Loading...
11/12/2014 - City Council SpecialSPECIAL CITY COUNCIL MEETING TUESDAY NOVEMBER 12, 2014 5:30 P.M. EAGAN ROOM — EAGAN MUNICIPAL CENTER AGENDA I. ROLL CALL AND ADOPTION OF THE AGENDA II. VISITORS TO BE HEARD III. CANVAS ELECTION RESULTS IV. JOINT MEETING WITH THE APrC a) APrC Highlights b) Parks and Recreation CIP V. OLD TOWN HALL REVISED OPTIONS VI. CABLE FRANCHISE UPDATE VII. 2015 E -TV BUDGET VIII. OTHER BUSINESS IX. ADJOURNMENT Agenda Information Memo November 12, 2014 Special City Council Workshop III. CANVASS ELECTION RESULTS Action To Be Considered: To certify the results of the November 4, 2014 Mayor and City Council Election. Facts: ➢ Minnesota Statute 205.185 Subd. 3 requires the governing body of a city to certify its election results between the third and tenth day after an election. ➢ The results for the Mayor race: Mike Maguire 18,680 votes 97.69% Write -Ins 441 votes 2.31% ➢ The results for the City Council race: Gale Anderson 8,705 votes 25.04% Dave Meyer 5,534 votes 15.92% Paul Bakken 11,366 votes 32.70% Gary Hansen 8,967 votes 25.80% Write -Ins 190 votes 0.55% ➢ Minnesota Statute 204C.36 states that a losing candidate for a municipal election may request a publicly funded recount if the difference between the votes cast for the winning candidate and the losing candidate is less than 0.5 %. ➢ The difference between the votes cast for Mr. Anderson and Mr. Hansen is 0.76°/x, thus the threshold for a publicly funded recount has not been met. Within seven days after the election results are certified, a losing candidate may request a recount. When the difference between the votes cast for the losing candidate and the winning candidate is greater than 0.5 %, the candidate who requests the recount is responsible for the City's recount expenses. Attachments: (1) III -1 Mayor and City Council Election Abstract % ]/ E w ¥@ § —0 e¥ ) -o s ° °2Df § )-o e oo - -z E E 7#0ro ƒ @ n §mo 7 § o < � \ \CD 0 �� (n ro V V O O O N m (6 N N O d' rn M O O N C a U l` Q c 0 U N W E2 N C N 0 N V/ (6 t° c U) F0 m d mo O W N E O � 21' N � U U a E N O Z T (0 N H O O 0) O O c0 C2 N M O r M cp � N 0 m 0- a ro C V V O O) tt O N _0 N N N O) MM O O C .Q U V1 .O Q 0 m 9 cc E c c6 N O m N N C N N co co N (6 N N T � N N > O C -O N O C N O O N O W C f0 O — N N N O O N (D O _ C N O N C O - > O) 0 m (n Q) N @ CO O O y O C N C C n � O -0 V N N N _a Vl N 00 0 O_ N O_ f6 c1. N O O O O O 7 E E E E E Z Z Z Z Z H 0 m 0- a ro C V V O O) tt O N _0 N N N O) MM O O C .Q U V1 .O Q Z W F- r Z U` oOo m a� w Of c Q) O fn N N z Y @cam Q Y ~ rn� r m owN Q J C cu v QCO M E : o a— z�r° zd� N =3 N E 0 m 0 z c w T m -a x w (D Z w 2 w F W � U v d Q LO z M U') I cu 0) w a Z w Of O fn D N ry W N Q m Z r W Q n W oo v W Lo z a— z�r° -0) zo0, w z m E o c w O O C T c6 � U I cu 0) w a y O) to O m 7 W M N m m � m V r O V O M (O m O O O M M m m O m 00 of m t0 N M O O m N W (n O m O s r to to N M r- N O N r h Ln t- m m 00 r N m N M N O - r- a- - - .- - - - .- - - - r - (0 .0 > N E m 7 C Z O m y o n. f- 4) m a 'O T 0 m V (O to m O <t (n m M N W LO M m (D N M m (0 W O O M w to to N cp m m (O CO CO m O CD m ¢ .-- - r- O ¢ (D O O N M B1.0 d O m M h � N O O O L? � W I? O O c C = y O m O N a w m N C O 'O 0) r2 M r 't � M m V (n V m Co r- N (o t` M N N a0 O m O O N to Co W O M to O V m O y r a r m M CO O N N N N .W N N a0 V N �M W O 3 N N h z z V z z z z z z z z z z 0 (O O C z 0 'v W N O V `N 0 o i 0 > 0 N p, N O 0 E E 0 z T (0 O ¢ ¢ ¢ ¢ N (1) ¢ ¢ ¢ ¢ 7 F ¢ ¢ ¢ ¢ 4) m a N M 7 ¢ m ¢ m r- O ¢ m O N M ct m M h O O O O L? L? I? O O O m m z z z z z z z z z z z z z z z z z z z z 0 ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ w w w w w w w w w w w w w w w w w w w w a, v o 0 0 0 o to O to 0 0 0 m 0 0_ 0 0 0 0 0 o w C N M V t0 to M (O t.- w m m O N M V to m ti 'U r r t` t� ti r r r O o0 W 00 a0 W 00 W O m m m m m m m m m m m m m m m m m m m m U 4) m a C O > Ln O O M N M 00 N M 'Cl- LD M LO N M LO (D M 7 U > z N N N N 0) — m W w H (6 O a O a m � Ln m Lf) d CO a CO a O a O a a) m c O d m N_ c M h V a Ln m m a aD U) Z a a Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w a� Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w F C Od o_ rn 0 N rn 0 M rn 0 V rn 0 LO rn LO M r rn 0 Co � rn LO (D h rn 0 I- r rn 0 W r rn 0 M r- rn M n rn 0 O co rn 0_ M rn co 0 M 00 rn 0 V M rn 0 M W rn 0 M 00 rn 0 r- W .. rn F 0 m o �W(V O d W O M z of h r M co O _ ti O M N M r 0) N LO CO LC) f.- n 00 In CO M () N M N O O 00 0) CO O O 00 W �, p Cl) Q) m O M N N O Ln Ln (D (D N 0) 00 O d) W cu -a) E Y_ o Z m Ln D H c m (6 O a O a O m O d Ln m Lf) d CO a CO a O a O a a) m O) m O d m N_ c M h V a Ln m m a O Z a a Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w Z a a w F C Od o_ rn 0 N rn 0 M rn 0 V rn 0 LO rn LO M r rn 0 Co � rn LO (D h rn 0 I- r rn 0 W r rn 0 M r- rn M n rn 0 O co rn 0_ M rn 0 N 00 rn 0 M 00 rn 0 V M rn 0 M W rn 0 M 00 rn 0 r- W .. rn F `I Q) rn m a : M M h O m r'- M m m O LO In (D M W h V O O Z N N m w N � N � r` w 7 �'- V 7 V LO 'ct M .- W V N N N M (O LO M In V 01 co Z H 2 } ryQ a> m a d Z Z W N m 00 h O V CO N m m m r` V N M m m M 00 m LO N O (O r O O N O N N m w N � N � r` w �'- V V V LO 'ct M LO m V N N N M (O LO M In V 01 co Z 2 } ryQ Q C7 d Z Z W m M CO "I O r- N LO m � V (O V r` r` O LO � r N m O LO O N w O V M N m O 00 O d' 0 O Y N LO LO LO m LO V m r W (O M M Cl) V r` LO LO r-. (0 M Y a � m J 7 Q a c O U d Q_' Z W M N CO r` m V O M LO O 00 O LO M LO LO r- m M W O r` lL7 00 m r h O h co LO r-- m V O LO V a M N } Cl) N Cl) Cl) N N Cl) co Cl) Cl) .- M N N V N LO LO W � 0) W O �rU) c m omo 0 W N d Z Z Q N CO M m m LO O r M 00 LO V N L_ CO r- m _ P- (O LO m O 00 m m LO (O M N r` LO O W T p U LO V V (O 7 Cl) LO LO N lO N M N N LO CO CO LO CO h p :Ll N fl� O - co W 0 a� D Q aa) > O W J Q Z (D T N a N 7 H N U N W C N 0) N w N E O N O M O V O Q Ln m Ln Q (0 m (O r O w O Q m m m O N M d' LO m h n a a a d a a a a a a a a d d d ri d d d L) o Z Q Z Q Z a Z Q Z Q Z a Z Q Z Q Z Q Z Q Z a Z a Z Q Z Q Z a Z a Z Q Z Q Z a Z Q a Q Q a a a Q a a Q Q a a a Q a Q a Q Q w w w w w w w w w w w w w w w w w w w w C 0 0 N 0 M 0 V 0 m LO LO o w LO m 0 r 0 W 0 m Ln m 0 O 0 0 N 0 M 0 V 0 LO 0 w 0 r- r- �_ �_ �_ P- �_ t- �_ � n_ r-- OD a_o 00 00 00 00 00 00 O a °� m m m .2 m T m m m m m m m m m m m m m m m o I- a> m a c f0 N N N >� N U N d L N N O 0 >Z o _ m E N > j c � m c L O N L �C O O> U �W C >_ t N N U C d N N0 c d N (p Q N 0 N O N E m m C C N O L 'O .. N N O 'V C O O 0-1 N N C 7 N C L U f6 CD > N (6 M L C 3 m is v L C e+ � r O U O > Ww O O L � m N C L N E (p C >c C U � N C O N U O_ O N !d. > w m _ L N -O C C U N ( _ C O 0 O D)'O -22 y O N � U O C (6 O) f6 W � O N U N L O U O N L c o (D @ w� 0 rn c E N O C � L f6 �O C NO O mU (6 O N CL N O "O N w- O N C � C T "O C O U d a� w L_ C C O N U C U N O_ C O _ U f6 N N N 7 y N w- O) O N N E -� O (D j O N V1 N C N CL O- Y f6 � QU 0) (6 U O N E N V O E N 16 C U O E N U., O M C U O N E U m O m N > co U O N E N 2 U c4 d a m C Q 0 N V I O) O C_Z O T cn @ d .O O N a 7 C � @ C C O L_ a -C CD @ C w O yW U — T @ M N N C N s0 0.2 a,s C O) d w O N — N O C c UW m- £ O a Z' YU G) (D Uw -.c O N a o I C N 7 Y N N U a TE C O @ w U O N �p y N Q @ @ �U C O a O C @ y @ w a @ o c c t C @ T T _ m o E W O O w N N O i N � � C cq U — 0 ;� N m d Agenda Information Memo November 12, 2014, Eagan City Council Meeting INFORMATIVE MEMO IV. -A 2013 -2014 Advisory Parks And Recreation Commission (APrC) 2013 -2014 Highlights And 2014 -2015 Continuing Projects. Information To Be Discussed: 2013 -2014 Advisory Parks and Recreation Commission (APrC) 2013 -2014 highlights and 2014 -2015 continuing projects. Information update for the City Council no formal action needed. 2013 -2014 APrC Highlights: ➢ Reviewed and recommended 2014 Parks & Recreation Fees & Charges, Park Dedication Fees and Trail Dedication Fees. ➢ Reviewed Playground selection and design process and criteria. ➢ Conducted joint meeting with Energy and Environment Commission to review Complete Streets initiatives, Safe Routes to School initiatives and filling of trail gaps within the City. Provided recommendations for naming new park (Bridgeview Park) in the Cedar Grove area. ➢ Construction was completed of Bridgeview Park. ➢ Reviewed and provided comments to Dakota County for the Eagan portion of proposed Minnesota River Greenway. ➢ Received a staff update concerning efforts to add healthier options to concessions at the Eagan Community Center. ➢ Conducted a workshop to kick -off Arts Visioning process with representatives from Caponi Art Park, Eagan Theater and the Eagan Art Festival Board. Steering committee was created with representatives from each group. A draft Arts Vision document will be presented to the APrC at their November 17, 2014 meeting. An APrC committee met with staff to review current recreation programs and services along with demographic information. Work will continue as the Park System Plan is updated in 2015. ➢ Completed a master plan for addition to Moonshine Park. Developed a list of proposed park development projects for inclusion in the 2015 CIP. Continuing Projects 2014 -2015: Arts Visioning Project — Draft document to be presented for review at November meeting. ➢ Park System Plan Update — APrC to work with consultant to gather public input and recommend updates to the Park System Plan. Updates may include components from prior APrC work plans: o Updating park facilities to address aging infrastructure while meeting changing demographic and recreational needs of the community. • Active Living Infrastructure — Complete Streets and Connected Trails • Concepts from Healthy Eating and Active Living resolution passed by the City Council in 2012 • Researching community interest, need and feasibility of additional facilities. ➢ Development Review for Park Dedication, Trail Dedication, Tree Preservation and Water Quality requirements. y Recommendation of Parks & Recreation Fees & Charges, Park Dedication Fees and Trail Dedication Fees. Attachments: (0) Agenda Information Memo November 12, 2014, Eagan City Council Meeting CONSENT AGENDA IV.B Approve The 2015 Parks And Recreation Capital Improvements Program Action To Be Considered: To approve the 2015 Parks and Recreation Department CIP for park improvements. Facts: The Advisory Parks Commission (APrC) has prepared and updated CIP for the years 2015 -2019. The CIP is consistent with the goals of the 20/20 Vision Plan and existing master plans. ➢ At their meeting on September 15, 2014, the APrC took formal action to recommend specific approval of the 2015 CIP projects with the years 2016 -2019 considered as preliminary and subject to change. ➢ Funding for the CIP has historically come from the Park Site Fund (PSF), which is primarily money collected from developments at the time of platting in lieu of land dedication. Starting with the 2012 budget the City Council designated a $400,000 annual allocation to fund what is now called the Park Systems Development and Renewal and Replacement Fund. ➢ Proposed 2015 CIP Projects: o Moonshine Park Phase II Improvements /$250,000 - Implementation of the park improvement master plan developed for the new park property acquired through dedication on the south shore of LeMay Lake. o Thresher Fields Drainage System Phase 11/$85,000 - Installation of a sub- surface drainage system to help alleviate water issues on south fields, expanding the north field drainage system installed in 2014. o Rahn Park Electrical Upgrades /$50,000 - Installation of electrical service for maintenance and user needs, and any future scoreboards on Rahn Park baseball field #1 and other Rahn Park athletic fields TBD. o Community Center Entrance Signage Upgrade /$25,000 - Replace and upgrade the entrance signage at the Community Center primary entrances. o Heine Pond Park Fishing Pier Installation /$40,000 - Install a floating, accessible fishing pier on Heine Pond. o Park Master Plan Update /$45,000 - Analyze, update and combine the 20/20 Vision Plan and the 1994 Park Systems Plan into a singular planning document. • Playground Installation @ sites TBD /$75,000 - Continuation of the ongoing program of playground replacement. Playgrounds are replaced on a rotational basis or as determined by inspections. Determinations are generally made in the spring. • Small Projects @ site TBD /$35,000 -Continuation of funding for special needs, partnerships, grant matches and small unanticipated projects that become necessary or apparent during the course of the year. Estimated total 2015 expenditure from Park Site Fund = $605,000 Attachments: (3) IV.B -1 2015 -2019 Capital Improvements Projects Budget Sheets IV.B -2 2015 -2019 Capital Improvement Projects Summary Sheet IV.B -3 Project Photos 4 C O E cv O. O C O :N O U O 06 ca CL N c U O O CL C O E O O � 0 O O Q N LO � O Q N ca U c +J 0 CL cd c co O U- L, co U c-I O N Of CD 0 N O N a U nD a [O U Q In a (O C d co u al d d 0 O O O p O pO_ O O O 0 O CDCDC)oo p p O 0 cyi Lo C) HOO VH i d p M coo p0 00 LO O t O 00 lzt O N LO CO rl rI be N �r-1 O .q M tR + O y�} N M N U C + C co m m O > J 0 (,3 II j U ~ U 'cj C O U 0 O p CD rl c LLJ a) m (C) O N o N taA p O L Ci0 rz O U � � O L c O N E C c-I ~ O "p O cu N c6 M c f{} O 1 N E to m '+D E cn N w In w N U w U [� w O g W m CV t�0 C w U) LL 0 w M w 0 UL M LL 0 w 0 LL- M LL N O U O O O O O O O O O Q) O O O O O O O O O � O CN Lf� co O Lo Ln N O lzt L6 d L6 I` Ln m LO O "4 Z � 'U., cn w co o 0 C Q) -0 0 U_ N =3 cn C 06 C O cz (n Q E w O O Q 0 O O O Cn N - O U w U U 1= n- O cn +� O a O vi ¢ C w Li- c6 d m cn O tl � � j C a_ i U 0 r U a> O N 0 C) I O J O I— U w N 2 m m m co O U- L, co U c-I O N Of CD 0 N O N a U nD a [O U Q In a (O C d co u al d d 0 O O O p O Op O O O 0 O p p O 0 cyi Lo C) M VH i d p M CO N LO CO rl .q M tR r-i I I y�} N N U C + C co m m O > J j U ~ U 'cj c a) o N taA p L a O � � CO co c E O cn N w w c 2 t k 3 0 / / k f � k U- � E \ m / 0 0 a \ ca m E t &� 2 k / o k / 5 7� E Q 0 / / k O 0 E § � « ƒ � � � 0 .� � .� ? \ 2 t \ \ ƒ � { $ \ / _ = 0 \ \ LO \ \ \ C 0 0 7 7 o�� k m + 9 R 6 � 0 % \ 0 § § \ % / 0 \ \ \ _ =.g e c m ¥ 2 6 ƒ§\ 2 \ E/ E � C14 / / /� \ o e 'E � k� Co 6 w g\ 2 ƒE o 3f J 2 E = / 2 a % / 7 $ 0 2 z 3 z $ o § 7 7 5 % / to 5 U- LL s LL LL- al ƒ ƒ ƒ ƒ LL k CD 0 CD CD k 0 0 \ \ 6 6 s a L G / � � + k 3 f / $ � E 6 $ 0 . \ k m CL g \ ) k CD ~ s e 6 s 0 o ±� _ . / / \ 0 a- o 2 » / / 7 a ƒ \ / / 3 � \ > i / [ c \ \ \ o \ 2 \ \ / \ / / ? \ 2 t \ \ ƒ � { $ \ / _ = 0 \ \ LO \ \ \ ƒ E t \ / _ / § / k k CL f LL \ E § ƒ k \ k I k \ E / / 2 E k � / E U) : / [ m ° w o 0 &0 § / . m f e a) a- � � � � � \ c \ �S® � 2 { \ \ / \ \ $ � � _ = o / \ LO \ \ co \ / c / c / c o c / o / o C! G m 6 a / / c \ w ^�^ LO / cyi m � �� / > / S � \ § \ _ =.g = CO 2 / % o ± m \ o 2 «ƒ / 7 s m LQ Cc M / 2 u ± r w 3 \ CO k \ \ / .E \ y y & uj m \ / \ / / / ƒ / / � y / o o° J o c° 0 c 9 c 0 / / c o o o / E � j -1 _ + + m m , m m Lo 3 f \ / § \ \ / m \ CL \ o 7 & / \ \ \ ® t / � - / / \ / f / Cl- 3 / a / \ \ \ \ / \ 2 { \ \ / \ \ $ � � _ = o / \ LO \ \ co \ C O E c6 a. O t� O co O U N co CL a c Lj- 4J C O N U M �U) Q c) O m O C }, f6 O cc (2) o O Q. N U m C Cc O O Q N O � U CL 0 > 0 0 cn a- E cn cn co s co a. Q c a� L m a cn � L Y cu u a° LL u n a a. C7 If Q6 a rn O N In -i O N d U N a m CO 0 0 0 O O 0 O 0 O m C6 OLO O O Cfl -1 Lm O (a Efl, { m O II + O j v U U N CO J H U m If L) v M p m W m N O 0) O U N O O nq tr O c N �C C ri ca O L(i r` c co CO co CU } E c0 CD m Lu N U 00 O W W m N to LL 0 LL 0 LL 0 L.L 0 LL Cn Li- 0 C: 7 a- a_ m d d LL N O 00 O O O O O O O O O E O O ° O o0o ti m O m w cn 0 0 0 U) N_ 0 O O D Q +� cu O +� m O c6 O CB tz0 Q cq N O O O : U � Q C O U = = O *k O7C) _0 -O = ' i O O N M E CL m m m U- cn (B c� IZ a_ O O � � O d C6 = U 5_ O J m (r 0 1 m m Q c a� L m a cn � L Y cu u a° LL u n a a. C7 If Q6 a rn O N In -i O N d U N a m CO 0 C O E tf co Q N C O co U N 06 U) i O tZ C LL C N E N v m a U tr C Cu co O C N cr C co C O E Q O O N O E O N co CL U O i d C O O O � � O N Q E Liz c O Q N co 0 O C O CL OJT GCS w 0 4:1 a U) N c 0- cn @ a co a° 0 LL p C/) a 0 a rn 0 N Ln ,-A O N a- 0 Y a m cs po po 0 0 p 0 O 000 0 0 m � O o O q ' M f4 M LO � II + O j U II v U O N C ' v N m —i H m ri M w M U D U N O m h 0 CN O co O 0 0 C rl )10 !r O _ _0 N mcoo m C M 6� b0 a� � w a� E c0 Z E g m 0) W N o w N Q W in N N h0 C LL U) LL Cf) LL U) LL U) C O a- a. O.. IZ LL N U O O 00 O O O 0 a O O O O O O O 0 00 N m m � zt k& loll, N W 0 U C O O m co Q L O bA Q N C O 0 Q Q O V w O a- 0. O CL O IL a- c/) I m a_ O c +� (o co U ca J U O m m a U) N c 0- cn @ a co a° 0 LL p C/) a 0 a rn 0 N Ln ,-A O N a- 0 Y a m cs W�tiCity of Eapa Eagan Parks & Recreation CIP 2015 - 2019 Estimate 250,000 85,000 50,000 25,000 40,000 45,000 75,000 35.000 $605,000 100,000 250,000 165,000 75,000 35.000 $625,000 60,000 90,000 150,000 100,000 75,000 35.000 $510,000 150,000 100,000 150,000 80,000 75,000 35.000 $590,000 30,000 300,000 75,000 35.000 $440,000 Location Description 2015 Moonshine Park Phase II Park Improvements Thresher Fields Fields Drainage System Phase 11 Rahn Park Athletic Field Electrical Installation Eagan Community Ctr. Entrance Sign Upgrade Heine Pond Park Fishing Pier Updgrade TBD Park Master Plan Update TBD 2- Playgound Upgrades TBD Small Projects Total 2016 Civic Arena Field Turf Upgrade Trapp Farm Park Pavilion Replacement Various Parks 4 -Sun Shelter upgrades TBD Playground Upgrade (2) TBD Small Projects Tota 1 2017 Thomas Lake Park Trail Lighting Upgrade Northview Park Tennis Court Lights Goat Hill Park Building Renovation Goat Hill Park Field #1 Artificial Turf Installation TBD Playground Upgrade (2) TBD Small Projects Total 2018 Bridle Ridge Park Building Renovation Rahn Park Building Renovation Thomas Lake Park Pavilion Upgrade Goat Hill Park Field #2 Artificial Turf TBD Playground Upgrade (2) TBD Small Projects Total 2019 Cascade Bay Deck Upgrade Ohmann Park Field Expansion TBD Playground Upgrade (2) TBD Small Projects Total PROJECT PARKING LOT Park Development Park Improvements Festival Grounds Phase II Bur Oaks Trail Paving Rahn South Patrick Eagan Trail Boardwalk Cedar Grove Phase II Rahn Court Construction Holz Phase III Building Upgrades Section 16 Federal Drive Pickleball Courts Ohmann Fields Civic Arena Turf Wandering Walk Trails Bandshell Shade Structure Athletic Lighting Artificial Field Turf Lexington Diff ley Field Improvements Northview Master Plans Thresher Soccer Rahn South Ohmann Soccer Federal Drive Hockey Lighting Upgrades Ohmann Park Estimate 250,000 85,000 50,000 25,000 40,000 45,000 75,000 35.000 $605,000 100,000 250,000 165,000 75,000 35.000 $625,000 60,000 90,000 150,000 100,000 75,000 35.000 $510,000 150,000 100,000 150,000 80,000 75,000 35.000 $590,000 30,000 300,000 75,000 35.000 $440,000 17- I Ul I as 4z r4 ip :w �,. • 3 g Ti� •` •! ►'� .! �� F:'' . ~•.� *ter ..� ;� ' � 'mot , r'� .. � �� •* , - �.`ts.: 1. i i � St ;a t: r i ` Ti� •` •! ►'� .! �� F:'' . ~•.� *ter ..� ;� ' � 'mot , r'� .. � �� •* , - �.`ts.: 1. i i � St +r��rrr� V 1 L 4.1 L f- a 0 f - fardw _ .. ' fit x �t . ;, : �• - 7► `� .``t � �' oil V c • t t � 0 . F r' Y a t _* k) S a � 1 - NO ffil M4 J t I 4k. 0 mi, - y lln — - rl Agenda Information Memo November 12, 2014 Special City Council Meeting V. OLD TOWN HALL REVISED OPTIONS Direction for Consideration: Receive presentation of revised options from Mohagen I Hansen Architectural Group and provide direction to staff on the next steps associated with Old Town Hall. Facts: (Items in bold represent new facts) ➢ Old Town Hall (OTH) was constructed in 1914. It served as Eagan's meeting space until 1965. In the late 1980s and early 1990s, the structure was refurbished. Since that time, it has served as a museum and storage facility maintained by the City and run primarily by the Eagan Historical Society. ➢ On September 8, 2013, an arsonist set fire to OTH, causing substantial damage to the structure and contents. The roof trusses, south and west walls, flooring and contents were heavily damaged. The entire interior of the building suffered smoke and water damage. ➢ At the February 11, 2014 Council workshop, the Council gave direction to pursue proposals from architects seeking rough cost estimates and sketches of three options to replace 0TH. ➢ On April 16, 2014, the Council approved a professional services agreement with Mohagen I Hansen Architectural Group, in partnership with MacDonald & Mack Architects, who specialize in historic preservation and adaptive reuse. ➢ Mark Hansen and Steve Oliver of Mohagen I Hansen, along with Stuart MacDonald of McDonald & Mack, led a 6 -week process with a staff steering committee to define options for the City Council's consideration. Members of the Eagan Historical Society also contributed to the process. ➢ At the City Council workshop on June 10, the Council reviewed the proposed options for the potential relocation and restoration of OTH. The Council directed staff to work with the architectural team on the option to relocate OTH to the Municipal Center campus as a standalone building, and provide cost estimates ranging from a structure -only with no modern services (seasonal use only) to a fully restored structure with HVAC, basement foundation, etc. ➢ At the September 9, 2014 Council workshop, the architectural team presented the options and projected costs associated with moving OTH to the Municipal Center campus. Per Council direction on September 9, a side by side comparison has been prepared by the architects to include basic renovation /restoration of OTH to its previous condition with minimal enhancements, and to include costs associated with moving the building to the Municipal Campus. The Council asked that the cost options for each enhancement be called out as an individual expense. The Council also noted the need to look into fundraising efforts for the additional enhancement costs of the building. ➢ The architectural team will present the revised cost options at the November 12 workshop. ➢ As noted during the 2015 budget presentation at the August 11 City Council workshop, a possible funding source for the relocation of OTH could include the General Fund Balance or the Community Investment Fund. Opportunities for fundraising also exist, particularly in light of 2014 serving as the 100th anniversary of OTH. ➢ At the December 9, 2014 Council workshop, the Council will receive an update from Dave MacGillivray of Springsted regarding funding options for the various capital needs of the City. Any direction provided by the Council on November 12 pertaining to OTH can be incorporated into the financial analysis being prepared for the December workshop. ➢ Enclosed are the responses from the 2014 residential survey to questions fielded regarding the restoration of Old Town Hall (the survey results in their entirety will be presented to the Council in December). Attachments: (3) V -1 Mohagen I Hansen Revised Cost Projections and Graphics V -2 2014 Residential Survey Results for Old Town Hall V -3 Resident Letters City of Eagan Old Town Hall Restoration Preliminary Budget Analysis �,,.... rY 9 Y saga,, :(rwrcuiaC sae�ry Issuance: November 5, 2014 ?roject Gross Square Footage: 1,051 First Floor; 1051 Basement (where applicable) Scenario III - Relocate/Repair/Enhance: Move building to city hall site; repair III building to like materials and appearance; minor period upgrades; full basement with full HVAC systems, full site development. Scenario II - Relocate/Repair. Move building to city hall site; repair building H to like materials and appearance; minor period upgrades; minor site improvements; new host -free foundation. Scenario I - Repair in Place: Building to remain on existing I site; repair building to like materials and appearance; minor period upgrades; minor site improvements. I 1 II III I Final A. BASE BUILDING CONSTRUCTION AND REPAIRS Men Hansen Work is infill and repair work unless noted otherwise Architectural Group Roofing (Asphalt Shingle) City of Fagan MACDONALD c` MACK III I Final A. BASE BUILDING CONSTRUCTION AND REPAIRS Work is infill and repair work unless noted otherwise Roofing (Asphalt Shingle) $ 4,800 $ 4,800 $ - Roofing (100% New Cedar Shake Roof) $ - $ - $ 19,200 Chimney $ 1,000 $ 1,000 $ 1,000 Cornice $ 4,000 $ 4,000 $ 4,000 Siding/Sheathing $ 11,000 $ 11,000 $ 11,000 Window $ 1,500 $ 1,500 $ 1,500 Shutters $ 1,000 $ 1,000 $ 1,000 Front Door (period upgrade) $ 3,000 $ 3,000 $ 3,000 Exterior Paint (100 %) $ 4,500 $ 4,500 $ 4,500 Wall Framing/Shoring $ 4,200 $ 4,200 $ 4,200 Roof Framing $ 21,900 $ 21,900 $ 21,900 Floor Reinforcing $ 14,500 $ 14,500 $ 14,500 Wood Flooring $ 4,300 $ 4,300 $ 4,300 Wood Wainscot $ 4,500 $ 4,500 $ 4,500 Wall & Ceiling Cladding & Trim $ 10,000 $ 10,000 $ 10,000 Floor Finishing (100 %) $ 6,000 $ 6,000 $ 6,000 Interior Paint /Stain $ 13,000 $ 13,000 $ 13,000 Energy Upgrades (insulation, VB, venting etc.) $ 11,100 $ 11,100 $ 11,100 Regraded Entry (remove the ramp) $ 3,000 $ - $ - Fire Detection and Monitoring $ 3,000 $ 3,000 $ 3,000 Security Monitoring $ 3,000 $ 3,000 $ 3,000 Subtotal: I $ 129,300 1 $ 126,3001$ 140,700 1 K: \Jobs \Eagan Town_Hat1_13479 \01_Admin\ Budget\ 13479 _OTH_Budget_1- 2- 3_110514.xls City of Eagan _ MHansen Old Town Hall Restoration Architectural 1►� 1 ■ 1 "� �' a Group Preliminary Budget Analysis"'"'" ' &9 "" � S City o Fa�a�i MACDONALD MACK of Issuance: November 5, 2014 Project Gross Square Footage: 1,051 First Floor; 1051 Basement (where applicable) Scenario III - Relocate/Repair/Enhance: Move building to city hall site; repair III building to like materials and appearance; minor period upgrades; full basement with full HVAC systems; full site development. Scenario II - Relocate/Repair: Move building to city hall site; repair building H to like materials and appearance; minor period upgrades; minor site improvements; new frost -free foundation. Scenario I - Repair in Place: Building to remain on existing I site; repair building to like materials and appearance; minor period upgrades; minor site improvements. I II III Final B. SPECIALTY CONSTRUCTION AND REPAIRS General Conditions (10 %) $ Building Move $ - $ 30,000 $ 30,000 Temporary Bracing/Shoring $ - $ 10,000 $ 10,000 Smoke Abatement $ 25,000 $ 25,000 $ 25,000 Hazardous Materials Testing $ - $ - $ _ Hazardous Materials Abatement $ $ - $ Frost Free Foundation (shallow) $ $ 27,000 $ - Basement Foundation (deep, mech. space, access tunnel) $ - $ - $ 72,000 Landscape Improvements - minor $ 15,000 $ - $ - Landscape Improvements - modest /move $ - $ 40,000 $ - Landscape Improvements - Enhanced $ - $ - $ 145,000 Site Lighting $ - $ 7,500 $ 15,000 Electrical Wiring upgrades (connect /disconnect) $ 3,000 $ 3,000 $ - Electrical Wiring $ 1,000 $ 1,000 $ - Electrical Wiring (100% new) $ - $ - $ 7,000 Cabinet Unit Heater Replacement $ 4,000 $ 6,000 $ - Electrical Feed & Panel $ - $ 10,000 $ 10,000 Gas Feed $ $ 2,000 $ 2,000 HVAC System (AHU, CU, ducts, controls) $ $ - $ 20,000 Service Sink and Floor Drain $ $ - $ 6,000 Sump Pump, Pit & Piping $ $ - $ 3,000 Sewer Service $ $ - $ 30,000 Water Service $ $ - $ 30,000 Subtotal: I $ 48,0001 $ 161,500 1 $ 405,000 $ 177,300 $ 287,800 1 $ 545,700 C. CONTRACTOR COSTS General Conditions (10 %) $ 17,730 $ 28,780 $ 54,570 Overhead & Profit (15 %) $ 26,595 $ 43,170 $ 81,855 Contingency (15 %) $ 26,595 $ 43,170 $ 81,855 Subtotal: I $ 70,920 1 $ 115,1201$ 218,280 CONSTRUCTION /REPAIR TOTAL (A +B +C) D. PROJECT COSTS Soft Costs $ 12,411 $ 20,146 $ 38,199 Architectural and Engineering Fees $ 29,000 $ 40,000 $ 75,000 Subtotal: $ 41,411 $ 60,146 1 $ 113,199 �m����- imv;Ya]ias ®}- 'lot[Y:t %'see -.. $ 289,631 $ 463,066 1 $ 877,179 2 K: \ Jobs\ Eagan_Town_Hall_13479 \ 01_Admin\ Budget \ 13479_OTH_Budget_1- 2- 3_110514.xls City of Eagan Old Town Hall Restoration Preliminary Budget Analysis Issuance: November 5, 2014 Gross Square Footage: 1,051 First Floor; 1051 Basement Men Hans Hansen r Architectural . `,.'� • - �1 ,,,y Group �.� .. City o(' Ea�a�i �tarazi tsad&ry l M 9aya.a ACDONALI? MACK Scenario III - Relocate/Repair/Enhance: Move building to city hall site; repair III building to like materials and appearance; minor period upgrades; full basement with full HVAC systems; full site development. Scenario II - Relocate /Repair: Move building to city hall site; repair building II to like materials and appearance; minor period upgrades; minor site improvements; new frost -free foundation. Scenario I - Repair in Place: Building to remain on existing I site; repair building to like materials and appearance; minor Deriod upgrades: minor site improvements. II[ I Final Scenario II to Scenario III I I I II I E. SCENARIO TO SCENARIO COST COMPARISON $ 14,400 Scenario I to Scenario II $ Added Cost Building Move $ $ 30,000 Temporary Bracing/Shoring $ $ 10,000 Frost Free Foundation (shallow) $ $ 27,000 Landscape Improvements - modest /move $ $ 25,000 Site Lighting $ $ 7,500 Cabinet Unit Heater Replacement $ $ 2,000 Electrical Feed & Panel $ $ 10,000 Gas Feed $ $ 2,000 Subtotal Cost Adds* $ $ 113,500 CONTRACTOR COSTS General Conditions (10 %) $ 11,350 Overhead & Profit (15 %) $ 17,025 Contingency (15 %) $ 17,025 Total Value Cost Adds $ 158,900 II[ I Final Scenario II to Scenario III $ Added Cost Roofing (new cedar) $ 14,400 Basement Foundation (deep, mech. space, access tunnel) $ 45,000 Landscape Improvements - Enhanced $ 105,000 Site Lighting $ 7,500 Electrical Wiring (100% new) $ 3,000 HVAC System (AHU, CU, ducts, controls) $ 14,000 Service Sink and Floor Drain $ 6,000 Sump Pump, Pit & Piping $ 3,000 Sewer Service $ 30,000 Water Service $ 30,000 Subtotal Cost Adds $ 257,900 CONTRACTOR COSTS General Conditions (10 %) $ 25,790 Overhead & Profit (15 %) $ 38,685 Contingency (15 %) $ 38,685 Total Value Cost Adds $ 361,060 * There is a $3,000 variation between this value and the difference between the Scenario I and 11 subtotals under item B due to the inclusion of the Regraded Entry item included in section B for Scenario I. 3 K: \Jobs \ Eagan_Town_HaB_13479 \ 01_Admin\ Budget\ 13479_OTH_Budget_1- 2- 3_110514.xls Cie Z LU U Z U (A LU r) LU V Z 0 V LU L) z < ;t 0 co oo ro 0 z 0 0 U—) LU OC Lu rE lom -ED adt- I At 44 c) Z LU u Z LU LLI V z 0 V LU CL Q) Q CD z WD D 0 z Z 0 7 (j Z 0 U) 0 c 0 0 7C) Z a C < u < o LL.1 E 3 1 -ED adt- I At 44 c) Z LU u Z LU LLI V z 0 V LU CL Q) Q CD z WD D 0 z Z 0 7 (j Z 0 U) 0 c 0 0 7C) Z a C < u < o LL.1 E 3 2014 Residential Survey Questions /Responses Pertaining to Old Town Hall The 1914 Old Town Hall is the oldest government building remaining in the City of Eagan. It was damaged by an arson fire last September. The City could move the Old Town Hall to the municipal campus where there is more security and parking. 81. Do you think the City should move STRONGLY/MOVE .......... 5% the Old Town Hall to the municipal MOVE ..................41% campus or should it be left at its LEFT ..................32% current location? (WAIT FOR RE- STRONGLY /LEFT......... 16% SPONSE) Do you feel strongly that DON'T KNOW /REFUSED..... 6% way? Regardless of the location of Old Town Hall, it needs repairs. The City is planning to repair it to its prior condition, which allows it to be opened six to eight days a year and for occasional tours. For each of the following, please tell me if you would be interested in seeing any of these additional enhancements made to the Old Town Hall to allow for expanded uses. (ROTATE) YES NO DKR 82. Providing climate control to allow year -round use. 63% 34% 4% 83. Enhancing the outside of the Town Hall to create attractive gathering spaces. 600 37% 4% 84. Displaying history of community groups, organizations and businesses in addition to city history displays. 67% 29% 4% Insurance coverage on the Old Town Hall is insufficient to cover enhancements to the building. 85. If additional funds are needed, which option would you most support: (ROTATE) A) a fundraising campaign; B) using city funding; C) do you not support funding beyond basic repairs; OR D) Something else? ELSE: STATEMENT A...........45% STATEMENT B...........24% STATEMENT C...........25% STATEMENT D............2% DON'T KNOW /REFUSED..... 5% Eagan City Council September 13, 2014 Mayor Mike Maguire Re: Old Town Hall - preserve and leave it where it is Dear Mayor and Council: Thank you for your consideration of the preservation of the Old Town Hall. Count us in on trying to preserve our heritage. We are writing only to express our views regarding what option should be used. We do not understand why there is any preference to move the building. It sits well on the property where it is -- a very suitable site that would not be well used for any other use. We live two doors down from the site and can't imagine how this property could be used in any other way without disrupting the neighborhood and traffic. Thanks for your attention to this and service to our community. Seerel Rick and atty Kleven 1408 Kingswood Ponds Road Eagan, MN 55122 612 844 7216 (day) 651 365 0683 (home) RESTORATION OF 1914 CITY HALL The 1914 City Hall on the corner of Pilot Knob and Westcott is the property of the City of Eagan. The Eagan Historical Society is a small group of volunteers interested in preserving the history of Eagan and making that history known to all the residents of Eagan. Since the fire at the Town Hall, the Historical Society has had no place to call home or to do its work from. We are asking the city to save the Town Hall. The City would make needed repairs to the fire damaged structure so to resemble the original building. The addition of heat, air conditioning, lighting, and water would make the building usable all year round. The Societies volunteers are ready to take the responsibility furnishing the display materials and other items to make the town hall a functioning museum again. Much of this would be done through donations, available grants and volunteer labor. I personally have had great experiences making presentations about the history of Eagan to scout troops and individuals. These people both young and old are just fascinated to learn what Eagan was like in the past and how it became what it is today. Not having the facilities to show people our history is a great disappointment and a feeling of failure to my community. I was proud to be involved in compiling the history displays at the new Fire Safety Center, but I know that Eagan's history needs to be more than just the Fire Department. We are malting history here tonight just like we made history around the pot belly stove in the old town hall. Preserving this historic building is important and you can do something you will be proud of. Thank you for your consideration to our needs. Ted Ringberg, member Eagan Historical Society November 12 2014 Agenda Information Memo November 12, 2014 Special City Council Workshop VI. CABLE FRANCHISE UPDATE Direction for Consideration: This is an informational briefing and no specific action is required. Council feedback on the items discussed are welcomed and appreciated. Facts: ➢ The City Council was last briefed on the cable franchise renewal process in February and significant developments have occurred since that time. In late April, Comcast announced its intent to spin -off the Twin Cities and other markets in an effort to consolidate markets elsewhere and gain Federal Communications Commission (FCC) regulatory approval for its bid to acquire Time Warner Cable. ➢ Based on the three year renewal window that opened in 2012, the City of Eagan had been preparing to negotiate with Comcast on its request to renew its cable franchise. In 2012 -13 the City retained legal, technical, and financial experts to help the City prepare for negotiations. ➢ Last fall the Council will remember the City conducted a widespread effort to gather public feedback for a required Community Needs Assessment and a record 1,156 respondents from 101 organizations and institutions in the Eagan area participated in surveys along with 115 people who attended focus groups. ➢ Based on that data and City Council feedback regarding customer service standards a revised draft franchise was completed and recently forwarded to Comcast for their review. ➢ Eagan also participated in making reply comments to FCC regarding the proposed Comcast /Time Warner merger and proposed spin -off. ➢ Eagan's Cable Franchise Attorney, Mr. Brian Grogan of Moss & Barnett, and Communications Director Garrison will provide a cable update and answer questions. ➢ Eagan's current franchise expires on January 6, 2015. Attachments: (0) Agenda Information Memo November 12, 2014 Special City Council Workshop VII. E -TV Budget Direction to be considered: To provide direction to staff regarding the proposed 2015 Eagan Television budget Facts: ➢ February, 2015 will mark the six -year anniversary of operations for Eagan Television (E -TV) and its award winning partnership with Thomson Reuters for studio space. ➢ The E -TV budget is funded by two sources, a 5% franchise fee paid by Comcast and small monthly fee on cable franchise subscriber bills to support local Public, Educational, and Governmental public access facilities and programming like televising City Council and Advisory Commission meetings, high school sports games, music from Market Fest and more. ➢ E -TV also brings in outside revenue through paid production, class fees and dubbing. Though October, 2014, more than $27,000 revenue was received. That number is expected to rise another $10,000 before the end of the year because of a paid production project, and for 2015 revenues are projected to increase another 14.2 %. ➢ It is important to draw a distinction between the normal operations budget of E -TV and cable franchise renewal expenditures experienced every 10 -15 years. ➢ Absent cable franchise negotiations the normal operational budget for E -TV would decrease in 2015 by 4.3% or $24,300. With the legal costs included for the informal negotiation process the proposed budget is up 10.2 %, an increase of $53,200. ➢ Entering into informal franchise negotiations some cities have chosen to also include an enhanced line item for formal franchise negotiations to demonstrate their wherewithal to continue to represent local concerns should circumstances force the more formal negotiating process. Staff notes that no such line item has been placed in the proposed budget. However, a funding source exists should that be the Council's desire to include. ➢ Communications Director Garrison and E -TV Studio Supervisor Jeff Ongstad will provide a brief budget overview and will be present to answer questions. ➢ Following direction tonight this budget will be brought back for formal adoption on the December 2, 2014 Eagan City Council meeting. Attachments: (1) VII. -1 E -TV Proposed 2015 Budget City of Eagan 2015 Proposed Budget Operating Budget 9 p 9 9 E -N (197) Responsible Manager: Tom Garrison, Director of Communications PURPOSE & DESCRIPTION Eagan Television (E -TV) creates public, educational, and government cable TV programming through a partnership of volunteers and professional staff. E -TV also provides television production equipment facilities, and channel time to televise locally - produced programming. It is cable programming by the community, for the community. PERFORMANCE INDICATORS 2012 2013 2014 2015 Description Actual Actual Estimate Target Monthly Staff Program Production 16 18 20 24 Monthly Access Show Production 23 23 25 30 New Vol unteers 110 134 175 200 Outside Revenue $14,388 $27,846 $35,000 $40,000 Opportunities For Youth 12 -18 43 106 125 140 4111 City of EOPH 2015 Proposed Budget Operating Budget E -N (197) Responsible Manager: Tom Garrison, Director of Communications Expenditure by Category Personal Services ------- 65% Parts and Supplies 5% Services Capital and Other Outlay Charges 4% 26% HIGHLIGHTS & CHANGES Overview: The Eagan Television (E -TV) operational budget is proposed to increase 10.2% or $53,200. The increase is predominately due to franchise negotiations that occur every 10 to 15 years. The negotiations are programmed to cost $77,000 in 2015. Without the Legal costs for negotiations the operational budget would decrease by 4.3% or $24,300. The E -TV budget is funded by non - taxpayer dollars. The sources of funding are franchise fees paid by Comcast and a small fee on local subscriber bills which supports capital equipment for Public, Educational and Governmental (PEG) public access facilities. Highlight /Change 1: Cable Franchise Renewal Expenditures transition from technical studies in prior years to actual negotiations. Complicating matters the City has been told it will also receive a request to transfer the franchise to an as yet unnamed spin off company to be run by another operator, Charter Communications. This necessitates a financial review of that company's ability to deliver under the terms of any newly negotiated franchise. This will strengthen Eagan's negotiating position and help us hold the line against the erosion of millions of dollars of PEG and Franchise support Eagan has received since 1999. Financial Impact: $40,200 increase in what should be final year of contract negotiations. Service Level Impact: This will take a significant amount of Director Garrison's time, but should not affect day -to -day E -TV operations. Highlight /Change 2: The production revenue budget is proposed to increase $5,000 or 14.2 %. Through increased summer camp offerings as well as increased outside video production projects, E -TV is pacing at roughly 108% of our 2014 revenue budget. Growth is expected and anticipated in the 2015 Budget of at least an additional 7 to 12 %. Financial Impact: $5,000 or 14.2% Increase in production revenue. Service Level Impact: The additional projects will allow us to increase our production revenue with no impact on our other duties. City of Faun 2015 Proposed Budget Operating Budget E -TV (197) Responsible Manager: Tom Garrison, Director of Communications EXPENDITURE SUMMARY POSITION INVENTORY Personnel Actual Actual Budget Budget Expenditure 2012 2013 2014 2015 Personal Services $ 352,552 $ 369,135 $ 375,900 $ 388,900 Parts and Supplies 26,455 24,043 31,600 30,100 Services and Other Charges 67,116 124,582 113,800 155,500 Capital Outlay 146,819 188,373 21,600 22,600 Total $ 592,941 $ 706,133 $ 542,900 $ 597,100 POSITION INVENTORY Personnel 2012 2013 2014 2015 Hours Studio Supervisor 1 1 1 1 2,080 Cl i ent Servi ces Coordinator 1 1 1 1 2,080 Govt Progra mmi ng Coordi nator 1 1 1 1 2,080 Field Coordinator /Video Specialist 1 0 0 0 0 Vi deogra pher /Editor 0 1 1 1 2,080 Total 4 4 4 4 8,320 WORK PLAN 2015 Activi Routine 1 Supervision of PEG channels for Eagan 2 Provide and maintain public access facilities 3 Provide trai ning for PA facility and equipment 4 Facilitate, organize and execute the playback of all sponsored PA shows 5 Provide coverage of community events 6 Provide coverage of all Eagan government meeti ngs 7 Provide video production services to City of Eagan departments 8 Provide video production services to revenue generating clients 9 Assist Comcast customers with complaints 10 Provide video production services to Thomson Reuters in exchange for rent 41� City of Eapo 2015 Proposed Budget Operating Budget E -TV (197) Responsible Manager: Tom Garrison, Director of Communications REVENUE SUMMARY CAPITAL PURCHASES CIP(PEG) E -TV Master Control Upgrade $ 12,905 CIP(PEG) Edit Suite Computer Replacements 42,720 Total $ 55,625 Actual Actual Budget Budget Revenue 2012 2013 2014 2015 4689 PEG fees (total) $ 364,808 $ 371,671 $ 360,000 $ 375,000 Less: PEG fees used for current year CIP - E -TV - - (46,200) (55,600) PEG fees used (available) for future cap. exp. - - (189,300) (157,100) Net PEG fees used for E -TV operations 364,808 371,671 124,500 162,300 4690 City contribution -from Cable Franchise Fees fund 353,858 371,288 383,400 394,800 4695 E -TV dubbing 1,657 1,438 2,500 3,000 4699 Class fees 8,040 12,335 14,000 15,000 4696 Dub /Rental /Paid production - - - - 4697 E -TV paid production 3,497 15,840 13,500 19,500 XXXX Other Revenue 1,194 (1,767) 5,000 2,500 Total Operating Revenues 733,054 770,805 542,900 597,100 CAPITAL PURCHASES CIP(PEG) E -TV Master Control Upgrade $ 12,905 CIP(PEG) Edit Suite Computer Replacements 42,720 Total $ 55,625 City of blao 2015 Proposed Budget p g Operating Budget E -TV (197) Responsible Manager: Tom Garrison, Director of Communications LINE ITEM DETAIL 2012 2013 2014 2015 Actual Actual Budget Budget 6110 SALARIES AND WAGES- REGULAR 250,875 265,317 267,400 273,500 6112 OVERTIME - REGULAR 4,941 3,641 3,000 3,000 6130 SALARIES AND WAGES- TEMPORARY 19,881 19,160 18,500 20,000 6142 PERA - COORDINATED 19,586 20,200 20,900 22,200 6144 FICA 20,266 20,845 22,100 22,700 6151 HEALTH INSURANCE /VEBA 36,064 38,926 42,100 45,500 6155 WORKERS COMPENSATION 938 1,046 1,900 2,000 PERSONAL SERVICES 352,552 369,136 375,900 388,900 6210 OFFICE SUPPLIES 225 562 500 500 6212 OFFICE SMALL EQUIPMENT - 255 500 500 6215 REFERENCE MATERIALS 34 160 500 500 6220 OPERATING SUPPLIES - GENERAL 7,876 6,181 9,300 9,300 6224 CLOTHING /PERSONAL EQUIPMENT - - 2,000 1,000 6231 MOBILE EQUIPMENT REPAIR - PARTS 1,595 1,313 2,000 2,000 6232 SMALL EQUIPMENT REPAIR - PARTS 3,479 2,831 2,500 2,000 6235 FUEL, LUBRICANTS, ADDITIVES 2,166 1,369 2,000 2,000 6270 COMPUTER SOFTWARE 11,080 11,372 12,300 12,300 PARTS & SUPPLIES 26,455 24,043 31,600 30,100 6310 PROFESSIONAL SERVICES- GENERAL 1,148 7,962 39,800 2,500 6311 LEGAL 5,650 20,558 - 77,500 6313 PLANNING 3,618 37,412 - 6314 AUDITING 200 100 - 6346 POSTAGE 48 130 500 500 6347 TELEPHONE SERVICE & LINE CHARGES - - 100 100 6353 PERSONAL AUTO /PARKING 10 - 100 100 6355 CELLULAR TELEPHONE SERVICE 1,961 1,784 2,700 4,200 6357 GENERAL ADVERTISING - 1,100 3,200 2,800 6359 LEGAL NOTICE PUBLICATION - 200 - 6370 GENERAL PRINTING AND BINDING - 166 1,000 3,700 6385 INSURANCE 7,400 7,400 7,400 7,400 6405 ELECTRICITY 12,000 12,000 12,000 12,000 6425 MOBILE EQUIPMENT REPAIR - LABOR 925 - 1,500 1,500 6426 SMALL EQUIPMENT REPAIR - LABOR 3,772 325 5,500 4,000 6457 MACHINERY & EQUIPMENT RENTAL - - 400 200 6475 MISCELLANEOUS 6,283 5,146 5,000 5,000 6476 CONFERENCES AND SCHOOLS 1,155 3,258 4,600 4,600 6477 LOCAL MEETING EXPENSES 141 388 800 200 6479 DUES AND SUBSCRIPTIONS 3,105 3,093 4,500 3,600 6480 LICENSES, PERMITS AND TAXES 16 - - 6569 MAINTENANCE CONTRACTS 19,685 23,761 24,500 25,600 OTHER SERVICES AND CHARGES 67,116 124,582 113,800 155,500 TOTALOPERATING 446,122 517,761 521,300 574,500 10.2% 6640 MACHINERY /EQUIPMENT 9,709 87,823 15,200 15,000 6660 OFFICE FURNISHINGS /EQUIPMENT - 160 400 1,600 6670 OTHER EQUIPMENT 137,110 95,252 - - 6680 MOBILE EQUIPMENT - 5,138 6,000 6,000 TOTAL CAPITAL 146,819 188,373 21,600 22,600 4.6% TOTAL E -TV 592,941 706,134 542,900 597,100 10.0