Loading...
3365 Central Park Village Dr Use BLUE or BLACK Inky �1� . � For Office Use ---------� I Permit#: z Zfo I f City of EapIl I Permit Fee: / r l 3830 Pilot Knob Road I I Eagan MN 55122 I I Date Received: Phone: (651)675-5675 I Fax: (651)675-5694,, 11 —/ / . � I Staff: 2016 COMMERCIAL BUILDING PERMIT APPLICATION Date: 4/22/2016 Site Address: 3365 Central Park Village Drive, Eagan, MN 55121 Tenant Name: Spec Retail / Building 0 (Tenant is: ✓ New/ Existing) Suite#: Former Tenant: N/A Name: CSM Corporation Phone: 612-395-7030 Property Owner 500 Washington Ave S., Suite 3000, Minneapolis, MN 55415 Address/City/Zip: Applicant is: Owner Contractor Type of Work Description of work: Construction of new building within Central Park Commons Construction Cost: $650,000 Name: R.J. Ryan Construction, Inc. 291031 License#: Contract®r Address: 1100 Mendota Heights Road City: Mendota Heights State: MN Zip_ 55120 Phone: 651-681-0200 Contact: Aaron Waller Email: awaller @rjryan.com Name: Robert Lucius, RSP Architects Registration#: 14066 Archi teCUEngine�er Address: 1220 Marshall Street NE c;ty: Minneapolis State: MN Zip: 55413 Phone: 612-677-7100 Contact Person: Robert Lucius Email: i Licensed plumber installing new sewedwater service: f:� l hone#: (% ;> / NOTE:glans and supporting documents#hat you submit are owns ed tO be pubis kWor "ba..po!"Vom of #►e lniormaticet'may be ofassii� of as noti !f ycwcr provide sp ns tat would perrnd tee City ttr copctude hat atse CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan;that I understand this is not a permit, but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work whic2h_requires a review and approval of plans. x Aaron Waller Applicant's Printed Name Applicant's Signature Page 1 of 3 DO NOT WRITE BEL01 THIS LINE SUB TYPES Foundation _ Public Facility _ Exterior Alteration-Apartments _ Commercial/Industrial _ Accessory Building _ Exterior Alteration-Commercial _ Apartments _ Greenhouse/Tent _ Exterior Alteration-Public Facility Miscellaneous Antennae WORK TYPES New _ Interior Improvement Siding _ Demolish Building* Addition _ Exterior Improvement Reroof _ Demolish Interior Alteration Repair Windows Demolish Foundation Replace _ Water Damage Fire Repair _ Retaining Wall Salon Owner Change *Demolition of entire building-give PCA handout to applicant DESCRIPTION Valuation Co. O Occupancy Af .4 MCES System Plan Review Code Edition Zg/S MAC SAC Units (25%_100%!6 Zoning City Water Census Code Stories Booster Pump #of Units D Square Feet PRV #of Buildings / Length Fire Sprinklers Type of Construction V.(3 Width REQUIRED INSPECTIONS ✓ Footings(New Building) ✓ Sheetrock Footings(Deck) Final/C.O.Required Footings(Addition) Final/No C.O.Required V/ Foundation -7 Other: f0t SrolfflN L' Drain Tile Pool: Footings —Air/Gas Tests _Final ✓ Roof: ✓Decking ✓ Insulation _Ice&Water ✓ Final ✓ Siding:_Stucco Lath _Stone Lath -/Brick Framing Windows Fireplace:_Rough In _Air Test _Final Retaining Wall Insulation Erosion Control Meter Size: Concrete Entrance Apron Final C/O Inspection: Schedule Fire Marshal to be present: ✓ Yes No Reviewed By: , Building Inspector Reviewed By: 1��'w! b • , Planning COMMERCIAL FEES Base Fee 40 Zo(. .'7f' Storm Sewer Trunk Surcharge 3LS.ws+ Sewer Trunk Plan Review Z'15 i .11 Water Trunk MCES SAC 4t 4170.0-d Street Lateral City SAC ZZO.as Street S&W Permit&Surcharge f-2-1 °° Water Lateral Treatment Plant j+7 11'. r.d Other: Treatment Plant(Irrigation) Park Dedication 219 72 a-b Trail Dedication Water Quality TOTAL: /I, $Z. 1 Page 2 of 3 MCES USE:Letter Reference: 160420A5 Address ID:704363 Payment ID:392457 -3-7 / Date of Determination:04/20/16 Determination Expiration:04/20/18 Greetings! Please see the determination below. Project Name: Central Park Commons Building 0 Project Address: Yankee Doddle/Pilot Knob Road Suite#/Campus: Central Park Commons City Name: Eagan Special Notes: The Council understands this building has speculative retail. At the time the finishing permits are issued, if the use changes from its speculative use to a different use,the SAC assignment needs to be reviewed based on that change. Charge Calculation: Retail : 4819 sq.ft. @ 3000 sq.ft./SAC= 1.61 Total Charge: 1.61 or 2 Credit Calculation: none Total Credit: none Net SAC: 2 -or- 2 SAC Due The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size,a redetermination will need to be made. If you have any questions email me at:core.mccullough @metc.state.mn.us. Thank you, Cory McCullough SAC Program Technical Specialist Please visit our SAC website by going to: http://www.metrocouncil.org/Wastewater-Water/Funding-Finance/Rates-Charges/Sewer-Availability-Charge.aspx Robert - METROPOLtTAN C 0 u N c i L m N Q Q 0 0 p N O 0 M� W Z�' -TL O OH 90NM 1011d J N IIIIIIIz 'a III Z N I t CL O Imp cc CI) c oC i LJ a Vill Ij LU J _i III Q z $ao } � o I 1! I U in; s� ^_2 I • J IM U { Q � •.t Jill ®—�XVMHHtld WillN30 o NNLL G]' mak'. O Q m o r —� Uw le Z cm �_ /1 sWz Zw 1 1 W tJ pm 0 g� OZ 9}f� fell Nb� H W � 1 lid did a � i y ggg ' g S 'R s I w l x WH as 1 a l Hull � ?S # �y Y. IFIE �� 1 Ell City of EaQall 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 ( rf =� fJ Use BLUE or BLACK Ink For Office Use %] Permit #: / L Permit Fee: Date Received: Staff: 2016 FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION Date: <, r Site Address: � a 0 Tenant: ky, 1A o.IC ✓;Il&S c r - J Suite #: Name: Address / City / Zip: Applicant is: Phone: Owner Contractor Description of work: Construction Cost: " 1 Co° � H i C os, � Name: opt, '" i rt. r, Address: C e.r rt,1 1 I - Estimated Completion Date: O/c2-?)1(0 State: MA) Zip: 55)17 Contact: S oSS\-; . Phone: License #: City: 1-11-4-1 C CF C\ 651-7? I -8674/ 'M"Cr� �n Email: \Jv r'� i SCt�`(C c0 FIRE PERMIT TYPE cc�� k Sprinkler System (# of heads 7) Fire Pump _ Standpipe Other: WORK TYPE X: New _ Addition Alterations Remodel Other: DESCRIPTION OF WORK: Commercial Residential Educational FEES $60.00 Permit Fee Minimum Surcharge = Contract Value x $0.0005 If the project valuation is over $1 million, please call for Surcharge $100.00 Residential New (includes State Surcharge) Contract Value $ 7 x .01 = $ Li Permit Fee = $ + 7 Surcharge _$ 77`7 TOTAL FEE 3/4" Fire Meter - $280.00 = $ 2-V::).00 Fire Meter _ $ 1 . 70 TOTAL FEE **Requirements: 2 complete sets of drawings and specifications, cut sheets on materials and components to be used I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in actorance with the approved plan in the case of work which requires a review and approval of plans. x LY r‘ 2rS1. Applicant's Printed Name x ofEa an 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 2015 pLuvia,13-ov6) IN III la • sr— = - — • Use BLUE or BLACK Ink For Office Use Permit #: 300 73 Permit Fee: 1/ / 077D Date Received: Staff: PERMIT APPLICATION Aai/21.4-1c- Date: 8-3-16 site Address: Central Park Commons Drive Please submit two (2) sets of plans with all commercial applications. Tenant: Building 0 Resdei"itiOiNnier = Ccilltractor I State: Name: Address / City / Zip: Name: Voss Utility & Plumbing Address: PO Box 240 MN ziD: 55341 Phone: Suite #: License #: PC000306 City: Hanover Phone: 763-497-4577 Contact: Steven Voss Email: vossup@comcast.net V New Replacement Additional Plumbing for Shell Building Alteration Demolition ; NOTE: Rictof Ittotitited and grotitld mottrtted rriechartlotiii etilliprrierit is reciuttwct o be screened by City corleact ogeollaritual InspectOr for irtforniation onperrrftt red soreforting trietftods COMMERCIAL RESIDENTIAL Furl -lace Permit Type Air Conditioner Air Exchanger Heat Pump Other RESIDENTIAL FEES 1 $60.00 Minimum Add or alteration to an existing unit (includes $500 State Surcharge) $100.00 Residential New (includes $5.00 State Surcharge) COMMERCIAL FEES //-21444e4 47/0 '°6) contract Value $ 27,400.00 x.01 1 $55,00 Permit Fee Minimum $70.00 Underground tank installation/removal A410+1a 419°. if contract value is LESS than $10,010, Surcharge = $5.00 **If contract value is GREATER than $10,010, Surcharge = Contract Value x $0.0005 "*"If the project valuation is over $1 million, please cat for Surcharge I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work Will be in accordance with the approved plan in the case of work which requires a review and approval of plans. V New Construction Install Piping Gas Interior Improvement Processed Exterior HVAC Unit _ Under/Above ground Tank L.. Install / Remove) TOTAL FEE $ 274.00 $ 13.70 Surcharge* $ TOTAL FEE Permit Fee x Steven Voss Applicant's Printed Name FOR OFFICE US Required inspectiOns:Date: Wei y: , to<1.--;r1dergrOund ()ugh ir Test Gas Serviae Test infloor Heat final HVAC Applicant's Signature - Use BLUE or BLACK Ink 4 1lb" For Office Use • " 'Cit Of Ea o� 1 Permit#: `' Permit Fee: J &7> - 0 (4) 3830 Pilot Knob 12oad RECEIVED Eagan MN 55122 Phone: (651)675-5675 Date Received: l2-/S/;( Fax: (651)675-5694 DEC 1 5 1016 Staff: 7 J 2016 MECHANICAL PERMIT APPLICATION ❑ Please submit two(2)sets of plans with all commercial applications. 327825 Date: Site Address:3365 CENTRAL PARK VILLAGE DRIVE Tenant: CPC BUILDING O Suite#: Reside t owner` ; Name: Phone: iHiii; Address/City/Zip: Name: MODERN HEATING &AIR CONDITIONING License#: N/A Con r to' Address: 2318 FIRST ST NE City: MINNEAPOLIS State: MN Zip: 55418 Phone: 612-781-3358 Contact: JIM TURPIN Email: JTURPIN@MODERNHTG.COM New Replacement Additional Alteration Demolition Type of Work,. _ , , Description of work: NOTE z of g u GI' r Is X �,ljL C e Ss ,fi sl .Please t' n}aact. tl hanical Ins r 6#at),: of 1i :, 4$ :``: 3 )( € k RESIDENTIAL COMMERCIAL Furnace 4lew Construction Interior Improvement�� Air Conditioner Install Piping Processed Air Exchanger tC Gas 0 Exterior HVAC Unit Heat Pump Under/Above ground Tank ( Install/ Remove) Other RESIDENTIAL FEES $60.00 Minimum Add or alteration to an existing unit, includes State Surcharge $100.00 Residential New, includes State Surcharge =$ TOTAL FEE COMMERCIAL FEES Contract Value$16,000.00 x.01 $60.00 Permit Fee Minimum 160.00 $70.00 Underground tank installation/removal =$ Permit Fee _$ 8.00 Surcharge Surcharge=Contract Value x$0.0005 If the project valuation is over$1 million,please call for Surcharge =$ 168.00 TOTAL FEE I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. JIM TURPIN "�'1 x � ,�►7 Applicant's Printed Name ,pp i- ture .44 U �i , -�FI05 �E E I : �d t , ir. Ji , r -Re *00ns b . r r l } tUncle rout Ral In Air T s' .- ,. . .. , • ,, t =4 m,• , ;- Use BLUE or BLACK Ink I� b it ii � pt i'‘'-'1 For Office Use C� I-f Permit:eY Cit of Ea a4111 ..--7..._? a Permit e.42, 3830 Pilot Knob Road Eagan ° )`7 MN 55122 Date Received: Phone: (651) 675-5675 RECEIVED Fax: (651) 675-5694 Staff: MAR - 7 2017 2017 COMMERCIAL BUILDING PERMIT APPLICATION Date: 3/7/17 Site Address: 3365 Central park Village Drive, Suite #2O– /d Tenant Name: Viverant (Tenant is: 200— X New/ Existing) Suite#: Former Tenant: None /ems �` �� Name: CSM Phone: 612-395-7000 Prcpe�rty Owner , 500 Washington Ave. S, Minneapolis 55415 Address/City/Zip: ;,:` Applicant is: X Owner Contractor Description of work: Tenant build out ,_ Construction Cost: 74) -I c • Q Name: R'J• Ryan Construction License#: ntraor Address: 1100 Mendota Heights Rd. city. Mendota Heights State: MN Zip: 55120 Phone: 651-681-0200 (,/Z• 8 `ll- 3$03 Aaron Waller awaller@rjryan.com Contact: Email: Name: WIIkus Architects Registration#: 15 Ninth Ave. North Hopkins ` 1t / #1in�lr Address: City: State: M N Zip: 55343 Phone: (45-2_) q - 40 Contact Person: Jeff Rapp Email: jmr@WIIkUSarch.Com Licensed plumber installing new sewer/water service: Phone#: } Plan and 403.:0.00A:documents that youubrnit � � r t �� on.,o�� the information ma r b asrtied.as non-pu�c tf y� wide7,--..---.-,:,''-,reasons�� r� �. Cit ,o conclude t,,,,,,:,,,,„,.-;,,:ifey arta ode .=. ; . CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work whichhrequires a review and approval of plans. X Aaron Waller Xact's.... Applicant's Printed Name Applicant's Signature Page 1 of 3 DO NOT WRITE BELOW THIS LINE SUB TYPES Foundation _ Public Facility _ Exterior Alteration-Apartments Commercial I Industrial Accessory Building _ Exterior Alteration-Commercial Apartments Greenhouse I Tent _ Exterior Alteration-Public Facility Miscellaneous Antennae WORK TYPES New ✓/Interior Improvement Siding Demolish Building* Addition _ Exterior Improvement Reroof _ Demolish Interior Alteration Repair Windows Demolish Foundation Replace Water Damage Fire Repair Retaining Wall Salon Owner Change *Demolition of entire building—give PCA handout to applicant DESCRIPTION ✓' Valuation 1751 t . Occupancy 6 MCES System Plan Review ✓ Code Edition LO/S'Ma3G SAC Units V% +e— (25% 100% V) Zoning ' -' City Water ✓ Census Code Stories ( Booster Pump #of Units t✓° Square Feet 3)3G 1 PRV #of Buildings I Length Fire Sprinklers t/ Type of Construction V•$ Width REQUIRED INSPECTIONS Footings(New Building) ✓ Final I C.O. Required Footings(Deck) Final I No C.O. Required Footings(Addition) V/ Other: /7i--V• 91 PPIN4► Foundation Foundation Before Backfill Pool: Footings _Air/Gas Tests Final Drain Tile Siding: Stucco Lath _Stone Lath _Brick EFIS Roof:_Decking Insulation Ice&Water Final Retaining Wall ✓ Framing 30 Minutes 1 Hour Erosion Control Fireplace: Rough In Air Test Final Concrete Entrance Apron Insulation ;'Meter Size: Sheetrock V Electronic Plans Required Windows i Final C/O Inspection: fi dole F Marshal to be present: " Yes No Reviewed By: 7 , Planning New Business to Eagan: \i-i2- Reviewed By: eRA-1 c , Building Inspector FEES Water Quality Base Fee /SOL . 7S" Storm Sewer Trunk Surcharge $7. SO Sewer Trunk Plan Review /7/ 3/ Water Trunk MCES SAC Street Lateral City SAC Street S&W Permit&Surcharge Water Lateral Treatment Plant Other: Treatment Plant(Irrigation) Park Dedication Trail Dedication TOTAL: I Z S7 5. 6`l" Page 2 of 3 MCES USE:Letter Reference: 170315A4 Address ID:704363 Payment ID:400234 /G// g Date of Determination:03/15/17 Determination Expiration:03/15/19 Greetings! Please see the determination below. Project Name: Viverant Project Address: 3365 Central Park Village—Building 0 Suite#/Campus: 0-2/Central Park Commons City Name: Eagan Applicant: Aaron Waller, RJ Ryan Construction Special Notes: None Charge Calculation: Office: 1167 sq.ft. @ 2400 sq.ft./SAC=0.49 Gym/no shower: 1398 sq.ft. @ 2060 sq.ft./SAC=0.68 Total Charge: 1.17 Credit Calculation: Central Park Commons(SAC 07/16) Retail: 3038 sq.ft. @ 3000 sq.ft./SAC= 1.01 Total Credit: 1.01 Net SAC: 0.16 —or— 0 SAC Due The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size,a redetermination will need to be made. If you have any questions email me at: karon.cappaert@metc.state.mn.us. Thank you, Karon Cappaert Administrative Specialist Please visit our SAC website by going to: http://www.metrocouncil.org/SACprogram 390 Robert Street North I St. Paul. MN 55101-1805 Phone 651.602.1000 I Fax 651.602.1550 I TTY 651.291.0904 j metrocouncil.arg METROPOLITAN An Equn!Opportunfly Einclvyer G O U N C I L (6-/Ij ,a..9_,C Use BLUE or BLACK Ink oPtit Qi For Office Use ,�� city o� Eapll Permit#: I Li Permit Fee: (P),. 3830 Pilot Knob Road f1: Eagan MN 55122 A" a !) -. :,,,,t1 Date Received: "��� Phone: (651)675-5675 Fax: (651)675-5694 J Staff: 2017 FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION Date: 4/4/2017site Address: 3365 CENTRAL PARK VILLAGE DR Tenant: VIVERANT _ ___Suite#: 100 .. �. Name: ,.. ��,,. , u, r ..W. Phone: ,. , �, , p n , i Property Owner Address/City/Zip: 3 I Applicant is: Owner Contractor 3. Type of Work Description of work: NEW PENDNENT HEADS FOR TENANT BUILDOUT ii ; Construction Cost: 4400 Estimated Completion Date. MAY 2017 ,____,__ ______,_,_i ESCAPE FIRE C0086 t Name: License#: I 3000 CENTERVILLE ROAD LITTLE CANADA t t Contractor I Address: City: I MN 55117 Phone: 651-771-8874 _ State: Zip: GREGORY M. PFEIFER GREGP@ESCAPEFIRE.COM I t t Contact Email: FIRE PERMIT TYPE WORK TYPE u ✓ Sprinkler System (#of heads to) New _Addition I Fire Pump ^Standpipe s T Alterations ✓ Remodel l t 4 Other: Other ' DESCRIPTION OF WORK: XCommercial _Residential Educational FEES I $60.00 Permit Fee Minimum Contract Value$4400.00 x .01 I Surcharge= Contract Value x$0.0005 =$ 60.00 Permit Fee I l If the project valuation is over$1 million, please call for Surcharge 2 20 =$ Surcharge $100.00 Residential New(includes State Surcharge) =$ 62.20 TOTAL FEE 3/4" Fire Meter-$290.00 =$ Fire Meter 62.20 $ TOTAL FEE ' **Requirements: 2 complete sets of drawings and specifications,cut sheets on materials and components to be used I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. / )(GREGORY M. PFEIFER )( ,Ailk. •� Applicant's Printed Name Applicant's S.11 a , (iii( 49 3 FOR OFFICE USE REQUIRED INSPECTIONS I Hydrostatic ' Flow Alarm Drain Test ✓ Rough In Trip Pump Test Central Station Final 0 Conditions of Issuance: 9 1 I iPermit Reviewed b • r %/ Date: , 4/- / /6 / I / r • Escape Fire Protection ESCA PE 3000 Centerville Road Protection Canada, MN 55117 Fire Protection 651-771-8874 Letter of Transmittal 04/04/17 Send Via: X Mail CITY OF EAGAN UPS Delivery 1-hour Enclosed is (are): X Shop Drawings Attn: FIRE SPRINKLER Close-Out Documents PERMITS X Product Submittals REG: VIVERNAT Change Order Letter Request for Proposal EAGAN., MN Permit Check Permit Application Copies Date Item 3 2/14/2017 NEW OFFICE REMODEL PLAN 3 HEAD DATA 1 PERMIT APPLICATION 1 PERMIT CHECK These are Transmitted: X For Approval 1 Returned COPY As Requested Rejected For your Information Revise and Resubmit Approved as submitted For Review Approved as Noted For Your Use For Bids Due: Remarks: From: GREGORY M. PFEIFER Project Manager 0( v��i Use BLUE or BLACK Ink t City ��, For Office Usg 1.4.7„..(31 L., LA, U lJ ��� n �7. �� �_ ::: e: 3830 Pilot Knob Road , Eagan MN 55122 APR 1 1 2017 Date Received: 44/-/7 Phone:(651)675-5675 Fax:(651)675-5694 Staff: -7 J 2017 COMMERCIAL PLUMBING PERMIT APPLICATION ❑ Please submit two(2)sets of plans with all commercial applications. Date: 4-5-17 Site Address: Central Park Commons Drive-Building 0 , ,,,kI \ fL' k- V Tenant: Viverant ��14�� ,33 105- Cc Suite#: Proper owner` Name: Phone: Name: Voss Utility&Plumbing License#: PC000306 Contractor Address: PO Box 240 City: Hanover State: MN Zip: 55341 Phone: 763-497-4577 Email: vossup@comcast.net o k —New _Replacement _Repair _Rebuild it Modify Space Work in R.O.W. Type O , Description of work: Tenant Build-Out ....„,,„.„.,,,,Are '' COMMERCIAL New Construction Modify Space Irrigation System(—yes/_no)(_RPZ/ PVB) s • Rain sensors required on irrigation systems Permit Type • Avg.GPM (2"turbo required unless smaller size allowed by Public Works) Meters Call(651)675-5646 to verity that tests passed prior to picking up meter. Domestic:Size&Type Fire: 1 � Avg.GPM High demand devices?_Yes_No Flushometers_Yes_No COMMERCIAL FEES Contract Value$6695.00 x.01 $60.00 Permit Fee Minimum 66.95 $60.00 PVB/RPZ Permit(includes State Surcharge) _$ Permit Fee _$ 3.35 Surcharge Surcharge=Contract Value x$0.0005 70.30 If the project valuation is over$1 million, please call for Surcharge =$ TOTAL FEE Following fees apply when installing a new lawn irrigation system $ Water Permit Contact the City's Engineering Department,(651)675-5646,for required fee amounts. $ Treatment Plant $ Water Supply&Storage $ State Surcharge _$ 70.30 TOTAL FEE CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. \ I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x Steven Voss x n ' _)C 4 Applicant's Printed Name Applicant's Signature 1=tOFFICE USE Y µ. Approved By t • ltte Required IrtOc�s �r Ground I�ugh-in j f'Tem . Gas T ,' Fina! r ,,... uir1�Yes No ; MeRelated Items 1 M Size . , Radio Read Man S" Page 1 of 3 ` Use BLUE or BLACK Ink 1L1 1 (' For Office Use 411111" C1/11 • � �0,0 � �`,i.. Permit#: ty �l �U � ( V" Permit Fee: ! iiii 3830 Pilot Knob Road CL" Eagan MN 55122 APR 101017 Date Received: -10 - i7 Phone: (651)675-5675 Fax:(651)675-5694 Staff: 2017 COMMERCIAL FIRE ALARM PERMIT APPLICATION Date: 4/7/2017 Site Address: 3365 Central Park Village Drive Tenant: Suite#: Name: CSM Corp. CPC Bldg 0 Phone: Property Owner Address/City/Zip: Applicant is: Owner Contractor Type of Work Description of work: Add mechanical room access, burg&environmental with strobe light Construction Cost: Estimated Completion Date: Name: Wellington Security Systems License#; TS00657 Contractor Address 5555 W. 78th St. Suite H city: Edina State: MN Zip: 55439 Phone: 612-822-4094 Contact: Judith Email:jschmeling@wellingtonsecurity.com New _Remodel Work Type ✓ Addition Other: Alterations DESCRIPTION OF WORK: Commercial _Residential _Educational FEES Contract Value$2083.00 x.01 $60.00 Permit Fee Minimum =$ 60.00 Permit Fee Surcharge=Contract Value x$0.0005 =$ 1 .0415 Surcharge* if the project valuation is over$1 million,please call for Surcharge =$ 61.04 TOTAL FEE **Requirements:2 complete sets of drawings and specifications,cut sheets on materials and components to be used I hereby apply for a Fire Alarm permit and acknowledge that the information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. ! r� "x�../uJp f'/""f" ii> SC.rte, �'N)f7 / -t '- C Applicant's Printed Name , plicant's Signature FOR OFFICE USE Reviewed By .- r. .- Date: /-17-17 Required Inspections: Rough-In ,Final Fire Alarm Test Use BLUE or BLACK Ink ��, For Office Use �j/ 't I 0V Permit#: /(---6�-� / d'---------1 4� UI L ��� G�S �`� Permit Fee: /1/g/- �"I- 3830 Pilot Knob Road Eagan MN 55122 Phone: (651)675-5675 Date Received: II') '� Fax: (651)675-569kf 4 Staff: 2016 MECHANICAL PERMIT APPLICATION IZ Please submit two(2)sets of plans with all commercial applications. Date: 4/24/2017 Site Address:3365 Central Park Village Suite 100 Tenant: Viverant Central Park Commons Suite#: Name: Phone: Resident/Owner Address/City/Zip: Name: Legacy Companies Inc License#: 8850 Wentworth Ave South Bloomington Contractor Address: City: MN 55420 612-866-1351 uz 1 ` . State: Zip: Phone: Clint Anderson infoQa legacymech.net Contact: Email: New Replacement Additional Alteration Demolition T e'of Work Description Of Work: Add 1 exhaust PRV,3 supplemental duct heaters,distribution from 2 existing rooftop units yp. NOTE Roof mountedand ground mounted mechanical equipment is requtred,Q;to be creeriad 11,P-ity Code. Pleaseecontact the Mechanical Inspector for information on&permttted screening methods RESIDENTIAL COMMERCIAL Furnace New Construction if Improvement Permit Type Air Conditioner Install Piping Processed '` Air Exchanger 9 Gas Exterior HVAC Unit Heat Pump Under/Above ground Tank (—Install/ Remove) , , :' Other RESIDENTIAL FEES $60.00 Minimum Add or alteration to an existing unit, includes State Surcharge $100.00 Residential New, includes State Surcharge =$ TOTAL FEE COMMERCIAL FEES Contract Value$10,316 x.01 $60.00 Permit Fee Minimum $70.00 Underground tank installation/removal =$ //VA '/�/� Permit Fee =$ / Surcharge Surcharge=Contract Value x$0.0005 If the project valuation is over$1 million,please call for Surcharge =$ /0g- '---- TOTAL FEE I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. s }1 x Clint Anderson x (? l M, Applicant's Printed Name Applicant's Signature FORDFFfCE USE Required inspections Reviewed By: .,-;:i,..:::li,„,..,,, r Underground RSaugh In Air Test __: Gas Service Test In-floor Heat Final HVAC Screening Use BLUE or BLACK Ink For Office Use City of Eaaall Permit#: L-7‘.2/�/7/ Permit Fee: % 0 6 3830 Pilot Knob Road Eagan MN 55122 Date Received: Phone:(651)675-5675 Fax:(651)675-5694 Staff: 2017 COMMERCIAL PLUMBING PERMIT APPLICATION ❑ Please submit two(2)sets of plans with all c. 4rcial applications. Date: 5-15-17 Site Address: Central Park -. Dr Tenant: Building 0939,bcp Suite#: --:'Property Owner Name: Phone: Name: Voss Utility&Plumbing License#: PC000306 Contractor. Address: PO Box 240 City: Hanover State: MN Zip: 55341 Phone: 763-497-4577 Email: vossup@comcast.net New —Replacement Repair Rebuild Modify Space Type of Wnrk. — Work in R.O.W.— • Description of work: ,..., .... COMMERCIAL 1 Irrigation Sy tem ..,, ,. x New Construction Modify Space / //l/ (_yes/ no)(_RPZ/_PVB) �" `� � • Rain sensors required on irrigation systems dip Permit type • Avg.GPM (2"turbo required unless smaller size allowed by Public Works) ✓ Meters Call(651)675-5646 to verity that tests passed prior to picking up meter. Domestic:Size&Type 1' Fire: 1 Avg.GPM High demand devices?_Yes_No Flushometers_Yes_No COMMERCIAL FEES Contract Value$ x.01 $60.00 Permit Fee Minimum 60.00 $60.00 PVB/RPZ Permit(includes State Surcharge) $ Permit Fee =$ Surcharge Surcharge=Contract Value x$0.0005 If the project valuation is over$1 million, please call for Surcharge =$ TOTAL FEE Following fees apply when installing a new lawn irrigation system $65.00 Water Permit Contact the City's Engineering Department,(651)675-5646,for required fee amounts. $ Treatment Plant $ Water Supply&Storage $ State Surcharge =$ 495.00 TOTAL FEE CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. \ I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x Steven Voss x + �� Applicant's Printed Name Applicant's Signature FOR OFFICE USE AOproyed Date: Requited Inspections:., Under Ground _Rough-In Alt Test Gas Test Falai #il"{Require* Yet No Meter Related Items Meter Size Radio-Raid Manometer Page 1 of 3 Peggy Fleck /L! 7/V From: Abby Decker Sent: Friday, May 12, 2017 1:40 PM To: Peggy Fleck; 'vossup@comcast.net; Brent Massmann Subject: FW: BFP Attachments: CPClrrigation Rev3.pdf; CPClrrigation Rev3.pdf Peggy, 67O 04-16-t_ Brent has approved the following �� Six 1" irrigation meters // (i i/7 For: 3325 ;d 3345 —141P i ( (ld f' L f9 G 1 / 3340X7/1 etcki • 3360'`/17-7/3 �1�j .• 3365--It-p-7/e1/We), 0 _,-3380 Central Park Village Drive--ly-7/S Size of meters: j • •- • : Sive Voss 763-497-4577 �•{��76 bKC (.)/ S ( c .(J" _ {'16 Meters will be housed: inside _ ��p I ` ,� -3v-4 Please touch base with Steve Voss to confirm the permit and funds are in order. We have 1" meters in stock and e can come up and pick them up any time during office hours. M-F 0700-1530 Thanks Peggy! Abby From: Brent Massmann Sent: Friday, May 12, 2017 1:25 PM To:Abby Decker<adecker@cityofeagan.com> Subject: FW: BFP I spoke with the irrigation designer to confirm the flow rate requirements for the system.They will ne be getting 1 %2" meters they will be issued 1" iPearl meters.They are in stock and can be picked up whenever they want.We will need to make sure we have them tagged for which building they belong to. Thanks, Brent Massmann City of Eagan-Utility Operations Supervisor 3419 Coachman Rd - Eagan, MN 55122 Office: 651-675-5217 Cell: 651-485-8915 bmassmann@cityofeagan.com From: Aaron Waller [mailto:awalier(arjryan.com] Sent: Thursday, May 11, 2017 2:31 PM To: Brent Massmann; James Hauth 1 ave,. ptuot 137 v 4,11111° Cly of Eaaafl WeMo # 13 TO: on Hohenstein,Community Development Mike Ridley, Planning ✓parrin Bramwell, Fire Marshal Scott Peterson, Building Inspections Russ Matthys, Engineering )ohn Gorder, Engineering Aaron Nelson, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Joe Gibbs, Finance Jared Flewellen, Parks&Recreation Jon Eaton, Utilities ✓Josh Wilske, IT Eric Macbeth,Water Resources Gregg Thompson,Water Resources Gregg Hove, Forestry Lt. Mike Fineran, Police FROM: Craig Novaczyk Date: 5/16/16 Project Name: Building 0 Sub Type,Work Type: Shell building Address: 3365Central Park Village Drive The plans are located in the Plan Review area in Community Development. Please review and indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request"form. Please submit a response within 7 days. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No Landscape Security Required Zoning: ❑ Yes 0 No Water Quality Dedication Meter Size: ❑ Yes ❑ No Park Dedication O Yes ❑ No Trail Dedication ❑ Yes ❑ No Tree Dedication ❑ Yes 0 No PRV Required ❑ Yes ❑ No REF Reconciliation between Engineering& Finance Signature Date G:\Building Inspections\FORMS\Commercial Bldgs Final&Plan Review Letters City of Eaafl MeMo # 13 TO: Jon Hohenstein, Community Development Mike Ridley, Planning Darrin Bramwell, Fire Marshal Scott Peterson, Building Inspections Russ Matthys, Engineering John Gorder, Engineering Aaron Nelson, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Joe Gibbs, Finance Jared Flewellen, Parks&Recreation Jon Eaton, Utilities Josh Wilske, IT Eric Macbeth,Water Resources Gregg Thompson,Water Resources Gregg Hove, Forestry Lt.Mike Fineran, Police FROM: Craig Novaczyk Date: 5/16/16 Project Name: Building 0 Sub Type,Work Type: Shell building Address: 3365 Central Park Village Drive The plans are located in the Plan Review area in Community Development. Please review and indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request"form. Please submit a response within 7 days. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No Landscape Security Required Zoning: ❑ Yes ❑ No Water Quality Dedication Meter Size: ❑ Yes ❑ No Park Dedication ❑ Yes ❑ No Trail Dedication ❑ Yes w No Tree Dedication ❑ Yes ❑ No PRV Required ❑ Yes ❑ No REF Reconciliation between Engineering &Finance Digitally signed by Gregg Hove ove Date:2016.05.17 08:11:35 Gregg�7�7 -05'00 5-17-16 Signature Date G:\Building Inspections\FORMS\Commercial Bldgs Final&Plan Review Letters 4111110111' City of Eaafl Mello # 13 TO: Jon Hohenstein, Community Development Mike Ridley, Planning Darrin Bramwell, Fire Marshal Scott Peterson, Building Inspections Russ Matthys, Engineering John Gorder, Engineering Aaron Nelson, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Joe Gibbs, Finance Jared Flewellen, Parks&Recreation Jon Eaton, Utilities Josh Wilske, IT Eric Macbeth,Water Resources Gregg Thompson,Water Resources Gregg Hove, Forestry Lt.Mike Fineran, Police FROM: Craig Novaczyk Date: 5/16/16 Project Name: Building 0 Sub Type,Work Type: Shell building Address: 3365 Central Park Village Drive The plans are located in the Plan Review area in Community Development. Please review and indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request"form. Please submit a response within 7 days. Comments: No comments. Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No Landscape Security Required Zoning: ❑ Yes ❑ No Water Quality Dedication Meter Size: ❑ Yes ❑ No Park Dedication El Yes ❑ No Trail Dedication ❑ Yes ❑ No Tree Dedication ❑ Yes ❑ No PRV Required ❑ Yes ❑ No REF Reconciliation between Engineering& Finance (.44): Josh Wilske W�` 2016.05.17 09:21:31-05'00' Signature Date G:\Building Inspections\FORMS\Commercial Bldgs Final&Plan Review Letters :0 .. .... 1 o all y WOMO # 13 TO: Jon Hohenstein, Community Development Mike Ridley, Planning Darrin Bramwell, Fire Marshal Scott Peterson, Building Inspections Russ Matthys, Engineering John Gorder, Engineering Aaron Nelson, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Joe Gibbs, Finance Jared Flewellen, Parks&Recreation Jon Eaton, Utilities Josh Wilske, IT Eric Macbeth, Water Resources Gregg Thompson, Water Resources Gregg Hove, Forestry Lt. Mike Fineran, Police FROM: Craig Novaczyk Date: 5/16/16 Project Name: Building 0 Sub Type,Work Type: Shell building Address: 3365 Central Park Village Drive The plans are located in the Plan Review area in Community Development. Please review and indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request"form. Please submit a response within 7 days. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No Landscape Security Required Zoning: O Yes ❑ No Water Quality Dedication Meter Size: ❑ Yes 0 No Park Dedication ❑ Yes ❑ No Trail Dedication ❑ Yes ❑ No Tree Dedication ❑ Yes ❑ No PRV Required ❑ Yes 0 No REF Reconciliation between Engineering & Finance ,_.1 - l V/ ( �. .:. -.API. Sign-t re Date G:\Building Inspections\FORMS\Commercial Bldgs Final&Plan Review Letters City of Eaali M # 13 TO: Jon Hohenstein, Community Development Mike Ridley, Planning Darrin Bramwell, Fire Marshal Scott Peterson,Building Inspections Russ Matthys, Engineering John Gorder, Engineering Aaron Nelson;Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Joe Gibbs, Finance Jared Flewellen, Parks&Recreation Jon Eaton, Utilities Josh Wilske, IT Eric Macbeth,Water Resources Gregg Thompson,Water Resources Gregg Hove, Forestry Lt. Mike Fineran, Police FROM: Craig Novaczyk Date: 5/16/16 Project Name: Building 0 Sub Type, Work Type: Shell building Address: 3365 Central Park Village Drive The plans are located in the Plan Review area in Community Development. Please review and indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request"form. Please submit a response within 7 days. Comments: No plbg. or mech. plans or apps yet Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No Landscape Security Required Zoning: ❑ Yes El No Water Quality Dedication Meter Size: ❑ Yes ❑ No Park Dedication ❑ Yes ❑ No Trail Dedication ❑ Yes ❑ No Tree Dedication ❑ Yes ❑ No PRV Required ❑ Yes ❑ No REF Reconciliation between Engineering & Finance 6/2-- it , Signature Date G:\Building Inspections\FORMS\Commercial Bldgs Final&Plan Review Letters 41011°. City of Il Meso # 13 TO: Jon Hohenstein, Community Development Mike Ridley, Planning Darrin Bramwell, Fire Marshal Scott Peterson, Building Inspections Russ Matthys, Engineering John Gorder, Engineering Aaron Nelson, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Joe Gibbs, Finance Jared Flewellen, Parks&Recreation Jon Eaton, Utilities Josh Wilske, IT Eric Macbeth,Water Resources Gregg Thompson, Water Resources Gregg Hove, Forestry Lt. Mike Fineran, Police FROM: Craig Novaczyk Date: 5/16/16 Project Name: Building 0 Sub Type,Work Type: Shell building Address: 3365 Central Park Village Drive The plans are located in the Plan Review area in Community Development. Please review and indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request"form. Please submit a response within 7 days. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No Landscape Security Required Zoning: ❑ Yes No Water Quality Dedication Meter Size: ❑ Yes ❑ No Park Dedication ❑ Yes El No Trail Dedication ❑ Yes ❑ No Tree Dedication ❑ Yes ❑ No PRV Required ❑ Yes ❑ No REF Reconciliation between Engineering& Finance Eric Macbeth Digitally..-signed ma=�" �°'u a.a�s 5/27/2016 Dater201805.2I11.6223 0500 Signature Date G:\Building Inspections\FORMS\Commercial Bldgs Final&Plan Review Letters 40' City of EaQali Memo # 13 TO: Jon Hohenstein, Community Development Mike Ridley, Planning Darrin Bramwell, Fire Marshal Scott Peterson, Building Inspections Russ Matthys, Engineering John Gorder, Engineering Aaron Nelson, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Joe Gibbs, Finance Jared Flewellen, Parks&Recreation Jon Eaton, Utilities Josh Wilske, IT Eric Macbeth,Water Resources Gregg Thompson, Water Resources Gregg Hove, Forestry Lt. Mike Fineran, Police FROM: Craig Novaczyk Date: 5/16/16 Project Name: Building 0 Sub Type,Work Type: Shell building Address: 3365 Central Park Village Drive The plans are located in the Plan Review area in Community Development. Please review and indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request"form. Please submit a response within 7 days. Comments: NOX Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No Landscape Security Required Zoning: ❑ Yes 0 No Water Quality Dedication Meter Size: ❑ Yes ❑ No Park Dedication ❑ Yes 0 No Trail Dedication ❑ Yes 0 No Tree Dedication ❑ Yes 0 No PRV Required ❑ Yes ❑ No REF Reconciliation between Engineering&Finance 6-10-/6 Signature Date G:\Building Inspections\FORMS\Commercial Bldgs Final&Plan Review Letters City of Eaali Memo # 13 TO: Jon Hohenstein, Community Development Mike Ridley, Planning Darrin Bramwell, Fire Marshal Scott Peterson, Building Inspections Russ Matthys, Engineering John Gorder, Engineering Aaron Nelson, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Joe Gibbs, Finance Jared Flewellen, Parks&Recreation Jon Eaton, Utilities Josh Wilske, IT Eric Macbeth,Water Resources Gregg Thompson,Water Resources Gregg Hove, Forestry Lt. Mike Fineran, Police FROM: Craig Novaczyk Date: 5/16/16 Project Name: Building 0 Sub Type,Work Type: Shell building Address: 3365 Central Park Village Drive The plans are located in the Plan Review area in Community Development. Please review and indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request"form. Please submit a response within 7 days. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes 0 No Landscape Security Required Zoning: ❑ Yes ❑ No Water Quality Dedication Meter Size: 0 Yes 0 No Park Dedication ❑ Yes ❑ No Trail Dedication ❑ Yes 0 No Tree Dedication Yes J No PRV Required EQ" Yes 0 No REF Reconciliation between Engineering & Finance Co( G 3 !L Signatur Date G:\Building Inspections\FORMS\Commercial Bldgs Final&Plan Review Letters ', . , , , .., 1 C Ea all MeMo # 13 TO: Jon Hohenstein, Community Development Mike Ridley, Planning Darrin Bramwell, Fire Marshal Scott Peterson, Building Inspections Russ Matthys, Engineering John Gorder, Engineering Aaron Nelson, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Joe Gibbs, Finance Jared Flewellen, Parks&Recreation Jon Eaton, Utilities Josh Wilske, IT Eric Macbeth,Water Resources Gregg Thompson, Water Resources Gregg Hove, Forestry Lt. Mike Fineran, Police FROM: Craig Novaczyk Date: 5/16/16 Project Name: Building 0 Sub Type, Work Type: Shell building Address: 3365 Central Park Village Drive The plans are located in the Plan Review area in Community Development. Please review and indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper"hold request"form. Please submit a response within 7 days. Comments: Park Dedication due with building permit. Per development contract, provide 37.5% credit: 2016 park dedication rate is $912 per 1,000 sf building. 5,039 sf/ 1,000 = 5.039 * $912 = $4,596 - $1,724 (37.5% of$4,596) = $2,872 park dedic. due Indicate below any fees that are to be collected with the building permit. Amount O Yes 0 No Landscape Security Required Zoning: PD ❑ Yes No Water Quality Dedication Meter Size: VI Yes ❑ No Park Dedication $2,872 El Yes W No Trail Dedication ❑ Yes VI No Tree Dedication ❑ Yes 0 No PRV Required O Yes 0 No REF Re a ciliation between Engineering & Finance f 1/,✓___ 1 4, June 30, 2016 Signatu a Date G:\Building Inspections\FORMS\Commercial Bldgs Final&Plan Review Letters fir /37 394 , sr A Non-Structural Steel Special Inspection Final Report Central Park Commons Building 0 Northeast Corner of Pilot Knob Road and Yankee Doodle Road Eagan, Minnesota Prepared for CSM Corporation Project B1501149.00 BRAUN May 222017 INTE RTEC Braun Intertec Corporation The Science You(Build On. BRAUN Braun Intertec Corporation Phone:952.995.2000 11001 Hampshire Avenue S Fax: 952.995.2020 ER 1 E Minneapolis,MN 55438 Web: braunintertec.com INTThe Science You Build On. May 22,2017 Project B1501149.00 Mr. Dan Ullom CSM Corporation 500 Washington Avenue South,Suite 3000 Minneapolis, MN 55415 Re: Non-Structural Steel Special Inspection Procedural and Final Report Central Park Commons Building 0 Northeast Corner of Pilot Knob Road and Yankee Doodle Road Eagan, Minnesota Dear Mr. Ullom: Please find attached to this procedural report the Non-Structural Steel Special Inspection Final Report for Building 0 of the Central Park Commons project, and the supporting Special Inspection Daily Reports for your review and records. Please note that,since this project encompassed construction of multiple buildings over two distinct phases,the numbering of the attached Special Inspection Daily Reports is not sequential. Rather,the reports are organized by date. Special Inspection and Testing Procedures The special inspection services were provided in accordance with the requirements of Chapter 17 of the International Building Code(IBC),the Special Inspection and Testing Schedule, and/or the project plans and specifications. The purpose of special inspections is to provide a review of the contractor's work designated by the project structural engineer as needing special inspection under the guidelines of the IBC to determine compliance with the approved construction documents.The special inspector does not have the responsibility or authority to, nor is it the intent of special inspections to have them,judge or modify the construction documents.Only the structural engineer of record can do this. As the special inspections were completed,a Special Inspection Daily Report was prepared to summarize the results of our inspections and testing.A copy of this report was provided to the contractor's site representative for their review and records. Plans and Specifications The provided plans and specifications or the plans available at the site were used for our inspections. AA/EOE CSM Corporation Project B1501149.00 May 22, 2017 Page 2 Summary of Special Inspections and Material Observations and Tests Soil Evaluation and Testing Our firm performed a geotechnical evaluation for the Central Park Commons development.Our findings and recommendations were presented in a Geotechnical Evaluation Report(Report)dated June 25,2015, and submitted under Braun Intertec project number B1501149.The Building 0 footprint is located within the footprint of the former Lockheed Martin facility.As discussed in our Report,the boring that was performed in closest proximity to Building 0 was Boring ST-37. In our opinion,the soils encountered at Boring ST-37 were suitable for support of the required additional fill and anticipated structural loads. During the mass grading phase of the project,the exposed soils within and around the footprint of Building 0 were consistent with those encountered and described in our Report and were judged to be suitable for support of the required fill materials and building loads.Our firm also observed fill placement and performed and tested structural backfill placed within the building pad area of Building O.The results of compaction testing performed indicate that fill was conditioned, placed,and completed in accordance with project specifications. During the construction phase of Building 0,soils exposed at structure subgrade elevations and in excavations were visually evaluated,while those below subgrade elevations and excavation bottoms were evaluated using hand auger borings and dynamic cone penetrometers.These tasks were performed to determine if the observed and tested soils were(a)consistent with those observed and tested during the mass grading phase of the project and(b)suitable for support of the design structural loads. The hand auger borings were drilled with a 1 1/2-inch-diameter hand auger.The borings were advanced in 2-to 4-inch increments to depths of 2 to 4 feet below subgrade elevations or excavation bottoms (shallower penetrations typically occurred where larger gravel,cobbles,and boulders were present).The auger was then withdrawn from the borehole to obtain cuttings.The soils encountered in the borings were classified in general accordance with ASTM D 2488,"Description and Identification of Soils(Visual/Manual Procedures)." Preliminary estimates of soil consistency and density were also evaluated based on resistance to penetration of the hand auger,and the turning resistance. The dynamic cone penetrometer(DCP)tests were completed using a solid metal rod fitted with a 1 3/8-inch diameter conical point.The point is driven into the soil with a 12-pound weight falling 20 inches.The number of blows required to drive the point each 6-inch increment was recorded and then used to correlate the soils' relative density,consistency or compaction with that determined or estimated from the geotechnical borings,and also used as a basis to estimate the suitability of the soils to support the design loads.This test procedure was generally used when granular soils were exposed at subgrade elevations or in excavation bottoms. Concrete Reinforcement We initially reviewed the reinforcement and dowel requirements on the project structural drawings and shop drawings, if available. Information reviewed included bar size, bar length, bar spacing, bar location, splice lengths,and dowel placement.This information was then used to determine if the inplace reinforcement was placed in accordance with the requirements of the project plans and specifications. We also noted if the inplace reinforcement was free of rust,scale, and soil. BRAUN INTERTEC CSM Corporation Project B1501149.00 May 22,2017 Page 3 Concrete Placement Observations Concrete placement observations were performed to monitor the procedures being used by the contractor and to determine if they were consistent with typical industry standards. Fresh Concrete Testing Routine tests to determine the plastic concrete's slump,temperature and air content were done during each pour. In addition,concrete cylinders were cast at rates specified in the project specifications to evaluate the concrete's compressive strength. Concrete Compressive Strength Testing The cast concrete cylinders were temporarily stored at the site and then returned to our laboratory for moist curing and testing.The results of the concrete compressive strength testing were forwarded to the interested parties under a separate cover as they became available. General In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under similar circumstances by reputable members of its profession currently practicing in the same locality.No warranty,express or implied, is made. Thank you for the opportunity to provide the special inspection and testing services for this project.After review of the attached Special Inspection Final Report,if you have any questions or require additional information, please call Dan Martin at 651.746.4006. Sincerely, BRAUN NTERTECCORPORATION'' T-1407 A. -Trf Daniel Martin Princi.-1—Senior Project Manager fr i 4 Joel C.Kurpius,PE Project Engineer Attachment: Non-Structural Steel Special Inspection Final Report c: Lane Wegener;City of Eagan Craig Novaczyk;City of Eagan Clark Wicklund;Alliant Engineering, Inc. Cory Casperson;Clark Engineering Corporation Leo Schaefers;Clark Engineering Corporation Aaron Waller; RJ Ryan Construction,Inc Craig Kohler; RJ Ryan Construction, Inc BRAUN INTERTEC BRA Braun Intertec Corporation Phone:952.995.2000 11001 Hampshire Avenue S Fax: 952.995.2020 (` `TE RTEC Minneapolis,MN 55438 Web: braunintertec.com The(Science You Build On. Non-Structural Steel Special Inspection Final Report Page 1 of 2 City of: Eagan, Minnesota Date: May 22,2017 Attention: Lane Wegener Project: Central Park Commons Building 0 Northeast of Pilot Knob Road and Yankee Doodle Road Braun Intertec Project: B1501149.00 In accordance with Section 1704 of the International Building Code and the agreed upon scope of services,the required special inspections and testing has been provided for the following items: Soils The required testing in the field and laboratory has been completed.The compaction testing done during placement of backfill and additional required fill indicated the procedures used by the contractor were adequate to compact the backfill and fill,and meet the project requirements.Observations and testing of the structure subgrades and excavation bottoms indicated that the exposed soils were consistent with those encountered by the geotechnical borings performed for this project, and were capable of supporting footings designed to exert a net allowable bearing pressure of up to 3,000 pounds per square foot.There are no outstanding or unresolved soils-related issues. Concrete The required testing in the field and in the laboratory has been completed.The results have been forwarded under separate cover.The compressive strength testing indicates the concrete placed has met the project requirements.The placement procedures used were judged to have met the project requirements.There are no outstanding or unresolved concrete-related issues. Reinforcing Steel The reinforcement placement detailed in the attached Special Inspection Daily Reports was observed according to the requirements of the project plans and specifications.There are no outstanding or unresolved reinforcing steel-related issues. AA/EOE CSM Corporation Project 81501149.00 May 22,2017 Page 2 Conclusion Based upon the inspections performed,the testing completed and the attached Special Inspection Daily Reports, it is our professional judgment that,to the best of our knowledge,the inspected work was performed and completed in accordance with the approved plans,specifications,and applicable workmanship provisions of the International Building Code. Inspecting Firm: Braun Intertec Corporation I hereby certify that this plan,specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. 8- MIMED Ti Joel C. Kurpius, PE spRoFgziONAL Project Engineer fENGINEER = License Number 43523 43523 , May 22,2017 1%,OF 101 ����'`��`�`*`�~ ��tmiuto Attachments: Special Inspection Daily Reports dated June 9,2015 through September 30,2016 (non-sequential numbering,organized by date) BRAUN I NTE RTEC A Structural Steel Special Inspection Final Report }fr Central Park Commons—Building 0 NE Corner of Pilot Knob Rd and Yankee Doodle Rd Eagan, Minnesota Prepared for CSM Corporation Project 81501149.00 BAuN May 22, 2017 ITE RTES Braun Intertec Corporation The Science You Build on. ry! BRA Braun Intertec Corporation Phone:952.995.2000 11001 Hampshire Avenue 5 Fax: 952.995.2020 IINTERTEC Minneapolis,MN 55438 Web: braunintertec.com The Science You Build On. May 22,2017 Project B1501149.00 Mr. Dan Ullom CSM Corporation 500 Washington Avenue South,Suite 3000 Minneapolis, MN 55415 Re: Structural Steel Special Inspection Procedural and Final Report Central Park Commons-Building 0 Northeast Corner of Pilot Knob Road and Yankee Doodle Road Eagan, Minnesota Dear Mr. Ullom: Please find attached to this procedural report the Structural Steel Special Inspection Final Report for Building 0 of the Central Park Commons project and the supporting Special Inspection Daily Reports. Special Inspection and Testing Procedures The special inspection services were periodically provided by International Code Council(ICC)certified special inspectors in accordance with the requirements of the Minnesota State Building Code, Chapter 17 of the International Building Code (IBC) and the project plans and specifications. The purpose of special inspections is to provide a review of the contractor's work designated by the project structural engineer as needing special inspection under the guidelines of the IBC to determine compliance with the approved construction documents.The special inspector does not have the responsibility or authority to, nor is it the intent of special inspections to have them judge or modify the construction documents.Only the structural engineer-of-record can do this. As the special inspections were completed, a Special Inspection Daily Report was prepared to summarize the results of our inspections and testing.A copy of this report was electronically provided to the construction team for their review and records.As part of this report, items needing correction or discrepancies observed from the approved construction documents were noted.We also summarized the discrepancies in a Discrepancy Log. Plans and Specifications The plans and project documents available at the site were used for our inspections. Visual Examination of the Field-Made Welds Visual examination of the field-made welded connections was conducted in accordance with the requirements of AISC 360,Chapter N,Section 5.4,the current AWS D1.1, and project plans and specifications. AA/E0E CSM Corporation Project B1501149.00 May 22, 2017 Page 2 Column Anchor Bolts Column anchor bolts were observed to document they were in place and that nuts were installed,fully engaged, and snug tight.The base plates were observed to document they were in full contact with the adjoining surface. Tension-Control Bolted Connection Tension-control bolted connection observations were conducted in general accordance with the AISC 360, Chapter N,Section 5.6.We observed and documented that bolt holes were filled,correct bolts were used, nuts were fully engaged, and the splined end of the tension-control bolts had separated from the body of the bolt. Removal of the splined end is a direct indicator the bolt has been torqued to the minimum snap-off load. Threaded Through Bolt Connection Threaded-through bolt connection observations were conducted in general accordance with the AISC 360,Chapter N,Section 5.6.Observations were performed after installation of the threaded through bolts to document they were installed as required in the project documents, placement was correct, correct bolts were used, nuts were fully engaged,adjoining plies were in contact with one another,and nuts were snug tight. Metal Deck Weld and Fastener Observations Metal deck weld observations were conducted in general accordance with the requirements of AISC 360, Chapter N,Section 6,the current AWS D1.3,and project plans and specifications. Items reviewed included the quality,size,and spacing of the welds. In addition,the location and completeness of the side lap fastener installation were observed and evaluated. BRAUN INTERTEC CSM Corporation Project B1501149.00 May 22,2017 Page 3 General In performing its services,Braun Intertec used that level of care and skill ordinarily exercised by reputable members of its profession currently practicing in the same locality. No warranty,express or implied, is made. Thank you for the opportunity to provide the special inspection and testing services for this project.After review of the attached Special Inspection Final Report,if you have any questions or require additional information,please call Dan Martin at 952.995.2227. Sincerely, BRAUN INTERTEC CORPORATION Daniel Graham ICC Certifi : Special Inspector-Structural Steel and Welding ristopher R. Kehl,PE Principal—Senior Engineer Attachment: Structural Steel Special Inspection Final Report c: Lane Wegener;City of Eagan Craig Novaczyk;City of Eagan Clark Wicklund;Alliant Engineering, Inc. Cory Casperson;Clark Engineering Corporation Leo Schaefers;Clark Engineering Corporation Aaron Waller;R1 Ryan Construction, Inc. Craig Kohler; RJ Ryan Construction, Inc. 4 { BRAUN INTERTEC 4 BRAUN Braun Intertec Corporation Phone:952.995.2000 11001 Hampshire Avenue S Fax: 952.995.2020 I, rTE C wTE Minneapolis,MN 55438 Web: braunintertec.com '1'Thee Science You Build On. Structural Steel Special Inspection Final Report City of: Eagan Date: May 22, 2017 Attention: Mr. Dan Ullom Project: Central Park Commons—Building 0 Northeast of Pilot Knob Road and Yankee Doodle Road Braun Intertec Project: B1501149.00 In accordance with the Minnesota State Building Code,Chapter 17 of the International Building Code and the agreed-upon scope of services,the required special inspections and testing have been provided for the following items: Bolting.The bolted connections detailed in the attached Special Inspection Daily Reports were observed in general accordance with the requirements of the plans and specifications. Discrepancies were noted and documented.These connections were found to be acceptable following the required corrections. There are currently no outstanding or unresolved bolted connection-related issues. Structural Field Welding.The welded connections detailed in the attached Special Inspection Daily Reports were observed in general accordance with the requirements of the project plans and specifications.There are currently no outstanding or unresolved structural welding-related issues. Metal Deck Welding and Fasteners.The metal deck welding and side-lap fasteners detailed in the attached Special Inspection Daily Reports were observed in general accordance with the requirements of the project plans and specifications. There are currently no outstanding or unresolved decking-related issues. A4/EOE CSM Corporation Project B1501149.00 May 22,2017 Page 2 Conclusion Based upon the inspections conducted,the testing performed and the attached reports,it is our professional judgment that,to the best of our knowledge,the inspected work was performed and completed in accordance with the approved plans,specifications,and applicable workmanship provisions of the Minnesota State Building Code and the International Building Code. Inspecting Firm:Braun Intertec Corporation I hereby certify that this plan,specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the .ws • e State of M` nesota dui .,,moi ,, „oe ,k A s fi tb. cl /MK Christopher R. Kehl, PE 4.4 ? 'PERA.;kc . Principal—Senior Engineer License Number 43459 sit% #43459 «1, May 22,2017 f',.„, l'';#.....•e . ,- t tii.it Attachments: Structural Steel Special Inspection Daily Reports 1 through 3 Summary of Discrepancy Log li BRAUN INTERTEC Craig Novaczyk From: Craig Novaczyk Sent: Tuesday, May 17, 2016 9:27 AM To: 'awaller@rjryan.com' Cc: Natina James (Natina.James@rsparch.com); Dan Ullom (DUllom@csmcorp.net); Mark Kronbeck(mkronbeck@alliant-inc.com) Subject: Building 0 @ Central Park Commons - 3365 Central Park Village Drive Aaron, We have started our building permit review for the shell building project mentioned above. Please provide the following required submittal documents/information so that we may complete our review. FYI, plan review memo has been sent to all of the applicable City of Eagan departments.The plan reviewers from these departments may have plan review comments as well. Provide a SAC determination from the Met Council. 2. Provide an Emergency Response Site Plan for this building. Reference the City's website for an example of an PRSP. rovide your contractor information for the permit application. Thank you in advance for your attention to these items, Craig Craig Novaczyk I Senior Building Inspector I City of Eagan411111° City Hall 13830 Pilot Knob Road I Eagan,MN 55122 1(651)675-5683 (651)675-5694(Fax)I cnovaczvk(a�cityofeagan.com li•ly of E THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND/OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error,please contact the sender and delete the e-mail and its attachments from all computers. 1 I Use BLUE or BLACK Ink For Office Use Permit#: I! ttlg3 ll�"lU < Cityof Eapli �f Permit Fee: � � I 3830 Pilot Knob Road Eagan MN 55122 �., - : ,y'L ;�,'i,3 Date Received: ' .--7`l 7 Phone: (651) 675-5675 buildinginspections(a)_citvofeagan.com SLc 272017 Staff: � 2017 COMMERCIAL BUILDING PERMIT APPLICATION ,. ,\,\�3at Date: 927/17 Site Address: 3365 Central Park Village, Building 011 Tenant Name: Gent � (Tenant is: New/ Existing) Suite#: f- Former Tenant: ��''r' �� Name: Michael Boyle 651-303-8296 ��. Phone: -_Property` Owner ,=�, 2566 Delaware Ave, Sunfish Lake, 55118 � _ Address/City/Zip: e r '1,4,k' - Applicant is: Owner Contractor � TI for new barber shop "� o - lo Q Description of work: ypeo#Work a of �� i ,p,f' Construction Cost: `' #'W , . . :e ' t t:',,, ,--� - Flannery Construction 01,, Name: i License#: 1375 St Anthony Ave St Paul .Contractor Address: City: MN 55104 651-225-1105 State: Zip: Phone: Matt Niedenfuer mniedenfuer@flanneryconstruction.com �' - '°- ";; Contact: Email: Name: Shea Design Registration#: " � 10 South 8th St Minneapolis Architect/Engineer Address: city: p M N 55402 651-339-2257 State: Zip: Phone: Kate Laszewski katel@sheadesign.com ' - Contact Person: Email: Licensed plumber installing new sewer/water service: Phone#: -7,7„ ---,77777-m-77ig „,,577----775.7- 7�E:; i i;�` -7"'"''''''" 77-7”..7 ,ys�� Jam,., . y77"--'''IT--- '. NO,-.1-7----77-----_---E Plans.and-, upporting documents that you submit are considered to be public information Portions of the i ' q -, in formation_maybe;classified as non public if yogi provide specific reasonsrthat would°permit the City tot"conclude that they,'l are tradesecretS �a �" ana �iro�Ns lui .,n , i.�M m-' ..il ,nr ,0.4: a,. a h it - .fit , � . a"�, ---',AP,;,„. -;tis Z,- You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeagan.com/subscribe. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. xMatt Niedenfuer x9417(-- (--- ___ Applicant's Printed Name Applicant's Signature Page 1 of 3 4 DO NOT WRITE BELOW THIS LINE L CPS SUB TYPES 334,:=6- G.-kcc,_\ Vv Nov_ ( Foundation _ _ Public Facility _ Exterior Alteration–Apartnts Commercial I Industrial _ Accessory Building _ Exterior Alteration–Commercial Apartments _ Greenhouse I Tent — Exterior Alteration–Public Facility Miscellaneous Antennae WORK TYPES _ New X` Interior Improvement Siding — Demolish Building* Addition _ Exterior Improvement Reroof _ Demolish Interior Alteration _ Repair Windows _ Demolish Foundation — Replace _ Water Damage _ Fire Repair _ Retaining Wall Salon Owner Change *Demolition of entire building—give PCA handout to applicant DESCRIPTION440/99i98 p ValuationOccupancy D MCES System 1 Plan Review � — Code Edition 'Z6 44 )ge" SAC Units 2 l j C.� (25%_100% ) Zoning ., City Water Census Code Stories 6 Booster Pump #of Units -- Square Feet ‘5q-4 PRV #of Buildings Length Fire Sprinklers Type of Construction Ir,j,Q Width '" REQUIRED INSPECTIONS Footings_New Building Deck—Addition Drain Tile Foundation Foundation Before Backfill Retaining Wall Vapor Barrier/ Erosion Control Framing if 30 Minutes 1 Hour Steel Reinforcement Insulation Concrete Entrance Apron Sheetrock Other: Roof:_Decking _Insulation _Ice&Water _Final Meter Size: Siding:_Stucco Lath _Stone Lath _Brick_EFIS Electronic Set of Final Revised Plans Windows Fireplace:_Rough In Air Test _Final /Final I C.O. Required Pool:_Footings _Air/Gas Tests _Final /Final/No C.O. Required Final CIO Inspec btt i rS�ched - Fire Marshal to be present: V Yes No 1 Reviewed By: r , Planning New Business to Eagan: u Reviewed By: j/�, _ -,' , Building Inspector FEES Water Quality Base Fee 1.>S.0 Storm Sewer Trunk eA Surcharge �S Sewer Trunk Plan Review 41. Uiii. 6'1 Water Trunk MCES SAC * 1974) ? Street Lateral ar City SAC 2LO Street S&W Permit& Surcharge l Water Lateral Treatment Plant 83 �- Stormwater Performance Security Treatment Plant (Irrigation) Landscape Security Park Dedication Other: Al Trail Dedication TOTAL: /2 g Page 2 of 3 MCES USE: Letter Reference: 171017A6 Address ID:704363 Payment ID:406000 \7" l (01 n Date of Determination: 10/17/17 Determination Expiration: 10/17/19 Greetings! Please see the determination below. Project Name: Gent Project Address: 3365 Central Park Village Drive Suite#/Campus: Building 01, Central Park City Name: Eagan Applicant: Matt Niedenfuer, Flannery Construction Special Notes: na Charge Calculation: Hari: 12 stations @ 4 stations/SAC=3.00 Total Charge: 3.00 Credit Calculation: Central Park Commons (SAC 07/16) Retail: 1572 sq.ft. @ 3000 sq.ft./SAC=0.53 Total Credit: 0.53 Net SAC: 2.47 —or— 2 SAC Due The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be made. If you have any questions email me at: cory.mccullough@metc.state.mn.us Thank you, Cory McCullough SAC Technician Please visit our SAC website by going to: http://www.metrocouncil.org/SACprogram 390 Robert Street North I St. Paul,MN 55101-1805 Phone 651.602.1000 I Fax 651.602.1550 I TTY 651.291.0904 I metrocouncil.org METROPOLITAN An Equal rtunit EmployerC O U N C I L q,:fXPFS Y . ` i S 35n, 4 U 7 ff J al rl 10: oR a T _ w4 Fes", to F,i,5 <_ I �- ag ,s d Q 1 1 i mmol c � A �4� ei a kg. a �$ig g ----. E -_. _� 2 a s i �g ff "yaw bi dr i aLL Y 9a ffi' , ; G 14, �I? i= i g y effi < ' 6 _ Er : La ; rQ F,8: i a1X git1=o ien g = i_ : _ ! I Bil dJ . .8gg, . gg.a ilhP 3 0 e�A 4 ? ffi t¢. { g€Ce l _ _ / 81 a8 m 4 Y Y -� "s g Ba g3 o;1a 00 5 kR. . e��2 2i1 a Se, 1 fpm y ® € 'y� '€Y ai � Y41g €i� c d 5� �' �`� � �_. 11 ���"4 I_ Y: '112 5 aS ifffi ee18= i=e$ ao° 5b � � e ms"� a � 3 am �= 5 � � 3 s � a�W°� c $€' =e=� �°W, � � a' F° l i dW p 18 8 a Pi 1 w g= Ea ,; 4 g' i 1� a9=' a ° i_'°-``� 21 �' e�Ez °3 y� �� �° �� e€ a� agffig ¢ ffi� �$ � �$ � � `s��W p � � �3i � $ ®9 a�m �3;�'m E z41 0 a _15i n 4 Y a moo ! $ ion w i", G €"ba"to s i3 4W_''"1" ffiys"_€Y€io; €p g 8 q g z m3 $� g ge$ NI �_ �! m 9ffi a � �°°w "§$ q 48e=o; oa affixj�jg" � i °�� ay3a€ c z gl i i'° <iNI @ a4i io Y s$ z m h S Y y aw °1 c€o ° 'lj qg 4 !m m ° E!aw � ;04'1050T-1'g eo �n< � m eW � cwa � � �t "a�W- @�� � ��$a G$°3"4��= °gym$€�� � �� � �Wg� � g 4 iii G e ass ;!Mli q G: w 5&�a�=� -501 m; a1aoy eg u§fie °a a 3€ 4igg l Igli5;11d 1x=4 0_ e Roimys�t,? '"�5 $ e d = .5A ,E iim g 15 so8 1d 8/ a3e�5 4 ' W6a el g5a € s a igf"gli ..I6 "°€4 a � i =ms � $ �� �Ws i. �. �=�.�34 wc� a �ffi�_° ��c=.€ ;a !Ming Nidiso§.a _g is ig P a dh €M� P 5� �I 41. OPOM �lg5 l Ke 4a p"}`-Iiiiiu5° ihn ��a "�� a- ��4€0�os � e� fiao' o�=� �a€i Y °� ��" �w, s'"�<�""� � e�a �€ � a= Y' $4 9°" �„£5 S W � �°” 3'P4"" �° iW B 9 a a�„ �€ �. 4;w a 8" a e xY�� 5 �s Y � g� � 6 rw3 Y a- � � Y� ��": 5=ase � ea e8 g Y�9"YSJ $w WW1!d� 8 e'� � � ��.g � ee �° y E~ ffi � B fie" � 8� � �. �°� �� e��_=� g8� :,sp T141 1 de=q4q xi lgig a°cW 141 gl!!! o i€:amE � ao gIg "74 _� 01(80,10 iplip ��c �'- �=e g 3��°onq" e€€B g0 1 § W €p;¢ 8,111=1; 14 1118 r$�'$°$ thiel li :� 4e024 ilg €��; tp Liam 5iB. Oq g6a4 ;,,,Ag; HRR $ 83, i'821, �° eg° n4 go„88 tly a iffi 4„ ;fy aa . 0� a0 s F'€ ��a��5� : r���acffi=,o� e�d�a`� 88�€�8>���iB_a3�gs za7mS`�99 �`e�e�” 6d�3 �t�a"ffiB�,:Yo�aW s�ag8�"��� �� �gi�EoB ��38�Y€den" a „ e " _ _ __ _ _ _ _ _ _ R E 5 8 sffig !i " E y Iie{e ° a - E E s 3 E i t o y . h! gwg li ;4 21 i g5i "3E !Igi i g oaa 1 . i4g! %Iill 1s ea7bea5! 1i15ie€g1 1i 1 ' ; i I . -1 i " Imo, z,.�I m ro 9 -AAI Q E•� . _ Q e - �. _ i I �01� ---- m- �O Ll i e Ern e —1117- e e� 1 /I � � ,t° 4i I - I 4D a a s ■ ; i it 6 , e 0 e ' ' =0 a " 4' '7 1--- . 1t} i e` O 131,._,L___ �6mmo.J® I_ — Q- a I t p1� ,______1_±____ e _. _ ,___F • mQ i I k ! a aoI I I W � aI tx M ® a QD; eL�� - + u; a I--, 11:) Use BLUE or BLACK Ink For Office Use of Eq `y Ci �/�OC�c .t'",: 4%,°:17 > /01 -'` Permit#: t s ♦J s ew :::+ �. �V 2 3 f! 4 C�LJ . « ..:. \�� �G Permit Fee: 1 ` �'r ""► �° ::: ce1: 71 I1 Al—, 3830 Pilot Knob Road I Eagan MN 55122 Phone:(651)675-5675 I buildinginspections@cityofeaean.com 2017 COMMERCIAL PLUMBING PERMIT APPLICATION `71 Please submit two(2)sets of plans with all commercial appliccaations./' (� Date: 11 /c i )fl Site Address: 3 3 cc C.CT/ nc 1 I o✓/C u/ I'e� Dr. Tenant: V ei'1 Suite#: C) Property / Owner Name: �.e�'1)-, LL t✓ Phone: Name: I3✓u CA, Of ISA % plar1�1 01 Elle.lil License#: PC- b j'1 O!3 contractor Address: 1)4). 30- P0);‘,1 Opo lc4 R ity: SJ-f w' State: 11 Ai Zip: STii' r S / Phone: (,SI-73 ff-°r!'?S- / Email: in ra4Pd./'(2h/'t.,ce.'Ie socyo.i. COP' Type of Work —New —Replacement _tt Repair _/ Rebuilds Modify Space _Work in R.O.W. Description of work: �.(rel o..f avast. 0i 1L p - I (/or �``'`.5 COMMERCIAL New Construction %Modify Space Irrigation System(_yes/ no)(_RPZ/_PVB) • Rain sensors required on irrigation systems Permit Type • Avg.GPM (2"turbo required unless smaller size allowed by Public Works) Meters Call(651)675-5646 to verity that tests passed prior to picking uo meter. Domestic:Size&Type Fire: 1 Avg.GPM High demand devices? Yes_No Flushometers YesXNo COMMERCIAL FEES Contract Value$ o)8,000.6() x.01 $60.00 Permit Fee Minimum $60.00 PVB/RPZ Permit(includes State Surcharge) =$ �o,Od Permit Fee =$ l ti. U0 Surcharge Surcharge=Contract Value x$0.0005 1 �/ If the project valuation is over$1 million,please call for Surcharge =$ 9 -[- 00 TOTAL FEE Following fees apply when installing a new lawn irrigation system $ Water Permit Cu•tt0.L Ll is CityS Ci'yin..ii.y D.NaiLnicnt,(03 I)073-3040,rut..4.1,m11==amounts. $ Treatment Plant $ Water Supply&Storage $ State Surcharge =$ TOTAL FEE You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeagan.com/subscribe. , CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x all`1'Lt"ri lit.` x Applicant's Printed Name Applicant's Signature FOR OFFICE USE &proved By Date.,ft //`7 Required Inspections: V Under Ground Rah;In Test. Gas Test -Anal PM(Required ,„Yes, No Meter Related Items: Meter Size Radio Read ." Manometer" Staff: Page 1 of 3 (Is. A� �J�� 0 Use BLUE or BLACK Ink For Office Use let Citi of Eapli C Permit#: 3830 Pilot Knob Road '� Permit Fee: 3/ Eagan MN 55122 RE CEI E /7 Date Received:h7- Phone: (651)675-5675 Fax:(651)675-5694 DEC L, 4 2017 Staff: J 2017 MECHANICAL PERMIT APPLICATION ❑ Please submit two(2)sets of plans with all commercial applications. el, Date: d Site Address: �0 i.i.4"' p a-4- �el/ - ,,i ,,,,""/ . Tenant: 6 4 Suite#: Resident/Owner Name: Phone: Address/City/Zip: f) Name: Vit (C,o /`a 1'CAI I f Soi.tv li A..'I License#: Contractor Address: 1 b4 tie J,k' ` 9 City: Vii. ,/.r" State: °'� Zip: r`r`1 Phone: -i"e de 1,%$- 04 -) n Contact: 1.1 V^A'i— Email: 0^0 4-0-it(-0 r/S2rLIc,4. (,ovw New Replacement Additional Alteration Demolition Type of Work, Description of work: -'^�",;'�A,,e'oi'J t i .v 6,,,t T.TI0✓u- ,, ` dII. .,c., I" 2 i►'�D$,i,— /fr/ey mounted and ground mounted mechanical equipment is required be screel edby City Code. Please contact the Mechanical Inspector for nformet ion on Permitted sPreentog methods. RESIDENTIAL COMMERCIAL A1,01"J � Furnace New Construction 1, Interior Improvement PermitT _Air Conditioner Install Piping _Processed ype _Air Exchanger Gas Exterior HVAC Unit _Heat Pump _Under/Above ground Tank ( Install/ Remove) Other RESIDENTIAL FEES $60.00 Minimum Add or alteration to an existing unit, includes State Surcharge $100.00 Residential New, includes State Surcharge =$ TOTAL FEE COMMERCIAL FEESContract Value$ a Z..0'3 '® x.01 $60.00 Permit Fee Minimum ow $75.00 Underground tank installation/removal, includes State Surcharge =$ �� a Permit Fee Surcharge=Contract Value x$0.0005 =$ Surcharge If the project valuation is over$1 million,please call for Surcharge =$ I,? /• i TOTAL FEE I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Ea an;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance wi h he approved plan in t e case of work which requires a review and approval of ply" G Applicant's Printed Name Applicant's Signature FOR OFFICE USE.; : eq d Inspections Reviewed By: lam: 1-1( '' Underground ough In Air Test , Gas Service Test ;', in fig Heat Final HVAC Screening t� Use BLUE or BLACK Ink es,( r For Office Use A. (� �;�(,(i L �" Permit#: ly7rt - `\ Permit Fee: CO 62- Y ' �4 7i Barra 1P4- Date Received: IoZ 4I .14 / 3830 Pilot Knob Road I Eagan MN 55122 Staff: Phone:(651)675-5675 I Fax:(651)675-5694 ---J buildinginspections@citvofeagan.com 2017 FIRE SUPPRESSION SYSTEMS� PERMIT APPLICATION Date: 12-7-i 7 Site Address:: 13 34 5 Ce�1[�_ 1 Park. Ur i Lc j e rs Tenant: e+n+ O4�+ J 4.l Suite#: ❑ Requirements: 2 complete sets of drawings and specifications,cut sheets on materials and components Name: Phone: Property Owner Address/City/Zip: A..licant is Owner Contractor Description of work: /is Ira l s er- rrw 4U ih et far`�G�f'oCvti � kdf u✓Se Y'Fibw1 , „�- Type of Wore p f rr Construction Cost: `118P/�L Estimated Com.letion Date: Pece.n.bu— 2017 - Name: F --ke - T 'e PrG1-e' /h.( License C/ZO ) .. . .. Address: 7 5 ecruwly lax B Eos 1 City: L4'If 1 e ( tele. contractor' State: MIU Zip: 55117 Phone: 6 S (_ gq "IZOO Contact: "IikE ©LStP u Email: :1O/5/4- a1ea-ies're41H - terti FIRE PERMIT TYPE WORK TYPE Sprinkler System (#of heads .lj ) _New _Addition Fire Pump _Standpipe VAlterations Remodel Other: Other: DESCRIPTION OF WORK: ,'Commercial Residential Educational FEES (� Contract Value$ a CO x.01 $60.00 Permit Fee Minimum Fji.w _$ ®• Permit Fee Surcharge=Contract Value x$0.0005 If the project valuation is over$1 million, please call for Surcharge =$ 0, 11° Surcharge $100.00 Residential New(includes State Surcharge) =$ LO. '4° TOTAL FEE 3/4"Fire Meter-$290.00 =$ Fire Meter _$ TOTAL FEE You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeaqan.com/subscribe. I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accord nce with the approv d plan in the case of work which requires a review and approval of plans. x its 04.5 TIN xe Applicant's Printed Name Applicant's Signature /q716 FOR OFFICE USE REQUIRED INSPECTIONS Hydro tatic Flow Am Final Teat Trip Pump feat Central S aticiri' Final'• Conditions of Issuance: 7, Z, Permit Reviewed by "'"" Date: -. J 1,P. , ,