Loading...
4621 Dakota Path Use BLUE or BLACK Ink I__ ~ City Eapo For Office Use of RECOWED I Pennit#: /Ja/5 (3l~ _ _ I 3$30 Pilot Knobad APR 15 2014 1 Permit Fee: I - Eagan MN 55122 Date Received: L °{5 Phone: (651) 675-5675( Fax: (651) 675-5694 Staff:_ j 2014 COMMERCIAL PLUMBING PERMIT APPLICATION ons ❑ Please submit two (2) sets of plans lwith all commercial lappli7'144-) Date: Site Address: Gkal t, Tenant: Suite Property Owner Name: Phone: - Name: License Contractor ( ~11~_~._ 'JJ City: E I t/M01n 1 Address: i. State: Y~vh. Zip: Phone: tfr~J D5 3 - 4-1 q Email: Type of Work -..1L-• New -Replacement -Repair _Rebuild _ Modify Spiace - Work in R.O.W, mil hotA Description of work: 1 O` J COMMERCIAL New Construction _ Modify Space Irrigation System yes I _ no) RPZ I _ PVB) • Rain sensors required on irrigation systems Permit Type Avg. GPM (2" turbo required unless smaller size allowed by Public Works) Meters Call (651) 675-5646 to verity that tests passed prior to picking up meter. Domestic: Size & Type Fire: 1 Avg. GPM High demand devices? _Yes No Flushometers ___Yes _No ti.,- . COMMERCIAL FEES Contract Value 29000.0 0 _ x .01 $55.00 Permit Fee Minimum _ $ 2ND-00 Permit Fee *If contpct value is LESS than $10,010, Surcharge = $5.00 = $ t 2--00 Surcharge- **If contract value is GREATER than $10,010, Surcharge = Contract Value x $0.0005 _ ***If the project valuation is over $1 million, please call for Surcharge = $ d TOTAL FEE Following fees apply when installing a new lawn irrigation system $ Water Permit .W Contact the City's Engineering Department, (651) 675-5646, for required fee amounts. $ Treatment Plant $ Water Supply & Storage $ State Surcharge = $ TOTAL FEE CALL. BEFORE YOU DIG. Call Gopher State One Call at (659) 454-0002 for protection against underground utility damage, S I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x ~A AA AJA QA,[+AY- x -~z-~AA.Aa ~AAJWIA-l Applicant's Prl ted Name Applicant's Signa ure FOR OFFICE USE Approved By: Date:^ Z P4 Required Inspections: cS/-_Under Ground' 1~ough-In ___~-A rTest `_Gas Test ,_)rl=nial PRV Required: Yes _ No Meter Related items:' Meter Size Radio Read Manometer. Staff: Page 1 of 3 Use BLUE or BLACK Ink E For Office Use C16 on Eap ( Permit ~50 ~ 1 I I 3830 Pilot Knob Road Permit Fee: Eagan MN 55122 I y r s s v Phone: (651) 675-5675 APR 15 2014 I Date Received: I I Fax: (651) 675-5694 Staff: 1 ~._..J 2014 MECHANICAL PERMIT APPLICATION ❑ Please submit two (2) sets of plans with all co merciall applications. r,~( Date: Site Address: ``r tL Z I k ht PAIL) Tenant: Suite Resident/Owner Name: phone: Address / City / Zip: Name: ~ a )m N~Y fU, ! License f y t Z tl Contractor Address: 1~~~~ P G~f~-!t_~ City: I State: - _f~M zip: IJJ Phone: i Contact: Email: l~ New Replacement Additional Alteration Demolition Type of Work Description of work: tIZA. NOTE: Roof mounted and ground moun ed_mechanical equipment is "irequired to be screened by City ~ Gode. Please contact the Mechanical Inspector for information o. permitted screening methods, V RESIDENTIAL / COMMERCIAL 4 _ Furnace ✓ New Construction _ Interior Improvement Permit Type € -Air Conditioner Install Piping _ Processed r Air Exchanger Gas Exterior HVAC Unit Heat Pump Under/Above ground Tank Install Remove) Other RESIDENTIAL FEES $60.00 Minimum Add or alteration to an existing unit (includes $5.00 State Surcharge) $100.00 Residential New (includes $5.00 State Surcharge) TOTAL FEE COMMERCIAL FEES Contract Value X.01 $55.00 Permit Fee Minimum $70.00 Underground tank Installationlremoval Permit Fee *If contract value is LESS than $10,010, Surcharge = $5.00 •n~ Surcharge* **If contract value is GREATER than $10,010, Surcharge = Contract Value x $0.0005 ***If the project valuation is over $1 million, please call for Surcharge = $ TOTAL FEE I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Applicant's -Printed Name Applicant's Sig ature FOR OFFICE USE Required Inspections: Reviewed By., f Date: r L j I Undecground dough !ra_ Fir lest - Gas SeiY;co Test 4--fioor Heat Final HVAC Scr~,ening S4 C!tyofEaaau 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 X14 Use BLUE or BLACK Ink For Office Use % Permit #: / 3 s'"g Co /Val 1 Permit Fee: Date Received: Staff: 2014 COMMERCIAL BUILDING PERMIT APPLICATION j Date: 414,2ciif Site Address: �-1%z1 1041K4774 iAm '+41f1tto:-$e-75a4116 1�1 WWai1,�r,i >l H;�Ir sr- f/c A Tenant Name: (Tenant is: V'New / Existing) Suite #: J Former Tenant: RoS sal c. Address/City/Zip: 2086.0 R-ii)(IC Applicant is: ✓ Owner ✓Contractor Description of work: 3 040 (2-66 A N) c' Construction Cost: -t f 3'S r czazv Name: i2 fl CjZ-j/4 Address: State: /1r/ Zip: S s �' c,/ Phone: License #: City: t frI.t 4,5 ,1E '625� Name: _51\1-P p-6YllfiiZ i ) Address: State: MP-) Zip: 5-0114 Phone: 6'12- 3761- 3°37 Contact Person: h Aa 1- dA014 AN) Licensed plumber installing new sewer/water service: . 77ai2- O& ?i u U Phone #: 1;1 Z 2 z l 3� °c) CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gooherstateonecall.orq hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires review and approval of plans. Applicant's Printed Name x Applicant' Signature Page 1 of 3 oz I 5k6)4 )06,4) DO NOT WRITE BELOW THIS LINE /13c(c.� SUB TYPES /Foundation Public Facility Commercial / Industrial Accessory Building Apartments Greenhouse / Tent Miscellaneous Antennae WORK TYPES ✓ New Addition Alteration Replace Salon Owner Change DESCRIPTION Valuation Plan Review (25% 100% ✓) Census Code # of Units # of Buildings Type of Construction Interior Improvement Exterior Improvement Repair Water Damage l3S/000.°= yes REQUIRED INSPECTIONS V Footings (New Building) Footings (Deck) Footings (Addition) I/ Foundation Drain Tile VRoof: _Decking _Insulation 1/ Framing Fireplace: _Rough In _Air Test _Final ✓ Insulation Meter Size: Occupancy Code Edition Zoning Stories Square Feet Length Width _Ice & Water Final Exterior Alteration—Apartments Exterior Alteration—Commercial Exterior Alteration—Public Facility Siding Demolish Building* Reroof Demolish Interior Windows Demolish Foundation Fire Repair Retaining Wall *Demolition of entire building - give PCA handout to applicant V Zoo? 41.4513C. PP Sheetrock MCES System SAC Units City Water Booster Pump PRV Fire Sprinklers 17 Final / C.O. Required Alb Final / No C.O. Required Other: Pool: Footings Air/Gas Tests Final Siding: _Stucco Lath _Stone Lath Brick Windows Retaining Wall Erosion Control Final CIO Inspection: Schedule Fire Marshal to be present: Yes V No Reviewed By: rA , Building Inspector Reviewed By: , Planning COMMERCIAL FEES Base Fee Surcharge Plan Review MCES SAC / City SAC / S&W Permit & Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication Trail Dedication Water Quality .173- 41. %s 4%. S� 8A3,361 �(V cS. oc) Water Quality Water Supply & Storage (WAC) Storm Sewer Trunk Sewer Trunk / 00.00 Water Trunk oo Street Lateral (f . 0o Street Water Lateral Other: TOTAL 5,6 9S. 6 f4 Page 2 of 3 June 1, 2014 Dale Schoeppner Chief Building Official City of Eagan 3830 Pilot Knob Road Eagan, MN 55122-1810 Dear Mr. Schoeppner: The Metropolitan Council Environmental Services (MCES) Division has determined the SAC to be charged for the wastewater capacity demand for Hillcrest Pool Building to be located at 4621 Dakota Path within the City of Eagan. The City will be charged 1 SAC Unit for this project, as determined below SAC Units Charges: Pool Building for Residents Use Only minimum 1 SAC The business information was provided to MCES by the applicant at this time. It is also the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be made. If you have any questions email me at jessica.nve(u�metc.state.mn.us. Sincerely, 17,46.c Jessie Nye Supervisor, ES Revenue (SAC) J N:140601 A8 Determination expiration: 06/01/2016 cc: File, MCES Amy Griffin, Eagan (email) Robert Krostue, DR Horton (email) 390 Robert Street North j St. Paul, MN 55101-1805 Phone 651.602.1000: j Fax 651.602.1550 1 TTY 651.291.0904 An Equal Opportunity Employer etrocouncik..arg METROPOT IT1 COUN ���M�� � �2���� Foehringer Engineering, InG 5529 Woodlawn Boulevard Minneapolis,Minnesota 55417 (612) 869-0330 George W. Foehringer,P.E.,President H.V.A.C. Greg Danicich, Vice President Plumbing June 27, 2014 Mr. Todd Boyum Sabre Plumbing, Heating and Air Conditioning, Inc. 15535 Medina Road North Plymouth, MN 55447 Telephone: 763-473-8565 Email: Todd(c�r�SabreHeatin .g,com Re; Hillcrest Pool Building, 4621 Dakota Path, Eagan,MN Todd: Regarding the insulation of the underground sanitary sewer line between the toilet room building and the pool equipment building -- To achieve an additional 18 inches of cover, we are recommending that you insulate above and both sides of the pipe with an (R=20.0) insulation that is suitable for underground installation. The insulation would have to cover the underground sanitary line between the two buildings approximately 12 feet. Please call if you have any questions. �� Regards, George W. Foehringer, P.E. Foehringer Engineering, Inc. HillcrestPool i ,, � ~ ������ Use BLUE or BLACK Ink MAY 3 U 20�0- �-----------------, I For Office Use � 1'� � J�� /.�r� � � PermitV�� � � � Cl�� 0� ��.�l�Il ��: � , � , n I Permit Fee: !' � 3830 Pilot Knob Road ������� �E�� � � � Date Received: I Eagan MN 55122 I � Phone:(651)675-5675 � Staff: Fax:(651)675-5694 ��,m�G,��� � I � � -----------------� 1 � 2014 RE TIAL BUILDING PERMIT APPLICATION ���, �%�.""' � � � � / � =� ��l�,�C� un�t#: � Date: �.,�' ' l Site Address: �/ � /j,�,�.�-} '� �%j� � y�s�- ��s� 7a�� Name: � � G-1�1`T`LJ" �'1.(' '--/ ��,�t�'�����.Phone: R.�siderttl /� /" �(.�� � �'.e:>'/��� '��- "f QWi14'C Address/City/Zip:�[�z>ie�i�� T��'-y`"`1 C�y7� ��'t�s�� s��r � - Hpplicant is: Owner �Contractor � ��� ` �1�aa_ . �a� � T � ci�#V�/dCk ' Description of work: "� �� ��`��/ � � � �� � 1�' ' Construction Cost:""' Multi-Family Building: (Yes /No �) '�� Company: �% � �''-�- �� � � � � Contact: 1/t��C� �����f � 3; Cit �'�/'�'�'LcS/�/ Address: � C.a� ���C ��� Y� �Q17�F7G�i�(`" �, � ��_ ..�``, ��/��� ' Statef/`^ Zip:i:+%� Phone: � - Z '�/"Email: �'tlAr��'�/.(�°�°1GfTL�i`����GCS��`. , G�y.y,l. ' License#: Lead Certificate#: If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING � In the last 12 months,has the City of Eagan issued a permit for a similar plan based on a master plan? � _Yes _No If yes,date and address of master plan: � Licensed Plumber: Phone: � Phone: � Mechanical Contractor: Sewer&Water Contractor: Phone: � �C37'E:Ptans a�d sup�►�rxir�c�;d��eur��nt:�i`hat,�s�e�'��ul�mit ar�e cear��id�res�te��►e pubfic�r�f�r,tt�at��r�,�'��.Port��r�s c�f � t#�e ir�fQ►7n�tivr�may b+�ciasstf�ed as nvn-pc�blic if you prr��ide s��ci��reasor�s ttra#wvtr/d permr't"the City#t� car��l�de�hat the are t`rade secr�#s. -- � CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www aoaherstateonecali.orq I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to �art without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minne ta S il i g Code must be completed within 180 days of permit issuance. X i�11��1� �' � � �5/ X Applicant's Printed Name Appli t' Si Page 1 of 3 • �� � , `�C� �) �G I��� l� �'�, DO NOT WRITE BELOW THIS LINE � �� �� � SUB TYPES _ Foundation _ Fireplace _ Porch(3-Season) _ Exterior Alteration(Single Family) _ Single Family _ Garage _ Porch(4-Season) _ Exterior Alteration (Multi) Multi Deck Porch(Screen/Gazebo/Pergola) Miscellaneous _ 01 of_Plex _ Lower Level �Pool �d��r��� _ Accessory Building W RK TYPES New _ Interior Improvement _ Siding _ Demolish Building* _ Addition _ Move Building _ Reroof _ Demolish Interior _ Alteration _ Fire Repair _ Windows _ Demolish Foundation _ Replace _ Repair _ Egress Window _ Water Damage _ Retaining Wall *Demolition of entire building—give PCA handout to applicant DESCRIPTION Q� Valuation �(���0{jQ Occupancy _� '� MCES System � � Plan Review T— Code Edition dQ rl+t�j SAC Units ���„�,rdar+�S (25%_ 100%�) Zoning �� City Water Census Code Stories Booster Pump #of Units Square Feet PRV #of Buildings Length Fire Sprinklers Type of Construction �_ Width REQUIRED INSPECTIONS Footings (New Building) Meter Size: Footings(Deck) Final/C.O. Required Footings(Addition) Final/No C.O. Required Foundation HVAC Gas Service Test Gas Lin�Air Test Roof:_Ice&Water _Final �Pool:�ootings �r/Gas Tests �'���Final Framing Drain Tile Fireplace:_Rough In _Air Test _Final Siding:_Stucco Lath _Stone Lath _Brick Insulation Windows Sheathing Retaining Wall:_Footings_Backfill_Final Sheetrock Radon Control Fire Walls Erosion Control Braced Walls � Other: Reviewed By: !�f�l� �"° , Building Inspector RESIDENTIAL FEES '��, �� Base Fee �'j'"D,�Q Surcharge Plan Review MCES SAC City SAC Utility Connection Charge S�W Permit&Surcharge Treatment Plant Copies TOTA '' �+ � ' Page2of3 Use BLUE or BLACK Ink �-----------------� � For Office Use � �1� �l �� �� ' I������ � Permit#: /� i � � � � Permit Fee: � � 3830 Pilot Knob Road �LP 0 � 2094 � p� , / � Eagan MN 55122 � Date Received: �6 �7" � Phone:(651)675-5675 � I I Fax:(651)675-5694 �Y'" � Staff: � � �----------------� 2014 COMMERCIAL PLUMBING PERMIT APPLICATION ❑ Please submit two(2)sets of plans with all c mmercial applications. Date: � Site Address: �,lpZ� ' ��� �/a� Tenant: �I� ��f'C�YI Suite#• � �� " 1G k � �i � - ��t� Name: Phone: y� � � ..,a:.. ,_._>s._ .�..-'r �� � �� , �t�= �j��v " 1',, _ ) `� � �Y'� 'p�)�� � License#:� lt��J'C� �� ���i ���� Name: ,� , �� ��� � ��� �Address: 155� QG�_l �l City: State:�Zip:�_ °� �"��� ��� `11e�•2.53- �4-'I�� , ����h �'����, ��� : Phone: Email: �� � � = � ��''� � ✓ew Replacement Repair _Rebuild _Modify Space Work in R.O.W. � =_, _ — � � — �� � � �6 y_,� ,�� � , Description of work: � 4 �_4 �?:l � . '� COMMERCIAL New Construction Modify Space � � � �� ,« ���� —� � � � � ��b � ✓Irrigation System(✓yes/_no)( ✓RPZ/_PVB) �� — = '��� ��; � • Rain sensors required on irrigation systems � a��it � 7, a�� • Avg.GPM (2"turbo required unless smaller size allowed by Public Works) �`�` � � � Meters Call(651)675-5646 to verity that tests passed prior to aickina up meter. �ai I� � _�,a �;� �, Domestic:Size&Type Fire: 1 � �"� '���`� Avg.GPM High demand devices? Yes No Flushometers_Yes No � ���_,�; ��-�`�: — — — COMMERCIAL FEES Contract Value$ x.01 $55.00 Permit Fee Minimum =$ �j�.Q� Permit Fee "If contract value is LESS than$10,010,Surcharge=$5.00 =$ 5•�� Surcharge" ""*If contract value is GREATER than$10,010,Surcharge=Contract Value x$0.0005 *""If the project valuation is over$1 million, please call for Surcharge =$ ��•�Q TOTAL FEE Following fees apply when installing a new lawn irrigation system $ Water Permit Contact the City's Engineering Department,(651)675-5646,for required fee amounts. $ Treatment Plant $ Water Supply&Storage $ State Surcharge _$ LO•OD TOTAL FEE CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. \ I hereby acknowiedge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City ot Eagan; that I understand this is not a permit, but oniy an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x x App ic t's Print Name Applicant's Sig ure ��k` �- '�€�.., .��. � .�+'�i�5 in e w ��� ` .. � '`� � '� ���� fis=�;s".��'. �'��`�.�� �I. �r�_� "� �� I�`-��,�i �$�3fi��i� —�' n�� °�.k�� v.��kb�.�.�"m��^�F S.v = re � �,.�,� - y, ,,� mxs� � ' � rr� j--� �� ,� �*x� � ur 4 i��s�:;" � �����,°4 � .� �r� dr,,'�"'� � , � �i'�� '� ,� ; `� t y- _ �� � �ri o �� y i�ti . � i i�.:�� � �� � � r�yy r � � ,� }�y�r.t_ �t`'E�t�.� 1�.:-�..�. "�t 5�� ��— ,.����j#�ii�i.-�_ r�': _ ����� , __- . � Page 1 of 3 . 1 0 � �11 May 13, 2014 Mike Maguire Rob Krostue Mayor D R Horton 20860 Kenbridge Ct. Lakeville, MN 55044 Paul Bakken Cyndee Fields Cc: Paul Hannan Gary Hansen Sala Architects 326 E. Hennepen Ave., Suite#200 Meg Tilley Minneapolis, MN 55414 Council Members RE: Bathroom/Shower Building and Equipment Building 4621 Dakota Path Dave Osberg City Administrator Dear Rob, We have started our review of the construction documents submitted in pursuit of obtaining a building permit for the above-referenced project. This review is not intended to be an exhaustive and comprehensive report. Unless otherwise noted, all references are to the 2006 I.B.C. It is our goal that this review will help you in complying with the applicable codes. 1. Provide the following required submittal documents so that we may complete our plan Municipal Center review: 3830 Pilot Knob Road �A SAC determination from the Met Council. Eagan, MN 551 22-1 81 0 �Wo sets of civil plans (i.e. site, grading, erosion and utility). yTwo (2) copies of a code analysis. 651.675.5000 phone �Wo (2) sets of landscape plans. s5i.s�5.so12 fax �Completed Energy Code Compliance forms for Service Water Heating and Lighting. 651.454.8535 TDD �ne (1) Emergency Response Site Plan (example enclosed). Thank you in advance for your attention to these items. If you have any questions concerning this , letter, please call me at (651)675-5683. i Maintenance Facility � 3501 Coachman Point Sincerely, Eagan, MN 55122 ���' 651.675.5300 phone CI'81g NOVaGZj/k 651.675.5360 fax Senior Building Inspector 651.454.8535 TDD Cc: Pam Dudziak— Planning Aaron Nelson - Engineering www.cityofeagan.com The Lone Oak Tree The symbol of strength and growth in our community. Craig Novaczyk From: Pam Dudziak Sent: Wednesday,June 04, 2014 3:56 PM To: Aaron Nelson; Craig Novaczyk Subject: RE: Dakota Path Pool House parking lot I don't know that there is a minimum required number of parking stalls for this. It is a private amenity and will be managed by the neighborhood HOA. That said,the Prelim. PD showed 16 stalls,the Final PD showed 11 stalls,with 2 of those being accessible. They should get as close to those numbers as possible. If they lose another one or two stalls in the final design,we won't make an issue of it. If there is not enough parking and they end up with spillover into the neighborhood,that will be an issue for the HOA. Pam Pamela Dudziak � Planner � City of Eagan City Hall � 3830 Pilot Knob Rd. � Eagan, MN 55122 � 651-675-5691 � 651-675-5694(Fax) � pdudziak@cityofea�an.com THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND/OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error, please contact the sender and delete the e-mail and its attachments from all computers. -----Original Message----- From:Aaron Nelson Sent: Wednesday,June 04,2014 9:16 AM To: Pam Dudziak; Craig Novaczyk Subject: Dakota Path Pool House parking lot Pam, I'm working with Dave Klee on their pool building permit. One of my comments was to align the driveway entrance with the median opening. I'm not sure why the median is where it is, because the approved development plans show them aligned. It sounds like they made plan revisions after the fact,and did not submit them to the city,so the median got placed further south than it should have. Regardless,they are going to narrow the driveway entrance from 28'to 24', and also are considering eliminating 1 or 2 of the parking stalls on the NE corner of the lot so they can shift the driveway entrance further south. Dave asked how many parking stalls are required, and also how many handicapped stalls. I think for the first 25 stalls, 1 handicapped is required (Craig, please verify). Pam, how many total stalls are required? Thanks. Aaron Nelson � Assistant City Engineer � City of Eagan City Hall � 3830 Pilot Knob Road � Eagan, MN 55122 � 651-675- 5635 � 651-675-5694(Fax) � anelson@citvofea�an.com THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND/OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error, please contact the sender and delete the e-mail and its attachments from all computers. 1 � t e Craig Novaczyk From: Aaron Nelson Sent: Tuesday,June 03, 2014 4:51 PM To: David R Klee(DRKIee@drhorton.com) Cc: Craig Novaczyk Subject: Pool House Building Permit Attachments: photo jpg Hi Dave, I'm not sure whose coordinating the building permit,so I'm going to send this directly to you. I'm doing the final review on your building permit and noticed we need a bit more information. Please make the final revisions and re-submit 2 full sized plan sheets for incorporation to the building permit. • Water service and irrigation service o Show gate valves on these lines if they were already installed,otherwise, include a gate valve on each line at the property line o Show how/where the water service connects to the building. • Sewer service o Show how/where the sewer service connects to the building • Driveway Entrance � o Re-align driveway with median opening Please let me know if you have any questions. Aaron Nelson � Assistant City Engineer � City of Eagan City Hall�3830 Pilot Knob Road�Eagan,MN 55122�651-675-5635�651-675-5694(Fax)�anelsonna.citvofeaqan.com ��� �������j 1� THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND/OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error,please contact the sender and delete the e-mail and its attachments from all computers. 1 � / � i / / � S �s CIt o� �a �� �e�o � � TO: �cott Peterson, Building Inspections # 10 ,don Hohenstein, Community Development '�Mike Ridley, Planning ✓Darrin Bramwell, Fire Marshal Russ Matthys, Engineering ,dohn Gorder, Engineering ✓Aaron Nelson, Engineering Leon Weiland, Engineering Jon Eaton, Utilities ✓Eric Macbeth, Maintenance �regg Hove, Maintenance Lt. Mike Fineran, Police FROM: Craig Novaczyk, Senior Building Inspector DATE: May 12, 2014 RE: Plan Review For: Bathroom/Shower Bldg. and Equipment Bldg. 4621 Dakota path The plans are in our plan review section for your review and comment. � Please return this form to my attention with your signed comments within 7 days. Please �i indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request"form to me. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No Landscape Security Required Zoning: ❑ Yes ❑ No Water Quality Dedication Meter Size: ❑ Yes ❑ No Park Dedication ❑ Yes ❑ No Trail Dedication ❑ Yes ❑ No Tree Dedication ❑ Yes ❑ No PRV Required ❑ Yes ❑ No Irrigation-Treatment Plant ❑ Yes ❑ No Sewer/Water Permit Signature Date G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters ��� CIt of �a a� ���o � � TO: Scott Peterson, Building Inspections # 10 Jon Hohenstein, Community Development Mike Ridley, Planning Darrin Bramwell, Fire Marshal Russ Matthys, Engineering John Gorder, Engineering Aaron Nelson, Engineering Leon Weiland, Engineering Jon Eaton, Utilities Eric Macbeth, Maintenance Gregg Hove, Maintenance Lt. Mike Fineran, Police FROM: Craig Novaczyk, Senior Building Inspector DATE: May 12, 2014 RE: Plan Review For: Bathroom/Shower Bldg. and Equipment Bldg. 4621 Dakota path The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request"form to me. Comments: , , � ,� � � � ; -. �` . . � _:� i g,. t�i,"Z G.�. � �1� ��. ;.�y"` l�4� �... . C��_::'1....0 .�'`,�''��--'�k� ;�`�-... 1 , . � i� �4. ',. � , a � _ / . . , .:: ,. .�. �. . , . . .,r,. ; �' s" � �} : . � , .;� � i��M� t '�t '"��. ' .. t t.. j�y .. -e� �i 9 ��`�...�:. "_\) _.�.s �/. ..,_.+{�.'�,/�-) ` r � Indicate below any fees that are to be collected with the building permit. Amount �� ❑ Yes �I No tLandscape Security Required Zoning: ,� ❑ Yes '� No Water Quality Dedication Meter Size: ❑ Yes L�No Park Dedication ❑ Yes �l No Trail Dedication ❑ Yes � No Tree Dedication ❑ Yes ❑ No PRV Required ❑ Yes ❑ No Irrigation-Treatment Plant ❑ Yes ❑ No Sewer/Water Permit ;-� . ,._ �� � .,-�=�; , / � � :,. R ��� �` q,�r r (��.,�(.�-"��. L _ �., � Signature , Date G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters • II �lt o� �a �� �e�0 '�� � � �� TO: Scott Peterson, Building Inspections # 10 Jon Hohenstein, Community Development '� Mike Ridley, Planning I Darrin Brarnwell, Fire Marshal Russ Matthys, Engineering John Gorder, Engineering Aaron Nelson, Engineering Leon Weiland, Engineering Jon Eaton, Utilities Eric Macbeth, Maintenance Gregg Hove, Maintenance Lt. Mike Fineran, Police FROM: Craig Novaczyk, Senior Building Inspector DATE: May 12, 2014 RE: Plan Review For: Bathroom/Shower Bldg. and Equipment Bldg. 4621 Dakota path The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request" form to me. Comments: _ �C,Iri, GiD�s !1��jJ1�'�.'zi �f�� ��t�i/�i��` 't��/ �-�;�,/� .�u����5'�'�; � Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No Landscape Security Required Zoning: ❑ Yes ❑ No Water Quality Dedication Meter Size: ❑ Yes ❑ No Park Dedication ❑ Yes ❑ No Trail Dedication ❑ Yes ❑ No Tree Dedication ❑ Yes ❑ No PRV Required ❑ Yes ❑ No Irrigation-Treatment Plant ❑ Yes ❑ No Sewer/Water Permit . �` ��G>�J'�� Signature Date G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters CIt of �� �� �e�o � � TO: Scott Peterson, Building Inspections # 10 Jon Hohenstein, Community Development Mike Ridley, Planning Darrin Bramwell, Fire Marshal Russ Matthys, Engineering John Gorder, Engineering Aaron Nelson, Engineering Leon Weiland, Engineering Jon Eaton, Utilities Eric Macbeth, Maintenance Gregg Hove, Maintenance Lt. Mike Fineran, Police FROM: Craig Novaczyk, Senior Building Inspector DATE: May 12, 2014 RE: Plan Review For: Bathroom/Shower Bldg. and Equipment Bldg. 4621 Dakota path The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request" form to me. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No Landscape Security Required Zoning: ❑ Yes ❑ No Water Quality Dedication Meter Size: ❑ Yes ❑ No Park Dedication ❑ Yes ❑ No Trail Dedication 5 ❑ Yes ❑ No Tree Dedication " ❑ Yes �I No PRV Required �`le�°�`�t.,+��'� ,�,,'L �I Yes ❑ No �ew�-Treatment Plant - �'•-• � -, �— � w��l, c � �j�� � Yes ❑ No Sewer/Water Permif �^, : l�,�.� 7s� �. � � _ �... '`� ��� �,`y Signat �e Date— G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters ' �e�o Clt of �a a� Y � TO: Scott Peterson, Building Inspections # 10 Jon Hohenstein, Community Development Mike Ridley, Planning Darrin Bramwell, Fire Marshal Russ Matthys, Engineering John Gorder, Engineering Aaron Nelson, Engineering Leon Weiland, Engineering Jon Eaton, Utilities Eric Macbeth, Maintenance Gregg Hove, Maintenance Lt. Mike Fineran, Police FROM: Craig Novaczyk, Senior Building Inspector DATE: May 12, 2014 RE: Plan Review For: Bathroom/Shower Bldg. and Equipment Bldg. 4621 Dakota path The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request"form to me. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes I� No Landscape Security Required Zoning: ❑ Yes No Water Quality Dedication Meter Size: ❑ Yes No Park Dedication ❑ Yes ❑ No Trail Dedication ❑ Yes ❑ No Tree Dedication ❑ Yes ❑ No PRV Required ❑ Yes ❑ No Irrigation-Treatment Plant ❑ Yes � No Sewer/Water Permit ,,; 5 �� �� Signature � Date G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters Cl of �� �� �e�o t � � TO: Scott Peterson, Building Inspections # 10 Jon Hohenstein, Community Development Mike Ridley, Planning Darrin Bramwell, Fire Marshal Russ Matthys, Engineering John Gorder, Engineering Aaron Nelson, Engineering Leon Weiland, Engineering Jon Eaton, Utilities Eric Macbeth, Maintenance Gregg Hove, Maintenance Lt. Mike Fineran, Police FROM: Craig Novaczyk, Senior Building Inspector DATE: May 12, 2014 RE: Plan Review For: Bathroom/Shower Bldg. and Equipment Bldg. - 4621 Dakota path The pians are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request"form to me. Comments: - - / „ .— /� �/ � �G�� �C���� G� ' � ��°L�, c � � /�� (Y.�(.�'�o' /l�� � C �' �f ,� � � / ��� f� � �, r � . �, �- Indicate below any fees that are to be collected with the building permit. ���� C � Amount �r ��� ❑ Yes ❑ No Landscape Security Required Zoning: ❑ Yes ❑ No Water Quality Dedication Meter Size: ❑ Yes ❑ No Park Dedication ❑ Yes ❑ No Trail Dedication ❑ Yes �No Tree Dedication ❑ Yes ❑ No PRV Required ❑ Yes ❑ No Irrigation-Treatment Plant ❑ Yes ❑ No Sewer/Water Permit �-zl - � � Signatur Date G:\Buildin Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters C' �e�o lt 0� �� �Il � � TO: Scott Peterson, Building Inspections # 10 Jon Hohenstein, Community Development Mike Ridley, Planning Darrin Bramwell, Fire Marshal Russ Matthys, Engineering John Gorder, Engineering Aaron Nelson, Engineering Leon Weiland, Engineering Jon Eaton, Utilities Eric Macbeth, Maintenance Gre H e Maintenance - . ' e ineran, o FR M: Craig Novaczyk, Sen' uilding Inspector DATE: ay 12, 2014 RE: Plan Review For: Bathroom/Shower Bldg. and Equipment Bldg. 4621 Dakota path The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request"form to me. Comments: d�p Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No Landscape Security Required Zoning: ❑ Yes ❑ No Water Quality Dedication Meter Size: ❑ Yes ❑ No Park Dedication ❑ Yes ❑ No Trail Dedication ❑ Yes ❑ No Tree Dedication ❑ Yes ❑ No PRV Required ❑ Yes ❑ No Irrigation-Treatment Plant ❑ Yes ❑ No Sewer/Water Permit __. � Sig ture Date G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters