Loading...
3212 Riverview Ave Use BLUE or BLACK Ink j I l ~6< ~ For Office Use I EaRao /DO" ~ Permit P! J Permit Fee: 6-713. 3830 Pilot Knob Road J I O Eagan MN 55122 I Date Received: > - I Phone: (651) 675-5675 I Fax: (651) 675-5694 Staff: I 2013 RESIDENTIAL BUILDING PERMIT APPLICATION Date: 04-22-2013 Site Address: 161c ('1/i cvJ _ Unit Name: Inver Hills Family Housing LP Phone: 612.675.4400 Resident/ Owner Address / City / Zip: 1228 Town Centre Drive Eagan MN Applicant is: Owner X Contractor Type of Work Description of work: 27 unit slab on grade. Multi-family residential building Construction Cost: 13 3 S 7,5 Company: Eagle Building Company LLC Contact: Chad Weis Contractor Address: 730 Stinson Blvd. Suite 200 City: Minneapolis State: MN Zip: 55413 Phone: 612.378.1115 License Lead Certificate If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? _Yes X No If yes, date and address of master plan: Licensed Plumber: Superior Mechanical Phone: 507-289-0229 Mechanical Contractor: Superior Mechanical Phone: 507-289-0229 Sewer & Water Contractor: Quiring Excavating Phone: 612-490-8111 NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DI Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. x Chad Weis x Applicant's Printed Name Applicant's Signature Page 1 of 3 r DO NOT WRITE BELOW THIS LINE I D SUB TYPES 3Z IZ- ~r ✓Ql Vl^ e L.) - Foundation - Fireplace - Porch (3-Season) - Storm Damage - Single Family - Garage Porch (4-Season) _ Exterior Alteration (Single Family) - Multi _ Deck _ Porch (Screen/Gazebo/Pergola) _Exterior Alteration (Multi) 01 of 3 Plex - Lower Level _ Pool - Miscellaneous Accessory Building WORK TYPES New _ Interior Improvement _ Siding _ Demolish Building* Addition Move Building Reroof Demolish Interior Alteration Fire Repair Windows Demolish Foundation Replace _ Repair _ Egress Window _ Water Damage _ Retaining Wall *Demolition of entire building -give PCA handout to applicant DESCRIPTION 12 --z Valuation Occupancy MCES System Plan Review Code Edition SAC Units (25%_100% ) Zoning City Water Census Code Stories Booster Pump # of Units ` Square Feet PRV # of Buildings Length Fire Sprinklers Type of Construction Width REQUIRED INSPECTIONS Footings (New Building) Meter Size: Footings (Deck) 4Final / C.O. Required Footings (Addition) Final / No C.O. Required Foundation HVAC Gas Service Test Gas Line Air Test Drain Tile Other: Roof: -Ice & Water Final Pool: Footings `Air/Gas Tests Final Framing Siding: `Stucco Lath Stone Lath Fireplace: Rough In -Air Test -Final Windows -X-Brick Insulation Retaining Wall: Footings Backfill Final 4Sheathing Radon Control --pheetrock Erosion Control Reviewed By: Building Inspector RESIDENTIAL FEES Base Fee Surcharge '~^^11 Plan Review ox q MCES SAC City AC 0 5,Qd Utility Connection Charge (V S&W Permit & Surcharge Treatment Plant Copies t TOTAL Page 2 of 3