2013 MECHANICAL PERMIT APPLICATION
El Please subunit two (2) sets of plans with all commercial applications.
Date: Site Address:
Tenant: Suite 4:
Resident/Owner Name: Phone:
Address t City 1 Zip:
Name:_ License
Address: City: Contractor -
Slate: Ci-1: F')one:
Contact: - Email:
New Replacement Additional Alteration Demolition
Type of Work Description of work:
NOTE: Root mounted and ground mounted mechanical equipment is required to be screened by City
Code. Please contact the Mechanical inspector for information on permitted screening methods.
RESIDENTIAL j COMMERCIAL
Furnace New Construction Interior Improvement
Permit Type -Air Conditioner Install Piping Processed 41
_ Air Exchanger Gas Exterior HVAC Unit
Heat Pump Under/Above ground Tank Install Remove)
Other
s
= RESIDENTIAL FEES
$60.00 Minimum Add or alteration to an existing unit (includes $5.00 State Surcharge)
$100.00 Residential New (includes $5.00 State Surcharge) _ $ TOTAL FEE
G COMMERCIAL FEES
Contract Value $ ~Do x .01
$55.00 Permit Fee Minimum
$70.00 Underground tank installationlremoval = $ Permit Fee
If contract value is LESS than $10,010, Surcharge = $5,00 Surcharge*
**If contract value is GREATER than $10,010, Surcharge = Contract Value x $0.0005
If the project valuation is over $1 million, please call for Surcharge
TOTAL FEE
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance
with the approved plan in the case of work which requires a review and approval of plans.
x ,
x
Applicant's -riinted Name Signature
FOR OFFICE USE g -
Required Inspections: Revlvwed By: \ Date: /
Underground Y Rough In Air Test Gas Service Test In-floor Heat final HVAC Screening
____Use BLUE or BLACK Ink
I
For Office Use C~tt 6 V Eapn 1(a n vt~ Permit
I
I Permit Fee:
3830 Pilot Knob Road I - - I
Eagan MN 55122 I Date Received: ` I S
Phone: (651) 675-5675 I I
Fax: (651) 675-5694 Staff: r'1 1
2013 COMMERCIAL PLUMBING PERMIT APPLICATION
❑ Please submit two (2) sets of plans with all commercial applications.
Date: Site Address: _ 3&r s- r-~4GM~y UV1<-l 1 ~/}n1C t v~,.~, J# ~VV
Tenant:
_ Suite
Property
Owner Name: Phone:
Name: ` WO✓\ 12[LfA6rA( t4,%(- License#: (p7GPyS -Pry1
Contractor Address: 1` (S ~~'h S t d
~ .s City: 6T s State: MA Zip:
Phone: 91Z y3 cY "9100 Email: Gw e U OSv✓) 114-4 . &f1-1,I
Type of Work ~ New -Replacement -Repair _Rebuild - Modify Space - Work in R.O.W.
I
Description of work:
COMMERCIAL New Construction Modify Space
9 _ Irrigation System yes / _ no) RPZ / _ PVB)
• Rain sensors required on irrigation systems
Permit Type . Avg. GPM (2" turbo required unless smaller size allowed by Public Works)
Meters Call (651) 675-5646 to verity that tests passed prior to picking up meter.
Domestic: Size & Type Fire: 1
Avg. GPM High demand devices? Yes No Flushometers Yes No
COMMERCIAL FEES Contract Value $ 100, u tio X.01
$55.00 Permit Fee Minimum
_ $ Permit Fee
*If contract value is LESS than $10,010, Surcharge = $5.00 = $ Surcharge*
**If contract value is GREATER than $10,010, Surcharge = Contract Value x $0.0005
***If the project valuation is over $1 million, please call for Surcharge = $ TOTAL FEE
Following fees apply when installing a new lawn irrigation system $ Water Permit
Contact the City's Engineering Department, (651) 675-5646, for required fee amounts. $ Treatment Plant
$ Water Supply & Storage
$ State Surcharge
TOTAL FEE
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you
intend to dig to receive locates of underground utilities. www.oopherstateonecall.ora
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
x I V-N, Y\ l, uos> x
Applicant's Printed Name Applicant's Signature
FOR OFFICE USE Approved By: Date: l3
Required Inspections: ZU-nder Ground ugh-In _ it Test Gas Test Final PRV Required: - Yes No
Page 1 of 3
Use BLUE or BLACK Ink
2013 SEWER AND WATER CONNECTION AND AVAILABILITY CHARGES
EXISTING COMMERCIAL PROPERTY (if applicable)
Date: FOR OFFICE USE ONLY
Property Owner: _ PRV required
City R-O-W Permit
Address: Phone Number:
County R-O-W Permit
Plumber: Contact Name:
SEWER - WATER
Sewer Service Water Service
Sewer lateral charge Water lateral charge
Sewer trunk Water trunk
City SAC @ $100/unit Water supply storage
MCES SAC @ $2,4351unit Receipt Date:
Receipt Date: Treatment Plant @ $801/unit
Permit Fee $60.00 Permit Fee $60.00
State Surcharge $5.00 State Surcharge $5.00
TOTAL: *Plumbing Permit Required - water meter to be
acquired with building permit TOTAL:
SEWER & WATER
_ Sewer Service
Water Service
Sewer lateral charge
Water lateral charge
Sewer trunk
Water trunk
City SAC
MCES SAC
Receipt # Date
Water supply & storage
Receipt # Date
Treatment plant
Permit Fee $120.00
State Surcharge $5.00
*Plumbing Permit Required - water meter to be
acquired with building permit TOTAL:
Number of SAC units is determined by the Metropolitan Council Environmental Services (651) 602-1000.
Sanitary Sewer Trunk Connection Charge applies if not charged sewer trunk by assessment in the past.
1-5 SAC units 1,780.00 per SAC unit r -----------------I
6-10 SAC units 8,900.00 plus 445.00 per SAC unit over 5 I For Office Use
I I
11+ SAC units 11,130.00 plus 178.00 per SAC unit over 10 I I
Permit
I I
I
Permit Fee:
I I
I
I Date Received: I
I I
L Staff: I
Cc: City of Eagan Finance Department
Page 2 of 3
ity of Eaiali
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
,L) 11‘1°0
2013 COMMERCIAL BUILDING PERMIT APPLICATION
Date: May 16, 2013 Site Address: 3885 Eagan Outlets Parkway (Building 700)
Use BLUE or BLACK Ink
For Office USE*
Permit #: 1 1OCI
, I
44- tiA- 61'1' :
Permit Fee: I •
Date Received: 1) 11 113
Staff:
Tenant Name: Paragon Outlets Cedar Grove
(Tenant is: X New 1 Existing) Suite #:
Former Tenant: N/A
Name: Paragon Outlets Eagan LLC.
Phone: 410-856-1812
Address 1 city / zip: c/o Paragon Outlet Partners LLC. , 217 East Redwood St. - 21st fir.
Baltimore, MD 21202
Applicant Is: X Owner Contractor
Description of work: A new 40,838 s.f. (GBA) shell retail structure including site work
Construction Cost: $4 018,560
Name: Ryan Companies US, Inc.
License It; N/A
Address: 50 South 10th Street, Suite 300 city: Minneapolis
Phone: 612-492-4312
State: MN
Zip: 55403-2012
Contact Brian Kombrink
Email: Brian.Kombrink@RyanCompanies.com
Name: Dal Pos Architects, LLC/Taras Pawliw, AIA
Address: 101 N. Clinton Stree, Suite 300
State: NY
zip: 13202
Registration #: 43971
city. Syracuse
phone: 315-422-0201
contact Person: Dennis E. Cox, AIAEmail: dcox@dalpos.com
U , Exceoiccheln
Licensed plumber instaltin • sewer/water service: .-3113MITfiti
(0S -q -
phone
GALL BEFORE YOU DIG. Call Gopher State One Call at (651)454-0002 for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. wwwdooherstateonecalLorg
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and
codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a
permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans,
x e811:7300.1 Irt (471.33,414_
Applicant's Printed Name
Applicant's Signature
Page 1 of 3
5U5 Ear nALA-s 14-1
DO NOT WRM BELOW THIS LINE
1c10
SUB TYPES
Foundation
V Commercial / industrial
Apartments
Miscellaneous
WORK TYPES
/New
Addition
Alteration
Replace
Public Facility
Accessory Building
Greenhouse / Tent
Antennae
Interior improvement
Exterior Improvement
Repair
Water Damage
Salon Owner Change
DESCRIPTION
gab
Valuation 1, 1'1 II D4'0 Occupancy
Plan Review V Code Edition
(25% 100% V ) Zoning
Census Code Stories
# of Units 0 Square Feet
# of Buildings Length
Type of Construction rf Width
REQUIRED INSPECTIONS
Footings (New Building)
Footings (Deck)
Footings (Addition)
*/ Foundation
,Drain Tile
v/ Roof: Decking I/Insulation Ice & Water Final
Framing
/Fireplace: Rough In Air Test Final
Insulation
Meter Size:
Exterior Alteration -Apartments
Exterior Alteration-Commercizil
Exterior Alteration -Public Facility
Siding Demolish Building*
Reroof Demolish Interior
Windows Demolish Foundation
Fire Repair Retaining Wall
*Demolition of entire building - give PCA handout to applicant
MCES System
SAC Units
City Water
Booster Pump
PRV
4/1-C-Tre:/e—
Fire Sprinklers
Sheetrock
,0/ Final / C.O. Required
Final / No C.O. Required
v/ Other: Pi, -6' 5riPP/A/
Pool: Footings Air/Gas Tests Final
Siding: Stucco Lath Stone Lath /Brick
Windows
/Retaining Wall
,/ Erosion Control
Final C/O Inspection: Schedule Fire Marshal to be present: v
Reviewed By: tin I- Building Inspector
Yes No
Reviewed By: r
Planning
cOMMERCIAL FEES
Base Fee /9 e32. • 75 -
Surcharge 1,1/41•4e
//, 721 -29
Plan Review
MCES SAC
City SAC
S&W Permit & Surcharge
Treatment Plant
Treatment Plant (Irrigation)
Park Dedication
Trail Dedication
Water Quality
7, 7 .
10.
Water Quality
Water Supply & Storage (W
Storm Sewer Trunk
Sewer Trunk
Water Trunk
Street Lateral
Street
Water Lateral
Other:
1141f 109q. 614/ Page 2 of 3
Dale Schoeppner
Chief Building Official
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122-1810
Dear Mr. Schoeppner:
July 2, 2013
1 O
The Metropolitan Council Environmental Services (MCES) Division has determined the SAC to be
charged for the wastewater capacity demand for Paragon Outlets Building 700 to be located at3005 •
Eagan Outlets Parkway within the City of Eagan. 3885'
The City will be charged 4 SAC Units for this project, as determined below.
Charges:
Retail
38,687 sq. ft. @ 3000 sq. ft. /SAC
Credits:
Cedar Grove Phased Development
Net Charge:
SAC Units
12.90
9.00
3.90 or 4
The business information was provided to MCES by the applicant at this time. It is the City's
responsibility to substantiate the business use and size at the time of the final inspection. If
there is a change in use or size, a redetermination will need to be made. If you have any
questions, call me at 651-602-1118 or email karon.cappaert@metc.state.mn.us.
Karon Cappaert
SAC Program Technical Specialist
Environmental Services Division
KC:ms: 130702A9
Determination expiration: 07/02/2015
cc: File, MCES
Amy Griffin, City of Eagan (email)
Salem R. LaHood, Paragon Outlets Eagan, LLC. (email)
390 Robert Street North 1 St. Paul, MN 55101-1805
Phone 651.602.1000 1 Fax 651.602.1550 1 TTY 651.291.0904 1 metrocouncil.org
An Equal Opportunity Employer
M ETROPOI,ITAaN
C. C) ll N C L.
Use BLUE or BLACK Ink
For Office Use
City of Ea an I Permit I
S~
I Permit Fee: ~ • I
3830 Pilot Knob Road I I
Eagan MN 55122 I ;
Phone: (651) 675-5675 I Date Received: / (O )3
Fax: (651) 675-5694 I I
; Staff: ~
2013 FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION*
Date: 09 ) Ztp 1 13 Site Address: 3805 E«4 U., jo, -ir ~s Porkwo,!4
Tenant: Suite
Name: Phone:
Property Owner Address / City / Zip:
Applicant is: Owner Contractor
Type of Work Description of work: new we f •c, EE' r mss; a n S.~se.rn
Construction Cost: S3,000 Estimated Completion Date: to 1
Name: ,Ahrarr, P-rc Prv~C s -t-,on License Co 3!3
Contractor Address: 13'705 24f' Ave.- Su-}c \\n City: nni nne «pa 1 5
State:. M nl Zip: 5-4 44 1 Phone: C-7 62,) 2( .8 115
Contact: Cnc-l1'e N►,`PIC..r Email: C- rn - 1) y-OP, c+hcrnf,~re .Cann
FIRE PERMIT TYPE WORK TYPE
Sprinkler System of heads 3ga X New - Addition
Fire Pump _ Standpipe Alterations - Remodel
Other: Other:
DESCRIPTION OF WORK: Commercial _ Residential _ Educational
FEES
Contract Value $ 5 3.ooo X.01
$55.00 Permit Fee Minimum = $ 530 Permit Fee
If contract value is LESS than $10,010, Surcharge = $5.00
**If contract value is GREATER than $10,010, Surcharge = Contract Value x $0.0005 = $ 2rs _ 5n Surcharge*
***If the project valuation is over $1 million, please call for Surcharge
_ $ SS to . 50 TOTAL FEE
3/4" Displacement Fire Meter - $245.00 2A5 Fire Meter
80J-50 TOTAL FEE
*Requirements: 2 complete sets of drawings and specifications, cut sheets on materials and components to be used
I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in
conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but
only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work
which requires a review and approval of plans.
x C hmr I e M; 11 r x
Applicant's Printed Name Applicant's Signature
FOR OFFICE USE
REQUIRED INSPECTIONS
Hydrostatic Flow Alarm Drain Test _L,~<ough In
Trip Pump Test Central Station Final
Conditions of Issuance:
i
s
1
Permit Reviewed by e= Date: /0 / 11-3
I
C!ty of Eaall
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
Use BLUE or BLACK Ink
For Office Use
Permit #: 1
Permit Fee:
Date Received:
Staff:
2014 COMMERCIAL FIRE ALARM PERMIT APPLICATION*
Date: 3 - (`1- 14 Site Address: 3 SSS EA r' a. r,
Tenant ?ARA 40✓` OrsTC, ET /v vu_
f»TC.rrr ?t;rLrwAy
J
Suite 8:
State: ^' Zip: S S 3 Z 55
Contact: S#eut MA .IC
DESCRIPTION OF WORK:
FEES
Commercial Residential
$55.00 Permit Fee Minimum
*If contract value is LESS than $10,010, Surcharge = $5.00
**If contract value is GREATER than $10,010, Surcharge = Contract Value x $0.0005
***If the project valuation is over $1 million, please call for Surcharge
Educational
Contract Value $
_$
_$
=$
x .01
Permit Fee
Surcharge*
TOTAL FEE
*Requirements: 2 complete sets of drawings and specifications, cut sheets on materials and components to be used
I hereby apply for a Fire Alarm permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the
ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but only an application for
a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review
and approval of plans.
x
..34-e 01- fu\nt iC
Applicant's Printed Name
Clt of �a a� �e�o
� �
TO: Scott Peterson, Building Inspections # 20
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 6/13/2013
RE: Plan Review For: Paragon Building #700
3885 Eagan Outlets Parkway
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request"form to me.
Comments:
1(��`�e�,,-�. �y ,��-������r
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree Dedication
❑ Yes ❑ No PRV Required
Signature Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
Clt of �� a� �e�o
� �
TO: Scott Peterson, Building Inspections # 20
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 6/13/2013
RE: Plan Review For: Paragon Building #700
3885 Eagan Outlets Parkway
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request" form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes �No Tree Dedication
❑ Yes No PRV Required
�.—.�...
G � 27 - r3
Signat Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
r 4
Clt of �a a� �e�o
� �
TO: Scott Peterson, Building Inspections # 20
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 6/13/2013
RE: Plan Review For: Paragon Building #700
3885 Eagan Outlets Parkway
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request" form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree Dedication
❑ Yes ❑ No PRV Required
Signature Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
Clt of �a an �e�o
� �
TO: Scott Peterson, Building Inspections # 20
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 6/13/2013
RE: Plan Review For: Paragon Building #700
3885 Eagan Outlets Parkway
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request"form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes No Landscape Security Required Zoning:
❑ Yes No Water Quatity Dedication Meter Size:
❑ Yes ❑ o Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes No Tree Dedication
❑ Y No P V Required --
U �'�j //
Signature Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
Clt of �� a� �e�o
Y �
TO: Scott Peterson, Building Inspections # 20
Jon Hahenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
�-� `t1�ci e��n�r� Police
�T-'
FR�. Craig Novaczyk, Se ior Building Inspector
DATE: 6/13/2013
RE: Plan Review For: Paragon Building #700
3885 Eagan Outlets Parkway
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request" form to me.
Comme s:
�
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Qedication
❑ Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree Dedication
❑ Yes ❑ No RV R ired
�--- �
Signat e Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
A Structural Steel Special Inspection
Final Report
Cedar Grove Outiet Mall-Building 700
3905 Eagan Outlets Parkway
Eagan, Minnesota
Prepared for
Paragon Outlets Eagan LLC
Project BL-12-04579A
luly 31, 2014
Braun intertec Corporation
4
Braun Intertec Carporation Phone:952•995•2���
. iiooi Hampshire Ave S Fax: 952•995•2020
Minneapolis,MN 55438 Web: braunintertec.com
July 31, 2014 Project BL-12-04579A
Mr. Steven Trainer
Paragon Outlets Eagan LLC
217 E Redwood Street, 21st Floor
Baltimore, MD 21202
Re: Structural Steel Special Inspection Procedural and Final Report
Cedar Grove Outlet Mall—Building 700
3905 Eagan Outlets Parkway
Eagan, Minnesota
Dear Mr.Trainer:
Please find attached to this procedural report the Structural Steel Special Inspection Final Report for the
Cedar Grove Outlet Mall Building 700 Project and the supporting Special Inspection Daily Reports.
Special Inspection and Testing Procedures
The special inspection services were periodically provided by International Code Council (ICC) certified
special inspectors in accordance with the requirements of the Minnesota State Building Code,
Chapter 17 of the International Building Code (IBC) and the project plans and specifications.
The purpose of special inspections is to provide a review of the contractor's work designated by the
project structural engineer as needing special inspection under the guidelines of the IBC to determine
compliance with the approved construction documents. The special inspector does not have the
responsibility or authority to, nor is it the intent of special inspections to have them,judge or modify
the construction documents. Only the structural engineer of record can do this.
As the special inspections were completed, a Special Inspection Daily Report was prepared to summarize
the results of our inspections and testing. A copy of this report was provided to the contractor's site
representative for their review and records. As part of this report, items needing correction or
discrepancies observed from the approved construction documents were noted. We also summarized
the discrepancies documented in a Discrepancy Log: As needed, we also eontacted the project structural
engineer for additional clarification on specific issues related to the drawings or discrepancies observed.
Plans ar�d Specificati��s
The plans and project documents available at the site were used for our inspections. From time to time,
we received plan modifications from the structural engineer. When received,these were used to
evaluate the work completed in the field.
Visual Examination of the Field-Made Welds
Visual examination of the field welds was conducted in accordance with American Welding Society
(AWS) D1.1-2010, Figure 5.4 and Table 6.1 requirements and the requirements of the project plans and
specifications.
AA/EOE Prouiding engineering and environmental solutions since i957
- Paragon 0utiets Eagan LLC
Project BL-12-04579A
July 31, 2014
Page 2
Tension-Control Bolted Connection Observations
Tension-control bolted connection observations were conducted to determine if the bolt holes were
filled, if the correct bolts were used, if the nuts were fully engaged and if the splined end of the tension-
control bolts had separated from the body of the bolt. Removal of the splined end is a direct indicator
the bolt has been torqued to the minimum snap-off load. At connections where the splined ends were
not, or could not be removed, the torque applied to the bolt by the contractor was determined using a
hand-held torque wrench. In addition, each connection was observed for fit-up and to determine if the
various plies were in contact with one another.
Hex-Head Bolted Connection Observations
Hex-head bolting observations were performed to determine if the bolt holes werp filled, if the correct
bolts were used, if the nuts were fully engaged and if they appeared to be snug tight. Each hex-head
bolted connection was observed for fit-up and to determine if the various plies were in contact with one
another. Random bolts were also selected at various connections to determine if the nuts were snug
tight. This was done using a wrench and cheater bar.
Metaf Deck Weld and Fastener Observations
Metal deck weld observations were conducted in general accordance with AWS D1.3-2008, Section 6.0
requirements and the requirements of the project plans and specifications. Items reviewed included the
quality, size and spacing of the welds. In addition, the location and the completeness of the side-lap
fastener installation were observed and evaluated.
Column Anchor Bolt Observations
The column anchor bolts were observed to determine if they were in place, and if the nuts were
installed,fully engaged and snug tight. The base plates were observed to determine if they were in full
contact with the adjoining surface. If required by the construction documents, we also observed if the
piate washers were installed.
Cold Form Metal-Framing Mechanical Fasteners
Visual observations were conducted to determine if the mechanical fasteners used in the cold form
metal-framing construction were placed in conformance with the requirements of the structural details,
plans and specifications.
���������.�
• Paragon Outlets Eagan LLC
Project BL-12-04579A
July 31, 2014
Page 3
General
In performing its services, Braun Intertec used that level of care and skill ordinarily exercised by
reputable members of its profession currently practicing in the same locality. No warranty, express
or implied, is made.
Thank you for the opportunity to provide the special inspection and testing services for this project.
After review of the attached Special Inspection Final Report, if you have any questions or require
additional information, please call Dan Graham at 952.995.2524 or Marv Denne at 952.995.2510.
Sincerely,
BRAUN INTERTEC CORPORATION
,r°�
/�'��`��� ������c'�.�''�-�--� �f�'C__.:�
Daniel P. Gra am
ICC Certified Special Inspector-Structural Steel and Welding
�
���
hristopher R. Kehl, PE
Principal-Senior Engineer
Attachment:
Structural Steel Special Inspection Final Report
c: Jeff Graham, PE;Thorson Baker&Associates, Inc.
Mark Kronbeck;Alliant Engineering, Inc,
James Miller; Dalpos Architects& Integrators
Craig Novaczyk; City of Eagan
Michael Thorson, PE;Thorson Baker&Associates, Inc.
Brad McCarter, PE; Braun Intertec
��°�_,..��.�,��
Braun Intertec Coaporation Phone:952�495•2c�oo
. uooi Hampshire Ave S Fax: 952•995•2020
Minneapolis,MN 55438 Web: braunintertec.com
Structural Steel Special inspection final Report
City of: Eagan Date: July 31, 2014
Attention: Mr.Steven Trainer
Project: Cedar Grove Outlet Mall—Building 700
3905 Eagan Outlets Parkway
Eagan, Minnesota
Braun Intertec Project: BL-12-04579A
In accordance with the Minnesota State Building Code, Section 1704 of the International Building Code
and the agreed-upon scope of services,the required special inspections and testing have been provided
for the following items:
Bolting. The bolted connections detailed in the attached Special Inspection Daily Reports were
observed in general accordance with the requirements of the plans and specifications. There are
currently no outstanding or unresolved bolted connection-related issues.
Structural Field Welding. The welded connections detailed in the attached Special Inspection Daily
Reports were observed in general accordance with the requirements of the project plans and
specifications. Discrepancies were noted and documented. These connections were found to be
acceptable following the required corrections as provided by the engineer. There are currently no
outstanding or unresolved structural welding-related issues.
Metal Deck Welding and Fasteners. The metal deck welding and side-lap fasteners detailed in the
attached Special Inspection Daily Reports were observed in general accordance with the requirements
of the project plans and specifications.There are currently no outstanding or unresolved decking-
related issues.
Mechanical Fasteners. The mechanical fasteners detailed in the attached Special Inspection Daily
Reports were observed in general accordance with the requirements of the plans and specifications.
There are currently no outstanding or unresolved mechanical fastener-related issues.
AA/EOE Prouiding engineering and enuironmental solutions since Y957
- Paragon Outlets Eagan LLC
Project BL-12-04579A
July 31, 2014
Page 2
Conclusion
Based upon the inspections conducted,the testing performed and the attached reports, it is our
professional judgment that,to the best of our knowledge, the inspected work was performed and
completed in accordance with the approved plans, specifications,engineer-provided modifications and
applicable workmanship provisions of the Minnesota State Building Code and the International Building
Code.
Inspecting Firm: Braun Intertec Corporation
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engir��er,
under the laws of the State of Minnesota -;�"�j����t ��f`�r�
�4-, �pH ��c:�,�.
�.,rr�sW� � ,:,.
��Gl i� � _ .. �
//s�� �P , ,
> r•, 5
Z�� yfi ±i� f��;4
,W, ���,.... ._� .., . . .
ristopher R. Kehl, PE , ;A,
Principal-Senior Engineer �',.> "_�
License Number: 43459 .. f
July 31, 2014
Attachments:
Special Inspection Daily Reports 1 through 7
Summary of Discrepancy Log
� �
�I�����;�.
�'.� � �� �° Issue Date: 2013/01101 Rev Na.: 0
�� :��.
>,;
� g . ��
. � �� ���
�. ' �.
`.�.:
���.,,���� �� �
Special Inspection Daily Repart
City of Eagan, MN. Page 1 af 1
Report No.: Structural Steel#1 Date of this Report: 9-03-13
Project Name: Building 700 Project No.: BL-12-04579A
Project Address: 3905 Eagan Outlets Parkway
Client: Paragon Outlets Eagan Client Project No.:
Weather: Sunny PM Brad McCarter Temperature: 72 ° F
Type of Inspection: Inspection Coverage:
❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ Specia! Cases:
� Periodic �Welding 8�Bolting ❑ Concrete ❑ Fireproofing
❑ Piles� Piers ❑ Tendon Placement ❑ Soils
Did the architect or engineer authorize changes to City-approved plans? ❑Yes (Listed Below) ❑ No
Description and location of work completed:
_ __ _ __ _. _ - _ . _ _ _ _ .
Visual weld observations were performed in accordance with AWS D1.1 Section 6 2010 criteria on the following:
1) Bar joist fillet welds Roof Level Grid B.5-G.1 40.5-44.2 per Nucor Vulcraft details. No discrepancy noted
2) Anchor bolts at Foundation Level Grid B.5-G.1 40.5-44.2 plies in direct contact with full nut engagement present.
3) A325 3/4"Tension control bolts at Roof Level Grid B.5-G.1 4Q.5-44.2 (various random locations splines end still intact,
bolts hand tightened with wrench and bar). No discrepancy noted
4) Bar joist moment plate fillet welds Roof Level Grid B.5-G.1 40.5-44.2 per sheet S5.1 noted. No discrepancy noted
5) Drag strut angle from truss girder to beam fillet welds Roof Level Grid B.5-G.1 40.5-44.2 per Section S4 detail. No
discrepancy noted
_. _ .__ __
_ _ _ _ __ . _ ___ _ __ ___
List tests pertormed:
_ _ -- _ _ _ _ _ _ . .
__ _ _ _- .__
Visual
_ _-_. _..__ _ _ __ _ _ _ , __ .___ __ _-
■ Are there any discrepancies noted from this day's observations? Yes ❑ No �
■ Are there any outstanding discrepancies on this project? Yes ❑ No �
o If yes, see attached Summary Sheet.
• Report given to Contractor: Yes � No ❑
To the best of our knowledge,work inspected was done in accordance with the approved plans, spee�cations, and
applicable workmanship provisions of the current fBC, except as noted above.
3igned: �-"�t�.y�.�l.� Date: 9-03-13
Print Futl Name: Daniel P. Graham I.D. No.: 1054095 S1&S2
� _- �_����;.
`�"� -���-�-�-; `,�_t. Issue Date: 2013/01/Oi Rev P{o.: 0
. '.� �� -
� _ :�'
�
� �t�
= � Special Inspection Qaily Report
City of Eagan, MN. Page 1 of 1
Report No.: Structural Steel#2 Date of this Report: 9-05-13
Proje�t Name: Building 700 Project No.: BL-12-04579A
Project Address: 3905 Eagan Outlets Parkway
Ciient: Paragon Outlets Eagan Client Project Na.:
LNeather: Sunny PM Brad McCarter Temperature: 72 ° F
Type oi inspecfion: Inspection Coverage:
❑ Continuous ❑ Masonry ❑ Rebar Piacement ❑ Foundations ❑ Speciai Cases:
� Periodic � Welding 8�Bolting ❑ Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement ❑ Soils
Did the architect or engineer authorize changes to City-approved plans? ❑Yes (Listed Below) ❑ No
Description and location of work completed:
_ _ _ _ __._ __ ._ __ _ _ . _ _
Visual weld observations were performed in accordance with AWS D1.1 Section 6 2010 criteria on the following:
1) Bar joist fillet welds Roof Level Grid G.1-J.9 40.5-42.9 per Nucor Vulcraft detai4s. No discrepancy noted
2) Anchor bolts at Foundation Level Grid G.1-J.9 40.5-42.9 plies in direct contact with full nut engagement present.
3) A325 3/4"Tension controt bolts at Roof Level Grid G.1 J.9 40.5-42.9(various random locations splines end still intact,
bolts hand tightened with wrench and bar). No discrepancy noted
4) Bar joist moment plate fillef welds Roof Level Grid G.1-J.9 40.5-42.9 per sheet S5.1 noted. No discrepancy noted
5) Drag strut angle from truss girder to beam fillet welds Roaf Level Grid G.1-J.9 40.5-42.9 per Section S4 detail: No
discrepancy noted
_ _ _ __
__
_
_ . . _ _._ _ -__ _ _
List tests performed:
__ _
_
_ _
Visual
_ - - _. . _ _._ . _ _ _. _ __ _ _
• Are there any discrepancies noted from this day's observations? Yes ❑ No �
■ Are there any outstanding discrepancies an this project? Yes ❑ No �
o If yes, see attached Summary Sheet.
■ Report given to Contractor: Yes � No ❑
To the best of our knowledge,work ir�spected vras done in accordance with the approved plans, specificatians, and
applicable workmanship provisions of the current IBC, except as noted above.
:iigned: Date: 9-05-13
Print Fult Narr�e: Qaniel P. Graham I.D. Pto.: 1054095 S1&S2
�-�� t -�� •
� �`'����' � ��- Issue Date: 2013t01/47 Rev No.: 0
��.:
„i '��a: 3 ..
. 7� � � � �
�� F £, fa
�1
, ���,# �Ri�" 3a
��.
A
� Special Inspection Daily Report
City of Eagan, MN. Page 1 of 1
Report No.: Structural Steel#3 Date of this Report: 9-09-13
Project Name: Building 700 Project No.: BL-12-04579A
Project Address: 3905 Eagan Outlets Parkway
Client: Paragon Outlets Eagan Client Project No.:
Weather: Sunny PM Brad McCarter Temperature: 92 ° F
Type of Inspectior�: Inspection Coverage:
❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ Special Cases:
� Periodic � Welding 8�Bolting ❑ Cancrete ❑ Fireproofing
❑ Piles&Pisrs ❑Tendon Placement ❑ Soils
Did the architect or engineer authorize changes to City-approved plans? ❑Yes (Listed Below) ❑ No
Description and location of work completed:
__ __ .__ __ _. __ _. .
Visual weld observatians were performed in accordance with AWS D1.1 Section 6 2010 criteria on the following:
1) Truss girder fillet welds Roof Level Grid B.5-G.1 40.5-44.2 and G.1-J.9 40.5-42.9 per Nucor Vulcraft details. No
discrepancy noted
_-- _ __ _ ___ . _ _ . _._
List tests perFormed:
_ __ ___
_. _ _ _ _ _ _ _ _ _ . _ ._. __ .
Visual
_ _ __
__ _ _ __ _ . _ _ _ __ _
• Are there any discrepancies noted from this day's observations? Yes ❑ No �
■ Are there any autstanding discrepancies on this project? Yes ❑ No �
o If yes,see attached Summary Sheet.
■ Report given to Contractor: Yes � No ❑
To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications, and
applicabie workmanship provisions of the current IBC, except as noted above,
Signed: Date: 9-09-13
Print Full Name: Daniel P. Graham i.D. No.: 1054095 S1&S2
�`� � ���� �� � � � Issue Date: 2093l01I01 Rev Na: 0
� �%
'j {• .�insx+-�'�.> � '"i� .
� ^ ,.Y ���� �-�ae�.a > �
. �;.. .��9, �.�. - � .
y � �� Special inspection Daily Report
r.�,
City of Eagan, MN. Page 1 of 1
Report No.: Structural Steel#4 Date of this Report: 9-25-13
Project Name: Building 700 Project No.: BL-12-04579A
Project Address: 3905 Eagan Outlets Parkway
Client: Paragon Outlets Eagan Ciient Project No.:
Weather: Sunny PM Brad McCarter Temperature: 72 ° F
Type of Inspectian: Inspection �overage:
❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ Special Cases
� Periodic �Welding 8�Bolting ❑ Concrete ❑ Fireproofing
❑ Pi{es& Piers ❑Tendon Placement ❑ Soils
Did the architect or engineer authorize changes to City-approved plans? ❑Yes {Listed Below) ❑ No
Description and location of work completed:
. _ _ __ _ _ _ _ _ _ . _ _
Visual weld observations were performed in accordance with RWS D1.1 and D1.3 criteria on the following:
1) Puddle welds and side lap fasteners at Roof Level Grid B.5-G.1 40.5-44.2 and G.1-J.9 40.5-42.9 per Nucor Vulcraft
details. No discrepancy noted
2) A325 1/1/4"hexhead bolts at Raof Level Grid F.4-G.1 41 turn of the nut performed. No discrepancy noted
3) Light gauge metal stud PAF and tek fasteners at slide cilp Roof Level Grid B.6-G.1 44 per Excei drawings. No
discrepancy noted
4) Column cap plate fillet welds at Roof Level (misaligned bolts holes, fillet welded on al!4 sides)Grid E.6 41, C.5 42-
42.9. Weld quality found acceptable
5) lntermediate tube steel to plate fillet we{ds Grid B.5-G.1 40.5-44.2 and G.1-J.9 40.5-42.9. No discrepancy noted
6} Tower tube steel/x-brace angle fillet welds Grid B.5-G.1 40.5-442 and G.1-J.9 40.5-42.9. No discrepancy noted
7) Deck support anglelsplice bar fillet welds at Roof Level grid B.5-G.1 40.5-44.2 and G.1-J.9 40.5-42.9. No discrepancy
noted
_ _ _ __ _
List tests perfiormed:
_ . _ _ _ . _ _
Visual
. __. _ . __ __ _ __ ____
■ Are there any discrepancies noted from this day's observations? Yes ❑ No �
• Are there any outstanding discrepancies on this project? Yes ❑ No �
o If yes, see attached Summary Sheet.
• Repork given to Contractor: Yes � f�o ❑
To the best of our knowledge, work inspected was done in accordance with the appraved p(ans, specifications, and
applicable workmanship pravisions of the current IBC, except as noted abave.
Signed: Date: 9-25-13
Print Fuii Name: Daniel P. Graham I.D. No.: 1 Q54095 S1&S2
� � ��` ���� Issue Date: 20i3l01/01 Rev No.: 0
-ti� ��-�'�•
�
• � ;� � �1��� , ,��
� ._��,.
�
�� Special inspection Daily Report
City of Eagan, MN. Page 1 of 1
Report No.: Structurai Steel#5 Date of this Report: 10-31-13
Project Name: Suiiding 700 Project No.: BL-12-04579A
Project Address: 3905 Eagan Outlets Parkway
Client: Paragon �utlets Eagan Cfient Project No.:
Weather: Partfy Cloudy PM Brad McCarter Temperature; 42 ° F
Type of Inspection_ Inspection Coverage:
❑ Continuous ❑ Masonry ❑ Rebar Piacement ❑ Foundations ❑ Special Cases:
� Periodic �Welding &Bolting ❑ Concrete ❑ Fireproofing
❑ Piles 8�Piers ❑Tendon Placement ❑ Soils
Did the architect or engineer authorize changes to City-approved plans? ❑Yes (Listed Below) ❑ No
Description and location of work completed:
_ _
_ _ _ _ _
___ _ _
Visual weld observations were performed in accordance with AWS D1.1 and D1.3 criteria an the following:
1) Bottom chord joist/truss girder to column stabifizer plate fillet welds at Roof Level Grid B.5-G.1 40.5-44.2 and G.1-J.9
40.5-42.9 per Nucor details. No discrepancy noted
2) Upliff angle from bar joist to truss girder/beam Roof Level Grid B.5-G.1 40.5-44.2 and G.1-J_9 40.5-42.9 per Nucor
details. No discrepancy noted
List tests perFormed:
_ . _ _
. _ _ _ _- _ ____
Visual
■ Are there any discrepancies noted from this day's observations? Yes ❑ No �
■ Are there any outstanding discrepancies on this project? Yes ❑ No �
� ff yes, see attached Summary SheeE.
■ Report given to Contractor: Yes � No ❑
To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications, and
applicable workmanship provisions of the current IBC, except as noted above.
Signed: ��' Date: 10-31-13
Print Full Name: Danief P. Graham I.D. No.: 1054095 S1&S2
'� �'`� > � F� �
��� 'f��� .��,���'� , {ssue Date: 2013/01/01 Rev Rfa.: 0
�� • � �`��.�-���� �
. � �- �
�
a�., £'�
�"m,.,�."e�� �
�`���r��� � `
� ���������,�-;
�4��� ,6����� �� : Special Inspec#ion Daily Report
City of Eagan, MN. Page 1 of 1
Repor� Fdo.: Structural Steel#6 Date of this Report: 12-30-13
Project Name: Building 700 Project No.: BL-12-04579A
Project Address: 3905 Eagan Outlets Parkway
Client: Paragon Outlets Eagan Client Project No.:
Weather: Indoors PM Brad McCarter Temperature: 70 ° F
Type of Inspection: inspection Coverage:
❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ Special Cases:
� � Periodic �Welding 8�Bolting ❑ Concrete ❑ Fireproofing �
❑ Piles&Piers ❑ Tendon Placement ❑ Soils
� Did the architect or engineer authorize changes to City-approved plans? ❑Yes (Listed Below) ❑ No I
Description and locati�n of work completed:
_ _ _ _ _ _ __ _ _ _ _ _ __ ._ _
The following visual observations were performed on bar joists from slab on grade (various areas with damaged
chords/lacings). Results as follow to be reviewed by the joist supptier, Nucor:
'`A) Grid J.2-J.7 40.7-42, 2nd joist south of J.2, 5th apex from 42 towards 40.7, east diagonal bent approx. 1/2"
*B) Grid J.2-J.7 40_7-42, 3rd joist south of J.2,4th to 5th apex and 5th to 6th apex from 42 towards 40.7 bottorrt chord
bent apprax. 1/2"
*C) Grid B.5-C.2 42-44, 5th joist south of B.2, 5th apex from 44 towards 42, diagonal bent approx. 1/2"
List tests performed:.
_ _
_. . _ __ ___ _ .
Visual
■ Are there any discrepancies noted from this day's observations? Yes � No ❑
• Are there any outstanding discrepancies on this project? Yes � No ❑
o If yes, sse attached Summary Sheet.
■ Report given to Contractor: Yes � No ❑
To the best of our knowledge, work inspectsd was done in accordance with the approved plans, specfications, and
appiicable workmanship provisions of the current IBC, except as noted above.
Signed: Date: 12-30-13
Print Full Name: Daniel P. Graham &Troy Bauman I.D. No.: 1054095 S1&S2
�
'' ��'�` ��������f` Pssue Date: 201310U01 Rev No.: 0
� �� �� ��
-��•� -�,,.� r4:..,._3 �`
����'�� �."� � '
,.., ���_���
-- � - �� � Special Inspection Daily Report
City of Eagan, MN. Page 1 of 1
Report No.: Structural Steel#7 Date of this Report: 4-14-14
Project Name: Buiiding 700 Project No.: BL-12-04579A
Project Address: 3905 Eagan Outlets Parkway
Ctient: �aragon Outiets Eagan Client Project No.:
Weather: Indoors PM Brad McCarter Temperature: 70 ° F
Type vf Inspection: Inspection Coverage:
❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ Special Cases:
� Periodic �Welding &Bolting ❑ Concrete ❑ Fireproofing
❑ Piles&Piers ❑ Tendon Placement ❑ Soiis
Did the architect or engineer authorize changes to City-approved plans? ❑Yes (Listed Below) ❑ No
Description and location of work completed:
�sual weld observatians were perfiormed in accordance with AWS D1.1 2010 criteria on outstanding discrepancies listed
on Report#6 12-30-13 on Item A} Grid J.2-J.7 40.7-42, Znd joist south of J.2, 5th apex from 42 towards 40.7, east
diagonal bent approx. 1/2", Item B) Grid J.2-J.7 40.7-42, 3rd joist south of J.2, 4th to 5th apex and 5th to 6th apex from
42 towards 40.7 bottom chord bent approx. 1/2" and Item C) Grid B.5-C.2 42-44, Sth joist south of B.2, 5th apex from 44
towards 42, diagonal bent approx. 1/2" have now been repaired per Nucor fixes. No discrepancy noted
__ __ _ _ _
List tests performed:
_ _ _ _
Visual _ _ _
_. _ _ _ ._ __ _ _ _ _ _.
■ Are there any discrepancies noted from this day's observations? Yes ❑ No �
■ Are there any outstanding discrepancies on this project? Yes ❑ No �
o If yes, see attached Summary Sheet.
• Report given to Contractor: Yes � No ❑
To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications, and
appficable workmanship provisions of the current IBC, except as noted above.
Signed: Date: 4-14-14
Print Full Name: Daniel P. Graham &Troy Bauman I.D. No.: 1054095 S1&S2
� ��'� y;�� , "� �� :� � Issue Date: 2013l09I01 Rev Plo.: 0
� ` �,���,�' ���`����
���� :
.� ��` ,r a�..�m�.�. �' �. .
�� � �� - � Summary of Discrepancies Needing �orrection or Review
�
. � �T � _� � by the Design Engineer or Architect
Project Name: Building 700 BL-12-04579A PM Brad McCarter
Project Address: Eagan,MN. Structural Steei
The following items must be reviewed by the engineer and/or corrected and/or inspected before work can continue in the area.
Report No. Report Description Resolution to O/C Status
Date Discre anc
The follow�ing visual observations were performed on bar joists
from slab on grade(various areas with damaged chordsllacings).
Results as foilow to be reviewed by the joist supplier,Nucor:
*A) Grid J.2-3.7 40.7-42,2nd joist south of J.2,Sth apex from
6 12-30-13 42 towa�'ds 40.7,east diagonal bent approx. 1/2" repaired per closed 4-14-
*B) Grid J.2-J.7 40.7-42,3rd joist south of J.2,4th to Sth apex Nucor fixes 14
and Sth to 6th apex from 42 towards 40.7 bottom chord bent
approx. 1/2"
*C) Grid B.5-C.2 42-44, Sth joist south of B.2,Sth apex from
44 towards 42,diagonal bent a prox. 1/2"
�