1992 Rahncliff Ct - Nothing Bundt Cakes TAB Report 2015-08-31
`
Technician:
Cell Phone:
Email Address:
Peter Leptuch
Report Date
August 31, 2015
Allan Mechanical Contractors
7875 Fuller Road
Eden Prairie, MN 55344
ENGINEER
pete@premierbalancing.com
PROJECT
Nothing Bundt Cakes
1992 Rahncliff Court
Eagan MN 55122
CLIENT
375 230th Ave, Somerset WI 54025 - Phone: (612) 834-0311 Fax: (414) 377-3349
www.Premierbalancing.com
Testing, Adjusting & Balancing Report
TABB TECHNICIAN
Pete Korzenowski
612-834-0311
TABB CERTIFICATION
TABB certification of a Supervisor is TABB's statement that the Supervisor is able to
supervise testing, adjusting and balancing of building environmental systems to produce the
design objectives or optimum system performance. For TABB Certification purposes, a
Supervisor is the person who, while employed by a TABB Certified Contractor, is
responsible and accountable for overseeing, coordinating and ensuring that projects are
performed by TABB Certified Technicians in accordance with TABB standards (including the
ICB Code of Conduct and the TAB General Rules).
Measurements recorded in this report are in accordance with the SMACNA / TABB HVAC Systems,
Testing, Adjusting and Balancing manual.
TABB Certified "The Professional's Choice" Page 2
TABB QUALITY ASSURANCE PROGRAM
BACKGROUND
TABB seeks to ensure the integrity of its certification program by: (a) setting eligibility criteria for TABB
Certified Supervisors and TABB Certified Contractors, (b) establishing testing procedures for TABB
Certified Supervisors, (c) requiring continuing education and continuous compliance with eligibility criteria
for renewal of certification, and (d) periodically reviewing its recognition of technician certification. High
quality work on the part of TABB Certified Technicians and TABB Certified Supervisors and TABB Certified
Contractors ( TABB Professionals ) is essential to integrity of the TABB Certification Program. TABB offers
this TABB Quality Assurance Program to help assure high quality work. By accepting TABB qualification or
certification, every TABB Professional accepts the responsibilities or this Program.
Quality Assurance
Every customer of a TABB Certified Contractor shall be entitled to expect: (1) that testing, adjusting and
balancing work by the contractor and its TABB Professionals will meet TABB standards; (2) that testing,
adjusting and balancing reports provided to the customer will have been prepared by a TABB Certified
Technician, and reviewed by a TABB Certified Supervisor; and (3) that the report(s) will include
measurements taken accurately with the date and mode of operation of the systems.
TABB
8403 Arlington Boulevard
Fairfax, VA 22031
Phone - (703) 299-5646
Fax - (703) 683-7615
TABB Certified "The Professional's Choice" Page 3
INSTRUMENT
CALIBRATION REPORT
Rotating Measuring Instrument
Temperature Measuring Instrument
Electrical Measuring Instruments
Air Pressure Measuring Instrument
Air Velocity Measuring Instrument
Hydronic Pressure Measuring Instrument
0 to 300 psi
Humidity Measuring Instrument MITCT917 Mitchell Instruments 100610809 01/19/15
HM-670 Alnor 71133088 01/21/15
ADM-870C Shortridge M12418 01/22/15
ADM-870C Shortridge M12418 01/22/15
322 Fluke 17830473 01/21/15
117 Fluke 18561871 01/21/15
ADM-870C Shortridge M12418 01/22/15
DATE
PLT-5000 Mitchell Instruments B1488503 11/19/14
INSTRUMENT MODEL MANUFACTURER SERIAL NUMBER CALIBRATION
TABB Certified "The Professional's Choice" Page 4
Index
Project:Nothing Bundt Cakes Premier Job Number:
Pete Korzenowski Report Date:
Page
6 RTU-1 Constant Air Volume
7 RTU-2 Constant Air Volume
8 EF-1 Constant Air Volume
9 EF-2 Constant Air Volume 8/28/15
8/28/15
8/28/15
8/28/15
System / Equipment Description Completion Date
Technician:8/31/15
Premier Test & Balance
4338
TABB Certified "The Professional's Choice" Page 5
Air Handling Unit Test Data
Project:Nothing Bundt Cakes
System:RTU-1 Premier Job Number:
Pete Korzenowski Completion Date:
Equipment Location:
Motor HP:NA NA
Motor RPM:1750 1750
Motor Hertz:60 60.0
Motor Service Factor:1.15 1.15
Motor Phase:3 3
Motor Voltage:208 205 205 207
Motor Amperage:9.4 4.9 4.9 5.1
Motor BHP:--
Fan RPM:-1290
Supply Total
Opening Size K
No.Factor Velocity CFM Velocity CFM %Velocity CFM
1 Flow Hood 1.00 200 200 324 324 162%475 475
2 Flow Hood 1.00 310 310 526 526 170%468 468
3 Flow Hood 1.00 250 250 372 372 149%473 473
4 Flow Hood 1.00 200 200 325 325 163%446 446
Total 960 1547 161%1862
Minimum Outside Air
Size K
Factor Velocity CFM Velocity CFM %Velocity CFM
28x14 2.72 64 175 71 189 108%45 123
Remarks:a)Fan sheave is set to lowest setting.
b)Diffusers are not noisy so no problems anticipated.
c)
d)
e)
Design Final Reading
Total
Sales
Sales
Sales
Sales
Area Design Final Reading
Served
Total Design CFM:920 Min.Outside Air CFM: 175
Fan Static Pressure:Roof
Premier Test & Balance
System Scheduled Data
Model number: 48KCEB04 Serial number: 2815C86776
Manufacturer:Carrier
Preliminary Reading
Preliminary Reading
Airflow Measurements
Performance Data
Description Scheduled / Submittal Data Actual Field Measurements
Outlet Total CFM: 960
4338
Technician:8/28/15
TABB Certified "The Professional's Choice" Page 6
Air Handling Unit Test Data
Project:Nothing Bundt Cakes
System:RTU-2 Premier Job Number:
Pete Korzenowski Completion Date:
Equipment Location:
Motor HP:NA NA
Motor RPM:1750 1750
Motor Hertz:60 60.0
Motor Service Factor:1.15 1.15
Motor Phase:3 3
Motor Voltage:208 205 205 203
Motor Amperage:9.4 6.2 6.2 6.5
Motor BHP:--
Fan RPM:-1355
Opening Size K
No.Factor Velocity CFM Velocity CFM %Velocity CFM
1 Flow Hood 1.00 200 200 281 281 141%215 221
2 Flow Hood 1.00 250 250 343 343 137%372 372
3 Flow Hood 1.00 150 150 198 198 132%313 313
4 Flow Hood 1.00 300 300 389 389 130%386 386
5 Flow Hood 1.00 200 200 245 245 123%326 326
6 Flow Hood 1.00 300 300 370 370 123%312 321
7 Flow Hood 1.00 150 150 188 188 125%353 353
8 Flow Hood 1.00 50 50 63 63 126%89 89
Total 1600 2077 130%2381
Minimum Outside Air
Size K
Factor Velocity CFM Velocity CFM %Velocity CFM
28x14 2.72 119 325 128 348 107%70 191
Remarks:a)Fan sheave is set to lowest setting.
b)Diffusers are not noisy so no problems anticipated.
c)
d)
e)
Preliminary Reading
Total
Design Final Reading
Kitchen
Kitchen
Kitchen
Kitchen
Served
Kitchen
Kitchen
Kitchen
Kitchen
Airflow Measurements
Area Design Final Reading Preliminary Reading
Fan Static Pressure:Roof
Performance Data
Description Scheduled / Submittal Data Actual Field Measurements
Manufacturer:Carrier Outlet Total CFM: 1,600
Total Design CFM:1,600 Min.Outside Air CFM: 325
Premier Test & Balance
4338
Technician:8/28/15
System Scheduled Data
Model number: 48KCEB06 Serial number: 2815C86867
TABB Certified "The Professional's Choice" Page 7
Fan Test Data
Project:Nothing Bundt Cakes
System:EF-1 Premier Job Number:
Pete Korzenowski Completion Date:
Motor HP:0.50 0.50
Motor RPM:1750 1750
Motor Hertz:60 60.0
Motor Service Factor:1.15 1.15
Motor Phase:1 1
Motor Voltage:120 117
Motor Amperage:6.2 5.1
Motor BHP:-0.40
Fan RPM:Direct Drive Direct Drive
Fan:
Fan Total
Opening Size K
No.Factor Velocity CFM Velocity CFM %Velocity CFM
1 8"0.35 1074 375 1095 382 102%1593 556
Total 375 382 102%556
Remarks:a)Speed controller was used to reduce flow.
b)
c)
d)
e)
Served
Various
Airflow Measurements
Area Design Final Reading Preliminary Reading
In Out Rise / Drop Total
-0.34 0.03 Rise 0.37
Performance Data
Description Scheduled / Submittal Data Actual Field Measurements
Static Pressure Data
Component Static Pressure Pressure Pressure
Fan Static Pressure:1.0 ESP
Manufacturer:Greenheck Outlet Total CFM: 375
Total Design CFM:325 Equipment Location:Roof
Technician:8/28/15
System Scheduled Data
Model number: CUE-141HP-VG Serial number: 14218517
Premier Test & Balance
4338
TABB Certified "The Professional's Choice" Page 8
Fan Test Data
Project:Nothing Bundt Cakes
System:EF-2 Premier Job Number:
Pete Korzenowski Completion Date:
Motor HP:0.25 0.25
Motor RPM:1725 1725
Motor Hertz:60 60.0
Motor Service Factor:1.15 1.15
Motor Phase:1 1
Motor Voltage:120 118
Motor Amperage:3.4 2.8
Motor BHP:-0.20
Fan RPM:Direct Drive Direct Drive
Fan:
Fan Total
Opening Size K
No.Factor Velocity CFM Velocity CFM %Velocity CFM
1 Flow Hood 1.00 75 75 82 82 109%145 145
Total 75 82 109%145
Remarks:a)Speed controller was used to reduce flow.
b)
c)
d)
e)
Served
Various
Airflow Measurements
Area Design Final Reading Preliminary Reading
-0.23 0.03 Rise 0.26
Static Pressure Data
Component Static Pressure Pressure Pressure
In Out Rise / Drop Total
Performance Data
Description Scheduled / Submittal Data Actual Field Measurements
Total Design CFM:75 Equipment Location:Roof
Fan Static Pressure:.5 ESP
System Scheduled Data
Model number: G-097-A Serial number: 14218518
Manufacturer:Greenheck Outlet Total CFM: 75
Premier Test & Balance
4338
Technician:8/28/15
TABB Certified "The Professional's Choice" Page 9