3965 Eagan Outlets Pkwy Unit 337 - Gymboree - Testing & Balancing Report
7
375 230th Ave, Somerset WI 54025 - Phone: (612) 834-0311 Fax: (414) 377-3349
www.Premierbalancing.com
7F'Mf- 4oJu9l9MKf AND oaUNnnG GUBEAU
r.+e YRgFEBdSIS?Nin ~ cpvsCa°
Testing, Adjusting & Balancing Report
TABB TECHNICIAN
Technician: Tony Kompelien
Cell Phone: 612-419-1425
Email Address: tony@premierbalancing.com
PROJECT
Gymboree Outlet
3965 Eagan outlets parkway,
Suite 337
CLIENT
Allan Mechanical Contractors
7875 Fuller Road
Eden Prairie, MN 55344
ENGINEER
Emanuelson-Podas Consulting Engineers
10401 Bren Road East
Minnetonka, MN 55343
Report Date
August 1, 2014
TABB CERTIFICATION
TABB certification of a Supervisor is TABB's statement that the Supervisor is able to
supervise testing, adjusting and balancing of building environmental systems to produce the
design objectives or optimum system performance. For TABB Certification purposes, a
Supervisor is the person who, while employed by a TABB Certified Contractor, is
responsible and accountable for overseeing, coordinating and ensuring that projects are
performed by TABB Certified Technicians in accordance with TABB standards (including the
ICB Code of Conduct and the TAB General Rules).
Measurements recorded in this report are in accordance with the SMACNA 1 TABB HVAC Systems,
Testing, Adjusting and Balancing manual.
ff - 1 x ANJ~`l ~ ANSI
Anthony Kompelien Anthony Kompelien
j' P2A'tK' . 6 9r:: dtCT tt~..
T PT- T, fn / '1ABBB sup t-' -3r
BB 875224T d"If TES 52245
14
t
fed Tec1~'' ed Sul)
4 ~~T & BA
AZ
Peter Cfi
Korzenowshi
( TS04587120 tf{
Supervisor #0728
Na llid Uniess Sign
Exp•1- 12014
TABB Certified "The Professional's Choice"
Page 2
TABB QUALITY ASSURANCE PROGRAM
BACKGROUND
TABB seeks to ensure the integrity of its certification program by: (a) setting eligibility criteria for TABB
Certified Supervisors and TABB Certified Contractors, (b) establishing testing procedures for TABB
Certified Supervisors, (c) requiring continuing education and continuous compliance with eligibility criteria
for renewal of certification, and (d) periodically reviewing its recognition of technician certification. High
quality work on the part of TABB Certified Technicians and TABB Certified Supervisors and TABB Certified
Contractors ( TABB Professionals ) is essential to integrity of the TABB Certification Program. TABB offers
this TABB Quality Assurance Program to help assure high quality work. By accepting TABB qualification or
certification, every TABB Professional accepts the responsibilities or this Program.
Quality Assurance
Every customer of a TABB Certified Contractor shall be entitled to expect: (1) that testing, adjusting and
balancing work by the contractor and its TABB Professionals will meet TABB standards; (2) that testing,
adjusting and balancing reports provided to the customer will have been prepared by a TABB Certified
Technician, and reviewed by a TABB Certified Supervisor; and (3) that the report(s) will include
measurements taken accurately with the date and mode of operation of the systems.
TABB
8403 Arlington Boulevard
Fairfax, VA 22031
Phone - (703) 299-5646
Fax - (703) 683-7615
TABB Certified "The Professional's Choice"
Page 3
INSTRUMENT
CALIBRATION REPORT
INSTRUMENT MODEL MANUFACTURER SERIAL NUMBER CALIBRATION
DATE
Rotating Measuring Instrument PLT-5000 Mitchell Instruments 1312A8503P 12/02/13
Temperature Measuring Instrument ADM-870C Shortridge M12072 01/21/14
Electrical Measuring Instruments 117 Fluke 18561871 01115/14
322 Fluke 17830473 01115114
Air Pressure Measuring Instrument ADM-870C Shortridge M12072 01/21/14
Air Velocity Measuring Instrument ADM-870C Shortridge M12072 01121/14
Hydronic Pressure Measuring Instrument HM-670 Alnor 71133088 01/15/14
0 to 300 psi
Humidity Measuring Instrument MITCT917 Mitchell Instruments 100610809 01/20/14
TABB Certified "The Professional's Choice"
Page 4
Premier Test & Balance Index
Project: Gymboree Outlet Premier Job Number: 1235
Technician: Tony Kompelien Report Date: 8/1/14
Page System 1 Equipment Description Start Date Completion Date
6 RTU 337-1 Constant Air Volume 6/12/14 7/30/14
7 RTU 337-1 Constant Air Volume 6/12114 7/30/14
8 EF-1 Constant Air Volume 6112114 7/30/14
TABB Certified "The Professional's Choice"
Page 5
Premier Test & Balance Air Handling Unit Test Data
Project: Gymboree Outlet
System: RTU 337-1 Premier Job Number: 1235
Technician: Tony Kompelien Completion Date: 7/30/14
System Scheduled Data
Model number: KCA092H4BN1G Serial number: 5613J10097
Manufacturer: Lennox Outlet Total CFM: 2,950
Total Design CFM: 3,000 Min.Outside Air CFM: 300
Fan Static Pressure: 1.0" ESP E ui ment Location: Roof
Performance Data
Description Scheduled 1 Submittal Data Actual Field Measurements
Motor HP: 2.00 2.00
Motor RPM: 1755 1755
Motor Hertz: 60. 60
Motor Service Factor: 1.15 1.15
Motor Phase: 3 3
Motor Voltage: 460 478 478 478
Motor Amperage: 2.9 2.6 2.6 2.6
Motor BHP: 1.86
Fan RPM 777
Static Pressure Data
Component Static Pressure Pressure Pressure
In Out Rise I Drop Total
Fan: _0.16 0.57 Rise 0.73
Airflow Measurements
Supply Air
Opening Area Size K Design Final Reading Preliminary Reading
No. Served Factor Velocity CFM Velocity CFM % Velocity CFM
1 Various 16" 1.40 1114 1560 1109 1553 100% 1045 1463
2 Various 16" 1.40 993 1390 1003 1404 101% 1046 1464
Total 2950 2957 100% 2927
Minimum Outside Air
Size K Design Final Reading Preliminary Reading
Factor Velocity CFM Velocity CFM % Velocity CFM
Total 28x23 4.47 67 300 69 309 103% 31 139
Remarks: a)
b)
C)
d)
e)
TABB Certified "The Professional's Choice"
Page 6
Premier Test & Balance Air Outlet Test Report
Project: Gymboree Outlet
System: RTU 337-1 Premier Job Number: 1235
Technician: Tony Kompelien Completion Date: 7130114
Airflow Measurements
Opening Area Size K Design Final Reading Preliminary Reading
No. Served Factor Veloci CFM Velocity CFM % Velocity CFM
1 Hall 11x7 1.00 100 100 104 104 104% 101 101
2 Stockroom 91x5 0.38 655 250 712 272 109% 711 272
3 Sales 11x5 0.38 681 260 616 235 91% 680 260
4 Sales 11x5 0.38 681 260 650 248 96% 663 253
5 Sales 11x5 0.38 681 260 627 239 92% 727 278
6 Sales 11x5 0.38 681 260 718 274 105% 661 253
7 Sales 11x5 0.38 681 260 707 270 104% 663 253
8 Sales 11x5 0.38 681 260 732 280 108% 578 221
9 Sales 11x5 0.38 681 260 658 251 97% 757 289
10 Sales 11x5 0.38 681 260 739 282 109% 640 245
11 Sales 11x5 0.38 681 260 746 285 110% 649 248
12 Sales 114 0.38 681 260 745 285 109% 729 278
Total 2950 3026 103% 2950
Remarks: a)
b)
C)
d)
e)
TABB Certified "The Professional's Choice"
Page 7
Premier Test & Balance Fan Test Data
Project: Gymboree Outlet
System: EF-1 Premier Job Number: 1235
Technician: Tony Kompelien Completion Date: 7130/14
System Scheduled Data
Model number: SP-13110 Serial number: 13374722
Manufacturer: Greenheck Outlet Total CFM: 100
Total Design CFM: 100 Equipment Location: Restroom
Fan Static Pressure: .25 ESP
Performance Data
Description Scheduled 1 Submittal Data Actual Field Measurements
Motor HP. 0.15 0.15
Motor RPM: 950 950
Motor Hertz: 60... 60
Motor Service Factor: 1.15 1.15
Motor Phase: 1 _ 1
Motor Voltage: 115 115
Motor Amperage: 1.0 0.8
Motor BHP: _ 0.12
Fan RPM: 950 Direct Drive
Static Pressure Data
Component Static Pressure Pressure Pressure
In Out Rise / Drop Total
Fan: -0.01 0.14 Rise 0.15
Airflow Measurements
Fan Total
Opening Area Size K Design Final Reading Preliminary Reading
No. Served Factor Velocitv CFM Veloci CFM % Veloci CFM
1 Bathroom Flow Hood 1.00 100 100 110 110 110% 110 110
Total 100 110 110% 110
Remarks: a) No speed control - no problems anticipated.
b)
C)
d)
e)
TABB Certified "The Professional's Choice"
Page 8