Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
4845 Rusten Rd
PERMIT City of Eagan Permit Type:Mechanical Permit Number:EA122365 Date Issued:05/06/2014 Permit Category:ePermit Site Address: 4845 Rusten Rd Lot:3 Block: 1 Addition: Deer Rest Pond PID:10-19875-01-030 Use: Description: Sub Type:Residential Work Type:Replace Description:Furnace & Air Conditioner Comments:Questions regarding electrical permit requirements should be directed to State Electrical Inspector, Mark Anderson at (952) 445-2840. Holly Flood 1408 Northland Dr #310 Fee Summary:ME - Permit Fee (Replacements)$55.00 0801.4088 Surcharge-Fixed $5.00 9001.2195 $60.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Ronald Roth 2260 James Ct Eagan MN 55122 Sedgwick Heating & Air Conditioning 1408 Northland Drive, Suite 310 Mendota Heights MN 55120 (952) 881-9000 Applicant/Permitee: Signature Issued By: Signature PERMIT City of Eagan Permit Type:Mechanical Permit Number:EA122366 Date Issued:05/06/2014 Permit Category:ePermit Site Address: 4845 Rusten Rd Lot:3 Block: 1 Addition: Deer Rest Pond PID:10-19875-01-030 Use: Description: Sub Type:Residential Work Type:Alteration Description:Stove Comments:Questions regarding electrical permit requirements should be directed to State Electrical Inspector, Mark Anderson at (952) 445-2840. Holly Flood 1408 Northland Dr #310 Fee Summary:ME - Permit Fee (Replacements)$55.00 0801.4088 Surcharge-Fixed $5.00 9001.2195 $60.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Ronald Roth 2260 James Ct Eagan MN 55122 Sedgwick Heating & Air Conditioning 1408 Northland Drive, Suite 310 Mendota Heights MN 55120 (952) 881-9000 Applicant/Permitee: Signature Issued By: Signature PERMIT City of Eagan Permit Type:Mechanical Permit Number:EA122367 Date Issued:05/06/2014 Permit Category:ePermit Site Address: 4845 Rusten Rd Lot:3 Block: 1 Addition: Deer Rest Pond PID:10-19875-01-030 Use: Description: Sub Type:Residential Work Type:Alteration Description:Dryer Comments:Questions regarding electrical permit requirements should be directed to State Electrical Inspector, Mark Anderson at (952) 445-2840. Holly Flood 1408 Northland Dr #310 Fee Summary:ME - Permit Fee (Replacements)$55.00 0801.4088 Surcharge-Fixed $5.00 9001.2195 $60.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Ronald Roth 2260 James Ct Eagan MN 55122 Sedgwick Heating & Air Conditioning 1408 Northland Drive, Suite 310 Mendota Heights MN 55120 (952) 881-9000 Applicant/Permitee: Signature Issued By: Signature � � �;� � ���-�� ��� ��� �� 1 � �a� Use BLUE or BLACK Ink 1 �j �----------------- � '�t✓ 1 R�I..F rr?:."'!"r � i For Office Use � I � �� � ^��'�j � . � � �� �.� � Permit#: O C�� � Clt of �� aIl � ��Y � � �o,� , 1.�� ,$, ; � � �� � Permit Fee: � L � I 3830 Pilot Knob Road � � ���, Eagan MN 55122 j Date Received: j Phone:(651)675-5675 �� / I Staff: I Fax:(651)675-5694 � ,����� � � � �--------------�'�1�,�� 2014 RESIDENTIAL BUILDING PERMIT APPLICATION `� n /� � �1 Date: �-"�"l �f Site Address: 'a'���'« /{��'��K 1'� Unit#: � � � �/ � � ��� Name: �V�I��f3ih �vu+�$ Phone:�����`�— �9`!I `ResidentJ: �� Owner> address�city�zip:l�1�I� �lS lJ�� /1� P�Y�tvc�� ��t' S���'6 ��� Applicant is: 1�Owner l�Contractor Type Of WOI'k � Description of work: /'(fa'W �u n 5�'rv���cGe. Construction Cost: Z,`E.�DDn Multi-Family Building: (Yes /No ) Company: /Vcs/'-I�d:� �/a�.r.c t 5 Contact: C�lw��� c��' J uhr� Contractor Address Ciry: �lyrruo��� State: '�Zip: �7"til G Phone: �� �'°���"'.�`�I Email: G:F�I'iS Ntr����f�{�t /�/u��COwI License#: p� (�3�f 2�/ Lead Certificate#: If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) l� �° � (�la �� � �- ��r�f � �d COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? _Yes � If yes,date and address of master plan: Licensed Plumber: liW�a�`��G.tin- /�G�kCc�c�t.c.�� p�✓[ Phone: �/2° �_iU-� c7v27� Mechanical Contractor: ���i G,� f�it.7l�H-�i �- ,.1 r�rhv� Phone: �:�� �1 " ��`�d Sewer&Water Contractor: L�/� - /�`t��K L. Phone. �S�"��� ���0 NOTE:Plans and supporting documents that you submit are conside'red to be public information Port�ons�of the information may;be cl�ssified as.non=pu�li�if you;p�`vvide specific reasons t�#"at would permit the City to M�conc/ude tha�the�` are trade secrets.- CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.aopherstateonecall.orq I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. x �h r'a`� /Vo��a�'l. x L�. �/G'� Applicant's Printed Name Applicant's Signature Page 7 of 3 ► � / ��J �iJ S��� �C,� ` DO NOT WRITE BELOW THIS LINE � �"� �� � SUB TYPES Foundation _ Fireplace _ Porch(3-Season) _ Exterior Alteration(Single Family) � Single Family _ Garage _ Porch(4-Season) _ Exterior Alteration(Multi) _ Multi _ Deck _ Porch(Screen/Gazebo/Pergola) _ Miscellaneous _ 01 of_Plex _ Lower Level _ Pool _ Accessory Building WORK TYPES � New _ Interior Improvement _ Siding _ Demolish Building* _ Addition _ Move Building _ Reroof _ Demolish Interior _ Alteration _ Fire Repair _ Windows _ Demolish Foundation _ Replace _ Repair _ Egress Window _ Water Damage _ Retaining Wall *Demolition of entire building-give PCA handout to applicant DESCRIPTION /� { Valuation V J� Occupancy � MCES System Plan Review Code Edition ��j�.-� SAC Units (25%_100%�) Zoning ;F/� City Water Census Code Stories _�,�� Booster Pump #of Units Square Feet PRV #of Buildings Length � Fire Sprinklers Type of Construction �_ Width � REQUIRED INSPECTIONS � Footings (New Building) Meter Size: Footings(Deck) � Final/C.O. Required Footings(Addition) Final/No C.O. Required � Foundation HVAC_Gas Service Test Gas Line Air Test Roof:_Ice&Water _Final Pool:_Footings _Air/Gas Tests _Final Framing Drain Tile Fireplace:�Rough In �Air Test �[Final Siding:_Stucco Lath Stone Lath Brick Insulation Windows Sheathing Retaining Wall:_Footings_Backfill_Final Sheetrock � Radon Control Fire Walls � Erosion Control �` Braced Walls Other: Reviewed By: - i � , Building Mspector RESIDENTIAL FEES ��� /��/� '��/ � ,r�� ��� nO �i�/' Base Fee �� � � �•� �� � � �i � 4/ Surcharge // Q (� f2 Plan Review � �'"� �/�G� � 7,� ��` � � l�J DO�/"" c�tysacc Jo ��=4�s' � �5�?� = / 7��/ ��,2.i `��1` �� Utility Connection Charge a S8W Permit&Surcharge � � � � ���E �� � � � ������ �°`'�"�G�C�� � �v 0 Treafinent Plant Copies r,��,�,,� � ��.� - � ____�� � , .�, ;�`�, TOTAL ,�..�, �,Q � ll " ���� ��'1 t�� �� ���.��'�-' � V� Page 2 of 3 � '����;�t��'i.����� . ���� � ���`���� y ,. 1 ��-�� � New Construction Energy Code Compliance Certificate Per N 1101.8 Building Certificate.A building certificate shall be posted in a permanently visible location insi �ate Certificate rosted the building. The certificate shall be completed by the builder and shall list information and values of components listed in Table N I 101.8. Mailing Address of the Dwelling or Dwelling Unit City COMM. N Q. Z��Z 7� 4845 Rusten Road Ea an, MN Name of Residentlal ConMac[or MN License Number Norton Homes THERMAL ENVELOPE RADON SYSTEM Type:Check All That Apply X Passive(No Fan) w O N T � � Active(With fan and monometer or F-� A �, other system manitoring device) � �a = a '" �° a° °? � � � � d W 0.1 a�i U � �o ❑ � T > � ° y � ° c, w x � Insulafion Locatio� � •� o � � U O � W � � � � ou an E�- � Z w w w° w° � w a Other Please Describe Here Below Entire Slab FoundatiOn Wall R-'rJ X Type in location:interior exterior or integral Perimeter of Slab on Grade R-�0 X R1m Joist(Foundati0tt) R-15 X Type in location:interior exterior or integral Rlm JOist(1�FIOOrt) R-�rj )( Type in location:interior exterior or integral wall R-19 X Ce�ting,nat R-44 X Ceiling,vaulted Bay Windows or cantilevered areas f2-5$ ' X Bonus room over garage R-44 X Describe otherinsulated areas Windows 8 Doors Heating or Cooling Ducfs Outside Conditioned Spaces Average U-Factor(excludes skylights and one door)U: .27-.28 Not applicable,all ducts located in conditioned space Solar Heat Gain Coefficient(SHGC): .22-.24 R-value MECHANICAL SYSTEM Mdke-up Air Selecta Type Appliances Heati�g System Domestic Water Heater Cooling System X Not required per mech.code Fue�1'ype GAS ELECTRIC ELECTRIC Passive Manufacturer GOODMAN GOODMAN Powered Interlocked with exhaust device. Model G M H950453BX G SX13030 Describe: Input in 45000 Capaciry in Output in 2.5 Other,describe: Ratittg or Size BTUS: Gallons: Tons: Heat Losr. 42466 Heat Gain 29,839 Location of duct or system: Structure's Calculated AFUE or 96 SEER: 13 HSPF% Calculated 2.5 Efficienc cooling load: Cfin's °round dact OR Mechanical Venfilation Sysfem "metal duct Describe any additional or combined heating or cooling systems if installed:(e.g.two furnaces or air Combusfion Air Select a Type source heat pump with gas back-up furnace): Not required per mech.code Select Type Passive X Heat Recover Ventilator(HRV) Capacity in cfins: Low: High: 98 Other,describe: Energy Recover Ventilator(ERV)Capaciry in cfms: Low: High: Location of duct or system: Cootinuous exhausting fan(s)rated capaciry in cfins: BA$EMENT Location of fa�(s),describ IN HRV Cfin's Capaciry continuous ventilation rate in cfms 98 "round duct OR Total ventilation(intermittent+continuous)rate in cfins: 328 "metal duct Norton Homes 4845 Rusten Road, Edina, MN HVAC Load Calculations for Norton Homes ����� ���� �� Prepared By: Jarrod Beach Sedgwick Heating And Air Conditioning 1408 Northland Drive Mendota Heights, MN 55120 952-881-9000 Thursday,July 17,2014 Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. ,f,. , ... _, .. . i 2 �r�+( . . .z ,. ,x.. � ����p ��1�[,.iR ��4. N . � { ?.�:�;. � t�� � : . . r a : " -� ,.>�.' ,y+ ..,' . , � , � e,, a „�",: s,. r" '�; ,a4� ��s '�`-�'%�., Pro�ect Re ort �eneral�ro'ect i�for�#�%in ° � , , �, , �- Project Title: Norton Homes 4845 Rusten Road, Edina, MN Designed By: Jarrod Beach Project Date: Monday, May 05, 2014 Client Name: Norton Homes Company Name: Sedgwick Heating And Air Conditioning Company Representative: Jarrod Beach Company Address: 1408 Northland Drive Company City: Mendota Heights, MN 55120 Company Phone: 952-881-9000 Company Fax: 952-881-4491 Company E-Mail Address: jarrodb@sedgwickheating.com Company Website: sedgiwckheating.com Company Comment: t5esi n'Dafa . . Reference City: Minneapolis/St. Paul AP, Minnesota Building Orientation: Front door faces Southeast Daily Temperature Range: Medium Latitude: 44 Degrees Elevation: 834 ft. Altitude Factor: 0.970 Outdoor Outdoor Outdoor Indoor Indoor Grains � Bulb Wet Bulb Rel.Hum R .Hum Dry Bulb Difference Winter: -15 -11.42 n/a 30% 70 25.53 Summer: 88 71 44% 50% 75 24 Check�i ures Total Building Supply CFM: 1,174 CFM Per Square ft.: 0.303 Square ft. of Room Area: 3,871 Square ft. Per Ton: 1,557 Volume(ft3) of Cond. Space: 33,109 Builtlirt Loads ' _ I Total Heating Required Including Ventilation Air: 42,466 Btuh 42.466 MBH Total Sensible Gain: 26,418 Btuh 89 % Total Latent Gain: 3,421 Btuh 11 % Total Cooling Required Including Ventilation Air: 29,839 Btuh 2.49 Tons(Based On Sensible + Latent) Nates ,;. , � _ Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions i C:\...\Norton 4845 Rusten Road.rh9 Thursday,July 17, 2014, 10:49 AM � �:., , { . ` �t�ial t#�f "` � t�I� `� , .� � , �� �`�c� � � �� :�.u, ,�. T � . u$ , . , x �„ : w¢� � a ,.0 *� . .. � , � �� �, � _� a ,� dfll� � n > �w ��; . � <:. � , f,. �.r� . n ft. � , ��k. Miscellaneous Re ort system 1 C�uti�tat�� t�tattlot�r G�utaac�t,:' 'ind��' ; �dc� Cr�iin�; fn ut�ata t�'` E� : �IUe�E3ial . f ` R .Hum R�1.ti � `t�' Winter: -15 -11.42 100% 30% 70 25.53 Summer: 88 71 44% 50% 75 23.51 Duct Si2in: Ir� uts ,, ; . Main Trunk Runouts Calculate: Yes Yes Use Schedule: Yes Yes Roughness Factor: 0.00300 0.01000 Pressure Drop: 0.1000 in.wg./100 ft. 0.1000 in.wg./100 ft. Minimum Velocity: 650 ft./min 450 ft./min Maximum Velocity: 900 ft./min 750 ft./min Minimum Height: 0 in. 0 in. Maximum Height: 0 in. 0 in. t�utsitle Air Data Win r Summer Infiltration Specified: 0.130 AC/hr 0.070 AC/hr 59_ CFM 32 CFM Infiltration Actual: 0.000 AC/hr 0.000 AC/hr Above Grade Volume: X 27,157 Cu.ft. X 27,157 Cu.ft. 0 Cu.ftJhr 0 Cu.ft./hr X 0.0167 X 0.0167 Total Building Infiltration: 0 CFM 0 CFM Total Building Ventilation: 98 CFM 98 CFM ---System 1--- Infiltration &Ventilation Sensible Gain Multiplier: 13.87 = (1.10 X 0.970 X 13.00 Summer Temp. Difference) Infiltration &Ventilation Latent Gain Multiplier: 15.51 = (0.68 X 0.970 X 23.51 Grains Difference) Infiltration &Ventilation Sensible Loss Multiplier: 90.72 = (1.10 X 0.970 X 85.00 Winter Temp. Difference) Winter Infiltration Specified: 0.130 AC/hr(59 CFM), Construction: Tight, Fireplaces: 1, 0 CFM, Tight Summer Infiltration Specified: 0.070 AC/hr(32 CFM), Construction: Tight I i C:\...\Norton 4845 Rusten Road.rh9 Thursday,July 17, 2014, 10:49 AM � ���le�& �f�.Sl ���1,�''.OY�I � ' ?r ta r � "��' f,, . `���.. �t ..C�"�/�"�`r. � � � � �� ��v"�` . �1Lt3r''M� ����� '.�,'�;1f.,, ,?� � e. „+ .. �<' �� �`�.��_ .�fi Load Preview Re ort � Has Net ft2� ' Sen Lat� Net; Sen' Mms Min� Sys Sysj 5ys Duct Scope AED Ton /Ton Areaj Gain Gain Gain Lossj CFM CFM� CFM CFM� CFM Size __._.,., __..__ � ,.... ....._.�...,..._.._��...._..._�.......�_i. ...._.._....1 __..�_..___��______�__.�....__.__� _F...._._.,_._ . �_ .... Building 2.49 1,557 3,871 26,418 3,421 29,839 42,466 542 1,174 542 1,174 1,174 System 1 Yes 2.49 1,557 3,871 26,418 3,421 29,839 42,466 542 1,174 542 .��"��,' 1,174 12x17 ________, Ventilation 1,360 1,520 2,880 1,956 Humidification 2,641 Zone 1 3,871 25,058 1,901 26,959 37,869 542 1,174 542 Y+� �! 1,174 12x17 1-Master Bedroom 263 2,656 400 3,056 2,663 38` 124 38 �� 124 2--5 2-Bedroom 2 182 1,359 200 1,559 2,499 36 64 36 `+�u� 64 1--5 3-Laundry And Hali 128 1,081 0 1,081 1,551 22 51 22 ��,� 51 1--4 4-Bedroom 3 205 1,937 200 2,137 2,255 32 91 32 a. *� '�' - 91 1--6 �. 5-Bedroom 4 153 1,899 200 2,099 1,613 23 89 23 ���', 89 1--6 6-Bedroom 4 Closet 49 191 0 191 740 11 9 11 �_��I 9 1--4 7-Bathroom 2nd Fioor 86 276 0 276 554 8 13 8 �� 13 1--4 8-Master Bath Toilet And Closet 88 280 0 280 565 8 13 8"�e� 13 1--4 �,M,,,, 9-Master Bath Tub And Showe� 128 887 0 887 1,776 25 42 25„�,�.• 42 1--4 10-Upstairs Haliway 212 317 0 317 396 6 15 6 �'��; 15 1--4 �w 11-Dining Room 180 1,369 0 1,369 2,668 38 64 38 �r,4;�', 64 1--5 �� 12-GreatRoom 270 2,205 0 2,205 2,322 33 103 33,h�;^� 103 1--6 13-Study 156 2,330 0 2,330 2,382 34 109 34;� 109 1--6 14-Mud Room 100 427 0 427 1,478 21 20 21 ���' PO 1--4 15-1/2 Bath First Floor 63 93 0 93 394 6 4 6.��"'",��', 4 1--4 .z.�,. 16-Kitchen 273 4,258 901 5,159 2,329 33 199 33 ' 199 2--6 � �•� 17-Stainvell And Pantry Area 140 66 0 66 364 5 3 5 V�;;�;.�', 3 1--4 �°:-- ' 18-Entry 1st Floor 31 229 0 229 974 14 11 14 �;y„��! 11 1--4 �w , 19-Basement Mechanicai And Storaqe � 234 0 0 0 2,507 36� � 0 36�,��;„�i 0� 0--0 20-Basement Bath 66 0 0 0 272 4 0 4��,A;s�;,:�g'; 0 0--0 21-Basement Bedroom 234 618 0 618 2,095 30 29 30��: m 29 1--4 22-Future Family Room And Stairs 450 1,993 0 1,993 2,864 41 93 41 �,;�', 93 1--6 � : , 23-Basement Future Bar Area 180 587 0 587 2,608 37 28 37 „s,�N 28 1--4 C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM ��'1 A,��1 s � � ' 3' �, �� S6CtgWtG�H� (#£'� # , � �`� � �=�;, � ��3 � x. , �..:� ,ii '�; Mend€�f �Ner � °IUI' �� u� x '� � � � '� �"��. �., Total Buildin Summa Loads c�mpon�r�t �re� � �,.�rt �'�� �La� �; �,� ���t � -. �'�#�I [?escri tion ttan ` Lc�ss ` � �a�n' window: Glazing-operable window, e=0.20 on surface 2, 25 574 0 451 451 vinyl frame, u-value 0.27, SHGC 0.24 window: Glazing-operable window, e=0.20 on surface 2, 382 9,095 0 6,762 6,762 vinyl frame, u-value 0.28, SHGC 0.22 window: Glazing- 10 213 0 222 222 window: Glazing-operable window, e=0.20 on surface 2, 38 839 0 707 707 vinyl frame, u-value 0.26, SHGC 024 4A-1v-o: Glazing-Double pane low-e (e= 0.20 or less), 30 714 0 508 508 operable window, e=0.20 on surtace 2, vinyl frame, u- value 0.28, SHGC 0.22 4A-1 v-o: Glazing-Double pane low-e (e= 0.20 or less), 25 574 0 451 451 operable window, e=0.20 on surface 2, vinyl frame, u- value 0.27, SHGC 0.24 11 P: Door-Metal- Polyurethane Core 57.4 1,416 0 400 400 12E-Osw: Wall-Frame, R-19 insulation in 2 x 6 stud 2649.8 15,316 0 2,776 2,776 cavity, no board insulation, siding finish, wood studs 15B0-4sf-10:Wall-Basement, , R-4 board insulation to 920.7 5,167 0 0 0 floor, no interior finish, 10'floor depth 15B0-0-8: Wall-Basement, , no insulation or framing, no 61.6 787 0 31 31 interior finish, 8'floor depth 16A-44: Roof/Ceiling-Under Attic with Insulation on Attic 1494.1 2,793 0 2,233 2,233 Floor(also use for Knee Walls and Partition Ceilings), Unvented Attic, No Radiant Barrier,Any Roofing Material,Any Roof Color, R-44 insulation 20P1-30op: Floor-Over open crawl space or garage, 128 381 0 36 36 Passive, spray foam insulation, R-30 open cell 1/2 Ib. spray foam insulation, 8 inches in 2 x 10 joist cavity, any cover _ _ Subtotals for structure: 37,869 0 14,577 14,577 People: 5 1,000 1,150 2,150 Equipment: 901 9,331 10,232 Lighting: 0 0 0 Ductwork: 0 0 0 0 Infiltration: Winter CFM: 0, Summer CFM: 0 0 0 0 0 Ventilation:Winter CFM: 98, Summer CFM: 98 1,956 1,520 1,360 2,880 Humidification (Winter)7.20 gal/day : _ 2,641 0 0 __ _ 0 Total Building Load Totals: 42,466 3,421 26,418 29,839 Check Fi ures , � � �� �.. � � � Total Building Supply CFM: 1,174 CFM Per Square ft.: 0.303 Square ft. of Room Area: 3,871 Square ft. Per Ton: 1,557 Volume(ft3) of Cond. Space: 33,109 Buildin Loads Total Heating Required Including Ventilation Air: 42,466 Btuh 42.466 MBH , Total Sensible Gain: 26,418 Btuh 89 % Total Latent Gain: 3,421 Btuh 11 % Total Cooling Required Including Ventilation Air: 29,839 Btuh 2.49 Tons (Based On Sensible+ Latent) Notes � < <:: .,. . Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM n ,It461f0l��41�If�y' �"4�� 'tk�� � �c..lzy,r +S. ��qk .���{3� � b����!T,.: ,Y, eafirig ani � � r�Q�r'� � ,c#�c `Mendo ei ht �± �� 4���% �° _, `'� �} S stem 1 Summa Loads Gc�rrtpan+ent Are� , ` S�r�' . irat ; `��t� Tc�i��; Desc�i tinn an, L���; �aira C�ir� ': ��fin.'' window: Giazing-operable window, e=020 on surface 2, 25 574 0 451 451 vinyl frame, u-value 0.27, SHGC 0.24 window: Giazing-operable window, e=0.20 on surface 2, 382 9,095 0 6,762 6,762 vinyl frame, u-value 0.28, SHGC 022 window: Glazing- 10 213 0 222 222 window: Glazing-operable window, e=0.20 on surface 2, 38 839 0 707 707 vinyl frame, u-value 0.26, SHGC 0.24 4A-1 v-o: Glazing-Double pane low-e (e= 0.20 or less), 30 714 0 508 508 operable window, e=0.20 on surface 2, vinyl frame, u- value 0.28, SHGC 0.22 4A-1 v-o: Glazing-Double pane low-e (e= 0.20 or less), 25 574 0 451 451 operable window, e=0.20 on surface 2, vinyl frame, u- value 0.27, SHGC 0.24 11 P: Door-Metal- Polyurethane Core 57.4 1,416 0 400 400 12E-Osw: Wall-Frame, R-19 insulation in 2 x 6 stud 2649.8 15,316 0 2,776 2,776 cavity, no board insulation, siding finish,wood studs 15B0-4sf-10: Wall-Basement, , R-4 board insulation to 920.7 5,167 0 0 0 floor, no interior finish, 10'floor depth 15B0-0-8: Wall-Basement, , no insulation or framing, no 61.6 787 0 31 31 interior finish, 8'floor depth 16A-44: Roof/Ceiling-Under Attic with Insulation on Attic 1494.1 2,793 0 2,233 2,233 Floor(also use for Knee Walls and Partition Ceilings), Unvented Attic, No Radiant Barrier,Any Roofing Material,Any Roof Color, R-44 insulation 20P1-30op: Floor-Over open crawl space or garage, 128 381 0 36 36 Passive, spray foam insulation, R-30 open cell 1/2 Ib. spray foam insulation, 8 inches in 2 x 10 joist cavity, any cover Subtotals for structure: 37,869 0 14,577 14,577 People: 5 1,000 1,150 2,150 Equipment: 901 9,331 10,232 Lighting: 0 0 0 Ductwork: 0 0 0 0 Infiltration: Winter CFM: 0, Summer CFM: 0 0 0 0 0 Ventilation: Winter CFM: 98, Summer CFM: 98 1,956 1,520 1,360 2,880 Humidification (Winter)7.20 gal/day : ____ _ 2,641_ _ 0__ __ 0 __ _ 0_ System 1 Load Totals: 42,466 3,421 26,418 29,839 Check Fi ures Supply CFM: 1,174 CFM Per Square ft.: 0.303 Square ft. of Room Area: 3,871 Square ft. Per Ton: 1,557 Volume(ft3) of Cond. Space: 33,109 S stem Loads Total Heating Required Including Ventilation Air: 42,466 Btuh 42.466 MBH Total Sensible Gain: 26,418 Btuh 89 % Total Latent Gain: 3,421 Btuh 11 % Total Cooling Required Including Ventilation Air: 29,839 Btuh 2.49 Tons (Based On Sensible + Latent) Notes . ,. Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM �`k �kl ��111'I[}�i@fC�1���11 f��� ,�� r + � s ���i � , . . n ' ° c' ...< l� �C� �+,� < _ � . � s�. �,...,�� # � a �� � f"� � _ „ � . , s' � �. � w.;: �dC1r ` 8, , , � � ,�� �� �� ��, , rt . �:a . �" � � ,.�� ,,h �m s�� �, = r n � .., � S stem 1 Zone 1 Summa Loads Avera e Load Procedure for Rooms �ompQner�t � Ace�..� , ��:� .'�C� � � ' t,.�t : �..; �S�n .��:� ��� .T�st�l�'��� �' Qescri tian Quan ', Lo ° ,' � in=; �rt Caii� window: Giazing-operable window, e=0.20 on surface 2, 25 574 0 451 451 vinyi frame, u-value 0.27, SHGC 0.24 window: Glazing-operable window, e=0.20 on surface 2, 382 9,095 0 6,762 6,762 vinyl frame, u-value 0.28, SHGC 0.22 window: Glazing- 10 213 0 222 222 � window: Glazing-operable window, e=0.20 on surFace 2, 38 839 0 707 707 � vinyl frame, u-value 0.26, SHGC 0.24 4A-1 v-o: Glazing-Double pane low-e(e= 0.20 or less), 30 714 0 508 508 operable window, e=0.20 on surface 2, vinyl frame, u- value 028, SHGC 0.22 4A-1v-o: Glazing-Double pane low-e (e= 0.20 or less), 25 574 0 451 451 operable window, e=0.20 on surface 2, vinyl frame, u- value 0.27, SHGC 0.24 11 P: Door-Metal-Polyurethane Core 57.4 1,416 0 400 400 12E-Osw:Wall-Frame, R-19 insulation in 2 x 6 stud 2649.8 15,316 0 2,776 2,776 cavity, no board insulation, siding finish,wood studs 1560-4sf-10: Wall-Basement, , R-4 board insulation to 920.7 5,167 0 0 0 ' floor, no interior finish, 10'floor depth ', 1560-0-8: Wall-Basement, , no insulation or framing, no 61.6 787 0 31 31 ', interior finish, 8'floor depth 16A-44: Roof/Ceiling-Under Attic with Insulation on Attic 1494.1 2,793 0 2,233 2,233 ' Floor(also use for Knee Walls and Partition Ceilings), Unvented Attic, No Radiant Barrier,Any , Roofing Material,Any Roof Color, R-44 insulation , 20P1-30op: Floor-Over open crawl space or garage, 128 381 0 36 36 I Passive, spray foam insulation, R-30 open cell 1/2 Ib. I spray foam insulation, 8 inches in 2 x 10 joist cavity, I any cover I Subtotals for structure: 37,869 0 14,577 14,577 People: 5 1,000 1,150 2,150 Equipment: 901 9,331 10,232 Lighting: 0 0 0 Ductwork: 0 0 0 0 Infiltration; Winter CFM;0, Summer CFM: 0 0 0_ 0 _ 0 System 1, Zone 1 Load Totals: 37,869 1,901 25,058 26,959 Gheck Fi ures Supply CFM: 1,174 CFM Per Square ft.: � � 0.303 � Square ft. of Room Area: 3,871 Square ft. Per Ton: 1,723 Volume(ft3)of Cond. Space: 33,109 Zc�ne Laads Total Heating Required: 37,869 Btuh 37.869 MBH Total Sensible Gain: 25,058 Btuh 93 % Total Latent Gain: 1,901 Btuh 7 % Total Cooling Required: 26,959 Btuh 2.25 Tons(Based On Sensible + Latent) Notes , � Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manuat J 8th Edition, Version 2, and ACCA Manual D. All computed resultsare estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM FIV' . �. . � � ,� � , �dg� �k Fiea� � c�� � � � �'�� MendotaF� hf�11A ' ��� � �¢ � �° � ��` .,�. #�_ ��� Detailed Room Loads - Room 1 - Master Bedroom Avera e Load Procedure �erieral ' � , � . Calculation Mode: Htg. &clg. Occurrences 1 Room Length: 14.6 ft. System Number: 1 Room Width: 18.0 ft. Zone Number: 1 Area: 262.8 sq.ft. Supply Air: 124 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 3.6 AC/hr Volume: 2,102.4 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 2 Actual Winter Vent.: 7 CFM Runout Air: 62 CFM Percent of Supply.: 6 % Runout Duct Size: 5 in. Actual Summer Vent.: 10 CFM Runout Air Velocity: 456 ft./min. Percent of Supply: 8 % Runout Air Velocity: 456 ftJmin. Actual Winter Infil.: 0 CFM Actual Loss: 0.168 in.wgJ100 ft. Actual Summer Infil.: 0 CFM ltem �a. ,. ��- }�tg `.. , � Sen t�� L��.:, � Descri #ion " Ctuanti ' Ual�e 'HT�I to,�s T� ,t� �ir� ` `'{G�r�.:; NW-Wall-12E-Osw 4 X 8 32 0.068 5.8 185 1 A 0 34 NE-Wall-12E-Osw 18 X 8 89 0.068 5.8 514 1.0 0 93 SE-Wall-12E-Osw 4 X 8 32 0.068 5.8 185 1.0 0 34 NE-Gls-window shgc-0.24 0%S 25 0.270 23.0 574 18A 0 451 NE-Gls-window shgc-0.22 0%S (2) 30 0.280 23.8 714 16.9 0 508 UP-Ceil-16A-44 14.6 X 18 _ 262.8 0.022 1.9 491 1.5 0 393 _ __ — Subtotals for Structure: 2,663 0 1,513 Infil.: Win.: 0.0, Sum.: OA 208 0.000 0 0.000 0 0 People: 200 lat/per, 230 sen/per: 2 400 460 Equipment: 0 683 Room Totals: 2,663 400 2,656 E`'ui rnent Cootin L�ads �'��� Conttnuot�s ; � Coniintrous � �utpu# . . ;C3tatput Au�rage ; P+er+c�irtt . ' ��t"t�ible �:at�i�t= ��'� � Sensible� !Lat+�nt�� tn-C�� � ... � lls� 'TI»t�+�� '�� �.�+d Item Name . ;, : F3tuh B#uh '; C?�r u# ee Nr�ur, :' ' �t�r�i ., =Btuh, Color television__ 683 0 100 100 683 0 Total 683 0 j C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM : s�c�entiz� � ��� �� t H1l�,Q�4 � ,� � 4�� �� � �� i He�tim ` �r � ���� � �„f ° � �� 11Aendot 'Her"�` ,��� " • �� � � '�� �.�, 4 �z}, �i'� . Detailed Room Loads - Room 2 - Bedroom 2 Avera e Load Procedure Generat i� Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 14.0 ft. System Number: 1 Room Width: 13.0 ft. Zone Number: 1 Area: 182.0 sq.ft. Supply Air: 64 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 2.6 AC/hr Volume: 1,456.0 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 6 CFM Runout Air: 64 CFM Percent of Supply.: 10 % Runout Duct Size: 5 in. Actual Summer Vent.: 5 CFM Runout Air Velocity: 467 ft./min. Percent of Supply: 8 % Runout Air Velocity: 467 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.175 in.wg./100 ft. Actual Summer Infil.: 0 CFM Item� � ��, '�� �" --�1=;� �; Ht�. ` .. S� :' r+�1� � :. ���= ���`�8�� �escri tion Qu�ntit '<tla(ue' °!i'T`NI Los : ;�1T'�A ��� � ,-, ir� NE-Wall-12E-Osw 14 X 8 112 0.068 5.8 647 1.0 0 117 SE-Wall-12E-Osw 13 X 8 74 0.068 5.8 428 1 A 0 77 SW-Wall-12E-Osw 8 X.8 64 0.068 5.8 370 1.0 0 67 SE-Gls-window shgc-0.2 0%S (2) 30 0280 23.8 714 19.9 0 596 UP-Ceil-16A-44 14 X 13 182 OA22 1.9 340 1.5 0 272 _ _ _ __ Subtotals for Structure: 2,499 0 1,129 Infil.: Win.: 0.0, Sum.: 0.0 280 0.000 0 0.000 0 0 People: 200 lat/per, 230 sen/per: 1 200____ 230 Room Totals: 2,499 200 1,359 C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM ktva� �'Re5i �Li�.• eC�z� 4� E� ' ��� � �;I�(t�+ �edgwicicfie� , � �� ,� k ` ° � �� �' > � y K , � � � �: � `` � � � , .` � ;�_, ..F? . �Nfendota`�ler hts�MI� '�2� � ' � �,� �.� Detailed Room Loads - Room 3 - Laund And Hall Avera e Load Procedure Gen�ra� Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 16.0 ft. System Number: 1 Room Width: 8.0 ft. Zone Number: 1 Area: 128.0 sq.ft. Supply Air: 51 CFM Ceiling Height: 8.0 ft. Supply Air Changes 3.0 AC/hr Volume: 1,024.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 4 CFM Runout Air: 51 CFM Percent of Supply.: 8 % Runout Duct Size: 4 in. Actual Summer Vent.: 4 CFM Runout Air Velocity: 580 ftJmin. Percent of Supply: 8 % Runout Air Velocity: 580 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.369 in.wg./100 ft. Actual Summer Infil.: 0 CFM ltem Rrea =U_' H#9 �i�r� CI� , �at. ,'; �e�n Descri #ion ; uan. , Uai�ae iHTM �css ' #�"'�#A .�i�' � SE-Wall-12E-Osw 16 X 8 116 0.068 5.8 670 1 A 0 121 SE-Gls-window shgc-0.22 0%S 4 0.250 21.3 85 21.3 0 85 SE-Gls-window shgc-022 0%S (2) 8 0260 22.1 176 21.3 0 170 UP-Ceil-16A-44 16 X 8 128 0.022 1.9 239 1.5 0 191 Floor-20P1-30op 8 X 16 _ 128 0.035 3.0 381 0.3 0 36 . Subtotals for Structure: 1,551 0 603 Infil.: Win.: 0.0, Sum.: 0.0 128 0.000 0 0.000 0 0 Equipment: 0 478 _ __ _. . Room Totals: 1,551 0 1,081 E ui ent Caolin Loacis ' Continuous ' Continuous i Ou#put ' tJutput Av�rage 'P�rcen# ��nsi�te �.a��n# ` Se�tsible Lat�nt ! In-Use Used t�t��;d Ltiad' l��n Name �� Bt�th ` : �' 8tuh � ; `��ut ut � � Ht�iur �#i�h� � � Btuh����� �, , , Vented clothes dryer- 10 1707 0 50 50 427 0 percent to space Clothes washing machine- 205 0 50 50 51 0 10 percent to space_ Total 478 0 C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM Rh esi �&I.igh erc�a[k� � ;� � ��,. ��. ,�ed�wick F� 'nd lfi�.'> � `' � ��•; �g Mendota Fi� c IV; �' (� � �v. � � �� � : .�:�� Detailed Room Loads - Room 4 - Bedroom 3 Avera e Load Procedure �eneral , , Calculation Mode: Htg. &cig. Occurrences: 1 Room Length: 12.8 ft. System Number: 1 Room Width: 16.0 ft. Zone Number: 1 Area: 204.8 sq.ft. Supply Air: 91 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 3.3 AC/hr Volume: 1,638.4 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 6 CFM Runout Air: 91 CFM Percent of Supply.: 6 %o Runout Duct Size: 6 in. Actual Summer Vent.: 8 CFM Runout Air Velocity: 462 ft./min. Percent of Supply: 8 % Runout Air Velocity: 462 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0:133 in.wg./100 ft. Actual Summer Infil.: 0 CFM Ifem � Rr�a -U���� � . Htg �;� �� � � �� ���� '����# `. .� �� ��n.������ Descri tion . �����.�Qua�+ti ���Value:. �lTM t����' s ` � N� 1V�� " � '��ir��.;. ��air�������� SW-Wall-12E-Osw 16 X 8 128 0.068 5.8 740 1.0 0 134 � NW-Wall-12E-Osw 12.8 X 8 72.4 0.068 5.8 418 1 A 0 76 NW-Gls-window shgc-0.22 0%S (2) 30 0.280 23.8 714 16.9 0 508 UP-Cei1-16A-44 12.8 X 16 _ 204.8 0.022 1.9 383 1_.5 0 306: Subtotals for Structure: 2,255 0 1,024 Infil.:Win.: 0.0, Sum.: 0.0 230 0.000 0 0.000 0 0 People: 200 lat/per, 230 sen/per: 1 200 230 Equipment: 0 683 Room Totals 2,255 200 1,937 E ui ent Coc�lin Loatls '�� Contit�uous �� Ct�n#triut�us' 4utput ' C3utput Av�rage Perce�tt ' ! Sensibte Lat�nt: 5ensibte ! '��Lat�ent'��� ' (n-�Jse � ���d � ��.�a�,, � � �.��ct�� I�etn Name � ';� Btuh, ' �. �Btuh+ '� C�u u# ����r�#oti�r �� �- �tut��; : �. ���:8tut�' Color television 683 0 100 100 683 0 Total 683 0 C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM R �i��$c Li �. ir��'����" s 4 ' �>� �, � � ' �t�1�anc�a �` ��� �':� j �` ����'` �r� � '��' ��� $ � .:� ��' ' � �:��. Detailed Room Loads - Room 5 - Bedroom 4 Avera e Load Procedure Gen�ral ' Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 11.8 ft. System Number: 1 Room Width: 13.0 ft. Zone Number: 1 Area: 153.4 sq.ft. Supply Air: 89 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 4.3 AC/hr Volume: 1,227.2 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 4 CFM Runout Air: 89 CFM Percent of Supply.: 5 % Runout Duct Size: 6 in. Actual Summer Vent.: 7 CFM Runout Air Velocity: 453 ft./min. Percent of Supply: 8 % Runout Air Velocity: 453 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.128 in.wg./10D ft. Actual Summer Infil.: 0 CFM item Rrea U� . Htg �v��' ' ��g ' t�t � Descri tion : uan' Va1ue` MTM ` Lc�ss ` !�`14� ��ir�' C�ain NW-Wall-12E-Osw 2 X 8 16 0.068 5.8 92 1.0 0 17 SE-Wall-12E-Osw 2 X 8 16 0.068 5.8 92 1.0 0 17 SW-Wall-12E-Osw 13 X 8 74 0.068 5.8 428 1.0 0 77 SW-Gls-window shgc-0.22 0%S (2) 30 0.280 23.8 714 21.5 0 646 UP-Ceil-16A-44 11.8 X 13 153.4 0.022 1.9 287 1.5 0 229 _ __ _ . . . Subtotals for Structure: 1,613 0 986 Infil.: Win.: 0.0, Sum.: 0.0 136 0.000 0 0.000 0 0 People: 200 lat/per, 230 sen/per: 1 200 230 Equipment: 0 683 Room Totals: 1,613 200 1,899 E ui ment Goaifn Loac�s �ontinuous Continu�ius �utput C?ufiput; �iverage Perc�rtf ���si��� �,at�rtt �ensiE��e .` '���Latent���, <��.ra-Us� �� - � llse��� � ��.�.�_ ��` ����t���� Item Name . B u#� . Btuh 'f� ut . �et�Hci�r B#titi,: Color television 683 0 100 100 683 0 Total 683 0 C:\...\Norton 4845 Rusten Road.rh9 Thursday,July 17, 2014, 10:49 AM pa �e ic�entia� �orp� �al �s L ��� �� Er�� � E,. edgwickF{� aild�C! � � +�� ° � � ` t ��tus e� c€�cf � a�Mf�; 'Etdot�F1'e�i ;.lU1N�tt'�=� � � .4,, �„ �_ °` Detailed Room Loads - Room 6 - Bedroom 4 C/oset Avera e Load Procedure General Calculation Mode: Htg.�&clg. � � Occurrences:� � � 1 Room Length: 7.0 ft. System Number: 1 Room Width: 7.0 ft. Zone Number: 1 Area: 49.0 sq.ft. Supply Air: 9 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 4.4 AC/hr Volume: 392A cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 2 CFM Runout Air: 9 CFM Percent of Supply.: 21 % Runout Duct Size: 4 in. Actual Summer Vent.: 1 CFM Runout Air Velocity: 103 ft./min. Percent of Supply: 8 % Runout Air Velocity: 103 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.013 in.wg./100 ft. Actual Summer Infil.: 0 CFM {tem ��. Ar,ea � � _U_,. H#g � �, ��n . ��°. � C:i� � Lat'< :��+�aa����� �', E?escri #ion � uanti��� � � '���V�lue���� �HTM� ��� � Lt�ss � H'f�f �� ��� � ��� in� �� � Cait�`������ I SW-Wall-12E-Osw 7 X 8 56 0.068 5.8 324 1.0 0 59 � SE-Wall-12E-Osw 7 X 8 56 0.068 5.8 324 1.0 0 59 UP-Ceil-16A-44 7 X 7 49 0.022 1.9 92 1.5 0 73 _ Subtotals for Structure: 740 0 191 InfiL;Win.: 0.0, Sum.: 0.0 112 0.000 0 0.000 0 0 Room Totals: 740 0 191 C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM �ac,Reslde�T �F;i �Ca A�L a ' ��" }' �k� '� e� wPc tin x ' � � �� �� '� 9 e� a d AtC`.� � ��� �°"� �� 4.; .� , . r , ,, � : � . � . �. z Mendot�� �tts N1N���fi � ��K ` ���, �`� � �� rF.�' Detailed Room Loads - Room 7 - Bathroom 2nd Floor Avera e Load Procedure General Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 14.0 ft. System Number: 1 Room Width: 6.2 ft. Zone Number: 1 Area: 86.1 sq.ft. Supply Air: 13 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 1.1 AC/hr Volume: 688.8 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 13 CFM Percent of Supply.: 11 % Runout Duct Size: 4 in. Actual Summer Vent.: 1 CFM Runout Air Velocity: 148 ft./min. Percent of Supply: 8 % Runout Air Velocity: 148 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.026 in.wg./100 ft. Actual Summer Infil.: 0 CFM It�m �Ar�� � -�I�� � i�fg � ��Sen,� � �°. .!�tg � � ����� ' Lat ,'� :,� < �en�� , Descri tion Quanti llalu� !t�#'fi�A ` I.r�s� Tl� �in. Gain NW-Wall-12E-Osw 6.2 X 8 43.2 0.068 5.8 250 1.0 0 45 NW-Gls-window shgc-0.22 0%S 6 0.280 23.8 143 17.0 0 102 UP-Ceil-16A-44 14 X 6.2 86.1 0.022 1.9 161 1.5 0 129 Subtotals for Structure: 554 0 276 InfiL;_Win.:0.0, Sum.: OA 49 0.000 0 0.000 0 0 Room Totals: 554 0 276 C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM �al&�ir�ht Gr�` er ia1 �'k�Lc�at! �` ,� �: ' �� `� �andAlC,`,�; � ��w��� � � ��� �' �I�or� � RtIN 551.�5 ns' `a� ��� ,�.� _�� ��4 3�,;.p; '�"" Detailed Room Loads - Room 8 - Master Bath Toilet And C/oset (Average Load Procedure General i � �. , Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 14.0 ft. System Number: 1 Room Width: 6.3 ft. Zone Number: 1 Area: 88.2 sq.ft. Supply Air: 13 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 1.1 AClhr Volume: 705.6 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 13 CFM Percent of Supply.: 11 % Runout Duct Size: 4 in. Actual Summer Vent.: 1 CFM Runout Air Velocity: 150 ft.lmin. Percent of Supply: 8 °/a Runout Air Velocity: 150 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.026 in.wg./100 ft. Actual Summer Infil.: 0 CFM 1t�m � ' � . �� '� ��6a � -U-�� � 4 Htg ���,. S�1 �� ': . t'�9 �.� Lat '� . � �„�en; Descri tion `Qua ii ? �lalu NTM ' i�oss . ` H"1`M � i� ai NW-Wall-12E-Osw 6.3 X 8 44.4 0.068 5.8 257 1.0 0 46 NW-Gls-window shgc-0.22 0%S 6 0.280 23.8 143 17.0 0 102 UP-Ceil-16A-44 14 X 6.3 88.2 0.022 1.9 165 1.5 0 132 Subtotals for Structure: 565 0 280 Infil.: Win.: 0.0, Sum.: 0.0 50 0.000 0 0.000 0 0 _ _ _ Room Totals: 565 0 280 C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM �tb z � �ttti, �Gq� �i� ��E�*l,` ' ° � ,� � .�� ,,,� �.>� � �� � ��t�' w1 ea' '� .� �x dota He!` �11N�:. ,°��� ��� ,�"�� ��� '�6��� Detailed Room Loads - Room 9 - Master Bath Tub And Shower(Average Load Procedure Genera�` Calculation Mode: Htg. &clg. �� Occu�rrences�: � � 1 � Room Length: 12.0 ft. System Number: 1 Room Width: 10.7 ft. Zone Number: 1 Area: 127.9 sq.ft. Supply Air: 42 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 2.4 AC/hr Volume: 1,023.4 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 5 CFM Runout Air: 42 CFM Percent of Supply.: 11 % Runout Duct Size: 4 in. Actual Summer Vent.: 3 CFM Runout Air Velocity: 476 ft./min. Percent of Supply: 8 % Runout Air Velocity: 476 ftJmin. Actual Winter Infil.: 0 CFM Actual Loss: 0.250 in.wg./100 ft. Actual Summer Infil.: 0 CFM ttem �� �Rr�� -u- ` Fttg ; S�n �_ C#� > ��.at � �� �et���'�� �escri tion � ` � � ` � �� '�� ('�ua�i �� '; ltalue'� � ��HT � � �lr� s ��� H M �' � � ��i� � 'a�n� NW-Wall-12E-Osw 10.7 X 8 75.3 0.068 5.8 435 1 A 0 79 NE-Wall-12E-Osw 12 X 8 76 0.068 5.8 439 1.0 0 80 NW-Gls-window shgc-0.24 0%S 10 0.260 22.1 221 17.9 0 179 NE-Gls-window shgc-0.24 0%S 20 0.260 22.1 442 17.9 0 358 UP-Ceil-16A-44 12 X 10.7 127.9 0.022 1.9 _ 239 1.5 0 ___191 Subtotals for Structure: 1,776 0 887 Infil.: Win.: 0.0,Sum.: 0.0 181 0.000 0 0.000 0 0 _ _ _ _ _.. _ Room Totals: 1,776 0 887 C:\...1Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM Rhvar 'e��i ��I t3�L�ght��43 Q cs�tt '�£ � ,� �i'�t tt ` , T �� `' � , .; 'J�@Cj4� `���s��l ;,�`` w' � '� `� x u .'3+ .�vr� �r� n+T (�'�#l�f� F� �Mer�rio �H�i x= -� "�` ������ ��`: Detailed Room Loads - Room 10 - U stairs Hallwa Avera e Load Procedure Ge�eral Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 13.0 ft. System Number: 1 Room Width: 16.3 ft. Zone Number: 1 Area: 211.9 sq.ft. Supply Air: 15 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 0.5 AC/hr Volume: 1,695.2 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 15 CFM Percent of Supply.: 7 % Runout Duct Size: 4 in. Actual Summer Vent.: 1 CFM Runout Air Velocity: 170 ft./min. Percent of Supply: 8 °/a Runout Air Velocity: 170 ft./min. Actual Winter Infil.: 0 CFM Actual Loss 0.034 in.wg./100 ft. Actual Summer Infil.: 0 CFM {tem � �rea � -�#- �; ��g ,� � ��er�; ���Ig -', La��y �� ��aa De�cri �ion �� � � � � ��Qu�nti ����� '�atue`�� � H1`M ���� � Lc�ss . ..:: � �� � , ��� ������� �. ��i�� UP-Ceil-16A-44 13 X 16.3 211.9 0.022 1.9 396 1.5 0 317 _ _ _ Subtotals for Structure: 396 0 317 Infil.: Win.: 0.0, Sum.: 0.0 0 0 0 0 0 0 Room Totals: 396 0 317 ; C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM i 8�k� �t�orrlr�erciaf�" �t'� � i. , �' � ;�tt�:r � � 3'��and�G�' ; ��c ��� �.,z�� � � �aad ��i� Ntl!� � ta 'er t� �_ ��-, �, ��� " � , Detailed Room Loads - Room 11 - Dinin Room Avera e Load Procedure I General ' Calculation Mode: Ntg. &clg. Occurrences: � 1 Room Length: 15.0 ft. System Number: 1 Room Width: 12.0 ft. Zone Number: 1 Area: 180.0 sq.ft. Supply Air: 64 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 2.4 AC/hr Volume: 1,620.0 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 7 CFM Runout Air: 64 CFM Percent of Supply.: 11 % Runout Duct Size: 5 in. Actual Summer Vent.: 5 CFM Runout Air Velocity: 470 ft./min. Percent of Supply: 8 % Runout Air Velocity: 470 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.178 in.wg./100 ft. Actual Summer Infil.: 0 CFM tt�m �, Are���� ���� � �U-� ����� �Htg �;� ���� .5�n .", ����� � ��I+� , 1..2t�; �.. 5�sra��� Descr� tion ' Ctuar�ti ` ' Value :H'�M css� Y` �ir� _ '� NW-Wall-12E-Osw 15 X 9 100 0.068 5.8 578 1.0 0 105 NE-Wall-12E-Osw 12 X 9 73 0.068 5.8 422 1.0 0 76 NW-Gls-window shgc-0.22 0%S (2) 35 0.280 23.8 834 17.0 0 594 NE-Gls-window shgc-0.22 0%S(2) 35 0.280 23.8 834 17.0 0 594 Subtotals for Structure: 2,668 0 1,369 Infil.:Win.; O.Q Sum.: 0.0 243 0.000 0 0.000 0 0 _ Room Totals: 2,668 0 1,369 C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM � �.•�Reside &Lig ' e�cial,H� �CI � � "' � c► r'� e�ts�ms��;,,1 � Sed ti�t ,,and -E � � x� i � �� �� 4� � hts��I�1 �' ° � ��� ,���<:�� � ,��" Detailed Room Loads - Room 12 - Great Room Avera e Load Procedure Cer�era ; Calculation Mode: � � Htg. &clg. � � Occurrences: � 1 � Room Length: 18.0 ft. System Number: 1 Room Width: 15.0 ft. Zone Number: 1 Area: 270.0 sq.ft. Supply Air. 103 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 2.6 AC/hr Volume: 2,430.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 6 CFM Runout Air: 103 CFM Percent of Supply.: 6 % Runout Duct Size: 6 in. Actual Summer Vent.: 9 CFM Runout Air Velocity: 526 ft./min. Percent of Supply: 8 % Runout Air Velocity: 526 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.172 in.wg./100 ft. Actual Summer Infil.: 0 CFM � .. � Ifsrn �� �:��P�re� r -U- �� Ntg �; .� Sen ' „��1� t�#� � '.�en��. D�scri tion � °�'. � Qu�n�i � � �'alue H"1`� ' - �� " �,��'Nt � � '��� �G�i� � ���� i�i NW-Wall-12E-Osw 4 X 9 36 0.068 5.8 208 1.0 0 38 NE-Wall-12E-Osw 18 X 9 107 0.068 5.8 618 1.0 0 112 SE-Wall-12E-Osw 4 X 9 36 0.068 5.8 208 1.0 0 38 NE-Gls-4A-1v-o shgc-0.22 0%S (2) 30 0.280 23.8 714 16.9 0 508 NE-GIs-4A-1v-o shgc-0.24 0%S _ 25 __ 0270__ 23A _ 574 18.0 _ 0_ 451 Subtotals for Structure: 2,322 0 1,147 Infil.: Win.: 0.0, Sum.: 0.0 234 0.000 0 0.000 0 0 Equipment: 0 1,058 _ _ Room Totals 2,322 0 2,205 E ui ment Caolin Loads Continuc��is Ccrntinuaus; (3ut�ut �utp�i#i Average Percent- 5+�nsib�e !.a#ent.: � ����ible '�� - ��� L�tent� ����, ln-Us� � � �Js�t�� L��d � ���L��d�'��. lte�n Name `� E3tuh ������� � ���� Btuh` � � �"�-��������Qu ` �� r H�siir � �#fuh ���`Btuih'�� Color television 683 0 100 100 683 0 Stereo 375 0 100 1A0 375 0 Total 1058 0 C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM ac»� �sident� ���a �r � ; ; ��r�� � �}� � ( ��Pr2tlt���.. �'`�"` ; a ``-:�� � ''� t u„��' * ,�,' S _:� �� C�,� ����`''l��'' " �� �v� '. ta�`ei hf �M�+1���51 � �,, � nr �s +�^���.� �"� Detailed Room Loads - Room 13 - Stud Avera e Load Procedure General Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 12.0 ft. System Number: 1 Room Width: 13.0 ft. Zone Number: 1 Area: 156.0 sq.ft. Supply Air: 109 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 4.7 AC/hr Volume: 1,404.0 cu.ft. Req. Vent. Cig: 0 CFM Number of Registers: 1 Actual Winter Vent.: 6 CFM Runout Air: 109 CFM Percent of Supply.: 6 °/a Runout Duct Size: 6 in. Actual Summer Vent.: 9 CFM Runout Air Velocity: 556 ft./min. Percent of Supply: 8 % Runout Air Velocity: 556 ft./min. Actual Winter Infil.' 0 CFM Actual Loss: 0:192 in.wg./100 ft. Actual Summer Infil.: 0 CFM 11oen1 � �� % :.�.: ;" Mtg ,��, �6rt�. ��: �Clg„ �.at�4�'�, ��`�r�" �escri ti�n �uan�. ��� Valt�e= �Hl'M � � �� ��. �° < H'�1V� � �,�'��%.� � �����ir�` � NE-Wall-12E-Osw 12 X 9 78 0.068 5.8 451 1 A 0 82 SE-Wall-12E-Osw 13 X 9 87 0.068 5.8 503 1.0 0 91 NE-Gls-window shgc-0.22 0%S (3) 30 0.280 23.8 714 17.0 0 510 SE-GIs-window shgo-0.2 0°/aS (3) 30 0.280 23.8 714 19.9 0 _ __597 Subtotals for Structure: 2,382 0 1,280 Infil.: Win.: 0.0, Sum.: OA 225 0.000 0 0.000 0 0 Equipment: 0 1,05Q Room Totals: 2,382 0 2,330 E ui rnent Coolin Laacls �on�nuou� ' , Continuc�us' t}utput ; �utput Average ' Pet'�nt ' Sensibt� 1��tent' Sens�ble '�� � ����Latent� � �� tn-U�e '�� lisett L��! �� �,�atl' Iterrr Name B#uh ! Bfuh C�u ut ' er i-[caur . �tuh ` °Btuh Computer and monitor 1536 0 35 100 538 0 Laser printer 512 0 100 100 512 0 Total 1050 0 C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM �I���.��tesidenti" G�omm �c���#\T� �� '` � � ���c�?n+lr�c Heating a "��� �;� � "`,� � ��' .�� �kr� e�� �ndotahlei`hts IVtN`5512 �N` � ���z �����, � P"a e,2 Detailed Room Loads - Room 14 - Mud Room Avera e Load Procedure Gener�� ; Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 10.0 ft. System Number: 1 Room Width: 10.0 ft. Zone Number: 1 Area: 100A sq.ft. Supply Air: 20 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 1.3 AC/hr Volume: 900.0 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 4 CFM Runout Air: 20 CFM Percent of Supply.: 19 % Runout Duct Size: 4 in. Actual Summer Vent.: 2 CFM Runout Air Velocity: 229 ft./min. Percent of Supply: 8 % Runout Air Velocity: 229 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.060 in.wg./100 ft. Actual Summer Infil.: 0 CFM item �� � Ar�a� �U� � � � �1tg ,. , ���r� : C� . , 'r����� �_�� �����ti���� Descri tion ,' �i�n�t . �alt�� ' :M7'Nk ; L'' �:#7�{ ` ,��; SW-Wall-12E-Osw 10 X 9 84 0.068 5.8 486 1.0 0 88 SE-Wall-12E-Osw 10 X 9 71.8 0.068 5.8 415 1.0 0 75 SE-Door-11 P 2.6 X 7 18.2 0.290 24.7 449 7.0 0 127 SW-Gls-window shgc-0.24 0%9 6 0.250 21.3 _ 128 22.8 0 137__ _ Subtotals for Structure: 1,478 0 427 Infil.: Win.: 0.0, Sum.: 0.0 180 0.000 0 0.000 0 __ 0 _ _ __ _ Room Totals: 1,478 0 427 C:\...\Norton 4845 Rusten Road.rh9 Thursday,July 17, 2014, 10:49 AM � h idenf�'°� �� ;t��r� '�i� ��- � �� � � �edg afi � d A!� � x���� �; � ��� � w, . . n �. , „ �: � �� �p �nd'�� ht��I�IN v 551 � ,;_ � ,� .;� �� Detailed Room Loads - Room 15 - 1/2 Bath First Floor Avera e Load Procedure Generai ' Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 11.5 ft. System Number: 1 Room Width: 5.5 ft. Zone Number: 1 Area: 63.3 sq.ft. Supply Air: 4 CFM Ceiling Height: 9.0 ft. Supply Air Changes 0.5 AC/hr Volume: 569.3 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 4 CFM Percent of Supply.: 23 % Runout Duct Size: 4 in. Actuai Summer Vent.: 0 CFM Runout Air Velocity: 50 ft./min. Percent of Supply: 8 % Runout Air Velocity: 50 ft./min. Actual Winter Infil.: 0 CFM Actual Loss 0.003 in.wg./100 ft. Actual Summer Infil.: 0 CFM Item �� � �1rea� � � .U-���, Htg � �e�. � . : +CI� �� [.�t r� ��,�n��� � D�scri tian � � ' � �����t��r�t� � ! Va�ue; ��.��`H�"R�1 � � � ' Lcrss� ��: H�'�( = , �� � ��aar��' N -Wall-12E-Osw 5.5 X 9 43.5 0.068 5.8 251 1.0 0 46 N -_Gls-window shgc-0.22 100%S __ __ 6 0280 __ 23.8 __ 143 7.8 0 47 Subtotals for Structure: 394 0 93 Infil.: Win.: 0.0, Sum.: 0.0 50 0.000 0 0.000 0 0 _ _ Room Totals: 394 0 93 � C:\...\Norton 4845 Rusten Road.rh9 Thursday,July 17, 2014, 10:49 AM tF�' �� �itiat� � ti.��' mirii �i �: � �,� .�.n°. �` � < �f��l �' ���'. k ��*" � � �� M2t1�f7�a'�`I^{@t �� ���.�5 '�� `� � u" ak � �' '° ' 'z ,�}�`� Detailed Room Loads - Room 16 - Kitchen Avera e Load Procedure General Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 21.0 ft. System Number: 1 Room Width: 13.0 ft. Zone Number: 1 Area: 273.0 sq.ft. Supply Air: 199 CFM Ceiling Height 9.0 ft. Supply Air Changes: 4:9 AC/hr Volume: 2,457.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 2 Actual Winter Vent.: 6 CFM Runout Air: 100 CFM Percent of Supply.: 3 % Runout Duct Size: 6 in. Actual Summer Vent.: 17 CFM Runout Air Velocity: 508 ft./min. Percent of Supply: 8 % Runout Air Velocity: 508 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.161 in.wg./100 ft. Actual Summer Infil.: 0 CFM Item A�'� �� -U- � � Htt,� ,�. ��.. �; " � �!g �; �; t.�t ����� ���i���� D�scri #i�n � �� t�uan�' �� '���#�iu� '!-ITM ;�� �s� - '���` �'� . � � . '.�in � � ���_��ai�� SW-Wall-12E-Osw 13 X 9 117 0.068 5.8 676 1.0 0 123 NW-Wall-12E-Osw 21 X 9 158.8 0.068 5.8 918 1.0 0 166 NW-Door-11 P 2.6 X 7 18.2 0290 24.7 449 7.0 0 127 NW-Gls-window shgc-0.22 0%S_(2) 12 0.28Q 23.8 286 1_7.0 _ 0 204 Subtotals for Structure: 2,329 0 620 Infil.:Win.: 0.0, Sum.: 0.0 306 0.000 0 0.000 0 0 Equipment: _ _ . 901 3,638 Room Totals: 2,329 901 4,258 E ui rnent Coolin ,Loatls ' Cc�r�tint�ous Gc�ntinuous' � t�u�ut ���, C�u��ut' Auerage '��� �ercer�� �� � ��� Sen�ibl� �,U��?f���� Sensible : ' k.atenk ln-Use 19s+�t i.�d ' �i�ad Item Name , Btuh B#uh Uut ut- er Hi�ut`. �#,t1t " . . �tth Coffee maker- brewer 1331 717 100 25 333 179 Dishwasher 4096 1433 100 25 1024 358 Microwave 4949 1732 75 25 928 325 Refrigerator or freezer- 16 1000 0 100 100 1000 0 cubic feet Cooking range with hood - 0 0 100 100 0 0 four burners on high heat Toaster_ 3532 392 100 10 353 39 Total 3638 901 C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM R'h�a� Re�t �� �&LF�}ht�� K,ia!�11i,+� "�° � �ti� o�r��v�t � .,�ed�wtc�Ne� 't���: � � $ } �� 5 Rirsf�t���na<��� L�I�h€�cit'a'"ti ��5`�2 � �. �� a'� � � w�� � Nh Detailed Room Loads - Room 17- Stairwell And Pantry Area (Average Load Procedure Generai ' Calculation Mode: Htg. &clg. �� Occurrences: � �� �� 1 � � Room Length: 15.5 ft. System Number: 1 Room Width: 9.0 ft. Zone Number: 1 Area: 139.5 sq.ft. Supply Air: 3 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 0.1 AC/hr Volume: 1,255.5 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 3 CFM Percent of Supply.: 30 % Runout Duct Size: 4 in. Actual Summer Vent.: 0 CFM Runout Air Velocity: 35 ft./min. Percent of Supply: 8 % Runout Air Velocity: 35 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.002 in.wg./100 ft. Actual Summer Infil.: 0 CFM item Area -�J- Htg S�n C�g , .. t.�t S�r� Qescri tion Quan i . Value H'TM l: � ; FI " ;=Gair�` , iri' SE-Wall-12E-Osw 7 X 9 63 0.068 5.8 364 1 A 0 66 Subtotals for Structure: 364 0 66 Infil.: Win.: 0.0,_Sum.: 0.0 63 0.000 0 0.000 0 0 _ _ _ Room Totals: 364 0 66 I I C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM �, �v� e►� a�i�l.i��, e�'cia1,HV� � � � � � � � �„ ° p ��� �� � ;� '�d � �ting� �,�� �r � �`��� � � .��� � �, e w � w � � ? `�„� : �Flf� ,�@1 f'1 Ps� �� � � �t`� �,' ��� "..... �� ..... k ° �* " j� �•-�-. �J,: ° � h..°s#'^�'���-.'�; Detailed Room Loads - Room 18 - Ent 1 st Floor Avera e Load Procedure General Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 5.6 ft. System Number: 1 Room Width: 5.5 ft. Zone Number: 1 Area: 30.8 sq.ft. Supply Air: 11 CFM Ceiling Height: 9A ft. Supply Air Changes: 2.3 AC/hr Volume: 277.2 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 3 CFM Runout Air: 11 CFM Percent of Supply.: 23 % Runout Duct Size: 4 in. Actual Summer Vent.: 1 CFM Runout Air Velocity: 123 ft./min. Percent of Supply: 8 % Runout Air Velocity: 123 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.018 in.wg./100 ft. Actual Summer Infil.: 0 CFM ltem � � ���tea �� '� �-�t- � � �>h�t� '�, : `�er�"� ��� ,.�� +�ig.� , ��� �L�t�:_ �_; �rtr'; �3�scri #ia�n ;";�����. Ctuan�� � '�� �falue �'=°H'Cl�tl '�� � L�ss �� �� H�l1A � ��, G�r�`�: �� ���t�� SE-Wall-12E-Osw 5.5 X 9 28.5 0.068 5.8 165 1 A 0 30 SW-Wall-12E-Osw 5.6 X 9 50.4 0.068 5.8 291 1.0 0 53 SE-Door-11 P 3 X 7 21 0290 24.7 518 7.0 0 146 _ _ Subtotals for Structure: 974 0 229 InfiJ.:_Win.: 0.0, Sum.: 0.0 100 0.000 0 0.000 0 0 _ . Room Totals: 974 0 229 i C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM R�i"„� �ia!&I��gh�� ,merei >�v�. � , '' � t'{ � � �,�` � u e `��' �����, �' � . �� � `� ��� .��'. RAeriiiota Hei` �i �`�55�2Q `" <; r .�� ���� r� .,� � '-� Detailed Room Loads - Room 19 - Basement Mechanical And Storage (Average Load Procedure Gen�ral Calculation Mode: Htg. &clg. Occurrences 1 Room Length: 12.0 ft. System Number: 1 Room Width: 19.5 ft. Zone Number: 1 Area: 234.0 sq.ft. Supply Air: 0 CFM Ceiling Height: 8.8 ft. Supply Air Changes: 0.0 AC/hr Volume: 2,059.2 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 0 Actual Winter Vent.: 6 CFM Runout Air: 0 CFM Percent of Supply.: 0 % '% Runout Duct Size: 0 in. Actual Summer Vent.: 0 CFM ' Runout Air Velocity: 0 ft./min. Percent of Supply: 0 % Runout Air Velocity: 0 ftJmin. Actual Winter Infil.: 0 CFM Actual Loss: 0.000 in.wg./100 ft. Actual Summer Infil.: 0 CFM Item �lrea -U- ' Htg ��rt C�j , �at ; Ser� Descri tion � � Quan�. � � �laiue�, '��H'17\fi `�� k.ia s � ��� H � � � ����ai�t-��� � �; SE-Wall-15B0-4sf-10 11.1 X 8.8 98.1 0.066 5.6 550 0.0 0 0 SW-Wall-1560-4sf-10 28.5 X 8.8 250.8 0.066 5.6 1,407 0.0 0 0 NW-WaII-15B0-4sf-10 11.1 X 8.8 98.1 0.066 5.6 550 0.0 0 0 Subtotals for Structure: 2,507 0 0 Infil.:Win.; 0.0, Sum.: 0.0 0 0 0 0 0 0 _ _ __ __ _ Room Totals 2,507 0 0 C:\...\Norton 4845 Rusten Road.rh9 Thursday,July 17, 2014, 10:49 AM � �'�Si � f,�, �� � Ofll ,`��i�id�� "�� { �'d f �` t t �. � r ,� _� . �:�� i4�G H8'� d t�/,' , ��` ��� t� � NA [T�I�f�� M@ndQt2 k�8[��1 �>��n `� �i�r�� r� ��� ��. s�' Detailed Room Loads - Room 20 - Basement Bath Avera e Load Procedure General . _ Calculation Mode: Htg. &clg. Occurrences 1 Room Length: 12.0 ft. System Number: 1' Room Width: 5.5 ft. Zone Number: 1 Area: 66.0 sq.ft. Supply Air: 0 CFM Ceiling Height: 8.8 ft. Supply Air Changes: 0.0 AC/hr Volume: 580.8 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 0 Actual Winter Vent.: 1 CFM Runout Air: 0 CFM Percent of Supply.: 0 % Runout Duct Size: 0 in, Actual Summer Vent.: 0 CFM Runout Air Velocity: 0 ft./min. Percent of Supply: 0 % Runout Air Velocity: 0 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.000 in.wg./100 ft. Actual Summer Infil.: 0 CFM ltem ' �a. = ' -U- Mtg ; ��n Cig _ ` � ' , ., ;. fS�n;' Descri ti�n uanti ; <��iue ' FiTM Ltiss ' ': , I�i"I�( �:`` : �� ; NW-Wa11-1560-4sf-10 5.5 X 8.8 48.4 0.066 5.6 272 OA 0 0 Subtotals for Structure: 272 0 0 Infil.: Win.: 0.0,Sum.: 0.0 0 0 0 0 0 0 Room Totals: 272 0 0 C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM �2��iac r ,,� � e,,ti� �,'"�.ig +Ctlm�7, ����1� �' �� Yed n atin �tC�: � � �#'���` '�k ��Qi�p� �� � � � : n , , , u, � l�st t�°' �551 tk�- � � � r � ", . , �,.���. > r a; ,.r:.� ., r,v r �� �,. „ :.�.. . Detailed Room Loads - Room 21 - Basement Bedroom Avera e Load Procedure General ' ,, .,, � � _- . , Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 12.0 ft. System Number: 1 Room Width: 19.5 ft. Zone Number: 1 Area: 234.0 sq.ft. Supply Air: 29 CFM Ceiling Height: 8.8 ft. Supply Air Changes: 0.8 AC/hr Volume: 2,059.2 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 5 CFM Runout Air: 29 CFM Percent of Supply.: 19 % Runout Duct Size: 4 in. Actual Summer Vent.: 2 CFM Runout Air Velocity: 332 ft./min. Percent of Supply: 8 °/a Runout Air Velocity: 332 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.123 in.wg./100 ft. Actual Summer Infil.: 0 CFM �f�m� � � �6;r�: �y � � -1J�,� F�J�g ;�: �` .Se� � �'�Ig �� �. �` Descri br�n � ,� ���� (�u� ti�i ,. �� l�atue �H M��: � � . �„ ..�t�= .��y ° ; �`C"� : NW-Wall-15B0-4sf-10 5.5 X 8.8 48.4 0.066 5.6 272 0.0 0 0 NW-Wall-15B0-4sf-10 13.5 X 3.5 47.2 0.066 5.6 265 0.0 0 0 NE-Wall-15B0-4sf-10 12 X 3.5 42 0.066 5.6 236 0.0 0 0 NW-Wall-12E-Osw 13.5 X 5.3 71.6 0.068 5.8 414 1.0 0 75 NE-Wall-12E-0sw 12 X 5.3 33.6 0.068 5.8 194 1.0 0 35 NE-GIs-window shgc-0.22 0%S_(2) 30 0.280 23.8 714 16.9 0 508 __ _ _ Subtotals for Structure: 2,095 0 618 Infil.: Win.;_0.0, Sum.: 0.0 135 0.000 _ _ 0 0.000 ___ 0 0 __ _ Room Totals: 2,095 0 618 C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM 'Rh 'Res�d�=� � ��(��� ��� a��lf �LcFat �� �s�� ' � ka4� ���1� S�d�v�¢k Hea�i� �/ � `� .���� � �,�,�° ��� � � °(Vlentlo4a H'ei"�h �'`a51:�: ��. ����� ���,< �, e' �� Detailed Room Loads - Room 22 - Future Family Room And Stairs (Average Load Procedure General �, , e, . . Calculation Mode: Htg. &clg. Occurrences 1 Room Length: 25.0 ft. System Number: 1 Room Width: 18.0 ft. Zone Number: 1 Area: 450.0 sq.ft. Supply Air: 93 CFM Ceiling Height: 8.8 ft. Supply Air Changes: 1.4 AC/hr Volume: 3,960A cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 7 CFM Runout Air: 93 CFM Percent of Supply.: 8 % Runout Duct Size: 6 in. Actual Summer Vent.: 8 CFM Runout Air Velocity: 476 ft./min. Percent of Supply: 8 % Runout Air Velocity: 476 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.141 in.wg./100 ft. Actual Summer Infil.: 0 CFM Item }�rea -U- Htg .. �ert C1g ` t,at S�ri Descri ti�n �� u�f� � V�lue.� . + T�,�? �� �� ��'��. � � �� in: NW-Wall-15B0-4sf-10 4 X 3.5 14 0.066 5.6 79 OA 0 0 SE-Wal1-1560-4sf-10 4 X 3.5 14 0.066 5.6 79 0.0 0 0 NW-Wall-12E-Osw 4 X 5.3 21.2 0.068 5.8 123 1 A 0 22 NE-Wall-12E-Osw 18 X 8.8 118.4 0.068 5.8 673 1.0 0 122 SE-Wall-12E-Osw 4 X 5.3 212 0.068 5.8 123 1.0 0 22 SE-Wal1-1560-0-8 7 X 8.8 61.6 0.117 12.8 787 0.5 0 31 NE-Gls-window shgc-0.23 0%S 42 0280_ 23.8 1,000 17.6 0__ 738_ Subtotals for Structure: 2,864 0 935 Infil.: Win.: 0.0, Sum.: 0.0 206 0.000 0 0.000 0 0 Equipment: _ 0 1,058 Room Totals: 2,864 0 1,993 E'ui men#Goc�lir� L�ads Contintic�us Continuc�us t7�u#put ;C1ut�iut A�erac�e ' Rercent ' S�i#i�t: Lat�r�t Sensibl� : <L.af�rit In-tJse ` Used . ; 1.r�ad �;ti�d Item Name Btuh Btuii: ` C?�tf ut ` �r Nc�ur B€�th 8tuh Color television 683 0 100 100 683 0 Stereo 375 0 100 100 375 0 Total 1058 0 C:\...\Norton 4845 Rusten Road.rh9 Thursday, July 17, 2014, 10:49 AM Rhva, i�es�dentfa� �C�t� `� C�L�� �� '� H <�I�t��` <.- �,,,, � � � � �„ '� �` s�Sedgw�ck�Heati»g,artcF�4/��.� � � I�lendota`Hei ht'��ll 55120 �� �'��; � �,� " ,,'� �� ' ���� '�,,x- �,:;��. �'. �=�,3EM.; Detailed Room Loads - Room 23 - Basement Future BarArea (Average Load Procedure �ener�E ., , � � �, . Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 12.0 ft. System Number: 1 Room Width: 15.0 ft. Zone Number: 1 Area: 180.0 sq.ft. Supply Air: 28 CFM Ceiling Height: 8.8 ft. Supply Air Changes: 1.0 AC/hr Volume: 1,584.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 7 CFM Runout Air: 28 CFM Percent of Supply.: 25 % Runout Duct Size: 4 in. Actual Summer Vent.: 2 CFM Runout Air Velocity: 315 ft./min. Percent of Suppiy: 8 % Runout Air Velocity: 315 ftJmin. Actual Winter Infil.: 0 CFM Actual Loss: 0.111 in:wg./100 ft. Actual Summer Infil.: 0 CFM Item� � Ar���� �� -tJ-���,� � h#�g ��;��� ��a �. �_':�� :�3� . v� ���,�f�, ;. ��t1�� Descri #ion Quan�i kfalue: M1'AA l.a�� H"�. C�a1ia . a� ; NE-Wall-12E-Osw 12 X 8.8 75.6 0.068 5.8 437 1.0 0 79 SE-Wall-15B0-4sf-10 16.5 X 8.8 1452 0.066 5.6 815 0.0 0 0 SW-Wall-15B0-4sf-10 13 X 8.8 114.4 0.066 5.6 642 0.0 0 0 NE-Gls-window shgc-0.22 0%S(2) 30 0280 23.8 714 16.9 0 508 - ___ _ ___ Subtotals for Structure: 2,608 0 587 InfiL;Win.; 0.Q Sum.: 0.0 106 0.000 0 0.000 0 0 Room Totals: 2,608 0 587 C:\...\Norton 4845 Rusten Road.rh9 Thursday,July 17, 2014, 10:49 AM F� �dent�' t�ig, mrrier�i G��f ,� � � �` �, �,fn � � S,` � eat�n �,�� � � �`� �� 'Me tlo'ta.hC t5, 5 12 ', � � � > fi�` 3� S stem 1 Room Load Summa � � � �Ht�. � � nAin ` �, � Run Rur� �� � ��g . ����� �C1g � ; , � �Ai�� Act; Room ; . ��Area , ���. .. .Sens . � ',��Itg "; �Duct ���.�:.�u�t �:; Ser�� �� , :� ;. L�# G'�g� -, ��.;;Sys�� No Name �� SF" :� :� ��tuh� �CFM ��'� "�� �ze� � � ����''..A/�E��;�� �� ��� ��� �Btt�h �� �G�[�f �- � ����FM ---Zone 1--- 1 Master Bedroom 263 2,663 38 2-5 456 2,656 400 124 124 2 Bedroom 2 182 2,499 36 1-5 467 1,359 200 64 64 3 Laundry And Hall 128 1,551 22 1-4 580 1,081 0 51 51 4 Bedroom 3 205 2,255 32 1-6 462 1,937 200 91 91 5 Bedroom 4 153 1,613 23 1-6 453 1,899 200 89 89 6 Bedroom 4 Closet 49 740 11 1-4 103 191 0 9 9 7 Bathroom 2nd 86 554 8 1-4 148 276 0 13 13 Floor 8 Master Bath Toilet 88 565 8 1-4 150 280 0 13 13 And Closet 9 Master Bath Tub 128 1,776 25 1-4 476 887 0 42 42 And Shower 10 Upstairs Hailway 212 396 6 1-4 170 317 0 15 15 11 Dining Room 180 2,668 38 1-5 470 1,369 0 64 64 12 Great Room 270 2,322 33 1-6 526 2,205 0 103 103 13 Study 156 2,382 34 1-6 556 2,330 0 109 109 14 Mud Room 100 1,478 21 1-4 229 427 0 20 20 15 1/2 Bath First 63 394 6 1-4 50 93 0 4 4 Floor 16 Kitchen 273 2,329 33 2-6 508 4,258 901 199 199 17 Stairwell And 140 364 5 1-4 35 66 0 3 3 Pantry Area 18 Entry 1 st Floor 31 974 14 1-4 123 229 0 11 11 19 Basement 234 2,507 36 0-0 0 0 0 0 0 Mechanical And Storage 20 Basement Bath 66 272 4 0-0 0 0 0 0 0 21 Basement 234 2,095 30 1-4 332 618 0 29 29 Bedroom 22 Future Family 450 2,864 41 1-6 476 1,993 0 93 93 Room And Stairs 23 Basement Future 180 2,608 37 1-4 315 587 0 28 28 Bar Area _ ._ Ventilation 1,956 1,360 1,520 Humidification 2,64_1 _ _ System 1 total _ 3,871__ 42,466 __ 542_ __ 26,418 3,421 1,174 1,174 System 1 Main Trunk Size: 12x17 in. Velocity: 829 ft./min Loss per 100 ft.: 0.096 in.wg CooGn S stem Summa �tx�ling; ��nsible�-.atent Se�asible. � �„at� � ' � �Tt�t�1� T`�r�s' ; S tit Btuh �;' �ttsh ! ��u#� Net Required: 2.49 89%/ 11% 26,418 3,421 29,839 E`ui ment Data . .. Heating�stem Cooling System Type: . Natural Gas Furnace Standard Air Conditioner ModeL Indoor Model: Brand: Efficiency: 0 AFUE 0 SEER Sound: 0 0 Capacity: 0 Btuh 0 Btuh Sensible Capacity: n/a 0 Btuh C:\...\Norton 4845 Rusten Road.rh9 Thursday,July 17, 2014, 10:49 AM . � ,� hv � � entia)B�L�gh er'�ia�,F�3FAC L, r � � „� ` 5 ������ � ' � ' #�ln�� v,r y ��tl � "tieafin ar� ,, �°` � 9.,_ c[�C, � �;$.. � �s� ��9 �� r�`�a ��It�. ,. Mendata Mel .��'IVlhi 55�'F20 x $. � `�,�., � � �F'��� " '� S stem 1 Room Load Summa cont'd E ui men�C�ata a.. Latent Capacity: n/a 0 Btuh C:\...\Norton 4845 Rusten Road.rh9 Thursday,July 17, 2014, 10:49 AM ` vl��� � � �� City Inspection Dept. Copy Ul"� �! "tt�Ull �� City Forester Copy Applicant/Builder Copy lNDIVIDUAL RESIDENTIAL LOT TREE PRESERVATION `PLAN SUMMARY CITY OF EAGAN FORESTRY D/V/S/ON '651-675-5300 (BUILDER, PLEASE READ ATTACHMENTS) July 31, 2014 Development Deer Rest Pond Addition Lot Number 3 Block Number 1 Address 4845 Rusten Rd Builder Norton Homes Phone Number: Pat Hill r1�•/"1�!"1� I�V�G� ! �� ��Y��7iVN Contact: 763-559-2991 �� � B� � Tree Protection Requirements: D� , �1�- � � �° � X Tree Protection Fenci Instalied on i e X Oak Tree Pruning (Im r'n ril 1 to I 31 Therapeutic Pruning R quired � X Retaining Wall To Be I stalled Other: Replacement Trees: Not Required X As Follows: Twelve(12) Category A trees (>=4" caliper deciduous trees, or>= 12' hgt coniferous tree or clump deciduous tree)or $7,200.00. The builder has optioned to do the cash mitigation. To be collected at the time of buildina permit. Attachments: X Yes (Refer to attached documents for details) No Additional Notes: Builder to place 12" of wood chips on the critical root zone(one foot radius per inch of tree trunk diameter)of trees#487 (21" diameter oak) and #466(27" diameter tree) to prevent soif compaction during the construction process. Wood chips can be removed after construction is complete. Tr� � IrLVentor �J SURVEY FOR : Norton Ho►-nes DESCRIBED AS : Lot 3, Block 1, DEER REST POND ADDITION, City of Eagan, Dakota County, Minnesota and reserving easements of record. TREE INVENTORY (SAVED) 27"OAK 466 7.5"SPRUCE 48 L 0 T SQ. F00 TA GE = 17� � � � 11"OAK 486 21"OAK 487 5.5"SPRUCE 485 20.5"OAK 482 I MPER V. SQ. F00 TA GE = 3, 06 9 pOND AP- 19 26.5"OAK 476 23"OAK 478 NWL=930.6 20.5"OAK 479 19.5"OAK 480 1 MPER VI OUS CO VERA GE = 18� HW�-938:8 10.5"OAK 475 9.5"PINE 477 17"OAK 455 13.5"OAK 468 � 11"OAK 481 17"OAK 477 15 Edge of Ice • -934A ,` �`^\ �\�Z \ � V` �� 15 9� � o�� � \� ��;_.- -�-_� � 9 36.7 J .� ec � � cor. S \ �\ \� �e� � � � � � � /h � _� n `�\ \ \� ` �� I.0 � \ .: f�• -- t�i/ \\'A \�.J 23,J \S`3 B' . (y� � A � `_�`�- �1-�i � ass �` s ° o°�937.1 2s6�s�'' �� n� � 9s \y °�j 95$Oa� „ � 48�.,0\�p���D � _ 9 FN�_7/ 954.1 r___ ��_� / / , 1 . 0\ � \ � 5.5 rti e 942.1 �' QQ�� / / i� I r� FN'D IP s o.s�"oak-' �_� 4 8� � ( 954. �,9sz.z �� � ' � � -� _ � � /�-� � O j k �.�� �k r- i �rn � -r--- aso � z �' s�. : � � i •x�. �oak e e� \ 6 4s7 � �� /� Iw� • 956.�J "Oa� 7.5'Spruc I _- ��� ,�e� ��� \ 9 �, ak �� \\ 4 .�s.� �� 951.5 954.4� __ � g6� � ��` \ � °o o , o° � � �-' \ '►� � � =sss °` 800 �`�947. 26 oa�l� ,.r� ,�`i 4 Oak � � � �B=�52 O -g .1 M HUB � �ssz.� _ ' �° oa �a ° .� 952.24 �, fl � ��\\ `\ � \ 472 � y����0 465 �� -9 y� � c�o � G � ��"�� �.° �2.s"o � D IP cn � �\' � ��, 96 4 9 �p���. ��Qv� 950.5� O^� 9 6 �*9 9 2.4 � ' � I N W � TREE INVENTORY \���a$ \�� �8 oa� �� " k `2 � � (REMOVE) � g5 94 � SO C�� �p ' e me ' �FND IP 23"OAK 474 9 \� �� 4 � \� 2"°3k Jcao� �� 95�6 9 � r 955.0 .� 17"OAK 472 ��o . 3. 'S � � � 61. ��,`��O o�� o° s§.�.i � o, `� , � 12.5"OAK 465 �, \� �� '`^ � `�� � \ � �oo'� d;� 954.1 ,(� " 16.5"OAK 464 � cS` � ,,..aa �a �° 9 &,6 y\ �, ��,6' x 1� ,� � � 16 OAK 463 �� 6`"'�� s�6 9 �� 9 '8 ' o / .,.., FND IP Rock Con t. 6 PINE 462 � \ � � 1. �' �� � � 955.1 En,t. � 10.5"PINE 449 �� �� T� � � $ I �� 44 954.6�_f1 17"OAK 452 � � �� \ 6' 65�� Pin 10.5" Pine �.1 � 96) Hf�. 955.9 � [� �i 25.5"OAK 454 � HP�': -95 �y 8= .=956 � 18"OAK 469 4 0.8 4s ( aa� 25.5 � 9.5"Re Pine � ��0 70J 9 .3 17 ak 1 3.5 O A K 4 7 0 .$ � � ss4.� � ,a 5\s 12"OAK 461 � \ \ y�_ �� � 11"OAK 457 � � D&U\Ea eme � � �� 15��OAK 459 FND � H \6 S8 �3 1 E �\ � 95 $p 955.4 7.5"PINE 448 978'2 � � ,. -�- � � 17"OAK 450 �_ '„ � '+ 15"OAK 467 House = 2,156sq.ft. Sidewalk = 56sq.ft. Driveway = 839sq.ft. Patio = 18sq.ft. PROPOSED ELEVATIONS Top of Foundation = 957.1 Garage Floor = 956.7 Basement Floor = 948.4 Aprox. Sewer Service = Verify Proposed Elev. _ � MIN. SETBACK REQUIREMENTS Existing Elev. _ Drainage Directions = -- Front- 30 House Side - 10 Denotes Offset Stake = • Rear- 15 Garage Side- 5 SCALE: 1 inch = 30 feet JOB N0: I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT REPRESENTATION 13R-214 HEDL VND OF THE BOUNDARIES OF THE ABOVE OESCRIBED PROPERTY AS SURVEYED BY ME OR UNDER MY DIRECT SUPERVISION AND DOES NOT PURPORT T0 BOOK: PAGE: PLANNING ENGINEERING SURYEYING SHOW IMPROVEMENTS OR ENCROACHMENTS, EXCEPT AS SHOWN. 2005 Pin Oak Drive ' Eagan, MN 55122 DATE 7_/28/_�4 �. CAD FILE: Phone: (651� 405-6600 J F . LINDGR , LAND S EYOR Norton 13 Fax: (651) 405-6606 ESOTA LICENSE NUMBER 376 Point# Tag # Species DBH Condition Type 2803 466 Oak, white 27.0 Good Hardwood 2804 488 Spruce, white 7.5 Good Coniferous 2814 486 Oak, red 11.0 Good Hardwood 2815 487 Oak, white 21.0 Good Hardwood 2816 485 Spruce, blue 5.5 Fair Coniferous 2817 484 Spruce, white 4.0 Fair Coniferous 2819 482 Oak, white 20.5 Good Hardwood 2820 476 Oak, white 26.5 Good Hardwood 2821 478 Oak, red 23.0 Good Hardwood 2822 479 Oak, red 20.5 Fair Hardwood 2825 480 Oak, white 19.5 Good Hardwood 2826 475 Oak, white 10.5 Good Hardwood �� 4�3 9a�e� �:A E}ssd #a�es� 2828 474 Oak, red 23.0 Good Hardwood 2829 472 Oak, white 17.0 Good Hardwood 2830 465 Oak, white 12.5 Good Hardwood 2831 464 Oak, white 16.5 Good Hardwood 2832 463 Oak,white 16.0 Fair Hardwood 2833 462 Pine, red 6.0 Fair Coniferous 2835 449 Pine, red 10.5 Good Coniferous 2836 448 Pine, red 7.5 Good Coniferous 2837 447 Pine, red 9.5 Good Coniferous 2838 450 Oak,white 17.0 Good Hardwood �9 4�-� ri.,..� n..�,o,-��..,, �5 Fr6Ad �6##�6@� 2840 452 Oak, white 17A Good Hardwood �$4� 4.�-r3 ri.,-, n,,..,,,-��-,n �:-0 �AAd � , 2843 454 Oak,white 25.5 Fair Hardwood 2846 455 Oak, white 17.0 Good Hardwood 2848 467 Oak, white 15.0 Good Hardwood 2849 468 Oak,white 13.5 Good Hardwood 2850 469 Oak, white 18.0 Good Hardwood 2851 470 Oak, white 13.5 Good Hardwood . 2852 481 Oak, white 11.0 Good Hardwood �-5-� 4-� 8a-�-E'-e� �:9 Fee� �ee� �54 4-� 9ak;-�e� �8 �ee� #a�ae� 2855 461 Oak, white 12.0 Good Hardwood 2856 457 Oak, white 11.0 Good Hardwood �$5� 45� rir, n..,„r;�..., �-9 F�eed �e#�eed , 2858 459 Oak, white 15.0 Good Hardwood �5s3 4£A ri.,, n„-,,,,-��..., �-5 �96� �e€�eA� 2860 477 Oak, white 17.0 Fair Hardwood � - + LOT SURVEY CHECKLIST FOR RESIDENTIAL BUILDING PERMIT APPLICATION PROPERTY LEGAL: •��3����� ��''�t'' (�S:-�S� J�►G+ (.L�����'�'� DATE OF SURVEY: ��[�I� LATEST REVISION: d a� c �a s U O z ¢ DOCUMENT STANDARDS � ❑ ❑ • Registered Land Surveyor signature and company �' ❑ ❑ • Building Permit Applicant � � 0 • Legal description � ❑ � • Address ,� ❑ � • North arrow and scale � ❑ ❑ • House type (rambler,walkout, split w/o, split entry, lookout,etc.) �' p ❑ • Directional drainage arrows with slope/gradient% ` �' ❑ 0 • Propased/existing sewer and water services& invert elevation � �( ❑ � • Street name � O ❑ • Driveway(grade&width-in R/W and back of curb,22' max.) � ❑ ❑ • Lot Square Footage � 0 0 • Lot Coverage ELEVATIONS Existin � ❑ ❑ • Properly comers � p ❑ • Top of curb at the driveway and property line extensions � ❑ ❑ • Elevations of any existing adjacent homes � 0 ❑ • Adequate footing depth of structures due to adjacent utiliry trenches � ❑ 0 • Waterways (pond, stream, etc.) Proposed < � 0 0 • Garage floor f�Y ❑ 0 • Basemenf floor � ❑ ❑ • Lowest exposed efevation (walkouUwindow) �' ❑ ❑ • Property corners �r` 0 0 • Front and rear of home at the foundation PONDING AREA(if applicable) �' yp ❑ • Easement line � ❑ ❑ • NWL ,. fi]'' 0 ❑ • HWL ,� 0 ❑ • Pond#designation ❑ � � • Emergency Overflow Elevation �( ❑ ❑ • Pond/VVetland buffer delineation � Y � • Shoreland Zoning Overlay District Y • Conservation Easements DIMENSIONS �' ❑ 0 • Lot lines/Bearings&dimensions �° ❑ ❑ • Right-of-way and street width (to back of curb) �1 0 ❑ • Proposed home dimensions including any proposed decks, overhangs greater than 2', porches, etc. (i.e. all structures requiring permanent footings) �f ❑ ❑ • Show afl easements of record and any City utilities within those easements ,,�' ❑ ❑ • Setbacks of proposed structure and s' d setback of adjacent existing structures �� �' ❑ 0 • Retaining wall requirements: � � �' '' �� �-�1 L '-��� j'�'�; Reviewed By: Date � � G:/FORMS/Building Permit Application Rev.11-26-04 , - s Surv e o r's Ce r ti 2 c a t e 2J .f SURVEY FOR : Norton Homes DESCRIBED AS :Lot 3, Block 1, DEER REST POND ADDITION, City of Eagan, Dakota County, Minnesota and reserving easements of record. � ~t� ���1R����� '_( t , a ,� � L 0 T SQ. F00 TA GE = 17, 116 �� � IMPERV. SQ. FOOTAGE =3, 069 pOND AP—>9 I MPER VIOUS CO VERA GE = 18� HWL=938.8 � � �5 Edge of Ice • �=934A ��� � \y t , � �5 �� ` \� -- -�=� �NSTALt. � � �� 9g '�� � 936.��.� ��= TR _� � S ��, � ���,ye� ` � PERIMETER CON -- � ` � ,,:��- .� .,- ���_`_''- � e�`°i��RSS ��"`,.1 �YJ \S��'R, �/ . �`���__ J i ��S ' o� � 2S'�Si.. 9s � �$ FF i � \ ��z � 7.1 •6g� t FN�,_1� \\ — /� i� ��Y� ```.,\��O\ FND �� � �r. 954.1 �--- \ -� .� \ � 9��— �Q:, / i a� 9 �p `- �i �..._� �, + \ 43.4� � I j o`h �°��� �� � ,�-� �' �_� --�"'� +�.� °�i �, ---� + �� ��,u '�-- -�----./� t,/F e� s ' "-�-- ,,,,�- �,� i W� � e e e� �� 954.4� `` �'~`,� � � � ` � `` 947.9 46.6� c 951.5 �---_ 6 � � ?�O o � o t t 9 � �'k \` �� �. _9ss °`� .o �.o•� t I 947. �I: I ^� � \ � � � ` �� �oeoa$52�a � _g5 �� 9�q`"�� N ,,:� G� .4 �a o`'oc��,\° , s �I � � -�, �y c^� ��, g �oJ��?`Q�ry�iQ�� 0949.^�0 9 /49 9 2.4 � o, ��, ����„� A � h � m� � �.., �\ .�. � ` � c� N �„� � � � 28s ��°a '.~ 6• � '��FNp IP `� \9 9 � ��aa �� 95�6 � 955.0 I� 9���0 � �, �� � ` s1. ��,h�o�° oo � / 6 F o. I R.,fx �o �' \�\� 956J?�0� � � hp"� � 954.1 ,(� �.s 6� y ' � �''� �1� ~ cr '�.� '~ � � 9 $ � '� � '�`� rJ yf -, J1r'f✓� , �.. 65. \ �~`'\ �.0� ' o /` p Rock Co t7 ���'. ��Ll���� �., ~�.� \ °� �� � \\ �� F 955.1 54.6n`J ���� y+ J �' � 65.1� �� w �(�� ��+� ��J'U-��� �,���J�G� \\ �� � $ � 6.H� �n � � ' l' � \ HP0.8 l�� � \6= � £.=956 � � . . \ � � I\ � . �`,� \ ` \� ` � \ ' 10 O\\ �_ _�J � � D&U\Ea eme � \ � si�.2 �.$ �6 S$ 3 1 E \\ ` s .�P 955.4 , „ -,- - � � � � � , �_ ., � -+ House = 2,156sq.ft. Sidewalk = 56sq.ft. Driveway = 839sq.ft. � Patio = 18sq.ft. � � PROPOSED ELEVATIONS �� n 7� � � Sd`u'i�. Gs�' Top of Foundation = g57.� EAGqI�t ENGI1�t���G DEPT, Garage Floor = 956.7 Basement Floor = 948.4 Aprox. Sewer Service = Verify Proposed Elev. = 0 MIN. SETBACK REQUIREMENTS Existing Elev. _ Drainage Directions = ----- Front- 30 House Side —�o Denotes Offset Stake = • sca,�E: i inch = 30 feet Rear— �5 Garage Side-5 JOB N0: HEDL UND I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT REPRESENTATION 13R-214 OF THE BOUNDARIES OF THE ABOVE DESCRIBED PROPERTY AS SURVEYED BY ME OR UNDER MY OIRECT SUPERVISION AND DOES NOT PURPORT TO BOOK: PAGE: PLANNING ENGINEERING SURYEYING SHOW IMPROVEMENTS OR ENCROACHMENTS, EXCEPT AS SHOWN. 2005 Pin Oak Drive ' Eagan, MN 55122 DATE �/ 16� 14 �. Ca,o Fl�E: Phone: (651) 405-6600 J . LINDGR , LAND S YOR Fax: (651) 405-6606 ESOTA LICENSE NUMBER 376 Norton 13 Use BLUE or BLACK Ink �-----------------, � For OfFlce Use � Cit of Ea a� ; Permit#: 1 � � � � � � Permit Fee: - �� � 3830 Pilot Knob Road � � M,�r � -� Eagan MN 55122 ?6?Oi5 I Date Received: �� � �i Phone: (651) 675-5675 � �\^ I Fax: (651)675-5694 � Staff;�.J � �����������������J 2015 RESIDENTIAL PLUMBING PERMIT APPLICATION Date: Site Address: Tenant: g � Suite#: �'�����£��� � �� �ReS���n�t�f)��uWfl�l�w" Name: � Phone: ���iX.r_��j�x� �-��� 1� '�` �'� � � ���~�"'� -`�'� �Address/City/Zip: U�'L�,�P�°t,�� �� �y t � � w'h� -- y� Ni . � � � ;�� � �� Narrie: M�bert Corr�pany Inc dba Culligan Water WC641376�. �� � � � � � � � License#: �� � � � � � ���Ca �ra� �� �� AddreSs: 18Q1 50ih St East c�ty: Inver Grove Hgts. ���� � �� � �� Mn p 55077 651-451-2241� � State: Zi : Phone: � � William R Milbert ����, ' � Contact: � EmaiL � � � � � � , � �� , , , � �� ��T�/p �� Or : ,�,New _Replacement _Repair _Rebuild _Modify Space Work in R.O.W. } �,�.,� �� _� — ��,� ��, � Description of work: - - ---- ��� � " ���� � ��� RESIDENTIAL � � � � ��M � ���� �= � � � � � � � `� Water Heater $ ` Lawn lrrigation(_RPZ/ PVB) �Water Softener •���' ri,� — �� � �� Septic System � Add Piumbing Fixtures(_Main/_Lower Levei) � � s New Water Turnaround ,.. _ � `�'�� �.� � . �� �� Abandonment � � � � � RESIDENTIAL FEES: $60.00 Water Heater, Water Softener,or Water Heater and Softener(includes$5.00 5tate Surcharge) $6Q.OQ Lawn lrrigation(includes$5.00 minimum State Surcharge) $60.00 Add Plumbing Fixtures, Septic Svstem Abandonment,Water Turnaround*(includes$5.00 State Surcharge) ''Water Turnaround(add$200.00 if a 5/8"meter is required) $115.00 Septic Svstem New($10.00 per as built)(includes County fee and$5.00 State Surcharge) /� TOTAL FEES$ V O O CALL BEFORE YOU DIG. Call Gopher State One Cali at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.qopherstateonecall orq I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start ' out a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Xl�,�,r�L �l�: ���.� ce'�'� n X Applicant's Prmted Name Applicant's Signature , � �_ �,��,. �. � ., �`��� �' ` � •.� � � � r� � � � � u �"�' /1� F, � .. °, . � ,- _ ,��,_ 1r;, :. ���,;- � � . , . . _ .� . � ��� . - i. ��, . .. ' � . � �,'1 8 ffS C� �P ��- "' � �� � � �a � �i 4 e�t�Y ��t� B �`. �� � City of hp Address: 4845 Rusten Rd Permit #: 125796 The following items were / were not completed at the Final Inspection on: / /Z-. Final Final grade - 6" from siding Permanent steps — Garage Permanent steps — Main Entry Permanent Driveway Permanent Gas Retaining Wall or 3:1 Max Slope Sod / Seeded Lawn Trail / Curb Damage Porch Lower Level Finish Deck Fireplace A4,1),4 • Verify with your builder that roof tes caps from the plumbing system have been removed. • Turn off water supply to the outside lawn faucets before freeze potential exists. • Call the Engineering Department at (651) 675-5646 prior to working in the right-of-way or installing an irrigation system. Building Inspector: G:\Building Inspections\FORMS\Checklists