Loading...
3162 Riverview Ave s G Use BLUE or BLACK Ink S~ For Office Use Permit I City o Ea I I Permit Fee: ~6~1-77 0 3830 Pilot Knob Road Eagan MN 55122 ► 1,1 Date Received: 1 Phone: (651) 675-5675 l 1 Fax: (651) 675-5694 Staff: 0 2013 RESIDENTIAL BUILDING PERMIT APPLICATION Date: 04-22-2013 Site Address: ~ 1 CP Z- _ kk\L*fVre-") V 1 V e - Unit " Name: Inver Hills Family Housing LP Phone: 612.675.4400 Resident/ t Owner Address / City / Zip: 1228 Town Centre Drive. Eagan MN Applicant is: Owner X Contractor r Description of work: 27 unit slab on grade. Multi-family residential building. Type of Work Construction Cost: 3 7 Company: Eagle Building Company LLC Contact: Chad Weis Contractor Address: 730 Stinson Blvd. Suite 200 City: Minneapolis State: MN Zip: 55413 Phone: 612.378.1115 License Lead Certificate If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? _Yes X No If yes, date and address of master plan: Licensed Plumber: Superior Mechanical Phone: 507-289-0229 Mechanical Contractor: _Superior Mechanical Phone: 507-289-0229 Sewer & Water Contractor: Quiring Excavating Phone: 612-490-8111 NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. _ Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. x Chad Weis x Applicant's Printed Name Applicant's Signature Page 1 of 3 DO NOT WRITE BELOW THIS LINE ~C ✓V i t4') B T~ YPES Storm CD✓amage i Foundation - Fireplace - Porch (3-Season) - Porch (4 Season) - Exterior Alteration (Single Family) Single Family -Garage - _ Multi _ Deck _ Porch (Screen/Gazebo/Pergola) -Exterior Alteration (Multi) Lower Level Pool _ Miscellaneous 01 of Plex - - T Accessory Building WORK TYPES Demolish Building* Interior Improvement 9 New - - Siding - Move Building Reroof Demolish Interior Addition - Alteration Fire Repair Windows Demolish Foundation - Water Damage Replace - Repair _ Egress Window - Retaining Wall *Demolition of entire building - give PCA handout to applicant DESCRIPTION Valuation Occupancy MCES System Code Edition SAC Units Plan Review City Water (25%_100%) Zoning Stories Booster Pump Census Code PRV # of Units Square Feet Length Fire Sprinklers # of Buildings Type of Construction Width REQUIRED INSPECTIONS Footings (New Building) Meter Size: Footings (Deck) Final I C.O. Required Footings (Addition) Final I No C.O. Required HVAC Gas Service Test Gas Line Air Test Foundation Drain Tile Other: Roof: -Ice & W ater Final Pool: -Footings `Air/Gas Tests Final Framing Siding: -Stucco Lath Stone Lath Brick Fireplace: Rough In -Air Test -Final Windows Insulation Retaining Wall: Footings Backfill Final Radon Control Sheathing Erosion Control 4"Sheetrock Reviewed By: , Building Inspector RESIDENTIAL FEES r~ Base Fee i t ° J Y Surcharge rrtt Plan Review V MC ESSAC cfi 121 City SAC Utility Connection Charge t S&W Permit & Surcharge Treatment Plant Copies TOTAL Page 2of3