3162 Riverview Ave s
G Use BLUE or BLACK Ink
S~ For Office Use
Permit I
City o Ea I I Permit Fee: ~6~1-77 0
3830 Pilot Knob Road
Eagan MN 55122 ► 1,1 Date Received: 1
Phone: (651) 675-5675 l 1
Fax: (651) 675-5694 Staff:
0
2013 RESIDENTIAL BUILDING PERMIT APPLICATION
Date: 04-22-2013 Site Address: ~ 1 CP Z- _ kk\L*fVre-") V 1 V e - Unit "
Name: Inver Hills Family Housing LP Phone: 612.675.4400
Resident/
t Owner Address / City / Zip: 1228 Town Centre Drive. Eagan MN
Applicant is: Owner X Contractor
r Description of work: 27 unit slab on grade. Multi-family residential building.
Type of Work
Construction Cost: 3 7
Company: Eagle Building Company LLC Contact: Chad Weis
Contractor Address: 730 Stinson Blvd. Suite 200 City: Minneapolis State: MN Zip: 55413
Phone: 612.378.1115
License Lead Certificate
If the project is exempt from lead certification, please explain why: (see Page 3 for additional information)
COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING
In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan?
_Yes X No If yes, date and address of master plan:
Licensed Plumber: Superior Mechanical Phone: 507-289-0229
Mechanical Contractor: _Superior Mechanical Phone: 507-289-0229
Sewer & Water Contractor: Quiring Excavating Phone: 612-490-8111
NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of
the information may be classified as non-public if you provide specific reasons that would permit the City to
conclude that they are trade secrets.
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours
before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans. _
Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180
days of permit issuance.
x Chad Weis x
Applicant's Printed Name Applicant's Signature
Page 1 of 3
DO NOT WRITE BELOW THIS LINE
~C ✓V i t4')
B T~ YPES Storm CD✓amage
i Foundation - Fireplace - Porch (3-Season) -
Porch (4 Season) - Exterior Alteration (Single Family)
Single Family -Garage -
_ Multi _ Deck _ Porch (Screen/Gazebo/Pergola) -Exterior Alteration (Multi)
Lower Level Pool _ Miscellaneous
01 of Plex - -
T Accessory Building
WORK TYPES Demolish Building*
Interior Improvement 9
New - - Siding -
Move Building Reroof Demolish Interior
Addition
-
Alteration Fire Repair Windows Demolish Foundation
- Water Damage
Replace - Repair _ Egress Window -
Retaining Wall *Demolition of entire building - give PCA handout to applicant
DESCRIPTION
Valuation Occupancy MCES System
Code Edition SAC Units
Plan Review City Water
(25%_100%) Zoning
Stories Booster Pump
Census Code PRV
# of Units Square Feet
Length Fire Sprinklers
# of Buildings
Type of Construction Width
REQUIRED INSPECTIONS
Footings (New Building) Meter Size:
Footings (Deck) Final I C.O. Required
Footings (Addition) Final I No C.O. Required
HVAC Gas Service Test Gas Line Air Test
Foundation
Drain Tile Other:
Roof: -Ice & W ater Final Pool: -Footings `Air/Gas Tests Final
Framing Siding: -Stucco Lath Stone Lath Brick
Fireplace: Rough In -Air Test -Final Windows
Insulation Retaining Wall: Footings Backfill Final
Radon Control
Sheathing Erosion Control
4"Sheetrock
Reviewed By: , Building Inspector
RESIDENTIAL FEES r~
Base Fee i t ° J Y
Surcharge rrtt
Plan Review
V
MC
ESSAC cfi 121
City SAC
Utility Connection Charge
t
S&W Permit & Surcharge
Treatment Plant
Copies
TOTAL
Page 2of3