Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
3485 Promenade Ave - Commissioning Check List
SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance -- C-- . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting - . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. N EAT RAMP ) a k Model: 24 H CE 2-9 A&a3Qo i i FAN CU« 01 $itTh cri Serial #: 1-10 7 E 2-2-0 2-- Technicians Technicians Name: )C4--, V%-, Date: D- C 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 51.? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance °- 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting c--- . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. PAW Colt. it 3 Model: 3 H x5-zqo L-11c3665-vii Fs Ess t yoi) Serial #: Aoq c2_84yoc; Technicians Name: /C.c !-� -S, Date: a ` 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance - 0 -. 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting v --. 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. EAT R ' 1 Alc Model: 2SI-ICEy3bA0031011 FAN Cou * 2 NORTIk Cameo,ovi kve Serial #: 1-100E1696C Technicians Name: I(e,'4--x Tom- JL; Date: D -- I '`f- I 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Sim? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance – v . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting ._ .7—.- 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper startup). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. P COi t- OZ. Model: 36.14)(5 -2W LI tc3 os-v 1 N®RTH CB NITS Serial #: Ac 18 z-No r7 Technicians Name: 5 Date: -' t&4 Ct 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 511.? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance — — . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting -_ — . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-u.. PiAP 1 Air Model: .5HcELBGAoo3loi I FAN coat. i3 F, Ess Room Lot Serial #: -WPE ► 032� Technicians Name: /Cc. -- Date: D-- `-r— g 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 511? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. CFAKI Con_ * I Model: 2-1-( 14)(5 '-2-'0 ti c2y05 - 9 So � a RA Serial #: Rc9 C281-13bq Technicians Name: 1Cc..; Date: a 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance . . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting T1 . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. (-161/\ West Model: gKCEAoGA2RsftoA0j Serial #: •32-1.7c51-1359 Technicians Name: Date: k % 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Si? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incomingas pressure to manufacturer's recommended pressure per appliance `?, S . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3.S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Rrq .. T Model: LIS KCFA06112As iorkoA0 Serial #: S2 7C-5L.1363 Technicians Name: Ke.,' Date: LI— 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance A- 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting — 0— . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. PVIC Model: rre t 5 36 5oAvxxBA CT---D r SNA Serial #: ! O332-k2 Technicians Name: Ke._ Date: "1-1`-i- I 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 51.1? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance -7,9 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3. S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. UNIT Hem& Model: Ut1\P - 1-100 Fps Serial #: BRi=' 30GZO30711 Technicians Name: (Q-A`--- A 1c.+=.. Date: \ 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance —7, 7 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting `3 . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: MAP - LO& Wesr Serial #: ?aF3062o3 B?7Lo Technicians Name: )(c. -_. L.. a,<i Date: a—1`i— 1 S 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 imm? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance T. 3 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting �3, . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: (Mit)ocl 2Lk A), " ' if s Serial #: 5 le 11 4 «3(0(e Technicians Name: C e Date: D-- - 1 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance `7, . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3'S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling(condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: ���� 4 5 o P L u A Serial #: St( t1G-1.‘ dAci Technicians Name: • Date: -i 1 C( 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance `1, ) . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: IC 9- 3Codcl Pr6AL Serial #: S k n N \,-2„.0\- j Technicians Name: IC Date: 8 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 51.? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance -7, . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. CUV___a S Model: VQQ,Bv,sum Serial #: Stutz 1`o Technicians Name: )(e Date: i` 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Sami Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 3 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting -3, S 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off'heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: u,,JOA, '7,i octi? k5) vY\ 0- S21 Serial #: S S Technicians Name: K Date: - f g 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance I w . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: 1A-)C.(6 `,(.09 p Vz v°n Oc- 57_0 Serial #: Sic 11 ‘A e, 93 Le Technicians Name: K Date: 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 S.? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: kk\..)L 9 Ou 0c1k fl A'i. 4211116 Serial #:5 '\CD ki c Technicians Name: --• 1 - k Date: 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 S.? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting Ti� �� . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: ,4wc: Y. to 09 P.1,2.42 On. i Serial #: c r S 3 5 Technicians Name: — \ Date: S— 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 5 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting "3, S� . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. 411,Model: \-k,,,,LTY-, ,-\boct Serial #: .coy. G-I 11 Technicians Name: f Ce V\-- Date: D-- 1 C- 1 I( 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming has pressure to manufacturer's recommended pressure per appliance 7,S . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: kk,,,c, P,3(4 0a cs2_4.2_ t- S Lo Serial #: Sic,1714 1. suk-ty Technicians Name: )C w 3,1c, , Date: �- - 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 51? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance `7., -1 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting ; 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: rweeB'i2,3(oP 12,A7_ Serial #: siu sz- 5205 Technicians Name: ��� � �— -"S,, Date: 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 5 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance '1, . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting � 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. 41211) Model: vv,,,c,R Serial #:Stool-, 4l-cL,LIC0 Technicians Name: tc\-- 1.1tc- Date: a- k 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 5Ili Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance -7 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting -3.r. 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: `1 voc .;ku ac\ P 1 2 Serial #: S1413tot-f5 Technicians Name: )(e. ‘-‘-, Date: 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Smil? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance `7. 9 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting -3, . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: oc g t1,-(o ne-i k3 i?Az v ��4- S Serial #:59 Technicians Name: 1(c. Date: - \ c.- 1 if 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Si? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance '7.9 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3Y Ste. 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: \A kio c_ P v Vn l E Serial #: tut') (6 ( of Technicians Name: Date: i S---- S 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 .51111? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance `7 , . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting Ta c 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: 4wutw5u001 2. v k 0 Serial #: \A U o Technicians Name: Ke-1 -5 V Date: €- c-- 1 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance —7.-J . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3. S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: L 8 U � 2(� ( oci Serial #: c o Technicians Name: )< 3\Q Date: D- 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance -7..9 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting '3 t, 3 . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "bum off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. - Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: kW c- i?,(-Vo°et p-2_,L►-2 UV 11- SOb Serial #: 1-1 G S Technicians Name: N Date: `a-\ c C 6757 Oxford St., St. Louis Park,MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers,paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance Ss, . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting J, S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: c (6cL,3t9oci(1,1 ve So ) Serial #: S�.t��i \Po(01,11 Technicians Name: )(c:-;k\-,. Date: 5-- 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance —) . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3o S� . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. c,99 Model: we fj P, cto .2 P ? Serial #:5ISp1i 4 i0 � 3 Technicians Name: > --, 416--3 Date: - 1 ss-- I V 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance ""), . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle-unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: oD\ Pin P 2, Serial #: S .tin cob Technicians Name: )C-c Date: — k ) 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 Si? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance —7 ,—1 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3, S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "bum off'heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: c. S �o A �� ���� Serial #: ' .a7 1-1 Technicians Name: )(cDate: \ 5-- ) 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance —7, . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting -3tf- . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "bum off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: U ' �rkw�. . . (AQ�i �'� HA2 Serial #: S11kii n Technicians Name: 1(eDate: a - 1 S- 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 51.11? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7 . . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting -3,J' . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: \A,N R -sr I ()VM 501, Serial #: 1(.)1.--/s12 t k L1 J Technicians Name: clk. --,-3 Date: 2- - V 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 Smi Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance -7.9 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting-3, . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model:\Awc8V)4oct 8A/ \k SO t) Serial #: > ( cl Technicians Name: �C Date: 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7, . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 1.f . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: (. � 92)ori P L� k LA-2_ w Z Serial #: S l r)G- \L Technicians Name: r a1.° Date: a-1 -- 1 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance '). . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3,; J' . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: 9 LA&ftP1,(.1 C—D\J Serial #: cS Technicians Name: K : - &\c Date: D.— L 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 S.? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance —7. . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting .�3, S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: `k,,,c..%) t -c ` PGA-7, v Z Serial #: J 1ZL\5 Technicians Name: )Ce- -L TS a Date: a— NC—IV 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 51? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance ?,i. 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting ; ( . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: Nw c`)) ‘1,1\ L �� Lk 'ZZ- Serial #: 5\ i, \-) N IS Technicians Name: 1(e.: T atc:, Date: a- 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance —i, 4' . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting T c 9. Inspect for any defects in parts or operation. 10. Run heat to fully "bum off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: \-\‘,.) ,` ``� c Gti-N 1 Serial #: S t-1 sl-1_,L c\ Technicians Name: Ky *\-, S: 4Date: a.-1 L--1C 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Smi Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting `7, c . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: u`3'(;'su pt j;,-k-kA Serial #: o u tf1 Technicians Name: K Date: a - q 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 511? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance '7), ( . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "bum off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: � .,). F, ,(11fi P2�tA Z, v�, �-� k 9 Serial #: tv Technicians Name: Kc-N - Date: ` \ C- 1 t 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance TS . 1 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 7, ( 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: \Awc Cl 91-2,14t Serial #: t n _ \ E; -Z 1 Technicians Name: Date: ca- 1 L-- k 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Sui Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance e . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting `3.. r. 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop,compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: \2,w .e Oct ?L4 az41111110 Serial #: C)IL; 19,11-11.c) Technicians Name: Kr.,‘' Date: -it.-- kg 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance Ir., b . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting - S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: NAwc, , 3i � � , �. Z Serial #: yb Technicians Name: Date: 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming g,as pressure to manufacturer's recommended pressure per appliance "7 , . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: Q LA ) 5 Serial #: S t 4 0 ?_ Technicians Name: Date: a - .rt 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SIR Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming as pressure to manufacturer's recommended pressure per appliance "7. . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: \.) wL `, Serial #: ' rL2\-? 5 \- x s Technicians Name: IC e - .��-�� > Date:-Z— t ` 8 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 Slimi Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7s . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting -3 i Sc . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: At.,;. -,; (6, k �3 Serial #: Technicians Name: 1( 'S--01\ Date: a--1 f--k 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance ,g . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting ` S' . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. • Model: twc_9 R, y(, r)`i F tZAZ Serial #: S unsk-A (31 Technicians Name: K.: Date: 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Si? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting D. 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: ILL (I UC.(i Serial #: s ,- Technicians Name: 1C ; 3Date: a-)c 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance ^7 < �. 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting -3. c. 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Mode1:0,\:,c G Serial #: 5R i1Nt2 ( 1 Technicians Name: Date: a- 6757 -6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7• . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting -3 3 . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: 1.k,,,,c v ,-;(;rt'; P [-LA Z uA 140 °t Serial #: 5WW-t s Technicians Name: K- Date: a- ‘c-- w 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance r I . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: \Ai ? uIy)ocip-Li,) Cun (40 ` Serial #: nN ��� � Technicians Name: Date: a- 1 -1 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Sawi Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7 . . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting T>-C . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: 4w c. , c,0'1 �� t�- l--1 0 I Serial #: 5 s u -t Technicians Name: Date: ' 1 tr-1 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Si? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance-7,`fi . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting i r. 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: 'NAL , .or't? I2-Ai Crk t L(OU Serial #: cityv .t3 Technicians Name: K Date: 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Si? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance Q L . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting J, 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: ‘zpi� 05 Serial #: s r Technicians Name: 1t Date: K— cr 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Smi Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance --), 1 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting `3 . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: ,,„ .u'9,c�1 c Z Serial #: Technicians Name: 1C e ` �'�. o��� - . Date: 1 i c 1 ff 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 51.? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance "7, "1 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting , 5 . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: H liQCS LibociPty f 2 Serial #: S 16I c7 N 1235_5 Technicians Name: iCDate: a-\es- 1 c' 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting D, 1- . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off'heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: H CS fZy bol PZy t1 2 Serial #: S 16I 7 G o 3y H Technicians Name: 1C-6 *3 ��; Date: 7 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Sli Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance '? • ) . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 9 J J . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. c#121RD Model: 1-11WC8R36ogPi8Aa. Serial #: 3 16 t'fl 11334 Technicians Name: \Cc.,- k\____ c k- — Date: a.- \S- i r 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance �7. c . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop,compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. (A N i 32-2- Model: 322Model: 1-11A)C8K3G09 PIZA2 Serial #: S161751354_5 Technicians Name: 1 CC; �-� J� d ice; •=3 Date: — 1"1-- e 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 5I? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming as pressure to manufacturer's recommended pressure per appliance 7S . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting -3 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off'heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Wm- 32-I Model: -1-1WC-8K3Goct P18 AL Serial #: S ) 7 113�q Technicians Name: )C-c- Date: a - 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Sim? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7. 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting ` f 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. UNIT— 320D Model: -114CbZ360 PIZA2 Serial #: 1'3599 Technicians Name: K e Date: a- t1--1 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 51? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance , . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting `3. , 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. UNIT 319 Model: flW c8,IZ36o iPizAz Serial #: s i c ( 171 fp-11662,9 Technicians Name: 'rte J c�lc► Date: a-- 1 °‘ gr 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 511? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 3-, 3 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting -3,_/ 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. ��- 31 J Model: WC 3R-36®ci P t 212 Serial #: s; 1 v73-13ca7 Technicians Name: 1�-N �� �.����-; a Date: .2-- 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Sig? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 1. r . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting C . 9. Inspect for any defects in parts or operation. 10. Run heat to fully"burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels,doors and screws removed for start-up. 11r 3/9 Model: fI1 C gLi Bocipzil Fi z Serial #: siGifr&iLiScici Technicians Name: Aka Date: 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 5111? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance ). 1 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. + �. 8. Set manifold gas pressure to specified setting 3 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. ((ANr- 326 Model: c8K36oq p1 A 2 Serial #: si(tr7H)$focL1 Technicians Name: Kt c\c-: Date: t 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power,low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance "7, J . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: 1-114c R%%C P12zg2- CNr7 31 Serial #: -516173-1355y Technicians Name: Date: a- k \`‘ 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Si? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance `7 5 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting J. 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. ONir 3iy Model: H WC 8 R%oq p 122_ Serial #: S)6I 7 H 18 605 Technicians Name: QC-. . : Date: i 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 511.? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance `7. 8' . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3' 5 . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. (uJiT 313 .) Model: liwc8u6oci Ptuz_ Serial #: s 1(24'73135 30 Technicians Name: )(-4--\'`+‘-,_ `- leo Date: a-- 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 511? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance `-?. J . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: ffWcMk%oct Pt 2A2 Serial #: £I617St355 j Technicians Name: K-c- c -, Date: 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Si? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power,low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install(e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming as pressure to manufacturer's recommended pressure per appliance —7, . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 7 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. UNIT 3I Model: HWc8K3609 P►2AZ Serial #: s161 r75 I35S3 Technicians Name: 1 ..\ *� Date: a.-1 g 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 511? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7. 4 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting -31 f . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. l�iw rr Model: fWC8R36o�P I zAz 310 Serial #: 516,73 t 355® Technicians Name: 42i_ =3 Date: a- 5— 17 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 5111? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance Y, . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting -3, . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. @11 309 Model: HWc883601 P12. 12_ Serial #: S 161 731352-0 Technicians Name: Date: - 1 I 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 Smi Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance :2I. ? . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: H Wc8IZy iOi P zy A2 (Ur_308) Serial #: s i Con H12-373 Technicians Name: ICc i1t-; Date: a - )5- It 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Smi Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance -"7., . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting "3 ( . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "bum off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: 1-1WC8R3609P12-A2 Nil- 30D Serial #: SI61'73-13533 Technicians Name: K Date: D's M^) 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 511? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance . I . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 s S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. UNIT 306 Model: fliNiCSR36oci Piapl2 Serial #: s 161 `71i 11C232_ Technicians Name: Date: --moo— 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 5IR Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance -7 9 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully"burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Usrr 3o5 Model: HIc8R36o9 P i 21z. Serial #: S16117H1$ 630 Technicians Name: Date: a-1 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 5111.? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance ~) . . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3- 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up.- =14/411- 3" Model: 1.114c8R 3609 P18 A2- Serial 2Serial #: _C/61 ? aII3y3 Technicians Name: ICc-. L J \; —.s Date: c) - 1 - 1 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Sm? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance . . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 3 . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. (�N,r- 3o Model: H W 3 R3Go p ?Az_ Serial #: £ 1617 t l 3y8 Technicians Name: K-c-- Date: a— 5— k 7 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 511? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance g, 0 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 7 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. �,ir 392 Model: HWCBR3Goq r viz Serial #: S 16O 3 t V 3 8 Technicians Name: K c- T,- Date: - 19— t 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 65-, I . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 .J . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "bum off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. UNIT 301 Model: PWC8K360qPi8Az Serial #: ' 161r1-5113s Technicians Name: )C--‘- Date: 1 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incomingas pressure to manufacturer's recommended pressure per appliance -7... 5 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting •./ . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: HWcBRilSo Pz., 2 a"�� q Serial #: S1617621 old Technicians Name: )<-t ' �� d��� Date: a - \ 8 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance , a . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3.„S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "bum off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: NWCBR P241112_ Serial #: S1617 GZl O c Technicians Name: K e .- 5v Date: g 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance ` d`, 3 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. S 8. Set manifold gas pressure to specified setting s . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. T 223 Model: f 1WC8R36oi P 18 A2._ Serial #: S 1to 7H 124 IS Technicians Name: Date: I -a a 41 % 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance -) , . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3, C. 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: N WC$R36oci p ZA2. 411=6 Serial #: s !GI 3- 135i9 Technicians Name: )C---\- Date D-0- 6757 -0_6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance '7.4- . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting-3 _ . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: H WC8R3Go9 p2i12 Serial #: S1(0173'00383 Technicians Name: k-. Date: �a 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance .9 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 ,C . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off'heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. poi r 2D Model: I4WC8R36oc, Pi zA2 Serial #: S t , r7 zy 135,13 Technicians Name: 1Lc : ��'�a\<=, — Date: ar') --\fit 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Smi Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance , . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting --3,r . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. UNIT- 2J11 Model: 11JC8P o' PIzA2 Serial #: S' I2In1M 18. 91 Technicians Name: Y.--e ► c\jS Qk.► Date: 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 S.? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance -7.7) . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3,-( . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "bum off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: H Il $!Z3609 pi 2A 2 UNiT 210 Serial #: _11073- 13 5 29 Technicians Name: S (Vc:i Date: a- a-c)., g 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 2 .3 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 ► Sr . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: 14wcsw-t8oct Paq A2 (Apar 2)7 Serial #: S Technicians Name: 1( ; Date: a- 2Q°'-1 g 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting *S 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: N wc8R 36 o9 p i 2 Z , to N i r 2.161 Serial #: I6 I r7f11$6I7 Technicians Name: K-e- ; 3,\<‘ — Date: - c,---1 g 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance -7.'1' . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting J i ( . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: H WC-13R. %.ai P'i2 Z Serial #: '1617z- 1353B Technicians Name: K e ; Date: o 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SIR Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 'T' . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "bum off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. UNIT- Model: HIVCSCZ.3,otj P12- Serial #: -g1G171'135 -18 Technicians Name: 1C1.- 3<<1 --' Date: '� • ac)---k 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Wjir 213 Model: it WC R3eoi P1lm a Serial #: ±627/I1862 Technicians Name: 1( ; N\-, A\ Date: a - )--0- IT 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance tm 3 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: n WCR3609 P22A2 Serial #: L6171-(38 600 Technicians Name: \ -c- Date: `1 20- i g 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance . . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting `3r s . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: e_$IZ3bq nzA 2 Uwhr 21 Serial #: £iG r7 1353 -f Technicians Name: 1(z_ ; A 1c,; '-, Date: a © - I 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 Si? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance `T7 .( . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 - C 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. 210 Model: i-I CM 36oq P12A2 Serial #: s 1 G i °7 Z.13-517 Technicians Name: )Ce ; Date: .D - 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance '2_ g . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting , 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. ONtr 2-09 Model: Hl4c61 0 Pgzig2 Serial #: S16 /73--/35•37 Technicians Name: 1C-e. A\t.23Date: 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7.. ( . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: N e-13 R,18 o9 '24-I Az_ 208) Serial #: 1262 ' t1U2y°7 Technicians Name: Date: a av - 1 ¶ 6757 Oxford St.. St. Louis Park,MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Sni Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance -7. . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 w�. 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model fiwe 3 o 1'12 2 UNIT- 267 SR � � Serial #: ,11(717 3`135 a3 Technicians Name: �L e " � J ��t=�-4 Date: 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Sal Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: BIW R360 Pjlfz r ZOO Serial #: S 1 7 135 2 Technicians Name: K Date: .-- a - 1 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 51.? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance '7. . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. — 8. Set manifold gas pressure to specified setting `1,S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: HINC-0R Go a C���� 2059 �. A 2 Serial #: 81617 H.2 Co2 Technicians Name: )C c l(; J Date: D..- ,4-( - 11 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Si? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance -7. 4 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 . . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "bum off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. (wHT 2V-1) Model: 1.I4Jc3R%%09 P18/I 2 Serial #: £16i73113y2 Technicians Name: KC- 1Date: ca - ac.- 0 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 51.? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 3 r 1 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting r S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully"burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. imer 2-03) Model: NI CCR 3601 pie A2 O-- Serial #: 1617 50037' Technicians Name: K A Vic=► Date: a-a o t Y 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7.. ST 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3...S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "bum off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: 1-1Wcf3R36oq F18p2- 21)2) Serial #: sU1'7zS21336 Technicians Name: )Cc- , *\ A16 Date: a ' 1 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 5.? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance `?. . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified settings . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. 04N r 2013 Model: iNceR3eo q Serial #: 161'7700385 Technicians Name: �' �`— 5 v ���►=� Date: 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SR Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance —7-3 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting '3 , . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. UNrr 12D Model: 'N CSR ©q P2 A2 W y� H Serial #: S1c17c 8 iii Technicians Name: )‹.-c-- Act% -, Date:0- ' I 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Si? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance '7-a 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting - e c 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: C5 8D P2 2 =Wilt y A� y Serial #: S1.61 '761511 11 Technicians Name: K c► Date: - a\ 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7,J. . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3-S- 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: H WC8A 3609 Pj8 A Z. ;ir- 123D Serial #: 61.61 Jj13146 Technicians Name: ��--� �'� �� �'=ti Date: a a I ) 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 511? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance `7, . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting ®S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "bum off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: VAC R360q P1.Z2 122- Serial -Serial #: g 261.7N 1862k Technicians Name: Kc Date: a 1 Ce 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. - stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7. 1 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 , S'. 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: I4 .836,®q P18A2 ellEM Serial #: S 16 L'7 Z"113 y r7 Technicians Name: K Date: -a) - 1 ' 6757 Oxford St.. St. Louis Park.MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 51? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7. C, . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. (-Dili- 120Model: )414C8R3609 p 12 2 Serial #: 1617713522_ Technicians Name: K. ALA Date: 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance ci , p . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 .s . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop,compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: iikCeR360c/P12412. rlitivir c Serial #: s i 1 H 1%16 Technicians Name: K- 1.--, J Date: - -Di " 19 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Smi Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance I."), . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting D. S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: 1-14&jC8R360gPl 2 Uwfr iie Serial #: S .Gi'7H18G37 Technicians Name: t - T5 1kG J Date: 1 — g 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 511? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incomings pressure to manufacturer's recommended pressure per appliance 7. S . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting . f 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: 1-1Wc8Kilboi pzi-oz (NIT 117 Serial #: Technicians Name: K Date: a_�� V 6757 Oxford St.._ St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 51? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3, . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: WM 3609 Pz2A2 Ua►r 116 Serial #: 1617.513518 Technicians Name: Date: a1-- l 8( 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 5.? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7. . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting )' c . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: PWC8R3Go9P2ztA2 Serial #: g2U .7/1186N2 Technicians Name: K e + -VN, akr-i Date: a- - D I % 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 5111? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7.3 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3. 3 . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: I WC6R3eoc F 12.A 2 elED Serial #: `c1i1rm161L Technicians Name: ) C e_ J 1c-�--szp Date: a 8 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7. 7 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3., c . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: lWC' R%%o'P 2fl . CSIM Serial #: 67/61r71-118G03 Technicians Name: K .e `�',, A1�►r`-3 Date: - 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Si? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance -7. D . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3_.c . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "bum off" heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: 14Wc3 R 360c1 PlZA a ti=t4 T 112 Serial #: 1617a/3511i Technicians Name: K A1c- Date: a - - t ' 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Sa? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance , o . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting `3.. S 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: C$R3609 Pi2R 2 abvir111) Serial #: S1617 H 1B6o1 Technicians Name: K.e Date: " .21 - 1 g 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Sim? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance `7 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: /-I14CSK3 o.9 P2ZA2 l �►�- n(2 Serial #: ...C1627c13SZLI Technicians Name: c Date: 6757 Oxford St., St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance —7,).` . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3. c . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: HlAic8R366q Pi2A 2 (Aar _log Serial #: g161 7 S". 35°36 Technicians Name: K Date: a- a' - 1 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: HIS"C K118o9PzyA2 `UNIT- Joe Serial #: -11G-1:M12370 Technicians Name: K�� - 5 �A`c- Date: a.-.1\ - 6757 .,--.-1 ''6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Sim? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance .7, S-. 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting '3, ST . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off'heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: 1-IWC5K3Go3 PizA z 1,144ir 106) Serial #: g1&17 18 63i Technicians Name: Kc- -r\-- Date: "a 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7. `f- . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3. 5— . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: fl WCM36a9 PIZA26/kir 105 Serial #: S lGir7 H 2 8 612 Technicians Name: Date: a—ai ' 12' 6757 Oxford St.. St. Louis Park, MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3- . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: MA)C8R36ogP/BAa VV1T 101 Serial #: g, G17a0039 Technicians Name: Ke ; -��'—, ��--' Date: / 6757 Oxford St., St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Si? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7. 1 . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3.c . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: H3ÔO9P23fz. (EINIT C S► Serial #: S16273113t/1 Technicians Name: Date: J 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 Smi Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance `?„k, . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting `3. S . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: R 14C8K36o9 P1S Az 1T 101 Serial #: S16177121.NE Technicians Name: Date: a. 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952) 933-1484 SI? Mechanical City Vue II Apartments Commissioning Check List 3435 Promenade Ave. Eagan MN 55121 1. Verify equipment power, low voltage, gas and drains are ready for operation. 2. Inspect unit for any material that should have been removed at install (e.g. stickers, paperwork and shipping hardware). 3. Check for gas leaks, purge line if necessary. 4. Check and set the incoming gas pressure to manufacturer's recommended pressure per appliance 7.Jr . 5. Power up equipment and test for correct voltage to ground. 6. Create a call for heat at thermostat or other control devise for unit to run at least 5 minutes. 7. Monitor for correct sequence of operation. 8. Set manifold gas pressure to specified setting 3, Sr . 9. Inspect for any defects in parts or operation. 10. Run heat to fully "burn off' heat exchanger. 11. Cycle unit down t control and verify proper sequence. 12. Create a call for cooling (condenser ambient must be above 50°F for proper start up). 13. Check unit temp drop, compare with outdoor scale. 14. Verify sub-cool and superheat are within specified range on all split systems. 15. Follow procedure to adjust refrigerant charge for split systems. 16. Cycle unit up at control and verify proper sequence. 17. Verify functions at thermostat or control separate from heat/cool cycle. 18. Replace all panels, doors and screws removed for start-up. Model: C 360 r5 �N r 161 Serial #: 516177003'3 Technicians Name: /( 51/4J-�� Date: • ,- I 6757 Oxford St.. St. Louis Park. MN 55426 Phone: (952) 933-6933 Fax: (952)933-1484