Loading...
1023 Wescott Ct ,31_ 1.51 <?-z -- 1/, l3 qhs r irfil o° G . - e,e) -69 Q For Office Use iif /�/ // 3-34-7. ( _ . Permit#: ���qo, OPV 16.„ %. .0 ., E A N r 1,��� "' Permit Fee: l/ `5 --- , ' • �� �~ RECIEVPD Date Received: c/67/O 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 AUG 1672018 J (651)675-5675 I TDD:(651)454-8535 I FAX: (651)675-5694 Staff: buildinginspectionsa:ci ofeaaan.com L. r Li) //SVa / 7 20 8RESIDENTIAL BUILDING PERMIT APPLICATION Date: s(C C D 1 Site Address: 10 a 3 c 5 L cam` 0-0:.,✓- Unit#: 1 Name: G o n C...G._ g Al,c 5 Phone: 6 51-d I/_5-061-11 Resident! J / / Owner Address I City I Zip: 100 i 6 0 c Ovt Al ��t-4 40 Applicant is: Owner ( Contractor /�O i 7 g/ot r / iJi if0 i) i'c16 6 1ccD4'c escription of work: B✓: �I (,✓ �"'b Me9- Type of Work I Construction Cost: .3.75/ O 4. 0 Multi-Family Building:(Yes /No V) Company: G b.� Nt,cs- #b An.z..$ Contact 6f5P y= J Contractor Address: City: �1r, L State: Zip: Phone:‘S/',7�"Uii • 'Email: 1 054 c 0Ajc.ei,Aoet'c5.GUlot License#: (9 5 . Lead Certificate#: J �! 4. If the project is exempt from lead certification, please explain why: 'W't, f-40 in \ it r COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months,has the City of Eagan issued a permit for a similar plan based on a master plan? Yes /No If yes, date and address of master plan: ) Licensed Plumber: a �r'c-- Phone: 6tI'1 558 ` 0811 Mechanical Contractor: J 0. t Phone: �a f O 7 _. Sewer&Water Contractor: • '✓ $P s Phone: 1 7/5.55/.051/3 Fire Suppressjon"Cantractor: Phone: NOTE:Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as n. _ . if .- provide .-•fic reasons that would it the C to conclude th4at y are trade secrets. You may subscribe lo receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeaoan.comisubscribe. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.qopherstateonecall.orq I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the o dinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start wi ••+ a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. ` x Jo s vP- 3 G,G_. x - , . Applicant's Printed Name Applicant's Sig ature DO NOT WRITE BELOW THIS LINE � 2 S t )e- cd I- C /5-/q- _ < SUB TYPES Foundation _ Fireplace _ Porch(3-Season) _ Exterior Alteration(Single Family) 1( Single Family _ Garage _ Porch(4-Season) _ Exterior Alteration(Multi) Multi _ Deck _ Porch(Screen/Gazebo/Pergola) _ Miscellaneous 01 of_Plex Lower Level Pool Accessory Building WORK TYPES New _ Interior Improvement _ Siding _ Demolish Building* Addition _ Move Building _ Reroof Demolish Interior — Alteration _ Fire Repair _ Windows _ Demolish Foundation Replace _ Repair _ Egress Window _ Water Damage Retaining Wall *Demolition of entire building-give PCA handout to applicant DESCRIPTION , g 1, e Valuation ftJ.I Occupancypvi,..g., MCES System Plan Review ) Code Edition vviSAC Units (25%_100% X) Zoning 0 a City Water Census Code Stories Booster Pump #of Units Square Feet NamPRV #of Buildings Length i#I Fire Suppression Required Type of Construction V111 Width 44 REQUIRED INSPECTIONS Footings(New Building) Meter Size: Footings(Deck) / v Final I C.O. Required Footings(Addition) Final/No C.O. Required !` Foundation ``r. Foundation Before Backfill HVAC Gas Service Test Gas Line Air Test Hood Roof: Ice&Water _Final Pool:_Footings _Air/Gas Tests _Final Framing 30 Minutes /"1 Hour Drain Tile p Fireplace: r Rough In Air Test , Final Siding:_Stucco Lath _Stone Lath _Brick_EFIS XInsulation Windows Sheathing Retaining Wall:_Footings_Backfill_Final Sheetrock ,X Radon Control Fire Walls Fire Suppression: Rough In Final Braced Walls A, Erosion Control Shower Pan Other: Reviewed By: -T� , Building Inspector y a RESIDENTIAL FEES ' �� 1 (�� tS V Base Fee 14 ; (2, i 2(93 /X 1 7c,73 -,o I713\40(401i Surcharge �! k s:1 ) L/(t 106 102-- Plan o� Plan Review g ��"? MCES SAC / �VJ x 9� 7z 171-160/ 6' City SAC 914) Utility Connection ChargeFIN-WC pop // O ' ¶V , 5, 00, S&W Permit&Surcharge C 917' Q) Treatment Plant6441714 �� ` 0, (4l a " l f Copies `f" X (s- D tel TOTAL 0 OA 1 zgelp 1 New Construction Energy Code Compliance Certificate Date Certificate Posted Per R401.3 Building Certificate.A building certificate shall be posted on or in the electrical distribution panel. 7/30/18 Mailing Address of the Dwelling or Dwelling Unit 1023 Wescott Court Name of Residential Contractor MN License Number Gonyea Homes 2459 Community Plan ID Eagan GH0899 THERMAL ENVELOPE IRADON SYSTEM Type:Check All That Apply X Passive(No Fan) I) Active(With fan and monometer or 2other system monitoring device) c ° U U u Location(or future Location)of Fan: G P T > Z `n h O ¢ u, p O Attic Insulation LocationC° U 0 w o op on E E -a � -o T6 o °n oo E on on F Z u w w 2 c K Other Please Describe Here Below Entire Slab X Foundation Wall(Sides) R-15 X R-10 Exterior,R-5 Interior Foundation Wall(Front and Back) R-10 X Exterior Rim Joist(Foundation) R-20 X Interior Rim Joist(15t Floor+) R-20 X Interior Wall R-20 X Ceiling,flat R-49 X Ceiling,vaulted R-49 X Bay Windows or cantilevered areas R-30 X Bonus room over garage R-32 X X Describe other insulated areas Building Envelope air Tightness: Duct system air tightness: Windows&Doors Heating or Cooling Ducts Outside Conditioned Spaces Average U-Factor(excludes skylights and one door)U. 0.31 Not applicable,all ducts located in conditioned space Solar Heat Gain Coefficient(SHGC): 0.31 R-8 R-value MECHANICAL SYSTEMS Make-up Air Select a Type Appliances Heating System Domestic Water Heater Cooling System X Not required per mech.code Fuel Type NAT GAS NAT GAS R-410A Passive Manufacturer Bryant Rheem Bryant Powered Interlocked with exhaust device. Model 912SC48080517 PROG5042NRH67PV BA13NA036 Describe: Input in 80000 Capacity in 50 Output in 3 Other,describe: Rating or Size BTUS: Gallons: Tons: AFUE or 92% SEER or 13 Location of duct or system: Efficiency HSPF% EER HEAT LOSS HEAT GAIN COOLING LOAD RESIDENTIAL LOAD CALC 67,747 26,487 33,514 Cfm's "round'duct UK Mechanical Ventilation System "metal duct Describe any additional or combined heating or cooling systems if installed:(e.g.two furnaces or air Combustion Air Select a Type source heat pump with gas back-up furnace Not required per mech.code Select Type X Passive Heat Recover Ventilator(HRV) Capacity in cfms: Low: High: Other,describe: X Energy Recover Ventilator(ERV)Capacity in cfms: Low: 40%=124 High: 70%=217 Location of duct or system: Balanced Ventilation Capcity in CFMS: furnace room ILocations of Fans,describe: Cfm's Capacity continuous ventilation rate in cfms: 95 3 "round duct OR Total ventilation(intermittent+continuous)rate in cfms: 190 "metal duct 1023 Wescott Ct Eagan SPEC HVAC Load Calculations for Gonyea Homes Golden Valley, MN Prepared By: Michael Hoium Sabre Plumbing&Heating 15535 Medina Road Plymouth, MN 55447 763-473-2267 Monday,July 30,2018 Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc. Sabre Plumbing&Heating • 1023 Wescott Ct Eagan SPEC Plymouth, MN 55447 Page 2 1 Project Report - - General Project Information Project Title: 1023 Wescott Ct Eagan SPEC Designed By: Michael Hoium Project Date: Sunday, July 29, 2018 Client Name: Gonyea Homes Client City: Golden Valley, MN Company Name: Sabre Plumbing & Heating Company Representative: Michael Hoium Company Address: 15535 Medina Road Company City: Plymouth, MN 55447 Company Phone: 763-473-2267 Design Data Reference City: Minneapolis, Minnesota Building Orientation: Front door faces South Daily Temperature Range: Medium Latitude: 44 Degrees Elevation: 834 ft. Altitude Factor: 0.970 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter: -15 -12.38 n/a 30% 72 29.40 Summer: 88 73 50% 50% 75 35 Check Figures Total Building Supply CFM: 1,183 CFM Per Square ft.: 0.259 Square ft. of Room Area: 4,576 Square ft. Per Ton: 1,638 Volume (ft3): 37,964 Building Loads Total Heating Required Including Ventilation Air: 67,747 Btuh 67.747 MBH Total Sensible Gain: 26,487 Btuh 79 % Total Latent Gain: 7,028 Btuh 21 Total Cooling Required Including Ventilation Air: 33,514 Btuh 2.79 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. Monday, July 30, 2018, 9:09 AM Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc. Sabre Plumbing&Heating 1023 Wescott Ct Eagan SPEC Plymouth, MN 55447 Page 3 -- ----------- Load Preview Report 1 Sys Net ft.' Sen Lat Net Sen Hts Cls' Act; Duct Scope Ton! /Tont Area Gain Gain Gain; Loss CFM( CFM CFM Size Building 2.79 1,638 4,576 26,487 7,028 33,514 67,747 797 1,183 1,183 System 1 2.79 1,638 4,576 26,487 7,028 33,514 67,747 797 I 1,183 12x17 Ventilation 1,054 4,409 5,463 7,057 Supply Duct Latent 360 360 Return Duct 176 158 334 1,175 Humidification 7,004 Zone 1 4,576 25,256 2,101 27,357 52,512 797 Not 1,183 12x17 1-Basement 1,322 3,009 0 3,009 15,328 233 141 2--5 2-Main Floor 1,356 13,267 2,101 15,368 17,362 263 I, jal 622 6--6 3-Second Floor 1,898 8,980 0 8,980 19,821 301F a 421 4--6 • Monday, July 30, 2018, 9:09 AM Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc. Sabre Plumbing&Heating • 1023 Wescott Ct Eagan SPEC Plymouth, MN 55447 _ Page 4_ Total Building Summary Loads Component Area Sen Lat Sen Total Description Quan Loss GainGain _ Gain LowEE 3032: Glazing-Windows, u-value 0.3, SHGC 0.32 194.8 5,084 0 2,876 2,876 LowEE 3131: Glazing-Windows, u-value 0.31, SHGC 0.31 20 539 0 198 198 LowEE 3231: Glazing-Windows, u-value 0.32, SHGC 0.31 209.3 5,832 0 3,410 3,410 LowEE 3031: Glazing-Windows, u-value 0.3, SHGC 0.31 47.5 1,240 0 1,562 1,562 Door 23UF: Door-Exterior Door- .23 U Factor, .17 SHGC 37.8 756 0 208 208 Eagan - R15 8ft: Wall-Basement, Custom, Eagan - 8" 490 2,515 0 249 249 poured concrete wall, R-15 board insulation to footing, no interior finish, 8' floor depth Eagan - R15 4ft: Wall-Basement, Custom, Eagan - 8" 123 631 0 62 62 poured concrete wall, R-15 board insulation to footing, no interior finish, 4'floor depth R20 12F-Osw: Wall-Frame, Custom, R-20 Insulation in 2921.5 16,776 0 2,565 2,565 2x6 Cavity, no board insulation, siding finish, wood studs Eagan - R10 4ft: Wall-Basement, Custom, Eagan - 8" 176 903 0 89 89 poured concrete wall, R-10 board insulation to footing, no interior finish, 4'floor depth Eagan - R10 8ft: Wall-Basement, Custom, Eagan -8" 352 1,807 0 179 179 poured concrete wall, R-10 board insulation to footing, no interior finish, 8'floor depth RJ 20 Spray Foam: Wall-Frame, Custom, Rim Joist R-20 583.6 2,540 0 716 716 Closed Cell Spray Foam R49 16B-49: Roof/Ceiling-Under Attic with Insulation on 1898 3,798 0 2,095 2,095 Attic Floor(also use for Knee Walls and Partition Ceilings), Custom, R-49 Blown Insulation, No Radiant Barrier, Vented Attic, Asphalt Shingles 21A-20: Floor-Basement, Concrete slab, any thickness, 2 1322 3,105 0 0 0 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 20'wide P-32 R-32: Floor-Over open crawl space or garage, 711 1,856 0 171 171 Custom, R-30 Blanket insulation, 3/4" Foamboard R- 2, any cover Subtotals for structure: 47,382 0 14,380 14,380 People: 6 1,200 1,380 2,580 Equipment: 901 4,116 5,017 Lighting: 1250 4,263 4,263 Ductwork: 6,305 518 1,294 1,812 Infiltration: Winter CFM: 0, Summer CFM: 0 0 0 0 0 Ventilation: Winter CFM: 190, Summer CFM: 190 7,057 4,409 1,054 5,463 Humidification (Winter) 1.9.10 gal/day : 7,004 0 0 0 Total Building Load Totals: 67,747 7,028 26,487 33,514 Check Figures Total Building Supply CFM: 1,183 CFM Per Square ft.: 0.259 Square ft. of Room Area: 4,576 Square ft. Per Ton: 1,638 Volume (ft3): 37,964 Building Loads Total Heating Required Including Ventilation Air: 67,747 Btuh 67.747 MBH Total Sensible Gain: 26,487 Btuh 79 Total Latent Gain: 7,028 Btuh 21 Total Cooling Required Including Ventilation Air: 33,514 Btuh 2.79 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Monday, July 30, 2018, 9:09 AM Rhvac -Residential&Light Commercial HVAC Loads Elite Software Development,Inc. Sabre Plumbing&Heating 1023 Wescott Ct Eagan SPEC Plymouth,MN 55447 __— Page 5 Total Building Summary Loads (cont'd) ----------- Notes Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. • Monday, July 30, 2018, 9:09 AM Rhvac-Residential&Light Commercial HVAC Loads • Elite Software Development,Inc. Sabre Plumbing&Heating 1023 Wescott Ct Eagan SPEC Plymouth MN 55447 -_-_-- --- _____- Page 6 Detailed Room Loads - Room 1 - Basement fAverage Load Procedure) General Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 26.4 ft. System Number: 1 Room Width: 50.0 ft. Zone Number: 1 Area: 1,322.0 sq.ft. Supply Air: 141 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 0.8 AC/hr Volume: 10,576 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 2 Actual Winter Vent.: 55 CFM Runout Air: 70 CFM Percent of Supply.: 39 Runout Duct Size: 5 in. Actual Summer Vent.: 23 CFM Runout Air Velocity: 517 ft./min. Percent of Supply: 16 % Runout Air Velocity: 517 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.214 in.wg./100 ft. Actual Summer Infil.: 0 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain E -Wall-Eagan - R15 8ft 26.8 X 8 214 0.042 5.1 1,098 0.5 0 109 E -Wall-Eagan - R15 4ft 19.2 X 4 77 0.041 5.1 395 0.5 0 39 N -Wall-R20 12F-Osw 19.2 X 4 77 0.066 5.7 442 0.9 0 68 N -Wall-Eagan - R10 4ft 44 X 4 176 0.054 5.1 903 0.5 0 89 N -Wall-R20 12F-Osw 44 X 4 86 0.066 5.7 494 0.9 0 75 W-Wall-Eagan - R15 4ft 11.5 X 4 46 0.041 5.1 236 0.5 0 23 W-Wall-R20 12F-Osw 11.5 X 4 46 0.066 5.7 264 0.9 0 40 W-Wall-Eagan - R15 8ft 34.5 X 8 276 0.042 5.1 1,417 0.5 0 140 S -Wall-Eagan - R10 8ft 44 X 8 352 0.050 5.1 1,807 0.5 0 179 E -Wall-RJ 20 Spray Foam 46 X 1.7 76.7 0.050 4.4 334 1.2 0 94 N -Wall-RJ 20 Spray Foam 44 X 1.7 73.3 0.050 4.4 319 1.2 0 90 W-Wall-RJ 20 Spray Foam 46 X 76.7 0.050 4.4 334 1.2 0 94 1.7 S -Wall-RJ 20 Spray Foam 44 X 1.7 73.3 0.050 4.4 319 1.2 0 90 N -GIs-LowEE 3032 shgc-0.32 70 0.300 26.1 1,825 9.9 0 695 100%S (5) N -GIs-LowEE 3131 shgc-0.31 20 0.310 27.0 539 9.9 0 198 100%S Floor-21A-20 50 X 26.4 1322 0.027 2.3 3,105 0.0 0 0 Subtotals for Structure: 13,831 0 2,023 Infil.: Win.: 0.0, Sum.: 0.0 1,740 0.000 0 0.000 0 0 Ductwork: 1,497 133 Lighting: 250 853 Room Totals: 15,328 0 3,009 Monday, July 30, 2018, 9:09 AM Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Incl Sabre Plumbing&Heating 1023 Wescott Ct Eagan SPEC Plymouth MN 55447 Pag-e7 Detailed Room Loads - Room 2 - Main Floor(Average Load Procedure) i General - - Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 27.1 ft. System Number: 1 Room Width: 50.0 ft. Zone Number: 1 Area: 1,356.0 sq.ft. Supply Air: 622 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 3.1 AC/hr Volume: 12,204 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 6 Actual Winter Vent.: 63 CFM Runout Air: 104 CFM Percent of Supply.: 10 % Runout Duct Size: 6 in. Actual Summer Vent.: 100 CFM Runout Air Velocity: 528 ft./min. Percent of Supply: 16 % Runout Air Velocity: 528 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.173 in.wg./100 ft. Actual Summer Infil.: 0 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain E -Wall-R20 12F-Osw 46 X 9 396.7 0.066 5.7 2,278 0.9 0 348 N -Wall-R20 12F-Osw 44 X 9 295 0.066 5.7 1,694 0.9 0 259 W-Wall-R20 12F-0sw 46 X 9 360.5 0.066 5.7 2,070 0.9 0 316 S -Wall-R20 12F-0sw 44 X 9 311.9 0.066 5.7 1,791 0.9 0 274 E -Wall-RJ 20 Spray Foam 50.5 X 75.8 0.050 4.4 330 1.2 0 93 1.5 N -Wall-RJ 20 Spray Foam 44 X 1.5 66 0.050 4.4 287 1.2 0 81 W-Wall-RJ 20 Spray Foam 50.5 X 75.8 0.050 4.4 330 1.2 0 93 1.5 S -Wall-RJ 20 Spray Foam 44 X 1.5 66 0.050 4.4 287 1.2 0 81 S -Door-Door 23UF 3 X 6.7 20 0.230 20.0 400 5.5 0 110 S -Door-Door 23UF 2.7 X 6.7 17.8 0.230 20.0 356 5.5 0 98 E -GIs-LowEE 3032 shgc-0.32 0%S 5.3 0.300 26.1 139 33.7 0 180 E -GIs-LowEE 3032 shgc-0.32 0%S 12 0.300 26.1 314 33.8 0 406 (2) N -Gls-LowEE 3032 shgc-0.32 63 0.300 26.1 1,644 10.0 0 627 100%S (3) N -GIs-LowEE 3231 shgc-0.31 30 0.320 27.8 836 10.0 0 300 100%S (2) N -GIs-LowEE 3231 shgc-0.31 8 0.320 27.8 223 10.0 0 80 100%S W-GIs-LowEE 3031 shgc-0.31 0%S 40 0.300 26.1 1,044 32.9 0 1,315 W-GIs-LowEE 3031 shgc-0.31 0%S 7.5 0.300 26.1 196 32.9 0 247 W-GIs-LowEE 3032 shgc-0.32 0%S 6 0.300 26.1 157 33.8 0 203 S -GIs-LowEE 3231 shgc-0.31 0%S 33 0.320 27.8 918 18.2 0 602 (2) S -GIs-LowEE 3231 shgc-0.31 0%S 13.3 0.320 27.8 372 18.3 0 244 (2) Subtotals for Structure: 15,666 0 5,957 Infil.: Win.: 0.0, Sum.: 0.0 1,904 0.000 0 0.000 0 0 Ductwork: 1,696 587 People: 200 lat/per, 230 sen/per: 6 1,200 1,380 Equipment: 901 3,638 Lighting: 500 1,705 Room Totals: 17,362 2,101 13,267 Monday, July 30, 2018, 9:09 AM --- -- --- --- Rhvac-Residential&Light Commercial HVAC Loads is Elite Software Development,Inc. Sabre Plumbing&Heating 1023 Wescott Ct Eagan SPEC Plymouth, MN 55447 __ --Pa•e 8 Detailed Room Loads - Room 3 - Second Floor (Average Load Procedure) J General Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 38.0 ft. System Number: 1 Room Width: 50.0 ft. Zone Number: 1 Area: 1,898.0 sq.ft. Supply Air: 421 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 1.7 AC/hr Volume: 15,184 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 4 Actual Winter Vent.: 72 CFM Runout Air: 105 CFM Percent of Supply.: 17 % Runout Duct Size: 6 in. Actual Summer Vent.: 68 CFM Runout Air Velocity: 536 ft./min. Percent of Supply: 16 % Runout Air Velocity: 536 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.178 in.wg./100 ft. Actual Summer Infil.: 0 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain E -Wall-R20 12F-Osw 50.5 X 8 388 0.066 5.7 2,228 0.9 0 341 N -Wall-R20 12F-0sw 44 X 8 317.5 0.066 5.7 1,823 0.9 0 279 W-Wall-R20 12F-Osw 50.5 X 8 404 0.066 5.7 2,320 0.9 0 355 S -Wall-R20 12F-0sw 44 X 8 239 0.066 5.7 1,372 0.9 0 210 E -GIs-LowEE 3032 shgc-0.32 0%S 16 0.300 26.1 418 33.8 0 541 S -Gls-LowEE 3231 shgc-0.31 0%S 30 0.320 27.8 836 18.3 0 548 (2) N -GIs-LowEE 3032 shgc-0.32 22.5 0.300 26.1 587 10.0 0 224 100%S N -GIs-LowEE 3231 shgc-0.31 12 0.320 27.8 334 10.0 0 120 100%S S -GIs-LowEE 3231 shgc-0.31 0%S 75 0.320 27.8 2,090 18.3 0 1,370 (5) S -GIs-LowEE 3231 shgc-0.31 0%S 8 0.320 27.8 223 18.3 0 146 UP-Ceil-R49 16B-49 38 X 50 1898 0.023 2.0 3,798 1.1 0 2,095 Floor-P-32 R-32 20 X 35.5 711 0.030 2.6 1,856 0.2 0 171 Subtotals for Structure: 17,885 0 6,400 Infil.: Win.: 0.0, Sum.: 0.0 1,512 0.000 0 0.000 0 0 Ductwork: 1,936 397 Equipment: 0 478 Lighting: 500 1,705 Room Totals: 19,821 0 8,980 Monday, July 30, 2018, 9:09 AM Site address 1023 Wescott Court Eagan Date 7/30/2018 Contractor Completed Sabre Plumbing & Heating By Michael H Section A Ventilation Quantity (Determine quantity by using Table R403.5.2 or Equation 11-1) Square feet(Conditioned area including 4576 Total required ventilation 190 Basement—finished or unfinished) - 5 Continuous ventilation 95 Number of bedrooms Directions-Determine the total and continuous ventilation rate by either using Table R403.5.2 or equation 11-1. The table and equation are below Table R403.5.2 Total and Continuous Ventilation Rates(in cfm) Number of Bedrooms 1 2 3 4 5 6 Conditioned space(in Total/ Total/ Total/ Total/ Total/ Total/ • .1 '1 • •1 '. • .1 '1 • •1 'I • •1 .1 • •I '. I 1000-1500 60/40 75/40 90/45 105/53 120/60 135/68 1501-2000 70/40 85/43 100/50 115/58 130/65 145/73 2001-2500 80/40 95/48 110/55 125/63 140/70 155/78 2501-3000 90/45 105/53 120/60 135/68 150/75 165/83 3001-3500 100/50 _115/58 130/65 145/73 160/80 175/88 3501-4000 110/55 125/63 140/70 155/78 170/85 185/93 4001-4500 120/60 135/68 150/75 165/83 180/90 195/98 4501-5000 130/65 145/73 160/80 175/88 190/95 205/103 5001-5500 140/70 155/78 170/85 185/93 200/100 215/108 5501-6000 150/75 165/83 180/90 195/98 210/105 225/113 Equation 11-1 (0.02 x square feet of conditioned space)+[15 x(number of bedrooms+1)]=Total ventilation rate(cfm) Total ventilation—The mechanical ventilation system shall provide sufficient outdoor air to equal the total ventilation rate average,for each one-hour period according to the above table or equation. For heat recovery ventilators(HRV)and energy recovery ventilators(ERV)the average hourly ventilation capacity must be determined in consideration of any reduction of exhaust or out outdoor air intake,or both,for defrost or other equipment cycling. Continuous ventilation-A minimum of 50 percent of the total ventilation rate,but not less than 40 cfm,shall be provided, on a continuous rate average for each one-hour period.The portion of the mechanical ventilation system intended to be continuous may have automatic cycling controls providing the average flow rate for each hour is met. Section B Ventilation Method (Choose either balanced or exhaust only) Balanced,HRV(Heat Recovery Ventilator)or ERV(Energy Recovery Exhaust only Ventilator)—cfm of unit in low must not exceed continuous Continuous fan rating in cfm ventilation rating by more than 100%. Low cfm: 124 2 I High cfm: n^ Continuous fan rating in cfm(capacity must not exceed 7 continuous ventilation rating by more than 100%) Directions-Choose the method of ventilation,balanced or exhaust only.Balanced ventilation systems are typically HRV or ERV's. Enter the low and high cfm amounts.Low cfm air flow must be equal to or greater than the required continuous ventilation rate and less than 100%greater than the continuous rate.(For instance,if the low cfm is 40 cfm,the ventilation fan must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. Section C Ventilation Fan Schedule Description Location Continuous Intermittent Directions-The ventilation fan schedule should describe what the fan is for,the location,cfm,and whether it is used for continuous or intermittent ventilation.The fan that is chose for continuous ventilation must be equal to or greater than the low cfm air rating and less than 100%greater than the continuous rate.(For instance,if the low cfm is 40 cfm,the continuous ventilation fan must not exceed 80 cfm.)Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. Section D Ventilation Controls (Describe operation and control of the continuous and intermittent ventilation) ERV has wall control-set to 40%=124cfm ERV has wall control-set to 70%=217cfm Directions-Describe the operation of the ventilation system.There should be adequate detail for plan reviewers and inspectors to verify design and installation compliance.Related trades also need adequate detail for placement of controls and proper operation of the building ventilation.If exhaust fans are used for building ventilation,describe the operation and location of any controls,indicators and legends.If an ERV or HRV is to be installed,describe how it will be installed.If it will be connected and interfaced with the air handling equipment,please describe such connections as detailed in the manufactures' installation instructions.If the installation instructions require or recommend the equipment to be interlocked with the air handling equipment for proper operation,such interconnection shall be made and described. Directions-In order to determine the makeup air,Table 501.4.1 must be filled out(see below).For most new installations,column A will be appropriate,however,if atmospherically vented appliances or solid fuel appliances are installed,use the appropriate column. Please note,if the makeup air quantity is negative,no additional makeup air will be required for ventilation,if the value is positive refer to Table 501.4.2 and size the opening.Transfer the cfm,size of opening and type(round,rectangular,flex or rigid)to the last line of section D. Table 501.4.1 PROCEDURE TO DETERMINE MAKEUP AIR QUANITY FOR EXHAUST EQUIPMENT IN DWELLINGS (Additional combustion air will be required for combustion appliances,see KAIR method for calculations) One or multiple power One or multiple fan- One atmospherically vent Multiple atmospherical- vent or direct vent ap-pliances assisted appliances and power gas or oil appliance or one solid ly vented gas or oil appliances or no combus-tion appliances vent or direct vent appliances fuel appliance or solid fuel appliances Column D Column A Column B Column C 1. 0.15 0.09 0.06 0.03 a)pressure factor (cfm/sf) b)conditioned floor area(sf)(including 4576 unfinished basements) Estimated House Infiltration(cfm):[la 686 x ib] 2.Exhaust Capacity a)continuous exhaust-only ventilation system ERV=0 (cfm);(not applicable to ba-lanced ventilation systems such as HRV) b)clothes dryer(cfm) 135 135 135 135 c)80%of largest exhaust rating(cfm); Kitchen hood typically 240 (not applicable if recirculating system or if powered makeup air is electrically interlocked d)80%of next largest exhaust rating Not (cfm);bath fan typically Applicable (not applicable if recirculating system or if powered makeup air is electrically interlocked Total Exhaust Capacity(cfm); 375 [2a+2b+2c+2d] 3.Makeup Air Quantity(cfm) 375 a)total exhaust capacity(from above) b)estimated house infiltration(from 686 above) Makeup Air Quantity(cfm); [3a—3b] -311 (ififvalue is negative,no makeup air is needed) 4.For makeup Air Opening Sizing,refer to Table 501.4.2 NOT REQ'D A.Use this column if there are other than fan-assisted or atmospherically vented gas or oil appliance or if there are no combustion appliances.(Power vent and direct vent appliances may be used.) B.Use this column if there is one fan-assisted appliance per venting system.(Appliances other than atmospherically vented appliances may also be included.) C.Use this column if there is one atmospherically vented(other than fan-assisted)gas or oil appliance per venting system or one solid fuel appliance. D.Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically vented gas or oil appliances and solid fule appliances. Table 501.4.2 Makeup Air Opening Sizing Table for New and Existing Dwelling Units One or multiple power One or multiple fan- One atmospherically vented Multiple atmospherically Duct di- vent,direct vent ap- assisted appliances and gas or oil ap- vented gas or oil ap- ameter pliances,or no combus- power vent or direct vent pliance or one solid fuel pliances or solid fuel tion appliances appliances Column B appliance appliances Passive opening 1-36 1-22 1-15 1-9 3 Passive opening 37-66 23-41 16-28 10-17 4 Passive opening 67—109 42—66 29—46 18—28 5 Passive opening 110-163 67—100 47—69 29—42 6 Passive opening 164-232 101-143 70-99 43-61 7 Passive opening 233-317 144-195 100-135 62-83 8 Passive opening 318-419 196-258 136-179 84-110 9 w/motorized damper Passive opening 420-539 259-332 180-230 111-142 10 w/motorized damper Passive opening 540-679 333-419 231-290 143-179 11 w/motorized damper Powered makeup air >679 >419 >290 >179 NA Notes: A.An equivalent length of 100 feet of round smooth metal duct is assumed.Subtract 40 feet for the exterior hood and ten feet for each 90-degree elbow to determine the remaining length of straight duct allowable. B.If flexible duct is used,increase the duct diameter by one inch.Flexible duct shall be stretched with minimal sags.Compressed duct shall not be accepted. C.Barometric dampers are prohibited in passive makeup air openings when any atmospherically vented appliance is installed. D.Powered makeup air shall be electrically interlocked with the largest exhaust system. L_ Combustion air Not required per mechanical code(No atmospheric or power vented appliances) ✓ Passive(see IFGC Appendix E,Worksheet E-1) Size and type 2"Rigid, 3"Flex Other,describe: Explanation-If no atmospheric or power vented appliances are installed,check the appropriate box,not required.If a power vented or atmospherically vented appliance installed,use IFGC Appendix E,Worksheet E-1(see below).Please enter size and type.Combustion air vent supplies must communicate with the appliance or appliances that require the combustion air. Section F calculations follow on the next 2 pages. Directions-The Minnesota Fuel Gas Code method to calculate to size of a required combustion air opening,is called the Known Air Infiltration Rate Method.For new construction,4b of step 4 is required to be filled out. IFGC Appendix E,Worksheet E-1 Residential Combustion Air Calculation Method (for Furnace,Boiler,and/or Water Heater in the Same Space) Step 1:Complete vented combustion appliance information. Furnace/Boiler: 80000 draft Hood Flan Assisted ✓ direct Vent Input: Btu/hr or Power Vent Water Heater: 40000 raft Hood I Fan Assisted DDirect Vent Input: Btu/hr or Power Vent Step 2:Calculate the volume of the Combustion Appliance Space(CAS)containing combustion appliances. 2592 The CAS includes all spaces connected to one another by code compliant openings. CAS volume: ft3 LxWxH nL1]WnH Step 3:Determine Air Changes per Hour(ACH)1 Default ACH values have been incorporated into Table E-1 for use with Method 4b(KAIR Method).If the year of construction or ACH is not known,use method 4a(Standard Method). Step 4:Determine Required Volume for Combustion Air.(DO NOT COUNT DIRECT VENT APPLIANCES) 4a.Standard Method Total Btu/hr input of all combustion appliances Input: Btu/hr Use Standard Method column in Table E-1 to find Total Required TRV: ft3 Volume(TRV) If CAS Volume(from Step 2)is greater than TRV then no outdoor openings are needed. If CAS Volume(from Step 2)i s less th an TRV then go to STEP 5. 4b.Known Air Infiltration Rate(KAIR)Method(DO NOT COUNT DIRECT VENT APPLIANCES) Total Btu/hr input of all fan-assisted and power vent appliances Input: 40000 Btu/hr Use Fan-Assisted Appliances column in Table E-1 to find RVFA: 3000 ft3 Required Volume Fan Assisted(RVFA) Total Btu/hr input of all Natural draft appliances Input: 0 Btu/hr Use Natural draft Appliances column in Table E-1 to find RVNFA: 0 ft3 Required Volume Natural draft appliances(RVNDA) Total Required Volume(TRV)=RVFA+RVNDA TRV= 3000 + 0 3000 TRV ft3 Step 5:Calculate the ratio of available interior volume to the total required volume. Ratio=CAS Volume(from Step 2)divided by TRV(from Step 4a or Step 4b) Ratio= 2592 / 3000 = 0.86 Step 6:Calculate Reduction Factor(RF). RF=lminus Ratio RF=1- 0.86 = 0.14 Step 7:Calculate single outdoor opening as if all combustion air is from outside. 40000 Total Btu/hr input of all Combustion Appliances in the same CAS Input: Btu/hr (EXCEPT DIRECT VENT) Combustion Air Opening Area(CAOA): Total Btu/hr divided by 3000 Btu/hr per in2 CAOA= 40000 /3000 Btu/hr per int= 13.33 inz Step 8:Calculate Minimum CAOA. Minimum CAOA=CAOA multiplied by RF Minimum CAOA= 13.33 3.33 x 0.14 = 1 .81 in2 Step 9:Calculate Combustion Air Opening Diameter(CAOD) CAOD=1.13 multiplied by the square root of Minimum CAOA CAOD=1.13 V Minimum CAOA= 1"52 in.diameter go up one inch in size if using flex duct 1 If desired,ACH can be determined using ASHRAE calculation or blower door test.Follow procedures in Section G304. IFGC Appendix E,Table E-1 Residential Combustion air(Required Interior Volume Based on Input Rating of Appliance) Input Rating Standard Method Known Air Infiltration Rate(KAIR)Method(cu ft) (Btu/hr) Fan Assisted or Power Vent Natural Draft 1994 to present Pre-1994 1994 to present Pre-1994 5,000 250 375 188 525 263 10,000 500 750 375 1,050 525 15,000 750 1,125 563 1,575 788 20,000 1,000 1,500 750 2,100 1,050 25,000 1,250 1,875 938 2,625 1,313 30,000 1,500 2,250 1,125 3,150 1,575 35,000 1,750 2,625 1,313 3,675 1,838 40,000 2,000 3,000 1,500 4,200 2,100 45,000 2,250 3,375 1,688 4,725 2,363 50,000 2,500 3,750 1,675 5,250 2,625 55,000 2,750 4,125 2,063 5,775 2,888 60,000 3,000 4,500 2,250 6,300 3,150 65,000 3,250 4,875 2,438 6,825 3,413 70,000 3,500 5,250 2,625 7,350 3,675 75,000 3,750 5,625 2,813 7,875 3,938 80,000 4,000 6,000 3,000 8,400 4,200 85,000 4,250 6,375 3,188 8,925 4,463 90,000 4,500 6,750 3,375 9,450 4,725 95,000 4,750 7,125 ,3,563 9,975 4,988 100,000 5,000 7,500 3,750 10,500 5,250 105,000 5,250 7,875 3,938 11,025 5,513 110,000 5,500 8,250 _4,125 11,550 5,775 115,000 5,750 8.625 4,313 12,075 6,038 120,000 6,000 9,000 4,500 12,600 6,300 125,000 6,250 9,375 4,688 13,125 6,563 130,000 6,500 9,750 4,875 13,650 6,825 135,000 6,750 10,125 5,063 14,175 7,088 140,000 7,000 10,500 5,250 14,700 7,350 145,000 7,250 10,875 5,438 15,225 7,613 150,000 7,500 11,250 5,625 15,750 7,875 155,000 7,750 11,625 5,813 16,275 8,138 160,000 8,000 12,000 6,000 16,800 8,400 165,000 8,250 ,12,375 6,188 17,325 8,663 170,000 8,500 12,750 6,375 17,850 8,925 175,000 8,750 13,125 6,563 18,375 9,188 180,000 9,000 13,500 6,750 18,900 9,450 185,000 9,250 13,875 6,938 19,425 9,713 190,000 9,500 14,250 7,125 19,950 9,975 195,000 9,750 14,625 7,313 20,475 10,238 200,000 10,000 15,000 7,500 21,000 10,500 205,000 10,250 15,375 7,688 21,525 10,783 210,000 10,500 15,750 7,875 22,050 11,025 215,000 10,750 16,125 8,063 22,575 11,288 220,000 11,000 16,500 8,250 23,100 11,550 225,000 11,250 16,875 8,438 23,625 11,813 230,000 11,500 17,250 8,625 24,150 12,075 1.The 1994 date refers to dwellings constructed under the 1994 Minnesota Energy Code.The default KAIR used in this section of the table is 0.20 ACH. 2.This section of the table is to be used for dwellings constructed prior to 1994.The default KAIR used in this section of the table is 0.40 ACH. 0. ! EAGAN City Inspection Dept. Copy City Forester Copy Applicant/Builder Copy INDIVIDUAL RESIDENTIAL LOT TREE PRESERVATION PLAN SUMMARY CITY OF EAGAN FORESTRY DIVISION 651-675-5300 (BUILDER, PLEASE READ ATTACHMENTS) Development Willow Ridge Lot Number 7 Block Number 1 Address 1023 Wescott Ct. Builder Gonyea Homes Contact: Josh Phone: 612-245-0277 Email: iosh(c gonyeahomes.com Tree Protection Requirements: Tree Protection Fencing Installed on Site(orange silt fence) Oak Tree Pruning (Immediately seal wounds during April 1 to July 31) Therapeutic Pruning Required Retaining Wall To Be Installed Other: Replacement Trees: Not Required X As Follows: Ten (10) Category A trees, (4.0" caliper deciduous trees or 12' hqt evergreen trees)to be installed following completion of construction. Five(5) Black Hills Spruce,three(3) Northwood Red MapleasatimaulawAnielibite Oak. Attachments: EAGAN FORESTRY DIVISION X Yes (Refer to attac eREviE E w No BY Additional Notes: DATE d"--"at' H:\ghove\2•18file\treepres\Tree Preservation Plan Willow Ridge.Lot 7 Block 1 +�+� O z rii O u. Q }7� ? ri F° IE 2t'z EE o Q t- LL O19 4 .. a13- €tl0,e.S Q D O t0 2p = O �u Q 0 5� S 3I _ s W O 2 2 r 2 m WS '6 w S `d' rd I g3.dR: •. d o z > > 6 0 p ! ! fflW ! Hfl Oj QY Tdm R O O O 'E-�T i i oz WO Y j o te�a~a Q € 1 - 43 a" I I W M ' O • ' oIt N00 a o ,11, 1 9' � W J F- _I S ,w MI inalf ill La W tid o u o Y //► O o 5 o c z "q W ?N . za� a l w Z�L "" E- 3 °° z cc j.a, o a s p 06¢ $ P. O n a .i o°q6 W3G ¢4oLL „ o O '^ ¢ g ozi69� 6 o }y a ttom^, . LL(1 Of OF =W Z BFo' J Cvl = o^ ag WZZ=6 91- 4 i4. &W wg0 ad 28;iiF% 2§jO,0 to g^ OW 1 .W m 20074 NV 461 Cyt1�► lI r N KI .0 •_�F W C./ O '' `i. Or-1.AWL7—§;;g;82§;;g;82 SR3X --V®mlII N Z - O F 111111011 C6m C".01 _ uT o 44 o ^"I` 44 16• 'w2 W 5dQo `6a q Y c koZ O 88 IP, Z ZW= c4 „ N 0-1* 6 A 2_ 4 .ww. '078~0 ti =g82oore x X X X g! WECpTT • CiRC�E Y Y F.cd A 1 —' to . m X }�/j/J(//// UO m•”" • O li rn Z n —, £+IL'£9 �4 01 MNZ1►,OS•LON_,I_ Bc>£ 2 \X 6bg �qo s m • soT. "n •° GO'GZZ=2! • r. 1N3W35tl3 A31111n a 39VNiraGJ.yL o— 7 W ___ _ I o0' < o0X -`•�'F a —i-- e R xi 1 _�� �wm o _ _ o n ! Ix p ��.� 91 = x I W / $. �� x i x M /j i m g $ M i _�:.� a '/ m m l o 30'oBLN�NG SETBA`C .' �' I $ j 01 RI Lx x N �/ - ', — oa w LJ70 ' xJ is `1 n / 1 — mX o �y 1N.' �-°- ,, lob ? I o�,J I r il___I- • � 1 I- 4 < _W .1,,,, Io m , V �Y e0� m00Z-x-4)--,!TI PMI O og z lm x n oQaI 4oI < 000 m 'i a ,ow .), m 0EEE i • g T 1Z 4- 1 , V -X I in 1 OG'z• i N x i I. L_x N P $ n W ml 5 i.. OSI _sr� 0109 N X - .�. IO ^,m6 ere o"' C7ax --ry �=� 7.nm >A 94'64-----�.5-0,--93. 1 x ,` k1 • ;i;iyty 1m 8 a P t o m O 5 o ' -� 00'42 L'in• • l II �.• n 1N3 35V3 ALlliln 9 30VNItlZIO -r I.- _ - - a ——— ; m 2.I•, : . �� ' N h ',1r2 .. ^ aau fgAo .‘.3.-, / II I m o m 00i9X -y m X - ' T 0NLL51X3 / / / ir 41r4 1 I -1--- --44vAt v/' / ' >7 ' /// 4i.r---- .(C.,. -- . , - 41/4. Is, / i / ,n8 / ' .-:''''s- '.4....'i...'' ' il— 1 ' ' \ 2 P401 > ,\. \ / 7.L.....:.y......__.. , _____,_._ ____........_,..‘_.. • ,......:.:....'.1-tv....•: 'itz..4'71 IMMO \ illi (., •,,,,,, i V , o'lr.r:iV.:1,0"-':.:,',..1 I/ I 1 \ ,; I jt„,, ...,,.._/._/, \,.............. ".. ,,,,,,,, ..,,,,,i.,, ;" . ‘k / 4100_, \ .1. ...„..../, , , .r.�,.:.. 6:6 J f / i/ i sr .... 11 -,P) 1 l L 15C �.�� / 4� — / � I / I ----t_ _..� � ��' 1 !/.•:. 1 ::f�:� ��_,s, � �i_V� -^moi . , 01,11141: \ i �J - �--_.---1-2-7/171 7 . :.__- � t 1 :: ': '` j ! ! / 1---v...t-lt :w' •4 �2 ..�dk `'' 'mak 11,- r,'sia p.::',, '' t.:.: --1.:.. :._ 717 .:..1:::: '.1::.......:‘,44.yi.S.........:0.-i...k.- --- - :/ .V. , A 'I .� �, ! �"--- / I ...� I � . G:::::.':1.:.-:.../(i�•.:ii:{(ii'4\;:'..:'.:.:.: :.•fit 1'.:;i:,..ri::i. ..*.V....:4, xi ,f.' .\ .,k, I , Ai, , ..::. : \V::::1-•::::1::.:::::N.'::::•':::::•.%,,,,..........c.'irab:•:::•::••::::::::::::4 7 / 7- 1 1: x. . : 'f . .. :-:.•:::. : .. --- 41,41 / .. �.:.... •..: ::.:;...Vis.. .:' ;:::::: �1. r t '\,4, .y s '{1 , s..,Si...A•ti ,. 'I/l''. Aril' II"' \ Tii.l''''4.4 it.1310AfZ.:AC*..... ...Y.....N.:' -.......:: '� T EE P 0 T(•Tabby :::•::•„k"„,,,..%. a ,�„ :: • T / Air 1 0 "‘.......*:.:::*::-.7.:::. '.::'"p?!,...7.:•:.: e> �� I ► Di LIMITS ' P.),I / II (� !I .�s .::...: . : >. �::., ;: . I :.: c....:1:: ':� :. .: ok INV ---.... .1 .; I / 114'—I ,/1 `•Arill w , „cl (n„, ,.:..:. •,,,.•.:.:.:.:.•.•,..............:,:........................N......... .....„ 7. \ .. �o'::. \ :. s. / r; \ 1 ! ''.: ::: :ti: AL' - / --7-I, Vilf:;;;:::.:.:; :.:. ---r.,„.. ‘ ) 1 . . i \ ' \'\' i \\i W E 4"TT ........ .. . .....:: 4, .. , _I -__ � � ,SOU ' i 14 ./.:0 -rii..,::.:.:I:.:.:.::::::::::::/::::::'.:'.:7.::::'1.:1:1:1:.::::::: :1::.::::: :::::::::::::::::.:::::..;T:.::: ::::::. ••-....(:‘, 1 1•:.:.:•:•.:•:( :':: Wil. _ .t -r- --' V4..----I • AUNIIIi.;L P140' '., .......t.r.....,........ :.E8:::.:.:Awiaii:::::::6',;....i..:12 :::::::E.'''. .*::::F i I I N ,..., ! _,-,c,,A , ! •— k ' / / - \f!::4r::r::Iri: ':: tt:•::•: "•7`. ::. •' .i..:_.,•. / '✓ !I jr ill�� v .:..: :. :.: :::.....:..�::; ;' :?..: i r f �. �� �. ... i' '::..'.. i \ I _ i filL' I\ 1 IP 4 II 1 15,. , "i,... ..,,,, , ,,7„:.::,,...:::..:::::::::::::.:::.:.:.:.:v....., ...„ . , 1 , ,,......___... ...................... , , ..,..... ,/ :::::\ , .7..., ''' / )1 i \i'i - 4 "......- , i i t , , t....:.... •r.' •:,� - .1 `I r�' '.......• 1.:•. 1 `.....V. :1-.L-.4 \; I ! i _ i _rr.__:�;:_: :J.:°'. ... 1 I.--'' \1�•...... t_. �......i l S I I I I- 0 FO- O 0 0 0 CC CC CC CC U 0 0 0 1 I I 1 > > > > Z ZO 0 0 S Y Y Y 0 Z Z Z Z Z D D D D CC CC I:t CC CC CC U) F- F- I- F- O0i L.L. _ �f Y i i S S L < X 0 0 0 0 0 J w Lo cr () (I) n (n( LL LL H S F- 0 cn m F- z Jg m w m m m m 0 Z m m m m mm U> z W W W 0 0 0 0 _ I - oa CC d N - - - N W W W 0 U) d d st N N N U cc 0 0 p I- z * w z . . o co w >, 1--w W J (n ® o 0 - Q 00 0 Z 0 0 - 0 0.)Z Z0 1.1J< 0 0 o WO W Z Z o -S W - L Ill (/) m W o o >v E I) -0QO 0 * v =cn cc L U > W W o o o IN- M ".c O 0 F— J M Q , I Q * c L 0 o cnw Q N W ' ` z o v aLi n *v v� O J< Va UN O (n - c o 0 o °' o Q C U) W WCO U N '" \ C> E U 1.1.11.d W F-- ''r (1; z � o I 1:12 H p Zx = Z 0 U < 0 oO co O0 N W W (7 OW O .a 0_ 11 Z �.. 11 LO 2 1- 0 I- 0 w a (n (n Z< QQ II Q N w O Z II Z N (3 O F- W OJ 0 3 N W J ,_ za.w v w O w F- w < S Z F= mum w P f L- ® - = d `` o Od • F— r O Lary V Z Q J O cn W D G Q LAJ WU' J 0 c711 S Z Z (n 0 m m ~ F=2 R. O (O �-' �'' U 11 } g M ..e- M g Z Lei i W z z Z 0 W Y m J M O1: - D I=- W O O O Q LU S S Z mCO /c Q Q Q E. H H F- O O i- I O s-.re) N CO ro I- CL 1.1.1 0Z / / - /• LOT SURVEY CHECKLIST FOR RESIDENTIAL BUILDING' PERMIT APPLICATION PROPERTY LEGAL: � J � �1 1 j BA �!//0 R"C1, DATE OF SURVEY: 8/14//8 LATEST REVISION: a) s C.) O z a DOCUMENT STANDARDS ❑ 0 • Registered Land Surveyor signature and company X 0 0 • Building Permit Applicant X 0 ❑ • Legal description l 0 0 • Address ,A 0 0 • North arrow and scale X 0 ❑ • House type(rambler,walkout,split w/o,split entry, lookout,etc.) 4 0 0 • Directional drainage arrows with slope/gradient% • ❑ 0 • Proposed/existing sewer and water services&invert elevation 0 0 • Street name �Xd ❑ ❑ • Driveway(grade&width-in RNV and back of curb,22'max.) aF' ❑ 0 • Lot Square Footage Afi 0 ❑ • Lot Coverage ELEVATIONS Existing jer 0 0 • Property corners ,l1 0 0 • Top of curb at the driveway and property line extensions api' 0 0 • Elevations of any existing adjacent homes /I 0 ❑ • Adequate footing depth of structures due to adjacent utility trenches ❑ ,X ❑ • Waterways(pond,stream,etc.) Proposed 0 0 • Garage floor 0 0 • Basement floor )2' 0 0 • Lowest exposed elevation(walkout/window) 7 0 0 • Property corners 0 0 • Front and rear of home at the foundation Y .t • PRV Required PONDING AREA Of applicable) O B 0 • Easement line ❑ * ❑ • NWL ❑ lir ❑ • HWL ❑ je 0 • Pond#designation ❑ �iJ 0 • Emergency Overflow Elevation ❑ • Pond/Wetland buffer delineation Y • Shoreland Zoning Overlay District Y & • Conservation Easements DIMENSIONS ,e' 0 ❑ • Lot lines/Bearings&dimensions 0 0 • Right-of-way and street width(to back of curb) ,e( ❑ 0 • Proposed home dimensions including any proposed decks,overhangs greater than 2', porches,etc. (i.e. all structures requiring permanent footings) ❑ 0 • Show all easements of record and any City utilities within those easements 7 0 0 • Setbacks of proposed structure and si.- rd setback of adjacent existing structures 0 ❑ • Retaining wall requirements: Reviewed By: ' Date cOV/P G:/1 Engineering/FORMS/Cert.of Survey Checklist Rev.11-16-16 cr O Ow ❑ nO0 Z n o c 'O W ❑ OQ Z ¢ N c p~ Z O Z Q W LL JW _ �a", xEO Zr- o H Q fr F- F- W J W O Q I- CC Y c p,7,. LU LU 0 0 Z Z w Z 1-1-I O U °....c°0 ^ N 0-Z c M cc V._ c S... o rn._ W LU 0 L C } m W = Q O LU 0 ❑ ❑ O • N o '°i j .co O W ❑ U O CC J Z 2 Q .• m vv oma' w` °to to cd g W Z Z Z 0 z o Q Q } ❑ W W W a 1- ❑ 1� N N Ta �.m o g o (9 U 0 Q Q F- W F- U > 2 m z U ( 6(n 0 D W E-o y o�, r l� a z 0 � 2 2 m o LU 0 °C 2 Q O O O Z O 2 �i ~ o `m°° t -r�''`-aa W Z Zcc w cc i- _, n_ a s ❑ Y m OJT -°a��m 11 ani�� 3 x m m O O g a ~ O z ~ O O O J O w " w �,_2° o, fiii q w a o 0 w c~n can a a a m J o o �_ W O ,Evc r:g E 0 = w �' W Q LLI a ' E 1 A f O ! o c� X O O M in W W J J = J Ij 0a y+`Z O CZ) Z Z CI �V-� ° o kg O ❑ F- QLiu r� _ o`r'n-a` in o W O W W >- ❑ V 0 •- O F- O m CO Z O l(7 0 F- 0 ❑ Q _o Y Z Elul (11) 1. zZ g QJ � z z• QQ Y o W P o tpIS 1+ w � < � D UL J 01- - W t*r� LL0 (nZU ❑ U rifrtl cp Ntii 8 Cq 1 jR O U'a' Q N li I ` N. a - '- (n ❑ W Z ❑ w F_ `wJ a Q) N. • } WN C7 ZwOW > oZ '2U ?► i wZuS Z ❑ ZOO Z � z � IID C j ❑ V� ''^^ � c7 � Q Jrwo� a w � � w vJ D Z D W � � � Wt1 W WJd W > V) w � m coo ❑ > Q ci) u) < () T N c.6 4 0 i— C W LD Z O CSL L LEL l.- � U Q O O O Q •• w ^o � QO� QO cb lr^ i A •. c� _coo ,rco o co 14 CD O —1 0 T I. N. Co coC'O U N T W T T � N: oocO � � QT Z `�1 oo �T QCO II II II II II II II OO • a rnrnrnrnrn rnrnzrn c� N 0 �� � p II II II II II Q II II II II M I- 6 N O ¢ lel �I O �N � W ° N o '11444411 -, Q•4 �i OD 1-4 cc W 'moi = � = co c"� LI IQp J C.5 � � W 0 Q O F- cnNo � u WaW � a Z Q vIlligiti ❑ o� a N a0 D o = w w o = > � o� WQ � aQ � � 0§ � •. A cnww w � ¢ °C } O JWQZ r w T_� • CI) UT rw� ❑ °CO °o ❑ QO Q'' w Q � Q �, II cnWaQa � OU M q YZ �1 � `r1 � OIJi (� Z0LLi � Z z W2 Qci Q fnW gal� YY � Uz 0 mil-- O p � � 0 �'+ ❑� ¢ ¢ ¢ 5Oc� Ocwww CO 1.4.1 0 '' m - Cg wM a 2LI- wwF- � ww � z > Uz } CSN ¢ W = ❑ Ucn ❑ ❑ m C5 _� q � Z O Oaww ~+ Qaw1- O � �a � o O oom N � o q oQ �i CL CL CC awcvaC7 J — X co, �, F- C7m � owC w � C7mu. T W '5) x-. XXl V X / 03 in CO C76. in 0) n N N o X O N 0 a' CD 0 Q, X X I\ )( X ---------__________?_____< / cn rn X cIRCLE o wtsCQTLn r 0 ,_. a, c�-ci, ,rte. - ,o co •:,_ . Q v ,• x O , , ca CV co cr) in _, • N N O o 0 0 .0:4 CC �o c-0 �� c? C LQIv O a01 N ''`i CO 0 '' —eith G o tf� .`I - 1 O In 1�N`I1 1 ., N �- .N °' �V901' O o o xl x v: rx o X ;. rx CT) CD '' O.CZZ-�X • o rn -1N3W3Sd� klll11f1 3�yNldilO`� 01 �^ cn 0 c0 ���. xcr, N 1- 0 d ,4:1_,',, N N • .1 X o � -- - � 0-, or. o �� �..x _ r O 0 / Ct d0i _��� M 1--- N co pp i ,• O �- O� rn f o rn rn X a-- w o D o to ,/,, I / X x X SEBj �oOo �--- c 30' BVIL0� ��Q o ° rn - N co N i o °' x N CO• 0D0 rn o. 1,1" di XJ a' •p U i - (0 • IJ Q1NV� Wm m w• La I O N �(') • �, a' 00 0 Y O Lw W „0 10,C) rn cri Q co a, W I co o ( ao 0 O N O J l�- > X X 0 Z cn N 0 - - Q I'rn a0', o No o X rr) El " �rn m� x oc�0°, -. Y Lx x X x rn o Zw�-.1ce0 �z w ¢ O m N W o> -- r ro)'• �? '� (DK; 'ncn I m! �� r ��N cD rn, Vrn1.17 w WI rn CO v cn x=wF< o o o v•''') � ca �, N 03 M w Nc�i o W rn o ~ N NJ O 0 O Q 00 c0 st O m Z rn o rnQ o' rn rn m l W o AVM3ARIa rn r Z I,, ? cn x X° O N C^ - 0� I 9NIlSIX3 I in rn r Ni- 1 �r H ,In 00 w ma, ok Te 1 Oy I X�in o 0 n.- n n T f Ln 00 • ol O O r • X rn 3c�.i moos uiii0 jy� a0i too rn C)'( Iri 0)a r• o N of hat' - �°- rn cm 303 LN. ca —,.,In ] vi vi p� Fin �n� „,..8-1N3 3Sb3 .IlI1I1 11t1t10 • mrn ~0 300' Pr) /.' •; rn rn , rn -0 a,a, II .! 0°'0 0 • x .. X1-0cl) ^30 32,6L'6 I 311 N2OoQOS� ct ---1/41 m --- — __co _!fir .� —1 �-- o - -- �, oma' �� X I 3 .• I rn rn) N r'd� a0i / p� - 1-0 ip(V ..r...:.). I< N co m0 L() al 'O moo a' I 3°1 2,.4: lfi a' ,n a, N opo F-0 O 3snoH rn I Nr730 r` a' `JNIISIX3 / // / / °omc) 6 1 For Office Use — 1 1 Permit A I EAGAN i I C•`_ I Permit Fee: (47 L� I I NOV®01� 1 Date Received: 3830 PILOT KNOB ROAD j EAGAN, MN 55122-1810 1 1 (651) 675-5675 1 TDD: (651) 454-8535 1 FAX: (651) 675-5694 I Staff: 1 auildinginspectionsa-cilyofeagan.com- - - - - - - - - - - - - ----1 2018 RESIDENTIAL PLUMBING PERMIT APPLICATION Date: I I- Z 1- 1 (,) Site Address: 1o'23 1. I cs e -c f � 1. Tenant: Suite #: 4 ResidentlOwner Name: Phone: i Address / City / Zip: y }worn:.•aysaarnsss-«-xs�sac.m�.vea — t:®..e�r,.�z�...z�r��.ccar.3c�.n-..:�.�..,n...vx.:.:a.�«�<,��.�cvmau.:�3:,-.___.. - _ �:w ._.� :- } Aaame®m� 3 Name: fad, aJ��License #: 60 Q L'�i)oz 1 COntraCtOr Address: � Lj2l nylc' e r)A�roj -f)UL City: � n� -- A ��� ice` State: I`� ► P Zip: �?� Phone: �7(4 ,"� 1" I P30 ) fi I Contact izo-y(f" Email: .1Iz Type of Work X -New Replacement Repair Rebuild Modify Space Work in R.O.W. i Description of work:In 1C-{�r�/" i RESIDENTIAL Water Heater 1 Water Softener Lawn Irrigation RPZ / PVB) Permit Type Add Plumbing Fixtures L— Main ! Lower Level) Septic System i v H New Water Turnaround e i Abandonment i s RESIDENTIAL FEES: F $60.00 Water Heater, Water Softener, or Water Heater and Softener (includes State Surcharge) t $60.00 Lawn Irrigation (includes State Surcharge) $60.00 Add Plumbing Fixtures, Septic System Abandonment, Water Turnaround* (includes State Surcharge) *Water Turnaround (add $280.00 if a 3/4" meter is required) $115.00 Septic System New (includes County fee and State Surcharge) TOTAL FEES $ CALL BEFORE YOU DIG. Call Gopher State One Cali at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. vJ,A+_v_.gooherstateonecO.ora You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeaaan.com/subscribe. I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x Ll 7-0=+h n X Applicant's Printed Name Applicant's Signature FOR OFFICE USE Reviewed By: Date: Required Inspections: Under Ground Rough -In Air Test Gas Test Final Meter Related Items: Meter Size Radio Read Manometer Staff: 4 ft fence REVIEWED FOR CODE COMPLIANCE 03/09/2022 8:17:11 AM Terry Zelenka, Building Inspector BUILDING INSPECTIONS