Loading...
2229 Wall St - Zoning Permits & Plans t ------------------ For office Use s City of Ea non E Permit* / l 1 t 3834 Pilot Knob Road 1 1 Eagan MN 55122 1 Date Received: l Phone:(651)675.5685 ————————————— --+ Fax:(651)675-5694 Email:pianningcityofeaaan,com 2016 ZONING PERMIT APPLICATION p Please identify improvements on a scaled site plan drawing that shows lot lines, structures and existing conditions. Property Site Address: , — Information i Owner Name: Ne, Name: <1 _`� € s Phone; Address: 5 -- ` 2-30 City/State/Zip: icy Contact Applicant Signature: Date: V, A — Email address: C { = Cc JZ Retaining Wall<4 feet ❑ Driveway O Other: Type of Work `;�Patio ❑ Sport Court : � ❑Sidewalk ❑ Fence Description of work: Planning Setbacks hard surface coverage,shoreland zoning, bluff zone/setbacks,etc. T!0/Q AV Ones to be vdrftd �6� 2 5 l� Staff: Nom ; tmctodowner. y-t j,-t rti 'i yra5 v,,`a-(( 441 ov, 4 ct f(ev v'�e.. ..t v-,eS LA2 W'( Revised Plans Approved: Yes f No Date: Staff: Engineering Grading,drainage, Utility easements,wetlands, erasion control,improvements in the Right-of-Way,etc. Appro4 /Denied Date: Ly t Staff: — — Notes:_ Revised Plans Approved': Yes/No Date: Staff: Comments CALD6EFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities, www.gooh0rsLate2ne4ci1II.oEg G:IBuilding lnspectionslPERMIT APPLICATIONS p � N MIN 6isap adn:)spubl Ay � m 3 \ a F191 Q " .t $ s \ m 3 o ! 'Z' Ed I( a�O p`° N 1 , i m I N m� G � F A Pam Dudziak From: Pam Dudziak Sent: Friday, August 19, 201610:52 AM To: Bob Bauer(bauerr @dmshb.com) Subject: 2229 Wall Street Attachments: 2229 Wall St site survey.pdf, SUZUYA_CONCEPT_ON_SURVEY_8-3-16.pdf This property is in Whispering Woods 91h Addition, which was platted in 1994. It backs up to a Pond,which is owned by the City of Burnsville. The site survey shows a 50' BSL(building setback line)from the pond. The origin of the 50' BSL appears to be from the initial subdivision,which the development contract included a condition stating"The grading of this development shall not disturb a 50' buffer zone along the edge of Pond E-24." The subdivision staff report says"The buffer zone shall allow the existing trees and vegetation around the pond to remain in the undisturbed state to help prevent erosion into the pond." This lot was vacant for a long time and a house finally built upon it in 2015. The new homeowner is proposing extensive landscaping and hardscape improvements in the back yard that extend well within the 50' BSL. Does the 50' non-disturb buffer established in the development contract still apply once the lots are sold and individually owned? Typically we would allow non-building improvements like landscaping, retaining walls and patios, unless this non-disturb buffer still applies to the lot. However,there does not appear to be a separate conservation easement or other documented covenants or restrictions on the property,and the rear yard d/u easement extends only 15' into the property. Please advise.Thank you. f&kmft I..h MWp .% 'xC s��3lkSf 0 + r�sur.rs. praoanr , mss- �r k - a: XMii4 em�. ka}iHd 93 8G36rt.�'tryR ,4 tax IxNfi E k 'rY 1 s•••, r� u. xM Yds9k+� h4F'}4.y.Ek,4 Pamela Dudziak Planner City of Eagan City Hall 13830 Pilot Knob Road I Eagan,MN 55122 1651-675-5691 1651-675-5694(Fax)I pdudziak(qcityofeagan.corn oi Wan THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND/OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. 1 'p M • �,j�,Sri ir��11�.� .• ,, i s I s f :y ��� s'> ♦Ifs, � k,�,�`� A' � sr,. ? A s i ti' " /•, �" ro Fff � K It \Nq US FA t x t..x9 `\T \ ♦ k r• , ♦ i' $ ♦ �� w 1 Ki D. Permits 1. This development shall be responsible for the acquisition of all regulatory agency permits in the time frame required by the affected agency. E. Parks and Trails Dedication 1. This development shall fulfill its parks dedication requirements as recommended by the Advisory Parks, and Recreation Commission and approved by Council action. F. Water Ouality Dedication 1. This development shall be responsible for providing a cash dedication in addition to/in lieu of ponding requirements in accordance with the criteria identified in the City's Water Quality Management Plan. G. Other 1. All standard platting and zoning conditions shall be adhered to unless specifically granted a variance by Council action. 2 . A variance of 20' for Lot 1, Block 1; Lot 1, Block 2 ; and Outlot A. 3 . A variance of 10' for Lots 1-7, Block 3, and Lot 2.,. Block 2 . 4. The street name - 125th Street - shall be continued through the Whispering Woods 9th Addition. 5. 'he grading of this development shall not disturb a 50' buffer KZO_ ng the edge of Ponds E-24 . 6. This development will be responsible for removing the eroded sediments from Pond E-24 in the backyard a7.-ea of Lot 7 , Block 3. 7. The driveway for Lot 1, Block 4, sliall be directed to the main east-west road along the north side of Lot 1, Block 4 . GRADINGIDRAINAGE&ROSIONIEROSION CONTROL: 'Phis 114ot residential' subdivision is in an area of rolling terrain that is heavily wooded. The developer has graded a rough road through the trees where the proposed street will be built. The preliminary grading plan submitted for review for the proposed 9th Addition shows cuts of 18 feet and fills of 14 feet. The grading for the lots and houses will remove a majority of the trees on this site. The drainage for this site will require the construction of catch basins and storm sewer at the low point of the street. The storm sewer line will be constructed in between Lots 3 and 4, Block 3, and discharge into city,of Burnsville Pond E-24. Pond E 24 has an e�risting'21" outlet on the west end of the pond that drains the pond through Burnsville to the Minnesota River. The area of the pond at the normal water level is approximately 9.5 acres and the 100-year high water level is 939.1. The City of Burnsville purchased the area around Pond E-24 for ponding purposes. The grading of this development shall not disturb a 50 foot buffer zone along the edge of Pond E-24 The buffer zone shall allow the existing trees and vegetation around the pond to remain in the undisturbed state to help prevent erosion into the pond. Erosion has occurred into Pond E-24 'in the backyard area of Lot .7, Block 3. This development will be responsible for removing the eroded sediments from the pond and the excavated materials shall be placed away from=the pond. Erosion control measures shall be placed around the pond to prevent further erosion. The development will be responsible for installing and maintaining erosion control measures in accordance with the City's Erosion/Sediment Control Manual Standards.` WATER QUALITY: This development will be subject to a cash dedication requirement to meet water quality standards. The amount of the cash dedication is estimated 'at approximately $4,100. In addition, several wetlands lie on the 'site. The developer is required to delineate each wetland and comply with provisions of the Wetland Conservation Act for each. Documentation must be submitted by Monday, August 24, 1992. Recommendations on both water quality mitigation and wetland protection`are subject to approval by the Parks, Recreation and Natural Resource Committee. UTILITIES: Adequate sanitary sewer of sufficient depth and capacity is available in the northeast comer,of the site from an existing 8" line that flows easterly to the intersection of Slaters Road and Storland Road. The preliminary utility plan shows extending an 8" sanitary sewer in the street to the west to provide sewer services to the proposed lots. Adequate water main service of sufficient pressure and capacity'is readily available at the intersection of Slaters Road and Storland Road. The existing 8"water main is proposed to be connected to in Slaters Road and the utility plan shows extending an 8" water main to the west in the proposed street to serve the proposed lots.