Loading...
1321 Interlachen Dr _ 6L /503-- 7 - c /9%- a ipc. ! S /� 5 70 /%�-0 v r Use BLUE or BLACK Ink /1,'t ' ,C77,,,_ (/ _ /r90 _O 0 For Office Use / 7 . - City of na pil / - � 1 Permit#: /C j Nll 9� / Permit Feer! !6 9C / 3830 Pilot Knob Road r"—....--- a Eagan MN 55122 i_ ' 'l D Date Received ' Phone: (651)675-5675 Fax: (651)675-5694y Staff: Sq 60 tcb -7S 2017 RESIDENTIAL BUILDING PERMIT APPLICATION Date: 1( ' I Site Address: (*II l artAe.ovt brit/ Unit#: 11! Name: D.R. Horton, Inc Phone: Resident! 20860 Kenbridge Court Suite 100, LakevilleN 55044 --yyner Address/City/Zip: lk- t Applicant is: Owner X Contractor' 21 A D.-- p" i/ - / Description of work: New Residential, Single Family Type of Work pp Construction Cost. _x/202 O1`c/�• Multi-Family Building:(Yes /No X y ) ?_ Company: D.R. Horton, Inc Contact: Brooke Hareid Contractor Address: 20860 Kenbridge Court city: Lakeville State: MN Zip: 55044 Phone: 952-985-7806 Email: bmhareid@drhorton.corn License#: BC605657 Lead Certificate#: If the project is exempt from lead certification, please explain why: New Construction COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? Yes No If yes,date and address of master plan: 13ii4"l/11 9 `/2t{2 , �tievtl �✓h rtv Licensed Plumber Sabre Plumbing & Heating 1 Phone: 763-473-2267 Mechanical Contractor: Sabre Plumbing & Heating Phone: 763-473-2267 Sewer&Water Contractor: Starr Plumbing 952-884-4149 Phone: Fire Suppression Contractor: Phone: NOTE:,Plans'and supporting documentsthat you submit are considered to be public information ''ortions of ':`the information may be;classified"as nonubli -pc';if you:,provide specific reasons that would permit the City to conc%ufe'that they are trade Secrets s �: , CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. x Lair . .jeitivA4 xYw�li Applicant's Printed Name Applicant's S t re Page 1 of 3 DO NOT WRITE BELOW THIS LINESs / / 1� `� SUB TYPES 73 / /7 l'' -�/ /C l EJ/Z s Foundation _ Fireplace Porch(3-Season) Exterior Alteration(Single Family) Single Family Garage _ Porch(4-Season) Exterior Alteration(Multi) Multi _ Deck _ Porch(Screen/Gazebo/Pergola) Miscellaneous 01 of_Plex _ Lower Level _ Pool Accessory Building WORK TYPES New Interior Improvement Siding _ Demolish Building* Addition Move Building _ Reroof _ Demolish Interior Alteration Fire Repair _ Windows _ Demolish Foundation Replace _ Repair Egress Window Water Damage Retaining Wall *Demolition of entire building—give PCA handout to applicant DESCRIPTION Valuation 3/f, 'Ei .jZ Occupancy .i2r6 - f MCES System Plan Review Code Edition An b-, i 'S SAC Units (25%_100%,>) Zoning P7 City Water Census Code Stories 2- Booster Pump #of Units Square Feet PRV #of Buildings Length 99 .S ` Fire Suppression Required Type of Construction ''a,. Width ,5--- REQUIRED INSPECTIONS Footings (New Building) Meter Size: Footings (Deck) _ Final/C.O. Required Footings (Addition) Final/No C.O. Required Foundation t-' Foundation Before Backfill HVAC Gas Service Test Gas Line Air Test to Roof:1r'Ice&Water ',_Final Pool: Footings Air/Gas Tests Final ' Framing 30 Minutes r 1 Hour Drain Tile ' Fireplace: Rough In r Air Test - Final Siding: Stucco Lath Stone Lath Brick EFIS (c, Insulation Windows i>° Sheathing Retaining Wall: Footings Backfill Final Sheetrock Radon Control Fire Walls Fire Suppression: Rough In Final r�0Braced Walls Erosion Control 20 Shower Pan Other: Reviewed By: /0 VV1 fYI',r-IelA , Building Inspector RESIDENTIAL FEES JN 1-:4•S rr !S S►r+"7--- / v 9�lrg.fi-- ©10.4-s-a 77•fl Base Fee 6-,47-44,•e. 63, `Y• FT C98 ye.yi S9• F7 • Surcharge ) t T P/c:',,, J 1q y 59 • /7— 6), `7S• /3 S�I••ff Plan Review 47) IA9v/2-- / t y 57. ' • coL8 1,--•73 > , j-,' MCES SAC 02Q✓yr PeRC Ff i t/S .S9. ,f r t' 5-D..0 57 .f/ City SAC Utility Connection Charge S&W Permit&Surcharge Treatment Plant Copies i TOTAL Page 2 of 3 • New Construction Energy Code Compliance Certificate �V Date Certificate Posted s„. .. „ 'Per R401.3 Building Certificate.A building certificate shall be posted on or in the electrical distribution paneL 7/5/18 /50 .557 Mailing Address of the Dwelling or Dwelling Unit 1321 Interlachen Drive Name of Residential Contractor MN License Nnmber DRHorton BC605657 Community - Plan ID Eagan 5486 THERMAL ENVELOPE 'RADON SYSTEM Type:Check All That Apply X Passive(No Fan) 0 U h ^r Active(With fan and monometer or ro '8 „ other system monitoring device) Aa .9. • �j ,5 Location(or future Location)of Fan: W W N an �, Insulation Location > o z o a w ”' ° Attic c'4 •'" .. o w �. i v o w w° w° r r2' Other Please Describe Here Below Entire Slab X Foundation Wall(Sides) R-1 5 X R-10 Exterior,R-5 Interior Fonudation Wall(Front and Baek) R-10 X Exterior Rim Joist(Foundation) R-20 X inter or Rim Joist(Is`Floor+) R-20 X Interior T` Wall R-21 X Ceiling,flat R-49 X Ceiling,vaulted R-49 X Bay Windows or cantilevered areas R-30 X Bonus room over garage R-32 X X Describe other insulated areas Building Envelope air Tightness: Duct system air tightness: Windows&Doors Heating or Cooling Ducts Outside Conditioned Spaces Average U-Factor(excludes skylights and one door)U: 0.31 Not applicable,all ducts located in conditioned space Solar Heat Gain Coefficient(SHGC): 0.31 R-8 R-value MECHANICAL SYSTEMS I Make-up Air Select a Type Appliances Heating System Domestic Water Heater Cooling System X Not required per mech.code Fuel Type NAT GAS NAT GAS R-410A Passive Manufacturer Bryant Rheem Bryant Powered Interlocked with exhaust device. Model 912SC48080S17 PROG5042NRH67PV BA13NA030 Describe: Input in 80000 Capacity in 50 Output in 2.5 Other,describe: Rating or Size BTUS: Gallons: Tons: ART 0, 92°% SEER.or 13 Location of duct or system: Efficiency HSPF% EER HEAT LOSS HEAT GAIN COOLING LOAD RESIDENTIAL LOAD CALC 55,652 22,741 28,729 Cfin's "round duct UK Mechanical Ventilation System "metal duct Describe any additional or combined heating or cooling systems if installed:(e.g.two furnaces or air Combustion Air Select a Type source heat pump with gas back-up furnace Not required per mech.code Select Type X Passive Heat Recover Ventilator(HRV) Capacity in cfms: Low: High: Other,describe: X Energy Recover Ventilator(ERV)Capacity in cfms: Low: 50%=88 High: 90%=158 Location of duct or system: Balanced Ventilation Capcity in CFMS: furnace room ILocations of Fans,describe: Chu's Capacity continuous ventilation rate in cfms: 78 5 "round duct OR Total ventilation(intermittent+continuous)rate in chins: 155 "metal duct 1321 Interlachen Dr Eagan HVAC Load Calculations for DR Horton Lakeville, MN Prepared By: Michael Hoium Sabre Plumbing&Heating 15535 Medina Road Plymouth, MN 55447 763-473-2267 Thursday,July 05,2018 Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. Rhvae-Residential&Light Commer0a tt /AC Loads Ny Elite Software©eveloprriertt;Trac Sabre Plumbing& eatrnq 0a4 s 1321 Interlachen DrEa95n Plyrriout ,MN'5544'7 ,1.. .>1...w,•. . . , a,.,. «s., I Page 2 Project Report general.Project)nf. tl I.', IE, .s. .., i. .. .r f\' Project Title: 1321 Interlachen Dr Eagan Designed By: Michael Hoium Project Date: Thursday, July 05, 2018 Client Name: DR Horton Client City: Lakeville, MN Company Name: Sabre Plumbing & Heating Company Representative: Michael Hoium Company Address: 15535 Medina Road Company City: Plymouth, MN 55447 Company Phone: 763-473-2267 Company Fax: 763-473-8565 Reference City: Minneapolis, Minnesota Building Orientation: Front door faces South Daily Temperature Range: Medium Latitude: 44 Degrees Elevation: 834 ft. Altitude Factor: 0.970 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter: -15 -12.38 n/a 30% 72 29.40 Summer: 88 73 50% 50% 75 35 Total Building Supply CFM: 1,020 CFM Per Square ft.: 0.263 Square ft. of Room Area: 3,876 Square ft. Per Ton: 1,619 Volume(ft3): 33,300 13tindlitaLdaitnaglitgallisimostre 4111111111111MMINEECring,21111111111111111111111MAIREMEMBErnal Total Heating Required Including Ventilation Air: 55,652 Btuh 55.652 MBH Total Sensible Gain: 22,741 Btuh 79 Total Latent Gain: 5,988 Btuh 21 % Total Cooling Required Including Ventilation Air: 28,729 Btuh 2.39 Tons(Based On Sensible+ Latent) Notes mi��»�*.r, '.' ... . k Ott, / iLlsdo..S.itzaan, f,ta., swA Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. Thursday, July 05, 2018, 8:44 AM Rh�r,`k!r ti�es�ciet i i$ �gh`t Cc i erc�at 1>IAYy L d l b � > Nt ftware ! a= eI 1 Sabt61Ptu tbiri9&eattn f'321 Inte a hen DrI ate; tt ��7 7a^' �(, .', / ,. „_ - ./�!r Gf�`, ^..:- \ a�.5632,l.�i,,,.,.9, ..a.... �"� M .. „. .F, .9. rage.-5• Load Preview Report Net ft.2 Sen Lat Net Sen Sys l Sys Sys i CAct Duct Scope Ton, /TonArea Gain Gain Gain Loss CFM CFM CFM Size Building 2.39 1,619 3,876 22,741 ' 5,988 28,729 55,652 659 1,020 1,020 System 1 2.39 1,619 3,876 22,741 5,988 28,729 55,652. 659 1,020 1,020 12x15 Ventilation 860 3,596. 4,457 5,757 Supply Duct Latent 202 202 Return Duct 99 89 188 662 Humidification 5,948 Zone 1 3,876 21,781 2,101 23,882 43,285 659 1,020 1,020 12x15 1-Basement 1,098 2,903 0 2,903 13,933 212 136 136 2-5 2-Main Floor 1,194 10,534 2,101 12,635 13,351 203 493 493 5-6 3-Second Floor 1,584 8,344. 0 8,344" 16,001 244 391 391 4-6 • • Thursday, July 05, 2018, 8:44 AM ess .s Rhvac Residential&Light Gammerciai FI�JAC Roads lite Sot�tware evelapment, Sabre F?iumbingfr&,Heating " , `vgtoi,a1321 1nte lacherlDr Ea ai Plymouth,MN..57.' ,.,, y . , . , . Total Building Summary Loads C€�mporent\ a , Arai Set t Sen w ,... DRH LowEE 3131: Glazing-DRH Windows, u-value 0.31, 279 7,533 0 4,770 4,770 SHGC 0.31 DRH LowEE 3132: Glazing-DRH Windows/Glass Doors, 98 2,644 0 1,144 1,144 u-value 0.31, SHGC 0.32 DRH Door 31 UF: Door-DRH Exterior Door- .31 U Factor, 20 539 0 149 149 .23 SHGC Eagan - R15 9ft: Wall-Basement, Custom, Eagan -8" 486 2,494 0 246 246 poured concrete wall, R-15 board insulation to footing, no interior finish, 9'floor depth Eagan -R15 4ft: Wall-Basement, Custom, Eagan -8" 96 492 0 48 48 poured concrete wall, R-15 board insulation to footing, no interior finish, 4'floor depth R20 12F-Osw: Wall-Frame, Custom, R-20 Insulation in 2817 16,175 0 2,474 2,474 2x6 Cavity, no board insulation, siding finish, wood studs Eagan - R10 9ft: Wall-Basement, Custom, Eagan -8" 360 1,848 0 183 183 poured concrete wall, R-10 board insulation to footing, no interior finish, 9'floor depth RJ 20 Spray Foam: Wall-Frame, Custom, Rim Joist R-20 433.8 1,886 0 534 534 Closed Cell Spray Foam R49 16B-49: Roof/Ceiling-Under Attic with Insulation on 1584 3,170 0 1,749 1,749 Attic Floor(also use for Knee Walls and Partition Ceilings), Custom, R-49 Blown Insulation, No Radiant Barrier, Vented Attic, Asphalt Shingles 21A-20: Floor-Basement, Concrete slab, any thickness, 2 1098 2,579 0 0 0 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 20'wide P-32 R-32: Floor-Over open crawl space or garage, 400 1,044 0 96 96 Custom, R-30 Blanket insulation, 3/4" Foamboard R- 2, any cover Subtotals for structure: 40,404 0 11,393 11,393 People: 6 1,200 1,380 2,580 Equipment: 901 4,116 5,017 Lighting: 1250 4,263 4,263 Ductwork: 3,543 291 729 1,020 Infiltration: Winter CFM: 0, Summer CFM: 0 0 0 0 0 Ventilation: Winter CFM: 155, Summer CFM: 155 5,757 3,596 860 4,457 Humidification (Winter) 16.22 gal/day.__...... 5,948 0 0 0 Total Building Load Totals: 55,652 5,988 22,741 28,729 Total Building Supply CFM: 1,020 CFM Per Square ft.: 0.263 Square ft. of Room Area: 3,876 Square ft. Per Ton: 1,619 Volume (ft3): 33,300 Total Heating Required Including Ventilation Air: 55,652 Btuh 55.652 MBH Total Sensible Gain: 22,741 Btuh 79 % Total Latent Gain: 5,988 Btuh 21 % Total Cooling Required Including Ventilation Air: 28,729 Btuh 2.39 Tons(Based On Sensible+ Latent) Note. ..... . Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. Thursday, July 05, 2018, 8:44 AM Rtivac Residential.&tight commercial NVAG odds �, � Elea off r-e,1,4,:, .vvl p ept lnc Sabre Plumbing&Heating, 1321 Interla0i)1r Eagan , Plymouth,MN 55447 .,,:.» ti p ,,m-, r ,P,a9 e 5 Detailed Room Loads - Room 1 - Basement (Average Load Procedure) Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 22.0 ft. System Number: 1 Room Width: 50.0 ft. Zone Number: 1 Area: 1,098.0 sq.ft. Supply Air: 136 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 0.8 AC/hr Volume: 9,882 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 2 Actual Winter Vent.: 50 CFM Runout Air: 68 CFM Percent of Supply.: 37 % Runout Duct Size: 5 in. Actual Summer Vent.: 21 CFM Runout Air Velocity: 499 ft./min. Percent of Supply: 15 % Runout Air Velocity: 499 ft./mina Actual Winter Infil.: 0 CFM Actual Loss: 0.200 in.wg./100 ft. Actual Summer Infil.: 0 CFM Iteile �4 kW y en ' Laf deft cri �11q.fttft 4 HTfVT,�. : Liss `'' f � Gan., l�lrl' ©L'Sr113�7t2rT' ....,... /r7....,�a �y�. ,,„ ,.,..�U� E -Wall-Eagan -R15 9ft 27 X 9 243 0.042 5.1 1,247 0.5 0 123 E -Wall-Eagan -R15 4ft 12 X 4 48 0.041 5.1 246 0.5 • 0 24 E -Wall-R20 12F-Osw 12 X 5 60 0.066 5.7 345 0.9 0 53 N-Wall-R20 12F-Osw 40 X 9 275 0.066 5.7 1,579 0.9 0 241 W-Wall-R20 12F-Osw 12 X 5 60 0.066 5.7 345 0.9 0 53 W-Wall-Eagan - R15 4ft 12 X 4 48 0.041 5.1 246 0.5 0 24 W-Wall-Eagan- R15 9ft 27 X 9 243 0.042 5.1 1,247 0.5 0 123 S-Wall-Eagan -R10 9ft 40 X 9 360 0.050 5.1 1,848 0.5 0 183 E -Wall-RJ 20 Spray Foam 39 X 1.5 58.5 0.050 4.4 254 1.2 0 72 N -Wall-RJ 20 Spray Foam 40 X 1.5 60 0.050 4.4 261 1.2 0 74 W-Wall-RJ 20 Spray Foam 39 X 58.5 0.050 4.4 254 1.2 0 72 1.5 S -Wall-RJ 20 Spray Foam 40 X 1.5 60 0.050 4.4 261 1.2 0 74 N -Gls-DRH LowEE 3131 shgc-0.31 45 0.310 27.0 1,215 9.9 0 447 100%S (3) N -Gls-DRH LowEE 3132 shgc-0.32 40 0.310 27.0 1,079 10.1 0 404 100%S Floor-21A-20 50 X 22 1098 0.027 2.3 2,579 0.0 0 0 Subtotals for Structure: 13,006 0 1,967 Infil.: Win.: 0.0, Sum.: 0.0 1,659 0.000 0 0.000 _0 0 Ductwork: 927 84 Lighting: 250 853 Room Totals: 13,933 0 2,903 Thursday, July 05, 2018, 8:44 AM Rhvac-Residential$&Liht Commercial HVAC Loads6. e' i;r Elite m Software Develope ),nc Sabre Plumbin &g eiffie(�`c' ,exz c rf✓r '. * 132 4nterlachen Or an Plymouth>"MN 55447 .,,. :r.. Detailed Room Loads - Room 2 - Main Floor (Average Load Procedure) General = . .. " "" , ,. _,- r-ao : Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 23.9 ft. System Number: 1 Room Width: 50.0 ft. Zone Number: 1 Area: 1,194.0 sq.ft. Supply Air: 493 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 2.8 AC/hr Volume: 10,746 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 5 Actual Winter Vent.: 48 CFM Runout Air: 99 CFM Percent of Supply.: 10 % Runout Duct Size: 6 in. Actual Summer Vent.: 75 CFM Runout Air Velocity: 503 ft./min. Percent of Supply: 15 °A) Runout Air Velocity: 503 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.157 in.wg./100 ft. Actual Summer Infil.: 0 CFM is r at:tr f' AgHt: n tg t , Seng 11: �, < - . G® Galrn D�pti+3n...... . - -:"-: a���;`NOarttity ��°�l�tl�g � �>,- �� � � ,...� '�.` � E -Wall-R20 12F-Osw 39 X 9 336 0.066 5.7 1,929 0.9 0 295 N -Wall-R20 12F-Osw 40 X 9 263 0.066 5.7 1,510 0.9 0 231 W-Wall-R20 12F-0sw 39 X 9 351 0.066 5.7 2,015 0.9 0 308 S -Wall-R20 12F-Osw 40 X 9 310 0.066 5.7 1,780 0.9 0 272 E -Wall-RJ 20 Spray Foam 42 X 1.2 50.4 0.050 4.4 219 1.2 0 62 N -Wall-RJ 20 Spray Foam 40 X 1.2 48 0.050 4.4 209 1.2 0 59 W-Wall-RJ 20 Spray Foam 42 X 50.4 0.050 4.4 219 1.2 0 62 1.2 S -Wall-RJ 20 Spray Foam 40 X 1.2 48 0.050 4.4 209 1.2 0 59 S -Door-DRH Door 31 OF 3 X 6.7 20 0.310 27.0 539 7.4 0 149 E -GIs-DRH LowEE 3131 shgc-0.31 15 0.310 27.0 405 33.0 0 495 0%S N -GIs-DRH LowEE 3131 shgc-0.31 45 0.310 27.0 1,215 9.9 0 447 100%S (3) N -Gls-DRH LowEE 3131 shgc-0.31 12 0.310 27.0 324 9.9 0 119 100%S N -GIs-DRH LowEE 3132 shgc-0.32 40 0.310 27.0 1,079 10.1 0 404 100%S S -Gls-DRH LowEE 3131 shgc-0.31 30 0.310 27.0 810 18.1 0 544 0%S(,2) Subtotals for Structure: 12,462 0 3,506 Infil.: Win.: 0.0, Sum.: 0.0 1,619 0.000 0 0.000 0 0 Ductwork: 889 305 People: 200 lat/per, 230 sen/per: 6 1,200 1,380 Equipment: 901 3,638 Lighting: 500 1,705 Room Totals: 13,351 2,101 10,534 Thursday, July 05, 2018, 8:44 AM Rhvac Residential&Light Commercial HVAC .oads r, " Vic, ittett'o twa uelopment,Inc. Sabre Plumbing&Heating ,"" ` r� o, 132'1 lnterlachen Dr Ea "r Plymouth,«MN 5565.47<:. : .,: ';,.--,,,,0,6 ,11,0t'-'%-,''''''" ''',.r .:a.., „....., '''''i'-'70'4,04'''''''''' Pane 5, Detailed Room Loads - Room 3 - Second Floor (Average Load Procedure) k3e1eral,. �' r �t ,..., „�u _ 55,55... ..., . �� ems.. . 5555. .?�.� �����,.. . , alifr, Calculation Mode: Htg. &cig. Occurrences: 1 Room Length: 31.7 ft. System Number: 1 Room Width: 50.0 ft. Zone Number: 1 Area: 1,584.0 sq.ft. Supply Air: 391 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 1.9 AC/hr Volume: 12,672 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 4 Actual Winter Vent.: 57 CFM Runout Air: 98 CFM Percent of Supply.: 15 % Runout Duct Size: 6 in. Actual Summer Vent.: 59 CFM Runout Air Velocity: 498 ft./min. Percent of Supply: 15 Runout Air Velocity: 498 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.154 in.wg./100 ft. Actual Summer Infil.: 0 CFM JtemAi $0 ylU -f6: to tg `a Sen Description: � ,,,, 1 afttFty 4 ,11 . Ltd$... �VAIEVII. Gait*, Gain E -Wall-R20 12F-Osw 42 X 8 306 0.066 5.7 1,757 0.9 0 269 N -Wall-R20 12F-Osw 40 X 8 278 0.066 5.7 1,596 0.9 0 244 W-Wall-R20 12F-0sw 42 X 8 321 0.066 5.7 1,843 0.9 0 282 S -Wall-R20 12F-Osw 40 X 8 257 0.066 5.7 1,476 0.9 0 226 E -Gls-DRH LowEE 3131 shgc-0.31 30 0.310 27.0 810 33.0 0 990 0%S (2) N -Gls-DRH LowEE 3131 shgc-0.31 30 0.310 27.0 810 9.9 0 298 100%S(2) N -Gls-DRH LowEE 3131 shgc-0.31 12 0.310 27.0 324 9.9 0 119 100%S W-Gls-DRH LowEE 3131 shgc- 15 0.310 27.0 405 33.0 0 495 0.31 0%S S -Gls-DRH LowEE 3131 shgc-0.31 45 0.310 27.0 1,215 18.1 0 816 0%S (3) S -Gls-DRH LowEE 3132 shgc-0.32 18 0.310 27.0 486 18.7 0 336 0%S (3) UP-Ceil-R49 16B-49 31.7 X 50 1584 0.023 2.0 3,170 1.1 0 1,749 Floor-P-32 R-32 20 X 20 400 0.030 2.6 1,044 0.2 0 96 Subtotals for Structure: 14,936 0 5,920 Infil.: Win.: 0.0, Sum.: 0.0 1,312 0.000 0 0.000 0 0 Ductwork: 1,065 241 Equipment: 0 478 Lighting: .__...... 500 1,705..... Room Totals: 16,001 0 8,344 Thursday, July 05, 2018, 8:44 AM Site address 1321 Interlachen Dr Eagan Date 7/5/2018 Contractor Sabre Plumbing & Heating `omByeted y Michael H Section A Ventilation Quantity (Determine quantity by using Table R403.5.2 or Equation 11-1) Square feet(Conditioned area including 3876 Total required ventilation 155 Basement—finished or unfinished) - Continuous ventilation 4 78 Number of bedrooms Directions-Determine the total and continuous ventilation rate by either using Table R403.S.2 or equation 11-1. The table and equation are below Table R403.5.2 Total and Continuous Ventilation Rates(in cfm) Number of Bedrooms 1 2 3 4 5 6 Conditioned space(in Total/ Total/ Total/ Total/ Total/ Total/ so.ft 1 rontinunus continuous continuous continuous continuous continuous 1000-1500 60/40 75/40 90/45 105/53 120/60 135/68 1501-2000 70/40 85/43 100/50 115/58 130/65 145/73 2001-2500 80/40 95/48 110/55 125/63 140/70 155/78 2501-3000 90/45 105/53 120/60 135/68 150/75 165/83 3001-3500 100/50 115/58 130/65 145/73 160/80 175/88 3501-4000 110/55 125/63 140/70 155/78 170/85 185/93 4001-4500 120/60 135/68 150/75 165/83 180/90 195/98 4501-5000 130/65 145/73 160/80 175/88 190/95 205/103 5001-5500 140/70 155/78 170/85 185/93 200/100 215/108 5501-6000 150/75 165/83 180/90 195/98 210/105 225/113 Equation 11-1 (0.02 x square feet of conditioned space)+[15 x(number of bedrooms+1)]=Total ventilation rate(cfm) Total ventilation—The mechanical ventilation system shall provide sufficient outdoor air to equal the total ventilation rate average,for each one-hour period according to the above table or equation.For heat recovery ventilators(HRV)and energy recovery ventilators(ERV)the average hourly ventilation capacity must be determined in consideration of any reduction of exhaust or out outdoor air intake,or both,for defrost or other equipment cycling. Continuous ventilation-A minimum of 50 percent of the total ventilation rate,but not less than 40 cfm,shall be provided, on a continuous rate average for each one-hour period.The portion of the mechanical ventilation system intended to be continuous may have automatic cycling controls providing the average flow rate for each hour is met. Section B Ventilation Method (Choose either balanced or exhaust only) Balanced,HRV(Heat Recovery Ventilator)or ERV(Energy Recovery n Exhaust only Ventilator)—cfm of unit in low must not exceed continuous Continuous fan rating in cfm ventilation rating by more than 100%. Low cfm: �� 58 High cfm: ^ Continuous fan rating in cfm(capacity must not exceed 1 8 continuous ventilation rating by more than 100%) Directions-Choose the method of ventilation,balanced or exhaust only.Balanced ventilation systems are typically HRV or ERV's. Enter the low and high cfm amounts.Low cfm air flow must be equal to or greater than the required continuous ventilation rate and less than 100%greater than the continuous rate.(For instance,if the low cfm is 40 cfm,the ventilation fan must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. Section C Ventilation Fan Schedule Description Location Continuous Intermittent Directions-The ventilation fan schedule should describe what the fan is for,the location,cfm,and whether it is used for continuous or intermittent ventilation.The fan that is chose for continuous ventilation must be equal to or greater than the low cfm air rating and less than 100%greater than the continuous rate.(For instance,if the low cfm is 40 cfm,the continuous ventilation fan must not exceed 80 cfm.)Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. Section D Ventilation Controls (Describe operation and control of the continuous and intermittent ventilation) ERV has wall control-set to 50%=88 CFM ERV has wall control-set to 90%=158 CFM Directions-Describe the operation of the ventilation system.There should be adequate detail for plan reviewers and inspectors to verify design and installation compliance.Related trades also need adequate detail for placement of controls and proper operation of the building ventilation.If exhaust fans are used for building ventilation,describe the operation and location of any controls,indicators and legends.If an ERV or HRV is to be installed,describe how it will be installed.If it will be connected and interfaced with the air handling equipment,please describe such connections as detailed in the manufactures' installation instructions.If the installation instructions require or recommend the equipment to be interlocked with the air handling equipment for proper operation,such interconnection shall be made and described. Directions-In order to determine the makeup air,Table 501.4.1 must be filled out(see below).For most new installations,column A will be appropriate,however,if atmospherically vented appliances or solid fuel appliances are installed,use the appropriate column. Please note,if the makeup air quantity is Negative,no additional makeup air will be required for ventilation,if the value is positive refer to Table 501.4.2 and size the opening.Transfer the cfm,size of opening and type(round,rectangular,flex or rigid)to the last line of section D. Table 501.4.1 PROCEDURE TO DETERMINE MAKEUP AIR QUANITY FOR EXHAUST EQUIPMENT IN DWELLINGS (Additional combustion air will be required for combustion appliances,see KAIR method for calculations) One or multiple power One or multiple fan- One atmospherically vent Multiple atmospherical- vent or direct vent ap-pliances assisted appliances and power gas or oil appliance or one solid ly vented gas or oil appliances or no combus-tion appliances vent or direct vent appliances fuel appliance or solid fuel appliances Column 0 Column A Column B Column C 1. 0.15 0.09 0.06 0.03 a)pressure factor (cfm/sf) b)conditioned floor area(sf)(including 3876 unfinished basements) Estimated House Infiltration(cfm):[la 581 x lb] 2.Exhaust Capacity a)continuous exhaust-only ventilation system ERV=O (cfm);(not applicable to ba-lanced ventilation • systems such as HRV) b)clothes dryer(cfm) 135 135 135 135 c)80%of largest exhaust rating(cfm); Kitchen hood typically 240 (not applicable if recirculating system or if powered makeup air is electrically interlocked d)80%of next largest exhaust rating Not (cfm);bath fan typically Applicable (not applicable if recirculating system or if powered makeup air is electrically interlocked Total Exhaust Capacity(cfm); 375 [2a+2b+2c+2d] 3.Makeup Air Quantity(cfm) 375 a)total exhaust capacity(from above) b)estimated house infiltration(from 581 above) Makeup Air Quantity(cfm); [3a-3b] 206 (if value is negative,no makeup air is needed) -206 4.For makeup Air Opening Sizing,refer NOT REQ'D to Table 501.4.2 A.Use this column if there are other than fan-assisted or atmospherically vented gas or oil appliance or if there are no combustion appliances.(Power vent and direct vent appliances may be used.) B.Use this column if there is one fan-assisted appliance per venting system.(Appliances other than atmospherically vented appliances may also be included.) C.Use this column if there is one atmospherically vented(other than fan-assisted)gas or oil appliance per venting system or one solid fuel appliance. D.Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically vented gas or oil appliances and solid fule appliances. • Table 501.4.2 Makeup Air Opening Sizing Table for New and Existing Dwelling Units One or multiple power One or multiple fan- One atmospherically vented Multiple atmospherically Duct di- vent,direct vent ap- assisted appliances and gas or oil ap- vented gas or oil ap- ameter pliances,or no combus- power vent or direct vent pliance or one solid fuel pliances or solid fuel tion appliances appliances Column B appliance appliances Passive opening 1-36 1-22 1-15 1-9 3 Passive opening 37-66 23-41 16-28 10-17 4 Passive opening 67-109 42-66 29-46 18-28 5 Passive opening 110-163 67-100 47-69 29-42 6 Passive opening 164-232 101-143 70-99 43-61 7 Passive opening 233-317 144-195 100-135 62-83 8 Passive opening 318-419 196-258 136-179 84-110 9 w/motorized damper Passive opening 420-539 259-332 180-230 111-142 10 w/motorized damper Passive opening 540-679 333-419 231-290 143-179 11 w/motorized damper Powered makeup air >679 >419 >290 >179 NA Notes: A.An equivalent length of 100 feet of round smooth metal duct is assumed.Subtract 40 feet for the exterior hood and ten feet for each 90-degree elbow to determine the remaining length of straight duct allowable. B.If flexible duct is used,increase the duct diameter by one inch.Flexible duct shall be stretched with minimal sags.Compressed duct shall not be accepted. C.Barometric dampers are prohibited in passive makeup air openings when any atmospherically vented appliance is installed. D.Powered makeup air shall be electrically interlocked with the largest exhaust system. Combustion air Not required per mechanical code(No atmospheric or power vented appliances) Passive(see IFGC Appendix E,Worksheet E-1) Size and type 4"Ri.id,5"Flex Other,describe: Explanation-If no atmospheric or power vented appliances are installed,check the appropriate box,not required.If a power vented or atmospherically vented appliance installed,use IFGC Appendix E,Worksheet E-1(see below).Please enter size and type.Combustion air vent supplies must communicate with the appliance or appliances that require the combustion air. Section F calculations follow on the next 2 pages. , Directions-The Minnesota Fuel Gas Code method to calculate to size of a required combustion air opening,is called the Known Air Infiltration Rate Method.For new construction,4b of step 4 is required to be filled out. IFGC Appendix E,Worksheet E-1 Residential Combustion Air Calculation Method (for Furnace,Boiler,and/or Water Heater in the Same Space) Step 1:Complete vented combustion appliance information. Furnace/Boiler: 80000 raft Hood pan Assisted ✓ Direct Vent Input: Btu/hr or Power Vent Water Heater: 40000 draft Hood JFan Assisted Direct Vent Input: Btu/hr or Power Vent Step 2:Calculate the volume of the Combustion Appliance Space(CAS)containing combustion appliances. 1248 The CAS includes all spaces connected to one another by code compliant openings. CAS volume: ft3 LxWxH 12 LnWnH Step 3:Determine Air Changes per Hour(ACH)1 Default ACH values have been incorporated into Table E-1 for use with Method 4b(KAIR Method).If the year of construction or ACH is not known,use method 4a(Standard Method). Step 4:Determine Required Volume for Combustion Air.(DO NOT COUNT DIRECT VENT APPLIANCES) 4a.Standard Method Total Btu/hr input of all combustion appliances Input: Btu/hr Use Standard Method column in Table E-1 to find Total Required TRV: ft3 Volume(TRV) If CAS Volume(from Step 2)is greater than TRV then no outdoor openings are needed. If CAS Volume(from Step 2)is less th an TRV then go to STEP 5. 4b.Known Air Infiltration Rate(KAIR)Method(DO NOT COUNT DIRECT VENT APPLIANCES) Total Btu/hr input of all fan-assisted and power vent appliances Input: 40000 Btu/hr Use Fan-Assisted Appliances column in Table E-1 to find RVFA: 3000 ft3 Required Volume Fan Assisted(RVFA) Total Btu/hr input of all Natural draft appliances Input: 0 Btu/hr Use Natural draft Appliances column in Table E-1 to find RVNFA: 0 ft3 Required Volume Natural draft appliances(RVNDA) Total Required Volume(TRV)=RVFA+RVNDA TRV= 3000 + 0 = 3000 TRV ft3 Step 5:Calculate the ratio of available interior volume to the total required volume. Ratio=CAS Volume(from Step 2)divided by TRV(from Step 4a or Step 4b) Ratio= 1248 / 3000 = 0.42 Step 6:Calculate Reduction Factor(RF). RF=1minus Ratio RF=1- 0.42 = 0.58 Step 7:Calculate single outdoor opening as if all combustion air is from outside. 40000 Total Btu/hr input of all Combustion Appliances in the same CAS Input: Btu/hr (EXCEPT DIRECT VENT) Combustion Air Opening Area(CAOA): Total Btu/hr divided by 3000 Btu/hr per in2 CAOA= 40000 /3000 Btu/hr per in2= 13.33 inz Step 8:Calculate Minimum CAOA. Minimum CAOA=CAOA multiplied by RF Minimum CAOA= 13.33 x 0.58 = 7.79 int Step 9:Calculate Combustion Air Opening Diameter(CAOD) CAOD=1.13 multiplied by the sq u are root of Minimum CAOA CAOD=1.13 V Minimum CAOA= 3.15 in.diameter go up one inch in size if using flex duct 1 If desired,ACH can be determined using ASHRAE calculation or blower door test.Follow procedures in Section G304. • IFGC Appendix E,Table E-1 Residential Combustion air(Required Interior Volume Based on Input Rating of Appliance) Input Rating Standard Method Known Air Infiltration Rate(KAIR)Method(cu ft) (Btu/hr) Fan Assisted or Power Vent Natural Draft 1994 to present Pre-1994 1994 to present Pre-1994 5,000 250 375 188 525 263 10,000 500 750 375 1,050 525 15,000 750 1,125 563 1,575 788 20,000 1,000 1,500 750 2,100 1,050 25,000 1,250 1,875 938 2,625 1,313 30,000 1,500 2,250 1,125 3,150 1,575 35,000 1,750 2,625 1,313 3,675 1,838 40,000 2,000 3,000 1,500 4,200 2,100 45,000 2,250 3,375 1,688 4,725 2,363 50,000 2,500 3,750 1,675 5,250 2,625 55,000 2,750 4,125 2,063 5,775 2,888 60,000 3,000 4,500 2,250 6,300 3,150 65,000 3,250 4,875 2,438 6,825 3,413 70,000 3,500 5,250 2,625 7,350 3,675 75,000 3,750 5,625 2,813 7,875 3,938 80,000 4,000 6,000 3,000 8,400 4,200 85,000 4,250 6,375 3,188 8,925 4,463 90,000 4,500 6,750 3,375 9,450 4,725 95,000 4,750 7,125 3,563 9,975 4,988 100,000 5,000 7,S00 3,750 10,500 5,250 105,000 5,250 7,875 3,938 11,025 5,513 110,000 5,500 8,250 4,125 11,550 5,775 115,000 5,750 8.625 4,313 12,075 6,038 120,000 6,000 9,000 4,500 12,600 6,300 125,000 6,250 9,375 4,688 13,125 6,563 130,000 6,500 9,750 4,875 13,650 6,825 135,000 6,750 10,125 5,063 14,175 7,088 140,000 7,000 10,500 5,250 14,700 7,350 145,000 7,250 10,875 5,438 15,225 7,613 150,000 7,500 11,250 5,625 15,750 7,875 155,000 7,750 11,625 5,813 16,275 8,138 160,000 8,000 12,000 6,000 16,800 8,400 165,000 8,250 12,375 6,188 17,325 8,663 170,000 8,500 12,750 6,375 17,850 8,925 175,000 8,750 13,125 6,563 18,375 9,188 180,000 9,000 13,500 6,750 18,900 9,450 185,000 9,250 13,875 6,938 19,425 9,713 190,000 9,500 14,250 7,125 19,950 9,975 195,000 9,750 14,625 7,313 20,475 10,238 200,000 10,000 15,000 7,500 21,000 10,500 205,000 10,250 15,375 7,688 21,525 10,783 210,000 10,500 15,750 7,875 22,050 11,025 215,000 10,750 16,125 8,063 22,575 11,288 220,000 11,000 16,500 8,250 23,100 11,550 225,000 11,250 16,875 8,438 23,625 11,813 230,000 11,500 17,250 8,625 24,150 12,075 1.The 1994 date refers to dwellings constructed under the 1994 Minnesota Energy Code.The default KAIR used in this section of the table is 0.20 ACH. 2.This section of the table is to be used for dwellings constructed prior to 1994.The default KAIR used in this section of the table is 0.40 ACH. EAGAN City Inspection Dept. Copy City Forester Copy Applicant/Builder Copy INDIVIDUAL RESIDENTIAL LOT TREE PRESERVATION PLAN SUMMARY CITY OF EAGAN FORESTRY DIVISION 651-675-5300 (BUILDER, PLEASE READ ATTACHMENTS) Development Dakota Path 4th Add. Lot Number 4 Block Number 2 Address 1321 Interlachen Drive Builder D. R. Horton Phone Number: 612-508-1642 Contact: Kevin Tree Protection Requirements: Tree Protection Fencing Installed on Site(Erosion tubes) Oak Tree Pruning (Immediately seal wounds during April 1 to July 31) Therapeutic Pruning Required Retaining Wall To Be Installed Other: Replacement Trees: Not Required: X As Follows: Seven (7) Category B trees (>= 2.5" deciduous trees). Mitigation trees to be installed following construction. Attachments: EAGAN FORESTRY DIVISION X Yes (Refer to attac ,f.71 NOY Additional Notes: H:\ghove\2017file\treep=.\ resrvati (J airiararmaratia 0 0 00 A` 1- _ n 0 ry 0ry 0 0 0 0 0 � r O O O O O D O NufDi ?, RCRi1lfg m ommiim,n�ie II oZ v m a * j ii / 09, 1 / / _4mN ma R F e b Ct.�?oN2 ", • Fo g % 3vf cil ' I; ' / 7.. N+.... 4/0034‘) /1,/1"1-0 / / , c>,,,.. 1///* IQ 0/ t ?4 Ur l (i !ao%44°/ ' / j s N ,Isie(log 4/ e�jO` // / -TOP OH Mq\ i • •0 7 If i.O / � �3p'- rstEv D 9a>kke \ ,�R996c� �•L. ). �`'` -� 'r0 . 00 is, .%' 11i ! �.; / tG l 390 \%j \ 47 '4 y ; \ Q[,s f ` �1. °R� `��o'o/� 1 i ‘','7§::. ----'s„ eti� /�Y\//< '� + / ,..1.-- O ....2",\ 1\,, .� „U A fib$ / i' ° �� / :�:. / �1 �if '!;`s�2p\c 1gO ,z..,..,,..? .w� /1...0 44'�ti• �co�w /` Z y / �r rO�. / 47c v "y / v o /I Nw t-_ .rS.00 9� ,I Sa �D^ / F / to T 2 / 01 '�/ r>ys_- '% v/ ao f`7 -A 1 coon , A-oat. _ _ / I / � ` ,, t06�.9) `L e(i053.2)— /0, �- 161.25 ,O\) o 6.o., / o o,_21.18-1$y� 44.41 1057.0 .. 1049.1 / °'chi / 5 % '8 N00°55'22"W 187.91 1 �o r / w m m o1 II �~ / 1_-51 1 c zg tvsov �. ,Z / -/ �// ti 9 { T ?. �i ocn A NI15%3 ■O L.'J I ..i '% /^� (r) \......... co 1, ......-.\ IlL - - 1 CC 'l / 0 A `m , /!IJ EL_ N i3d3s C 0=E7 = ox0c 71 a CO o .,m v, p w N1� Z ,17.' 73r 'v e' ew 1.4 O Z zr .. 23 + O P ON4a o°+mmP < d v SAm O c n '0211f/m ' �c2mxza�mmfT m w m? m3A ma. -< •'° a n T9C„ 8 x N ..@No ° ° 3cm � m i -Iwm H 4 O w O ° �zma fm1 T y h � N i 'ili R11 :� . —1 - 0 cm � Is 9. -t -c 1 5 mN cm nva8 , .. . 0, 3" 0 335. 111 ~ S n ' a -1 O mrtaaa' 0dmccf• ;cjw 0 O Orn oi ?-31 g N a c T �' w N..� C C/' °. > ' m -° el ' w N -1x --1 •.j' o and^< n r- p.,I.snn I- v° 34'°`-,.x � Tm`<.1 m �� y co D 9 N N -•m 0 N �^ ym-cs,3 O,y O 7 p V, 8Jmv N a `nN -t °�in mmF°d, mNoo Dl. 3 camvo-N.�=�. !m-. . l3a N m 00 '° cv -. F,8854 E. op°3i C3mnn3Gm 'Egg., ^y .O co .4 w A,Y W I"'m �' WK �� O O • V N O� 2 OJo V WOGcn Rt G ," O O C? O O A R SO nd Ab ¢ Q �r...),-1..0.,...= =-4.3°, � Qg 17,- 71•p O j m K N ...- ,....0. 53"2-.11-2-71,14,. §.1'.; n maim n R N - °' C a•- 'a ? c 4 °i ! m _n O If _w Lu 6N£-; .. no . a 7g .301Q w w s. 2 A O I 5CERTIFICATE OF SURVEY FOR James R. Hill, Inc. -5 t 1 m 3 c M -0 2 12R ilium Fitly - .1100 fAt I I PLAt S/ENCS/SURVEYORS 3Z A N m d Lot'4, Block 2, DAKOTA PATIO 4Th I d.--i� 2500 NEST COUNTY ROAD 42,SUITE 120. O 0 ADDITION,Dakota County, Minnesota. 551511E. 3F PHONE(952) 4AIL(952)590-5214 1 0 , /i'. /,,-** •:*,-,„,„. ititik : / ' -i • • 6, ,, „ , / /// ' 1 i' '''''''• „ ...,,,, '4, h r we :„ , ,.,,, /.: *44k.44;11Tijlt- 4 , ",,,„,..,...,:, ,,,,,, , / , s , -- .... ” - ,. 0 Vim.: ; ; 0 y e„,,,,,.„.„..../ , ,, ,,_ ,., , , .. . , •, ., . , ,,,' 4 .r ,,,,,: , 6 . — .. , . .. .0 ..\,•,.\_. , '�, — /. 0111111 .1 , \ , , a _ 1.---„,. ,,,,: , 0 1 i 1 , ; , i ,0,..., € • 1313 , ST. t Ni,,,,,,.. , , ., . .,„\.,,,,,:‘,.. ..... ,N lam' . r ----,--,----,71:1 1_ 2 �. t .I . Ali o, '14% \ ; .. v----...• . ------ 1 1TI t, . <� \\ ,,4 ,,'i / .'._ - .� ...._ ..... _�^ - ._. __._..... I1............. '',),,r r 0 WO 4 g �K t i •• . n t i AF / € f -�,;,, / ' 51:fei- te..:. „AN 7 '1 t r � . \(4 im / .., ,,,,,ra . __ o lay 1 . / ///' '- . 'i W - 1121.,.. ....... J.,,, , .. ._. _. _ ,,i1 ,I 2 ,‘4 1 r. .. f' . IIIIIIIiik.larP1.7''' 111114111 i 47:1' I/ 0th i u , -.1‘ ali, /\ ISPwl F l 86t75-i'££'1,g9 :auoydalai v-isv'1 901,55 NW `Med 1uleS I d ens I .eny A010)1a98 £891, 6uiuueld-u6isaa aigeuie4sng-OJnPoa}iyoid edeospue, 241. 011 ti r10J o u 6 u sea xAi a uonel 0 0 H D D z 0 0 W 0 CD 2 Z Z 2 C2 EC o a_ a C) co (1) O m m m CD m o.S oa o2S o o S 05 oe5 025 o m m m m m m m 1 CC a zJ J J J J J J ( Q Q Q Q Q Q Q M -- 0 0 0 0 C.) 00 W in in in in to in in N N N N N ("\i N N (75 a) O a) 00 > Y O u) to 0 EL) O c - W a > 2 .c N O a) a) (0 - Q J > W ami - 03 1.I.5 t > 2 ca $ E — •c) CIZ (La 0 x w 2 E Y o O CD Q O = U E CJ a) 0 ZO F— 0 < D O < C7 1 = v 0 Z . • 0 H al _ D Y 0Ti Z w< g Oa_-1 H W 0 O 2 0 < J z w J H W Cr I- Z Z +� Z Q = CDEr Z: u) 1 o 22 >' W.11 ag > W 0 O 0 r Q F- o CC 0 >- 0 • U — - u') < oOZC Cl)Yo_ \ O W ,_.c W Q• Dyr M N M N N r r CO c ZW 0 W < CLI O 0 W IL U 4 f i 0 } e LOT SURVEY CHECKLIST FOR RESIDENTIAL /' - 7 BUILDINGU� PERMITwAPPLICATION ` PROPERTY LEGAL: t``x-d 1 ��'`� 11 � �y ' slit DATE OF SURVEY: //lr° LATEST REVISION: c --7 /2 /ic/ek be __s ..B. O z a DOCUMENT STANDARDS A 0 0 • Registered Land Surveyor signature and company X 0 0 • Building Permit Applicant , 0 0 • Legal description % 0 0 • Address X ❑ 0 • North arrow and scale R( 0 0 • House type(rambler,walkout,split w/o,split entry, lookout,etc.) / 0 ❑ • Directional drainage arrows with slope/gradient% fi ❑ 0 • Proposed/existing sewer and water services&invert elevation 0 ❑ • Street name )' ❑ 0 • Driveway(grade&width-in R/W and back of curb,22'max.) X 0 ❑ • Lot Square Footage g 0 ❑ • Lot Coverage ELEVATIONS Existing X ❑ ❑ • Property corners ,,If ❑ ❑ • Top of curb at the driveway and property line extensions ❑ ❑ • Elevations of any existing adjacent homes 7 0 ❑ • Adequate footing depth of structures due to adjacent utility trenches y1 ❑ ❑ • Waterways(pond,stream,etc.) Proposed ❑ ❑ • Garage floor 2f 0 ❑ • Basement floor ,d ❑ ❑ • Lowest exposed elevation(walkout/window) ' ❑ ❑ • Property corners yr ❑ ❑ • Front and rear of home at the foundation Y 6 • PRV Required PONDING AREA(if applicable) ❑ ❑ • Easement line ❑ ❑ • NWL 7 ❑ 0 • HWL fa' 0 ❑ • Pond#designation ❑ X ❑ • Emergency Overflow Elevation ,ll ❑ ❑ • Pond/Wetland buffer delineation Y oc • Shoreland Zoning Overlay District Y fid' • Conservation Easements DIMENSIONS 7 ❑ ❑ • Lot lines/Bearings&dimensions / ❑ 0 • Right-of-way and street width(to back of curb) 2f ❑ 0 • Proposed home dimensions including any proposed decks,overhangs greater than 2', porches,etc. (i.e.all structures requiring permanent footings) ,Jit' 0 ❑ • Show all easements of record and any City utilities within those easements X ❑ ❑ • Setbacks of proposed structure and sideyard setback of adjacent existing structures .. 0 ❑ • Retaining wall requirements: ° 1 Reviewed By: Date 7/4 o G:/1 Engineering/FORMS/Cert.of Survey Checklist Rev.11-16-16 1 4tL8-068 (Zc6) )(tl 4408-068 (ZSB) :3 oHd •o}oseuum ',( uno o}ojoa `N011100V m 0' - GL££SS Nil °311V1SN23f19 Hltr H1bd d10>1VC1 'Z Nf0O18 'tr 101 ct LC* z O 'oZt Sins 'Zi' avow �.LNloo iS3M 00SZ CD a] z J o co SH0A311flf1S / S2133NION3 / SI3NNVld Et - WU 'maim 2( 1 i _ C;; v . r 631111 IIIIH gH Seiner el0..1 cf) .... .-- c 1 A-+ 0 f3 C ,4J' 4.. ,n 0 C -, QJ `a L E a! N ro c E cu m E � ro a) c ro o 0 0 co ^ m a o \ o a a ro > c ro _ m p , — a VI c o c o o 0 3 o v a o as to O ', W a p 0 1` X II A O al 0 4 .oc0 m `° co ,., a c cub- ?3 ,41 ,_ anal U F. F v c y m 0 r+.. >., c m m E o < Q cz O aQ y a�ui Q' ;; +� ro ;•13- C m ^ o 0_ c o ° `(� ro o '� n -^ '- ri m a c Cl. v ` ro a, ., 'x a cw a �p U ,� Q vl a 1 - - n a a) a -0 a c ,--I d a a) �0 ra v as a, c ro p o o + ro p i EO +� +�+ 'B .t-. V N ru t�.l b. al +n -0 0 0 ,; O u i c O E z (,I 1p m n co 0 ? a+ ra 4.'71. "- C o o ` a u o - m w o o m m r. Cl) 4, u ai �; Jca. = ro Q) a = 0} o Q) C V) m O a^ a lD Cg 1p v1 O - V� C2.J 0 N +o "T3 L O v, — U u N m t�1 O O'0 O O D 0 L ay >' ,n F:-. o a 0 a - c c +. x ,-r ii -J o t•-I .-+ ,-, r+ o Q L a E 0 C p i To _o 0 = a) a) •'-' f n • O 0 Q. II u II II Z00 Q r+ C u ro a -a o_ a cc ra m 0 cT • r: W c o C m c . 'X M w o " ,' _ `^ u i_ ro E ra ` , Oh=- 2- w c a • Q a� o me c a m o > o m �r r If <[ a `a I- c 00 • •a• cos tin o E W.0 C c in 0- Q in ul N U a +' a, o 1— 1a_ H to aron c ., '47, u u a 3 = '> •C .e o —1 ..� LL -c L IN a 0 Q_ °- W "' v O Q°'i c a o a E a moi, va m c Q a)yZ V u n n Q f— N c c W 0 ® L sa aCO c, > o o Q, a v u; 0 F— x U c 4 W + co a) W Y La 0 2 E c ,,i °n a, N +' -0 i v ci QO Q o u u �` R7 n o ro as o cl Q Q c ro a c v .c S_ u N j, h0 ro 0J ct ro u. 0 0 .Z • z3 CS N Q) O t a t, d Q) a ❑ a n tf1 L a] O e J+ V) 4., ` N f O. ro IN Y c as c a n• o a V, 4-. ,E r`o Z Q a _I tu IE -0@. 0 0 1_ > to Q a i >: oa co E-- 1- 'c '6 a a, Q Er w o -a 9 W O o O 0 to O m a, v �. v _ Cr O m ro = � E ' a , a c ro c c 0 o 0 o CO >-' u +.. .c E ,c 1 W W + CI) v +, ._ o ._ C o c L L m m = +, " N '- U tJ ro W " *' v +a "- 1Z m G_ c W mm w -rsZI4-, a +, n Ta. V1 LL O a� v +' Q.) 4.4. Nv, O 0 U c O an aka D m 3 > o D o c -o ay a n= o m 0 W 0 o 03 a o < o o •� ro s wo ro O_ _, CL Z •-a N m 4 u'i to N ca CO I- W C7 l7 2 _ .� = a Q (f} - E - ._ n v) 2 i,,, 1./ r Q La c.4 / t---0 ,N ,Nc.D _ ..04 -*/ '1' L,) ) __....\ ti HOUSE N a k...1 1 a 2O I� 15 �� \ \ / I- •.. 0. .- 1064.S L fs 7r // W C) ' 1055.5 Lai O W m I ,..I / 0 ') t 6ti01. O'LSOt / Z b N© �� SZ t9 -f.: � Z'£50L)___ ,, —.-+-- 6 L9i�l r / 0 i to rn• ��, / , 10 / c'' Z i is? CO N _ [ 3 11 :3- fi~ �i •,?c �"0. 4 � �k s 00 St`:"'' '7� / _ /**.%. %! J 4 r o 6Spr , ,', • `• "` , J :7Q ,b,QW �4 w oPO •f Q p ��o��,/ I \f e)V-. tum 0' n 08 i c �,-� `�." \ A06s/f�� "' .5S Lt./ 1+,q / o 1=,�' ��,��'11ca 1 ...� I 41 w r , cr 0•e. tr c)� N LQ ,,,>\,/ . c . 61 i c.-) --) \ \ / . A ok \-, kQ('',5 1 ----- I, / AIN?.,, \\\\):, (.?\ s a? 0 to rt '44- nSo '�'" .,,,• roc \qh0N la r l/ .8,, , ! o c s_ ^ /I e 06g \ ,0.00•,,v,- , o o..................\v v �~ is 0 4i .00$1 0 0 ss01 .9•9 a.- .'�+.. 11 0Fe 0 r as Xis �r /$1 — 'a . cJ ,� s .do 37.E ,S / to 0 �� F� ; ! ��b�' y0N Q1--_- / ��`r• Q (I) E 9 cQ� r�� sod 38 / • % \O �a`J N co i mac; / �0 g `'( / 2 /(t‘l 2 � Q W C�7 YP�j o�Sl `� ���� Ni � g. Q1 /7//,, P CO m I (al so` !moo `�' O� �-• sat `. /4141cifo 4911.1 �����0 , l RapeEa) /2, r 64_ s/ c �� 1��0�A• aCU cE a)i a co 1 silt \ p �� E m O G3 e,;e o / (e. ,-- r SON E.0 . CQ .11 : : ::- .-c-: cai v w a? Ya z . < aouoaco L.,-. M AGl L� Q - a n a a 0 00) . Z O r V St (.,� Wvs Vs vs vs vs vs vs �') 11 ,iiifag \Ocn/ a 4-' 4-' 4-' rCU CU CU te+ ate+ 4�., ��.. 0 0 0 0 0 0 0 U-, , Yi Z HLT. c c c c c c 0 %)Y7/ CD 0 v a a a a, �' A:ac. 0Q 2711ID, .4 Q BRAUN Page of enat-dsn 10/14 INTERTEC The Science You Build On. Daily Soil Observation Notes Project No.: Q�S03 2'U�l' �� Date: 130 / " Repo No.: Project Name: t" �� Project Location: Client: D 2 ``��,\ ~ Temp/Weather: (?-,-----7 Project Manager: ut Y" �0A l Time Arrived: Departed: Areas Observed: ❑ Building Pad L House Pad ❑ Roadway ❑ Pkng/walks ❑ Footing ❑ Proof Roll ❑ Other(describe) Soil report available? ❑ Yes ❑ No Report reviewed? ❑ Yes p No Report prepared by: I.fU U"`- Get copy Benchmark: tc..:W-, Benchmark elevation : \f ooti T '‘j`_ Benchmark provided by: 5 V-/CA, Finish floor elevation : -� �•- I C. Bottom of footing elevation :SCA, h.,L i Bottom of excavation elevation: 'NAe. Approved plans available? ye,-.., Specified compaction : Fill source: Oversizing appears adequate? NA ❑ Yes ❑ No Soils observed agree with Soils report? Yes ❑ No Soils appear adequate for design loads? di,Yes ❑ No Proposed project bearing capacity(psf): 2-0023 Contractor notified of results? Yes ❑ No Name of person notified: -)41/C... t ( i�' Was a copy of this report left on site? Yes ❑ No If so,whom was it submitted to? - I,I 1 111 illiiiilarnim, Al ' ' - ‘Ik - ' g 6 6 - �, III WU JL rE �.... • � .� IN �Q,ii f 1._ t.f���-) r 14%41 itill pm mil ...111111111 OM t alli ' -Cri 014"" IIIME —If \--(` 1§ i 4. t 0 k1.1 Iiii LG I (t, _ ,_ 1 i. i 1 I MEM IIII 211)ow. .�. 1 ( i� , 4 , , 1111111111A , IR -I il .11 4 1 Oil lakalliE Vt11‘.'1 I l_ I . r+ 1— C,,J •• E Notes/Comments: i I r ; /0 -H 3 t I Write ba elevations, date excavated, oversizI g .and type: of bottom soils can sketch ,-- () (C4Z. 22.1.cic/11) i Performed By: r I Reviewed By: Date: This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed. Observations and/or conclusions and/or recommendations conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. PERMIT City of Eagan Permit Type:Plumbing Permit Number:EA154528 Date Issued:03/28/2019 Permit Category:ePermit Site Address: 1321 Interlachen Dr Lot:4 Block: 2 Addition: Dakota Path 4th PID:10-19543-02-040 Use: Description: Sub Type:Residential Work Type:Underground Sprinkler System Description:PVB Meter Size Meter Type Manufacturer Serial Number Remote Number Line Size Comments:Please call Building Inspections at (651) 675-5675 to schedule a final inspection. Carbon monoxide detectors are required within 10 feet of all sleeping room openings in residential homes (Minnesota State Building Code). Fee Summary:PL - RPZ/PVB/Lawn Irrigation $59.00 0801.4087 Surcharge-Fixed $1.00 9001.2195 $60.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Dr Horton Inc Minnesota 20860 Kenbridge Ct Ste 100 Lakeville MN 55044 Sabre Plumbing Heating & A/c Inc 15535 Medina Road Plymouth MN 55447 (763) 473-2267 Applicant/Permitee: Signature Issued By: Signature -Ctll4 For Office Usee I ', 11'19 ° ° Permit#: /-5-17/v 7S' EAGAN%.,....... ...,. Permit Fee: I Ems ! (� Date Received: / 0 /9 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 V 4,` (651)675-5675 I TDD: (651)454-8535 I FAX: (651)675-56 AA Staff: buildinqinspections@cityofeagan.com APR 1 V 2Qf L 2019 RESIDENTIAL BUI i-- -= ,_.:,i APPLICATION Date: 1i v i 7 Site Address: /321 `/V 7e 1 IV 0pv6 Unit#: Name: 1Je /l-7 Phone: Resident/ .:3 Owner ,; Address I City I Zip: Applicant is: Owner b( Contractor Description of work: F/AJ1S/l �WE/ti &YEL /knl/LI vy ii4 Type of Work F p Construction Cost: t !' 500 Multi-Family Building: (Yes /'No 1c ) Company: b 4Dg.TP- Contact: br.QDlt6 i�;7 7b ` Address: ZO$'(�D it'd:1,1'01./ t o ITT City: 14AeV�'//i,,C rntrsctorL-- /� / - ho _ State: IM/ Zip:5V Phone�SZ4f S'7t0�0 Email: b ,4,2feId@drio/7472.Cd)97 License#: ,gCro 05b SI Lead Certificate#: If the project is exempt from lead certification, please explain why: d8W a 4Srx1G77 o„/ Zo/$ COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? Yes No If yes,date and address of master plan: Licensed Plumber: Phone: . Mechanical Contractor: Phone: Sewer&Water Contractor: Phone: Fire Suppression Contractor: Phone: NOTE:Plans and Supporting vlocgments that you submit arse;considered to:e public information Portions of he information shay be classified as n® .fiblic if .• ® <vide .ficreasons that would.®. the Cl to,conclude that the ore trade =, ^ ..ia. 1,,. You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeaqan.com/subscribe. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.qopherstateonecall.orq I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of pla s. x "f/ L-ee- x Applicant's rinted Name Appli s Signature DO NOT WRITE BELOW THIS LINE / y, I n 1 h6- v D g , /SL/g7 SUB TYPES Foundation Fireplace Porch(3-Season) Exterior Alteration (Single Family) Single Family _ Garage _ Porch(4-Season) Exterior Alteration(Multi) Multi _ Deck _ Porch(Screen/Gazebo/Pergola) _ Miscellaneous 01 of_Plex Lower Level _ Pool _ Accessory Building WORK TYPES New ?k Interior Improvement _ Siding _ Demolish Building* _ Addition _ Move Building _ Reroof _ Demolish Interior Alteration Fire Repair Windows Demolish Foundation Replace _ Repair _ Egress Window _ Water Damage Retaining Wall *Demolition of entire building—give PCA handout to applicant — DESCRIPTION �+ Valuation :/o 57/ 9 co Occupancy '(Le 1 MCES System Plan Review Code Edition !fin Z9i 5— SAC Units (25%_ 100%C') Zoning "P")) City Water Census Code Stories Booster Pump #of Units Square Feet PRV #of Buildings Length Fire Suppression Required Type of Construction V Width REQUIRED INSPECTIONS Footings (New Building) Meter Size: Footings (Deck) Final/C.O. Required Footings(Addition) Final/No C.O.Required Foundation Foundation Before Backfill HVAC_Service Test Gas Line Air Test_Hood Roof:_Ice &Water _Final Pool:_Footings _Air/Gas Tests _Final Framing 30 Minutes 1 Hour Drain Tile Fireplace:_Rough In _Air Test _Final Siding:_Stucco Lath _Stone Lath _Brick_EFIS Insulation Windows Sheathing Retaining Wall:_Footings_Backfill_Final Sheetrock Radon Control Fire Walls Fire Suppression: _Rough In_Final Braced Walls Erosion Control Shower Pan Other: Reviewed By: t)NAA- D''. t 4 - , Building Inspector RESIDENTIAL FEES '/' s h 1---47/2.1,i � /- Base Fee � i/ 4 �- . `i R Surcharge bL Z . l"---r: Plan Review --- /b .5'D 5�. Ff. (aite-e,9-01MCES SAC S' 7 RgeDJ City SAC S ` �3 vnaz ep ):fi Utility Connection Charge /cps S-.7 S&W Permit& Surcharge X 6 z Treatment Plant Copies TOTAL Page 2 of 3 t O E,, "�`p R 0 : C � o e<ls NEv 3830 Pilot Knob Road I Eagan MN 55122 Phone:(651)675-5675 I Fax: (651)675-5694 buildinginspections(a�citvofeagan.com Address: 1321 Interlachen Dr Permit#: 150557 The following items were /were not completed at the Final Inspection on: 6.,, ,,„-/ ( � Complete Incomplete Comments Final grade - 6"from siding Permanent steps—Garage 1/ �PermPermanent steps— Main Entry "1 --- Permanent anent Driveway Permanent Gas Retaining Wall or 3:1 Max Slope 1/-- Sod /Sod / Seeded Lawn ✓-. Trail / Curb Damage Porch Lower Level Finish 'V Deck 1/-- Fireplace V-- Gnn e;/7 f loc. (Z • Verify with your builder that roof test caps from the plumbing system have been removed. • Turn off water supply to the outside lawn faucets before freeze potential exists. • Call the Engineering Department at (651) 675-5646 prior to working in the right-of-way or installing an irrigation system. f iciy, - Building Inspector: 0 ,v) �/