3754 Vermilion Ct SFrom:ALLSTAR CONSTRUCTION 19529427464 09/03/2013 10:11 #482 P.011/043
314$1 3-is-a i 3-752,, 3154,
3155 3 -Mo, 3•-tba, 31(04
Date:
City of Eaafl
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
Y75(.0
3-1to (a
Use BLUE or BLACK Ink
For Office Use
Permit #: 03341
t15a. a.,‘
°k i i113
Permit Fee:
Date Received
Staff '"
J
S12112,015 2013 RESIDENTIAL BUILDING Mod
Site Address: 31'4 9)' 31,20 Vtl rAilioY tUth Unit #:
Resident/
Owner
Name: Phone:
Address / City / Zip:
Applicant is: Owner Contractor
Type of Work
Description of work: rt-11001"And Ye,- SI Cll
Construction Cost:* I 0 000 Multi -Family Building: (Yes / No
Contractor
Company: Oft( CiOnsiyucti0Y1 MarArket Contact: Wt tiliS ttia
Address: 51149 InalA Y 1 St. Mit %t # 103 City: MIK PtAi i n
� a 1,
State: M 1st Zip: 5535°1 Phone: -152 'H 2. - 1L1St-1
License #: 2C0431515 Lead Certificate #: N A -T.! 20°Itfly _O •
1 If the project is exempt from lead certification, please explain why: (see Page 3 for additional information)
In the last 12 months,
If
"�
COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING
has the City of Eagan issued a permit for a similar plan based on a master plan?
yes, date and address of master plan:
_Yes _No
Licensed Plumber: Phone:
• Mechanical Contractor:
Sewer & Water Contractor:
Phone:
Phone:
O E: Plans and supporting documents that you submit are considered to be public information. Portions of
the information may be classified as non-public if you provide specific reasons that would permit the City to
conclude that thaw are trade secrets.
CALL BEFORE YOU DIG. Call Gopher State One CaII at (651) 454-0002 for protection against underground utility damage. Call 48 hours
before you intend to dig to receive locates of underground utilities. www.aooherstateonecall.orq
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
Exterior work authorized by a building permit issued in accordance with the Minneso tate Building Code must be completed within 180
days of permit issuance.
x Ot Huls+eztd
Applicant's Printed Name
x
Applies] s Signat e
Page 1 of 3
*)
City of Eaan
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
RECEIVED
OCT 112018
Use BLUE or BLACK Ink
For Office Use
Permit #: 1.32/.3
Permit Fee:
Date Received: /0 .17-4)
Staff:
L
2016 RESIDENTIAL PLUMBING PERMIT APPLICATION
Date: 10/6/2016 Site Address: 3754 Vermillion Court South
Tenant:
Resident/Owner
Contractor
Type of Work
Permit Type
J
Suite #:
Name: Paul Krech Phone: 612-812-1408
Address / City / Zip: 3754 Vermillion Court South, Eagan, 55122
Name: Farr Plumbing & Heating, LLC License #: PC643680
Address: 2525 Nevada Ave. North, Suite 104
City: Golden Valley
State: MN Zip: 55427 Phone: 763432-9009
Contact: Jeff Quinn Email: jeff@farrplumbingandheating.com
New ✓ Replacement Repair Rebuild Modify Space Work in R.O.W.
Description of work: Install Water Heater
RESIDENTIAL
✓ Water Heater
Lawn Irrigation (_ RPZ / PVB)
Septic System
New
Abandonment
Water Softener
Add Plumbing Fixtures (_ Main / Lower Level)
Water Turnaround
RESIDENTIAL FEES:
$60.00 Water Heater, Water Softener, or Water Heater and Softener (includes State Surcharge)
$60.00 Lawn Irrigation (includes State Surcharge)
$60.00 Add Plumbing Fixtures, Septic System Abandonment, Water Turnaround* (includes State Surcharge)
*Water Turnaround (add $280.00 if a 3/4" meter is required)
$115.00 Septic System New (includes County fee and State Surcharge)
TOTAL FEES $60.00
CALL BEFORE YOU DIG. Call Gopher State One CaII at (651) 454-0002 for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq
I hereby acknowledge that this information is complete and accurate; that the work wit be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
.Jeff Quinn
Applicant's Printed Name
cAp iant's Signature
nature
FOR OFFICE USE
Required Inspections:
Meter Related Items:
Reviewed By: Date:
Under Ground Rough -In
Meter Size
Air Test
Gas Test Final
Radio Read Manometer Staff: