Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
4000 Eagan Outlets Pkwy - HEATING TEST RECORD-F8,9,11,12,15,16
HEATING TEST RECORD Project Name: _____________________Permit #: _____________ Address: _______________________________________________ Owner: _______________________________________________ Installed by J-Berd Mechanical Contractors, Inc. Gas Designed Unit Make: _______________________________________________ Model: _______________________________________________ Serial: _______________________________________________ Rated Input: __________________________________________ Test Manifold Pressure ___________ Percent CO² _________ Input CFH ___________ Percent O² _________ Stack Temp ___________ Percent/PPMCO _________ Limit Setting ___________ Percent Eff. _________ Date Tested: _____________________________________________ Name of Licensed Tester: ___________________________________ Affinity at Eagan 4000 Eagan Outlets Pkwy, Eagan MN 55122 Daikin f-16 Dm92ss1004cnaa 1711593331 100,000 8.29 6.1 20 3.5 140.2 185 deg 89.0 06/27/18 Brad pundsack HEATING TEST RECORD Project Name: _____________________Permit #: _____________ Address: _______________________________________________ Owner: _______________________________________________ Installed by J-Berd Mechanical Contractors, Inc. Gas Designed Unit Make: _______________________________________________ Model: _______________________________________________ Serial: _______________________________________________ Rated Input: __________________________________________ Test Manifold Pressure ___________ Percent CO² _________ Input CFH ___________ Percent O² _________ Stack Temp ___________ Percent/PPMCO _________ Limit Setting ___________ Percent Eff. _________ Date Tested: _____________________________________________ Name of Licensed Tester: ___________________________________ Affinity at Eagan 4000 Eagan Outlets Pkwy, Eagan MN 55122 Daikin f-15 Dm92ss1004cnaa 1711593329 100,000 btu 3.5 146.3 185 deg 8.13 6.4 15 88.8 06/27/18 Brad pundsack HEATING TEST RECORD Project Name: _____________________Permit #: _____________ Address: _______________________________________________ Owner: _______________________________________________ Installed by J-Berd Mechanical Contractors, Inc. Gas Designed Unit Make: _______________________________________________ Model: _______________________________________________ Serial: _______________________________________________ Rated Input: __________________________________________ Test Manifold Pressure ___________ Percent CO² _________ Input CFH ___________ Percent O² _________ Stack Temp ___________ Percent/PPMCO _________ Limit Setting ___________ Percent Eff. _________ Date Tested: _____________________________________________ Name of Licensed Tester: ___________________________________ Affinity at Eagan 4000 Eagan Outlets Pkwy, Eagan MN 55122 Daikin. F-9 Dm92ss1205dnaa 1803037251 120,000 btu 3.5 137.5 185 deg 8.46 5.8 26 89 06/27/18 Brad pundsack HEATING TEST RECORD Project Name: _____________________Permit #: _____________ Address: _______________________________________________ Owner: _______________________________________________ Installed by J-Berd Mechanical Contractors, Inc. Gas Designed Unit Make: _______________________________________________ Model: _______________________________________________ Serial: _______________________________________________ Rated Input: __________________________________________ Test Manifold Pressure ___________ Percent CO² _________ Input CFH ___________ Percent O² _________ Stack Temp ___________ Percent/PPMCO _________ Limit Setting ___________ Percent Eff. _________ Date Tested: _____________________________________________ Name of Licensed Tester: ___________________________________ Affinity at Eagan 4000 Eagan Outlets Pkwy, Eagan MN 55122 Daikin f-8 Dm92ss1205dnaa 1803037239 120,000 btu 8.45 6.1 14 3.5 146.3 185 deg 88.8 06/27/18 Brad pundsack HEATING TEST RECORD Project Name: _____________________Permit #: _____________ Address: _______________________________________________ Owner: _______________________________________________ Installed by J-Berd Mechanical Contractors, Inc. Gas Designed Unit Make: _______________________________________________ Model: _______________________________________________ Serial: _______________________________________________ Rated Input: __________________________________________ Test Manifold Pressure ___________ Percent CO² _________ Input CFH ___________ Percent O² _________ Stack Temp ___________ Percent/PPMCO _________ Limit Setting ___________ Percent Eff. _________ Date Tested: _____________________________________________ Name of Licensed Tester: ___________________________________ Affinity at Eagan 4000 Eagan Outlets Pkwy, Eagan MN 55122 Daikin. F-11 Dm92ss1205dnaa 1803037236 120,000 btu 8.24 6.2 16 3.5 132.6 185 deg 89.2 06/27/18 Brad pundsack HEATING TEST RECORD Project Name: _____________________Permit #: _____________ Address: _______________________________________________ Owner: _______________________________________________ Installed by J-Berd Mechanical Contractors, Inc. Gas Designed Unit Make: _______________________________________________ Model: _______________________________________________ Serial: _______________________________________________ Rated Input: __________________________________________ Test Manifold Pressure ___________ Percent CO² _________ Input CFH ___________ Percent O² _________ Stack Temp ___________ Percent/PPMCO _________ Limit Setting ___________ Percent Eff. _________ Date Tested: _____________________________________________ Name of Licensed Tester: ___________________________________ Affinity at Eagan 4000 Eagan Outlets Pkwy, Eagan MN 55122 Daikin. F-12 Dm92ss1205dnaa 1803037246 120,000 btu 8.18 6.3 31 3.5 128.7 185 deg 89.2 06/27/18 Brad pundsack