Loading...
3340 Central Park Village Dr - Cafe Zupas Test & Balance ReportPROJECT: Café Zupas #41 LOCATION: 3340 Central Park Village Drive, Eagan, MN 55121 ARCHITECT: Babcock Design Group MECH. ENGINEER: Nielson Engineers GEN. CONTRACTOR: Diversified Construction PROJECT NUMBER: T1272 T & B ENGINEER: Stephen K. Melink, PE ORIGINAL VISIT DATE: 2/15/17 CERTIFIED TEST ADJUST BALANCE REPORT "THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS AND FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH THE CURRENT EDITION OF THE NEBB PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, AND BALANCING OF ENVIRONMENTAL SYSTEMS. ANY VARIANCES FROM DESIGN QUANTITES, WHICH EXCEED NEBB TOLERANCES, ARE NOTED IN THE TEST- ADJUST-BALANCE REPORT PROJECT SUMMARY." 5140 River Road, Milford, Ohio 45150 USA Phone: (513) 965-7300 • Fax: (513) 965-7350 www.melinkcorp.com • mail@melinkcorp.com PROJECT: Café Zupas #41 DATE: 2/15/17 LOCATION: 3340 Central Park Village Drive, Eagan, MN 55121 PROJECT MANAGER: Phone: E-mail: SUPERINTENDENT: Phone: E-mail: MECH. CONTRACTOR: Phone: E-mail: MELINK TECHNICIAN: Phone: E-mail: 2nd VISIT TECHNICIAN: N/A Phone: N/A E-mail: N/A 3rd VISIT TECHNICIAN: N/A Phone: N/A E-mail: N/A 4th VISIT TECHNICIAN: N/A Phone: N/A E-mail: N/A STRATEGIC ACCOUNT MANAGER: Phone: E-mail: kwheeler@melinkcorp.com Matt Herriott (513) 965-7025 Cafezupas@melinkcorp.com N/A N/A (612) 501-9516 N/A Kirk Wheeler (513) 965-6087 TEST AND BALANCE CONTACT INFORMATION Ryan Moss (801) 200-2363 rmoss@cafezupas.com Rick (952) 929-7233 Melink Corporation Energy solutions for a brighter tomorrow Page 2 PROJECT: Café Zupas #41 DATE: 2/15/17 LOCATION: 3340 Central Park Village Drive, Eagan, MN 55121 0.53'' 60. Hz 4759 3416 1121 24 % 6.7 6.9 6.9 0.09''0.37''0.44'' 801 801 210 210 210 1VL44 x 7/8" BK90 x 1" BX62 Belt Tensioner Marathon 3 208/3 9.40 1.15 208/3 N/A Trane YSD150F3RHA0AK00 0000000A000000000 163910142D 12.5 1085 22 % YHD150G 12.5 0.50'' 5 RTU-3 Kitchen / Service 5000 5000 5000 0.87'' 60. Hz 4788 3595 1145 24 % 7.6 7.8 7.3 0.21''0.51''0.66'' 210 210 210 BX62 Belt Tensioner 790 790 208/3 9.40 1.15 1VL44 x 7/8" BK90 x 1" YSD150F3RHA0AK00 0000000A000000000 163910146D 12.5 Marathon 3 12.5 0.50'' 5 208/3 N/A Trane 5000 5000 5000 1085 22 % YHD150G 0.72'' 60. Hz 2052 1587 465 23 % 4.8 N/A N/A 0.18''0.46''0.54'' Tap 1 & 4 Tap 1 & 4 210 210 210 Direct Drive Direct Drive Direct Drive Direct Drive 1 208/1 6.90 N/A N/A Trane YSC063G3RHA01K00 0000003A00000F000 163911517L 5 N/A 22 % YHD060G 5 0.50'' 2 208/3 Supply CFM Return CFM Outside Air CFM Outside Air Ratio % RTU-1 South Dining 2000 2000 1565 Actual Volts Final Operating Amps Ret/Suction/Discharge External S.P. Motor Hertz Motor Sheave Fan Sheave Belt(s) Sheave Centerline Test Data RPM - Initial/Final Fan Motor • HP • Volts/Phase • FLA/SF Fan RPM Equip. Data Unit MFR • Model No. • Serial No. • Rated Tons Outside Air Ratio % Model Number Capacity (Tons) External S.P. Fan HP Volts/Phase ROOFTOP UNITS (RTU) DATA Design Data Scheduled CFM (SA) Supply CFM (Load) Return CFM Outside Air CFM 435 RTU-2 Dining Melink Corporation Energy solutions for a brighter tomorrow Page 3 PROJECT: Café Zupas #41 DATE: 2/15/17 LOCATION: 3340 Central Park Village Drive, Eagan, MN 55121 RTU-3 EQUIP. DATA Motor Hertz Supply CFM Return CFM Outside Air CFM Outside Air Ratio % RTU-2 LOW SP MEDIUM SP HIGH SP 1587 465 23 %Outside Air Ratio % RTU-1 LOW SP MEDIUM SP HIGH SP EQUIPMENT SUMMARY EQUIP. DATA Motor Hertz Supply CFM Return CFM Outside Air CFM 2052 Melink Corporation Energy solutions for a brighter tomorrow Page 4 PROJECT: Café Zupas #41 DATE: 2/15/17 LOCATION: 3340 Central Park Village Drive, Eagan, MN 55121 N/A 46. Hz 1821 2.5 2.5 2.5 N/A N/A N/A 210 210 210 Direct Drive Direct Drive Direct Drive N/A 46 Hz 46 Hz HSSA 3/4 1725 208/3 2.60 1.15 3/4 208/3 1356 Captive-Aire DU85HFA 2723617 N/A 60. Hz 156 KEF-1A Hood # 1 1950 1950 DU85HFA 0.85'' 1.3 N/A N/A N/A N/A N/A 118 N/A N/A Direct Drive Direct Drive Direct Drive N/A 10 10 Greenheck 1/10 1750 120/1 1.50 N/A 1/30 120/1 N/A Greenheck CUE-065-VG-X 14832677 16L N/A 60. Hz 153 EF-3 Men's Room 150 150 CUE-065 0.25'' 1.3 N/A N/A N/A N/A N/A 118 N/A N/A Direct Drive Direct Drive Direct Drive N/A 10 10 Greenheck 1/10 1750 120/1 1.50 N/A 1/30 120/1 N/A Greenheck CUE-065-VG-X 14832676 16L N/A 60. Hz 318 EF-2 Women's Room 150 150 CUE-065 0.25'' 1.4 N/A N/A N/A N/A N/A 118 N/A N/A Direct Drive Direct Drive Direct Drive N/A 10 10 1/10 1750 120/1 1.50 N/A 120/1 N/A Greenheck CUE-080-VG-X 14832688 16L Greenheck Motor Hertz Exhaust CFM EF-1 Server Room 300 300 CUE-080 0.25'' 1/20 RPM - Initial/Final Actual Volts Final Operating Amps Ret/Suction/Discharge External S.P. • FLA/SF Motor Sheave Fan Sheave Belt(s) Sheave Centerline Test Data • Serial No. Fan Motor • HP • RPM • Volts/Phase Fan HP Volts/Phase Fan RPM Equip. Data Unit MFR • Model No. EXHAUST FAN (EF) DATA Design Data Scheduled CFM (EA) Exhaust CFM (Load) Model Number External S.P. Melink Corporation Energy solutions for a brighter tomorrow Page 5 PROJECT: Café Zupas #41 DATE: 2/15/17 LOCATION: 3340 Central Park Village Drive, Eagan, MN 55121 N/A 60. Hz 871 2.4 N/A N/A N/A N/A N/A VSC VSC 118 N/A N/A 3.80 1.00 Direct Drive Direct Drive Direct Drive N/A 2723617 HSSA 1/3 1625 115/1 0.75'' 1/3 120/1 1613 Captive-Aire DU33HFA KEF-3 Panini Hood 850 850 DU33HFA N/A N/A N/A N/A 60. Hz 893 2.8 N/A N/A Direct Drive N/A VSC VSC 118 N/A N/A 1625 115/1 3.80 1.00 Direct Drive Direct Drive Captive-Aire DU33HFA 2723617 HSSA 1/3 900 DU33HFA 0.40'' 1/3 120/1 1585 N/A N/A N/A N/A 46. Hz 1803 2.4 2.4 2.5 N/A 46 Hz 46 Hz 210 210 210 208/3 2.60 1.15 Direct Drive Direct Drive Direct Drive DU85HFA 2723617 HSSA 3/4 1725 DU85HFA 0.85'' 3/4 208/3 1356 Captive-Aire Final Operating Amps Ret/Suction/Discharge External S.P. Motor Hertz Exhaust CFM KEF-1B Hood # 1 1950 1950 Belt(s) Sheave Centerline Test Data RPM - Initial/Final Actual Volts • HP • RPM • Volts/Phase • FLA/SF Motor Sheave Fan Sheave Equip. Data Unit MFR • Model No. • Serial No. Fan Motor Exhaust CFM (Load) Model Number External S.P. Fan HP Volts/Phase Fan RPM EXHAUST FAN (EF) DATA Design Data Scheduled CFM (EA) KEF-2 Dishwasher Hood 900 Melink Corporation Energy solutions for a brighter tomorrow Page 6 PROJECT: Café Zupas #41 DATE: 2/15/17 LOCATION: 3340 Central Park Village Drive, Eagan, MN 55121 N/A N/A N/A N/A 60. Hz 5963 11.7 11.6 11.7 N/A 904 904 210 210 210 208/3 13.60 1.15 2VP42 x 1 1/8" 2BK70H x 1 3/16" BX55 2723617 N/A Westinghouse 5 1750 0.50'' 5 208/3 900 Captive-Aire A3-D.750-G18-MPU Ret/Suction/Discharge External S.P. Motor Hertz Make-UP Air CFM MUA-1 Kitchen Hoods 5800 5800 A3-D.750-G18-MPU N/A Sheave Centerline Test Data RPM - Initial/Final Actual Volts Final Operating Amps • RPM • Volts/Phase • FLA/SF Motor Sheave Fan Sheave Belt(s) • Model No. • Serial No. • Rated Tons Fan Motor • HP External S.P. Fan HP Volts/Phase Fan RPM Equip. Data Unit MFR MAKE UP AIR (MUA) UNIT DATA Design Data Scheduled CFM (SA) Make-UP Air CFM (Load) Model Number Capacity (Tons) Melink Corporation Energy solutions for a brighter tomorrow Page 7 PROJECT: Café Zupas #41 DATE: 2/15/17 LOCATION: 3340 Central Park Village Drive, Eagan, MN 55121 871 0 % N/A 0 -1--2- 1117 -1--2- 10 N/A N/A N/A N/A Raw Opening 10 KH-4 Panini Hood 0 850 0 % Captive-Aire N/A Wall Canopy 893 0 % 841 N/A 0 -1--2- Raw Opening 14 -1--2- 14 4824 VHB-G Wall Canopy N/A N/A N/A N/A 1803 86 % KH-3 Dishwasher Hood 0 900 0 % Captive-Aire 248 234 211 -1--2- 219 230 126 1551 16 16 16 16 16 12 180 Raw Opening 20 -1--2- 82 % Captive-Aire 6624 ND-2 PSP-FB Wall Canopy Front Perforated 1821 89 % 215 235 250 233 132 1625 -1--2- 235 16 16 16 20 -1--2- 16 16 Wall Canopy Front Perforated 12 180 Raw Opening Balance Ratio % KH-1 Main Hood 1599 1950 82 % Captive-Aire 6624 ND-2 PSP-FB with filter D size E above F G H Exhaust CFM MUA Avg FPM MUA CFM Exh. Avg. FPM A B Correlates C with filter D velocities E below F G H Test Data Filter MFR Filter Height Filter Lengths A B Correlates C Hood MFR • Model No. • Hood Type MUA Open Dir. MUA Open Type MUA Width/Length KITCHEN HOOD (KH) DATA Design Data Make-Up CFM Exhaust CFM Balance Ratio % Equip. Data KH-2 Main Hood 1599 1950 Melink Corporation Energy solutions for a brighter tomorrow Page 8 PROJECT: Café Zupas #41 DATE: 2/15/17 LOCATION: 3340 Central Park Village Drive, Eagan, MN 55121 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A RTU-3 Kitchen / Service N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A RTU-2 Dining N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Fan Unoccupied Sensor Lock-Out RTU-1 South Dining N/A N/A N/A N/A N/A Heat °F Cool °F Start Time (Primary) Start Time (Secondary) Setup Fan Occupied OCCUPIED Heat °F Cool °F Start Time (Primary) Start Time (Secondary) UNOCCUPIED THERMOSTAT SETTINGS Equip. Data Manufacturer Model Number Location Program Melink Corporation Energy solutions for a brighter tomorrow Page 9 PROJECT: Café Zupas #41 DATE: 2/15/17 LOCATION: 3340 Central Park Village Drive, Eagan, MN 55121 DESIGN TOTAL +DESIGN TOTAL - FINAL TOTAL +FINAL TOTAL - DESIGN BUILDING BALANCE =CFM FINAL BUILDING BALANCE =CFM FINAL BUILDING PRESSURE =W.C.0.017'' 8,405 8,694 6,250 6,015 2,155 2,679 KEF-3 850 871 KEF-2 900 893 KEF-1B 1950 1803 MUA-1 5800 5963 KEF-1A 1950 1821 RTU-3 1085 1121 EF-3 150 156 RTU-2 1085 1145 EF-2 150 153 RTU-1 435 465 EF-1 300 318 BUILDING AIR BALANCE TEST RESULTS ( IN CFM ) MAKE-UP AIR EXHAUST AIR Design Final Design Final Melink Corporation Energy solutions for a brighter tomorrow Page 10