3552 Widgeon Way - Zoning Permits & Plans -----------------,
For office Use t
V! Qf h an i Permit t: �P D
3830 Pilot Knob;Road l i
Eagan MN 55122 I i
g t Date Received:
Phone:(661)675-5685 L----------------1
Fax:(651)676-5694
Email:planning0cityofeagan.com
ZONING PERMIT APPLICATION
Please identify improvements on a scaled site plan drawing that shows tot lines, structures
and exlsting!!conditions.
Properly Site Address: j
Information
m Owner Name: -:)-1 &%A
f
Name: Midwest Fence and Mfg Phone: 651-459-2222
Contact Address. 525 E. Villaume Ave. City/stateop: S. St. Paul, MN 5501
Applicant Signat
UFL
Date:
Email address: midwesttrev @gmail.com
13 Retaining Wail<4 feet O Driveway O Other
x 13 Patio ❑Sport Court
'1'Ype of Work 1 ❑Sidewalk WFence
Description of work: (l�0 ")Tall- c tAra-L,J In ( 2AA-ez )Yard
Planning Setbacks,hard surface coverage,shoceland zoning,bluff zonslsetbacks,etc. z
K
Approve Denied Date: ,ry i
Notes: I
Properrt,lines to be
verified contractor/ownr i
i
; Revised Plans i
i Approved: Yes 1 No Date: Staff t
Engineering Grading,drainage,utility easements,wetlands,erosion control,improvements in the Right-of-Way,etc.
f Approved/Denied Date: staff
Notes: '
4
z
Revised Plans
d
F Approved: Yes I No Date: Staff s
Comments
i
CALL BEFORE YOU QIG. Call Gopher state One Call at(654)454.0002 for protection against underground utility damage. Call
48 hours before you intend to dig to receive locates of underground utilities. www.aopherstateonecati ors
RECEIVED APR 15 2 016 G:113dilding InspectionslPERMIT APRUCATIONS
MIDWEST FENCE & MFG. CO.
CUSTOMER YV� 1-8�-�L-� FOR INTERNAL USE ONLY%
ADDRESS S'5-2— SCHEDULE DATE: TIME:
CITY %n:`nl
PHONE: (Hm� !Qcl Z711 "k) 6z CI�{ SET BY DATE:
(Wk) Sp074 WA 6 VI 241 — 55 F( COMPLETED BY DATE:
Salesperson -- U VV4\, % AMOUNT DUE: Set Completion
Locate ticket no. Hudson page no. Hudson grid no. Intersecting St.
CHAIN LINK FENCE DIAGRAM
C .
r
e ,
,
e
,
}
{ f { �
Cam _ mom/ c ./J
} } w
E
£ � I
} d £
n
PtG_rtv Pnes tp be vt,:ih*jd _ .
" A0'C..�a�L
t 3
I AUTHORIZE THE ❑JOB ADDITION ❑JOB CHANGE WE ARE SATISFIED WITH THE INSTALLATION
OF OUR FENCE
ADDITION OR CHANGE SIGNATURE SIGNATURE
General Information
All Galvanized RA Vinyl ❑ Galy. framework/Vinyl Wire Vinyl Chain Link
A ft. (479 hgt. ga. wide gate ❑l California heavy mil coat
�
ft, hgt. ga. wide gate 9 Vinyl Gate
tie ins 2`�"posts (no wide ate
g ❑Wood Gate C ornia Fenc
i tie ins "posts wide gate
`�, ed p s style
7-�_end posts welded gate
end posts ❑post s style
P welded gate
gate posts wide drive gate. ❑ ttorn 2x
gate posts wide removable panel tension wire
corner posts self closers Color
corner posts uto latches r NLrt.0-. 19black
breaker posts cement hard holes ❑tension wire ❑ brown
breaker posts ❑asphalt hard holes�---O bottom rail ❑green
General Instructions/Obstructions
n Remo
a
13 3-man c