Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
1858 Turquoise Tr - Zoning Permits & Plans
For Office of EapilUseCity Permit#: �4 ? / ! 3830 Pilot Knob Road Eagan MN 55122 Date Received: Phone:(651)676-5686 Fax:(651)675-5694 Email:planninaecltvofeagan.com 2017 ZONING PERMIT APPLICATION o Please identify improvements on a scaled site plan drawing that shows lot lines, structures and existing conditions. Property Site Address: 1858 Turquoise Trail, Eagan, MN 55122 Information owner Name: Andy Irlbeck Name: Andy Irlbeck Phone: 651-336-7333 Address: 1858 Turquoise Trail city/state/zip: Eagan, MN 55122 Contact Andre I rl beck Digitally signed by Andre Irlbeck 05-10-2017 Applicant Signature: Date:2017.05.1008:46:28-05'00' Date: Email address: andyirlbeck@hotmail.com ❑Retaining Wall<4 feet 0 Driveway other: Storage Shed ❑Patio 0 Sport Court Type of Work 0 Sidewalk 0 Fence , Description of work: ,". �1 e ' .t✓S , eL 0 c � tel'j (7 K7) On 'I ' '.1, Planning Setbacks, hard surface coverage,shoreland zoning,bluff zone/setbacks,etc. pproved enied Date: C- - Staff: < k S No ,, /ice i S lt� i 1 143 /jR✓t9.t . s%g ogi-vs-f "n•4A.- ,O"c4,4,, /•^K • Property Jin to be verified Revised Plans by contractor/owner. Approved: Yes/No Date: Staff: Engineering Grading,drainage, utility easements,wetlands,erosion control,improvements in the Right-of-Way,etc. Approved/Denied Date: Staff: The owner/applicant is Notes: responsible for compliance applicable construction Codes. Revised Plans Approved: Yes/No Date: Staff: Comments CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.nopherstateonecall.orq G:\Building Inspections\PERMIT APPLICATIONS , 1(0,7yc -I CD I 0 In co ro C) a) 0) Z Oa Z co a - o -0; K m3 , I- �� (D . -) \ a) rb O x N op v %.P NA V` 42 '4. CU m O y Is v c t. c Q Fivi F o .,..k, -4. k N 7 K .0 P rt .-- ...... ›-", .E.1..... 7.., ,...., 1 r - w i l 7 R' Site Preparation and Platform Construction (continued) Materials NOT supplied with BMS7791 Shed Kit Wood platform critical spacing 12-4 (APPROXIMATE) 424 a ��_ , 29"- 29h1 ---154l� 1541 w 8-° 4 4 854' 1 FRONT 9 4 .,I 4 L 84" "1 • Check all critical spacing measurements. Wood platform materials list Item I Qty I Size A B A 1 37-1/4"x 84"x 3/4" B 1 48"x 84"x 3/4" C 2 2" x 6"x 84" D 4 2"x 6"x 12-1/4" � E 7 2"x 6" x 82-114 D \ i PLEASE NOTE - DIMENSIONAL LUMBER 1 IS ACTUALLY 1/2" SMALLER THAN NOTED cSIZES (A 2X6 BOARD ACTUALLY l, E MEASURES 1-1/2" X 5-1/2) 1 11 Site Preparation and Platform Construction Materials NOT supplied with BMS7791 Shed Kit Note:Site preparation is required for this shed.Placing the shed on a constructed foundation is required. Without a constructed foundation, settling will probably occur, causing distortion and damage to the shed. Suncast is not responsible for replacing parts damaged or property lost due to incorrect assembly. Warranty requires foundation. Note:Complete the site preparation and foundation construction before unpacking parts and beginning assembly. To prepare your shed site,follow the below steps: 1) Consult your local authorities for building codes and covenants before beginning foundation or erecting shed. 2) Before any digging,check with local utilities to determine location of buried cables, pipes,etc. 3) Decide which type of foundation you want: -Concrete slab,4"thick 0 -Wood platform Use exterior grade wood.The wood platform should be set on pier blocks or footing. Consult your local retailer for help to determine the best anchoring method for your particular installation.The provided plans are sized for the minimum number of cuts to lumber and plywood. 4) Prepare the building site: -The ground should slope away from the foundation area to provide drainage. -The foundation surface must be flat and level. -A vapor barrier should be provided to prevent excessive condensation in the shed. -Follow local building codes for a proper vapor barrier. 5) Anchoring the shed to the foundation: -Consult your local retailer for help to determine the best anchoring method for your particular installation. -To secure the shed to a concrete slab, use masonry fasteners available at your local hardware retailer. -To secure the shed to a wood platform, use 1/4"x 3" long lag screws with washers. Anchoring floor panel to concrete slab Anchoring floor panel to wood platform °11*%14 1.1°.°11.11:>H11° *06/"'' 011°."111171°. �111411141111 � aq„ 4 8610 •Secure shed to concrete slab using masonry •Secure shed to wood platform using 1/4"x 3" lag fasteners. screws. • Dimensions allow for shed to fit within the nearest 1" on each side. 10 Julie Strid From: Andy Irlbeck <andy@rohlikfinancialgroup.com> Sent: Friday, May 12, 2017 1:30 PM To: planning Subject: Zoning Permit Application for Andy Irlbeck Attachments: 20170512131049322.pdf Hello, I would like to get a zoning permit to build a 7x7 plastic shed in my backyard.The shed will be built on a wood foundation and anchored to the ground. Attached is my permit application as well as my kindergarten plan drawing. Thanks, Andy Irlbeck Rohlik Financial Group, LLC 530 N 3rd Street#210 Minneapolis, MN 55401 Ph#(612) 353-6932 Fax#(612) 353-6173 Securities offered through Regulus Advisors Member: FINRA, SIPC. Rohlik Financial Group, LLC is Independent of Regulus Advisors. This message and any attachments contain information from Rohlik Financial Group, Regulus Advisors which may be confidential and/or privileged and is intended for use only by the addressee(s) named on this transmission. If you are not the intended recipient,or the employee or agent responsible for delivering the message to the intended recipient, you are notified that any review, copying, distribution or use of this transmission is strictly prohibited. If you have received this transmission in error, please (i) notify the sender immediately by e-mail or by telephone and (ii) destroy all copies of this message. Original Message From: scanner@rohlikfinancialgroup.com [mailto:scanner@rohlikfinancialgroup.com] Sent: Friday, May 12, 2017 1:11 PM To:Andy Irlbeck<andy@rohlikfinancialgroup.com> Subject: Message from "RICOH" This E-mail was sent from "RICOH" (Aficio MP C3001). Scan Date:05.12.2017 13:10:49 (-0500) Queries to: scanner@rohlikfinancialgroup.com 1 OVE For Office Use 411!!* City of Eag,a11. / t1 6 Permit#: 3830 Pilot Knob Road Eagan MN 55122 Date Received: Phone:(651)675-5685 Fax:(651)675-5694 Email:planning a cityofeaaan.com 2017 ZONING PERMIT APPLICATION o Please identify improvements on a scaled site plan drawing that shows lot lines,structures and existing conditions. Propertysite Address: 1858 Turquoise Trail, Eagan, MN 55122 Information Owner Name: Andre Irlbeck Name: Andre Irlbeck Phone: 651-336-7333 Address: 1858 Turquoise Trail city/state/zip: Eagan, MN 55122 Contact Applicant Signature: Andre IrIbeCn, Date 201 signed o21bosoo' Date:06/09/2017 Email address: andyirlbeck@hotmail.com ❑Retaining Wall<4 feet 0 Driveway 0 Other: o Patio 0 Sport Court Type of Work ❑Sidewalk 9fFence I' - Description of work: 5-5-� G ChGti;n SA �� P nning Setbacks,hard surface covera•e,shoreland zoning,bluff zone/setbat,etc. �Approv Denied Date: ft, Staff: L „it Notes: It roperty Anes to be verified by contractor/owner. Revised Plans Approved: Yes/No Date: Staff: Engineering Grading,drainage,utility easements,wetlands,erosion control,improvements in the Right-of-Way,etc. Approved/Denied Date: Staff: Notes: Revised Plans Approved: Yes/No Date: Staff: Comments CALL BEFORE YOU DIG. Call Gopher State One Call at(661)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq G:\Building Inspections\PERMIT APPLICATIONS �. roNN 1-4 cm -. '"' ''.,;iiiii.i-1-1-_,;,',.. . ' . ' -'' - . .'• ...: - ;:--- '-''''''''\'', s Immi Cos , 4 U, Co\ , R C d qNT A 0 ter. *-Q, n 1,...cl V r J i n m , %,,---A,--- EAGAN 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651)675-5685 ITDD: (651) 454-8535 I FAX: (651) 675-5394 planning eticitvofeaaan.com r --- For Office Use Permit #: Date Received: <00"/, Staff: 1 2019 ZONING PERMIT APPLICATION o Please Identify improvements or scaled site pian drawing that shows lot lines, structures and existing conditions. Site Address: l$58 Tvvctuoik Tvai Qagah MN G5/2 Z Cod/ }}osit muh' ivura 6ru jc 1111. Phone: ? to3-`13- 2 Ito ezf• sI I S,Ii8" 7S"" C4 tJ ciry/stateizip: p1N' o, PAN GS 3 ao Date: q 2u 2444 Applicant Signature: Coollide WiSiTA1V1 yfit. h Email address:atty. ht►StermaaG� cwrovu- 440441k• ct w► D Retaining Wall <4 feet 0 Patio 'Sidewalk Description of work: Qt Lac 741 Driveway 13 Sport Court `3 Fence •eXig tPI dviYC tPJ 0 Other: scehtwa.ik , prAYti (Rattsf4 44 ace coverage; Approved nied Date: 16 -5 'p21 / f Staff: notes: �I'S I"✓. • is ©I.( J ;11' It1hif c 1' c,/u Revised Plans Approved: 1 gineerin Yes 1 No Date: easements Staff: ;zan 22' Winds, er6s nbco nts Rigt-Q fWay Approved I Denied Date: Staff: Notes: ommef CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. wwr=.aopherstateonecall.orq You may subscribe to receive an electronic notiflcatk n from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeaaan.comisubscrlbe. Scanned with CamScanner 15184 75th Ct NE Otsego, MN 55330 Office (763) 493-2976 Fax (763) 354-6316 customerservice@aurore-asphalt.com sales@aurora-asphatt.com ASPHALT & CONCRETE AURORA ASPHALT & CONCRETE A Division of the Aurora Group, Inc. wwwaurora-asphalt.com www.aurora-concrete.com Attachment A ITES: NOT TO SCALE Scanned with CamScanner