2013 RESIDENTIAL BUILDING PERMIT APPLICATION
Date: ¢f Site Address: . STy8Z Unit
Name: <..L Cor>~S'1'r~ f 'SL Phone: 6a.5-4n. w38
Resident/
OWner' Address /City / Zip:
Applicant is: Owner Contractor
Type of Work Description of work: _ ~Lta "1,r.,11...L JAC*- JJC
Construction Cost: Multi-Family Building: (Yes IL' No
Company:(' Contact:
Contractor Address: City:
State: Zip: Phone:
License Lead Certificate
If the project is exempt from lead certification, please explain why: (see Page 3 for additional information)
q 610 L)k - ~p
- L"14 COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING
In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan?
_Yes /No If yes, date and address of master plan:
Licensed Plumber:'fJL_A_ !!JW4. A , Phone:g 5Z .44-S ACeA2.
Mechanical Contractor: '92L =4~ !Z'I Phone: gS2.4ng4. OoCS
Sewer 8: Water Contractor: 1=101mQ. Phone: ZLML-
F
NOTE' Plans and supporting o!oc ments that.you submit are consaalereal to tie public information Portions of
jt. the information may be classified as noon public if you proyide specific reasons that would permit the City to
cone/uale that hey,are #ra¢e secrets,
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours
before you intend to dig to receive locates of underground utilities. www.oopherstateonecall.oro
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180
days of permit issuance. .
x~~~' I ,
Applicant's Printed Name lie t Igna ure
Page 1 of 3
DO NOT WRITE BELOW THIS LINE
SUB TYPES
Foundation _ Fireplace _ Porch (3-Season) _ Storm Damage
Single Family _ Garage _ Porch (4-Season) _ Exterior Alteration (Single Family)
Multi _ Deck _ Porch (Screen/Gazebo/Pergola) _ Exterior Alteration (Multi)
01 of A-Plex _ Lower Level _ Pool _ Miscellaneous
Accessory Building
WORK TYPES
New _ Interior Improvement _ Siding _ Demolish Building*
Addition _ Move Building _ Reroof _ Demolish Interior
Alteration _ Fire Repair _ Windows _ Demolish Foundation
Replace - Repair _ Egress Window _ Water Damage
Retaining Wall *Demolition of entire building - give PCA handout to applicant
DESCRIPTION
Valuation W o-00, Occupancy -T MCES System
Plan Review Code Edition SAC Units
(25%100% Zoning City Water
/Rf
Census Code _ Stories ) Booster Pump /Va
# of Units Square Feet 3/ PRV
# of Buildings / Length ~3..G Fire Sprinklers A110
Type of Construction _ Width 39,
REQUIRED INSPECTIONS
Footings (New Building) Meter Size:
Footings (Deck) Final / C.O. Required
Footings (Addition) Final / No C.O. Required
Foundation HVAC _ Gas Service Test Gas Line Air Test
Drain Tile Other:
Roof: , 4Ice & Water Final Pool: -Footings -Air/Gas Tests -Final
Framing Siding: -Stucco Lath Stone Lath -Brick
Fireplace: Rough In Air Test Final Windows
Insulation Retaining Wall: _ Footings _ Backfill _ Final
Sheathing Radon Control
Sheetrock Erosion Control
Reviewed By: , Building Inspector
RESIDENTIAL FEES (f/Y f `/.t! L, / 13 J0 16 ,2.
Base Fee 12- L IS13 0Q 90 4Z 3G 517
Surcharge
Plan Review /0.10 ~NA+~t",E yc 301 ? 97 y
MCES
City SAC C DC GK IAY## Q !9 *
Utility d
Connection Charge ® k
o/l,Cy -713
S&W Permit & Surcharge
Treatment Plant G ~g G 33
Copies G @
TOTAL
Page 2 of 3
New Construction Energy Code Compliance Certificate
Per N110 L8 Building Certificate. A building certificate shall be posted in a permanently visible location inside Date Certificate Posted
the building. The certificate shall be completed by the builder and shall list information and values of
components listed in Table N1101.8.
Mailing Address of the Dwelling or Dwelling Unit City
3580 Lemieux Circle Eagan
Name of Residential Contractor MN License Number
Ron Clark Construction & Design 1220
THERMAL ENVELOPE RADON SYSTEM
Type: Check All That Apply X Passive (No Fan)
w
o ~
Active (Tl ith fan and monometer or
others}-'stem rnonitoringdevice)
a
U 0 v °
U ~ v c
V
> C, O vi vi O N O
Insulation Location s z . U a
o E E v Ti
E° c Z w w w° w° R R Other Please Describe Here
Below Entire Slab X
Foundation Wall R-5 X Exterior
Foundation Wall At Walk Out R-10 X Interior
Rim Joist (Foundation) R-12 X Interior
Rim Joist (1" Floor+) X
Wan R-19 X
Ceiling, flat R-44 X
Ceiling, vaulted X
Bay Windows or cantilevered areas R-30 X
Four Season Porch Above Unconditioned Space R-35 X X F.~ or BiownR30 i i° Rigid R5
Describe other insulated areas I J1
Windows & Doors Heating or Cooling Ducts Outside Conditioned Spaces
Average U-Factor (excludes skylights and one door) U: 0.31 x Not applicable, all ducts located in conditioned space
Solar Heat Gain Coefficient (SHGC): 0.35 R-value R-8 in garage area
MECHANICAL SYSTEMS Make-up Air Select a Type
Appliances Heating System Domestic Water Heater Cooling System X Not required per mech. code
Fuel Type GAS Electric R-41 OA Passive
Manufacturer Bryant Marathon Bryant Powered
Interlocked with exhaust device.
Model 912SB48080S17 MR1_05245 CAI 3030 Describe:
Input in 80,000 Capacity in 105 Output in 2.5 Other, describe:
Rating or Size BTUS: Gallons: Tons'
Heat Loss: 52;761 Heat 20,855 Location of duct or system:
Structure's Calculated Gain.
AFUE or 92% SEER: 13
HSPF%
Calculated 23,890
Efficiency cooling load: Cfm's
" round duct OR
Mechanical Ventilation System " metal duct
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air Combustion Air Select a Type
source heat pump with gas back-up furnace): Not required per mech. code
Select Type X Passive 6" Flex
X Heat Recover Ventilator (HRV) Capacity in cfms: Low: 64 High: 150 Other, describe:
Energy Recover Ventilator (ERV) Capacity in cfms: Low: High: Location of duct or system:
Continuous exhausting fan(s) rated capacity in cf ns: Basement
Location of fan(s), describe: Cfm's
Capacity continuous ventilation rate in cfins: " round duct OR Flex
L Total ventilation (intermittent + continuous) rate in cfms: " metal duct
Created by BAM version 052009
Burnsville Heating & Air Conditioning, Inc.
3451 W. Burnsville Pkwy, Suite 120, Burnsville, MN 55337
Phone 952-894-0005 - Fax 952-894-0925 - Web www.burnsvilleheating.com
Ventilation, Makeup and Combustion Air Calculations
Submittal Form for New Dwellings
Site address 3580 Lemieux Circle Date
Contractor Burnsville Heating & Air Conditioning, Inc Completed By Alan Dobson
Section A
Ventilation Quantity
(Determine quantity by using Table N1104.2 or Equation 11-1)
Square feet (Conditioned area including 3062 Total required ventilation 100
Basement-finished or unfinished)
Number of bedrooms 1 Continuous ventilation 50
Directions - Determine the total and continuous ventilation rate by either using Table N1104.2 or equation 11-1.
The table and equation are below.
Table N1104.2
Total and Continuous Ventilation Rates (in cfm)
Number of Bedrooms
2 3 4 5 6
Conditioned Total/ Total/ Total/ Total/ Total/ Total/
space (in sq. ft. continuous continuous continuous continuous continuous continuous
1000-1500 60/40 75/40 90/45 105/53 120/60 135/68
1501-2000 70/40 85/43 100/50 115/58 130/65 145/73
2001-2500 80/40 95/48 110/55 125/63 140/70 155/78
2501-3000 9 105/53 120/60 135/68 150/75 165/83
3001-3500 100/50 115/58 130/65 145/73 160/80 175/88
3501-4000 125/63 140/70 155/78 170/85 185/93
4001-4500 120/60 135/68 150/75 165/83 180/90 195/98
4501-5000 130/65 145/73 160/80 175/88 190/95 205/103
5001-5500 140/70 155/78 170/85 185/93 200/100 215/108
5501-6000 150/75 165/83 180/90 195/98 210/105 225/113
Equation 11-1
(0.02 x square feet of conditioned space) + [15 x (number of bedrooms + 1)] = Total ventilation rate (cfm)
Total ventilation - The mechanical ventilation system shall provide sufficient outdoor air to equal the total
ventilation rate average, for each one-hour period according to the above table or equation. For heat recovery
ventilators (HRV) and energy recovery ventilators (ERV) the average hourly ventilation capacity must be
determined in consideration of any reduction of exhaust or outdoor air intake, or both, for defrost or other
equipment cycling.
Continuous ventilation -A minimum of 50 percent of the total ventilation rate, but not less than 40 cfm shall be
provided, on a continuous rate average for each one-hour period. The portion of the mechanical ventilation
system intended to be continuous may have automatic cycling controls providing the average flow rate for each
hour is met.
G:\SAFETY\JK\Vent-makeup-comb air submittal (2).docx Page 1 of 6
Section B
Ventilation Method
(choose either balanced or exhaust only)
® Balanced, HRV(Heat Recovery Ventilator) or ERV (Energy ❑ Exhaust only
Recovery Ventilator) -cfm of unit in low must not exceed Continuous fan rating in cfm
continuous ventilation rating by more than 100%
Low cfm: 64 High cfm:150 Continuous fans rating in cfm (capacity
must not exceed continuous ventilation
rating by more than 100%)
Directions - Choose the method of ventilation, balanced or exhausts only. Balanced ventilation systems are typically HRV or
ERV's. Enter the low and high cfm amounts. Low c fm airflow must be equal to or greater than the required continuous
ventilation rate and less than 100% greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the ventilation fan
must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour.
Section C
Ventilation Fan Schedule
Description Location Continuous Intermittent
Bath Fan Master Bath 80
Bath Fan Main Bath 80
Directions - The ventilation fan schedule should describe what the fan is for, the location, cfm, and whether it is used for
continuous or intermittent ventilation. The fan that is chose for continuous ventilation must be equal to or greater than the low
c fm air rating and less than 100% greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the continuous
ventilation fan must not exceed 80 cfm. Automatic controls may allow the use of a larger fan that is operated a percentage of
each hour.
Section D
Ventilation Controls
(Describe operation and control of the continuous and intermittent ventilation)
Control Located In Mech Room
Directions- Describe the operation of the ventilation system. There should be adequate detail for plan reviewers and inspectors
to verify design and installation compliance. Related trades also need adequate detail for placement of controls and proper
operation of the building ventilation. If exhaust fans are used for building ventilation, describe the operation and location of any
controls, indicators and legends. If an ERV or HRV is to be installed, describe how it will be installed. If it will be connected and
interfaced with the air handling equipment, please describe such connections as detailed in the manufactures' installation
instructions. If the installation instructions require or recommend the equipment to be interlocked with the air handling
equipment for proper operation, such interconnection shall be made and described.
Section E
Make-up air
Passive (determined from calculations from Table 501.3.1)
Powered (determined from calculations from Table 501.3.1)
Interlocked with exhaust device (determined from calculations from Table 501.3.1)
Other, describe:
Location of duct or system ventilation make-up air: Determined from make-up air opening table
NR cfm Size and type (round, rectangular, flex or rigid)
2 1 P a g e
Directions - In order to determine the makeup air, Table 501.3.1 must be filled out (see below). For most new installations,
column A will be appropriate, however, if atmospherically vented appliances or solid fuel appliances are installed, use the
appropriate column. For existing dwellings, see IMC 501.3.3. Please note, if the makeup air quantity is negative, no additional
makeup air will be required for ventilation, if the value is positive refer to Table 501.3.2 and size the opening. Transfer the cfm,
size of opening and type (round, rectangular, flex or rigid) to the last line of section D. The make-up air supply must be installed
per IMC 501.3.2.3.
Table 501.3.1
PROCEDURE TO DETERMINE MAKEUP AIR QUANITY FOR EXHAUST EQUIPMENT IN DWELLINGS
(Additional combustion air will be required for combustion appliances, see KAIR method for calculations)
One or multiple One or multiple fan- One atmospherically Multiple
power assisted vent atmospherically
vent or direct vent appliances and gas or oil appliance vented gas or oil
appliances power vent or direct or appliances or solid
or no combustion vent one solid fuel fuel
appliances appliances appliance appliances
Column A Column B Column C Column D
1. 0.15 0.09 0.06 0.03
a) pressure factor
(cfm/sf)
b) conditioned floor area (sf) (including 3062
unfinished basements)
Estimated House infiltration (cfm): [1a 459.3
x 1b]
2. Exhaust Capacity
a) continuous exhaust-only ventilation
system (cfm); (not applicable to balanced
ventilation systems such as
HRV)
b) clothes dryer (cfm) 135 135 135 135
c) 80% of largest exhaust rating (cfm); 240
Kitchen hood typically
(not applicable if recirculating system
or if powered makeup air is electrically
interlocked and match to exhaust)
d) 80% of next largest exhaust rating Not
(cfm); bath fan typically Applicable
(not applicable if recirculating system
or if powered makeup air is electrically
interlocked and matched to exhaust)
Total Exhaust Capacity (cfm); 375
[2a + 2b +2c + 2d]
3. Makeup Air Quantity (cfm) 375
a) total exhaust capacity (from above)
b) estimated house infiltration (from 459.3
above)
Makeup Air Quantity (cfm); -84.3 ✓
Da - 3b]
(if value is negative, no makeup air is
needed)
4. For makeup Air Opening Sizing, refer
to Table 501.4.2
A. Use this column if there are other than fan-assisted or atmospherically vented gas or oil appliance or if there are no combustion appliances.
(Power vent
and direct vent appliances may be used.)
B. Use this column if there is one fan-assisted appliance per venting system. (Appliances other than atmospherically vented appliances may also
be included.)
C. Use this column if there is one atmospherically vented (other than fan-assisted) gas or oil appliance per venting system or one solid fuel
appliance.
D. Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically
vented gas or oil
appliances and solid fuel appliances.
31 Page
Makeup Air Opening Table for New and Existing Dwelling
Table 501.3.2
One or multiple One or multiple One atmospherically Multiple
power fanassisted vented gas or oil atmospherically
vent, direct vent appliances and appliance vented gas or oil
appliances, power vent or direct or one solid fuel appliances Duct diameter
or no combustion vent appliances appliance or solid fuel
appliances appliances
Column A Column B Column C Column D
Passive opening 1-36 1-22 1-15 1-9 3
Passive opening 37-66 23-41 16-28 10-17 4
Passive opening 67-109 42-66 29-46 18-28 5
Passive opening 110-163 67-100 47 - 69 29 - 42 6
Passive opening 164- 232 101-143 70 - 99 43 - 61 7
Passive opening 233- 317 144- 195 100-135 62 - 83 8
Passive opening 318-419 196-258 136-179 84-110 9
w/motorized
damper
Passive opening 420 -539 259 -332 180- 230 111-142 10
w/motorized
damper
Passive opening 540 -679 333 -419 231- 290 143- 179
11
w/motorized
damper
Powered makeup air >679 >419 >290 >179 NA
Notes:
A. An equivalent length of 100 feet of round smooth metal duct is assumed. Subtract 40 feet for the exterior hood and ten feet for each 90-
degree elbow to determine the remaining length of straight duct allowable.
B. If flexible duct is used, increase the duct diameter by one inch. Flexible duct shall be stretched with minimal sags. Compressed duct shall not
be accepted.
C. Barometric dampers are prohibited in passive makeup air openings when any atmospherically vented appliance is installed.
D. Powered makeup air shall be electrically interlocked with the largest exhaust system.
Sections F
Combustion air
Not required per mechanical code (No atmospheric or power vented appliances)
X Passive (see IFGC Appendix E, Worksheet E-1) Size and type r477;;,2
or 5" Flex
Other, describe:
Explanation - If no atmospheric or power vented appliances are installed, check the appropriate box, not
required. If a power ventedor atmospherically vented appliance installed, use IFGC Appendix E,
Worksheet E-1 (see below). Please enter size and type. Combustionair vent supplies must communicate
with the appliance or appliances that require the combustion air.
Section F calculations follow on the next 2 pages.
4~Page
Directions - The Minnesota Fuel Gas Code method to calculate to size of a required combustion air
opening, is called the Known Air Infiltration Rate Method. For new construction, 4b of step 4 is
required to be filled out.
IFGC Appendix E, Worksheet E-1
Residential Combustion Air Calculation Method
(for Furnace, Boiler, and/or Water Heater in the Same Space)
Step 1: Complete vented combustion appliance information.
Furnace/Boiler:
-Draft Hood -Fan Assisted or Power Vent _X_Direct Vent Input:_80000 BTU/HR
Water Heater:
-Draft Hood -Fan Assisted or Power Vent -Direct Vent Input:_Electric BTU/HR
Step 2: Calculate the volume of the Combustion Appliance Space (CAS) containing combustion appliances.
The CAS includes all spaces connected to one another by code compliant openings. CAS Volume: ft
LxWxH L W H
Step 3: Determine Air Changes per Hour (ACH)1
Default ACH values have been incorporated into Table E-1 for use with Method 4b (KAIR Method).
If the year of construction or ACH is not known, use method 4a (Standard Method).
Step 4: Determine Required Volume for Combustion Air. (DO NOT COUNT DIRECT VENT APPLIANCES)
4a. Standard Method
Total Btu/hr input of all combustion appliances Input: Btu/Hr
Use Standard Method column in Table E-1 to find Total Required TRV: ft3
Volume (TRV)
If CAS Volume (from Step 2) is greater than TRV then no outdoor openings are needed.
If CAS Volume (from Step 2) is less than TRV then go to STEP S.
4b. Known Air Infiltration Rate (KAIR) Method (DO NOT COUNT DIRECT VENT APPLIANCES)
Total Btu/hr input of all fan-assisted and power vent appliances Input:-40000. Btu/Hr
Use Fan-Assisted Appliances column in Table E-1 to find RFVA:_3000 ft3
Required Volume Fan Assisted (RVFA)
Total Btu/hr input of all Natural draft appliances Input: Btu/hr Input: -0 Btu/Hr
Use Natural draft Appliances column in Table E-1 to find RVNFA:none ✓ ft3
Required Volume Natural draft appliances (RVNDA)
Total Required Volume (TRV) = RVFA+ RVNDA TRV=_3000 + none = 3000 TRV ft3
If CAS Volume (from Step 2) is greater than TRV then no outdoor openings are needed.
If CAS Volume (from Step 2) is less than TRV then go to STEP S.
Step 5: Calculate the ratio of available interior volume to the total required volume.
Ratio = CAS Volume (from Step 2) divided by TRV (from Step 4a or Step 4b)
Ratio = / / 3000 = 0. 3
Step 6: Calculate Reduction Factor (RF).
RF= 1 minus Ratio RF = 1- 0-52
Step 7: Calculate single outdoor opening as if all combustion air is from outside.
Total Btu/hr input of all Combustion Appliances in the same CAS Input: Btu/Hr
(EXCEPT DIRECT VENT)
Combustion Air Opening Area (CAOA):
Total Btu/hr divided by 3000 Btu/hr per in2 CAOA = 40000 /3000 Btu/hr per in 13.33
Step 8: Calculate Minimum CAOA.
Minimum CAOA = CAOA multiplied by RF Minimum CAOA = 13.33 x = in
Step 9: Calculate Combustion Air Opening Diameter (CAOD)
CAOD = 1.13 multiplied by the square root of Minimum CAOA CAOD = 1.13 V Minimum CAOA =.2-7in. diameter
go up one inch in size if using flex duct
1 If desired, ACH can be determined using ASHRAE calculation or blower door test. Follow procedures in Section
G304.
5 Page
IFGC Appendix E, Table E-1
Residential Combustion air (Required Interior Volume Based on Input Rating of Appliance)
Known Air Infiltration Rate (KAIR) Method (cu ft)
Fan Assisted or Power Vent Natural Draft
Input Rating Standard Method 1994 to present Pre-1994 1994 to present Pre-1994
(Btu/hr)
5,000 250 375 188 525 263
10,000 500 750 375 1,050 525
15,000 750 1,125 563 1,575 788
20,000 1,000 1,500 750 2,100 1,050
25,000 1,250 1,875 938 2,625 1,313
30,000 1,500 2,250 1,125 3,150 1,575
35,000 1,750 2,625 1,313 3,675 1,838
40,000 2,000 3,000 1,500 4,200 2,100
45,000 2,250 3,375 1,688 4,725 2,363
50,000 2,500 3,750 1,675 5,250 2,625
55,000 2,750 4,125 2,063 5,775 2,888
60,000 3,000 4,500 2,250 6,300 3,150
65,000 3,250 4,875 2,438 6,825 3,413
70,000 3,500 5,250 2,625 7,350 3,675
75,000 3,750 5,625 2,813 7,875 3,938
80,000 4,000 6,000 3,000 8,400 4,200
85,000 4,250 6,375 3,188 8,925 4,463
90,000 4,500 6,750 3,375 9,450 4,725
95,000 4,750 7,125 3,563 9,975 4,988
100,000 5,000 7,500 3,750 10,500 5,250
105,000 5,250 7,875 3,938 11,025 5,513
110,000 5,500 8,250 4,125 11,550 5,775
115,000 5,750 8,625 4,313 12,075 6,038
120,000 6,000 9,000 4,500 12,600 6,300
125,000 6,250 9,375 4,688 13,125 6,563
130,000 6,500 9,750 4,875 13,650 6,825
135,000 6,750 10,125 5,063 14,175 7,088
140,000 7,000 10,500 5,250 14,700 7,350
145,000 7,250 10,875 5,438 15,225 7,613
150,000 7,500 11,250 5,625 15,750 7,875
155,000 7,750 11,625 5,813 16,275 8,138
160,000 8,000 12,000 6,000 16,800 8,400
165,000 8,250 12,375 6,188 17,325 8,663
170,000 8,500 12,750 6,375 17,850 8,925
175,000 8,750 13,125 6,563 18,375 9,188
180,000 9,000 13,500 6,750 18,900 9,450
185,000 9,250 13,875 6,938 19,425 9,713
190,000 9,500 14,250 7,125 19,950 9,975
195,000 9,750 14,625 7,313 20,475 10,238
200,000 10,000 15,000 7,500 21,000 10,500
205,000 10,250 15,375 7,688 22,525 10,783
210,000 10,500 15,750 7,875 22,050 11,025
215,000 10,750 16,125 8,063 22,575 11,288
220,000 11,000 16,500 8,250 23,100 11,550
225,000 11,250 16,875 8,438 23,625 11,813
230,000 11,500 17,250 8,625 24,150 12,075
1. The 1994 date refers to dwellings constructed under the 1994 Minnesota Energy Code. The default KAIR used in this section
of the table is 0.20 ACH.
2. This section of the table is to be used for dwellings constructed prior to 1994. The default KAIR used in this section of the
table is 0.40 ACH.
6~Page
RECEIVED
MAY 0 9 2013
3580 Lemieux Circle
HVAC Load Calculations
for
Ron Clark
s
~IDM
M"VACHVACLoADs
Prepared By:
Alan Dobson
Burnsville Heating & A/C Inc.
3451w Burnsville Pkwy, Suite 120
Burnsville,MN 55337
952-894-0005
Wednesday, April 24, 2013
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
Burnsville Light Commercial HVAC Loads - - - Elite Software Development, Inc.
[Burnsville, MIN55337 Page
Pro ject Report
General Project Information
Project Title:' 3580 Lemieux Circle
Designed By: Alan Dobson
Project Date: Wednesday, April 24, 2013
Project Comment:
Client Name: Ron Clark
Company Name: Burnsville Heating & A/C Inc.
Company Representative: Alan Dobson
Company Address: 3451w Burnsville Pkwy, Suite 120
Company City: Burnsville,MN 55337
Company Phone: 952-894-0005
Company Fax: 952-894-0925
Company Comment:
Design Data
Reference City: Minneapolis, Minnesota
Building Orientation: Front door faces West
Daily Temperature Range: Medium
Latitude: 44 Degrees
Elevation: 834 ft.
Altitude Factor: 0.970
Elevation Sensible Adj. Factor: 1.000
Elevation Total Adj. Factor: 1.000
Elevation Heating Adj. Factor: 1.000
Elevation Heating Adj. Factor: 1.000
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb ^et Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter: -15v-
15 5.33 80% n/a 72 n/a
Summer: 88 73 50% 50% 75 35
Check Figures
Total Building Supply CFM: 977 CFM Per Square ft.: 0.319
Square ft. of Room Area: 3,062 Square ft. Per Ton: 1,538
Volume (ft) of Cond. Space: 27,544
Building Loads..... _
Total Heating Required Including Ventilation Air: 52,761 Btu 52.761 MBH
Total Sensible Gain: 20,855 Btuh 87 %
Total Latent Gain: 3,036 Btuh 13 %
Total Cooling Required Including Ventilation Air: 2 83 90 Btu 1.99 Tons (Based On Sensible + Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
\\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Circle.rhv Wednesday, April 24, 2013, 2:21 PM
Rhvac - Residential Light Commercial HVAC Loads Elite Software Development, Inc.
Burnsville Heating & A/C Inc 3580 Lemieux Circle
Burnsville _MN 55337 Page 11
Total Building Summary Loads
Component - Area Sen Lat Sen Total
Description Quan Loss Gain Gain _ Gain_
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 3 76 0 72 72
SHGC 0.3
hbt. Glazing- bt, ground reflectance = 0.23, u-value 0.31, 338.9 9,136 0 10,059 10,059
SHGC 0.35
hbt: azing- , ground reflectance = 0.23, u-value 0.29 8 202 0 76 76
SHGC
hbT. lazing-hbt, ground reflectance = 0.23, u-value 0.31, 48 1,294 0 512 512
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 37.5 1,011 0 393 393
SHGC 0.33
Front-D` boor- 20.4 248 0 69 69
hbt: Door-hbt 19 232 0 64 64
12E-Osw: Wall-Frame, -1 sulation in 2 x 6 stud 2118.2 12,532 0 2,219 2,219
cavity, no board ins )ion,siding finish, wood studs
R-5 wall: Wall- eOr v 406.4 2,404 0 426 426
RC Rim Joist: Wall-Frame, Custom, RC Rim joist 222.6 1,608 0 284 284
16B-44-ad: Roof/Ceiling-Under Attic with Insulation on 1540.4 2,947 0 1,628 1,628
n
Attic Floor (also use for Knee Walls and n-44
Ceilings), vented attic, no radiant barrier, insul
ation, dark asphalt
21A-32-v: Floor-Basement, Concrete slab, any thickness, 1520 2,645 0 0 0
2 or more feet below grade, no insulation below floor,
vinyl_covering, shortest side of floor slab is 32' wide
Subtotals for structure: 34,335 0 15,802 15,802
People: 2 460 600 1,060
Equipment: 400 1,200 1,600
Lighting: 0 0 0
Ductwork: 4,787 366 2,170 2,535
Infiltration: Winter CFM: 147, Summer CFM: 78 13,639 1,810 1,083 2,893
Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0
Total Building Load Totals: 52,761 3,036 20,855 23,890
Check Figures
Total Building Supply CFM: 977 CFM Per Square ft.: 0.319
Square ft. of Room Area: 3,062 Square ft. Per Ton: 1,538
Volume (ft3) of Cond. Space: 27,544 `
B u i d n g Loads s _ - g _ `.--..a. 761_>... _ 1 - _ -
Total Heating Required Includin Ventilation Air: 52 Btu 52.761 MBH
Total Sensible Gain: 20,855 Btuh 87 %
Total Latent Gain: 3,036 Btuh 13 %
Total Cooling Required Including Ventilation Air: C2 , 90 B-Oh 1.99 Tons (Based On Sensible + Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
\\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Circle.rhv Wednesday, April 24, 2013, 2:21 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.l
Burnsville Heating & A/C Inc 3580 Lemieux Circle)
Burnsville N Y1 55337 Page 14
System 1 Main Floor Summary Loads
I Component Area Sen Lat Sen Total
_Description Quan Loss Ga_in_ Gain Gain
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 3 76 0 72 72
SHGC 0.3
hbt: az'GT ing- bt, ground reflectance = 0.23, u-value _0.31, 338.9 9,136 0 10,059 10,059
SHGC 0.35
hbt: aztin bt, ground reflectance = 0.23, u-value 0 .29, 8 202 0 76 76
SHG~C 0,~,
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 48 1,294 0 512 512
SHGC 0.35
hbt:'Gig- 6t, ground reflectance = 0.23, u-value 0.31, 37.5 1,011 0 393 393
SHGC 0.33 _
FronfMzr-15oor- 20.4 248 0 69 69
hbt: Door-hbt 11 19 232 0 64 64
12E-Osw: Wall-Frame, 19 i ulation in 2 x 6 stud 2118.2 12,532 0 2,219 2,219
cavity, no board insu a ion, siding finish, wood studs
R-5 wall: Wall- /~OdA4~L71/ve/ ?if .4 2,404 0 426 426
RC Rim Joist: Wall-Frame, Custom, RC Rim joist n ~./A 2.6 1,608 0 284 284
16B-44-ad: Roof/Ceiling-Under Attic with Insulation on 1540.4 2,947 0 1,628 1,628
Attic Floor (also use for Knee Walls and P 'tion
Ceilings), vented attic, no radiant barrie R-44
insulation, dark asphalt
21A-32-v: Floor-Basement, Concrete slab, any thickness, 1520 2,645 0 0 0
2 or more feet below grade, no insulation below floor,
vinyl covering, shortest side of floor slab _is. 32' wide
Subtotals for structure: 34,335 0 15,802 15,802
People: 2 460 600 1,060
Equipment: 400 1,200 1,600
Lighting: 0 0 0
Ductwork: 4,787 366 2,170 2,535
Infiltration: Winter CFM: 147, Summer CFM: 78 13,639 1,810 1,083 2,893
Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0
_
System 1 Main Floor Load Totals: 52,761 3,036 20,855 23,890
Check Figures
Supply CFM: 977 CFM Per Square ft.: 0.319
Square ft. of Room Area: 3,062 Square ft. Per Ton: 1,538
Volume (ft3) of Cond. Space: 27,544
System Loads... .
Total Heating Required Including Ventilation Air: 52,761 Btu 52.761 MBH
Total Sensible Gain: 0, 5 Btuh 87 %
Total Latent Gain: 3,036 Btuh 13 %
Total Cooling Required Including Ventilation Air: '23 g90 Btuh 1.99 Tons (Based On Sensible + Latent)
_Notes f
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
\\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Circle.rhv Wednesday, April 24, 2013, 2:21 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Burnsville Heating & A/C Inc " 3580 LemieLix Cirrle
Burnsville, MN 55337 Page 32
Detailed Room Loads - Room 10 - Basement (Peak Fenestration Gain Procedure)
General
Room is in zone 2, which peaks at 10 am
Calculation Mode: Htg. & clg. Occurrences: 1
Room Length: 47.5 ft. System Number: 1
Room Width: 32.0 ft. Zone Number: 2
Area: 1,520.0 sq.ft. Supply Air: 443 CFM
Ceiling Height: 9.0 ft. Supply Air Changes: 1.9 AC/hr
Volume: 13,680.0 cu.ft. Req. Vent. Clg: 0 CFM
Number of Registers: 1 Actual Winter Vent.: 0 CFM
Runout Air: 443 CFM Percent of Supply.: 0 %
Runout Duct Size: 11 in. Actual Summer Vent.: 0 CFM
Runout Air Velocity: 672 ft./min. Percent of Supply: 0 %
Runout Air Velocity: 672 ft./min. Actual Winter Infil.: 76 CFM
Actual Loss: 0.122 in.wg./100 ft. Actual Summer Infil.: 40 CFM
Item Area -U- Htg Sen Clg Lat Sen
Description m Quantity Value HTM Loss HTM Gain Gain
E -Wall-12E-Osw 32 X 9 193 0.068 5.9 1,142 1.0 0 202
S -Wall-12E-Osw 47.5 X 9 405.5 0.068 5.9 2,399 1.0 0 425
W -Wall-R-5 wall 32 X 9 288 0.068 5.9 1,704 1.0 0 302
N -Wall-R-5 wall 10 X 9 90 0.068 5.9 532 1.0 0 94
N -Wall-R-5 wall 7.9 X 3.6 28.4 0.068 5.9 168 1.0 0 30
N -Wall-12E-Osw 7.9 X 5.6 26.7 0.068 5.9 158 1.0 0 28
N -Wall-12E-Osw 29.8 X 9 204.2 0.068 5.9 1,208 1.0 0 214
E -Wall-RC Rim Joist 32 X 1.4 44.8 0.083 7.2 324 1.3 0 57
W -Wall-RC Rim Joist 32 X 1.4 44.8 0.083 7.2 324 1.3 0 57
S -Wall-RC Rim Joist 47.5 X 1.4 66.5 0.083 7.2 480 1.3 0 85
N -Wa1I-RC Rim t 47.5 X 1.4 66.5 0.08 7.2 480 1.3 0 85
E -GIs-hbt hgc-0.35 %S 30 0.310 27.0 809 52.8 0 1,584
E -GIs-hbt hgC-0.35 0%S (2) 44 0.310 27.0 1,186 52.8 0 2,324
E -GIs-hbt hgc-0.35 0%S 21 0.310 27.0 566 52.8 0 1,109
S -GIs-hbt hgc-0.35 0%S 22 0.310 27.0 593 26.3 0 579
N -GIs-hbt shgC-0.350%S(2) 44 0.310 27.0 1,186 10.5 0 460
N -GIs-hbt hgc-0.35 0%S 20 0.310 27.0 539 10.5 0 209
N -GIs-hbt hgc-0.33 0%S 17.5 0.310 27.0 472 9.9 0 174
Floor 2.1A 5.... 1520----._ 020. 1.7..... . 2,645 00 4._..... 0_
Subtotals for Structure: 16,915 0 8,018
Infil.: Win.: 75.5, Sum.: 40.1 1,657 4.233 7,014 0.336 931 557
Ductwork: 2,388 888
Room Totals: 26,317 931 9,463
\\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Circle.rhv Wednesday, April 24, 2013, 2:21 PM
Rhvac Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Burnsville Heating & NC Inc 3580 Lemieux Circle
Burn~ville. rX1 55337 Pa e 35
System 1 Room Load Summar
Htg Min Run Run Cig Clg Min Act
Room Area Sens Htg Duct Duct Sens Lat Clg Sys
No Name SFBtuh CFM Size Vel _ Btuh Btuh CFM CFM
---Zone 1---
1 Foyer 63 839 11 1-2 483 225 25 11 11
2 Den 149 3,049 41 1-5 266 775 107 36 36
3 Kitchen 223 2,149 29 1-7 336 1,915 68 90 90
4 Dining 188 2,921 39 1-5 607 1,766 81 83 83
5 Great Room 296 8,623 115 2-6 565 4,739 263 222 222
6 Master Bedroom 231 3,832 51 1-7 556 3,169 590 148 148
7 Master Bath 140 1,188 16 1-2 614 286 45 13 13
8 Laundry 126 1,068 14 1-2 550 256 440 12 12
9 Mud_Room 126._...._ 2,776 37.....__ 1-3 497......... 521 120 24 24....
- -
Zone 1 subtotal 1,542 26,444 354 13,651 1,739 640 640
---Zone 2---
_ 10_Basement 1,52026,317 _ 352__.._.. 1-11 6729,463 931___ _443__ 443
_ - -
Zone 2 subtotal_1,520 26,317 352 9,463 931 443 __..443.._
-
Duct Latent
__System1_.total 3,062___ 52,761 706____ 20,855 31036____ 977 977
System 1 Main Trunk Size: 11x16 in.
Velocity: 799 ft./min
Loss per 100 ft.: 0.099 in.wg
Note: Since the system is multizone, the Peak Fenestration Gain Procedure was used to determine glass sensible gains
at the room and zone levels, so the sums of the zone sensible gains and airflows for cooling shown above are not intended
to equal the totals at the system level. Room and zone sensible gains and cooling CFM values are for the hour in which
the glass sensible gain for the zone is at its peak. Sensible gains at the system level are based on the "Average Load
Procedure + Excursion" method.
[Coding System Summary
Cooling Sensible/Latent Sensible Latent Total
Btuh _ Btuh
Tons Split Btuh ------Btu h
Net Required: 1.99 87%/13% 20,855 3,036 23,890
\\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Circle.rhv Wednesday, April 24, 2013, 2:21 PM
LOT SURVEY CHECKLIST FOR RESIDENTIAL
BUILDING PERMIT APPLICATION
PROPERTY LEGAL:
DATE OF SURVEY: 3
LATEST REVISION:
a~
c
t
U
o z a DOCUMENT STANDARDS
❑ ❑ • Registered Land Surveyor signature and company
❑ ❑ • Building Permit Applicant
❑ ❑ . Legal description
❑ 0 • Address
❑ 0 • North arrow and scale
XJ ❑ ❑ • House type (rambler, walkout, split w/o, split entry, lookout, etc.)
❑ ❑ • Directional drainage arrows with slope/gradient %
j' ❑ ❑ • Proposed/existing sewer and water services & invert elevation
❑ ❑ • Street name
❑ ❑ • Driveway (grade & width - in R/W and back of curb, 22' max.)
0 D • Lot Square Footage
❑ 0 • Lot Coverage
ELEVATIONS
Existing
A 0 ❑ • Property corners
0 0 Top of curb at the driveway and property line extensions
" d" 0 , " . Elevations of any existing adjacent homes
❑ 0 • Adequate footing depth of structures due to adjacent utility trenches
❑ ❑ . Waterways (pond, stream, etc.)
Proposed
❑ ❑ • Garage floor
0 0 • Basement floor
❑ ❑ • Lowest exposed elevation (walkout/window)
❑ 0 • Property corners
0 0 • Front and rear of home at the foundation
PONDING AREA (if applicable)
0 0 • Easement line
❑ ❑ • NWL
0 Jd 0 • HWL
0 D 0 • Pond # designation
❑ "ry 0 • Emergency Overflow Elevation
❑ • Pond/Wetland buffer delineation
Y Shoreland Zoning Overlay District
Y Conservation Easements
DIMENSIONS
❑ 0 Lot lines/Bearings & dimensions
0 Right-of-way an reet w'dt to back of curb)
❑ Proposed home dimensions including any& PP-Osed`der-I s, over angs grea er an porches etc.
(i.e. all structures requiring permanent footings)
❑ ❑ • Show all easements of record and any City utilities within those easements
0 ❑ • Setbacks of proposed structure an and setback of adjacent existing structures
0 0 • Retaining wall requirements:
Reviewed By; Date
GJFORMS/Building Permit Application Rev. 11-26-04
v- ~Lunu ri u;c! c~ ~o uv I I I z ~U NU \ I UV i v I ~ uvvy, i1 1C
ti
Certificate of Survey for: RON CLARK CONSTRUCTION & DESIGN
952.8 Denotes Existing Elevation HOUSE TYPE: TOWNHOUSE FULL BASEMENT WALKOUT Job # B1601.10-124
981.5 Denotes Proposed Elevation
~ Denotes Surface Drainage PROPOSED HOUSE ELEVATIONS: Date: 3/06/13
GARAGE FLOOR ELEVATION = 887.5 Scale: 1"=20'
O Denotes 1/2" iron pipe set TOP OF FOUNDATION ELEV = 887.8
• Denotes 1/2" iron pipe found. LOWEST FLOOR ELEVATION = 879.1 REV EWE • maximum p
or Aem-InTrio Wr
Be Required Date /
ro -T
-U-) M LEMIEUX CIRCLE INL PROTECTION UNTIL
FIN TURF IS ESTABLISHED
N
C
rim!
W G ~h 6
PRD SAN. PRD SAN.
SERV. 875.5 SERV. 875.5
88s N89°53"33"E M 106.00
4 L -
r O 53.010 I N 53.0 I ( o
p L0
Q U-) lb I FT. 1
w T°BSrg - CANT. HH7.3 j CANT. _ Q
> p~A 32_33 _54.67°P
• o 19.0 p^m 21.0 Un 8a ~y~P
w q q~/cod 00 & ~~J
1 0 w W 00
py a0 ~ rb.
Q
o < < 10
Gar. FIr. C~ N 14, 0
Elev.= 887.3 81 887.3 1
2.0
885.47 ort--
c~i y 16.75 9.42 z
e$6~ O 886.1 PORCH Q9PORCHai 8F 01 86.1 w O ~
d
- - d 88s 18.33 8&~ yh 8.61 Q d
~Olp 885. 885.1 r
PROPOSED BUILDING ool 0 1 w
0 882.1 882. I J ANA W
z I o~ Lot Area: 6572 S.F. Lot Area: 6572 S.F. M I co
881.6 ca Coverage: 2093 S.F. Coverage: 2057 S.F. oa 881.6
co COI Q
878.6 #3582 #3580 878.6 7
7
CD 0
z
I N j Q N~
_ ►jz _
Cn (.0 a o
I w I 8~9 I o 0
SSA O a 11.04 0 12.63 10.83 2 4.5 -7. 00
V) 6 4 15.33 ~i 779 1b i~ 878.6 n i 10'x8' 1 Yio r 10
PO CH ~DECK I PATIO' Wlm I STM MH
LABOVE~- ABOVE - - ' -
8>> 11.04 15.33 8)) 12
6 16.67 L
- - - - - - - - - - - - - -
63.83 878.6 `FZ5.5 PJ s 25.50 ~o 10
d)Q d) \ (98)~ ~j p 8~s 6
'0 0
Cn \ EXISTING
CDC N RET. WALL
a~ EXISTING RET. WALL ~a10
53.00 $6 53.00 _
` N89°53'33"E 106.00
Lots 7 and 8, Block 3, PEARLMONT HEIGHTS, _Dak>ota Co'Lffl, MN
I hereby certify that this survey, plan, or report was-, prepared by me or under
my direct supervision and that I am a duly Licensed 'Eana- Surveyor -U-ndler--the--gl -
laws of the state of Minnesota.
- V113
Oliver Surveying & Engineering, Inc.
Oliver Surveying & Engineering, Inc.
By: Rick M. Blom, LS Land Surveying •Civil Engineering •Land Planning
License No. 21729 580 Dodge Ave. Elk River, MN 55330. 763.441.2072 fac. 763.441.5665
Date: 3/07/13 Rev.: 5/8/13 city comments Nww.oliver-se.com
Rev.: 3/26/13 (restake new plans)
rT to 770
RECEIN /FD
V/ sz / MAY 31 2013
3580 Lemieux Circle
HVAC Load Calculations
for
Ron Clark
"wN`11k11RVACHVAC ftSIOUNMAJ.
Lo $
Prepared By:
Alan Dobson
Burnsville Heating & A/C Inc.
3451w Burnsville Pkwy, Suite 120
Burnsville,MN 55337
952-894-0005
Thursday, May 30, 2013
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Burnsville Heating & NC Inc ~ 3580 Lemieux Circle
Burnsville. MN 55337 Page 2
PrPect Report
- - - -
L General Project Information
Project Title: 3580 Lemieux Circle
Designed By: Alan Dobson j V fl~ fl
Project Date: Wednesday, April 24, 2013
Project Comment: MAY 3
Client Name: Ron Clark
Company Name: Burnsville Heating & A/C Inc.
Company Representative: Alan Dobson
Company Address: 3451w Burnsville Pkwy, Suite 120
Company City: Burnsville,MN 55337
Company Phone: 952-894-0005
Company Fax: 952-894-0925
Company Comment:
Design Data
Reference City: Minneapolis, Minnesota
Building Orientation: Front door faces West
Daily Temperature Range: Medium
Latitude: 44 Degrees
Elevation: 834 ft.
Altitude Factor: 0.970
Elevation Sensible Adj. Factor: 1.000
Elevation Total Adj. Factor: 1.000
Elevation Heating Adj. Factor: 1.000
Elevation Heating Adj. Factor: 1.000
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter: -15 -15.33 80% n/a 72 n/a
Summer: 88 73 50% 50% 75 35
Check Figures
Total Building Supply CFM: 911 CFM Per Square ft.: 0.297
Square ft. of Room Area: 3,062 Square ft. Per Ton: 1,635
Volume (ft3) of Cond. Space: 27,544
Building Loads
Total Heating Required Including Ventilation Air: 51,755 Btuh 51.755 MBH
Total Sensible Gain: 19,437 Btuh 86 %
Total Latent Gain: 3,036 Btuh 14 %
Total Cooling Required Including Ventilation Air: 22,474 Btuh 1.87 Tons (Based On Sensible + Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
\\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Circle.rhv Thursday, May 30, 2013, 2:49 PM
RECEIVED
MAY 31 2013
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Burnsville Heating & AIC Inc 3580 Lemieux Circle
Burnsville.. MN 55337 Page 11
Total Buildin Summary Loads
Component Area Sen Lat Sell Total
_Q_uan Loss Gain Gain Gam
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 3 76 0 72 72
SHGC 0.3
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 276.2 7,449 0 8,431 8,431
SHGC 0.35
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 8 202 0 76 76
SHGC 0.3
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 42 1,132 0 448 448
SHGC 0.35
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 58.5 1,577 0 617 617
SHGC 0.35
Front Door: Door- 20.4 248 0 69 69
hbt: Door-hbt 19 232 0 64 64
12E-Osw: Wall-Frame, R-19 insulation in 2 x 6 stud 2165.9 12,813 0 2,268 2,268
cavity, no board insulation, siding finish, wood studs
R-5 wall: Wall- 406.4 2,404 0 426 426
RC Rim Joist: Wall-Frame, Custom, RC Rim joist 222.6 1,608 0 284 284
16B-44-ad: Roof/Ceiling-Under Attic with Insulation on 1540.4 2,947 0 1,628 1,628
Attic Floor (also use for Knee Walls and Partition
Ceilings), vented attic, no radiant barrier, R-44
insulation, dark asphalt
21A-32-v: Floor-Basement, Concrete slab, any thickness, 1520 2,645 0 0 0
2 or more feet below grade, no insulation below floor,
vinyl covering, shortest side of floor slab is 32' wide
.
Subtotals for structure: 33,333 0 14,383 14,383
People: 2 460 600 1,060
Equipment: 400 1,200 1,600
Lighting: 0 0 0
Ductwork: 4,783 366 2,171 2,538
Infiltration: Winter CFM: 147, Summer CFM: 78 13,639 1,810 1,083 2,893
Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0
Total Building Load Totals: 51,755 3,036 19,437 22,474
Check Figures
Total Building Supply CFM: 911 CFM Per Square ft.: 0.297
Square ft. of Room Area: 3,062 Square ft. Per Ton: 1,635
Volume (ft') of Cond. Space: 27,544
Building Loads
Total Heating Required Including Ventilation Air: 51,755 Btuh 51.755 MBH
Total Sensible Gain: 19,437 Btuh 86 %
Total Latent Gain: 3,036 Btuh 14 %
Total Cooling Required Including Ventilation Air: 22,474 Btuh 1.87 Tons (Based On Sensible + Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
\\SBS201 1\Redi rected Folders ...\Ron Clark Ea x Circle.rhv Thursday, May 30, 2013, 2:49 PM
RECEIVED
Burnsville He Mng & A/C Inc Commercial HVAC Loads - Elite Soft e 580 Lepiex Circle'
iircl
6urmvillE.. MN P
System 1 Main Floor Summary Loads
Component Area Sen Lat Sen Total
Description Quan Loss Gain Gain Gain
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 3 76 0 72 72
SHGC 0.3
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 276.2 7,449 0 8,431 8,431
SHGC 0.35
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 8 202 0 76 76
SHGC 0.3
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 42 1,132 0 448 448
SHGC 0.35
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 58.5 1,577 0 617 617
SHGC 0.35
Front Door: Door- 20.4 248 0 69 69
hbt: Door-hbt 19 232 0 64 64
12E-Osw: Wall-Frame, R-19 insulation in 2 x 6 stud 2165.9 12,813 0 2,268 2,268
cavity, no board insulation, siding finish, wood studs
R-5 wall: Wall- 406.4 2,404 0 426 426
RC Rim Joist: Wall-Frame, Custom, RC Rim joist 222.6 1,608 0 284 284
16B-44-ad: Roof/Ceiling-Under Attic with Insulation on 1540.4 2,947 0 1,628 1,628
Attic Floor (also use for Knee Walls and Partition
Ceilings), vented attic, no radiant barrier, R-44
insulation, dark asphalt
21A-32-v: Floor-Basement, Concrete slab, any thickness, 1520 2,645 0 0 0
2 or more feet below grade, no insulation below floor,
vinyl covering, shortest side of floor slabs 32' wide
- - -
Subtotals for structure: 33,333 0 14,383 14,383
People: 2 460 600 1,060
Equipment: 400 1,200 1,600
Lighting: 0 0 0
Ductwork: 4,783 366 2,171 2,538
Infiltration: Winter CFM: 147, Summer CFM: 78 13,639 1,810 1,083 2,893
_Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0
System 1 Main Floor Load Totals: 51,755 3,036 19,437 22,474
Check Figures
Supply CFM: 911 CFM Per Square ft.: 0.297
Square ft. of Room Area: 3,062 Square ft. Per Ton: 1,635
Volume (ft3) of Cond. Space: 27,544
System Loads
Total Heating Required Including Ventilation Air: 51,755 Btuh 51.755 MBH
Total Sensible Gain: 19,437 Btuh 86 %
Total Latent Gain: 3,036 Btuh 14 %
Total Cooling Required Including Ventilation Air: 22,474 Btuh 1.87 Tons (Based On Sensible + Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
\\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Circle.rhv Thursday, May 30, 2013, 2:49 PM
CFIV9;
Rhvac - Residential & Light Commercial HVAC Loads Eli r4 development, Inc.
Burnsville ueatmq PJC Inc 3580 Lemieux Circle
Burnsville, MN 553:37 Page 17
System 1 Zone 1 Summary Loads Peak Load Procedure for Rooms
Description t QuArea Sen anLoss ___Ga n Sen l
Gain Gain l
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 3 76 0 72 72
SHGC 0.3
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 159.2 4,294 0 4,762 4,762
SHGC 0.35
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.29, 8 202 0 76 76
SHGC 0.3
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 42 1,132 0 448 448
SHGC 0.35
Front Door: Door- 20.4 248 0 69 69
hbt: Door-hbt 19 232 0 64 64
12E-Osw: Wall-Frame, R-19 insulation in 2 x 6 stud 1313.4 7,771 0 1,375 1,375
cavity, no board insulation, siding finish, wood studs
16B-44-ad: Roof/Ceiling-Under Attic with Insulation on 1540.4 2,947 0 1,628 1,628
Attic Floor (also use for Knee Walls and Partition
Ceilings), vented attic, no radiant barrier, R-44
insulation,_dark asphalt
Subtotals for structure: 16,902 0 9,129 9,129
People: 2 460 600 1,060
Equipment: 400 1,200 1,600
Lighting: 0 0 0
Ductwork: 2,396 0 1,304 1,304
Infiltration: Winter CFM: 71, Summer CFM: 38 6,625 879 _ 5261 405
System 1, Zone 1 Load Totals: 25,923 1,739 12,759 14,498
Check Figures
Supply CFM: 598 CFM Per Square ft.: 0.388
Square ft. of Room Area: 1,542 Square ft. Per Ton: 1,276
Volume (ft') of Cond. Space: 13,864
Zone Loads
Total Heating Required: 25,923 Btuh 25.923 MBH
Total Sensible Gain: 12,759 Btuh 88 %
Total Latent Gain: 1,739 Btuh 12 %
Total Cooling Required: 14,498 Btuh 1.21 Tons (Based On Sensible + Latent)
Notes
Rhvac is an ALGA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
\\SBS201 1 \Redirected Folders ...\Ron Clark Ea... x Cirele.rhv Thursday, May 30, 2013, 2:49 PM
RECEIVED
MAY 2 1 A13
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development. Inc
I6urnsville Heating & A/C Inc 3580 Lenll, uU : Circle
`_♦3urnsville, 1%1N 553,37 _ _ Page 18
System 1, Zone 2 Summary Loads (Peak Load Procedure for Rooms)
Component Area Sen Lat Sen Total
Description-_-__ Quan Loss __----Gain _ Gain Gain
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 117 3,155 0 3,669 3,669
SHGC 0.35
hbt: Glazing-hbt, ground reflectance = 0.23, u-value 0.31, 58.5 1,577 0 617 617
SHGC 0.35
12E-Osw: Wall-Frame, R-19 insulation in 2 x 6 stud 852.4 5,042 0 893 893
cavity, no board insulation, siding finish, wood studs
R-5 wall: Wall- 406.4 2,404 0 426 426
RC Rim Joist: Wall-Frame, Custom, RC Rim joist 222.6 1,608 0 284 284
21A-32-v: Floor-Basement, Concrete slab, any thickness, 1520 2,645 0 0 0
2 or more feet below grade, no insulation below floor,
vinyl covering, shortest side of floor slab is 32'wide
-
Subtotals for structure: 16,431 0 7,058 7,058
People: 0 0 0 0
Equipment: 0 0 0
Lighting: 0 0 0
Ductwork: 2,387 0 867 867
Infiltration Winter CFM: 76,._Summer CFM:_40 _ 7,014 931 _ 557 _1,488
System 1, Zone 2 Load Totals: 25,832 931 8,482 9,413
Check Figures _ _ .......i
Supply CFM: 397 CFM Per Square ft.: 0.261
Square ft. of Room Area: 1,520 Square ft. Per Ton: 1,938
Volume (W) of Cond. Space: 13,680
Zone Loads
Total Heating Required: 25,832 Btuh 25.832 MBH
Total Sensible Gain: 8,482 Btuh 90 %
Total Latent Gain: 931 Btuh 10 %
Total Cooling Required: 9,413 Btuh 0.78 Tons (Based On Sensible + Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
\\SBS201 1 \Redirected Folders ...\Ron Clark Ea x Cir¢le.rhv Thursday, May 30, 2013, 2:49 PM
4
RECEIVED
New Construction Energy Code Compliance Certificate MAY 31 `2013
Per N1101.8 Building Certificate. A building certificate shall be posted in a permanently visible location inside Date Certificate Posted
the building. The certificate shall be completed by the builder and shall list information and values of
components listed in Table N1101.8.
Mailing Address of the Dwelling or Dwelling Unit city
3580 Lemieux Circle Eagan
Name of Residential Contractor MN License Number
Ron Clark Construction & Design 1220
THERMAL ENVELOPE RADON SYSTEM
Type: Check All That Apply X Passive (No Fan)
w
o ~
Active (With fan and monometer or
other system monitoring device)
~ U y
W fA abi U -C r.
m C O 0
Insulation Location ° z °
cG ~ ~ w
o? o a a o 75~ 72
cl:
F z w w a: a? Other Please Describe Here
Below Entire Slab X ,
Foundation Wall R-5 X Exterior
Foundation Wall At Walk Out R-10 X Interior
Rim Joist (Foundation) R-12 X Interior
Rim Joist (I" Floor+) X
Wall R-19 X
Ceiling, flat R-44 X
Ceiling, vaulted X
Bay Windows or cantilevered areas R-30 X
Four Season Porch Above Unconditioned Space R-35 X X F.G or8lownR30 / 1"Rigid R5
Describe other insulated areas
Windows & Doors Heating or Cooling Ducts Outside Conditioned Spaces
Average U-Factor (excludes skylights and one door) U: 0.31 x Not applicable, all ducts located in conditioned space
Solar Heat Gain Coefficient (SHGC): 0.35 R-value R-8 in garage area
MECHANICAL SYSTEMS Make-up Air Select a Type
Appliances Heating System Domestic Water Heater Cooling System X Not required per mech. code
Fuel Type GAS Electric R-41 OA Passive
Manufacturer Bryant Marathon Bryant Powered
Interlocked with exhaust device.
Model 912SB48080S17 MR105245 CA13030 Describe:
Input in 80,000 Capacity in 105 Output in 2,5 Other, describe:
Rating or Size BTUS: Gallons: Tons:
Heat Loss: 51,755 Heat 19,437 Location of duct or system:
Structure's Calculated Gain:
AFUE or 92% SEER: 13
HSPF%
Calculated 22,474
Efficient cooling load: Cfin's
" round duct OR
Mechanical Ventilation System "metal duct
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air Combustion Air Select a Type
source heat pump with gas back-up furnace): Not required per mech. code
Select Type X Passive 6" Flex
X Heat Recover Ventilator (HRV) Capacity in cfins: Low: 64 High: 150 Other, describe:
Energy Recover Ventilator (ERV) Capacity in cfins: Low: High: Location of duct or system:
Continuous exhausting fan(s) rated capacity in cfins: Basement
Location of fan(s), describe: Cfin's
Capacity continuous ventilation rate in cfins: " round duct OR Flex
Total ventilation (intermittent + continuous) rate in cfrns: " metal duct
Created by BAM version 052009
411'.
City of Eaali
Mike Maguire
Mayor
Paul Bakken
Cyndee Fields
Gary Hansen
Meg Tilley
Council Members
Dave Osberg
City Administrator
Municipal Center
3830 Pilot Knob Road
Eagan, MN 55122-1810
651.675.5000 phone
651.675.5012 fax
651.454.8535 TDD
Maintenance Facility
3501 Coachman Point
Eagan, MN 55122
651.675.5300 phone
651.675.5360 fax
651.454.8535 TDD
www.cityofeagan.com
The Lone Oak Tree
The symbol of
strength and growth
in our community.
August 02, 2013
Ron Clark Construction
7500 W 78th St
Edina, MN 55439
RE: 3580 Lemieux Circle
Lower level finish
Dear Habib:
This letter is in regards to an addendum of permit #110770 for the Lower level Finish at
3580 Lemieux Circle. Upon reviewing the plans, additional charges and inspections are
required. Please see detailed fees to be collected below. Fees must be paid prior to
any inspections.
Fee Type
Amount Due
Base Fee
$522.00
Plan Review
$339.90
TOTAL
$861.30
Thank you in advance for your attention to these matters. If you have any questions in
regard to the additional permit charges or this letter please contact Building Inspections
at (651) 675-5675.
Sincerely,
Clerical Technician
Cc: Jeff Wheeler, Building Inspector
Gity of Eagall
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
Use BLUE or BLACK Ink
For Office Use
Permit #:
Permit Fee: l:� �1i Li/
Date Received:
Staff:
2013 RESIDENTIAL BUILDING PERMIT APPLICATION
Date:14CW,
Site Address: 'o - $"111£t)X Unit#:
1:P13
l
Name: C,L,. C Cm4..15TI. ?('IESien& J, Phone:1cj2.41411.3vScS,
Address / City / Zip: -1,5c:10 LAI mercii...iA ,r 5541
Applicant is: toOwner (%Contractor
Description of work:
Construction Costs 2 5j, oak, Multi -Family Building: (Yes ,/ No _)
Company: S44 -#TE ►/'G_
Contact:
Address: City:
State: Zip: Phone:
License #: Lead Certificate #:
If the project is exempt from lead certification, please explain why: (see Page 3 for additional information)
COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING
In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan?
Yes /No If yes, date and address of master plan:
Licensed Plumber: T1I.,/S4{J.C110-•
Mechanical Contractor: 'bjV2t6...,L './+
Sewer & Water Contractor: OW?.
Phone:q 5Z,. .4C 2.
Phone: 'T 2. me4. ODC5
Phone:
P%ansa al suRpof#i%ig' ocdmentsonat
formation=rnay be,c/assified asenon-
F;r' c. '9:37 ` . ..`F 'rte
> ---t'''2 . : zcoi?Chi e
CALL BEFORE YOU DIG. Cali Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours
before you intend to dig to receive locates of underground utilities. www.aopherstateonecall.ora
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180
days of permit issuance. ,
K 1-4A2,11 17�.JI IC.
4pplicant's Printed Name
sCgigna ure
Page 1 of 3
SUB TYPES
Foundation
Single Family
Multi
01 of Plex'
Accessory Building
WORK TYPES
New.
Addition
Alteration
_ Replace
Retaining Wall
DESCRIPTION
Valuation
Plan Review
(25%__ 100% Y )
Census Code
73CW Le efri t ,e u . C-
DO NOT WRITE BELOW THIS LINE
_ Fireplace
— Garage
Deck
Lower Level
_ Porch (3 -Season) _ Storm Damage
Porch (4 -Season) _ Exterior Alteration (Single Family)
Porch (Screen/Gazebo/Pergola) _ Exterior Alteration (Multi)
_ Pool _ Miscellaneous
Interior Improvement
Move Building
Fire Repair
Repair
# of Units
# of Buildings
Type of Construction
REQUIRED INSPECTIONS
Footings (New Building)
Footings (Deck)
Footings (Addition)
Foundation
Drain Tile
Roof: Ice & Water _Final
Framing
Fireplace: _Rough In
Insulation
Sheathing
Sheetrock
Reviewed By:'
RESIDENTIAL FEES
Base Fee
Surcharge
Plan Review
MCES SAC
City SAC
Utility Connection Charge
S&W Permit & Surcharge
Treatment Plant
Copies
Occupancy
Code Edition
Zoning
Stories
Square Feet
Length
Width
Air Test _Final
TOTAL
A-31
Siding
Reroof
Windows
_ Egress Window
Demolish Building*
_ Demolish Interior
Demolish Foundation
Water Damage
*Demolition of entire building — give PCA handout to applicant
Pa
MCES System
SAC Units
City Water •
Booster Pump
PRV
Fire Sprinklers
Meter Size:
Final / C.O. Required
1 Final / No C.O. Required
HVAC Gas Service Test Gas Line Air Test
Other:
Pool: _Footings Air/Gas Tests _
. Siding: _Stucco Lath _Stone Lath
Windows
Retaining Wall: _ Footings _ Backfill
Radon Control
Erosion Control
Building Inspector
Final
Brick
Final
Page 2 of 3
PERMIT
City of Eagan Permit Type:Building
Permit Number:EA112692
Date Issued:08/22/2013
Permit Category:ePermit
Site Address: 3580 Lemieux Cir
Lot:8 Block: 03 Addition: Pearlmont Heights
PID:10-56950-03-080
Use:
Description:
Sub Type:Fireplace
Work Type:Gas Fireplace (new)
Description:
Census Code:434 -
Zoning:
Square Feet:0
Occupancy:
Construction Type:
Comments:Improvements to the home may require smoke detectors in all bedrooms. Chimney / flue must be inspected prior to
concealing.
Carbon monoxide detectors are required by law in ALL single family homes .
Mallory Miller
Fee Summary:BL - Base Fee $3K $88.50 0801.4085
Surcharge - Based on Valuation $3K $1.50 9001.2195
$90.00 Total:
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Contractor:Owner:- Applicant -
Pearlmount Heights Llc
7500 78th St W
Edina MN 55439
Hearth And Home Technologies
2700 N. Fairview Ave
Roseville MN 55113
(651) 638-3309
Applicant/Permitee: Signature Issued By: Signature
City of hop
Address: 3580 Lemieux Circle
Zip: 55122 Permit #: 110770
The following items were / were not completed at the Final Inspection on: NOVeL 1 - 2 , 2ol3
Final grade - 6" from siding
x
Permanent steps — Garage
Permanent steps — Main Entry
Permanent Driveway
x
Permanent Gas
Retaining Wall or 3:1 Max Slope
Sod / Seeded Lawn
Trail / Curb Damage
Porch
Lower Level Finish
Deck
FireplacT t)
• Verify with your builder that roof test caps from the plumbing system have been removed.
• Turn off water supply to the outside lawn faucets before freeze potential exists.
• Call the Engineering Department at (651) 675-5646 prior to working in the right-of-way or installing an
irrigation system.
Building Inspector: e r
C-khiem
G:\Building Inspections\FORMS\Checklists
P . viet-
• � • RECEIVED
For Office Use f � a
� A2A
� �( SQ!
F'0 :ze:
Date Received: ✓ - itr
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810
(651)675-5675 I TDD:(651)454-8535 I FAX:(651)675-5694 Staff:
buildinginspections(a�cityofeagan.com L
X,,A1
2018 RESIDENTIAL BUILDING PERMIT APPLICATION
Date: .3 1,Y l r Si Site Address: Unit#:
Name:AkLY ) Poppe4 (?)s--1(05, -'M 1� .%() Phone: C51- C38- 735(0
Resident/
Own r Address/City/Zip: 35-74 3 S7', 3,Sso; 35'76', 357i /-ep'ix(2 X CI1, ivuj f,sizes
Applicant is: Owner X Contractor
A Description of work: is Ft t$TG>NL 1 'Aei 12-f7;47 NT ,GAG- l l
Type of Mori`;;
Construction Cost: SZ 000, OO Multi-Family Building:(Yes ,X /No
Company: I (LI Id P 2 SA!! ( j:S Y A) Contact: --rid
M(�ri-77Z c2 i/
, ejO Mu1.7 lt_`` Address: I7�J J S 5 /U/j 1"7_ /J4,) sir* 11 City: /f ' ?ivtG�t_1i
State:Mt) Zip: ,s-7,3-0(05, Phone: 4..3/ -‘10. ,?l 7Email: r,(j2(,7J 406 Lid et-414-5.'1"S, tail/
License#: Lead Certificate#: AY4
If the project is exempt from lead certification, please explain why:
COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING
In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan?
Yes No If yes,date and address of master plan:
Licensed Plumber: Phone:
Mechanical Contractor: Phone:
Sewer&Water Contractor: Phone:
Fire Suppression Contractor: Phone:
;NOM Plan nd supporting documents that yo submit a m s'idered to be pabii 5 ation. a _ , y .
classifif s non public if t u provides•_
� sans that would perrnr�� icy to conclude that,i d 7:_... k=*,
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's
website at www.citvofeagan.com/subscribe.
Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180
days of permit issuance.
CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you
intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq
I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approvedplanin the
case of work which requires a review and approval of plans.
Applicant's Printed Name )Pficants Sigpaure
DO NOT WRITE BELOW THIS LINE k{ (..k, i 40 D 6 .
SUB TYPES
Foundation _ Fireplace _ Porch(3-Season) _ Exterior Alteration(Single Family)
_ Single Family Garage Porch(4-Season) _ Exterior Alteration(Multi)
_ Multi _ Deck _ Porch(Screen/Gazebo/Pergola) Miscellaneous
01 of Plex Lower Level Pool Accessory Building
WORK TYPES
_ New _ Interior Improvement _ Siding _ Demolish Building*
_ Addition _ Move Building _ Reroof _ Demolish Interior
_ Alteration _ Fire Repair _ Windows _ Demolish Foundation
Replace _ Repair _ Egress Window _ Water Damage
Retaining Wall *Demolition of entire building-give PCA handout to applicant
DESCRIPTION
Valuation J 5^2-) ." Occupancy MCES System
Plan Review Code Edition #44 Z°IS— SAC Units
(25%_100%ld) Zoning ?D City Water
Census Code Stories Booster Pump
#of Units Square Feet PRV
#of Buildings '2 Length Fire Suppression Required
Type of Construction ' V Width
REQUIRED INSPECTIONS
Footings (New Building) Meter Size:
Footings (Deck) Final/C.O. Required
Footings (Addition) Final/No C.O. Required
Foundation Foundation Before Backfill HVAC Gas Service Test Gas Line Air Test
Roof:_Ice &Water Final Pool:_Footings _Air/Gas Tests _Final
Framing 30 Minutes 1 Hour Drain Tile
Fireplace: Rough In Air Test Final Siding: _Stucco Lath Stone Lath _Brick_EFIS
Insulation Windows
Sheathing 1, Retaining Wall: O Footings ? Backfill O Final
Sheetrock Radon Control
Fire Walls Fire Suppression: Rough In_Final
Braced Walls Erosion Control
Shower Pan Other:
r- - jj
Reviewed By: C ' 17 A,!' 0//
cyn! , Building Inspector
RESIDENTIAL FEES
Base Fee
Surcharge
Plan Review
MCES SAC
City SAC
Utility Connection Charge
S&W Permit&Surcharge
Treatment Plant
Copies
TOTAL
Page 2 of 3
.
i
o riy nFyy ro
6/CH
r
Z why Ny N... Pw DTw2y4 OP N O4 9� 0.9_T 95.:.P �Z N -.M ti
„ mmzmmmaR� FSFSFmyr� -,5 g Eizmz c mF �.Ep�FJipJ
wmT = g8rZ0il 7m20o3m' Rt % c AD g4voPoPyoZ> 0. &' ry
CA 1dg 2 045ogo c28e Maw n v„0voS.l 6i°2 �i mr2'"� -M' b y °
n'< m i m mm 3C) °w-m cv vAi602;9m TF NNlm„ m-com= m r
�+•• T °r z Zvm �O fnr(�m mpv �i�$p � pA�g�y szs >F>°lqTny�Nz "
= .T 9 2 °-z zZ pZt: A y i O m lAZp AF y0_O�y1y�17� m ° 7d
O��_ Z Z�41N 1�11pp20 "T-yyy -SVN< pp9 �fl°- rN-IZti 7i y�"�'�
z p<n2N m mO20�� Fv.T� mm^vO�W �N000 IIImjN8p3C���1I~8pZ �l~il� y � 1111,g
,P Pe gp Nm.mU;cm 1p0^'m PNWP
o NP1§n1'8WW1 zy m y�
PO �mri k FNNSczi z�.+ig omo (c. CiZ, . 1 em s oze3 FBI* hi O "" a l..
z m €3z Wig �azczT o o C O
W 1yzN- m mrrFwm 0 a $Dr a qh ° iz opggg�v°zW8 to z y
y xx v,Ni w mo m LLo zvtc � 3�ym w N� vzi m oF-i r_ yy s
8 L-i $i o o roil; Fmv'm pw 6Tmz 0_a < my4QQQ /b P g Z 0
'd m A T v ym ;RM
<„-r., _,0.-.QQ .mQc, ZFz �n�3 V] 0 0
vz.7,Ota "42 p o AN
8R y.. FIT8zigv o2S Qr'6o2 W O"-'IIoFF �'
,��Z.0, 'd <= 8Z m yAy f3 iqy pM87:3 yNa h mz2 'nm9mm�r=OygO2 �n 4 8 v
graG p5g N $ OOTmL A 1°i1G Co9oymy <m C. my.'Orgzmam C0
aO° yqz z 0z az�2 g ow anig5,zmp=w pa F=N0�60 A R Y.1 x
`,!..A n.O P 6 C s 500 - P" •is pm- m PE,
OA�N ~0 V (' ^n1'
WO N ~ 'Do N O OZZT 02Q0Q01�1��2mT pZ NT O�Op��9 y `�. V_
NO g gg y Fm_ Fmzr<mQ�O Ptmn DSzp mri�0
t. .ry •• z � A gz o AMEs* yop z_z zT pF AII5Joc_z 0 0 til
;3Eirce m gi g z z C) z��z ,vis =w o,(, ,2-i5.UA C y U
yy Z y m<I T(�m m 6^�TI^im o mJmC yrm �/� p
stn fyyy N � N mA C �Oi S6Qf° IZIIrN Z<fdi F3m 27J <fNOANm �"y Vl ` e
ate, c 1 e TA z "�I, Ftt m�_R{i,a� r-ir ms z' mZF.°v m w 1--I V
oi. of $ <o m _oppc m sp28 'Rv z F P C j�
[Y� T °z g If
r g ri w . "6
m m • o V
w< z Nm
!A
le 53 ypp ET, 0 . H d y tri ,--'-3
J
x
bli
7dz y ' o H /› r ~4 /ft.
ry•y o2. L� �.• y > y ..y`
tli tell
VI
o r" N o 4 cn�
y H 4-tzG1 yr hR 4Q � 1
90 y � r A
05,g .3 '8 g 0 vl x t7
r'"4 z a ,..3 �"" Q
a m R 4 i I
1 5 1 o A S IV c ° H0°7.1 1
0 0— a 1:\)
wo �rfl ° , VI to
wd
DD 00 W
E; 2 }�• byr/il � n5 88Mm r0 8 V�
1 14 ti,
, lo Ory CSC P tor, ed' Ale 74 0 01 1
.
:43
"n
ti i H tilt. 0*
" F'..I t-1 NNN "^ Vz con
WWtY OO yU00WJ O gl0\0 : . �f ` R y0 , rN o o N M, '+ z` f�
r, — „4 g ,..i ___t_.
t., t., ,
7
1 iRf itr, :9-.q. ..3 i . 71 0-3
M: ot -i• ;: :-0
am.m "C' 0 ,.4,
R
�y t
r^ 0 co
aV00pW� W • OD 'y, y O O O O O O co `
a •
k Cn R. -----ELEV.IN FEET ��LEV.IN FEET
N xi mre„,2
o $ •
to O
0
0��
• r �-1 9
r ; - G wC . IS co
1, 0, II 47
in 6 • til 0
xo,,or z r z z
O°mac , y t71N map firi
b,,...��..11 rii4
oH� O 6 o-
E H- 4p _ i
i it-• t$1 -
G -i
2 t oO t
^ 11
tel` ' y C G II , II n, 1 I 0
'al
a i7J S. � o 99.
. h
C/� g n to n 0 0 C/)
51
m tri izi s4,5
x °
0 10� �,I. �, Ogoo y o
•] '• N
7
a w go- 4 g0 � o
x
E
FY.. N d
z' O II�R, 11 ) G° o-
O� y
pg
1 - o0oby p C+'1
(g Z3S
0.0
W N ° O 0
4 O g
w g b o 0
0 y�1
Vii !Ai
_ °°°I HN
I c-,\,\, r u, _ . 0
A
N
gg Q •
OmOzyoss9 ���
66,, ``��z (� r,_m 1p ..7'C'u RI y” O
Kcc O
HOs 7ylpe
od „
§imI
8
o �yz a,00
"� Cpz
44 Gee -
060.
10
MVryZ P >
�y'�' G C 11 A 04
r •
0 O
5' p S=L' 4 4
E,1n
K t.„
w ��G
n••
�
v xg
o
on r
gM
O0,Oq z n e m
R > o
�
ot7 N
�oH:4,o tri CA OZ i 5Am6
CT I
II : tee. am
li
L � <N od qi
N _ IIPiD
xII I :11All"I
)1 ;Ix
trio bo g g III
x M6
li1.
°n,
-I IL
....IN. c\i\:
I
re
II
),)
v ��9 �,� Z' + + Q W Z co� 5
\ O • .M g v Z coD CO
• h� 1 \cts I,
' 6.f; >- 2 d v
Q , s ea \ • G k Q w D 4- <o
Cr .,! a \oN� C o goo SZ
O \ .off ` \ O4 .Z7 I ° Q a H3 z
Z J Ui
i....,._�'� � . ' \ 30 , , ..,4 4 ..\ N...,,:\ ,...,_ \ \ \ \ lil
1- u.c LIcoLu iZ Z - O z
\ 7-- 'c'\ t \
W z �1 " 1\' �' ' \ e- w�1 ec
} �\ Q m. • � ws 1 n 1 \ �tiq O
-M9 4441 ;:-ec .
er
\,,,4:37
�— V� Z� '` '`o w o w 14-1 C.) C-----C) 4 .-
...:,,..,
..., icB ce cn
W �� �- �:`� t vsw Z = z15 a ZD _a Ili
a
0 Z WQ j : / C7t�V
It .o� /!.
H / �Qcn
v.... oc J ro I / a wli
Qt,,e
co Lc. / )i
W
°0 co v) / \\ \\\� �6' ° 3
o't,).--141-, ,... , / -I co - • \ \\\ZN6S9'9'
ct
W b% 53
tf.t '' . \ �8 1+ N_
a.
- t., I c-.) i t lc, 11 41 i''./-P•i . V' .--- \ \ \\..c-j„
%f . t !-.1t \ `° z W o
j4J i s ',0 iu O % Uzz_ , o
T Y_�.
cs o o v x ( I' I' o• \ M a c5 o i
0 Z r f J CC CQ Z Z Z �u r
Nc
.,W Iro 00 1 j , II K 0 4. W 4J m O r
kJ CO ' i jq l' '' T ,' , osa-.� Wim' 00Z O O E.
kJ 0
---N/.1 1 ( . ,--ij ii; 1 \ ci'l=i*— 0 13.
tt
0
Ut,
�
m. � s 9g —S$' I ((O 4' ".'
;.......„9 t%.1....L, 0) ._ ;bH..,, I
...! k , ;
�z s� -r1 )its ;\ :� B65 __
FC
°08 pa 5 X04 +A,'\ I _ % g67 Q N '3
IS 03 m ' 868 �_ II
\��'� ° a _-- 889 1`- -Ce
-.
J . m4 ^ \ —87a� –�
\ u) u;a 4 1
.....4 N 4. $4, (1- -I-- I \coar rtsfA(kw?ik' )fd.ii )
� ' �Z �4. 20 ' • - ii'' g .
:� i Q
ct W m , I / } 0,6 --=
t • �{F7 r
O� 1 O
kJ 0 r CO 1:::1)
n 8
O / r '. \. \ f I V r`
c
n.,; \ '
oW \ \ a) eV, re,05 I M Z a
�� E
PERMIT
City of Eagan Permit Type:Building
Permit Number:EA179547
Date Issued:10/10/2022
Permit Category:ePermit
Site Address: 3580 Lemieux Cir
Lot:8 Block: 03 Addition: Pearlmont Heights
PID:10-56950-03-080
Use:
Description:
Sub Type:Windows/Doors
Work Type:Overhead Garage Door
Description:
Census Code:434 - Residential Additions, Alterations
Zoning:
Square Feet:0
Occupancy:
Construction Type:
Comments:Improvements to the home require smoke detectors in all bedrooms. If altering window openings, call for framing
inspection. Call for final inspection after installation.
Carbon monoxide detectors are required within 10 feet of all sleeping room openings in residential homes (Minnesota State
Valuation: 1,500.00
Fee Summary:BL - Base Fee $1500 $62.50 0801.4085
Surcharge - Based on Valuation $1500 $0.75 9001.2195
$63.25 Total:
This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Contractor:Owner:- Applicant -
Leonard & Judith Haseman
3580 Lemieux Cir
Eagan MN 55122
Twin City Garage Door Co
5601 Boone Avenue North
Minneapolis MN 55428
(763) 533-3838
Applicant/Permitee: Signature Issued By: Signature