Loading...
3910 Cedar Grove Pkwy K25275 $67.00 ____Use_B_LUEorBLACK Ink For Office Use I L I R, Permit 1 F~l t I City of EataaR e cy4EO 3830 Pilot Knob Road I Permit Fee: Eagan MN 55122~►~ Z ~a~ I Phone: (651) 675-5675 I Date Received: Fax: (651) 675-5694 j I I Staff: r ! ~ I 2014 MECHANICAL PERMIT APPLICATION ❑ Please submit two (2) sets of plans with all commercial applications. Date: 4/23/14 Site Address: 3 910 Cedar Grove Parkway Tenant: V . P . Nails Suite Suite B Resident/Owner Name: Mid America Group Phone: Address/City/Zip: Minneapolis, MN 55416 Name: Modern Heating License Contractor Address: 2318 First Street N. E . City: Minneapolis State: MN Zip: 55418 Phone: 612-781-3358 Contact: Dan Krech Email: dkrech@modernhtg. com New Replacement X Additional Alteration Demolition Type of Work Description of work: Add air to air exchanger for ventilation NOTE: Roof mounted and ground mounted mechanical equipment is required to be screened by City Code. Please contact the Mechanical Inspector for information on permitted screening methods. RESIDENTIAL COMMERCIAL Furnace New Construction X Interior Improvement Permit Type -Air Conditioner Install Piping Processed Air Exchanger Gas Exterior HVAC Unit Heat Pump Under/Above ground Tank L_ Install Remove) Other RESIDENTIAL FEES $60.00 Minimum Add or alteration to an existing unit (includes $5.00 State Surcharge) $100.00 Residential New (includes $5.00 State Surcharge) = $ TOTAL FEE COMMERCIAL FEES Contract Value $ 6, 2 0 0. 0 0 X.01 $55.00 Permit Fee Minimum $70.00 Underground tank installation/removal 62.00 Permit Fee *If contract value is LESS than $10,010, Surcharge = $5.00 5.00 Surcharge* **If contract value is GREATER than $10,010, Surcharge = Contract Value x $0.0005 ***If the project valuation is over $1 million, please call for Surcharge 6 7 . 0 0 TOTAL FEE I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x Dan Krech X Applicant's Printed Name Applicant's Signature FOR OFFICE USE Required Inspections: Reviewed By: Date: Z Underground Rough In Air Test Gas Service Test In-floor Heat __Y' Final HVAC Screening A Use BLUE or BLACK Ink r----------------• I For Office Use City of NOR , Permit Ell i Permit Fee: 3830 Pilot Knob Road I Eagan MN 55122 1 Date Received: I Phone: (651) 675-5675 I Fax: (651) 675-5694 I Staff: I -----------------I 2014 COMMERCIAL BUILDING PERMIT APPLICATION Date: - ' ZO Site Address: 3 °t I o C eal4,' Gro;;~ / ~wY r Tenant Name: Up A ; A (Tenant is: X New / _ Existing) Suite M ~LS51c.;~4,r9 Former Tenant: ht;.- S~:lvsr Za%I Name: r 1~ l i.7~ I- L t Phone: 657- 6 8 7 0S1`0 Property Owner Address/ City/ zip: 315 3 i.~l zcf~ uaP ~wl~i 6So /n,~~t~~ SS ~SS9/~ Applicant is: Owner Contractor Type of Work Description of work: Construction Cost: b D ° Name: SLS Lens ~rN ~ , k4l ode/. s License m 9C 6 3J-S5'q Contractor Address: /)nvc y5~ City: 1V •i ~ lc~ flll~ State: _ 411V Zip:/ 65-1 Z--7 Phone: 6S I - Z!c ~a Z- L( Contact: azit C aKi.,~ Email: an4 LSl~aSfiKCrlaIS~!`!J/ e,~ Name: dq,(,_ t!/,.7 cCrS Registration M So -7 Address: 292y tJ. 1CP, m4si, Sf City: Sj 0yr/ Architect/Engineer State: _ i.J Zip: Fib 3e/ Phone: 3zo- 23? - 74'j,( Contact Person: /-V Email: /4 Licensed plumber installing new sewer/water service: t Phone if: - 076 NOTE. Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that the are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.aooherstateonecall.oro 1 hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work whic equires a review and approval of plans. xi 12 1- .9 Are- x 44A Applicants Prm d Name Applicants Signature Page 1 of 3 TAIL DO NOT WRITE BELOW THIS LINE SUB TYPES foundation - Public Facility _ Exterior Alteration-Apartments _ Commercial I Industrial _ Accessory Building Exterior Alteration-Commercial _ Apartments _ Greenhouse / Tent Exterior Alteration-Public Facility Miscellaneous Antennae WORK TYPES _ New V //Interior Improvement Siding Demolish Building' _ Addition _ Exterior Improvement Reroof _ Demolish Interior Alteration _ Repair Windows _ Demolish Foundation Replace Water Damage Fire Repair _ Retaining Wall Salon Owner Change 'Demolition of entire building - give PCA handout to applicant DESCRIPTION k- Valuation Z7f Occupancy $ MCES System V Plan Review Code Edition 1 eo7"5 Se- SAC Units 2 ~ - (25%_ 100%-!6 Zoning City Water ✓ Census Code Stories Booster Pump # of Units Square Feet Q PRV # of Buildings Length Fire Sprinklers Type of Construction • 8 Width REQUIRED INSPECTIONS Footings (New Building) Sheetrock Footings (Deck) V7' Final / C.O. Required Footings (Addition) Final / No C.O. Required Foundation Other: r!~ 5VVPP1A14 Drain Tile Pool: -Footings -Air/Gas Tests -Final Roof: -Decking -Insulation -Ice & Water -Final Siding: -Stucco Lath -Stone Lath -Brick Framing Windows Fireplace: -Rough In -Air Test -Final Retaining Wall Insulation Erosion Control Meter Size: / Final C/O Inspection: Schedule Fire Marshal to be present: Yes VINO Reviewed By: , Building Inspector Reviewed By: , Planning COMMERCIAL FEES Base Fee 45f. 5f~ Water Quality Surcharge /3-5-0 Water Supply & Storage (WAC) Plan Review ZBZ. 3 Storm Sewer Trunk MCES SAC 4 g 7 P• d° Sewer Trunk City SAC Za e • r. Water Trunk S&W Permit & Surcharge Street Lateral Treatment Plant Street Treatment Plant (Irrigation) Water Lateral Park Dedication Other: Trail Dedication Water Quality TOTAL $ 3 Page 2 of 3 May 5, 2014 Dale Schoeppner Chief Building Official City of Eagan 3830 Pilot Knob Road Eagan, MN 55122-1810 Dear Mr. Schoeppner: The Metropolitan Council Environmental Services (MCES) Division has determined the SAC to be charged for the wastewater capacity demand for VP Nails Salon to be located at 3910 Cedar Grove Pkwy within the City of Eagan. The City will be charged 2 SAC Units for this project, as determined below. SAC Units Charges: Manicure 8 stations @ 9 stations /SAC 0.89 Pedicure 8 stations @ 7 stations /SAC 1.14 Total Charge: 2.03 Credits: Nonconforming grandparent retail credit (SAC Paid 1973) 1,278 sq. ft. x 80% @ 3,000 sq. ft. /SAC 0.34 Net Charge: 1.69 or 2 The business information was provided to MCES by the applicant at this time. It is also the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be made. If you have any questions email me at karon. cappaert(c~metc.state. mn. us. Sincerely, Karon Cappaert SAC Program Technical Specialist KC:cg: 140505A7 Determination expiration: 05/05/2016 cc: File, MCES Sonny Lattue, SLS Construction & Remodeling (email) Amy Griffin, City of Eagan (email) •0 Robert Street North I St. Paul, MN 55101-1805 • - 651.602.1000 1 Fax 651.602.1550 1 TrY 651.291.0904 - • • METROPOLITAN Equal Opportunity Employer C 0 U N C I L I ' ~IA`' .,1 -Use-- BLUE or BLACK Ink For Office Use of kdn Permit / lj C Il RECEIVED I Permit Fee: / - T O 3830 Pilot Knob Road I I Eagan MN 55122 APR 3 0 2014 Date Received: C Phone: (651) 675-5675 Fax: (651) 675-5694 Staff. 2014 COMMERCIAL PLUMBING PERMIT APPLICATION t ❑ Please submit two (2) sets of plans with all commercial applications. Date: /-Z~~ %Y Site Address: I /!y Tenant: Suite Property- - Owner Name: Phone: Name: License Contractor ~ 6 , Address: _12-`t j a -„ram(! City: 6~ k,/Qt State: w!N Zip: L Phone: -2 r c-X, Email: d'uS' cv wf ~r c c b Type of Work - New - Replacement - Repair - Rebuild Modify Space _Work in R.O.W. Description of work: COMMERCIAL _ New Construction Modify Space - Irrigation System yes / _K no) RPZ / _ PVB) • Rain sensors required on irrigation systems Permit Type . Avg. GPM (2° turbo required unless smaller size allowed by Public Works) _ Meters Call (651) 675-5646 to verity that tests passed prior to picking up meter. Domestic: Size & Type Fire: 1 Avg. GPM High demand devices? _Yes No Flushometers _YeskNo COMMERCIAL FEES Contract Value $ X `i-/ X.01 $55.00 Permit Fee Minimum _ $ 4/6 Permit Fee *If contract value is LESS than $10,010, Surcharge = $5.00 = $ o o Surcharge* -if contract value is GREATER than $10,010, Surcharge = Contract Value x $0.0005 1 yb ***If the project valuation is over $1 million, please call for Surcharge $ TOTAL FEE Following fees apply when installing a new lawn irrigation system $ Water Permit Contact the City's Engineering Department, (651) 675-5646, for required fee amounts. $ Treatment Plant $ Water Supply & Storage $ State Surcharge = $ L TOTAL FEE CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of Applicant's Prin d Name Appli ant's Signature x FOR OFFICE USE Approved By: Date: Required Inspections: _KUnder Ground Rough-In _KAir Test _Gas Test Final PRV Required: - Yes _ No Meter Related Items: Meter Size Radio Read Manometer Staff: Page 1 of 3 w ~•~vne.tl9unq q!ema rm~ v, P i~~~a am-~~`~~tta _+-'nom ~H 0° 1 flm'~N 17v-+~!evv'6'19nnt[ ~F= ar 99fins )LVMXItVd AA099 YVQHJ OW $g - 1 ° ls'- °s -IS II,m"~D is =j NO IHS S1I~'N dA §6 CL..' S •M 6Z6Z p roa 7iG~X z .o-a r° a .0'A 171 ki~ ii 119 Uri E [I El IIH- [1 11 Ell- 0. z i is X d ~g ~~Ig , O - ljJ~ ❑ ❑ d ❑ ❑ ❑ ❑ ❑ z8! o~ ~ 30 0 0 ~fo 0 0 0 0 0~ - LL~ m, g r a ~aa 000~X °z II I I I Y x~ gnl ~ ~ 3 a J _ _ o 1A xo g § xF pr FT. I F~4 I °p 9 r I ~ I o v~S ~W3 E aox o~~ ~ o lU leg mopR~$~ E N u 41, ~8 g$~ a3 <a Z. p ~ i ~ o x a y 3 ~ • a m °l 0 0 VJ 0 0 Q J1 o ~ x Q~ Use BLUE or BLACK Ink r_________________ I For Office Use � � ���(�� I Clty of Ea�a� � Permit#: � � � 3830 Pilot Knob Road I Permit Fee: lS���� I � I Eagan MN 55122 � Date Received: � Phone: (651)675-5675 � I Fax: (651)675-5694 I � � Staff: I �-----------------� 2014 MECHANICAL PERMIT APPLICATION ❑ Please submit two (2) sets of plans with all commercial applications. Date: ,� ��� ` J7 Site Address:��/� C.�-�1/�2 �2�+�✓�- ��C L[/i� V • / ^ Tenant: �' /`�ls�� �� Suite#: , Resident/Owner Nam . Pnone: Address/City/Zip: Name:�O,��r �O��_�Y� � License#: Contractor Aaaress: �7�/D ���iv�-vN `�OL c�ty: �J'�G 1'�- , State: ��1 iv Zip: S"��'� Z� Phone: (�,�/` �/S'�/` 7 7 fv� Contact: ��� �8 Ga'� Email: �d(,a ✓ C I /�D � yY. New Replacement Additional Alteration Demolition Type of Work ` Description of work: NOTE: Roof mounted antl ground mounted mechanical equipment is required#o be screened by City Code. Please contact the Mechanical Inspector for information on permitted screening methods. RES/DENTIAL COMMERCIAL Furnace New Construction Interior Improvement Pe1'mlt Type —Air Conditioner Install Piping _Processed Air Exchanger Gas Exterior HVAC Unit _Heat Pump Under/Above ground Tank �Install/_Remove) _Other E CQjU11� �u jTT'U RESIDENTIAL FEES $60.00 Minimum Add or alteration to an existing unit(includes$5.00 State Surcharge) $100.00 Residential New(includes$5.00 State Surcharge) _$ TOTAL FEE COMMERCIAL FEES Contract Value$ ��a x.01 $55.00 Permit Fee Minimum $70.00 Underground tank installation/removal =$ Permit Fee `If contract value is LESS than$10,010, Surcharge=$5.00 =$ Surcharge* '"If contract value is GREATER than $10,010, Surcharge=Contract Value x$0.0005 """If the project valuation is over$1 million, please call for Surcharge =� TOTAL FEE I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. X �°d�'�� �c�Lo 7` X _ � _....._. Applicant's Printed Name App" IicanYs Signature FOR OFFICE USE ' f� Required Inspections: Reviewed By: ' � 1 Date:�y��� Underground �ough In Air Test Gas Service Test In-floor'Heat �Final � --HV�4C Screening 1998 BUILDING PERMIT APPLICATION (COMMERCIAL) - °l 33~ja CITY OF EAGAN - 681-4675 I p I Submit following to obtain necessary permit Foundation Only New Construction Interior Improvement structural plans (2 sets) architectural plans (2 sets) architectural plans (2 sets) civil plans (2 sets) structural plans (2 sets) code analysis (1) code analysis (1) " civil plans (2 sets) project specs (1 set) soils report (1) landscaping plans (2 sets) Key Plan project specs (1) code analysis (1) " energy calculations (1) not always " Special Inspections & Testing Schedule " soils report (1) Electric Power & Lighting Form (1) not always " SAC determination letter from MCNJS - SAC determination letter from MCNVS - SAC determination letter from MCNUS - call 602-1000 call 602-1000 call 602-1000 Special Inspections & Testing Schedule (1) project specs (1) energy calculations (1) Electnc Power & Lighting Form 1 Contact Building Inspections for sample Food & Beverage or Lodging facilities: Plan must be submitted to Minnesota Department of Health. Call 215-0700 for details. DATE: Jest )49i WORKTYr=-: _ NEW REMODEL DESCRIPTION OF WORK: Rebolu tRo I~cL(Z LA-1. ULA CONSTRUCTION COST: ya OOD TENANT NAME: SITE ADDRESS: oL RILL 38 °D - Q UE D 9- nn SUITE LOT BLOCK SUBD. 13 `P 0. t,, lJ f P.I.D. # Name: V14za1°r_ Jd ,T -oh Y-) Phone (0 0 [ - OS (0 PROPERTY Last First OWNER Street Address: City State: Zip: Company: t k- L r Cu-&yns Lnc Phone 1541-9811-7 CONTRACTOR Street Address: 16155 Lreeaknee RD ~ 316 License # av )68q a City I r l1Yly1>;4n(ZQ- State: -/M (q Zip: 255305 ARCHITECT/ ENGINEER Company: ]A-Jw-h 4 P _RQ `7y Phone 777-?OS 4-Y Name: Il Avr gAac ri, Registration Street Address: 3170 Ld& (f/-fi i Amp r• r.4yl E1 rnd State: M N zip: 35 p 12 n ewer & water): Sew"r tec a>ef<(pt1 i 'RSta ~4We~ I tRYeb t Ktf y application and state that the information is correct an o licable State of M~ptsota $ta sa'nd l ari r meYf%9- Signature of Applicant:: , i /t tBUIL L 1) 141Gilf'r`/Jty ) i.i NJ DEPT. OFFICE USE ONLY BUILDING PERMIT TYPE ' ❑ 01 Foundation ❑ 19 Comm./Ind. Misc. ❑ 21 Miscellaneous i' 18 Comm./Ind. ❑ 20 Public Facility WORK TYPE ❑ 31 New & 33 Alterations ❑ 35 Tenant Finish ❑ 32 Addition ❑ 34 Repair ❑ 37 Demolition GENERAL INFORMATION Const. (Actual) Basement sq. ft. MC/WS System (Allowable) First Floor sq. ft. City Water UBC Occupancy sq. ft. Fire Sprinklered Zoning sq. ft. Census Code N.37 # of Stories sq. ft. SAC Code 3 v Length sq, ft. Census Bldg. Depth Footprint sq. ft. Census Unit O APPROVALS Planning Building Engineering Variance Permit Fee Valuation: $D, ODr7 Surcharge ac. 00 ' Plan Review 3 117,0 MCMS SAC City SAC Water Conn. S/W Permit S/W Surcharge Treatment PI. Park Ded. Trails Ded. Water Qual. Other Copies Total: % SAC SAC Units Meter Size 3~0.;) cs_bA-2 "~o C-P Gg-~ ~ SEVERSON9 SHELDON9 3--7G p (o ( pAZ-~-J ~ &RRY S. SEVERSON DOUGHERTY & MOLENDA, P.A. 3 I 0 ANNETTE M. MARGARIT MICHAEL G. DOUGHERTY' STEPHEN A. LING MICHAEL E. MOLENDA; 69- 3 GARY L. HUUSKO LOREN M. SOLFEST"i KRISTINE K. NOGOSEK SHARON K. HILLS A PROFESSIONAL ASSOCIATION CHRISTINE J. CASSELLIUS$ DAVID L. KNUTSON ATTORNEYS AT LAW MICHAEL D. KLEMM$ ROBERT B. BAUER• EMILY FOX WILLIAMS CHRISTOPHER A. GROVE SUITE 600 BRANDON D. DERRY TERRENCE A. NIHRRM' 7300 WEST 147TH STREET APPLE VALLEY, MINNESOTA 55124-7580 OF COUNSEL (952) 432-3136 JAMES F. SHELDON TELEFAX NUMBER (952) 432-3780 www.seversonsheldon.com June 9, 2004 E-MAIL: 6au=@sevmonshe1don.wm Dakota Co ty Recorder 1590 W t Highway 55 Hasti gs, MN 55033 Easement and Assessment Agreement Lot 1, Block 1, Stryker Addition Our File No. 206-21773 Dear Sir or Ms.: Enclosed for recording regarding the above-referenced matter, please find an original Easement and Assessment Agreement. Also enclosed is our firm's check in the amount of $30.00 for the recording fee. Once the Agreement has been recorded, please return the original to the undersigned. Thank you for your assistance in this matter. Very truly yours, Robert B. Bauer RBB/kmw Eosures ~c: Marilyn Wucherpfennig, Planning Aide Karen E. Marty, Esq. INDIVIDUAL ATTORNEYS ALSO LICENSED IN IOWA AND WISCONSIN jQUALIFIED NEUTRAL. UNDER RULE 114 OF THE MINNESOTA GENERAL RULES OF PRACrICE 'CERTIFIED REAL PROPERTY LAW SPECIALIST, MSBA - r EASEMENT AND ASSESSMENT AGREEMENT This Easement and Assessment Agreement ("Agreement") is made this 1" day of June, 2004, by and between the CITY OF EAGAN, a Minnesota municipal corporation (hereinafter "City") and CEDARVALE BUSINESS CENTER, a Minnesota general partnership (hereinafter "Cedar-vale Partnership"). (The City and Cedarvale Partnership are collectively referred to as the "Parties"). WHEREAS, Cedarvale Partnership is the fee owner of certain property located at 3902 - 3938 Cedar Grove Parkway and legally described as Lot 1, Block 1, Stryker Addition (the "Property"); and WHEREAS, in connection with the City's Cedar Grove redevelopment activities, the City is proposing to construct future trailway improvements that will impact the Property (the "Future Project"); and WHEREAS, Cedarvale Partnership recognizes the benefit associated with the Future Project and is willing to grant the City the necessary construction easements and to provide a financial contribution towards the future project all upon the terms and conditions contained herein. NOW, THEREFORE, in consideration of the mutual covenants and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Parties agree as follows: 1. CONSTRUCTION OF FUTURE PROJECT. The Parties acknowledge that the Future Project has not been authorized by the City Council of the City. If the Future Project is approved, it will include the following items: A. Construction of Trail. A trail shall be constructed adjacent to the Property within the existing public right-of-way. B. Retaining Walls. The construction of the trail may require the removal of trees and construction of a retaining wall. If the slope of the Property adjacent to the right-of-way will exceed a three to one ratio, then a retaining wall shall be constructed. The City will use its best efforts to keep the sign described in paragraph 5 below in its proposed location or condition. C. Parking Lot Construction. The construction of the proposed trail will require grading and reconstruction of a portion of the Property's parking lots in accordance with the plans prepared by SEH and dated January 5, 2004, which are currently on file with the City. In the event such construction occurs, the City agrees it will undertake to minimize disruption of the business activities that occur on the Property and further covenants that at least one driveway access for the property will remain open during construction. Cedarvale Partnership will be given a copy of the plans and specifications for the parking lot construction, and an opportunity to comment on them prior to the initiation of work. The grading, reconstruction, and resurfacing will include the following: (1) Grading, reconstruction, and resurfacing of the property marked with slashed lines on Exhibit A. (2) Doing this work so that it blends with the unchanged portions of the Property. (3) Replacing any curbs that are damaged or destroyed during construction. (4) To the maximum extent possible, leaving the Property with a gently sloping grade from the buildings (or ungraded areas) to Cedarvale Parkway. (5) Striping of the resurfaced areas to match the existing parking. (6) The trail, any retaining wall(s), and other changes in the right-of-way adjacent to the Property shall be finished in a manner consistent with the new Cedar Grove theme. 2 i 2. GRANT OF EASEMENT/WAIVER OF COMPENSATION. Cedarvale Partnership acknowledges that the construction of the trail and driveway and parking lot modifications under the Future Project require the grant of temporary construction easements to the City, its agents and contractors. Cedarvale Partnership shall, at no cost to the City, grant such temporary construction easements as may reasonably be required by the City to undertake the construction activity associated with the Future Project. The City will pay for the costs to prepare and record such easements. Cedarvale Partnership acknowledges that trees will be removed in connection with the Future Project, and Cedarvale Partnership waives any and all damages arising out of or relating to the removal of trees or other activities performed as described in to this Agreement. This grant and waiver is contingent upon the construction of the Future Project. 3. ASSESSMENT. Cedarvale Partnership recognizes the benefit to the Property as a result of the Future Project. Cedarvale Partnership, for itself, its successors and assigns, hereby accepts an assessment against the Property for the Future Project in an amount not to exceed $17,500.00. The assessment shall be levied against the Property in the year following completion of the Future Project. The assessment shall be payable over a period of 10 years at a rate of 7% per annum. 4. WAIVER OF OBJECTION. Cedarvale Partnership hereby waives its right to object or appeal the assessment described in paragraph 3 above, pursuant to MINN. STAT. §429.081, and further waives notice of hearing on this Agreement. 5. HOLD HARMLESS/INDEMNITY. Cedarvale Partnership acknowledges that it currently has a monument sign, and that it has requested the City to grant a conditional use permit to allow for the construction of a pylon sign. The construction of such sign will be located within the present public drainage and utility easement adjacent to the right-of-way for Cedar Grove Parkway. Cedarvale Partnership agrees to hold harmless and indemnify the City from any claims, losses, judgments, damages or costs incurred, including attorneys' fees, resulting from the construction of the pylon sign on the Property within the public drainage and utility easement. This Agreement is subject to the City granting the conditional use permit, variance, and vacation of right-of-way to allow the sign as presented in City Planning Cases 19-CU-16-10-13 and 19-VA-18-10-13. The City further agrees to refund the second sign application fee paid by Cedarvale Partnership on or about March 19, 2004. 6. GOVERNING LAw. This, Agreement shall be governed by and interpreted under the laws of the State of Minnesota. 3 1 7. EXPIRATION. In the event the City has not undertaken construction of the Future Project within five years from the date of this Agreement, this Agreement (other than the indemnity obligation under paragraph 5) shall be null and void and of no further effect. CITY OF EAGAN, a Minnesota municipal corporation By: v Pat Geaga _ r Its: Mayor By: -Mop " C0L-~ Maria Petersen Its: Clerk STATE OF MINNESOTA) )ss. COUNTY OF DAKOTA ) -Tk4t The foregoing was acknowledged before me this /S l- day of May, 2004, by Pat Geagan and Maria Petersen, the Mayor and Clerk of the City of Eagan, a Minnesota municipal corporation, on behalf of the municipal corporation. othey Pu lie i t♦. JUdY M. JENKiNS ;yg}a `~-MiNNE5C7:: ~u• p'h' m~sbn E>Jen. 31, 2065 • 4 CEDARVALE BUSINESS CENTER, a Minnesota general partnership By: Its: 13Y! N STATE OF MINNESOTA) )ss. COUNTY OF DAKOTA ) The foregomi was acknowledged before me this ?F~*"day of May, 2004, by ~a U r ~C y and , the and of Cedarvale Business Center, a Minnesota general partnership, on behalf of the general partnership. n n~ LINDA MARIE DRALLE t r : •?iARYPUBIIC-MWNESOTA Notary Public ......on G.pirs Jan. 31.2CD5 THIS INSTRUMENT WAS DRAFTED BY: SEVERSON, SHELDON, DOUGHERTY & MOLENDA, P.A. 7300 West 147th Street, Suite 600 Apple Valley, MN 55124 (952) 432-3136 (RBB: 206-21773) 5 r r ` r .I ~ V `tyy 1 1, ~ 1 ~ V S CC . cyill \ EXHIBIT - -AL ~y P1 ~~r. 3~0.;) cs_bA-2 "~o C-P Gg-~ ~ SEVERSON9 SHELDON9 3--7G p (o ( pAZ-~-J ~ &RRY S. SEVERSON DOUGHERTY & MOLENDA, P.A. 3 I 0 ANNETTE M. MARGARIT MICHAEL G. DOUGHERTY' STEPHEN A. LING MICHAEL E. MOLENDA; 69- 3 GARY L. HUUSKO LOREN M. SOLFEST"i KRISTINE K. NOGOSEK SHARON K. HILLS A PROFESSIONAL ASSOCIATION CHRISTINE J. CASSELLIUS$ DAVID L. KNUTSON ATTORNEYS AT LAW MICHAEL D. KLEMM$ ROBERT B. BAUER• EMILY FOX WILLIAMS CHRISTOPHER A. GROVE SUITE 600 BRANDON D. DERRY TERRENCE A. NIHRRM' 7300 WEST 147TH STREET APPLE VALLEY, MINNESOTA 55124-7580 OF COUNSEL (952) 432-3136 JAMES F. SHELDON TELEFAX NUMBER (952) 432-3780 www.seversonsheldon.com June 9, 2004 E-MAIL: 6au=@sevmonshe1don.wm Dakota Co ty Recorder 1590 W t Highway 55 Hasti gs, MN 55033 Easement and Assessment Agreement Lot 1, Block 1, Stryker Addition Our File No. 206-21773 Dear Sir or Ms.: Enclosed for recording regarding the above-referenced matter, please find an original Easement and Assessment Agreement. Also enclosed is our firm's check in the amount of $30.00 for the recording fee. Once the Agreement has been recorded, please return the original to the undersigned. Thank you for your assistance in this matter. Very truly yours, Robert B. Bauer RBB/kmw Eosures ~c: Marilyn Wucherpfennig, Planning Aide Karen E. Marty, Esq. INDIVIDUAL ATTORNEYS ALSO LICENSED IN IOWA AND WISCONSIN jQUALIFIED NEUTRAL. UNDER RULE 114 OF THE MINNESOTA GENERAL RULES OF PRACrICE 'CERTIFIED REAL PROPERTY LAW SPECIALIST, MSBA - r EASEMENT AND ASSESSMENT AGREEMENT This Easement and Assessment Agreement ("Agreement") is made this 1" day of June, 2004, by and between the CITY OF EAGAN, a Minnesota municipal corporation (hereinafter "City") and CEDARVALE BUSINESS CENTER, a Minnesota general partnership (hereinafter "Cedar-vale Partnership"). (The City and Cedarvale Partnership are collectively referred to as the "Parties"). WHEREAS, Cedarvale Partnership is the fee owner of certain property located at 3902 - 3938 Cedar Grove Parkway and legally described as Lot 1, Block 1, Stryker Addition (the "Property"); and WHEREAS, in connection with the City's Cedar Grove redevelopment activities, the City is proposing to construct future trailway improvements that will impact the Property (the "Future Project"); and WHEREAS, Cedarvale Partnership recognizes the benefit associated with the Future Project and is willing to grant the City the necessary construction easements and to provide a financial contribution towards the future project all upon the terms and conditions contained herein. NOW, THEREFORE, in consideration of the mutual covenants and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Parties agree as follows: 1. CONSTRUCTION OF FUTURE PROJECT. The Parties acknowledge that the Future Project has not been authorized by the City Council of the City. If the Future Project is approved, it will include the following items: A. Construction of Trail. A trail shall be constructed adjacent to the Property within the existing public right-of-way. B. Retaining Walls. The construction of the trail may require the removal of trees and construction of a retaining wall. If the slope of the Property adjacent to the right-of-way will exceed a three to one ratio, then a retaining wall shall be constructed. The City will use its best efforts to keep the sign described in paragraph 5 below in its proposed location or condition. C. Parking Lot Construction. The construction of the proposed trail will require grading and reconstruction of a portion of the Property's parking lots in accordance with the plans prepared by SEH and dated January 5, 2004, which are currently on file with the City. In the event such construction occurs, the City agrees it will undertake to minimize disruption of the business activities that occur on the Property and further covenants that at least one driveway access for the property will remain open during construction. Cedarvale Partnership will be given a copy of the plans and specifications for the parking lot construction, and an opportunity to comment on them prior to the initiation of work. The grading, reconstruction, and resurfacing will include the following: (1) Grading, reconstruction, and resurfacing of the property marked with slashed lines on Exhibit A. (2) Doing this work so that it blends with the unchanged portions of the Property. (3) Replacing any curbs that are damaged or destroyed during construction. (4) To the maximum extent possible, leaving the Property with a gently sloping grade from the buildings (or ungraded areas) to Cedarvale Parkway. (5) Striping of the resurfaced areas to match the existing parking. (6) The trail, any retaining wall(s), and other changes in the right-of-way adjacent to the Property shall be finished in a manner consistent with the new Cedar Grove theme. 2 i 2. GRANT OF EASEMENT/WAIVER OF COMPENSATION. Cedarvale Partnership acknowledges that the construction of the trail and driveway and parking lot modifications under the Future Project require the grant of temporary construction easements to the City, its agents and contractors. Cedarvale Partnership shall, at no cost to the City, grant such temporary construction easements as may reasonably be required by the City to undertake the construction activity associated with the Future Project. The City will pay for the costs to prepare and record such easements. Cedarvale Partnership acknowledges that trees will be removed in connection with the Future Project, and Cedarvale Partnership waives any and all damages arising out of or relating to the removal of trees or other activities performed as described in to this Agreement. This grant and waiver is contingent upon the construction of the Future Project. 3. ASSESSMENT. Cedarvale Partnership recognizes the benefit to the Property as a result of the Future Project. Cedarvale Partnership, for itself, its successors and assigns, hereby accepts an assessment against the Property for the Future Project in an amount not to exceed $17,500.00. The assessment shall be levied against the Property in the year following completion of the Future Project. The assessment shall be payable over a period of 10 years at a rate of 7% per annum. 4. WAIVER OF OBJECTION. Cedarvale Partnership hereby waives its right to object or appeal the assessment described in paragraph 3 above, pursuant to MINN. STAT. §429.081, and further waives notice of hearing on this Agreement. 5. HOLD HARMLESS/INDEMNITY. Cedarvale Partnership acknowledges that it currently has a monument sign, and that it has requested the City to grant a conditional use permit to allow for the construction of a pylon sign. The construction of such sign will be located within the present public drainage and utility easement adjacent to the right-of-way for Cedar Grove Parkway. Cedarvale Partnership agrees to hold harmless and indemnify the City from any claims, losses, judgments, damages or costs incurred, including attorneys' fees, resulting from the construction of the pylon sign on the Property within the public drainage and utility easement. This Agreement is subject to the City granting the conditional use permit, variance, and vacation of right-of-way to allow the sign as presented in City Planning Cases 19-CU-16-10-13 and 19-VA-18-10-13. The City further agrees to refund the second sign application fee paid by Cedarvale Partnership on or about March 19, 2004. 6. GOVERNING LAw. This, Agreement shall be governed by and interpreted under the laws of the State of Minnesota. 3 1 7. EXPIRATION. In the event the City has not undertaken construction of the Future Project within five years from the date of this Agreement, this Agreement (other than the indemnity obligation under paragraph 5) shall be null and void and of no further effect. CITY OF EAGAN, a Minnesota municipal corporation By: v Pat Geaga _ r Its: Mayor By: -Mop " C0L-~ Maria Petersen Its: Clerk STATE OF MINNESOTA) )ss. COUNTY OF DAKOTA ) -Tk4t The foregoing was acknowledged before me this /S l- day of May, 2004, by Pat Geagan and Maria Petersen, the Mayor and Clerk of the City of Eagan, a Minnesota municipal corporation, on behalf of the municipal corporation. othey Pu lie i t♦. JUdY M. JENKiNS ;yg}a `~-MiNNE5C7:: ~u• p'h' m~sbn E>Jen. 31, 2065 • 4 CEDARVALE BUSINESS CENTER, a Minnesota general partnership By: Its: 13Y! N STATE OF MINNESOTA) )ss. COUNTY OF DAKOTA ) The foregomi was acknowledged before me this ?F~*"day of May, 2004, by ~a U r ~C y and , the and of Cedarvale Business Center, a Minnesota general partnership, on behalf of the general partnership. n n~ LINDA MARIE DRALLE t r : •?iARYPUBIIC-MWNESOTA Notary Public ......on G.pirs Jan. 31.2CD5 THIS INSTRUMENT WAS DRAFTED BY: SEVERSON, SHELDON, DOUGHERTY & MOLENDA, P.A. 7300 West 147th Street, Suite 600 Apple Valley, MN 55124 (952) 432-3136 (RBB: 206-21773) 5 r r ` r .I ~ V `tyy 1 1, ~ 1 ~ V S CC . cyill \ EXHIBIT - -AL ~y P1 ~~r. aa993 (-=<7agy4 y3 3l _ Request Dete Fire No Rough,n Inspection Required? )(Ready Now U Will Notify Inspector ] yes No When Ready' Ix ncensed contractor El owner hereby request inspection of above electrical work at: Job Address (Street. Box or Route No I City 3R10 ~'2u D.1 g46-,4,iILj Section No Township Name or No Range No County IA T,4 Occupant (PRINT) Phone No. C) t-.) t ft0urL ~C /vim f ZLV-3C- `f5(e -0Z-7- Power Supplier Address s . P, 3a 0o ~ s<4, At- c ~ Electrical Contractor (Company Name) Contractor's License No f f (Cr if I f LGe etTKCc C. G ~Ca ~f<FS Mailing Access (Contractor or Owner Making Installation) s3 stt>fe -j Y--,h /-11-00 2drt Aulh tl B nat~re ICOntre wn¢r ak~n St eaon) ~ Phone Number YsZ-gds' MINNESOTA STATE BOARD OF ELECTRICITY THIS INSPECTION REQUEST WILL NOT Gri BE ACCEPTED BY THE STATE BOARD 15]1 Unive 1 Pa r-N~5 10C UNLESS PROPER INSPECTION FEE IS Phu~(614}6{2+B ENCLOSED, REQUEST FOR ELECTRICAL INSPECTION cT E sp Ea-00001-0e 33993 • See mstryclions forL~mplehng this form on back of yellow copy 7' 7 "X" Below Work Covered by This Requests ' e C 7a 441 e Add Rep' Type of Building Appliances Wired Equipment Wired Home Range Temporary Service Duplex Water Heater Electric Heating Apt Building Dryer Other-(Specity) Comm /Industrial Furnace Farm Air Conditioner Other (specify) ContramorB Remarks `J) JO6 Compute Inspection Fee Below: S$A_,JtCC T6 14w-rtf#.ti G ns Z' RL1.~L . # Other Fee # Service Entrance Size Fee # Circuits/Feeders Fee Swimming Pool J 0 to 200 Amps ~,j, 0 to 100 Amps .O~ Transformers Above 200 Amps Above 100 Amps Signs Inspectors Use Only TOTAL Irrigation Booms Special Inspection Alarm/Communication THIS INSTALLATION MAY BE ORD NNECTED IF NOT X Other Fee kS' COMPLETED WITHIN 18 MONTHS. I, the Electrical Inspector, hereby Rough-in • Date certify that the above inspection has Final Dale b been made. ~~T y OFFICE USE ONLY This request void to months from For Office Use , --7C a ® # r Perm7 it#: �/ 1 E AGA N C" Permit Fee: Staff: L J ` 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 Payment Recvd: X1 Yes No (651)675-5675 I TDD: (651)454-8535 I FAX: (651)675-5694 Email: buildinginspections(ni,cityofeagan.comr Plans: Electronic Paper Plan Submittal: eplanscu�citVofeagan.com ( 42Qc— � CC�r OKt L 2018 COMMERCIAL PLUMBING PERMIT APPLICATION ❑ Please submit two(2)sets of paper plans with all commercial applications as well as an electronic set of the submittal, submitted via email, CD or flash drive Date: 8/16/18 Site Address: 3902-3938 Cedar Grove Pky Tenant: Cedarvale Shopoping Center Suite#: Property ner ', Name: JBL Phone: Name: Gilbert Mechanical License#: r Y���i � Address: 5251 West 74th St Edina mnZip: 55439 City: State: Phone: 952-835-3810 Email: rhammond@gilbertmech.com 1tltliIIIPgIa New _Replacement Repair _Rebuild Modify Space _Work in R.O.W. Typ. :fictql Description of work: Backflow prevention per Hydrocorp '0G'r 'II�Iuq���P� COMMERCIAL New Construction ✓ Modify Space Irrigation System( yes/ I no)( RPZ/ PVB) 9�s@,:,1,0111111100 Rain sensors required on irrigation systems Permittype • Avg.GPM (2"turbo required unless smaller size allowed by Public Works) 0���I tllo�m pr '' "„u��mm��l Meters Call(651)675-5646 to verity that tests passed prior to picking up meter. Domestic:Size&Type Fire: 1 tl Avg.GPM High demand devices? Yes_No Flushometers_Yes_No COMMERCIAL FEES Contract Value$7500 x.01 $60.00 Permit Fee Minimum $60.00 PVB/RPZ Permit(includes State Surcharge) -$ 75 Permit Fee =$ 3.75 Surcharge Surcharge=Contract Value x$0.0005 If the project valuation is over$1 million,please call for Surcharge =$ 78.75 TOTAL FEE Following fees apply when installing a new lawn irrigation system $ Water Permit Contact the City's Engineering Department,(651)675-5646,for required fee amounts. $ Treatment Plant $ Water Supply&Storage $ State Surcharge =$ TOTAL FEE You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.cltyofeaoan.comisu bscribe. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x Rick Hammond Applicant's Printed Name Applicant's Signature FI Ii =' ii'!"19YD@l'hi i ` a ''''1000040000 .(IgolM . A P _ red Inspect _- (1 f K(yrr ll�I�E III '__ a x�, es".;.TM' #1 r.no3 -' "f__�, itlgllPiiliria, lldlk� Page 1 of 3