Loading...
3905 Eagan Outlets Pkwy Unit 230 - Crazy 8 - Testing & Balancing Report i 375 230th Ave, Somerset WI 54025 - Phone: (612) 834-0311 Fax: (414) 377-3349 www.Premierbalancing.com '~$pIN6, f.IJ Jl15TIIIG AND ā¯‘ALANLING ~UNR/1 ~J 7NllROii~$~ONA4'S GHtl!{".~."' Testing, Adjusting & Balancing Report TABB TECHNICIAN Technician: Tony Kompelien Cell Phone: 612419-1425 Email Address: tony@premierbalancing.com PROJECT Crazy 8 Outlet 3905 Eagan outlets parkway Suite 230 CLIENT Allan Mechanical Contractors 7875 Fuller Road Eden Prairie, MN 55344 ENGINEER Emanuelson-Podas Consulting Engineers 10401 Bren Road East Minnetonka, MN 55343 Report Date August 1, 2014 TABB CERTIFICATION TABB certification of a Supervisor is TABB's statement that the Supervisor is able to supervise testing, adjusting and balancing of building environmental systems to produce the design objectives or optimum system performance. For TABB Certification purposes, a Supervisor is the person who, while employed by a TABB Certified Contractor, is responsible and accountable for overseeing, coordinating and ensuring that projects are performed by TABB Certified Technicians in accordance with TABB standards (including the ICB Code of Conduct and the TAB General Rules). Measurements recorded in this report are in accordance with the SMACNA 1 TABB HVAC Systems, Testing, Adjusting and Balancing manual. A r~ ANSI Q 1V A ISf ~ r. 0- ~ CJ- Anthony Kompelien Anthony Kompelien Perm r Test E 3.a-ame i TAFZT, r TA669u rvisor 5887522flT TB$752298 Dec(,nbe, ~D Decomber 31, 2014 d Zecr~' d SUP Bq Pater C N- Korzenowslci T80458712C Supervisor #0728 No acid unless Sign A exp. 12131 /2014 @ttlitB6 TABB Certified "The Professional's Choice" Page 2 TABB QUALITY ASSURANCE PROGRAM BACKGROUND TABB seeks to ensure the integrity of its certification program by: (a) setting eligibility criteria for TABB Certified Supervisors and TABB Certified Contractors, (b) establishing testing procedures for TABB Certified Supervisors, (c) requiring continuing education and continuous compliance with eligibility criteria for renewal of certification, and (d) periodically reviewing its recognition of technician certification. High quality work on the part of TABB Certified Technicians and TABB Certified Supervisors and TABB Certified Contractors ( TABB Professionals ) is essential to integrity of the TABB Certification Program. TABB offers this TABB Quality Assurance Program to help assure high quality work. By accepting TABB qualification or certification, every TABB Professional accepts the responsibilities or this Program. Quality Assurance Every customer of a TABB Certified Contractor shall be entitled to expect: (1) that testing, adjusting and balancing work by the contractor and its TABB Professionals will meet TABB standards; (2) that testing, adjusting and balancing reports provided to the customer will have been prepared by a TABB Certified Technician, and reviewed by a TABB Certified Supervisor; and (3) that the report(s) will include measurements taken accurately with the date and mode of operation of the systems. TABB 8403 Arlington Boulevard Fairfax, VA 22031 Phone - (703) 299-5646 Fax - (703) 683-7615 TABB Certified "The Professional's Choice" Page 3 INSTRUMENT CALIBRATION REPORT INSTRUMENT MODEL MANUFACTURER SERIAL NUMBER CALIBRATION DATE Rotating Measuring Instrument PLT-5000 Mitchell Instruments 1312A8503P 12/02/13 Temperature Measuring Instrument ADM-870C Shortridge M12072 01/21/14 Electrical Measuring Instruments 117 Fluke 18561871 01/15/14 322 Fluke 17830473 01/15/14 Air Pressure Measuring Instrument ADM-870C Shortridge M12072 01/21/14 Air Velocity Measuring Instrument ADM-870C Shortridge M12072 01/21/14 Hydronic Pressure Measuring Instrument HM-670 Alnor 71133088 01/15/14 0 to 300 psi Humidity Measuring Instrument MITCT917 Mitchell Instruments 100610809 01/20/14 TABB Certified "The Professional's Choice" Page 4 Premier Test & Balance Index Project: Crazy 8 Outlet Premier Job Number: 1236 Technician: Tony Kompelien Report Date: 8/1/14 Page System 1 Equipment Description Start Date Completion Date 6 RTU 230-1 Constant Air Volume 617/14 7/30/14 8 EF-1 (Bathroom) Constant Air Volume 617114 7/30/14 TABB Certified "The Professional's Choice" Page 5 Premier Test & Balance Air Handling Unit Test Data Project: Crazy 8 Outlet System: RTU 230-1 Premier Job Number: 1236 Technician: Tony Kompelien Completion Date: 7/30/14 System Scheduled Data Model number: KCA092H4BN1G Serial number: 5613,110100 Manufacturer: Lennox Outlet Total CFM: 3,000 Total Design CFM: 3,000 Min.Outside Air CFM: 600 Fan Static Pressure: 0.80 E ui ment Location: Roof Performance Data Description Scheduled i Submittal Data Actual Field Measurements Motor HP: 2.00 2.00 Motor RPM: 1755 1755 Motor Hertz: 60 60 Motor Service Factor: 1.15 1.15 Motor Phase: 3 . 3 Motor Voltage: 460 476 476 476 Motor Amperage: 2.9 2.4 2.4 2.4 Motor BHP: 1.71 Fan RPM: 720 Static Pressure Data Component Static Pressure Pressure Pressure In Out Rise 1 Drop Total Fan: -0.15 0.42 Rise 0.57 Airflow Measurements Supply Air Opening Area Size K Design Final Reading Preliminary Reading No. Served Factor Velocity CFM Velocity CFM % Velocity CFM 1 Various 14" 1.07 860 920 871 932 101% 1138 1218 2 Various 18" 1.77 1177 2080 1167 2062 99% 1266 2237 Total 3000 2994 100% 3455 Minimum Outside Air Size K Desi n Final Reading Preliminary Reading Factor Velocity CFM Velocity CFM % Velocity CFM Total 28x23 4.47 134 600 133 595 99% 71 318 Remarks: a) b) C) d) e) TABB Certified "The Professional's Choice" Page 6 Premier Test & Balance Air Outlet Test Report Project: Crazy 8 Outlet System: RTU 230-1 Premier Job Number: 1236 Technician: Tony Kompelien Completion Date: 7130114 Airflow Measurements Opening Area Size K Design Final Reading Preliminary Reading No. Served Factor Velocity CFM Velocity CFM % Velocity CFM 1 Hall 11x7 0.53 187 100 203 109 109% 189 101 2 Stockroom 11x5 0.38 785 300 766 293 98%0 817 312 3 Sales 11x5 0.38 681 260 707 270 104% 585 223 4 Sales 11x5 0.38 681 260 714 273 105% 845 323 5 Sales 11x5 0.38 681 260 678 259 100% 794 303 6 Sales 11x5 0.38 681 260 660 252 97%u 644 246 7 Sales 11x5 0.38 681 260 661 252 97% 667 255 8 Sales 11x5 0.38 681 260 699 267 103% 824 315 9 Sales 11x5 0.38 681 260 650 248 95%a 584 223 10 Sales 11x5 0.38 681 260 619 236 91%a 760 290 11 Sales 11x5 0.38 681 260 630 241 93%0 706 270 12 Sales 11x5 0.38 681 260 623 238 92%0 615 235 Total 3000 2938 98% 3095 Remarks: a) b) C) d) e) TABB Certified "The Professional's Choice" Page 7 Premier Test & Balance Fan Test Data Project: Crazy 8 Outlet System: EF-1 (Bathroom) Premier Job Number: 1236 Technician: Tony Kompelien Completion Date: 7/30/14 System Scheduled Data Model number: SP-B110 Serial number: 13374729 Manufacturer: Greenheck Outlet Total CFM: 100 Total Design CFM: 100 Equipment Location: Restroom Fan Static Pressure: .25 ESP Performance Data Description Scheduled 1 Submittal Data Actual Field Measurements Motor HP: 0.15 0.15 Motor RPM: 950 950 Motor Hertz: 60 60 Motor Service Factor: 1.15 1.15 Motor Phase: 1 1 Motor Voltage: 115 115 Motor Amperage: 1.0 0.9 Motor BHP: 0.13 Fan RPM: 950 Direct Drive Static Pressure Data Component Static Pressure Pressure Pressure In Out Rise 1 Drop Total Fan: -0.01 0.18 Rise 0.19 Airflow Measurements Fan Total Opening Area Size K Design Final Reading Preliminary Reading No. Served Factor Velocity CFM Velocity CFM % Velocity CFM 1 Bathroom Flow Hood 1.00 100 100 108 108 108% 108 108 Total 100 108 108% 108 Remarks: a) No speed control - no problems anticipated. b) C) d) e) TABB Certified "The Professional's Choice" Page 8