Loading...
3965 Eagan Outlets Pkwy Unit 337 - Gymboree - Testing & Balancing Report 7 375 230th Ave, Somerset WI 54025 - Phone: (612) 834-0311 Fax: (414) 377-3349 www.Premierbalancing.com 7F'Mf- 4oJu9l9MKf AND oaUNnnG GUBEAU r.+e YRgFEBdSIS?Nin ~ cpvsCa° Testing, Adjusting & Balancing Report TABB TECHNICIAN Technician: Tony Kompelien Cell Phone: 612-419-1425 Email Address: tony@premierbalancing.com PROJECT Gymboree Outlet 3965 Eagan outlets parkway, Suite 337 CLIENT Allan Mechanical Contractors 7875 Fuller Road Eden Prairie, MN 55344 ENGINEER Emanuelson-Podas Consulting Engineers 10401 Bren Road East Minnetonka, MN 55343 Report Date August 1, 2014 TABB CERTIFICATION TABB certification of a Supervisor is TABB's statement that the Supervisor is able to supervise testing, adjusting and balancing of building environmental systems to produce the design objectives or optimum system performance. For TABB Certification purposes, a Supervisor is the person who, while employed by a TABB Certified Contractor, is responsible and accountable for overseeing, coordinating and ensuring that projects are performed by TABB Certified Technicians in accordance with TABB standards (including the ICB Code of Conduct and the TAB General Rules). Measurements recorded in this report are in accordance with the SMACNA 1 TABB HVAC Systems, Testing, Adjusting and Balancing manual. ff - 1 x ANJ~`l ~ ANSI Anthony Kompelien Anthony Kompelien j' P2A'tK' . 6 9r:: dtCT tt~.. T PT- T, fn / '1ABBB sup t-' -3r BB 875224T d"If TES 52245 14 t fed Tec1~'' ed Sul) 4 ~~T & BA AZ Peter Cfi Korzenowshi ( TS04587120 tf{ Supervisor #0728 Na llid Uniess Sign Exp•1- 12014 TABB Certified "The Professional's Choice" Page 2 TABB QUALITY ASSURANCE PROGRAM BACKGROUND TABB seeks to ensure the integrity of its certification program by: (a) setting eligibility criteria for TABB Certified Supervisors and TABB Certified Contractors, (b) establishing testing procedures for TABB Certified Supervisors, (c) requiring continuing education and continuous compliance with eligibility criteria for renewal of certification, and (d) periodically reviewing its recognition of technician certification. High quality work on the part of TABB Certified Technicians and TABB Certified Supervisors and TABB Certified Contractors ( TABB Professionals ) is essential to integrity of the TABB Certification Program. TABB offers this TABB Quality Assurance Program to help assure high quality work. By accepting TABB qualification or certification, every TABB Professional accepts the responsibilities or this Program. Quality Assurance Every customer of a TABB Certified Contractor shall be entitled to expect: (1) that testing, adjusting and balancing work by the contractor and its TABB Professionals will meet TABB standards; (2) that testing, adjusting and balancing reports provided to the customer will have been prepared by a TABB Certified Technician, and reviewed by a TABB Certified Supervisor; and (3) that the report(s) will include measurements taken accurately with the date and mode of operation of the systems. TABB 8403 Arlington Boulevard Fairfax, VA 22031 Phone - (703) 299-5646 Fax - (703) 683-7615 TABB Certified "The Professional's Choice" Page 3 INSTRUMENT CALIBRATION REPORT INSTRUMENT MODEL MANUFACTURER SERIAL NUMBER CALIBRATION DATE Rotating Measuring Instrument PLT-5000 Mitchell Instruments 1312A8503P 12/02/13 Temperature Measuring Instrument ADM-870C Shortridge M12072 01/21/14 Electrical Measuring Instruments 117 Fluke 18561871 01115/14 322 Fluke 17830473 01115114 Air Pressure Measuring Instrument ADM-870C Shortridge M12072 01/21/14 Air Velocity Measuring Instrument ADM-870C Shortridge M12072 01121/14 Hydronic Pressure Measuring Instrument HM-670 Alnor 71133088 01/15/14 0 to 300 psi Humidity Measuring Instrument MITCT917 Mitchell Instruments 100610809 01/20/14 TABB Certified "The Professional's Choice" Page 4 Premier Test & Balance Index Project: Gymboree Outlet Premier Job Number: 1235 Technician: Tony Kompelien Report Date: 8/1/14 Page System 1 Equipment Description Start Date Completion Date 6 RTU 337-1 Constant Air Volume 6/12/14 7/30/14 7 RTU 337-1 Constant Air Volume 6/12114 7/30/14 8 EF-1 Constant Air Volume 6112114 7/30/14 TABB Certified "The Professional's Choice" Page 5 Premier Test & Balance Air Handling Unit Test Data Project: Gymboree Outlet System: RTU 337-1 Premier Job Number: 1235 Technician: Tony Kompelien Completion Date: 7/30/14 System Scheduled Data Model number: KCA092H4BN1G Serial number: 5613J10097 Manufacturer: Lennox Outlet Total CFM: 2,950 Total Design CFM: 3,000 Min.Outside Air CFM: 300 Fan Static Pressure: 1.0" ESP E ui ment Location: Roof Performance Data Description Scheduled 1 Submittal Data Actual Field Measurements Motor HP: 2.00 2.00 Motor RPM: 1755 1755 Motor Hertz: 60. 60 Motor Service Factor: 1.15 1.15 Motor Phase: 3 3 Motor Voltage: 460 478 478 478 Motor Amperage: 2.9 2.6 2.6 2.6 Motor BHP: 1.86 Fan RPM 777 Static Pressure Data Component Static Pressure Pressure Pressure In Out Rise I Drop Total Fan: _0.16 0.57 Rise 0.73 Airflow Measurements Supply Air Opening Area Size K Design Final Reading Preliminary Reading No. Served Factor Velocity CFM Velocity CFM % Velocity CFM 1 Various 16" 1.40 1114 1560 1109 1553 100% 1045 1463 2 Various 16" 1.40 993 1390 1003 1404 101% 1046 1464 Total 2950 2957 100% 2927 Minimum Outside Air Size K Design Final Reading Preliminary Reading Factor Velocity CFM Velocity CFM % Velocity CFM Total 28x23 4.47 67 300 69 309 103% 31 139 Remarks: a) b) C) d) e) TABB Certified "The Professional's Choice" Page 6 Premier Test & Balance Air Outlet Test Report Project: Gymboree Outlet System: RTU 337-1 Premier Job Number: 1235 Technician: Tony Kompelien Completion Date: 7130114 Airflow Measurements Opening Area Size K Design Final Reading Preliminary Reading No. Served Factor Veloci CFM Velocity CFM % Velocity CFM 1 Hall 11x7 1.00 100 100 104 104 104% 101 101 2 Stockroom 91x5 0.38 655 250 712 272 109% 711 272 3 Sales 11x5 0.38 681 260 616 235 91% 680 260 4 Sales 11x5 0.38 681 260 650 248 96% 663 253 5 Sales 11x5 0.38 681 260 627 239 92% 727 278 6 Sales 11x5 0.38 681 260 718 274 105% 661 253 7 Sales 11x5 0.38 681 260 707 270 104% 663 253 8 Sales 11x5 0.38 681 260 732 280 108% 578 221 9 Sales 11x5 0.38 681 260 658 251 97% 757 289 10 Sales 11x5 0.38 681 260 739 282 109% 640 245 11 Sales 11x5 0.38 681 260 746 285 110% 649 248 12 Sales 114 0.38 681 260 745 285 109% 729 278 Total 2950 3026 103% 2950 Remarks: a) b) C) d) e) TABB Certified "The Professional's Choice" Page 7 Premier Test & Balance Fan Test Data Project: Gymboree Outlet System: EF-1 Premier Job Number: 1235 Technician: Tony Kompelien Completion Date: 7130/14 System Scheduled Data Model number: SP-13110 Serial number: 13374722 Manufacturer: Greenheck Outlet Total CFM: 100 Total Design CFM: 100 Equipment Location: Restroom Fan Static Pressure: .25 ESP Performance Data Description Scheduled 1 Submittal Data Actual Field Measurements Motor HP. 0.15 0.15 Motor RPM: 950 950 Motor Hertz: 60... 60 Motor Service Factor: 1.15 1.15 Motor Phase: 1 _ 1 Motor Voltage: 115 115 Motor Amperage: 1.0 0.8 Motor BHP: _ 0.12 Fan RPM: 950 Direct Drive Static Pressure Data Component Static Pressure Pressure Pressure In Out Rise / Drop Total Fan: -0.01 0.14 Rise 0.15 Airflow Measurements Fan Total Opening Area Size K Design Final Reading Preliminary Reading No. Served Factor Velocitv CFM Veloci CFM % Veloci CFM 1 Bathroom Flow Hood 1.00 100 100 110 110 110% 110 110 Total 100 110 110% 110 Remarks: a) No speed control - no problems anticipated. b) C) d) e) TABB Certified "The Professional's Choice" Page 8