Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
3965 Eagan Outlets Pkwy Unit 415 - Crocs - Testing & Balancing Report
..y 375 230th Ave, Somerset WI 54025 - Phone: (612) 834-0311 Fax: (414) 377-3349 www.Premierbalancing.com n"NO,A0JU TWG AND BAS ANCINO BOR-AU THE PROFVAIIO GAL'S CHOICE- Testing, Adjusting & Balancing Report TABB TECHNICIAN Technician: Tony Kompelien Cell Phone: 612419-1425 Email Address: tony@premierbalancing.com PROJECT Croc's 3965 Eagan Outlets Parkway Suite 415 CLIENT Allan Mechanical Contractors 7875 Fuller Road Eden Prairie, MN 55344 ENGINEER Dunham Associates 50 South Sixth Street Suite 1100 Minneapolis, MN 55402-1540 Report Date July 15, 2014 TABB CERTIFICATION TABB certification of a Supervisor is TABB's statement that the Supervisor is able to supervise testing, adjusting and balancing of building environmental systems to produce the design objectives or optimum system performance. For TABB Certification purposes, a Supervisor is the person who, while employed by a TABB Certified Contractor, is responsible and accountable for overseeing, coordinating and ensuring that projects are performed by TABB Certified Technicians in accordance with TABB standards (including the ICB Code of Conduct and the TAB General Rules). Measurements recorded in this report are in accordance with the SMACNA 1 TABB HVAC Systems, Testing, Adjusting and Balancing manual. ANSI ANSI Anthony Kompelien Anthony Kompelien TALU're~r ic!a. BE -.u visor 688752247 TB8752285. ©~ia=,a<>r : r 1<: Ds er i 31.20 14 ed Tech~'~~~'d SuPe & BBL Meter Korzenowski TB0458712C Supervisor 00728 No id Unless Sign Exp.12(31120i4 TABB Certified "The Professional's Choice" Page 2 TABB QUALITY ASSURANCE PROGRAM BACKGROUND TABB seeks to ensure the integrity of its certification program by: (a) setting eligibility criteria for TABB Certified Supervisors and TABB Certified Contractors, (b) establishing testing procedures for TABB Certified Supervisors, (c) requiring continuing education and continuous compliance with eligibility criteria for renewal of certification, and (d) periodically reviewing its recognition of technician certification. High quality work on the part of TABB Certified Technicians and TABB Certified Supervisors and TABB Certified Contractors ( TABB Professionals ) is essential to integrity of the TABB Certification Program. TABB offers this TABB Quality Assurance Program to help assure high quality work. By accepting TABB qualification or certification, every TABB Professional accepts the responsibilities or this Program. Quality Assurance Every customer of a TABB Certified Contractor shall be entitled to expect: (1) that testing, adjusting and balancing work by the contractor and its TABB Professionals will meet TABB standards; (2) that testing, adjusting and balancing reports provided to the customer will have been prepared by a TABB Certified Technician, and reviewed by a TABB Certified Supervisor; and (3) that the report(s) will include measurements taken accurately with the date and mode of operation of the systems. TABB 8403 Arlington Boulevard Fairfax, VA 22031 Phone-(703)299-5646 Fax-(703)683-7615 TABB Certified "The Professional's Choice" Page 3 INSTRUMENT CALIBRATION REPORT INSTRUMENT MODEL MANUFACTURER SERIAL NUMBER CALIBRATION DATE Rotating Measuring Instrument PLT-5000 Mitchell Instruments 1312A8503P 12/02/13 Temperature Measuring Instrument ADM-870C Shortridge M12072 01/21/14 Electrical Measuring Instruments 117 Fluke 18561871 01/15/14 322 Fluke 17830473 01/15/14 Air Pressure Measuring Instrument ADM-870C Shortridge M12072 01/21/14 Air Velocity Measuring Instrument ADM-870C Shortridge M12072 01/21/14 Hydronic Pressure Measuring Instrument HM-670 Alnor 71133088 01/15/14 0 to 300 psi Humidity Measuring Instrument MITCT917 Mitchell Instruments 100610809 01/20/14 TABB Certified "The Professional's Choice" Page 4 Premier Test & Balance Index Project: Croc's Premier Job Number: 1233 Technician: Tony Kompelien Report Date: 7/15/14 Page System 1 Equipment Description Start Date Completion Date 6 RTU 415-1 Constant Air Volume 6/5/14 7115/14 7 RTU 415-1 (Supply) Constant Air Volume 6/5/14 7/15/14 8 RTU 415-1 (Return) Constant Air Volume 6/5/14 7/15/14 9 EF-1 (Bathroom) Constant Air Volume 6/5/14 7/15114 TABB Certified "The Professional's Choice" Page 5 Premier Test & Balance Air Handling Unit Test Data Project: Croc's System: RTU 415-1 Premier Job Number: 1233 Technician: Tony Kompelien Completion Date: 7/15/14 System Scheduled Data Model number: LCH072H4BJ2G Serial number: 5613L09682 Manufacturer: Lennox Outlet Total CFM: 2,400 Total Design CFM: 2,400 Min.Outside Air CFM: 395 Fan Static Pressure: 0.75 Equipment Location: Roof Performance Data Description Scheduled 1 Submittal Data Actual Field Measurements Motor HP: 2.00 2.00 Motor RPM: 1755 1755 Motor Hertz: 60 60 Motor Service Factor: 1.15 1.15 Motor Phase. 3 3 Motor Voltage: 460 474 474 474 Motor Amperage: 2.9 2.5 2.6 2.4 Motor BHP: 1.78 Fan RPM: 751 Static Pressure Data Component Static Pressure Pressure Pressure In Out Rise / Drop Total Fan: -0.16 0.51 Rise 0.67 Airflow Measurements Su I Air Opening Area Size K Design Final Reading Preliminary Reading No. Served Factor Velocity CFM Velocity CFM % Velocity CFM 1 Various 20" 2.18 1100 2400 1156 2522 105% 1541 3362 Total 2400 2522 105% 3362 Minimum Outside Air Size K Desi n Final Reading Preliminary Reading Factor Velocity CFM Velocity CFM % Velocity CFM Total 30X19 3.96 100 395 103 408 103% 27 107 Remarks: a) b) C) d) e) TABB Certified "The Professional's Choice" Page 6 Premier Test & Balance Air Outlet Test Report Project: Croc's System: RTU 415-1 (Supply) Premier Job Number: 1233 Technician: Tony Kompelien Completion Date: 7/15/14 Airflow Measurements Opening Area Size K Design Final Reading Preliminary Reading No. Served Factor Velocity CFM Velocity CFM % Velocity CFM 1 Store 12" 0.79 570 450 586 463 103% 477 377 2 Store 12" 0.79 601 475 621 490 103% 578 457 3 Store 12" 0.79 601 475 633 500 105% 648 512 4 Store 12" 0.79 633 500 677 535 107% 656 518 5 Store 12" 0.79 633 500 610 482 96% 662 523 Total 2400 2470 103% 2386 Remarks: a) b) C) d) e) TABB Certified "The Professional's Choice" Page 7 Premier Test & Balance Air Outlet Test Report Project: Croc's System: RTU 415-1 (Return) Premier Job Number: 1233 Technician: Tony Kompelien Completion Date: 7/15/14 Airflow Measurements Opening Area Size K Design Final Reading Preliminary Reading No. Served Factor Velocity CFM r4l CFM % Velocity CFM 1 Store 11x9 0.69 545 375 359 96% 438 301 2 Store 17x29 3.42 475 1625 1592 11% 517 1768 Total 2000 1951 98% 2069 Remarks: a) b) C) d) e) TABB Certified "The Professional's Choice" Page 8 Premier Test & Balance Fan Test Data Project: Croc's System: EF-1 (Bathroom) Premier Job Number: 1233 Technician: Tony Kompelien Completion Date: 7/15/14 System Scheduled Data Model number: SP-B110 Serial number: 13374722 Manufacturer: Greenheck Outlet Total CFM: 100 Total DesignCFM: 100 Equipment Location: Restroom Fan Static Pressure: .25 ESP Performance Data Description Scheduled 1 Submittal Data Actual Field Measurements Motor HP: 0.15 0.15 Motor RPM 950 950 Motor Hertz: 60 60 Motor Service Factor: 1.15 1.15 Motor Phase: 1 1 Motor Voltage: 115 115 Motor Amperage: 1.0 0.7 Motor BHP: 0.10 Fan RPM: 950` Direct Drive Static Pressure Data Component Static Pressure Pressure Pressure In Out Rise 1 Drop Total Fan -0.01 0.15 Rise 0.16 Airflow Measurements Fan Total Opening Area Size K Design Final Reading Prelimina Reading No. Served Factor Velocity CFM Velocity CFM % Velocity CFM 1 Bathroom Flow Hood 1.00 100 100 121 121 121% 121 121 Total E100 121 121% 121 Remarks: a) No speed control - no problems anticipated. b) C) d) e) TABB Certified "The Professional's Choice" Page 9