3965 Eagan Outlets Pkwy 330 - Test & Balance Reports
%
iv
375 230th Ave, Somerset WI 54025 - Phone: (612) 834-0311 Fax: (414) 377-3349
www.Premierbalancing.com
TESTING, AW V s T ir. , ar; p e a1.AHC,i reG 6t7ALM1
TNB SROI E"S30NALs LnoGE^
Testing, Adjusting & Balancing Report
PROJECT
Dress Barn
Paragon Outlets
3965 Eagan Outlets Parkway
Eagan MN 55122
CLIENT
Allan Mechanical Contractors
7875 Fuller Road
Eden Prairie, MN 55344
ENGINEER
N/A
Report Date
July 30, 2014
TABB CERTIFICATION
TABB certification of a Supervisor is TABB's statement that the Supervisor is able to
supervise testing, adjusting and balancing of building environmental systems to produce the
design objectives or optimum system performance. For TABB Certification purposes, a
Supervisor is the person who, while employed by a TABB Certified Contractor, is
responsible and accountable for overseeing, coordinating and ensuring that projects are
performed by TABB Certified Technicians in accordance with TABB standards (including the
ICB Code of Conduct and the TAB General Rules).
Measurements recorded in this report are in accordance with the SMACNA 1 TABB HVAC Systems,
Testing, Adjusting and Balancing manual.
rtif#e~~s f~
Anthony Kompelien Anthony Kompelien
TARP Technician Tt sir
H8$75224R TES -52243
NcemGer 11. 21119 rr _ "'.4
.
ed 7e~ d SU
& BA4Z
1: 0
Korzenowski
T130458712C
CL 7C1
Supervisor 04728
No lid Uriless Sign
4
Exp. 12/31/2014
TABB Certified "The Professional's Choice"
Page 2
TABB QUALITY ASSURANCE PROGRAM
BACKGROUND
TABB seeks to ensure the integrity of its certification program by: (a) setting eligibility criteria for TABB
Certified Supervisors and TABB Certified Contractors, (b) establishing testing procedures for TABB
Certified Supervisors, (c) requiring continuing education and continuous compliance with eligibility criteria
for renewal of certification, and (d) periodically reviewing its recognition of technician certification. High
quality work on the part of TABB Certified Technicians and TABB Certified Supervisors and TABB Certified
Contractors ( TABB Professionals ) is essential to integrity of the TABB Certification Program. TABB offers
this TABB Quality Assurance Program to help assure high quality work. By accepting TABB qualification or
certification, every TABB Professional accepts the responsibilities or this Program.
Quality Assurance
Every customer of a TABB Certified Contractor shall be entitled to expect: (1) that testing, adjusting and
balancing work by the contractor and its TABB Professionals will meet TABB standards; (2) that testing,
adjusting and balancing reports provided to the customer will have been prepared by a TABB Certified
Technician, and reviewed by a TABB Certified Supervisor; and (3) that the report(s) will include
measurements taken accurately with the date and mode of operation of the systems.
TABB
8403 Arlington Boulevard
Fairfax, VA 22031
Phone - (703) 299-5646
Fax - (703) 683-7615
TABB Certified "The Professional's Choice"
Page 3
INSTRUMENT
CALIBRATION REPORT
INSTRUMENT MODEL MANUFACTURER SERIAL NUMBER CALIBRATION
DATE
Rotating Measuring Instrument PLT-5000 Mitchell Instruments B12A8503P 12/02/13
Temperature Measuring Instrument ADM-870C Shortridge M12072 01/21/14
Electrical Measuring Instruments 117 Fluke 18561871 01/15/14
322 Fluke 17830473 01/15/14
Air Pressure Measuring Instrument ADM-870C Shortridge M12072 01/21/14
Air Velocity Measuring Instrument ADM-870C Shortridge M12072 01/21/14
Hydronic Pressure Measuring Instrument HM-670 Alnor 71133088 01/15/14
0 to 300 psi
Humidity Measuring Instrument MITCT917 Mitchell Instruments 100610809 01/20/14
TABB Certified "The Professional's Choice"
Page 4
Premier Test & Balance Index
Project: Dress Barn Premier Job Number: 4152
Technician: Tony Kompelien Report Date: 7/30/14
Page System I Equipment Description Start Date Completion Date
6 RTU-330-1 Constant Air Volume 6/11/14 7130/14
7 RTU 330-1 (Return) Constant Air Volume 6/11/14 7/30/14
8 RTU 330-2 Constant Air Volume 6/11/14 7/30/14
10 RTU 330-2 (Return) Constant Air Volume 6/11/14 7/30/14
12 RTU 330-3 Constant Air Volume 6/11/14 7/30/14
13 RTU 330-3 (Return) Constant Air Volume 6111114 7/30/14
14 EF-1 (Bathroom Exhaust) Constant Air Volume 6111/14 7/30/14
TABB Certified "The Professional's Choice"
Page 5
Premier Test & Balance Air Handling Unit Test Data
Project: Dress Barn
System: RTU-330-1 Premier Job Number: 4152
Technician: Tony Kompelien Completion Date: 7/30/14
System Scheduled Data
Model number: LCH072H4BJ2G Serial number: 5613LO9673
Manufacturer: Lennox Outlet Total CFM: 2,700
Total Design CFM: 2,700 Min.Outside Air CFM: 400
Fan Static Pressure: 1.0 ESP E ui ment Location: Roof
Performance Data
Description Scheduled 1 Submittal Data Actual Field Measurements
Motor HP: 2.00 2.00
Motor RPM: 1755 1755
Motor Hertz: 60 60
Motor Service Factor: 1.15 1.15
Motor Phase: 3 3
Motor Voltage: 460 482 482 482
Motor Amperage: 2.9 2.8 2.8 2.8
Motor BHP: 2.02
Fan RPM: 958
Static Pressure Data
Component Static Pressure Pressure Pressure
In Out Rise 1 Drop Total
Fan: _0.33 0.57 Rise 0.90
Airflow Measurements
Supply Air
Opening Area Size K Design Final Reading Preliminary Reading
No. Served Factor Velocity CFM Velocity CFM % Velocity CFM
1 Safes Flow Hood 1.00 600 600 565 565 94% 405 405
2 Sales Flow Hood 1.00 400 400 394 394 98% 346 346
3 Sales Flow Hood 1.00 340 340 357 357 105% 407 407
4 Sales Flow Hood 1.00 340 340 314 314 92% 392 392
5 Sales Flow Hood 1.00 340 340 343 343 101% 349 349
6 Sales Flow Hood 1.00 340 340 357 357 105% 430 430
7 Sales Flow Hood 1.00 340 340 358 358 105% 363 363
Total 2700 2687 100% 2692
Minimum Outside Air
Size K Design Final Reading Preliminary Reading
Factor Veloc=104 CFM % Velocity CFM
Total 30x19 3.96 101 412 103% 56 222
Remarks: a)
b)
C)
TABB Certified "The Professional's Choice"
Page 6
Premier Test & Balance Air Outlet Test Report
Project: Dress Barn
System: RTU 330-1 (Return) Premier Job Number: 4152
Technician: Tony Kompelien Completion Date: 7/30/14
Airflow Measurements
Opening Area Size K Design Final Reading Preliminary Reading
No. Served Factor Velocity CFM Velocity CFM % Velocity CIFM
1 Sales Flow Hood 1.00 765 765 702 702 92% 738 738
2 Sales Flow Hood 1.00 765 765 749 749 98% 851 851
3 Sales Flow Hood 1.00 765 765 751 751 98% 801 801
Total 2295 2202 96% 2390
Remarks: a)
b)
C)
d)
e)
TABB Certified "The Professional's Choice"
Page 7
Premier Test & Balance Air Handling Unit Test Data
Project: Dress Barn
System: RTU 330-2 Premier Job Number: 4152
Technician: Tony Kompelien Completion Date: 7/30/14
System Scheduled Data
Model number: KCA092H4BK1G Serial number: 5613LO5267
Manufacturer: Lennox Outlet Total CFM: 3,000
Total Design CFM: 3,000 Min.Outside Air CFM: 450
Fan Static Pressure: 1.0 ESP E ui ment Location: Roof
Performance Data
Description Scheduled 1 Submittal Data Actual Field Measurements
Motor HP: 2.00 2.00
Motor RPM: 1755 1755
Motor Hertz: 60 60
Motor Service Factor: 1.15 1.15
Motor Phase: 3 3
Motor Voltage: 460 481 481 481
Motor Amperage: 2.9 2.6 2.6 2.6
Motor BHP: 1.87
Fan RPM: 753
Static Pressure Data
Component Static Pressure Pressure Pressure
In Out Rise 1 Drop Total
Fan: _0.19 0.61 Rise 0.80
Airflow Measurements
Supply Air
Opening Area Size K Desi n Final Reading Preliminary Reading
No. Served Factor Velocity CFM Velocity CFM % Velocity CFM
1 Various Flow Hood 1.00 3000 3000 2959 2959 99% 2977 2977
Total 3000 2959 999/6 2977
Minimum Outside Air
Size K Design Final Reading Preliminary Reading
Factor Veloci CFM Velocity CFM % Velocity CFM
Total 28x23 4.47 101 450 100 447 99% 28 125
Remarks: a) Flow hood totals used for fan total CFM.
b)
C)
d)
e)
TABB Certified "The Professional's Choice"
Page 8
Premier Test & Balance Air Outlet Test Report
Project: Dress Barn
System: RTU 330-2 Premier Job Number: 4152
Technician: Tony Kompelien Completion Date: 7/30/14
Airflow Measurements
Opening Area Size K Design Final Reading Preliminary Reading
No. Served Factor Velocity CFM Velocity CFM % Velocity CFM
1 Flow Hood 1.00 450 450 416 416 92% 415 415
2 Flow Hood 1.00 320 320 297 297 93% 422 422
3 Flow Hood 1.00 320 320 344 344 107% 260 260
4 Flow Hood 1.00 450 450 436 436 97% 335 335
5 Flow Hood 1.00 450 450 432 432 96% 294 294
6 Flow Hood 1.00 150 150 157 157 105% 124 124
7 Flow Hood 1.00 150 150 162 162 108% 121 121
8 Flow Hood 1.00 150 150 155 155 104% 108 108
9 Flow Hood 1.00 80 80 78 78 98% 68 68
10 Flow Hood 1.00 30 30 31 31 102% 69 69
11 Flow Hood 1.00 140 140 146 146 105% 200 200
12 Flow Hood 1.00 70 70 74 74 106% 143 143
13 Flow Hood 1.00 140 140 130 130 93% 158 158
14 Flow Hood 1.00 50 50 47 47 95%0 148 148
15 Flow Hood 1.00 50 50 54 54 108% 112 112
Total 3000 2959 99% 2977
Remarks: a)
b)
C)
d)
e)
TABB Certified "The Professional's Choice"
Page 9
Premier Test & Balance Air Outlet Test Report
Project: Dress Barn
System: RTU 330-2 (Return) Premier Job Number: 4152
Technician: Tony Kompelien Completion Date: 7/30/14
Airflow Measurements
Opening Area Size K Design Final Reading Prelimina Reading
No. Served Factor Velocity CFM Velocity CFM % Veloc' CFM
1 Flow Hood 1.00 850 850 840 840 99% 916 916
2 Flow Hood 1.00 850 850 863 863 101% 898 898
3 Flow Hood 1.00 850 850 802 802 94% 649 649
Total 2550 2505 98% 2462
Remarks: a)
b)
C)
d)
e)
TABB Certified "The Professional's Choice"
Page 10
Premier Test & Balance Air Handling Unit Test Data
Project: Dress Barn
System: RTU 330-3 Premier Job Number: 4152
Technician: Tony Kompelien Completion Date: 7/30/14
System Scheduled Data
Model number: KCA092H4BK1G Serial number: 5613L05269
Manufacturer: Lennox Outlet Total CFM: 3,000
Total Design CFM: 3,000 Min.Outside Air CFM: 450
Fan Static Pressure: 1.0 ESP Equipment Location: Roof
Performance Data
Description Scheduled 1 Submittal Data Actual Field Measurements
Motor HP: 2.00 2.00
Motor RPM: 1755 1755
Motor Hertz: 60 60 .
Motor Service Factor: 1.15 1.15
Motor Phase: 3 3
Motor Voltage: 460 479 479 479
Motor Amperage: 2.9 2.6 2.6 2.6
Motor BHP: 1.87
Fan RPM: 768
Static Pressure Data
Component Static Pressure Pressure Pressure
In Out Rise 1 Drop Total
Fan: _0.24 0.52 Rise 0.76
Airflow Measurements
Supply Air
Opening Area Size K Desi n Final Reading Preliminary Reading
No. Served Factor -Velocity CFM Velocity CFM % Velocity CFM
1 Various Flow Hood 1.00 3000 3000 3125 3125 104% 3275 3275
Total 3000 3125 104% 3275
Minimum Outside Air
Size K Design Final Reading Preliminary Reading
Factor Velocity CFM Velocity CFM % Veloci CFM
Total 28x23 4.47 101 450 99 443 98% 41 183
Remarks: a) Flow hood totals used for fan total CFM.
b)
C)
d)
e)
TABB Certified "The Professional's Choice"
Page 11
Premier Test & Balance Air Outlet Test Report
Project: Dress Barn
System: RTU 330-3 Premier Job Number: 4152
Technician: Tony Kompelien Completion Date: 7/30/14
Airflow Measurements
Opening Area Size K Design Final Reading Preliminary Reading
No. Served Factor Velocity CFM Velocity CFM % Veloci CFM
1 Flow Hood 1.00 400 400 440 440 110% 425 425
2 Flow Hood 1.00 400 400 367 367 92% 438 438
3 Flow Hood 1.00 400 400 396 396 99% 405 405
4 Flow Hood 1.00 585 585 614 614 105% 623 623
5 Flow Hood 1.00 585 585 643 643 110% 631 631
6 Flow Hood 1.00 400 400 435 435 109% 360 360
7 Flow Hood 1.00 50 50 50 50 100% 99 99
8 Flow Hood 1.00 50 50 47 47 95% 103 103
9 Flow Hood 1.00 130 130 132 132 102% 191 191
Total 3000 3125 104% 3275
Remarks: a)
b)
C)
d)
e)
TABB Certified "The Professional's Choice"
Page 12
Premier Test & Balance Air Outlet Test Report
Project: Dress Barn
System: EF-1 (Bathroom Exhaust) Premier Job Number: 4152
Technician: Tony Kompelien Completion Date: 7/30/14
Airflow Measurements
Opening Area Size K Design Final Reading Preliminary Reading
No. Served Factor Velocity CFM Velocity CFM % Velocity CFM
1 Bathroom Flow Hood 1.00 100 100 107 107 107% 107 107
I
Total 100 107 107% 107
Remarks: a) Fan is noisy.
b)
C)
d)
e)
TABB Certified "The Professional's Choice"
Page 14
Technician:
Cell Phone:
Email Address:
Building 1, Suite 1420
West Lake, TX 76262
Report Date
CLIENT
JJJC, LLC
7964 Brooklyn Boulevard, #162
Brooklyn Park, MN 55445
375 230th Ave, Somerset WI 54025 - Phone: (612) 834-0311 Fax: (414) 377-3349
www.Premierbalancing.com
Testing, Adjusting & Balancing Report
TABB TECHNICIAN
Pete Korzenowski
612-834-0311
ENGINEER
DPCE
1301 Solana Boulevard
pete@premierbalancing.com
PROJECT
Columbia - Twin Cities Premium Outlets
3965 Eagan Outlets Parkway
Building 300, Suite 330
Eagan, MN 55122
March 19, 2020
TABB CERTIFICATION
TABB certification of a Supervisor is TABB's statement that the Supervisor is able to
supervise testing, adjusting and balancing of building environmental systems to produce the
design objectives or optimum system performance. For TABB Certification purposes, a
Supervisor is the person who, while employed by a TABB Certified Contractor, is
responsible and accountable for overseeing, coordinating and ensuring that projects are
performed by TABB Certified Technicians in accordance with TABB standards (including the
ICB Code of Conduct and the TAB General Rules).
Measurements recorded in this report are in accordance with the SMACNA / TABB HVAC Systems,
Testing, Adjusting and Balancing manual.
TABB Certified "The Professional's Choice" Page 2
TABB QUALITY ASSURANCE PROGRAM
BACKGROUND
TABB seeks to ensure the integrity of its certification program by: (a) setting eligibility criteria for TABB
Certified Supervisors and TABB Certified Contractors, (b) establishing testing procedures for TABB
Certified Supervisors, (c) requiring continuing education and continuous compliance with eligibility criteria
for renewal of certification, and (d) periodically reviewing its recognition of technician certification. High
quality work on the part of TABB Certified Technicians and TABB Certified Supervisors and TABB Certified
Contractors ( TABB Professionals ) is essential to integrity of the TABB Certification Program. TABB offers
this TABB Quality Assurance Program to help assure high quality work. By accepting TABB qualification or
certification, every TABB Professional accepts the responsibilities or this Program.
Quality Assurance
Every customer of a TABB Certified Contractor shall be entitled to expect: (1) that testing, adjusting and
balancing work by the contractor and its TABB Professionals will meet TABB standards; (2) that testing,
adjusting and balancing reports provided to the customer will have been prepared by a TABB Certified
Technician, and reviewed by a TABB Certified Supervisor; and (3) that the report(s) will include
measurements taken accurately with the date and mode of operation of the systems.
TABB
8403 Arlington Boulevard
Fairfax, VA 22031
Phone - (703) 299-5646
Fax - (703) 683-7615
TABB Certified "The Professional's Choice" Page 3
INSTRUMENT
CALIBRATION REPORT
Rotating Measuring Instrument
Temperature Measuring Instrument
Temperature Measuring Probe
Electrical Measuring Instruments
Air Pressure Measuring Instrument
Air Velocity Measuring Instrument
Hydronic Pressure Measuring Instrument
0 to 300 psi
HM70 Vaisala M4820017 11/13/19
HMP75 Vaisala M5040569 11/13/19
INSTRUMENT MODEL MANUFACTURER SERIAL NUMBER CALIBRATION
DATE
PLT-5000 Check-Line B15985012P 10/25/19
322 Fluke 17830473 10/25/19
117 Fluke 18561871 10/25/19
ADM-870C Shortridge M12418 10/25/19
ADM-870C Shortridge M12418 10/25/19
HM-675 Alnor 71550125 10/28/19
TABB Certified "The Professional's Choice" Page 4
Index
Project:Columbia - Twin Cities Premium Outlets Premier Job Number:
Pete Korzenowski Report Date:
Page
6-7 Existing RTU-1 Constant Air Volume
8-9 Existing RTU-2 Constant Air Volume
10-11 Existing RTU-3 Constant Air Volume
12 Existing EF-1 Constant Air Volume
Premier Test & Balance
3203
System / Equipment Description Completion Date
Technician:3/19/20
3/17/20
3/17/20
3/17/20
3/17/20
TABB Certified "The Professional's Choice" Page 5
Air Handling Unit Test Data
Project:Columbia - Twin Cities Premium Outlets
System:Existing RTU-1 Premier Job Number:
Pete Korzenowski Completion Date:
Equipment Location:
Motor HP:2.00 2.00
Motor RPM:1750 1750
Motor Hertz:60.0 60.0
Motor Service Factor:1.15 1.15
Motor Phase:3 3
Motor Voltage:460 470 471 470
Motor Amperage:2.9 2.2 2.3 2.1
Motor BHP:-1.55
Fan:
Supply Air
Opening Size K
No.Factor Velocity CFM Velocity CFM %Velocity CFM
1 18"1.77 1004 1775 1050 1856 105%1050 1856
2 18"1.77 693 1225 754 1332 109%754 1332
Total 3000 3188 106%3188
Minimum Outside Air
Size K
Factor Velocity CFM Velocity CFM %Velocity CFM
28x22.5 4.38 143 625 134 586 94%134 586
Remarks:a)
b)
c)
d)
Area Design Final Reading
Served
Various
Various
Design Final Reading
Total
In Out
-0.21 0.27
Performance Data
Description Scheduled / Submittal Data Actual Field Measurements
Static Pressure Data
Component Static Pressure (inches of water)
5613L09673
Manufacturer:Lennox Outlet Total CFM: 3,000
Total Design CFM:3,000 Min.Outside Air CFM: 625
Fan Static Pressure:0.75 Roof
Technician:3/17/20
3203
Premier Test & Balance
System Scheduled Data
Model number: LCH072H4BJ2G Serial number:
Rise 0.48
Pressure Pressure
Rise / Drop Total (inches)
Airflow Measurements
Preliminary Reading
Preliminary Reading
TABB Certified "The Professional's Choice" Page 6
Air Outlet Test Report
Project:Columbia - Twin Cities Premium Outlets
System:Existing RTU-1 Premier Job Number:
Pete Korzenowski Completion Date:
Opening Size K
No.Factor Velocity CFM Velocity CFM %Velocity CFM
1 Flow Hood 1.00 300 300 278 278 93%167 167
2 11x5 0.38 458 175 423 162 92%599 229
3 11x5 0.38 458 175 445 170 97%621 237
4 11x5 0.38 589 225 546 209 93%607 232
5 11x5 0.38 589 225 552 211 94%587 224
6 11x5 0.38 589 225 576 220 98%467 178
7 11x5 0.38 589 225 612 234 104%512 196
8 11x5 0.38 589 225 589 225 100%532 203
9 11x5 0.38 589 225 557 213 95%547 209
10 11x5 0.38 589 225 586 224 99%576 220
11 11x5 0.38 589 225 608 232 103%598 228
12 11x5 0.38 589 225 599 229 102%567 217
13 11x5 0.38 589 225 612 234 104%576 220
14 6"0.20 500 100 465 93 93%326 65
Total 3000 2932 98%2825
Remarks:a)
b)
c)
d)
e)
100
100
100
100
100
100
100
100
Storefront
Technician:3/17/20
Airflow Measurements
Area Design Final Reading Preliminary Reading
Served
105
103
103
100
100
Premier Test & Balance
3203
TABB Certified "The Professional's Choice" Page 7
Air Handling Unit Test Data
Project:Columbia - Twin Cities Premium Outlets
System:Existing RTU-2 Premier Job Number:
Pete Korzenowski Completion Date:
Equipment Location:
Motor HP:2.00 2.00
Motor RPM:1750 1750
Motor Hertz:60.0 60.0
Motor Service Factor:1.15 1.15
Motor Phase:3 3
Motor Voltage:480 472 470 470
Motor Amperage:2.9 2.4 2.4 2.5
Motor BHP:-1.65
Fan:
Supply Air
Opening Size K
No.Factor Velocity CFM Velocity CFM %Velocity CFM
1 18"1.77 849 1500 908 1605 107%908 1605
2 18"1.77 849 1500 934 1651 110%934 1651
Total 3000 3255 109%3255
Minimum Outside Air
Size K
Factor Velocity CFM Velocity CFM %Velocity CFM
28x22.5 4.38 142 620 133 582 94%133 582
Remarks:a)
b)
c)
d)
Served
Various
Various
Design Final Reading Preliminary Reading
Total
Airflow Measurements
Area Design Final Reading Preliminary Reading
In Out Rise / Drop Total (inches)
-0.16 0.32 Rise 0.48
Performance Data
Description Scheduled / Submittal Data Actual Field Measurements
Static Pressure Data
Component Static Pressure (inches of water)Pressure Pressure
Manufacturer:Lennox Outlet Total CFM: 3,000
Total Design CFM:3,000 Min.Outside Air CFM: 620
Fan Static Pressure:0.75 Roof
Premier Test & Balance
3203
Technician:3/17/20
System Scheduled Data
Model number: KCA092 Serial number: 5613L05267
TABB Certified "The Professional's Choice" Page 8
Air Outlet Test Report
Project:Columbia - Twin Cities Premium Outlets
System:Existing RTU-2 Premier Job Number:
Pete Korzenowski Completion Date:
Opening Size K
No.Factor Velocity CFM Velocity CFM %Velocity CFM
1 11x5 0.38 655 250 709 271 108%845 323
2 11x5 0.38 655 250 697 266 106%809 309
3 Flow Hood 1.00 150 150 140 140 93%124 124
4 Flow Hood 1.00 150 150 159 159 106%133 133
5 Flow Hood 1.00 100 100 92 92 92%67 67
6 Flow Hood 1.00 100 100 92 92 92%70 70
7 11x5 0.38 655 250 677 259 103%623 238
8 11x5 0.38 655 250 689 263 105%600 229
9 11x5 0.38 655 250 700 267 107%587 224
10 11x5 0.38 655 250 678 259 104%866 331
11 11x5 0.38 655 250 657 251 100%798 305
12 11x5 0.38 655 250 690 264 105%700 267
13 11x5 0.38 655 250 689 263 105%812 310
14 11x5 0.38 655 250 709 271 108%809 309
Total 3000 3117 104%3239
Remarks:a)
b)
c)
d)
e)
100
100
100
100
100
Airflow Measurements
Area Design Final Reading Preliminary Reading
Served
103
103
102
102
102
102
100
100
100
Premier Test & Balance
3203
Technician:3/17/20
TABB Certified "The Professional's Choice" Page 9
Air Handling Unit Test Data
Project:Columbia - Twin Cities Premium Outlets
System:Existing RTU-3 Premier Job Number:
Pete Korzenowski Completion Date:
Equipment Location:
Motor HP:2.00 2.00
Motor RPM:1755 1755
Motor Hertz:60.0 60.0
Motor Service Factor:1.15 1.15
Motor Phase:1 1
Motor Voltage:480 470
Motor Amperage:2.9 2.0
Motor BHP:-1.35
Fan:
Supply Air
Opening Size K
No.Factor Velocity CFM Velocity CFM %Velocity CFM
1 18"1.77 736 1300 798 1410 108%798 1410
2 18"1.77 622 1100 674 1191 108%674 1191
Total 2400 2601 108%2601
Minimum Outside Air
Size K
Factor Velocity CFM Velocity CFM %Velocity CFM
28x22.5 4.38 143 625 _____#VALUE!#VALUE!_____#VALUE!
Remarks:a)
b)
c)
d)
Served
Various
Various
Design Final Reading Preliminary Reading
Total
Airflow Measurements
Area Design Final Reading Preliminary Reading
In Out Rise / Drop Total (inches)
-0.16 0.29 Rise 0.45
Performance Data
Description Scheduled / Submittal Data Actual Field Measurements
Static Pressure Data
Component Static Pressure (inches of water)Pressure Pressure
Manufacturer:Lennox Outlet Total CFM: 2,400
Total Design CFM:2,400 Min.Outside Air CFM: 625
Fan Static Pressure:0.75 Roof
Technician:3/17/20
System Scheduled Data
Model number: KCA092H4BK1G Serial number: 5613L05269
Premier Test & Balance
3203
TABB Certified "The Professional's Choice" Page 10
Air Outlet Test Report
Project:Columbia - Twin Cities Premium Outlets
System:Existing RTU-3 Premier Job Number:
Pete Korzenowski Completion Date:
Opening Size K
No.Factor Velocity CFM Velocity CFM %Velocity CFM
1 11x5 0.38 393 150 428 163 109%546 209
2 11x5 0.38 393 150 412 157 105%552 211
3 11x5 0.38 524 200 568 217 108%521 199
4 11x5 0.38 524 200 572 218 109%536 205
5 11x5 0.38 524 200 556 212 106%548 209
6 11x5 0.38 524 200 578 221 110%564 215
7 11x5 0.38 524 200 532 203 102%521 199
8 11x5 0.38 524 200 545 208 104%513 196
9 11x5 0.38 524 200 566 216 108%557 213
10 11x5 0.38 524 200 525 201 100%576 220
11 11x5 0.38 524 200 562 215 107%535 204
12 11x5 0.38 524 200 521 199 99%557 213
13 6"0.20 500 100 465 93 93%324 65
Total 2400 2524 105%2557
Remarks:a)
b)
c)
d)
e)
100
100
100
Storefront
Airflow Measurements
Area Design Final Reading Preliminary Reading
Served
103
103
100
100
100
100
100
100
100
Premier Test & Balance
3203
Technician:3/17/20
TABB Certified "The Professional's Choice" Page 11
Air Outlet Test Report
Project:Columbia - Twin Cities Premium Outlets
System:Existing EF-1 Premier Job Number:
Pete Korzenowski Completion Date:
Opening Size K
No.Factor Velocity CFM Velocity CFM %Velocity CFM
1 Flow Hood 1.00 75 75 73 73 97%73 73
Total 75 73 97%73
Remarks:a)
b)
c)
d)
e)
Technician:3/17/20
Airflow Measurements
Area Design Final Reading Preliminary Reading
Served
Toilet
Premier Test & Balance
3203
TABB Certified "The Professional's Choice" Page 12