Loading...
3198 Riverview Ave ~g Use BLUE or BLACK Ink : I-----------------I iQ~ I + I to~ / I0) ~tf I For Office Use / City o EaRao~ ( i i I Lo! L~1 cy~ i Permit#: 3830 Pilot Knob Road Permit Fee: I I Eagan MN 55122 1 Date Received: J Phone: (651) 675-5675 - Fax: (651) 675-5694 Staff. , 1---- ------------1 2013 RESIDENTIAL BUILDING PERMIT APPLICATION Date: 04-22-2013 Site Address: 9 lit V C r'V~'e_,_J tj V'- Unit Name: Inver Hills Family Housing LP Phone: 612.675.4400 Resident/ Owner Address / City / Zip: 1228 Town Centre Drive. Eagan MN Applicant is: Owner X Contractor Type of Work Description of work: 27 unit slab on grade. Multi-family residential building. Construction Cost: 3 Y/? Company: Eagle Building Company LLC Contact: Chad Weis Contractor Address: 730 Stinson Blvd. Suite 200 City: Minneapolis State: MN Zip: 55413 Phone: 612.378.1115 License Lead Certificate If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? _Yes X No If yes, date and address of master plan: Licensed Plumber: Superior Mechanical Phone: 507-289-0229 Mechanical Contractor: Superior Mechanical Phone: 507-289-0229 Sewer & Water Contractor: Quiring Excavating Phone: 612-490-8111 NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. Ile, x Chad Weis x Applicant's Printed Name Applicant's Signature Page 1 of 3 s' e DO NOT WRITE BELOW THIS LINE SUB TYPES 3) 7r t i0e e - Foundation - Fireplace - Porch (3-Season) _ Storm Damage - Single Family - Garage - Porch (4-Season) _ Exterior Alteration (Single Family) _ Multi _ Deck Porch (Screen/Gazebo/Pergola) -Exterior Alteration (Multi) 01 of -~Plex - Lower Level - Pool - Miscellaneous _ Accessory Building WORK TYPES New _ Interior Improvement _ Siding _ Demolish Building* -P Addition Move Building Reroof Demolish Interior Alteration Fire Repair Windows Demolish Foundation Replace Repair Egress Window Water Damage _ Retaining Wall *Demolition of entire building - give PCA handout to applicant DESCRIPTION M YZ - Z, Valuation Occupancy v MCES System Plan Review Code Edition tnP IV23 17 SAC Units _ (25°/x_100% Zoning City Water Census Code Stories Booster Pump # of Units- Square Feet L(L PRV # of Buildings ' Length Fire Sprinklers Type of Construction ✓6 Width REQUIRED INSPECTIONS Footings (New Building) Meter Size: Footings (Deck) Final / C.O. Required Footings (Addition) Final / No C.O. Required ~C Foundation HVAC Gas Service Test Gas Line Air Test Drain Tile Other: Roof: `Ice & Water Final Pool: `Footings `Air/Gas Tests Final Framing Siding: -Stucco Lath Stone Lath Brick Fireplace: Rough In -Air Test -Final Windows Insulation Retaining Wall: Footings Backfill Final Sheathing _f Radon Control Sheetrock _,Y _Erosion Control Reviewed By: 1" Building Inspector RESIDENTIAL FEES Base Fee t".°yvf Q ~`I" 2j Surcharge I m Plan Review. MCES SAC (L/~ City SAC ft6lfz, Utility Connection Charge S&W Permit & Surcharge Treatment Plant / a Copies TOTAL Page 2 of 3