applicable, all ducts located in conditioned space Solar Heat Gain Coefficient (SHGC): 0.35 R-value R-8 in garage area MECHANICAL SYSTEMS Make-up Air Select a Type Appliances Heating System Domestic Water Heater Cooling System X Not required per mech. code Fuel Type GAS Electric R-41 OA Passive Manufacturer Bryant Marathon Bryant Powered Interlocked with exhaust device. Model 912SB48080S17 MR105245 CA13030 Describe: Input in 80,000 Capacity in 105 Output in 2,5 Other, describe: Rating or Size BTUS: Gallons: Tons: Heat Loss: 51,755 Heat 19,437 Location of duct or system: Structure's Calculated Gain: AFUE or 92% SEER: 13 HSPF% Calculated 22,474 Efficient cooling load: Cfin's " round duct OR Mechanical Ventilation System "metal duct Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air Combustion Air Select a Type source heat pump with gas back-up furnace): Not required per mech. code Select Type X Passive 6" Flex X Heat Recover Ventilator (HRV) Capacity in cfins: Low: 64 High: 150 Other, describe: Energy Recover Ventilator (ERV) Capacity in cfins: Low: High: Location of duct or system: Continuous exhausting fan(s) rated capacity in cfins: Basement Location of fan(s), describe: Cfin's Capacity continuous ventilation rate in cfins: " round duct OR Flex Total ventilation (intermittent + continuous) rate in cfrns: " metal duct Created by BAM version 052009 411'. City of Eaali Mike Maguire Mayor Paul Bakken Cyndee Fields Gary Hansen Meg Tilley Council Members Dave Osberg City Administrator Municipal Center 3830 Pilot Knob Road Eagan, MN 55122-1810 651.675.5000 phone 651.675.5012 fax 651.454.8535 TDD Maintenance Facility 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 651.675.5360 fax 651.454.8535 TDD www.cityofeagan.com The Lone Oak Tree The symbol of strength and growth in our community. August 02, 2013 Ron Clark Construction 7500 W 78th St Edina, MN 55439 RE: 3580 Lemieux Circle Lower level finish Dear Habib: This letter is in regards to an addendum of permit #110770 for the Lower level Finish at 3580 Lemieux Circle. Upon reviewing the plans, additional charges and inspections are required. Please see detailed fees to be collected below. Fees must be paid prior to any inspections. Fee Type Amount Due Base Fee $522.00 Plan Review $339.90 TOTAL $861.30 Thank you in advance for your attention to these matters. If you have any questions in regard to the additional permit charges or this letter please contact Building Inspections at (651) 675-5675. Sincerely, Clerical Technician Cc: Jeff Wheeler, Building Inspector Gity of Eagall 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 Use BLUE or BLACK Ink For Office Use Permit #: Permit Fee: l:� �1i Li/ Date Received: Staff: 2013 RESIDENTIAL BUILDING PERMIT APPLICATION Date:14CW, Site Address: 'o - $"111£t)X Unit#: 1:P13 l Name: C,L,. C Cm4..15TI. ?('IESien& J, Phone:1cj2.41411.3vScS, Address / City / Zip: -1,5c:10 LAI mercii...iA ,r 5541 Applicant is: toOwner (%Contractor Description of work: Construction Costs 2 5j, oak, Multi -Family Building: (Yes ,/ No _) Company: S44 -#TE ►/'G_ Contact: Address: City: State: Zip: Phone: License #: Lead Certificate #: If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? Yes /No If yes, date and address of master plan: Licensed Plumber: T1I.,/S4{J.C110-• Mechanical Contractor: 'bjV2t6...,L './+ Sewer & Water Contractor: OW?. Phone:q 5Z,. .4C 2. Phone: 'T 2. me4. ODC5 Phone: P%ansa al suRpof#i%ig' ocdmentsonat formation=rnay be,c/assified asenon- F;r' c. '9:37 ` . ..`F 'rte > ---t'''2 . : zcoi?Chi e CALL BEFORE YOU DIG. Cali Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.aopherstateonecall.ora I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. , K 1-4A2,11 17�.JI IC. 4pplicant's Printed Name sCgigna ure Page 1 of 3 SUB TYPES Foundation Single Family Multi 01 of Plex' Accessory Building WORK TYPES New. Addition Alteration _ Replace Retaining Wall DESCRIPTION Valuation Plan Review (25%__ 100% Y ) Census Code 73CW Le efri t ,e u . C- DO NOT WRITE BELOW THIS LINE _ Fireplace — Garage Deck Lower Level _ Porch (3 -Season) _ Storm Damage Porch (4 -Season) _ Exterior Alteration (Single Family) Porch (Screen/Gazebo/Pergola) _ Exterior Alteration (Multi) _ Pool _ Miscellaneous Interior Improvement Move Building Fire Repair Repair # of Units # of Buildings Type of Construction REQUIRED INSPECTIONS Footings (New Building) Footings (Deck) Footings (Addition) Foundation Drain Tile Roof: Ice & Water _Final Framing Fireplace: _Rough In Insulation Sheathing Sheetrock Reviewed By:' RESIDENTIAL FEES Base Fee Surcharge Plan Review MCES SAC City SAC Utility Connection Charge S&W Permit & Surcharge Treatment Plant Copies Occupancy Code Edition Zoning Stories Square Feet Length Width Air Test _Final TOTAL A-31 Siding Reroof Windows _ Egress Window Demolish Building* _ Demolish Interior Demolish Foundation Water Damage *Demolition of entire building — give PCA handout to applicant Pa MCES System SAC Units City Water • Booster Pump PRV Fire Sprinklers Meter Size: Final / C.O. Required 1 Final / No C.O. Required HVAC Gas Service Test Gas Line Air Test Other: Pool: _Footings Air/Gas Tests _ . Siding: _Stucco Lath _Stone Lath Windows Retaining Wall: _ Footings _ Backfill Radon Control Erosion Control Building Inspector Final Brick Final Page 2 of 3 PERMIT City of Eagan Permit Type:Building Permit Number:EA112692 Date Issued:08/22/2013 Permit Category:ePermit Site Address: 3580 Lemieux Cir Lot:8 Block: 03 Addition: Pearlmont Heights PID:10-56950-03-080 Use: Description: Sub Type:Fireplace Work Type:Gas Fireplace (new) Description: Census Code:434 - Zoning: Square Feet:0 Occupancy: Construction Type: Comments:Improvements to the home may require smoke detectors in all bedrooms. Chimney / flue must be inspected prior to concealing. Carbon monoxide detectors are required by law in ALL single family homes . Mallory Miller Fee Summary:BL - Base Fee $3K $88.50 0801.4085 Surcharge - Based on Valuation $3K $1.50 9001.2195 $90.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Pearlmount Heights Llc 7500 78th St W Edina MN 55439 Hearth And Home Technologies 2700 N. Fairview Ave Roseville MN 55113 (651) 638-3309 Applicant/Permitee: Signature Issued By: Signature City of hop Address: 3580 Lemieux Circle Zip: 55122 Permit #: 110770 The following items were / were not completed at the Final Inspection on: NOVeL 1 - 2 , 2ol3 Final grade - 6" from siding x Permanent steps — Garage Permanent steps — Main Entry Permanent Driveway x Permanent Gas Retaining Wall or 3:1 Max Slope Sod / Seeded Lawn Trail / Curb Damage Porch Lower Level Finish Deck FireplacT t) • Verify with your builder that roof test caps from the plumbing system have been removed. • Turn off water supply to the outside lawn faucets before freeze potential exists. • Call the Engineering Department at (651) 675-5646 prior to working in the right-of-way or installing an irrigation system. Building Inspector: e r C-khiem G:\Building Inspections\FORMS\Checklists P . viet- • � • RECEIVED For Office Use f � a � A2A � �( SQ! F'0 :ze: Date Received: ✓ - itr 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651)675-5675 I TDD:(651)454-8535 I FAX:(651)675-5694 Staff: buildinginspections(a�cityofeagan.com L X,,A1 2018 RESIDENTIAL BUILDING PERMIT APPLICATION Date: .3 1,Y l r Si Site Address: Unit#: Name:AkLY ) Poppe4 (?)s--1(05, -'M 1� .%() Phone: C51- C38- 735(0 Resident/ Own r Address/City/Zip: 35-74 3 S7', 3,Sso; 35'76', 357i /-ep'ix(2 X CI1, ivuj f,sizes Applicant is: Owner X Contractor A Description of work: is Ft t$TG>NL 1 'Aei 12-f7;47 NT ,GAG- l l Type of Mori`;; Construction Cost: SZ 000, OO Multi-Family Building:(Yes ,X /No Company: I (LI Id P 2 SA!! ( j:S Y A) Contact: --rid M(�ri-77Z c2 i/ , ejO Mu1.7 lt_`` Address: I7�J J S 5 /U/j 1"7_ /J4,) sir* 11 City: /f ' ?ivtG�t_1i State:Mt) Zip: ,s-7,3-0(05, Phone: 4..3/ -‘10. ,?l 7Email: r,(j2(,7J 406 Lid et-414-5.'1"S, tail/ License#: Lead Certificate#: AY4 If the project is exempt from lead certification, please explain why: COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? Yes No If yes,date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer&Water Contractor: Phone: Fire Suppression Contractor: Phone: ;NOM Plan nd supporting documents that yo submit a m s'idered to be pabii 5 ation. a _ , y . classifif s non public if t u provides•_ � sans that would perrnr�� icy to conclude that,i d 7:_... k=*, You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeagan.com/subscribe. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approvedplanin the case of work which requires a review and approval of plans. Applicant's Printed Name )Pficants Sigpaure DO NOT WRITE BELOW THIS LINE k{ (..k, i 40 D 6 . SUB TYPES Foundation _ Fireplace _ Porch(3-Season) _ Exterior Alteration(Single Family) _ Single Family Garage Porch(4-Season) _ Exterior Alteration(Multi) _ Multi _ Deck _ Porch(Screen/Gazebo/Pergola) Miscellaneous 01 of Plex Lower Level Pool Accessory Building WORK TYPES _ New _ Interior Improvement _ Siding _ Demolish Building* _ Addition _ Move Building _ Reroof _ Demolish Interior _ Alteration _ Fire Repair _ Windows _ Demolish Foundation Replace _ Repair _ Egress Window _ Water Damage Retaining Wall *Demolition of entire building-give PCA handout to applicant DESCRIPTION Valuation J 5^2-) ." Occupancy MCES System Plan Review Code Edition #44 Z°IS— SAC Units (25%_100%ld) Zoning ?D City Water Census Code Stories Booster Pump #of Units Square Feet PRV #of Buildings '2 Length Fire Suppression Required Type of Construction ' V Width REQUIRED INSPECTIONS Footings (New Building) Meter Size: Footings (Deck) Final/C.O. Required Footings (Addition) Final/No C.O. Required Foundation Foundation Before Backfill HVAC Gas Service Test Gas Line Air Test Roof:_Ice &Water Final Pool:_Footings _Air/Gas Tests _Final Framing 30 Minutes 1 Hour Drain Tile Fireplace: Rough In Air Test Final Siding: _Stucco Lath Stone Lath _Brick_EFIS Insulation Windows Sheathing 1, Retaining Wall: O Footings ? Backfill O Final Sheetrock Radon Control Fire Walls Fire Suppression: Rough In_Final Braced Walls Erosion Control Shower Pan Other: r- - jj Reviewed By: C ' 17 A,!' 0// cyn! , Building Inspector RESIDENTIAL FEES Base Fee Surcharge Plan Review MCES SAC City SAC Utility Connection Charge S&W Permit&Surcharge Treatment Plant Copies TOTAL Page 2 of 3 . i o riy nFyy ro 6/CH r Z why Ny N... Pw DTw2y4 OP N O4 9� 0.9_T 95.:.P �Z N -.M ti „ mmzmmmaR� FSFSFmyr� -,5 g Eizmz c mF �.Ep�FJipJ wmT = g8rZ0il 7m20o3m' Rt % c AD g4voPoPyoZ> 0. &' ry CA 1dg 2 045ogo c28e Maw n v„0voS.l 6i°2 �i mr2'"� -M' b y ° n'< m i m mm 3C) °w-m cv vAi602;9m TF NNlm„ m-com= m r �+•• T °r z Zvm �O fnr(�m mpv �i�$p � pA�g�y szs >F>°lqTny�Nz " = .T 9 2 °-z zZ pZt: A y i O m lAZp AF y0_O�y1y�17� m ° 7d O��_ Z Z�41N 1�11pp20 "T-yyy -SVN< pp9 �fl°- rN-IZti 7i y�"�'� z p<n2N m mO20�� Fv.T� mm^vO�W �N000 IIImjN8p3C���1I~8pZ �l~il� y � 1111,g ,P Pe gp Nm.mU;cm 1p0^'m PNWP o NP1§n1'8WW1 zy m y� PO �mri k FNNSczi z�.+ig omo (c. CiZ, . 1 em s oze3 FBI* hi O "" a l.. z m €3z Wig �azczT o o C O W 1yzN- m mrrFwm 0 a $Dr a qh ° iz opggg�v°zW8 to z y y xx v,Ni w mo m LLo zvtc � 3�ym w N� vzi m oF-i r_ yy s 8 L-i $i o o roil; Fmv'm pw 6Tmz 0_a < my4QQQ /b P g Z 0 'd m A T v ym ;RM <„-r., _,0.-.QQ .mQc, ZFz �n�3 V] 0 0 vz.7,Ota "42 p o AN 8R y.. FIT8zigv o2S Qr'6o2 W O"-'IIoFF �' ,��Z.0, 'd <= 8Z m yAy f3 iqy pM87:3 yNa h mz2 'nm9mm�r=OygO2 �n 4 8 v graG p5g N $ OOTmL A 1°i1G Co9oymy <m C. my.'Orgzmam C0 aO° yqz z 0z az�2 g ow anig5,zmp=w pa F=N0�60 A R Y.1 x `,!..A n.O P 6 C s 500 - P" •is pm- m PE, OA�N ~0 V (' ^n1' WO N ~ 'Do N O OZZT 02Q0Q01�1��2mT pZ NT O�Op��9 y `�. V_ NO g gg y Fm_ Fmzr<mQ�O Ptmn DSzp mri�0 t. .ry •• z � A gz o AMEs* yop z_z zT pF AII5Joc_z 0 0 til ;3Eirce m gi g z z C) z��z ,vis =w o,(, ,2-i5.UA C y U yy Z y m<I T(�m m 6^�TI^im o mJmC yrm �/� p stn fyyy N � N mA C �Oi S6Qf° IZIIrN Z<fdi F3m 27J <fNOANm �"y Vl ` e ate, c 1 e TA z "�I, Ftt m�_R{i,a� r-ir ms z' mZF.°v m w 1--I V oi. of $ <o m _oppc m sp28 'Rv z F P C j� [Y� T °z g If r g ri w . "6 m m • o V w< z Nm !A le 53 ypp ET, 0 . H d y tri ,--'-3 J x bli 7dz y ' o H /› r ~4 /ft. ry•y o2. L� �.• y > y ..y` tli tell VI o r" N o 4 cn� y H 4-tzG1 yr hR 4Q � 1 90 y � r A 05,g .3 '8 g 0 vl x t7 r'"4 z a ,..3 �"" Q a m R 4 i I 1 5 1 o A S IV c ° H0°7.1 1 0 0— a 1:\) wo �rfl ° , VI to wd DD 00 W E; 2 }�• byr/il � n5 88Mm r0 8 V� 1 14 ti, , lo Ory CSC P tor, ed' Ale 74 0 01 1 . :43 "n ti i H tilt. 0* " F'..I t-1 NNN "^ Vz con WWtY OO yU00WJ O gl0\0 : . �f ` R y0 , rN o o N M, '+ z` f� r, — „4 g ,..i ___t_. t., t., , 7 1 iRf itr, :9-.q. ..3 i . 71 0-3 M: ot -i• ;: :-0 am.m "C' 0 ,.4, R �y t r^ 0 co aV00pW� W • OD 'y, y O O O O O O co ` a • k Cn R. -----ELEV.IN FEET ��LEV.IN FEET N xi mre„,2 o $ • to O 0 0�� • r �-1 9 r ; - G wC . IS co 1, 0, II 47 in 6 • til 0 xo,,or z r z z O°mac , y t71N map firi b,,...��..11 rii4 oH� O 6 o- E H- 4p _ i i it-• t$1 - G -i 2 t oO t ^ 11 tel` ' y C G II , II n, 1 I 0 'al a i7J S. � o 99. . h C/� g n to n 0 0 C/) 51 m tri izi s4,5 x ° 0 10� �,I. �, Ogoo y o •] '• N 7 a w go- 4 g0 � o x E FY.. N d z' O II�R, 11 ) G° o- O� y pg 1 - o0oby p C+'1 (g Z3S 0.0 W N ° O 0 4 O g w g b o 0 0 y�1 Vii !Ai _ °°°I HN I c-,\,\, r u, _ . 0 A N gg Q • OmOzyoss9 ��� 66,, ``��z (� r,_m 1p ..7'C'u RI y” O Kcc O HOs 7ylpe od „ §imI 8 o �yz a,00 "� Cpz 44 Gee - 060. 10 MVryZ P > �y'�' G C 11 A 04 r • 0 O 5' p S=L' 4 4 E,1n K t.„ w ��G n•• � v xg o on r gM O0,Oq z n e m R > o � ot7 N �oH:4,o tri CA OZ i 5Am6 CT I II : tee. am li L � <N od qi N _ IIPiD xII I :11All"I )1 ;Ix trio bo g g III x M6 li1. °n, -I IL ....IN. c\i\: I re II ),) v ��9 �,� Z' + + Q W Z co� 5 \ O • .M g v Z coD CO • h� 1 \cts I, ' 6.f; >- 2 d v Q , s ea \ • G k Q w D 4- <o Cr .,! a \oN� C o goo SZ O \ .off ` \ O4 .Z7 I ° Q a H3 z Z J Ui i....,._�'� � . ' \ 30 , , ..,4 4 ..\ N...,,:\ ,...,_ \ \ \ \ lil 1- u.c LIcoLu iZ Z - O z \ 7-- 'c'\ t \ W z �1 " 1\' �' ' \ e- w�1 ec } �\ Q m. • � ws 1 n 1 \ �tiq O -M9 4441 ;:-ec . er \,,,4:37 �— V� Z� '` '`o w o w 14-1 C.) C-----C) 4 .- ...:,,.., ..., icB ce cn W �� �- �:`� t vsw Z = z15 a ZD _a Ili a 0 Z WQ j : / C7t�V It .o� /!. H / �Qcn v.... oc J ro I / a wli Qt,,e co Lc. / )i W °0 co v) / \\ \\\� �6' ° 3 o't,).--141-, ,... , / -I co - • \ \\\ZN6S9'9' ct W b% 53 tf.t '' . \ �8 1+ N_ a. - t., I c-.) i t lc, 11 41 i''./-P•i . V' .--- \ \ \\..c-j„ %f . t !-.1t \ `° z W o j4J i s ',0 iu O % Uzz_ , o T Y_�. cs o o v x ( I' I' o• \ M a c5 o i 0 Z r f J CC CQ Z Z Z �u r Nc .,W Iro 00 1 j , II K 0 4. W 4J m O r kJ CO ' i jq l' '' T ,' , osa-.� Wim' 00Z O O E. kJ 0 ---N/.1 1 ( . ,--ij ii; 1 \ ci'l=i*— 0 13. tt 0 Ut, � m. � s 9g —S$' I ((O 4' ".' ;.......„9 t%.1....L, 0) ._ ;bH..,, I ...! k , ; �z s� -r1 )its ;\ :� B65 __ FC °08 pa 5 X04 +A,'\ I _ % g67 Q N '3 IS 03 m ' 868 �_ II \��'� ° a _-- 889 1`- -Ce -. J . m4 ^ \ —87a� –� \ u) u;a 4 1 .....4 N 4. $4, (1- -I-- I \coar rtsfA(kw?ik' )fd.ii ) � ' �Z �4. 20 ' • - ii'' g . :� i Q ct W m , I / } 0,6 --= t • �{F7 r O� 1 O kJ 0 r CO 1:::1) n 8 O / r '. \. \ f I V r` c n.,; \ ' oW \ \ a) eV, re,05 I M Z a �� E PERMIT City of Eagan Permit Type:Building Permit Number:EA179547 Date Issued:10/10/2022 Permit Category:ePermit Site Address: 3580 Lemieux Cir Lot:8 Block: 03 Addition: Pearlmont Heights PID:10-56950-03-080 Use: Description: Sub Type:Windows/Doors Work Type:Overhead Garage Door Description: Census Code:434 - Residential Additions, Alterations Zoning: Square Feet:0 Occupancy: Construction Type: Comments:Improvements to the home require smoke detectors in all bedrooms. If altering window openings, call for framing inspection. Call for final inspection after installation. Carbon monoxide detectors are required within 10 feet of all sleeping room openings in residential homes (Minnesota State Valuation: 1,500.00 Fee Summary:BL - Base Fee $1500 $62.50 0801.4085 Surcharge - Based on Valuation $1500 $0.75 9001.2195 $63.25 Total: This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Leonard & Judith Haseman 3580 Lemieux Cir Eagan MN 55122 Twin City Garage Door Co 5601 Boone Avenue North Minneapolis MN 55428 (763) 533-3838 Applicant/Permitee: Signature Issued By: Signature