3639 Vermilion Ct N
From:ALLSTAR CONSTRUCTION 19529427464 09/03/2013 10:17 #482 P.032/043
3 t~ 2I, 3(p-*49
(Q~jt t 3(O~j~t Use BLUE or BLACK ink
Am A~
For Office Use
j Permit M I 1 J/
City of Eajan I ,
Permit Fee: 15a
as-
3830 Pilot Knob Road
Eagan MN 55122 ; Date Received: o
Phone: (651) 675-5675 I ~ I
Fax: (651) 675-5694 i staff. a6,
v
2013 RESIDENTIAL BUILDING PERMIT APPLICATION
Date• v 2I 2013 Site Address: 3(p~~-3~-iI Vtft1ioh W AVt ,,~y,~ Nor 11' 1,,
• 1 Unit
Name: Phone:
Resident/
Owner Address / City/ Zip:
Applicant is: Owner Contractor
Typeof Description of work: t of Zl
Wcif
ork
Construction Cost: 1) o Q Multi-Family Building: (Yes /No
)
Company: Contact: 000 i I-Alsit-A4
t
Contractor Address: 515 IY1~IA~1 r t-Al St. ~1dat 103 City: M~tDl~i P171 i n
State: M_Zip: 51035°I Phone:, 952.- 0142- 1~CJ~
_ s a F License* aUP3105ICJ Lead Certificate _ N A.T " 10116-0
t If the project is exempt from lead certification, please explain why: (see Page 3 for additional information)
COMPLETE THIS AREA ONLY IF CONSTRUCTING ANEW BUILDING
In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan?
,Yes _No If yes, date and address of master plan:
R
Licensed Plumber: Phone:
9 Mechanical Contractor: Phone:
Sewer & Water Contractor: Phone: '
NOTE. Plans and supporting documents that you submit are considered to be public information. Portions of
t the information may be classified as non-public if you provide speck reasons that would permit the City to
t conclude that the are trade secrets.
CALL BEFORE YOU DIG. Call Gopher State One Calf at (651) 454-0002 for protection against underground utility damage. Call 48 hours
before you intend to dig to receive locates of underground utilities. www.oopherstateonecall.org
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
Exterior work authorized by a building permit issued in accordance with the Minnesota tate Building Code must be completed within 180
days of permit issuance.
x 741 s+eZl x
App icant's Printed Name Appli s Signat e
Page 1 of 3
Ottliq
` , For Office Use �y �j
* iit i��: Permit#: 114"7l / t °)-tt-
••• Permit Fee: • s
C i VEDate Received: ;a /'D.D -
3830 PILOT KNOB ROAD I EAGAN,MN 55122-1810 i
(651)675-5675 I TDD:(651)454-8535 I FAX:(651)675-5694 FEB 2 2 2018 Staff: ill
buiidinninsoections@citvofeagan.com L
2018 RESIDENTIAL BUILDING PERMIT APPLICATION
2/21/18 3619,3621,9623,3626,38'27,3629,9831,9993,3635,3837,3698,3841 Vermaon Court Nat
Date: Site Address: Unit#:
Gassen Company Mt Company952-922-5575
, " , Name:Resident/- p yana Management Phone:
.K 6438 City West ParkwayEden Prairie MN 55344
ow
ner ` Address/City/Zip: `�
Applicant is Owner X Contractor
Attic Insulation
Ty ,afw
Description of work:
mmConstruction Cost: $15'000am
OO Multi-Family Building:(Yes X /No
, Total Construction & Maintenance Me arson
y
Company: Contact:
6438 City West Parkway Eden Prairie
o - 3r. Address. City;
MN 55344 952-641-9300 dower@totalConstruction.net
State: Zip: Phone: Email:
}
License#: BC718951 Lead Certificate#: NAT-F173204-1
If the project is exempt from lead certification, please explain why:
COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING
In the last 12 months,has the City of Eagan issued a permit for a similar plan based on a master plan?
Yes No If yes,date and address of master plan:
Licensed Plumber: Phone:
Mechanical Contractor: Phone:
r
Sewer&Water Contractor: Phone:
Fire Suppression Contractor:
Phone:
.vW\ . .__.. cu _.. t. you .,, considered to bednlbmi�stfon POrtio
NOTEPlans and supporting
document* public ili9rti0lta'Mefm114MtrrlaV4riniaybe
classified as ublic If •' , .vide a reasons that would it the 0. to conclude that i� esestets. °
You may subscribe to receive en electronic notification from the City of proposed ordinances by signing up for an email update on the City's
website at www.citvofeaoan.comisubscribe.
Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180
days of permit issuance.
CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you
intend to dig to receive locates of underground utilities. www. opherstateonecaJI.org
I hereby acknowledge that this information is complete and accurate;that the • •= in conforman•- 'th the ordlnan.'- : , codes of the City of
Eagan; that I understand this Is not a permit, but only an application for a •- •; and work is not to sta without a •:° it; at the work will be in
accordance with the approved plan in the case of work which requires a review a •approval o • ns.
1bPtN� Nisre.h AliPrN
x ..
Applicant's Printed Name Applisanrs
DO NQT WRITE BELOW THIS LINE
SUB TYPES
__ Foundation Fireplace _ Porch(3-Season) _ Exterior Alteration(Single Family)
Single Family _ Garage — Porch(4-Season) _ Exterior Alteration(Multi)
iMulti Deck Porch(Screen/Gazebo/Pergola) _ Miscellaneous
01 of_ Flex Lower Level ____ Pool Accessory Building
WORK TYPES
New — Interior improvement _ Siding _ Demolish Building*
_ Addition Move Building _ Reroof Demolish Interior
Alteration — Fire Repair _ Windows _— Demolish Foundation
— Replace _ Repair Egress Window __ Water Damage
_ Retaining Wall *Demolition of entire building-give PCA handout to applicant
DESCRIPTION er 2 BG R-3
Valuation /0 49rOccupancy Iiiie MCES System
Plan Review Code Edition fkQ/5 SAC Units
(25%_100% Y) Zoning ,21--3 Ci Water
City _ m
Census Code 131/ Stories — Booster Pump
#of Units /,2 Square Feet — PRV
#of Buildings / Length — Fire Suppression Required
Type of Construction _ .44-3 Width
REQUIRED INSPECTIONS
Footings(New Building) Meter Size:
Footings(Deck) Final/C.O. Required
Footings(Addition) Final/No C.O.Required
Foundation Foundation Before Backfill HVAC_Gas Service Test Gas Line Air Test
Roof: Ice&Water Final Pool: Footings Air/Gas Tests _Final
Framing 30 Minutes 1 Hour Drain Tile
Fireplace: Rough In Air Test Final Siding: Stucco Lath Stone Lath Brick EFTS
Insulation Windows
Sheathing RAP, Retaining Wall: Footings_Backfill Final
Sheetrock Radon Control
Fire Walls Fire Suppression:_Rough In_ Final
—
Braced Walls Erosion Control
Shower Pan Other:
Reviewed By: /ii ,Building inspector
AMPRIMBIRONIMOW
RESIDENTIAL FEE f
Base Fee
G �� 01(e5 •.;
Surcharge j p
Plan Review 1----- / 7 a
MCES SAC
City SAC
Utility Connection Charge
SSW Permit&Surcharge
Treatment Plant
Copies
TOTAL
Page 2 of 3