2 013 COMMERCIAL PLUMBING PERMIT APPLICATION
❑ Please submit two (2) sets of plans with all commercial applications.
Date: Site Address: MAIL&,,s. r#5;t,o
Tenant: Suite
Property
Owner Name: Phone:
Name: Ua~Gn IPIstn-b►'M Pr t- License
Contractor
Address: /.~lS S' ~11-r• $l S City: 14-0ko%j Stater P! Zip:
Phone: 9-f2- 43k' 9300 Email: 14w a (JOicA (1e"b1 . Cc,"
Type of Work -<New -Replacement _Repair -Rebuild - Modify Space -Work in R.O.W.
~
Description of work:
COMMERCIAL New Construction Modify Space
Irrigation System yes / _ no) RPZ / _ PVB)
• Rain sensors required on irrigation systems
Permit Type • Avg. GPM (2" turbo required unless smaller size allowed by Public Works)
Meters Call (651) 675-5646 to verity that tests passed prior to picking up meter.
Domestic: Size & Type I a# Fire: 1
Avg. GPM High demand devices? _Yes No Flushometers Yes No
COMMERCIAL FEES Contract Value $ ~C~ , vG n X.01
$55.00 Permit Fee Minimum
_ $ Permit Fee
*If contract value is LESS than $10,010, Surcharge = $5.00 = $ Surcharge*
**If contract value is GREATER than $10,010, Surcharge = Contract Value x $0.0005
***If the project valuation is over $1 million, please call for Surcharge = $ TOTAL FEE
Following fees apply when installing a new lawn irrigation system $ Water Permit
Contact the City's Engineering Department, (651) 675-5646, for required fee amounts. $ Treatment Plant
$ Water Supply & Storage
$ State Surcharge
_ $ TOTAL FEE
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you
intend to dig to receive locates of underground utilities. www.gopherstateonecall.org
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
x 1(Am- v U!~, x 54
Applicant's Printed Name Applicant's Signature
FOR OFFICE USE Approved By: Date:
Required, Inspections: --kUnder Ground - ~ughdn _k7Vir Test Gas Testk! Final PRV Required: _ Yes No
Page 1 of 3
Use BLUE or BLACK Ink
2013 SEWER AND WATER CONNECTION AND AVAILABILITY CHARGES
EXISTING COMMERCIAL PROPERTY (if applicable)
Date: FOR OFFICE USE ONLY
Property Owner: _ PRV required
_ City R-O-W Permit
Address: Phone Number:
_ County R-O-W Permit
Plumber: Contact Name:
SEWER WATER
Sewer Service Water Service
Sewer lateral charge Water lateral charge
Sewer trunk Water trunk
City SAC @ $100/unit Water supply storage
MCES SAC @ $2,435/unit Receipt , Date:
Receipt Date: Treatment Plant @ $801/unit
Permit Fee $60.00 Permit Fee $60.00
State Surcharge $5.00 State Surcharge $5.00
TOTAL: 'Plumbing Permit Required - water meter to be
acquired with building permit TOTAL:
_ SEWER & WATER
Sewer Service
Water Service
Sewer lateral charge
Water lateral charge
Sewer trunk
Water trunk
City SAC
MCES SAC
Receipt # Date
Water supply & storage
Receipt # Date
Treatment plant
Permit Fee $120.00
State Surcharge $5.00
`Plumbing Permit Required - water meter to be
acquired with building permit TOTAL:
Number of SAC units is determined by the Metropolitan Council Environmental Services (651) 602-1000.
Sanitary Sewer Trunk Connection Charge applies if not charged sewer trunk by assessment in the past.
1-5 SAC units 1,780.00 per SAC unit r-----------------I
6-10 SAC units 8,900.00 plus 445.00 per SAC unit over 5 1 For Office Use
11+ SAC units 11,130.00 plus 178.00 per SAC unit over 10 I
Permit
I I
I
I Permit Fee:
I I
I
I Date Received:
L I I
I
I Staff:
Cc: City of Eagan Finance Department
Page 2 of 3
Use bLUE or 16LA ;K Ink
- - _ _ _ _ _
l- For Office Use
I
I
t I
-7
Permit I
City Eap z I
i Permit Fee: I
3830 Pilot Knob Road i 2 I
Eagan MN 55122 I
Phone: (651) 675-5675 { Date Received:
C I
Fax: (651) 675-5694 staff:
I
2013 MECHANICAL PERMIT APPLICATION
0 Please submit two (2) sets of plans # all corn morcial applications.
i'
Date:. _ t Site Address:
Tenant: _ Suite
Resident/Owner Name: - ' - - Phone:
Addressl City r 21, i.,_
Name: license
Contractor Address City:
i
State 11D: - Phone F ~
contact: Email-
New Replacement Additional Ali, +-ation Lemolition
i
Type of Work Description of work.
. x. ,.nx.,.,
NOTE: Roof mounted and ground mounted mechanical equipment is required to be screened by City
Code. Please contact the Mechanical Inspector for information on permitted screening methods.
RESIDENTIAL COMMERCIAL
_ Furnace New Construction Interior Improvement
Permit Type -Air Conditioner Install Piping _ Processed
_ Air Exchanger _ Gas Exterior HVAC Unit
_ Heat Pump I _ Under Above ground Tank Install Remove)
Other
RESIDENTIAL FEES
i $60.00 Minimum Add or alteration to an existing unit (includes $5.00 State Surcharge)
$100.00 Residential New (includes $5.00 State Surcharge) _ TOTAL FEE i
I
COMMERCIAL FEES Contract Value $ l 6 .~U X.01
$55.00 Permit Fee Minimum
I
$70.00 Underground tank i nstallationlrem oval = $ Permit Fee
r *If contract value is LESS than $10,010, Surcharge = $5.00
**If contract value is GREATER than $10,010, Surcharge = Contract Value x $0.0005 $ Surcharge*
s ***If the project valuation is over $1 million, please call for Surcharge = $ TOTAL FEE
I hereby acknowledge that th€s information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance
with the approved plan in the case of work which requires a review and approval of plans.
s
Applicant: Printed Name
FOR OFFICE USE
Required Inspections: Reviewed By: Date:
Underground Rough In Air Test Gas Service Test In-floor Heat Final HVAC Screening
City of Eapft
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
1.
sg_HRil7
Use BLUE or BLACK Ink
For Office Use
t 1 (i
#
Pennit Fee:
Date Received.
Staff:
6H0»
2013 COMMERCIAL BUILDING PERMIT APPLICATION
Date:
May 16, 2013 Site Address: 3985 Eagan Outlets Parkway (Building 500)
Tenant Name: Paragon Outlets Cedar Grove
(Tenant is: X New / Existing) Suite #:
Former Tenant: N/A
Name: Paragon Outlets Eagan LLC.
Phone: 410-856-1812
Address / City / Zip: c/o Paragon Outlet Partners LLC. , 217 East Redwood St. - 21st fir.
Baltimore, MD 21202
Applicant is: X Owner Contractor
Description of work: A new 44,302 s.f. (GBA) shell retail structure including site work
Construction Cost: $4,410,000
Name. Ryan Companies US, Inc.
Address: 50 South 10th Street, Suite 300
State: MN Zip: 55403-2012
License #: N/A
City: Minneapolis
Phone. 612-492-4312
Contact: Brian Kombrink Email: Brian.Kombrink@RyanCompanies.com
Name: Dal Pos Architects, LLC/Taras Pawliw, AIA Registration #: 43971
Address: 101 N. Clinton Stree, Suite 300 City: Syracuse
State: NY Zip: 13202 Phone 315-422-0201
Contact Person: Dennis E. Cox, AIA Email. dcox@dalpos.com
6;(,11,tA.L.1 Etakkt°'
Licensed plumberinstalling new sewer/water service; VoGOT1 Prumumg
NOTE: Plans and supporting docurnents that you submit are considered tii,liWONklattrirtatkifigiPeitiaieV
wfiftp#0.014010-L *Olaaakledi*khoav-W*kOOg:roogorh*jg(t7oitloaoi*that w90,0pgrOti#10k.City o
,
conclude that the are trade secrets.
wagetimgoothia2
f1) ivs -41.4 -
Phone #: -9-52-93R-9300—
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. www,gopherstateonecall.oro
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and
codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a
permit; that the work will be in accordance with the approved plan in the case of work which requires review and approval of plans.
xs1v ko"te.4.Pe.
Applicant's Printed Name
Applicant's Signature
Page 1 of 3
SUB TYPES
Foundation
Commercial / Industrial
Apartments
Miscellaneous
W,PRK TYPES
/ New
Addition
Alteration
Replace
Salon Owner Change
DESCRIPTION
Valuation
Plan Review
(25% 100% v)
Census Code
# of Units
# of Buildings
Type of Construction
3 C1135 Okkttt+S
DO NOT wRitE BELOW THIS LINE
Public Facility
Accessory Building
Greenhouse / Tent
Antennae
Interior Improvement
Exterior Improvement
Repair
Water Damage
1
.$
awl
Occupancy
Code Edition
Zoning
Stories
Square Feet
Length
Width
RE9UIRED INSPECTIONS
Footings (New Building)
Footings (Deck)
,Footings (Addition)
V Foundation
Drain Tile
/Roof: Decking vInsulation & Water /Final
Framing
[replace: Rough In Air Test Final
insulation
Meter Size:
Final C/O Inspection: Schedule Fire Marshal to be present:
Reviewed By:
Building Inspector
Exterior Alteration -Apartments
Exterior Alteration -Commercial
Exterior Alteration -Public Facility
Siding
Reroof
Windows
Fire Repair
Demolish Building*
Demolish Interior
Demolish Foundation
RetainingWall
*Demolition of entire building — give PCA handout to applicant
2-007 Aci$g
PP
/
45; 4 /
\--// heetrock
MCES System
SAC Units
City Water
Booster Pump
PRV
Fire Sprinklers
Final / C.O. Required
Final / No C.O. Required
/Other f[f 577/1/9/V‘
l5/Lerreit,
Pool: Footings Air/Gas Tests Final
VSiding: Stucco Lath Stone Lath N./Brick
Windows
/Retaining Wall
%V Erosion Control
Yes No
Reviewed By: , Planning
COMMERCIAL FEES
Base Fee
Surcharge
Plan Review
MCES SAC
City SAC
S&W Permit & Surcharge
Treatment Plant
Treatment Plant (irrigation)
Park Dedication
Trail Dedication
Water Quality
; citit .eto
117.37 .of
347 5 -7,5 -.0 --
Too•
12-, 0/5.0-u
Water Quality
Water Supply & Storage (WAC)
Storm Sewer Trunk
Sewer Trunk
Water Trunk
Street Lateral
Street
Water Lateral
Other:
TOTAL 93, ciVo,
Page 2 of 3
Dale Schoeppner
Chief Building Official
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122-1810
Dear Mr. Schoeppner:
May 6, 2013
The Metropolitan Council Environmental Services (MCES) Division has determined the SAC to be charged
for the wastewater capacity demand for Paragon Outlets building jato be located at 3985 Eagan Outlets
Pkwy. within the City of Eagan.
The City will be charged no SAC Units for this project, as determined below. The Council understands this
building is speculative retail.
Charges:
Retail (speculative)
43416 sq. ft. @ 3000 sq. ft. /SAC
SAC Units
14.47 or 15
At the time the finishing permits are issued, if the use
changes from its speculative use to a different use, then the SAC assignment needs to be reviewed based
on that change.
The business information was provided to MCES by the applicant at this time. It is also the City's
responsibility to substantiate the business use and size at the time of the final inspection. If there is a
change in use or size, a redetermination will need to be made. If you have any questions, call me at 651-
602-1118 or email karon.cappaert@metc.state.mn.us.
Karon Cappaert
SAC Program Technical Specialist
Environmental Services Division
KC:kg: 130506B1
Determination expiration: 05/06/2015
cc: J. Nye, MCES
Salem LaHood
Amy Griffin, Eagan (email)
390 Robert Street North 1 St. Paul, MN 55101-1805
Phone 651.602.1000 1 Fax 651.602.1550 1 TTY 651.291.0904 1 metrocouncil.org
An Equal Opportunity Employer
MLTRO NOLLT
l
City of �aoa� �` ‘(°)
3830 Pilot Knob Road RECEIVED
Eagan MN 55122
Phone: (651) 675-5675 ,AN 2O'
Fax: (651) 675-5694
Use BLUE or BLACK Ink
For Office Use
LPermit #: -IC
e?Li.-No
Permit Fee:
Date Received:
Staff:
2014 FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION*
Date: 01108/Z0144 Site Address: _ 3 LT 6.47arf Owl -lei -5 Parkway
Tenant: Suite #:
J
Property Owner
Name: Phone:
Address / City / Zip:
Applicant is: Owner Contractor
Type of Work
Description of work: Wei. 5P,%hkte.- 5y, kc Fr%
Construction Cost: 140,700 Estimated Completion Date: O11/2014/
Contractor
Name: Ahurn Pre Pn itti.ton License #: C039
Address: 13705 24,01 Ave, 5t411.e 110 City: Ptymov. th
State: M A% Zip: 4-5-414 1 Phone: (743) 2%8 - 0415
Contact: Chat -tic AV(; /I to" Email: Cm► fl ee 69 aitern4re . (pm
FIRE PERMIT TYPE
X Sprinkler System (# of
heads IVO
Standpipe
WORK TYPE
X New Addition
_ Fire Pump _
_
Alterations Remodel
Other:
Other:
DESCRIPTION OF WORK:
Commercial Residential
Educational
FEES
$55.00 Permit Fee Minimum
Contract Value $ S-3 1 7 _..01
= $3`7, rS7 Permit Fee
If contract value is LESS than $10,010, Surcharge = $5.00
**If contract value is GREATER than $10,010, Surcharge = Contract Value
***If the project valuation is over $1 million, please call for Surcharge
�,q
x $0.0005 = $ —°4,0 " f Surcharge*
_
= $ TOTAL FEE
3/4" Displacement Fire Meter - $260.00
= $0 , Fire Meter
= $ - . �D'LLI TOTAL FEE
equirements: 2 complete sets of drawings and specifications, cut sheets on materials and components to be used
I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in
conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but
only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work
which requires a review and approval of plans.
x �h ar t<e /V);
Applicant's Printed Name
Applicant's Signature
FOR OFFICE US
REQUIRED
INSPECTIOIiS
Hydrostatic
Trip
Conditions of Issuance:
pain Test
Central Station
Permit Reviewed b
ty of Eaall
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 6755694
Use BLUE or BLACK Ink
For Office Use
Penn* I i.a 1 3o
Permit Fee: WO , C
Date Received:
Staff:
J
2014 COMMERCIAL FIRE ALARM PERMIT APPLICATION*
Date: j — (( ( r.Site Address: g cl S E A.5.4." OuT (..eT a'r (:)A r k w r4y
Tenant ?eve e1/4 ( ' ci T (— T jv‘ H G c Suite ale:
Phone:
A g4e.- T -e a r5y Cp:u+r License: T S cl 1577
DESCRIPTION OF WORK:
FEES
mmerciai _ Residential _ Educational
$55.00 Permit Fee Minimum
"If contract value is LESS than $10,010, Surcharge = $5.00
**If contract value is GREATER than $10,010, Surcharge = Contract Value x $0.0005
**if the project valuation is over $1 million, please call for Surcharge
Contract Value $ ` \ )1k.01
_ $ r Permit Fee
= $ Surcharge*
= S (1),0 TOTAL FEE
*Requirements: 2 complete sets of drawings and specifications, cut sheets on materials and components to be used
I hereby apply for a Fire Alarm permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the
ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but only an appkcation for
a permit, and work Is not to start without a permit; that the work will be In accordance with the approved plan in the case of work which requres a review
and approval of plans.
x S4- VZ AA A
Applicant's Printed Name
icant's Signature
(nr\eJ,._
.. a
105372 Use BLU� or BLACK Ink
CALL FOR CREDIT CARD PAYMENT
i-----------------,
612.843.3210 � For Office Use �
. 1�D�'G 1^� I �� `i' I
C�� �� n n �n I Permit#: I
y 1 1 l� 1 1 j G� I
+Ct� � Permit Fee: �
3830 Pilot Knob Road ��,'�`1� � I
Eagan MN 55122 �� � � Date Received: �
Phone:(651)675-5675
Fax:(651)675-5694 ��� � � �'� � I
� Staff: �
`��_____�����__��J
2014 FIRE SUPPRE f�S10N SYSTEMS PERMIT APPLICATION*
oate: 6/10/14 site Address: 3985 Ea�an Outlets Parkwa�
Tenant: Adldas ' Suite#: 500
Name: Phone:
Property Owner Address/City�Zip:
Applicant is: Owner Contractor
Type of Work Description ofwork: Inst modify coverage for �rotection in new tenant spaces
Construction Cost: $4000.00 Estimated Completion Date: 7/1/14
Name: Ahern Fire Protection �icense#: C039
Contractor
` Address: 13705 26th Ave #110 �;ry: Plymouth
� State: Mn1 zip: 55441 Phone: 763.268.0515
co�tact: Ray Polos Ema;i: rpolos@ahernfire.com
FIRE PERMIT TYPE WORK TYPE
X Sprinkler System(#of heads 19) New _Addition
Fire Pump _Standpipe XAlterations _Remodel
Other: Other:
DESCRIPTION OF WORK: X Commercial Residential Educational
FEES Contract Value$ x.01 �
$55.00 Permit Fee Minimum =$ Permit Fee
'If contract value is LESS than$10,010, Surcharge=$5.00
`*If contract value is GREATER than$10,010, Surcharge=Contract Value x$0.0005 -$ Surcharge*
"`*If the project valuation is over$1 million, please call for Surcharge
_$ 60.00 TOTAL FEE
3/4" Displacement Fire Meter-$260.00 =$ Fire Meter
� _$ TOTAL FEE �
"Requirements: 2 complete sets of drawings and specifications,cut sheets on materials and components to be used
I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate;that the work will be in
conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes;that I understand this is not a permit,but
only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work
which requires a review and approval of plans.
X Barb Barnes 612.843.3210 X y`' - -�
ApplicanYs Printed Name ApplicanYs Signature
I
,. . . ��38��
FOR OFFICE USE
REQUIRED INSPECTIONS
Hydrostatic Flow Alarm Drain Test �ugh In
Trip Pump Test Central'Station `, �Final
Conditions oflssuance:
c !
Permit Reviewed by• Da#e:' �/�/�
Clt of �a a� ���o
� �
TO: Scott Peterson, Building Inspections #'�Q 20
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshaf
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 5/15/2013
RE: Ptan Review For: Paragon Building #500
3985 Eagan Outlets Parkway
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request"form to me.
Comments:
�'L°.�.tP� � J ��s� l-�2������
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree Dedication
❑ Yes ❑ No PRV Required
Signature Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
' �e�o
�lt 0� �� �I1
� �
TO: v �cott Peterson, Building Inspections # 22
+�Jon Hohenstein, Community Development
„d'Mike Ridley, Planning
�%Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
/Leon Weiland, Engineering
`'fJon Eaton, Utilities
✓Eric Macbeth, Maintenance
�'�Gregg Hove, Maintenance
Lt. Mike Fineran, Police
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 5/15/2013
RE: Plan Review For: Paragon Building #500
3985 Eagan Outlets Parkway
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request"form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree Dedication
❑ Yes ❑ No PRV Required
Signature Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
Clt of �a a� �e�o
� �
TO: , Scott Peterson, Building Inspections #`2�2'
Jon Hohenstein, Community Development 2v
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 5/15/2013
RE: Plan Review For: Paragon Building #500
3985 Eagar� Outlets Parkway
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request"form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes No Water Quality Dedication Meter Size:
❑ Yes No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree Dedication
❑ s ❑ No PRV Re ired
����
at Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
Clt of �a a� �e�o
� �
TO: Scott Peterson, Building Inspections #�
Jon Hohenstein, Community Development �
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 5/15/2013
RE: Plan Review For: Paragon Building #500
3985 Eagan Outlets Parkway
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request" form to me.
Comments:
� �� -
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree Dedication
❑ Yes ❑ N PR Re red
!3
Signature Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
I"��
Clt of �a a� �e�o
� �
TO: Scott Peterson, Building Inspections #���
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramweil, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 5/15/2013
RE: Plan Review For: Paragon Building #500
3985 Eagan Outlets Parkway
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request" form to me.
Comments:
�` I `� ��v�. �,�
Indicate below any fees that are to be collected with the building permit.
Amount �;5�
❑ Yes I�' No Landscape Security Required Zoning: It�.IrJ
❑ Yes �, No Water Quality Dedication Meter Size:
❑ Yes � No Park Dedication
❑ Yes �No Trail Dedication
❑ Yes L� No Tree Dedication
❑ Yes ❑ No PRV Required
�_. � `�I�� I ��
Signature Date `
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
Clt of �a a� �e�o�
� �
TO: Scott Peterson, Building Inspections #��
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Neison, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 5/15/2013
RE: Plan Review For: Paragon Building #500
3985 Eagan Outlets Parkway
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request"form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree Dedication
❑ s ❑ No PRV Required
- .��„� � �'/.3
Signature Date
G:1Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
Clt of �a a� �e�o
� �
TO: Scott Peterson, Building Inspections #��
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 5/15/2013
RE: Plan Review For: Paragon Building #500
3985 Eagan Outlets Parkway
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request" form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Y s ❑ No Tree Dedication '
❑ Y s ❑ No PRV Required
, _sl 3a ���
S' na ure Date
G:\B ding Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
Clt of �a a� ���o
� �
TO: Scott Peterson, Building Inspections # 22
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 5/15/2013
RE: Plan Review For: Paragon Building #500
3985 Eagan Outlets Parkway
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper "hold request" form to me.
Comments:
� �� GX �-��-� a /'��!sz S cf /J�'7 h�'�o<�t S /�GG �
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree Dedication
❑ Yes ❑ No PRV Required
�� �/z.-6 //3
Signature Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
Envelope Compliance Test Results Building_500
Project Summary Information
Name:Building_500
Address:3985 Eagan Outlets Parkway
CitylState/Zip: Eagan, MN
Climate Location: Eagan, Minnesota
Standard EnvStd climate data is used for compliance
Criteria Table: 6A
Floor Area(ft2);45336
Gross Wall Area(ftZ): 17391
Window Area(ft?):4176
Window Wali Ratio;0.240
Gross Roof Area(ft2):45336
Skylight Area(ftz):0
Skylight Roof Ratio:0.000
Door Area(ftZ):0
Com liance Summa --PASSES
EPF Pro osed Standard Mar in
Roofs 3605 5407 1802
Skylights 0 0 0
Exterior Walls and Windows 6640 6980 341
Below-Grade Walis 0 0 0
Floors 0 0 0
Slabs 0 0 0
Daylighting Potentiai 9618 9836 218
Total 19862 22223 2361
O a ue.Construction Schedule
Code Descri tion Net Area/Len th U-factor HC R-Cav R-Shth
C-1 Metal Framing-Metal Framing-3.5 in. (89 mm) 13215 0.055 n.a. 13.0 10.0
studs at 16 in.(400 mm)o.c.-Wall,Above
Grade Rcav-13+Rshth-10
G2 lnsuiation Entirely Above Deck or Mass- 45336 0.042 n.a. OA 23.0
Insulation Entirely Above Deck or Mass-Roof R-
23
Total 58551
Fenestration Schedule
Code Descri tion Area U-factor SHGC SC Tvis
G-1 User Defined-Window-Fixed-Aluminum with Thermal 4176 0.500 0.730 0.849 0.800
Break-Clear-Tenant_Glass(User Defined)
Total 4176
Area
Space Category:Bldg_500
Floor Area(ftZ):45336
Gross Wall Area(ftz): 17391
Window Area(ft2):4176
Window WaII Ratio:0.240
Gross Roof Area(ft2):45336
Skylight Area{ft2):0
Skylight Roof"Ratio: 0.000
Door Area (ft2):0
Surfaces
Name T e Const.Code Area Orient Notes
Roof Roof G2 45336 n/a n.a.
North_Wall,_W Wall C-1 4148 North n.a.
ith Gano
ASHRAE/IESNA Standard 90.1-2004 05/13/13
Envelope Compliance Test Results Building_500
North_Wal1,_W Wall C-1 2941 North n.a.
ith_No_Canop
Y
North West Wall C-1 680 Northwest n.a.
Wall
West_Wall Wall C-1 1288 West n.a.
South_Wail Wali C-1 6630 South n.a.
East_Wall Wall C-1 1704 East n.a.
Total g2727
O enin s
Name T e Const.Code Area Orient. Notes
Glass Window G-1 2079 North Overhang PF=0.35
North_Glass_w Window G-1 1251 North Overhang PF=0.44
ith Canopy
North Glass_w Window G-1 198 North n.a.
ithout_Canopy
Glass Window G-1 216 Northwest Overhang PF= 1.11
West_Glass Window G-1 216 West Overhang PF=0.44
East_Giass Window G-1 216 East Overhang PF= 1.11
Total 4176
ASHRAE/IESNA Standard 90.1-2004 05/13/13
� ` • ' • � • ! • i � • � �
Project Name: Paragon Outlets Building 500
Project Address:3985 Eagan Outiets Parkway Eagan,MN Date: 3/4/2013
City: Eagen Zip: 55122
HVAC System Designer of Record:Jeffrey M.Zunt Telephone: 330-659-6688
Contact Person:Jeffrey M.Zunt Telephone: 330-659-6688
Qualification O Exception:An energy recovery ❑ (j),Piping is insulated in accordance with
ventilation system is provided in Table 6.8.3.Insulation ezposed to weather is
o The buiiding is 2 stories'or less in height and accordance with the requirements in suitable for outtloor service.Cellular.foam
has a gross floor area is less than 25,000 ft2. §6.5:6. insulation is protected from water and solar
Requirements ❑ (f)The system shali be controlled by a radiation.
manual changeover or dual setpoint O Exception:Piping is located within
o (a}All systems serve a single HVAC zone. thermostat. manufactured HVAC units.
❑ (b)Cooling(if any)is provided by a unitary O (g)Heat,pumps equipped with auxiliary O (k)Ductwork and plenums are insulated in
packaged or split-system air conditioner that internal electric resistance heaters(if any) accordance with Tables 6.8.2A and 6.8.2B
is either air-cooled or evaporatively cooled have controls to prevent supplemental heater and sealed in accordance with Tables
and meets the efficiency requirements shown operation when the heating load can be met 6.4.4.2A and 6:4.4.26.
in Table 6.8.1.List equipment in the table by the heat pump alone.
below. ❑ (I)Construction documents require air
O (h)The system controls do not permit reheat systerrrs to be balanced in accordance with
o (c)The system has an air economizer as or any other form ofsimultaneous heating industry-accepted procedures to within 10%
required by Table 6.5.1,with controls as and cooling#o�humidity control. of design airflow rates.
required in Tables 6.5.1.1.3A and 6;5.1.1.36.
The economizer has either barometric or O (i)Systems are provided with a time switch ❑ (m)Where separate heating and cooling
powered relief sized to prevent that(1)can start and stop the system under equipmenf serve the same temperature zone,
overpressurization of the building.Outdoor air different schedules for seven diffe�ent day- thermostats are interlocked to prevent
dampers for the economizer use are provided types per week;(2)is capable of retaining simultaneous heating and cooling:
with blade and jamb seals. programming and time setting during a loss
of powerfor a period of at least 10,h;(3) o (n)Exhausts are equipped with graviry or
❑ Exception:The cooling efficiency meets includes an accessible manual override that motarized dampers that will automatically
or exceeds the efficiency requirement in allows temporary operation of the system for shut when systems are not in use.
Table 6.3.2.Document in table below. up to 2 h;(4)is capable of temperatu�e
setback down to 55°F du�ng off hours;and � Exception:Design capacity is less than
❑ (d)Heating(if any)shall be provided by a (5)is capable of temperature setup to 90°F 300 cfm.
unitary packaged or split-system heat pump, during off hours. O Exception:System operates
a fuel-fired fumace,an electric resistance
heater or a baseboard system connected to a ❑ Exception:System serves hotel/motel continuously.
boiler.All heating equipment meets the guest rooms. O (o)Systems have optimum start controls.
efficiency requirements of the Standard.List ❑ Exception:System operates
equipment in table below. continuously. O Exception:Supply air capacity is less
than 10,000 cfm.
❑ (e)The outdoor air quantity is less than or ❑ Exception: System has both a cooling
equal to 3,000 cfm and less than or 70%of or heating capacity less than 15,000
the supply air quantity at minimum outdoor air Btu/h and a supply fan motor power
design conditions. greater than 3/4 hp.
' Equi ment Efficienc
System Mfg.& Equipment Heating Cooling
Tag(s) Model Type
No. Rated Rated Minimum Rated Rated Minimum Econ.
Capacity Efficiency Efficiency Capacity Efficiency Efficiency Min.
Efficiency
q�p
0
ANSI/ASHRAE/IESNA Standard 90.1-2004 � a E �
� . ` • . • � ! � ' • , � -
Project Name:Paragon Outlets Building 500
Project Address: 3985 Eagan Outlets Parkway Eagan,MN Date: 3/4/2013
HVAC System Designer of Record; Jeffrey M,Zunt Telephone; 330-659-6688
Contact Person: Jeffrey M.Zunt Telephone: 330-659-6688
Ciry: Eagen Climate Zone: 6A
Zip:55122 1%Summer DB Temp: 91 F 1%Summer WB Temp: 73 F 99.6%Winter Temp: -16 F
Mandato E uipment E�cienc Worksheet 6.4.1.1
System Tag Equipment Type(Tables Size Category(Tables Sub-Category or Rating Units of E�ciency Minimum Efficiency(Tables
6.8.1A through G) 6.8.1A through G) Condition(Tables 6.8.1A (Tables 6.8.1A 6.8.1A thraugh G)
through G) through G)
Rated >_ Required
1.5 Ton Air Cond.Air Cooled <65,000 BTU Single Package SEER 13.0 >_ 12.0
2 Ton Air Cond.Air Cooled <65,000 BTU Single Package SEER 13.0 >_ 12A
3 Ton Air Cond.Air Cooled <65,000 BTU Single Package SEER 15.0 z 12.0
5 Ton Air Cond.Air Cooled >65,000 <135,000 Single Package SEER 15.0 >_ 12.0
6 Ton Air Cond.Air Cooled >65,000 <135,000 Single Package EER 12:6 >_ 10.3
7.5 Ton Air Cond.Air Cooled >65,000 <135,000 Single Package EER 13.0 >_ 10.3
>
Mandato Non-Standard Centrifu al Chiller Worksheet 6.4.1.1
System Tag Leaving CHW Entering CW Condenser Flow Rate Size Category Minimum Efficiency(Tables
Temperature(°F) Tempe�ature(°F) (gpm/ton) (Tables 6.8.1H 6.8.1H through J)
through J)
Rated >_ Required
>
>
>
>
General Mandatory Requiremen#s � Piping insulation meets or exceeds the Special Mandatory Requirements
requirements of the Standard(§6.4.4.1.3).
o Load calcuiations are provided for selection o Freeze protection or snow/ice melting
of aIl equipment and systems(§6.4.2). � Construction documents require record systems(if any),have cont�ols to prevent
❑ Stair vents,elevator shaftvents,gravity drawings(§'6.7.2.1),manuals(§6.7.2.2), operation in warm weather(§6.4.3.7).
system balancing(§6.7.2.3)and system
hoods,gravity vents and gravity ventilations o tndependent perimeter heating systems(if
are provided with motorized darnpers. �mmissioning(§6.7.2.4). any)comply with the control requirements of
❑ Exception:Gravity dampers are used
§6.4.3.1'1 and§6.4.3.2.
since the building is less than 3 stories ❑ Independent heating and cooling thermostatic
or in climate zones 1-3. controls(if any)are interlocked to prevent
❑ Exception:No vents are required as
crossover of set points(§6.4.3.2).
these systems ventilate unconditioned
zones.
� ��p
d � �
ANSI/ASHRAE/IESNA Standard 90.1-2004 E �
� . ' • . ' • • ' •' . ` • . . .:• -
Project Name:Paragon Outlets Building 500
Contact Person:Jeffrey M.Zunt Telephone: 330-659-6688
S stems Worksheet . 6.4
System Tag 1.5 Ton 2 Ton 3 Ton 5 Ton 6 Ton 7.5 Ton
Suppry CFM 600 800 1200 2000 2400 3000
Supply ESP(in.w.c.) ��� ��� ��, �,� ��� �„
Fan System HP 1/8 1/4 1A 1A 1.0 3.75
OA CFM(i.e.Outdoor Air CFM) 50 60 240 400 480 600
Automatic Shutdown(§6.4.3.2.1) C1 C1 C1 C1 C1 C1
beadband(§6.4.3.1.2) N2 N/A N2 N/A N2 N/A N2 N!A N2 N/A N2 N/A
Setback Controls(§6.4.3.2.2) C1 C1 C1 C1 C1 C9
Setup Controls(§6.4.3.2.2) C1 C1 C1 C1 C1 C1
Optimum Start(§6.4.3.1.3) N3 N/A N3 N/A N3 N/A N3 N/A N3 N/A N3 N/A
Zone Isolation(§6.4.3.1.4) N3 N/A N3 N/A N3 N/A N3 N/A N3 N/A N3 N/A
Shutoff Dampers(§6.4.3.3.3) C2 C2 G2 G2 C2 C2
Hsat Pump Aux Heat(§6.4.3,4) N1 N/A N1 N/A N1 N/A N1 N/A N1 N/A N1 N/A
Humidifier Preheat(§6.4.3.5) N1 N/A N1 N/A N1 N/A N1 N/A N1 N/A N1 N/A
Humidification/Dehumidification Deadband(§6.4.3.6) N1 N/A N1 N/A N1 N/A N1 N/A N1 N/A N1 N/A
Ventilation Controf(§6.4.3.8) N/A N/A N/A N/A N/A N!A
DucUPienum Insulation(§8.4.4.2:1) C1 C1 C1 C1 C1 C1
Duct Sealing Levels(§6.4.42.1)Supply/Retum A A A A A A
bucf Leakage Test(§6.4.4.2.2) Y Y Y Y Y Y
In the table above,enter the appropriate codes Setup Controls Heat Pump Aux Heat
from this list: . C1 Setup provided(up to 90F) • C1 Complying controts provided
Shutdown • N9 N/A continuous operation • N1 N/A system is not a heat pump
• N2 N/A_<15 kbtu/h or Q/4 hp • N2 N/A auxiliary is not electric or is not
• C1 Complying nonresidential time switch N3 N/A i%Sum DB<=100F provided
with override . N4 N/A no cooling • N3 N/A heat pump covered by NAECA
• C2 Complying residential time switch with
override Optimum Start Humidifier Preheat
• N1 N/A continuous operation . C1 Optimum start provided • C1 Complying controls provided
• N2 N/A s'15 kbtu/h or S3/4 hp . N1 N/A continuous operation • N1 N/A no humidifier
• N3 N/A hotel/motel guestroom . N2 N/A_<15 kbtu/h or Ci/4 hp
• N3 N/A su I <-10,000 cfm HumidificationlDehumidification Dead Band
Dead Band Pp y • C1 Gomplying controls provided
• C1 Dual setpoint control Shutoff Dampers • N1 N/A no humidification and/or
• C2 Manual change over control . C1 Motorized shutoff dampers on OA and dehumidification
• N9 N/A special occupancy(requires Exh DuctlPlenum Insulation
approval) . G2 Gravity shutoff dampers on OA and Exh
• N2 N/A heating or cooling only . N9 N/A continuous operation • C9 Complying insulation provided
N2 N/A 515 kbtu/h or Q/4 h • N1 N/A alP ducts located in conditioned
Setback Contrals ' p space
• C1 Setback provided(down to 55F) • N3 N/,4 OA/EA<=300 cfm
N1 N/A continuous o eration Duct Sealing
' P Zone Isolation . Enter highest seal level(A,8 or C)for
• N2 N/A 515 kbtu/h or Q/4 hp . C1 Isolation zones provided
• N3 N/A 99.6%Win DB>40F � supply and retum
N1 N/A confinuous operation
• N4 N/A radiant heating . N2 N/A_<15 kbtu/h or Q/4 hp Duct Leakage Test
• N5 N/A no heating . N3 N/A all zones on same schedule • Y Ducts will be tested for leakage
• N4 N/A OA/EA<=5,000 cfm • N Ducts will not be tested for leakage
y�p
0
ANSI/ASHRAE/IESNA Standard 90.1-2004 � � E �
r �� � � � � . � �� � � . � � �� . ,:
. . • -
Project Name: Paragon Outiets Building 500
Contact Person: Jeffrey M.Zunt Telephone: 330-659-6688
Prescriptive Checklist
heat addition and loop heat rejection(if any)
Prescriptive Economizers(§6.5.1) Specify economizer exemptions: �mply with the requirements of§6.5.2.2.3.
� Systems employ airside economizers
(§6.5.1.1). ❑ System pumps g�eater than 10 hp employ
variable flow controls(§6.5.4.1),pump
� Economizer provides up to 100°/a design isolation(§6.5.4.2)and temperature reset
airflow in outdoor air(§6.5.1.1.1). Prescriptive Air-System Requirements (§6.5.4.3).
� Economizer is integrated with the mechanical o Simultaneous Heating and Cooling Prescriptive Special System Requirements
cooling system(§6.5.1.1.2 and§6.5.1.3}. (§6.5.2.3).
❑ All heat rejection equipment with motors?7.5
� Economizer high limit shutoff complies with � Zone minimums were set to meet the hp employ controls that compiy with§6.5.5.
§6.5.1.1.3. requirements of Standard 62.
o Exhaust Air Energy Recovery:all fan.systems
� Economizer dampers meet or exceed ❑ Zone minimums were set to<_0.4 cfm/ftz of that have both a design supply capacity of>_
leakage requirements(§6.5.1.1.4). zone conditioned floor area. 5,000 cfm and a minimum outdoor air supply
of>_70%of the design supply air employ an
� System provides relief for up to 100%design � Zone minimums are less than 300 cfm. energy recovery system that complies with
airflow in outdoor air(§6.5.1.1.5). ❑ Other(requires special documentation and §6.5.6.1.
� Economizer complies with the heating system approval). ❑ Heat recovery for service water heating is
impact requirements(§6.5.1.4). o Humidity controls(if any)comply with the provided for facilities that operate
❑ Systems employ waterside economizers. requirements of§6.5.2.3. continuously,have a total water-cooled heat
rejection capacity exceeding 6,000,000 btu7h,
❑ Economizer can provide 100%of the load at o Systems that employ hydronic cooling and and have a design seivice water heating load
eithe�the outdoor conditions of 50°Fdbl45°F have humidification(if any)use a waterside exceeding 1,000,000 btu/h.The heat
wb o�45°F db/40°F wb where required for economizer that complies with§6.5.1. recovery system(if any)complies with
dehumidification purposes(§6.5.1.2.1). §6.5.6:2.
o Variable air volume fan controls comply with
❑ Precooling coils and heat exchangers have the requirements of§6.5.3.2. o Kitchen hoods with exhaust flows>5000 cfm
either a<_15 ft of WC pressure drop or are comply with the requirements of§6.5.7.1.
Prescriptive Water-System Requirements
bypassed when economizer is not in use(§ O Fume hoods with a total exhaust system flow
6.5.1`2.2). O Three-pipe systems are not used(§ >�5,000 cfm comply with the requirements of
6.5.2.2.1).
0 Economizer is integrated with the mechanical §6.5.7.2.
cooling system(§6.5.1.3). o Two-pipe changeover heating/cooling o Radiant heaters complying with§6.5.8.1 are
m Economizer complies with the heating system systems(if any)comply with the used to heat unenclosed spaces(if any).
impact requirements(§6.5.1.4). requirements of§6.5.2.2.2.
o Hydronic(ground-or water-loop)heat pump � The cooling equipment with hot-gas bypass
❑ Systems are exempt from the economizer systems that have equipment for both loop controls(if any)meets the unloading
requirements. requirements of§6.5.9.
�o ~
0
ANSI/ASHRAE/IESNA Standard 90.1-2004 � ���
� r . � � � . � � . .. ,,
�:
Pro�ect Name: Paragon Outlets Building 500
ContactPerson: Jeffrey M. Zunt Telephone: 330-659-6688
Complete one worksheet for each fan system >5hp
Prescriptive Fan Power Limitations 6.5.31
Supply Fan Retum Fan Exhaust Fan Series-Style Fan-Powered Total System
Box' Motor(hp)
Tag Supply CFM Motor(hp) Tag Motor(hp) Tag Motor(hp) Tag Motor(hp)
F-Total Supply CFM Total System Motor HP�
Table 6. . e hp/cfm
Total Supply CFM X cfm
Constant + 1,000
HP Allowance = hp(=Value X CFM/1000) 2
Credits and/or adjustments*-� Adjusted HP Allowance"` hp(see§6.5:3.1) z
'Attach calculations and documentation if credits or temperature adjustments are used.Refer to§6.5.3.1 for the formulas
Credits and adjustments are available for the following:
• Clean frlter pressure drops in excess of 1 in.w.c.;
• Pressure drop due to heat recovery coils or devices or evaporative cooling equipment or devices;
• Relief fans that operate during peak cooling due to high ventilafion rates;and
• Room to cooling air supply temperature differences that are greater than 20°F(e.g.low temperature supply).
���p
0
ANSI/ASHRAE/IESNA Standard 90.1-2004 � � � �
Y � . �, . � � � , . � ;, �
Project Name: Paragon Outlets Building 500
Project Address:3985 Eagan Outlets Parkway Eagan,MN Date: 3/4/2013
City: Eagen Zip: 55122
HVAC System Designer of Record:Jeffrey M.Zunt Telephone:330-659-6688
Contact Person: Jeffrey M.Zu'nt Telephone: 330-659-6688
Qualification o Exception:An ene�gy recovery ❑ Q)Piping is insulated in accordance with
ventilation system is provided in Table 6.8.3.Insulation exposed to weather is
o The building is 2 stories or less in height and accordance with the requirements in suitable for outdoor service.Cellular foam
has a gross floor area is less than 25,000 ftz. §6.5.6. insulation is protected from water and solar
radiation.
Requirements ❑ (f)The system shall be controlled by a
manual changeover or dual setpoint O Exception:Piping is located within
� (a)All systems serve a single HVAC zone. thermostat. manufactured HVAC units.
o (b)Cooling(if any)is provided by a unitary O (g)Heat pumps equipped with auxiliary ❑ (k)Ductwork and plenums are insulated in
packaged or split-system air conditioner that intemal electric resistance heaters(if any) accordance with Tables 6.8.2A and 6.8.2B
is either air-cooled or evaporatively cooled have controls to prevent supplemental heater and sealed in accordance with Tables
and meets the efficiency requirements shown operation when the heating load can be met 6.4.4.2A and 6.4.4.28.
in Table 6.8.1.List equipment in the table by the heat pump alone.
below. o (I)Construction documents require air
❑ (h)The system controls do not permit reheat systems to be balanced in accordance with
o (c)The system has an air economizer as or any other form of simultaneous heating industry-accepted procedures to within 10%
required by Table 6.5.1,with controls as and cooling for humidity controL of design airFlow rates.
requi�ed in Tables 6.5.1.1.3A and 6.5.1.1.3B.
The economizer has either barometric or ❑ (i)Systems are provided with a time switch o (m)'Where separate heating and cooling
powered relief sized to prevent that(1)can start and stop the system under equipment serve the same temperatu�e zone,
overpressurization of the building.Outdoor air different schedules for seven different day- thermostats are interlocked to prevent
dampers for the economizer use are provided types per week;(2)is capable of retaining simultaneous heating and cooling.
with blade and jamb seals. programming and time setting during a loss
of power for a period of at least 10 h;(3) o (n)Exhausts are equipped with gravity or
❑ Exception:The cooling e�ciency meets includes an accessible manual override that motorized dampers that will automatically
or exceeds the efficiency requirement in allows temporary operation of the system for shut when systems are not in use.
Table 6.3:2.Document in table below. up to 2 h;(4)is capable of temperature
setback down to 55°F during offhours;and � Exception:Design capacity is less than
❑ (d)Heating(if any)shall be provided by a (5)is capable of temperature setup to 90°F 300 cfm.
unitary packaged or split-system heat pump, during off hours. ❑ Exception:System operates
a fuel-fired furnace,an electric resistance continuously.
heater or a baseboard system connected to a o Exception;System serves hotel/motel
boiler.AI(heating equipment meets the guest rooms. O (o)Systems have optimum start controls.
efficiency requirements of the Standard.List ❑ Exception:System operates
equipment in table below. continuously. 0 Exception:Supply air capacity is less
than 10,000 cfm.
o (e)The outdoor air quantity is less than or ❑ Excepfion: System hasboth a cooling
equal to 3,000 cfm and less than or 70%`of or heating capacity less than 15,000
the supply air quantity at minimum outdoor air Btu/h and a supply fan motor power
design conditions. g�eater than 3/4 hp.
E uipment Efficienc
System Mfg.& Equipment Heafing Cooling
Tag(s) Model Type
No. Rated Rated Minimum Rated Rated Minimum Econ.
Capacity Efficiency Effibiency Capacity Efficiency Efficiency Min.
Efficiency '
H p
�,� 0
ANSI/ASHRAE/IESNA Standard 90.1-2004 � _E m
� . °.. • . • � � ; � . . � � . :
Project Name;Paragon Outlets Building 500
Project Address: 3985 Eagan Outlets Parkway Eagan,MN Date: 3/4/2013
HVAC System Designer of Record: Jeffrey M.Zunt Telephone: 330-659-6688
Contact Person: Jeffrey M.Zunt Telephone: 330-659-6688
City: Eagen Climate Zone: 6A
Zip:55122 1%Sumrner DB Temp: 91 F 1%Summer WB Temp: 73 F 99.6%Winter Ternp: -16 F
Mandato Equipment Efficienc Worksheet 6.4.1.1
System Tag Equipment Type(Tables Size Category(Tables Sub-Category or Rating Units of E�ciency Minimum Efficiency(Tables
6.8.1A through G) 6.8.1A through G) Condition(Tables 6.8.1A (Tables 6.8.1A 6.8.1A through G)
through G) through G)
Rated >_ Required
8.5 Ton Air Cond.Air Cooled >65,000 <135,000 Single Package EER 13.0 >_ 10.3
10 Ton Air Cond.Air Gooled >65,000 <135,000 Single Package EER 12.5 >_ 10.3
15 Ton Air Cond.Air Cooled >135,000 <180,000 Single Package EER 12.0 >_ 9.7
>
>
>
>
Mandato Non-Standard Gentrifu al Chiiler Worksheet 6,4.1.1
System Tag Leaving CHW Entering CW Condenser Flow Rate Size Category Minimum Efficiency(Tables
Tempe�ature(°F) Temperature(°F) (gpm/ton) (Tables 6.8.1H 6.8.1H through J)
through J)
Rated >_ Required
>
>
>
>
General Mandatory Requirements � Piping insulation meets or exceeds the Special Mandatory Requirements
requirements of the Standard(§6.4.4.1.3).
❑ Load calculations are provided for selection o Freeze protection or snow/ice melting
of all equipment and systems(§6.4_2). m Construction documents require record systems(if any)have controls to prevent
❑ Stair vents,elevator shaft vents,gravity drawings(§6.7.2.1),manuals(§6.7.2.2), operation in warm weather(§6.4:3T}.
system balancing(§6.7.2.3)and system
hoods,gravity vents and gravity ventilations �mmissioning`(§67.2.4). O Independent perimete�heating systems(if
are provided with motorized darnpers. any)compiy with the control requirements of
o Facception:Gravity dampers are used
§6.4.3.1.1 and§6.4.3.2.
since the building is less than 3 stories ❑ Independent heating and cooling thermostatic
or in climate zones 1-3. controls(if any)are interlocked to prevenf
o Exception:No vents are required as
crossover of set points(§6.4.3.2).
these systems ventilate unconditioned
zones.
��9
0
ANSI/ASHRAE/IESNA Standard 90.1-2004 � � E �
� •r � i i � � � ' ". �'-
Project Name: Paragon Outlets Building 500
Contact Person;Jeffrey M.Zunt Telephone: 330-659-6688
S stems Worksheet 6.4
System Tag 8.5 Ton 10 Ton 15 Ton
Supply CFM 3800 4000 6000
Supply ESP(in.w.c.) �^ �^ ���
Fan System HP 3.75 3.75 3.0
OA CFM{i.e.Outdoor Air CFM) 760 800 1200
Automatic Shutdown(§6.4.3.2.1) C1 C1 C1
Deadband(§6.4.3.1.2) N2 N/A N2 N/A N2 N/A
Setback Controls(§6.4.3.2.2} C1 C1 C1
Setup Controls(§6.4.3.2.2) C1 C1 C1
Optimum Start(§6.4.3.1.3) N3 N/A N3 N/A N3 N/A
Zone Isolation(§6.4.3.1.4) N3 N/A N3 N/A N3 N/A
Shutoff Darnpers(§6.4.3.3.3) C2 C2 C2
Heat Pump Aux Heat{§6.4.3.4) N1 N/A N1 N/A N1 N/A
HumidifierPreheat(§'6.4.3.5) N1 N/A N1 N/A N1 N/A
Humidification/Dehumidification Deadband(§6.4.3.6) N1 N/A N1 N/A N1 N/A
Ventilation Control(§6.4.3.8) N/A N/A N/A
Duct/Pienum Insulation(§6.4.4.2.1) C1 C1 C1
Duct Sealing Levels(§6.4.4.2:1)SupplylRetum A A A A A A
Duct Leakage Test(§6.4.4.2'.2) Y Y Y Y Y Y
In the table above,enter the appropriate codes Setup Controls Heat Pump Aux Heat
from this tist: . G1 Setup provided(up to 90F) • C1 Complying controls provided
Shutdown • N1 N/A continuous operation . N1 N/A system is not a heat pump
C1 Complying nonresidential time switch ' N2 N/A 515 kbtu/h or<3/4 hp . N2 N/A auxiliary is not electric or is not
• with override • N3 N/A 1%Sum DB<=100F provided
.
C2 Complying residential time switch with • N4 N/A no cooling • N3 N/A heat pump covered by NAECA
override Optimum Start Humidifier Preheat
• N1 N/LI continuous operation . Ci Optimum start provided • C1 Complying controls provided
• N2 N/A S15 kbtu/h or Q/4 hp . N1 N/A continuous operation • N1 N/A no humidifier
• N3 N/A hotel/motel guestroom . N2 N/A_<15 kbtu/h or Gi/4 hp
N3 N/A su I <-10,000 cfm Humidification/Dehumidification Dead Band
Dead Band � pP y . C1 Complying contro/s provided
• C1 Dual setpoint control Shutoff Dampers • N1 N/A no humidification and/or
• C2 Manual change over control . C1 Motorized shutoff dampers on OA and dehumidifrcation
• N1 N/A special occupancy(requires Exh
approval) . C2 Gravity shutoff dampers on OA and Exh Duct/Plenum Insulation
• N2 N/A heating orcooling only . N1 N/A continuous operation • C1 Complying insulation provided
N2 N/A_<15 kbtu/h or 4i/4 h • N1 N/A all ducts located in conditioned
Setback Controls ' p space
• C1 Setback provided(down to 55F) • N3 N/A OA/EA<=300 cfm
' p Zone Isolation Duct Sealin
Ni N/A continuous o eration 9
• N2 N/A s'15 kbtu/h or Gi/4 h • Enter highest sea/level(A,8 or C)for
p • C1/solation zones provided
• N3 N/A 99.6%Win DB>40F suppiy and return
+ N7 N/A continuous operation
• N4 N/A radiant heating . N2 N/A_<15 kbtu/h or Q/4 hp Duct Leakage Test
• N5 N/A no heating . N3 N/A al!zones on same schedule • Y Ducts will be fested for leakage
• N4 N/A OA/EA<=5,000 cfm • N Ducts wiN not be tested for leakage
y ~ 4
0
ANSI/ASHRAE/IESNA Standard 90.1-2004 � ���
� • -� � . � _ � � , .. . .
� . � . . .
. ...
Project Name: Paragon Outlets Building 500
Contact Person: Jeffrey M.Zunt Telephone: 330-659-6688
Prescriptive Checklist
heat addition and loop heat rejection(if any}
Prescriptive Economizers(§6.5.1) Specify economizer exemptions: comply with the requirement5of§6.5.2.2.3.
m Systems employ airside economizers o System pumps greater than 10 hp employ
(§6.5.1.1). variable flow controls(§6.5.4.1),pump
� Economizer provides'up to 100%design isolation{§6.5.4.2)and temperature reSet
airflow in outdoor air(§6.5.1.1.1). Prescriptive AirSystem Requirements (§6.5.4.3).
� Economizer is integrated with the mechanical O Simultaneous Heating and Cooling Prescriptive8pecial System Requirements
cooling system(§6.5.1.1.2 and§6.5.1.3). (§6.5.2.3).
o All heat rejection equipment with motors?7.5
� Economizer high limit shutoff complies with � Zone minimums were set to meet the hp employ controls that comply with§6.5.5.
§6.5.1.1.3. requirements of Standard 62.
o Exhaust Air Energy Recovery:all fan systems
� Economizer dampers meet or exceed � Zone minimums were set to 50.4 cfm/ftz of that have both a design supply capacity of>_
leakage requirements(§6.5.1.1.4). zone conditioned floor area. 5,000 cfm and a minimum outdoor air suppiy
of>_70%of the design supply air employ an
� System provides relief for up to 100%design � Zone minimums are less than 300 cfm. energy recovery system that complies with
airFlow in outdoor air{§6.5.1.1.5).
❑ Other(requires special documentation and §6.5.6.1.
m Economizer complies with the heating system approval}. ❑ Heat recovery for service water heating is
impact requirements(§6.5.1.4). ❑ Humidity controls(if any)comply with the provitled for facilities that operate
❑ Systems employ waterside economizers. requi�ements of§6.5.2.3. continuously,have a total water-cooled heat
rejection capacity exceeding 6,000,000 btu/h,
❑ Economizer can provide 100%of the load at o Systems that employ hydronic cooling and and have a design service water heating load
either the outdoor conditions of 50°F db/45°F have hurnidification(if any)use a waterside exceeding 1,000,OOO,btu/h.The heat
wb or 45°F db/40°F wb where re uired for economizer thaf complies with 6.5.1.
q § recovery system(if any)complies with
dehumidification purposes(§6.5.1.2.1). ❑ Variable air volume fan controls comply with §6.5.62.
❑ Precooling coils and heat exchangers have the requirements of§6.5.3.2. ❑ Kitchen hoods with exhaust flows>5000 cfm
either a_<15 ft of WC pressure drop or are comply with the requirements of§6.5.7.1.
Prescriptive Water-System Requirements
bypassed when economizer is not in use(§ o Fume hoods with a total exhaust system flow
6.5.1.2.2). o Three-pipe systems are not used(§ >15,000 cfm comply with the requirements of
m Economizer is integrated with the mechanical 6.5.2.2.1). §6.5.7.2,
cooling system(§6.5.1.3). ❑ Two-pipe changeover heatinglcooling o Radiant heaters compiying with§6.5.8.1 are
systems(if any)comply with the
m Economizer complies with the heating system requirements of§8.52.2.2. used to heat unenclosed spaces(if any).
impact requirements(§6.5.1.4}.
❑ Hydronic(ground-or water-loop)heat pump � The cooling equipment with hot-gas bypass
o Systems are exempt from the economizer systems that have equipment for both loop �ntrols(if any)meets the unloading
requirements. requirements of§6.5.9.
9�p
0
ANSI/ASHRAE/IESNA Standard 90.1-2004 � � E �
� �� - � � � . . � � _
Project tvame: Paragon Outlets Building 500
Contact Person: Jeffrey M.Zunt Telephone: 330-659-6688
Complete one worksheet for each fan system > 5hp
Prescriptive Fan Power Limitations 6.5.3.1
Supply Fan Retum Fan Exhaust Fan Series-Style Fan-Powered Total System
Box Motor(hp)
Tag Supply CFM Motor{hp) Tag Motor(hp) Tag Motor(hp) Tag Motor(hp)
E-Total Supply CFM Total System Motor HP�
Table 6. . . e hp/cfm
Total Supply CFM X cfm
Constant + 1,000
�
HP Ailowance = hp(=Value X CFM/1000) z
Credits andlor adjustments"'� Adjusted HP Allowance' hp(see§6.5.3.1) >_
"Attach calculations and documentation if credits or temperature adjustments are used.Refer to§6.5.3.1 for the formulas
Credits and adjustments are available for the following:
• Clean filter pressure drops in excess of 9 in.w.c.;
• Pressure drop due to heat recovery coils or devices or evaporative cooling equipment or devices
• Relief fans that operate during peak cooling due to high ventilation rates;and
• Room to cooling air supply temperature differences that are greater than 20°F(e.g.low temperature supply).
d��P
0
ANSI/ASHRAE/IESNA Standard 90.1-2004 � d E �
. •
BUILDING 500
:s • � • . - � � r ' . � ~, � . . - �
Pro�ect Name: PARAGON OUTLETS AT CEDAR`GROVE '
Project Address: TB� Date: 3:4.2d�3
oesignerotRecord: JEFFREY MITERKO -re�ephone:330,659.6688
Contact Person:GREG SUTYAK Telephone: 330.:659.6688
c�cy: EAGAN, MINNESOTA
Mandatory Provisions Checklist
Automatic lighting shutoff controls are provided m Each;space enclosed by ceiling-height ❑ Two-lamp tandem-wired ballasts.
based on either a scheduling device or an partitions has an indepentlent,accessible
occupant sensoc control that operates general lighting in the � Display lighting has a separate control.
❑ Exception: Space is intended for 24- space. ❑ Case lighting has a separate controL
hour operation. ❑ Exception: The control is locafed in a � Hotel/motel gaest rooms have a master
❑ ft2 ception: Space is smaller than 5,000 re sonsocation for safety or security switch at the main entry.
❑ Exception: Space for patient care. ❑ For spaces less than or equal to 10,000 ft2,a � Task lighfing has a separate control.
separate space control is provided for each ❑ Nonvisuai lighting has a sepa�ate controL
2,500 ft2 of area.
❑ Exception: Space where automatic 2 ❑ Demonstratian lighting has a separate
lighting shutoff would endanger safety or � For spaces more than 10,000 ft,a separate controL
space control is provided for each 10,000 ftZ
security. of area: m Exit signs do not exceed 5 W per face.
❑ Either a photosensor or an astronomical time ❑ Exterior building grounds luminaires greater
switch controls exterior lighting applications. than 100 W have lamps with minimum
❑ Exception: Lights must remain on for efficacy of 60 IumensiW.
safety,security or eye adaptation 0 'Exception: Luminaire is activated with a
reasons:` motion sensor.
Interior Li htin Power Allowance Buiidin Area Method
Builtling Lighting Power Density Building Area Lighting Power Allowance
TYpe (W/ft2) (ftz) (W)
Total
Interior:Li htin Power Allowance S ,ace-b -Space Method
Building CommoNSpecific Lighting Power Density Space Area Lighting Power Aliowance
TYPe Space Type {W/ft') (ft2) (W)
. . . . . � . . � CORRIDOR� � �� � 0.5 � . . . . . �� 753 � � � � . .. 376:5 � � . . . .
ELECT/MEGH 1S 501 751:5
Total 1128A
h�~q4
0
ANSI/ASHRAE/IESNA Standard 90.1-2004 � ���
. •
�
� � �. � . . : � .: ` " � � � ` � - . . �- ,
Pro�ect Name: PARAGON OUTLETS AT CEDAR GROVE
contact Person: GREG SUTYAK Te�ephone: 330.659.668$
interior Connected Li htin Power
TYPe „
�,
ID Luminaire Description � �� � Numberof Watts/ Total
(induding number of lamps pe�fixture,watts per lamp,type of ���� ��� m ��� Luminaires Luminaire Watts
baliast,type of fixture) �� � �- �s
�� � ��� m �
� �,�;a� � m s��
� � � o
�a
� � � �� �
ut� � ��d`� c z���:- �
�,-�c� u_ 2,� � �`=r� O
�� ��' �
AA � HIGH ABUSE,2-32W T8,ELEETRONIC� � � ��`�;�(� {���Q '(��-�� Q� � 10 60 � � 600
s
�,�:. s-�,.,�; �'
BB 4'INDUSTRIAL,2-32W T8,ELECTRONIC ��(� �_'�'„:a �; Q 8 60 480
�.�,. ���e�
0�;�0 ���0 �„�,���0
l�0 ��0 ���Q
0=:�0 =0��0 �����,0
��0 �<�0 `� p'
O��Q �O�O �::� O
Q��O ��0 ��0
��0 ��0 �� ;�p
�.
0�0 ��0 ��0
Total 1080
Additional Interior Li htin Power Allowance
_ Type
Space ID Space Name �' ' Area(ftz) Unit Allowance Allowance Luminaire Installed
����'` (W/ftz) (W) ID's Rower(W}
��.�
" �
> �a'3=
��� �w
�.c��
�� t`� `�a�:
�-�*' p ��rn
�� � �n�
��0 ��
��0 ��,
�0 �`�° '� �
�:��;
��0 ���"
���
� �0 �� �
k±�0 ��`�_
0�,0
���
, _ _„
��0 ���
h�p
0
ANSI/ASHRAE/IESNA Standard 90.1-2004 � E �,�`,
. ' �
� ._. � .. � ���� I . � >, � . •�: , ' � ' ' ,,_ v . , �_ �..'�.':^
Project Name: PARAGON OUTLETS AT CEDAR GROVE
Contact Person: GRE�'7 SU�A{'� Telephone: 33�.6�J9.66�8
Additional tnterior Connected Li htin Power
TYPe
p �, � ��� � �� Number of Watts/ Total
tD Luminaire Descri tion
(includingnumber of lamps per fixture,watts per lamp,type '�, '� �� m �m� Luminaires Luminaire Watts
of ballast,type of fi�u�e) = � ��� � ��1=�
� a� ��
� �
c �- '�: rn rn�
i�� a� �� �o m s:
. ,N y .���x p Q,�:
.'O� � � � -�r��&.. .
�,�� O ��F : � �Y�ti �
'� � ���'. C �-a-� L� .
. . ,� � � ' J ��� Q.
- -.� �`:x»v,s� . �
. � . '#� �' .�'� '«:� � .
. r-,s'�O tr��a�..�O ��..��0..
a�0 ��0 ��d
O 0 `����,0 ��O
O��O ��0 �U�0
��-��`'0 �,��0 ��0
Q�O �`�O ��p
�O ��0 ���0
Q` O O.�'�'O ��0
�r.��� ��
0�O �-'�0 ����Q
Total
h�p
ANSI/ASHRAE/IESNA Standard 90.1-2004 6 E m �'
._Lfi. � . . � � . . � .
Special Structural Testing & Inspection Program Summary Schedule
Project Name Paragon Outlets Cedar Grove Project# 12021
Location 3985 Eagan Outlets Parkway, Eagan, MN Permit# (1)
(Bu,ilding 500)
Technical 2) Description (3) Type of Specific Report Assigned Firm (6)
Section Article Inspection (4) Frequency(5)
1704.3 Steel Constr. Mat'I Verification SI -S Periodic
High Strength Boltin Si -S Periodic
Welding SI -S Continuous
1704.4 Conc. Constr. Reinf. Steel SI -S Periodic
Anchor Bolts SI -S Continuous
Design IVlix SI -S Periodic
Strength Test SI -S Continuous
Rlacement SI -S Continuous
Curing SI -S Periodic
Formwork SI -S Periodic
1704.5 Masonry Constr. Inspection SI =S Periodic
Prior to Grout SI -S Periodic
Grout Placement SI -S Continuous
Grout/Mo►tar Pris SI -S Continuous
Constr. Doc./Submi al SI -S Periodic
Compliance
1704.7 Soils Subgrade SI -S Periodic
Excavations SI -S Periodic
Controlled Fill SI -S Periodic
Placement of Fill SI -S Continuous
Subgrade Prep. SI -S Periodic
Note:This schedule shall be filled out and included in a Special Structural Testing and Inspection Program.
(If not otherwise specified, assumed program will be "Guidelines for Special Inspection &'Testing" as contained in the
Sta,te Building Code and as modified by the State adopted IBC.
*A complete specification-ready program can be downloaded directly by visiting CASE/MN at www.cecm.orq.
1. Permit number to be provide by the Building Official
2. Referenced to the specific technical scope section in the program
3. Use descriptions per IBC Chapter 17, as adopted by MN State Building Code.
4. Special Inspector-Technical (SIT);Special Inspector-Structural (SIS)
5. Weekly, monthly, per test/inspection, per floor, etc.
6. Name of firm contracted to perform services
1 ,
Acknowledgements
(Each appropriate representative shall sign below)
Owner Firm Paragon Outlets Eagan LLC. Date 26 j
Contractor Firm Ryan Companies US, Inc. Date J���y—/�
Architect Firm Dal Pos Architects, LLC. Date !� �
SER Firm Thorson Baker&Associates Date �j�1�,3
SI-S Firm Braun Intertec, Jnc. Date ��.� �
TA Firm Braun Intertec, Inc. Date `s���
F �1�,�w� Firm Linco Companies Date S �Z I )
If requested by Engineer/Architect of Record or Building Official, the individual names of all prospective Special Inspectors
and the work they intend to observe shall be identified as an attachment.
Le end
SER=Structural Engineer of Record SI-T =Special Inspector-Technical TA=Testing Agency
F= Fabricator SI-S =Special Inspector-Structural
Accepted for the Building Division By Date
BCSD-PR019 4/03
<�; ��;
Special lnspector Final Report
Date:
To City or County of:
Attention:
Street Address:
City: State: Zip Code:
RE: Final Project Report
Project Name:
Address:
To Whom it May Concern:
This is to certify that I performed special inspections on the following portions of the work at the above address which
required continuous inspection, and which I was employed to inspect:
Based on my personal observation and written reports of this work, it is my judgment that the inspected work was
performed, to the best of my knowledge, in accordance with #he approved plans, specifications, and the applicable
workmanship provisions of the Uniform Building Code.
Sincerely, '
Special Inspector's Signature Date
Print full name ID Number
cc: Client/Owner
Architect/Engineer
1 ' . � �y� 'rvb�� � �{ �`�� � � �� � �F '` �M�„�: { �� � #�� w'"!��"3+ms2.�s.
d � ��t �',�b# �Y . .4� }1 j 5�` `/ r g��
� ��iA.�� ���2 �� '�v�, .. y4:*��� �'..;� •..�` � �� �zj . � '} t` •�^ �Z
`4''� �.�v; . , N � • ""e ���a,` , .. '' �� J t .�' , .,;� ' A s;��
��
d r 4 �'. �yy' r 4 1 iK �Y f ,� c/� � P - � S �.
`P�'` ' .�#�Y� t�;k.��G . Y��t� � « � � � ���.: '�^-
Z�i��A `q. y���<<.�E � S :�� ' �. . � :..�. N� �l�y`,. S� 8_ ��`p' � �* LL
. . � "d� ,4�� ' ' +s;��Ci � } ��t�� ._+ ` �'� . � �/ � .4��. c�• i � y '� O
�'r � .� � -✓ �� ��� ��� � " �
J// �� �y4�$$A + � �• 11yy ��� '� l ;�� w � , k�" . .
%
� � � .. � b.. { •/ 4 "S�I�.,. W� • €" `� r��}��'n ../ j �' '. F,
�„"' 1 ° �-� �� • � �a�n M°'�'A4 �� �x.�, . t' �� O
'��+�� �ib, , ,�"�`��l �. � „� •„"� :.� � �r , . � �n
'�µ; .�*,. ' �s� � � y ;��, �� �,`��t �1'.. ` � � '�..� �� a {� 9���,. .
� � Y `� f. .f � �Y..�
�,`` // �•� m � � •� . � ' ,E� ��� �� �,lr� � � O
. �
� e �..e / �. � ... - ' N
Y
s"�� ';� � r�c`..' .:+^ .. r^ s ; , ..1'�: ��r . . '•�c .� � M
r
��'� � \`u�'\ O �, r � �� �'�'w Y �
.
. � �.,� { a ��a
-./"'" `� �, � � rz . :� r i . �:' �_
4 i� � '� �' ��'� \2-. �. �✓� �`� a � .> . .
,�s� �i d e
�N � y � %}` .; �. - :
y �� �
� i��i� � ' � � .
�� X ����f \�'�1 �1\,\ �j•4 ¢=~ +.� � . ��;
, y �- . �� � `\� ':a � �S
'��� � �G r �. 1'7" �� ����,�y ` �`.� 4, 1 �(tt g .a �a". 'a-
���� �%����� :� �� �. �7 . � ��k�� 1�",, �,., � i��� 4; 4 d �T .7,.� tt -`� ~�.,a+,_. , �
.N' � � � \1�� �� 1 ` r' • �1 ��.'
�t,.' 1� �� � �� j e,�Y��!�\�'�`����'�� �4J . e :�T�;t� �.k�.� t�r.��. t .i� i a vi� '. �.m�w
\0' `� . 4 - � �4 1 �14
` � �r %�� '� . � .����� � �� F �� r ,
. Yi �yj �l ��� �1 .'P•+� 1 y�' R�,�r,\3 ✓` � Y 4 (p C �'i'./
, �� '' �d � ,�,t �: �; : �� _ ,. c n . y; w i i'
�r�-• �.�.. `'
���`,``� 4, y��; � � �; � E o' ,. \ �'�� e 1 '� ��
x`�l� ,�� � ,���� / }� 1 '�4.�' � ��' � �i .
kr � '*. �/� �� > �:J�—•:---��s"^� ..
�� F �\�� �.}.l< G� \ ': �� ,�wZ? , � �.� q `� �,2� ��c'%^ .
C",
G , :�� � c , s-
RL 4! �� �,�.\� � `�♦ '3�'/ Tr ;S=A�.3 � - � x� r�
.� � ���� ` �. �� �v � ' Y � ;T' ���< :J" . . 1�`���� �� .
�� €�'��� ��:. V D� �,,.���� q �O� �t �,� -c-'
� �. '�� '�� �, i�S'� �P � � � � c ,yit.
� ' �
' '� M � .' • p,��� � � � J� Y O R . �� .'i,
,� .. .. � � q . V" , U L
�'��`�+ :� ` \ �` �, ' �✓4�� � .�SF P� Z¢ - { y_C ry ." � t`
�:: N <` `i ,�•a �,✓J�, '��V�\ •�,�y, r�, . � t,���r .'}`d"��'�`, ,t ;�
O) �� '�.���'� O . °��% ,,t� �,., � )
"� ch �� 'r J� .* �y ���� t 4+ti � .
,, �
, � 4
7 * ' ��
� �. `
\\ c• � `` �t{� P � .t +�s+ah��.�( >��
�a , ��.
`�', '�r '. � T3"��,r . '�t i � �'��tie� `.
� � �, � , � ,._ ,o ��0�t �, `-�"�,�` '� .3�' .(�
• � 4: ,�r; �, o�.� ,�..'i�. j"�`�„�'� �
.�'� �j � t+ .. � �� �.., p''�"#C � r',���
`., �b(�� �.k`'9 �:: .��� "� ; ��� .` ��� �` {�"'a . ..i+.e
\ � O� ,4'w� � '•�O�t � •e� +}�.
, r
V''� �� O if '� ��'�� R \� �� �' A`F`,, �� '�%� � � �.#
y� .� . L7. �' .
� f . � �`�'� � �,., t�`,�i1 ' `��
\t � `;� �£� + `��� ' ` '4
� M `t` ���i' `�A•����•���
.. , , ` �ric1`� '� � 67
� � �kE
:�
� ,r�,} � �4, ' t t +p�� +� vt� � .�U�� . . C
cn � co �, �s'' ��
! �` � rn �� '> . �.�`� !' �'� .� �'
� `� �,� `'ti'ti; � ��, ?'��,�'•,�` � / , t @��`ss �
�'fr �e''�' �`,r*.r-„��'�```jJ EL` 3 tt
. �.� �� �� ��P Y �
F�������;���i �� ,��. � � ttl �
�° .r\ a r`.
.\, , ,• ,,�' \ � �'�/,�h m �
� `�� �`� '� rr;3��� �� a v �'€, Q
� '' p�j � (Z� �r �j' ����, � N . '� �.
. � �,• 4;�.�c� 'y� �� A �� .� _
\ '� ��1 f`� i����'� f' � �`t ' �
W� .. ' ` �:. �. ��ry j` ���� ��� k��� � _
y �,. ' � V��'�� �J'f'j��S��{J, ��� �
�� �p,,���� �.Y���� . i I ti �
�" V .`� i� � ��� �� � � �-�E , � d - � ` L
�' . . .. \ ���J4� .� » �
��___� � �
.: � .. �"'�_-� _____""' '� . .
�. .,�_..,:_: w� t„+ �
. %���� * �� � �� , t���l ts'a���i..;��r t� '�
. �� � ' i
a �
, � � i .ro [_�:�-.K.. �
� 3 � .;� 3�f- t!! :�a t�-c e � N
�
�4 . _ //� .�/.�+�
� ,� � ... � � HC � V/ W
, ; � �. s � _� .-. � �
t � "
� ��� � � ' �� �����,. .. . � .:.. � O
.;, � � � :.r s
' � :�� � ' � , ; -,�` � j� �
� �� '�,��Y€ . ?` �� . A/ �
'� „� ' ,z ,�:��z '� #, L �
^' �� � � ��` � �
'�a e � .a �
. � ,- _
� � � < � � � �
� , -
,
. _ .
, � Ua
�� "��� ,_ �
�► Structurai Steei Special inspection
Fina1 Report
Cedar Grove Outlet Mall—Building 500
3905 Eagan Outlets Parkway
Eagan, Minnesota
Prepared for
Paragon Outlets Eagan LLC
Project BL-12-04579A
July 31, 2014
Braun Intertec Corporation
Braun Intertec Corporation Phone:952•995•2000
. iiooi Hampshire Ave S Fax: 952•995•2020
Minneapolis,MN 5543g Web: braunintertec.com
July 31, 2014 Project BL-12-04579A
Mr.Steven Trainer
Paragon Outlets Eagan LLC
217 E Redwood Street, 21st Floor
Baltimore, MD 21202
Re: Structural Steel Special Inspection Procedural and Finai Report
Cedar Grove Outlet Mall—Building 500
3905 Eagan Outlets Parkway
Eagan, Minnesota
Dear Mr. Trainer:
Please find attached to this procedural report the Structural Steel Special Inspection Final Report for the
Cedar Grove Outlet Mall Building 500 Project and the supporting Special Inspection Daily Reports.
Special Inspection and Testing Procedures
The special inspection services were periodically provided by International Code Council (ICC) certified
special inspectors in accordance with the requirements of the Minnesota State Building Code,
Chapter 17 of the International Building Code (IBC) and the project plans and specifications.
The purpose of special inspections is to provide a review of the contractor's work designated by the
project structural engineer as needing special inspection under the guidelines of the IBC to determine
compliance with the approved construction documents. The special inspector does not have the
responsibility or authority to, nor is it the intent of special inspections to have them,judge or modify
the construction documents. Only the structural engineer of record can do this.
As the special inspections were completed, a Special Inspection Daily Report was prepared to summarize
the results of our inspections and testing. A copy of this report was proviaed to the contractor's site
representative for their review and records. As part of this report, items needing correction or
discrepancies observed from the approved construction documents were noted. We also summarized
the discrepancies documented in a Discrepancy Log. As needed, we also contacted the project structural
engineer for additional clarification on specific issues related to the drawings or discrepancies observed.
Plans and Specifications
The plans and project documents available at the site were used for our inspections. From time to time,
we received plan modifications from the structural engineer. When received,these were used to
evaluate the work completed in the field.
Visual Examination of the Field-Made Welds
Visual examination of the fabrication shop welds was completed after the fabricated members were
delivered to the site in accordance with American Welding Society(AWS) D1.1-2008, Figure 5.4 and
Table 6.1 to document only the weld quality.
AA/EOE Prouiding engineering and enuironmental solutions since 1957
� Paragon Outlets Eagan LLC
Project BL-12-04579A
July 31, 2014
Page 2
Tension-Control Bolted Connection Observativns
Tension-control bolted connection observations were conducted to determine if the bolt holes were
filled, if the correct bolts were used, if the nuts were fully engaged and if the splined end of the tension-
contro! bolts had s�parated fr�r� t"e body of the bolt. Removal of the splined e��d is a direct indicator
the bolt has been torqued to the minimum snap-off load. At connections where the splined ends were
not, or could not be removed, the torque applied to the bolt by the contractor was determined using a
hand-held torque wrench. In addition, each connection was observed for fit-up and to determine if the
various plies were in contact with one another.
Metal Deck Weld and Fastener Observations
Metal deck weld observations were conducted in general accordance with AWS D1.3-2008, Section 6.0
requirements and the requirements of the project plans and specifications. Items reviewed included the
quality, size and spacing of the welds. In addition,the location and the completeness of the side-lap
fastener installation were observed and evaluated.
Column Anchor Bolt Observations
The column anchor bolts were observed to determine if they were in place, and if the nuts were
installed, fully engaged and snug tight. The base plates were observed to determine if they were in fuil
contact with the adjoining surface. If required by the construction documents, we also observed if the
plate washers were installed.
General
In performing its services, Braun Intertec used that level of care and skill ordinarily exercised by
reputable members of its profession currently practicing in the same locality. No warranty, express
or implied, is made.
Thank you for the opportunity to provide the special inspection and testing services for this project.
After review of the attached Special Inspection Final Report, if you have any questions or require
additional information, please call Dan Graham at 952.995.2524 or Marv Denne at 952.995.2510.
Sincerely,
BRAUN INTERTEC CORPORATiON �..�
�,��h�.��,�'- C �/ ���G�G'�-C-�'. / a����----`�
Daniel P. Graha`m
ICC Certifi d Special Inspector-Structural Steel and Welding
�
��'L ��=2�G��
C istopher R. Kehl, PE
Principal-Senior Engineer
�� i �����
� Paragon Outlets Eagan LLC
Project BL-12-04579A
July 31, 2014
Page 3
Attachment:
Structural Steel Special Inspection Final Report
c: Jeff Graham, PE; Thorson Baker&Associates, Inc.
Mark Kronbeck; Alliant Engineering, Inc.
James Miller; Dalpos Architects& Integrators
Craig Novaczyk; Gity of Eagan
Michael Thorson, PE;Thorson Baker&Associates, Inc.
Brad McCarter, PE; Braun intertec
�����.��..�..��..
��� �.,,
� ' Braun Intertec Corporation Yhone:952•995•2000
. iiooi Hampshire Ave S Fax: 952•995•2020
Minneapolis,MN 55438 Web: braunintertec.com
Structural Steel Special inspection Final Report
City of: Eagan Date: July 31, 2014
Attention: Mr. Steven Trainer
Project: Cedar Grove Outlet Mall—Building 500
3905 Eagan Outlets Parkway
Eagan, Minnesota
Braun Intertec Project: BL-12-04579A
In accordance with the Minnesota State Building Code, Section 1704 of the International Building Code
and the agreed-upon scope of services,the required special inspections and testing have been provided
for the following items:
Bolting. The bolted connections detailed in the attached Special Inspection Daily Reports were
observed in general accordance with the requirements of the plans and specifications.There are
currently no outstanding or unresolved bolted connection-related issues.
Structural Field Welding. The welded connections detailed in the attached Special Inspection Daily
Reports were observed in general accordance with the requirements of the project plans and
specifications. Discrepancies were noted and documented. These connections were found to be
acceptable following the required corrections as recommended by the engineer. There are currently no
outstanding or unresolved structural welding-related issues.
Metal Deck Welding and Fasteners. The metal deck welding and side-lap fasteners detailed in the
attached Special Inspection Daily Reports were observed in general accordance with the requirements
of the project plans and specifications.There are currently no outstanding or unresolved decking-
related issues.
AA/EOE Prouiding engineering and environmental solutions since 1g,57
• Paragon Outiets Eagan LLC
Project BL-12-04579A
July 31, 2014
Page 2
Conclusion
Based upon the inspections conducted, the testing performed and the attached reports, it is our
professional judgment that,to the best of our knowledge,the inspected work was performed and
completed ir accordance with the approved plans, specifications, engineer-provided m�difications and
applicable workmanship provisions of the Minnesota State Building Code and the International Building
Code.
fnspecting Firm: Braun Intertec Corporation
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer��ky k�id
under the laws of the State of Minnesota. t��„ ��:�F��;,��-,,
� `w ..'µy«p.p .,,,��0p� N,,^ .
//�<�/ ��„��+�g `k"�� �t:::.
/ o�<i�a� 6ea.1,. �r`,;�„�✓�1"�'.,'C�i�.u� .,, � .
� ' e°.+Y't5 e?.P�&::
Christapher R. Kehl, PE � �;yY �C��� ��� �`��
� ��-
��,.$ �Lde7�ti o.:�aF ,:�� . .
Principal-Senior Engineer 4,;,�b ,���,_ `
4�J1�°p�^ fl
License Number: 43459 ��,°a ���'��z���
July 31, 2014 ♦�„� ��'��~ �` �
�F �
Attachments:
Special Inspection Daily Reports 1 through 7
Summary of Discrepancy Log
��"�����$�:�.»,
��������:
� �y ������ Issue Date: 2U13/01I01 Rev Ido.: 0
� � <.
i���._.�,�.-�.r
_ � ��� .
- �a
` � Speciai Inspection Daily Report
City of Eagan, MN. Page 1 of 1
Report No.: Structurai Steel#i Date of this Re{��rR: 11-27-13
Project Name: Building 500 Project No.: BL-12-04579A
Project Address: 3905 Eagan Outlets Parkway
Client: Paragon Outlets Eagan ' Client Project No.:
Weather: Partly Cloudy PM Brad McCarter Temperature: 20 ° F
Type of Inspection: Inspection Coverage:
❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ Special Cases:
� Periodic �Wefding &Bolting ❑ Concrete ❑ Fireproofing
❑ Piles 8�Piers ❑ Tendon Placement ❑ Soils
Did the architect or engineer autharize changes to City-appraved plans? ❑Yes (Listed Below) ❑ No
Description and location of work completed:
_ _ _ __ _. . _
_ __ _ _ _ __ __ _
Visuai wefd observations were performed in accordance with AWS D1.1 criteria on the fo{lowing:
1) Bar joist fillet welds Roof Level Grid K-M.2 13-18.7 per Nucor Vulcraft details. No discrepancy noted
2) Anchor bolts at Foundation Level Grid K-M.2 13-18.7 plies in direct contact with full nut engagement present.
3) Truss girder fillet welds at Ro�f Level Grid K-M.2 13-18.7 per Nucor Vulcraft details. No discrepancy noted
List tests performed:
_ .
VFSUaI
• Are there any discrepancies noted from this day's observations? Yes ❑ No �
• Are there any outstanding discrepancies on this praject? Yes ❑ No �
o If yes, see attaehed Summary Sheet.
■ Report given to Contractor: Yes � No ❑
To the best of our knowledge, work inspected was done in accordance with the approved plans, spec�cations, and
applicable workmanship provisions of the current IBC, except as noted above,
Signed: Date: 11-27-13
Print Fu{I Name: Daniel P. Graham t.D. No.: 1054095 S1&S2
� �� � � ��, �; Issue Qste: 2013/0'1f01 Rev No.: 0
� � > .s� h� .
. ,� ;'� � �a -� :
�� ������� �. 7 �
a a� �� j
��� ��� <�
� ��;
. - �� �� Special fnspection Daily Report
City of Eagan, MN. Page 1 of 1
Report R�.: Structurai Steei#2 Date of 4his Report: i2-03-13
Project Name: Buiiding 500 Project No.: BL-12-d4579A
Project Address: 3905 Eagan Outlets Parkway
Ctient: Paragon Outlets Eagan Client Project No.:
Weather: Partly Cloudy PM Brad McCarter Temperature: 35 ° F
Type of Inspection: Inspection Coverage:
❑ Continuous ❑ Masonry ❑ Rebar P(acement ❑ Foundations ❑ Special Cases:
� Periodic �Welding &Bolting ❑ Concrete ❑ Fireproofing
i
❑ Piles&Piers ❑ Tendon Placement ❑ Soils
Did the architect or engineer authorize changes to City-approved plans? ❑ Yes (Listed Below) ❑ No
Description and location of work completed:
. __
_ _ __ _
Visual weld observations were perFormed in accordance with AWS D1.1 and D1.3 criteria on the following:
1) Bar joist fillet welds Roof Level Grid K-M.2 11-13 per Nucor Vulcraft details. No discrepancy noted
2) Anchor bolts at Foundation Level Grid K-M.2 11-13 piies in direct contact with full nut engagement present.
3} Truss girder fillet welds at Roof Level Grid K-M.Z 11-13 per Nucor Vulcraft details. No discrepancy noted
4} Puddle welds af Roof Level Grid K-M.Z 13-18.7 per structural details. No discrepancy noted
5) Deck support angle/splice bar fillet welds at Roof Level Grid K-M.2 13-18.7. No discrepancy noted
List tests performed:
. __ _
. _ _ _ _ __
Visual
■ Are there any discrepancies noted from this day's observations? Yes ❑ No �
■ Are there any outstanding discrepancies on this project? Yes ❑ No �
o Ifi yes,see attached Summary Sheet.
■ Report given to Contractor: Yes � No ❑
To the best of our knowledge, work inspected was done in accordance with the approved pians, specifications, and
appficable warkmanship provisions of the current iBC, except as noted above.
Q
3igned: � Date: 12-03-13
Print Ful( Name: Daniei P. Graham I.D. No.: 1054095 S1&S2
�������' Bssue Date: 2013/01/01 Rev No.: Q
� ������� �:
'� ����������
� �
����;m����-�
�_ ��
������• � .
� �: � � :��
�� � `�9 � �� �� Special Inspection Daily Report
�
City of Eagan, MN. Page 1 of 1
r'tepori ivo.: Struciurai Steei#3 Da4e of this �Feport: 12-1 u-i 3
Project Name: Building 500 Project No.: BL-12-04579A
Project Address: 3905 Eagan Outlets Parkway
Client: Paragon Outlets Eagan Client Project No.:
Weather: Partly Cloudy PM Brad McCarter Temperature: 5 ° F
Type of Inspection: Insoection Coverage:
❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ Special Cases:
� Periodic � Welding 8� Bolting ❑ Concrete ❑ Fireproofing
� Piles 8� Piers ❑Tendon Placement ❑ Soils
� Did the architect or engineer authorize changes to City-approved plans? ❑ Yes (Listed Befow) ❑ No
Description and location of work completed:
__ .._ _ . _ _ __ . __ _ _ _ __ __ . _._ _
Visual weld observations were performed in accordance with AWS D1.1 and D1.3 criteria on the following:
1) Bar joist fillet welds Roof Level Grid K-M2 4-11 per Nucor Vulcraft details. No discrepancy noted
2) Anchor bolts at Foundation Level Grid K-M.2 4-11 (at accessible locations) plies in direct contact with full nut
engagement present.
3) Truss girder fillet welds at Roof Level Grid K-M.2 4-11 per Nucor Vulcraft details. No discrepancy noted
4} Side lap fasteners on roof deck at Roof Level Grid K-M.2 13-18.7 per structura! details. No discrepancy noted
List tests performed:
_ _ _. __ __ _-. _ ___ _
Visual
■ Are there any discrepancies noted from this day's observations? Yes ❑ No �
■ Are there any outstanding discrepancies on this project? Yes ❑ No �
o Ifi yes, see attached Summary Sheet.
■ Report given to Contractor; Yes � No ❑
To the best of our knawledge, work inspected was done in accordance with the approved plans, specifications, and
applicable workmanship provisions of the current IBC, except as noted above.
�igned: "'�'V Date: 12-10-13
Print Full Name: Daniel P. Graham I.D. No.: 1054095 S1&S2
��LTES� �f3R INFORIVIATI010T �Y� 0
N,���,�,�.�wn�,�a,
Project: Paragon Outlet Mall RFI#: 0283
Project No: 003334000-LIVE Date: 13-Dec-2013
To: Thorson Baker&Associates
Attn: Jeff Graham
Subject: Building 500 short joist tail
Please review the following matter and advise us how to proceed:
Between grids 11 and 12 on grid M.2, there are 7 joist tails that are too short, which carry the outside
building angle. Attached is a photo of the iron workers proposed fix. They have added 6x6 tubes and
3x3 angles to the tails of the joists to carry the outside building angle. Is this acceptable?
Suggested Response
Cost Impact: Unknown
Estimated Cost Amount: 0.00
Schedule Impact: Unknown
Impact Day Type: Calendar Day
Estimated Impact Days: 0.00
Further information regarding the above question (question clarification):
Please respond no later than 20-Dec-2013 to minimize delay or interference with our ability to proceed with
the work.
Reply To: Nolan P Beron Company: Ryan Companies US,Inc.
Please respond via Froliance if you have a Proliance User Account,otherwise please respond via email.
Reply:
this is acceptable
Further information regarding the above reply (answer clarification):
Reply provided by: Jeff Graham Company: Thorson Baker&Associates
Attachmentsf References:
� SG^v joist tail iZFi.pdf
� ��� ���,
� -- x � Issue Date: 2013l01/01 Rev No.: 0
� � v � ;�.. a
r, a..� � `"i�;
�� �-. *';
� ���� �',�: � � . �. ��
�.'��' :<"� �
- ��� Special Inspection Daily Report
City of Eagan, MN. Page 1 of 1
Repo�Ro.: Structural Steel#4 Date of�his Repor�t: 1-'i3-i4
Project Name: Building 500 Project No.: BL-12-04579A
Project Address: 3905 Eagan Outlets Parkway
Ctient: Paragan Outlets Eagan Client Project No.:
Weather: Partly Cioudy PM Brad McCarter Temperature: 30 ° F
Type of Inspection: Inspection Coverage:
❑ Continuous � ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ Special Cases:
� Periodic �Welding & Bolting ❑ Concrete ❑ Fireproofing
❑ Piles& Piers ❑ Tendon Placement ❑ Soils
Did the architect or engineer authorize changes to City-approved plans? ❑ Yes (Listed Below) ❑ No
Description and location of work cornpleted:
_ _ _
_ _ . __ . _ _
Visual weld observations were performed in accordance with AWS D1.1 and D1_3 criteria on the fallov+ring:
1) Puddfe welds and side lap fasteners at Roof Level Grid K-M.2 4-13 per structural details. No discrepancy noted
2) Deck support angle/splice bar fiflet welds at Roaf Level Grid K-M.2 4-13. No discrepancy noted
. 3} Tower framing tube steel/x-brace angle fillet welds Grid K-M.2 4-18.7. No discrepancy noted
4) Lower girt tube steel to plate fillet welds (mid-level tube) Grid K-M.2 4-18.7. No discrepancy nated
List tests performed:
_ _ . __.
_ __ _ _ __
Visual
• Are there any discrepancies noted from this day's observations? Yes ❑ No �
• Ars there any outstanding discrepancies on this project? Yes ❑ No �
o If yes, see attached Summary Sheet.
• Report given to Contractor. Yes � No ❑
To the best of our knowledge,work inspected was done in aecardance with the approved plans, spec�cations, and
applicable workmanship provisions of the current IBC, excepf as noted above.
Signed: Date: 1-13-14
Print Fult Name: Daniel P. Graham l.D. No.: 1054095 S1&S2
- �; ����-° ,��� ��� �,� ; Issue€3ate; 2013(�1l�9 Rev No.: f�
��� � .- �,� .: �
� ��
�� t � �
�� �. �� ti��'� �
�,�,�� �� �
������ ���
� ���� _� Special Inspection Qaily Report
�� ����,�.._ �.
City of Eagan, MN. Page 1 of 1
Report No.: Structural Steel#5 �ate of this Report. 1-15-14
Project Name: Building 500 Project No.: BL-12-04579A
Project Address: 3905 Eagan Outlets Parkway
Client: Paragon Outlets Eagan Client Project No.:
Weather: Partiy Cloudy PM Brad McCarter Temperature: 30° F
Type of irtspection: Inspection Coverage:
❑ Corrtinuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ S�cial Cases:
� Periodic � Welding �Bolting ❑ Goncrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement ❑ Soils
Did ths architect or engineer authorize changes to Gity-approved plans? ❑Yes (Listed Belaw) ❑ No
Description and focatian of work comp}eted;
_ _ _ __ _
1} PerFormed visual observations of A325 TC Bolts. Roof framing grid J.8-M.S,4.44-19.1. No Discrepancies Noted.
_ _ _
List tests performed:
_ _ __ _
_
Visual
� Are there any discrepancies noted from this day's observations? Yes ❑ No �
■ Are there any outstanding discrepancies an this project? Yes ❑ No �
� If yes, see attacheti Summary Sheet.
• Report given to Contractor: Yes � No ❑
To the best of our knowledge,work inspected was�one in accordance with the approved plans, s�ecifications, and
applicable workmanship provisions of the current 1BC, except as noted above.
Signed: ��----"�— Date: 1-15-14
Prirrt Fut1 Name: Troy Baumann LD. IUo.: 5067860 S1&S2
Providing engineering and environmentat solutions since 4957
a "� '° � Issue Date: 2Ai3101lfl9 Rev fUo.: D
_ ;,�a �`� � ��
�-°- ���
�t,
��� �� ��
��.�;�� ��;; ,����
�.�'��� � ������� -
��-������������ Speciai Inspection Daily Report
City of Eagan, MN. Page 1 of 1
Re�crt No.: Strt,ictural Steei�S Date of this R�poet: 1-25-14
Project Name: Building 500 Rroject No.: BL-12-04579A
Project Address: 3905 Eagan Outlets Parkway
Ciient: Paragon Outlets Eagan Client Project No.:
Weather: Partly Cloudy PM Brad McCarter Temperature: 30° F
Type of Inspection: inspection Coverage:
❑ Corrtinuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ Special Cases:
� Periodic � Welding& Botting ❑ Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement ❑ Soils
Did the architect or engineer authorize changes to City-approved plans? ❑Yes (Listed Below} ❑ No
Description and)ocation of work completed.
__ _ _
The foliawing visual observafions were perfiormed on bar jaists from stab on grade(various areas with damaged
chords/lacings). Results as follow to be reviewed by the joist supplier, Nucor:
*A) Grid L-M, 12-13,2nd joist Sauth of L,6th apex from 12 towards 13, east diagonal bent approz. 1J2"
*B} Grid K-L, 5-6, 1 st joist North af L, 6th apex firom 5 towards 6, east diagonal bent approx. 1/2"
*C) Grid K-L, 8-9, 2nd joist North of L, 6th apex from 8 towards 9, east diagonal bent approx. 1/2"
*D} Grid K-L,$-9, 3rd joist North of L, 6th apex from 8 towards 9, east diagonal bent approx. 1/2"
*E} Grid K-L, 17, joist North of L,6th apex from east diagonal bent approx. 1/2"
___ _ _
_ _ _ _ _ - __ _
List tests pertormed:
_ _ _
Visual
• Are there any discrepancies noted from this day's observations? Yes � No ❑
■ Are theee any outs#anding discrepancies on fhis project? Yes � No ❑
o If yes, see attached 8ummary Sheet.
■ Report given to Contrador: Yes � No ❑
To ihe best of our knawledge,work inspected was done in accorriance writh the approved plans, specifica#ions, and
applicable workmanship provisions of the current lBC, except as noted above.
S igned: ��— Date: 1-29-14
Rri�rt Full Name: Troy Baumann i.D. No.: 5Q67860 S1&S2
Providing engineering and environmenta/sotutions since 1957
� � � ���`�.� � � .
����,��� � � ' issue Date: 2413/01/01 Rev No.: 0
�'h�.
, 'F'�� Y �h _.Y� �
' �"��� a -�t 3 r�'",�, .
��� ��s �
��.������,..�`"s.�.' � '; ..
� � �����=g Speciaf inspection Daily Report
.�,:�.� �� :{� w
City of Eagan, MN. Page 1 of 1
�teport No.: Structurai Stee!�? Date of this Rep�r±: 4-14-14
Project Name: Building 500 Project No.: BL-12-04579A
Project Address: 3905 Eagan Outlets Parkway
Client: Paragon Outlets Eagan Client Project No.:
Weather: Indoors PM Brad McCarter Temperature: 60 ° F
Type of Inspection: Inspection Coverage:
❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ Special Cases:
� Periodic �Welding & Bolting ❑ Concrete ❑ Fireproofing
❑ Piles &Piers ❑Tendon Placement ❑ Soiis
Did the architect or engineer authorize changes to City-approved plans? ❑Yes (Listed Below} ❑ No
Description and location of work completed:
. _ . _ _ _
�sual weld observations were performed in accordance with AWS D1.1 2010 criteria on outstanding discrepancies on
Report#6 1-29-14 Item A) Grid L-M, 12-13, 2nd joist South of L, 6th apex from 12 towards 13, east diagonal bent
approx. 1/2", Item S} Grid K-L, 5-6, 1st jaist North of L, 6th apex from 5 towards 6,east diagonal bent approx. 1/2", ftem
C) Grid K-L, 8-9, 2nd joist North of L, 6th apex from 8 towards 9, east diagonal bent approx. 1/2", Item D) Grid K-L, 8-9,
3rd joist North of L, 6th apex from 8 towards 9, east diagonal bent approx. 1/2"and Item E) Grid K-L, 17, joist North of
L, 6th apex from east diagonal bent approx. 1!2"have now been repaired/reinforced per Nucor fixes_ No discrepancy
noted
1) Bar joistJtruss girder bottom chord to column stabilizer fillet welds at Roof Level Grid J.8-M 26.8-40.8 per Nucor
Vulcraft details a�u S5.1 notes. Pdo discr�pancy noted
Z) Uplift angle from bar joist to truss girder/beam fillet welds at Roof Level Grid J.8-M 26.8-40.8 per Nucor Vulcraft details
and S5.1 details. No discrepancy noted
List tests performed:
_ __ _
Visual _ _
._ _ _ _ _ _ ._ _ _ _
■ Are there any discrepancies noted from this day's observations? Yes ❑ No �
■ Are there any outstanding discrepancies on this project? Yes ❑ No �
� If yes, see attached Summary Sheet.
• Report given to Contractor: Yes � No ❑
To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications, and
appticable workmanship provisions of the current IBC, except as noted above.
�
Signed: `�� Date: 4-14-14
Print Ful! Plame: Daniel P. Graham l.D. No.: 1054095 S1&S2
f
� �s� � � ��� ; issue Date: 2093(01/01 itev No.: 0
� � � �
�.�' "� �.��� A ���" �
` ''� ������a6 ' � �
�� _Y �������� ; Summary of Discrepancies Needing Correction or Review
� � � by the Design Engineer or Architect
��� . ,
Project Name: Paragon Outlets Eagan
Project Address: Building 500
The following items must be reviewed by the engineer and/or corrected andlar inspected before work can cantinue in the area.
Report No. Report Description Resolution to O/C Status
Date Discre anc
The following visual observations were performed on har joists
fram slab on grade(various areas with damaged chords/lacings).
Results as follow to be reviewed by the joist supplier,Nucor.
*A) Grid L-M, 12-13,2nd joist South of L,6th apex from 12
towards 13,east diagonal bent approx. 1/2"
*B) Grid K-L,5-6, 1st joist North of L,6th apex from 5
repaired per ciosed 4-14-
6 1-29-14 towards 6,east diagonal bent approx. 1/2" Nucor fixes 14
*C) Grid K-L, 8-9,2nd joist North of L,6th apex from 8
towards 9,east diagonal bent approx. 1/2"
*D) Grid K-L,8-9,3rd joist North of L,6th apex from 8
towards 9,east diagonal bent approx. 1/2"
*E) Grid K-L, 17, joist North of L,6th apex from east
diagonal bent a prox. 1/2"