06/21/1982 - City Council SpecialSPECIAL CITY COUNCIL MEETING
JUNE 21, 1982
6:00 P.M.
1. Firefighers' Pension Plan
2. Project 342 "Cedar Grove 1st & 2nd Addition -
Street Reconstruction"
3. Water Treatment Schedule
4. Other Business
5. Adjournment
MEMO TO: HONORABLE MAYOR & CITY COUNCILMEMBERS
FROM: CITY ADMINISTRATOR HEDGES
DATE: JUNE 18, 1982
SUBJECT: SPECIAL CITY COUNCIL MEETING
A special City Council meeting is scheduled for 6:00 p.m., Monday,
June 21, 1982, at the Eagan City Hall. Originally, the special
City Council meeting was scheduled for 7:00 p.m.; however, due
to a conflict with the Volunteer Firefighters, the meeting was
moved up to 6:00 p.m. The Volunteer Firefighters have their regular
Monday night training and a general meeting scheduled at 8:00 p.m.,
and, therefore, it was necessary to move the time schedule for
the meeting from 7:00 to 6:00 p.m.
Enclosed is a copy of the agenda for the special City Council
meeting which has been properly posted.
Firefighters' Pension Plan
Enclosed is a copy of the memorandum to the Finance Committee that
was copied to the City Council approximately two weeks ago that
outlines the various alternatives discussed at a special City Coun-
cil meeting on June 8, 1982. It was the consensus of the City
Council that the IRA, alternative #4, be presented to the Pension
Committee of the Relief Association. Enclosed is a copy of an
excerpt from the League of Minnesota Cities magazine, October,
1981 issue, that addresses the use of IRA accounts for volunteer
ambulance and fire fighers. It is very likely that legislation
will be required in order to work out at transition from a defined
benefit program to an IRA account if selected by the firefighers
and City Council and due to the special intricacies of working
out the required legislation, the City Administrator will await
a consensus before proceeding with a proposed IRA Retirement plan.
There are a number of memorandums and support data regarding pre-
vious discussions to change from a defined benefit program to a
defined contribution or other type of program. There are also
some fact findings from Roger Katzenmaier, Gus Welter and the City
Administrator. The City Council has received this information
in the past. If any member would desire any or all of this informa-
tion copied as resource data, please contact the City Administra-
tor's office.
Agenda Information Memo
June 18, 1982
Page Two
The City Administrator suggested at the last City Council meeting
that the Director of Public Works and City Administrator have time
to address issues that pertain to public works that are under con-
sideration by the City Council. Two (2) specific items were placed
on the agenda, one of which is Project 342, the Cedar Grove 1st
and 2nd Addition Street Construction, and secondly a water treatment
schedule to consider a water treatment plant revised study, survey
and public hearing. Other items to discuss are seal coating, county
road construction and any other items that the City Council may
have questions about.
Project #342
Enclosed is a memorandum and considerable information as it pertains
to a report on the proposed Project #342 Cedar Grove 1st & 2nd
Addition street reconstruction. This information has been prepared
and/or coordinated by the Director of Public Works.
Water Treatment Schedule
The Director of Public Works and City Administrator would like
to discuss the proposed time schedule for reconsideration of the
water treatment plant, the progress of the feasibility report,
a proposed survey to be considered as a City wide newsletter and
time for a public hearing. There is no support information to
send out with this scheduled item. The discussion is basically
proposed as strategy planning with the City Council.
Informative
Mayor Blomquist, City Councilmember Egan and City Administrator
Hedges all attended the League of Minnesota Cities meeting held
in Rochester this week. Mayor Blomquist and City Administrator
Hedges were in attendance on June 16 and 17 and City Councilmember
Egan was present on June 17 and 18. The conference was well
attended by elected and appointed officials from the State of Minne-
sota and both Mayor Blomquist and I were members of the Planning
Conference Committee and received positive input about the quality
of the conference which I believe benefited persons who were in
attendance. The City of Eagan was well represented at the various
sessions. The Director of Finance and Building Inspector were
also present for one day sessions to hear seminars that affect
their respective positions.
P&Qz �q4l.
City A
C'
d ministrator -
MEMO TO: FINANCE COMMITTEE MEMBERS JIM SMITH & TOM EGAN
FROM: CITY ADMINISTRATOR HEDGES
DATE: MAY 26, 1982
SUBJECT: VOLUNTEER FIREMEN'S RELIEF ASSOCIATION RETIREMENT PLAN
Background
The City Council received a memorandum from the City Administrator pro-
viding a brief history of discussions that have taken place between the
City Council and Volunteer Firemen's Relief Association regarding an increase
or change in the association• retirement plan. Also submitted for review
by the City Council on March 23, 1982 was a memorandum prepared by Roger
Katzenmaier addressing an independent study that he performed with Gus
Welter that examined the conversion of the association's retirement program
from a defined benefit plan to a defined contribution plan. The City Council
received the reports and asked the Finance Committee to meet with Mr. Kat-
zenmaier to review the lengthy memorandum. The meeting was scheduled
and held on Tuesday, April 6, 1982. There was a great deal of discussion
by the Finance Committee and Mr. Katzenmaier at that meeting, and as
a result, the Finance Committee desired additional time to study the facts
and prepare a recommendation for the City Council. A follow-up meeting
was held on May 26, 1982 at which time several options were again discussed
and a recommendation considered for review by the City Council at a special
meeting.
Recommendation
The Finance Committee, in studying the information prepared by Mr. Katzen-
maier, in addition to data supplied during the past several months, feels
that there are four (4) options available regarding the Volunteer Firemen's
Association Retirement Program. Those options are as follows:
I. Continue with the defined benefit program.
2. Convert to a defined contribution proposal as previously presented
by the City Council.
3• Provide a combination of the above two options by requiring a lump
sum benefit only.
4. Convert the existing program to an IRA which allows for cash pay-
ment to each volunteer fireman upon completing one year as a volun-
teer fire fighter and each year thereafter.
The Finance Committee feels a conversion to an IRA plan is a viable and
suitable option to be considered by the City Council.
Retirement Plan
May 26, 1982
Page Two
Action
The City Council has agreed in recent months that the Finance Committee
would be used to provide fact finding; however, the entire City Council
would present and discuss a position as it relates to any change or increase
in the retirement plan for the Volunteer Firemen's Relief Association. It
is therefore the recommendation of the Finance Committee that the City Coun—
cil hold a special City Council meeting and discuss their position. Once
an option is agreed upon, it will then be presented to the pension committee
for further consideration.
CLQ �L4
L-tty Administrator
`61
STANLEY PESKAR
EDITOR'S NOTE: The questions below are
typical of the thousands of Inquiries the
League receives each year. For more
comprehensive treatment of quesdomi, the
information service of the league Is
always available to municipal officials.
PERSONNEL—RETIREMENT
Does the new federal tax law solve
the problem of what to do about a
retirement program for ambulance
and other volunteers?
Apparently yes. Though the state
legislature has not had an opportuni-
ty to conform state tax laws to the
federal laws, it is highly probable it
will do so in the next session.
Whether the state ads or not,
"volunteers" and other city
employees, regardless of whether or
not they have another pension plan,
may annually put up to $2,000 into
an independent retirement account
(IRA), free of federal taxes.'
14
Thus, cities can now determine
how much to pay ambulance or
firefighter' volunteers, make a direct
payment to the volunteer, and let
him or her decide whether to take
the money as current compensation
or put it in an IRA for retirement pur-
poses.
Money placed in IRAs is not tax-
able in the year in which it is receiv-
ed. Therefore, the entire amount can
be invested and can earn a yield up
to the date of retirement. When the
volunteer retires, the payments are
taxable, but presumably the recipient
is in a lower tax bracket at that time
because of lower income and in-
creased exemptions or deductions or
a combination of all three.
The IRA has several advantages for
the volunteer over participation in a
more conventional retirement plan
such as a local relief association.
Since there is no vesting period,
assets are not lost by failure to serve a
minimum period. (Ten years is
typical in most other plans.) Thus,
there is full portability from one com-
munity and job to another. Further,
since the IRA belongs to the
volunteer, it is not subject to
manipulation through benefit for-
mula changes by a board of trustees
or the legislature. Consequently, the
volunteer need not commit valuable
time out of a busy schedule to par-
ticipation itt governance of a relief
association. He or she need only
select an IRA plan and determine
THEIN WELL CO., Inc.
Complete Well & Pump Service Since 1893
24 Hr. a Well Drilling a T.V. Well Inspection
Well rice Pump
Service a Well Repair a Electric Logging
a Pump Repair a Pump Sales
Clara City, MN .................... 612-847-3207
Spicer, MN ....................... 612.796-2111
Rochester, MN...................507.288-5554
each year the level of participation
which is appropriate.
The IRA assets are a reserve of cash
available to the volunteer in certain
emergencies before retirement. The
IRA thus provides a ready-made sur-
vivor, disability, and burial benefit to
the extent of funds in the account.
Should volunteers need additional
disability or survivor benefits, these
can be purchased individually or by
the city as part of the compensation
package from an insurance com-
pany.
The IRA also permits selection of a
money manager with an investment
strategy or policy which suits the in-
dividual economic or social goals of
the volunteer rather than the objec-
tives of the relief association trustees
or state legislators. Finally, the use of
current compensation (with
volunteer option to purchase an IRA)
to the volunteer ambulance or fire
service permits city officials (mayor
and clerk) to avoid responsibility for
managing a local relief association,
for preparing, reviewing, and filing
complex financial reports, and for
hassling with an organization which
can be a major political force in the
community.
The new federal law offers a less
complicated way to attract, retain,
and provide security for a citizen
resource which cities may increasing-
ly need to rely upon to provide ser-
vices in these times of contraction of
financial resources.
Footnotes
Those coordinated employees covered by
PERA would be subject to Social Security taxes
and PERA deductions on their IRA contribu-
tion- but it is unlikely that any volunteers
would be paid the minimum $725 per month
required for participation in the coordinated
PERA-Social Security program. Thus, no
federal deductions would be made.
' If the city has a local volunteer fire relief
association, all of the 2% state fire aid must go
to the relief association. If no local relief
association exists, the 2% aid may be used for
equipment, supplies, and buildings, and the
city could put a comparable amount from
other sources into current compensation
which could then be used by individual
firefighters for IRAs. IRAs could also be used to
supptcmcnl i-v4ing relief association benefits.
MINNESOTA CITIES
TO: HONORABLE MAYOR AND CITY COUNCIINEZ�9BEF6, C/O THOMAS L. HEDGES, CITY
40 1 111111 AT6][r*TI.TFR9
DATE: JUNE 18, 1982
RE: PRO= 342, CEDAR GROVE 1ST AND 2ND ADDITION - STREET RECCNSTRUCTION
In the early fall of 1980, the City Council directed staff to analyze:the
streets in the Cedar Grove Additions to evaluate their needs and maintenance
requirements in order to maintain these streets to try to lengthen their ser-
vice life before major reconstruction and replacamnt became necessary. Sub-
sequently, the staff performed an experimental repair on West Marble Lane
through the intersections of North and South Diamond Drive. The south half
of Marble lane was reconstructed after ramving the deteriorated and fractur-
ed existing bituminous surfacing. A 2" overlay was then placed over this
section of Marble Lane to analyze the difference between removal and replace-
ment prior to an overlay and the effects of just overlaying the existing bit-
uminous. This "test" section has now gone through tiro winter/spring cycles.
The results -indicate that the south half of Marble lane that was reconstruct-
ed has experienced.approximately 80% less of reflective cracking through the
2" bituminous overlay. On the north half of Marble Lane, random cracking has
reappeared which is a direct reflection of the random cracking that existed
prior to the bituminous overlay. Subsequently, this random cracking will di-
minish the expected additional life that could be provided by this corrective
overlay.
In the summer of 1981, the staff contracted with Midwest Pavement Management
Inc. to perform a detailed analysis of the streets in the Cedar Grove lst and
2nd Addition. Their analysis consisted of traffic counts, traffic distribu-
tion analysis, test core samples, and computerized pavement deflection eval-
uation to determine the existing pavement stability. A copy of that report
is attached for the Council's information. They were asked to evaluate 5
different possible alternatives as recommended by City staff. Their analysis
was then computed and converted to an "expected life/annual cost" relation-
ship as indicated on Page 12 of that report.
During 1981, the City had Professional Services Group Inc. televise the san-
itary sewer lines in the Cedar Grove 1st Addition to try to determine any
potential corrective work that may be required. This closed circuit tele-
vision investigation of the sanitary sewer indicated several areas that need
corrective work due to settlement of pipes, misalignment of pipes, fractured
pipes, protruding services, and extensive root infiltration which will great-
ly increase the potential of sanitary sewer back ups. In addition, during
the spring of 1982, the Public Works Utility Maintenance section performed
an analysis of all sanitary sewer and storm sewer manhole castings and found
that approximately 60% of these are in immediate need of reconstruction and
repair due to deterioration. Based on the results of the televising of the
1st Addition, the staff then contracted during the spring of 1982 with Mid-
west TV Inc. to televise the sewer lines in the 2nd Addition to try and de-
tennine if similar corrective work was necessary. The results of this -,vrk
Project 342
Jame 18, 1982
Page two
are not yet immediately available but are anticipated within the next three
weeks.
Subsequent to this pre -investigation work performed by staff, the results of
this information were forwarded to the City's Consulting Engineering firm o£
Bonestroo, Rosene, Anderlik and Associates, Inc. for the preparation of a
feasibility report to estimate the costs of repair and the resulting potential
assessments associated with this work in the 1st and 2nd Additions. Copies of
this feasibility report are also being forwarded to the Council for their re-
view. Please keep in mind that this feasibility report is in a preliminary
draft stage and is subject to revision after discussion between staff and Coun-
cil.
There are several concerns that have not been specifically addressed in the
feasibility report that staff would like to bring to the Council's attention
to receive further direction on before additional work is performed. These
are summarized as follows:
1. Possible replacement of deteriorated blacktop curbing with concrete curb
and gutter.
2. Required corrective construction to existing sanitary sewer and storm
sewers.
3. Reconstruction of deteriorated manhole casting supports and catch basin_
structures.
4. Elimination vs. restoration of service drives (Nicoll Road and County Road
30) .
5. Assessments against corner lots where only side streets are reconstructed/
upgraded.
6. Potential need of increasing the structural strength of minor "collector"
streets with potential sidewalks/pathways/striped walking lanes due to
the closure of Cedar Elementary School and the potential of increased
busing and/or increased pedestrian traffic through the 2nd Addition to
Rahn Elementary School.
7. Revenue sources: assessments vs. major street trunk fund
B. Consideration of additional storm sewer facilities in certain areas to
increase drainage capabilities.
MYLACEMENT CF BITUTINMS CURBING
The existing bituminous curbing has been in place for 20+ years and is show-
ing signs of deterioration resulting from extensive weathering, snowplow main-
tenance, etc. with the placement of a proposed 2" bituminous overlay of the
existing surface, these subdivisions will experience decreased curb heights
Project 342
June 18, 1982
Page three
which will decrease the capabilities of confining drainage from major storms
within the street area and will require extensive driveway approach recon-
struction. If the streets were reconstructed with concrete curb and gutter,
it would increase the drainage capabilities and minimize image resulting
from major storms and would greatly extend the life of the streets in these
subdivisions. However, there is greater cost associated with this improve-
ment as compared to a repair and maintenance of the existing street surfac-
ing.
I: 71•. •: • 7/.• M4 i\IM d. :\i• N:N x.171:
I will be available to discuss in further detail the condition of the exist-
ing sanitary and storm sewers in these Additions at the meeting to be held
between staff and Council to discuss this proposed project. The results of
the first internal televising report indicate that there are several areas
that need reconstruction. This work should be performed prior to any repair
work to the surface to minimize the potential of construction patching in
the future.
An inspection by the Utility Maintenance section indicates that the great
majority of manhole castings for sanitary and storm sewers within these Addi-
tions were placed without adequate grouting and/or support rings. Subsequent-
ly, these supports are deteriorated which results in infiltration around these
structures which will create the potential of extensive future patching to
correct these situations in the future.
171 Iu11Ud Y •i •i 71:d / •1 � : \I .
With the congpletion of the Cedar Avenue freeway, Nicols Road (County Road 23)
is anticipated to be turned back fran the County to the City. The traffic
volumes on this section of road have greatly decreased since the opening of
the Cedar Avenue freeway. Subsequently, where it was once considered a major
arterial, it will be reclassified to a City collector status. Subsequently,
there is a question as to whether the frontage roads along Nicols Road will
be necessary in the future. If not, should extensive reconstruction be per
foamed to these severely deteriorated frontage mads or should they be e]iminI
ted and the dollars spent in providing direct driveway connections to existinc*
Nicols Road and returning this frontage area to open space front yard for the
adjacent structures? Presently, there are several louses located north of
Cedar Elementary School which take direct access onto Nicols Road and several
which take direct access by way of a severely deteriorated frontage road. The
staff would recommend that these services drives be eliminated and reconverted
to front yard space with direct driveway connections being made to Nicols Road.
Should assessments be spread on a per lot basis equitably throughout the Addi-
tion or should assessments be based on the front food method with corner lots
receiving a greater assessment due to their increased frontage? In addition,
should corner lots that have frontage on streets not to be repaired be assess-
ed for the improvement of the streets adjacent to their side yard areas?
Project 342
June 18, 1982
Page four
WOW •Db N N V SM Vol 0
with the recent closure of Cedar Elementary School, students in the 1st and
3rd Additions will be transferred to Rahn Elementary School south of the 4th
Addition. Recently, there has been discussion as to whether the students on
the north side of County Road 30 will be bused to Rahn Elementary. If so,
should an internal "collector" street be designated through the 2nd and 4th
Addition for this bus traffic? If so, that designated street should be up-
graded to handle the anticipated heavy traffic loads associated with school
buses. I£ the busing alternative is not realized, there will be increased
pedestrian traffic through the 2nd and 4th Addition to Rahn Elementary School.
If this is the case, should tyre be consideration given to again designating
a "collector" street in either upgrading this designated street to a wider
width to provide on -street designated walking lanes or should a separate de-
tached sidewalk/pathway be constructed for this anticipated increased pedes-
trian traffic?
REVENUES: ASSESSMENTS VS. TRUNK FUND
Since these streets were constructed in the late 50's and early 60's, they
have been in service for approximately 20+ years. This is the average life
expectancy of a bituminous roadway. In addition, the design standards that
they were constructed to,provide for approximately 50% less structural strength
than present day standards. As such, what consideration should be given towards
assessments of benefited properties for not only maintaining these streets but
upgrading them to the structural strength necessary to handle the normal traf-
fic loads associated with residential streets? Mile a detailed status analy-
sis of the City's major street tank fund is not yet complete, pmli=. ary in-
dications are that due to recent major street construction projects (Pilot
Knob Road, Wescott Road, Galaxie Avenue) and required future collector street
construction requirements (Blackhawk Road, County Road 30, etc.), there are
limited construction funds available to undertake a project where a major
anticipated revenue is anticipated to be provided through this fund. In addi-
tiai, consideration should be given to potential precedence relating to this
assessment policy and its impact on future needs for other Cedar Grove Addi-
tions (3rd and 4th, etc.).
ADDITIONAL STORM SEWER
There are certain areas in these two Additions that presently either do not
have adequate storm sewer facilities or the catch basin structures that are
existing are below minimum inlet capacities for the normal 5 -year storm fre-
quency designs. In addition, several of the catch basin grates are of the
old design that have the inlet slats parallel to the curbing which present
a hazard to bicycle traffic. Consideration should be given to potential re-
placement of these castings, upgrading of existing storm sewer facilities
and/or installation of additional storm sewer systems at critical areas.
Project 342
June 18, 1982
Page five
As can be seen by several of these areas of concern, the anticipated im
provement in the Cedar Grove 1st and 2nd Additions enccnpasses more than
just routine maintenance and repair of the existing bituminous surfacing.
I don't believe that routine normal maintenance procedures through the
years could have eliminated or minimized any of these concerns. The maj-
ority of these concerns relate to the problems associated with streets
that are reaching the end of their original anticipated life expectancy.
Subsequently, staff would appreciate the opportunity to discuss in depth
these concerns with the City Council to receive a defined direction as to
how these problems should be approached.
I will welcome the opportunity to respond to any questions and discuss this
project in further detail with the City Council at their convenience.
spectfull
LL
REsuils[uittedi�
Thomas A Colbert, P.E.
Director of Public Vbrks
TAC/jack
cc - Bill Branch, Superintendent of Streets and Equipment
Joe Connolly, Assistant Superintendent of Utilities
EVALUATION OF THE.PAVEMENTS
in
CEDAR GROVE NO. 1AND 2
for
CITY OF PAGAN.
July 19,81
MIDWEST PAVEMENT ;MANAGEMENT, INC.
PAVEMENTMANAGEMENTCONSULTANTS
Swte:6so.:i 5500 Waynta awev'wd vv , a"=.'MmewtaiE6391 (612) 475-9957
Commission 0180014-6
The evaluation of the pavements in Cedar Grove No. 1 and 2 in the City of
Eagan (Figure 1) was conducted to determine what pavement work needs to be
done and what the estimated costs would be.
The evaluation consisted of the following:
• Pavement strength determination with the Road Rater
• A surface condition survey
• Pavement thickness determination
• Heavy Commercial traffic volumes
• Analysis and cost estimates
e Recommendations
RECOMMENDATIONS
The following recommendations are based on lowest cost per year of serviceable
life before structural pavement repairs would be expected.
1. Remove and replace the alligatored and distorted areas. This
represents 19,000 square yards of pavement or 20`� of the area.
The estimated unit cost of $4.00 per square yard is based on
removal by milling at $1.50 per square yard and replacement
with 2331 at $2.50 per square yard. It is recommended that
the removal and replacement items be bid separately and that
Mn/DOT Spec. 2332 be available as an alternate for the replace-
ment material which may lower the unit cost for this portion of
the work.
2. Apply a 1',' overlay to Garnet Lane and Drive, Zircon Lane and
that portion of Jasper Drive west of Sandstone Lane. Again
2332 should be allowed as an alternate material for this portion.
3. Overlay the entire area with 3/4" of 2331 modified or Bloomington
2341 modified. This is expected to give 15 to 20 years of service-
able pavement life before structural maintenance would be required,
resulting in the lowest overall per year cost. It is also expected
that the frequency of seal coating would be much lower for the 2331
modified or the Bloomington 2341 modified.
The estimated costs for this work on Cedar Grove No. 1 and 2 would be
5183,000.00 for 86,000 square yards of residential street.
-3-
FIGURE 1
LOCATION OF CEDAR GROVE NO. 1 AND 2
-4-
INTRODUCTION
g The City of Egan requested that Midwest Pavement Management, Inc. evaluate
the pavements in Cedar Grove No. 1 and 2 and provide the City with maintenance
recommendations and corresponding cost estimates.
The City does not have information regarding the design and construction of
the pavements in Cedar Grove No. 1 and 2. The pavements have provided approx-
imately 20 years of service and a general improvement is necessary at the time
I to protect the existing investment and to minimize future pavement failures
and maintenance costs.
Several alternate improvement designs are considered to determine which would
be most beneficial in terms of cost and expected life. The alternates
considered are as follows:
1. Crack filling with seal coat application (single or double)
1 2. Patch and repair with seal coat application
3. Patch and repair with bituminous overlay (determine minimum
thickness)
4. Overlay only with recommended bituminous thickness
Also, the economic and practical feasibility of including a filter fabric in
specified locations in lieu of patch and repair prior to overlay was considered.
I
— -5-
THICKNESS OF EXISTING PAVEMENT
To determine the thickness of the existing pavement, eight locations were
sampled by drilling a small (1 inch) hole into the pavement and measuring
the thickness. The bituminous thickness (listed in Table 1) average is
2.56 inches with a coefficient of variation of 19 percent. The aggregate
base averaged 3 inches at the locations sampled, resulting in an average
Granular Equivalent thickness of 8 inches.
(/ rAe
PYrSr„ / �rs'i �an fia/ Srrrrt Der.9w SfaN acV ciS (a X /`
12..S 116rSMr14r cfv, v,/rnY(G.G
for Sf YVcivlc./ Itrrns f/, lit
vs 9" 4i.e.. er.sAal _J Se% Jef,c,c.,cr
TABLE 1. Measurements of the bituminous layer thickness in Cedar Grove
No. 1 and 2
Bituminous
Point No.
Thickness
Street
(Addn)
1
3.0"
Diamond
(1st)
2
2-3/4"
Opal
(1st)
3
2-1/2"
Zircon
(1st)
4
3"
Diamond
(2nd)
5
3"
Sandstone
(2nd)
6
2-1/2"
Amber
(2nd)
7
1-3/4"
Jasper
(2nd)
8
2"
Jasper
(2nd)
Average = 2.56 inches
Standard deviation = 0.48 inch
-6-
f
1
TRAFFIC
The streets evaluated are functionally classified as residential. The
volume of traffic for residential streets is normally under 400 vehicles
per day. Of this traffic, only the Heavy Commercial traffic need be con-
sidered for pavement thickness design purposes. The predominant Heavy
Commercial vehicles that travel these streets are garbage trucks, school
buses (Table 2), and City maintenance vehicles. There are between 5 and
7 garbage trucks in Cedar Grove No. 1 and 2 per week. Other Heavy Com-
mercial traffic such as delivery trucks are normally much lighter than
the garbage trucks and school buses. There are no MTC buses on these
residential streets. The accumulation of truck traffic on these streets
results in an approximate Sigma N18 of 30,000 or less over a 20 year period.
This is well within the minimum design section of the Bituminous Pavement
Design Charts in the Mn/DOT Road Design Manual.
TABLE 2. School Bus Routes (All 66-72 passenger) in Cedar Grove No. 1 and 2
AO -E,114 0.rf>r $I$2 we 10 C�COOr L—�F'nr .6- nSrn51 ?
IST ADDITION
Street
Termini
Number of
Routes
Diamond Drive All 1
Garnet Lane Diamond Drive to Topaz Lane 2
Topaz Lane Garnet Lane to Zircon Lane 2
Topaz Lane Co. Rd. 30 to Zircon Lane 1
Zircon Lane All 1
2ND ADDITION
Coral Lane
All
2
Diamond Drive
Co. Rd. 30 to
Coral Lane 2
Jasper Drive
Rahn Road to
Sandstone Drive 2
Marble Lane
W. Jct. Diamond
Dr. to Nichols 2
Marble Lane
Sandstone Dr.
to W. Jct. Diamond 2
Dr.
Sandstone Drive
Coral Lane to
Jasper Drive 2
Sandstone Drive
Jasper Drive
to Marble Lane 1
-7-
THICKNESS DESIGN
Within the Mn/DOT Bituminous Pavement Design procedure, the pavement design
is based on the maximum allowable deflection during the spring thaw period.
Table 3 lists the present estimated spring deflection for each of the streets
in Cedar Grove No. 1 and 2. These deflections are calculated from the deflec-
tions measured with the Road Rater using relationships developed by Mn/DOT.
The last column in Table 3 indicates the increase in G.E. recommended to
reduce the deflections to the recommended value. Five of the seven streets
in the 1st Addition indicate a need for an increase in structure while only
three of the nine streets in the 2nd Addition require additional structure.
y TABLE 3. Summary of
pavement strength
analysis
1 1st ADDITION
Measured
Allowable
Additional
Deflection*
Deflection*
G.E. Required
(inches)
inches
(inches)
Diamond Drive
0.079
0.070
2.4
Garnet Lane & Drive
0.096
0.080
4_2
Sapphire Lane
0.067
0.070
Emerald Lane
0.072
0.075
---
Opal Drive
0.092
0.080
3.2
Zircon Lane
0.083
0.070
3.4
Topaz Drive
1
0.072
0.070
0.6
2ND ADDITION
Marble Lane
0.069
0.070
---
Diamond Drive
1
0.061
0.070
Moonstone Drive
0.071
0.075
Amber Drive
0.085
0.080
1.2
Amber Court
0.092
0.085
1_6
Limestone Drive
0.072
0.075
Sandstone Drive
0.075
0.075
---
Coral Lane
0.075
0.075
---
Jasper Drive
0.085
0.070
3.9
* The values are expressed as an equivalent Benkelman Beam deflection and
represent the mean plus two standard deviation values.
- -8-
' SURFACE CONDITION
A surface condition survey of the pavement was conducted to determine the
type and quantity of distress that is present. The type of distress and
the area affected that are relevant to the evaluation are as follows:
1 Distress Area of Pavement Affected
Alligator Cracking 17,000 sq. yds.
Distortion 4,000 sq. yds.
{ Block Cracking 18,000 sq. yds.
r A portion of the alligator cracking and block cracking is formed by very
D narrow to hairline cracks. Although these are hard to see, they will become
a more dominant in the future and should be considered at this date.
Several of the streets evaluated such as Diamond Drive in the 2nd Addition,
have extensive alligator cracking and patching while showing that the strength
was adequate. This type of condition is common in instances where the truck
traffic has provided continued compaction of the aggregate base and upper
portion of the subgrade while causing cracking of the asphalt surface. The
other streets that have higher deflections with minimal surface distress would
show the same response if subjected to increased volume of truck traffic.
Removal and replacement of the areas with alligator cracking is normally
recommended to avoid maintenance problems in the future caused by the reflec-
tion of those cracks if overlayed or to avoid the development of potholes.
-9-
I EXPECTED PERFORMANCE OF ALTERNATES CONSIDERED
The four alternates considered and their expected life are as follows:
H
I — -10-
Expected Time
to Structured
Alternate Maintenance
1. Crack fill and seal coat 1 year
2. Patch and repair with seal coat 7 - 10 years
3. Patch and repair with overlay 15 - 20 years
4. Overlay 7 - 10 years
The
years of performance before additional maintenance would be required is
described as follows:
1.
One year of performance would be expected for crack fill and seal coat.
There are a number of areas with substantial alligator cracking. Alli-
gator cracks form blocks of bituminous pavement with an average dimension
of 6 inches or less. Crack filling these areas would be very difficult
and do not effectively seal out moisture in these forms of cracking.
The cracks will be present and open the following spring, allowing water
1
to enter the base and subgrade below resulting in further deterioration
of the pavement.
2.
Seven to ten years of performance would be expected for patch and repair
with seal coat. The controlling factors for this alternate are the
existing block and longitudinal cracking that will slowly continue to
deteriorate and eventually require maintenance. The cold joints surround-
ing all the patch and repair areas also will have some localized deterior-
ation requiring future maintenance. However, it is expected that the
maintenance requirements would not be very extensive.
3.
Fifteen to twenty years would be expected from a patch and repair and,--
nd --overlay.
overlay.This alternate would provide service equivalent to what would
be expected from a new pavement. Weathering and spring will be the
dominant factors controlling the length of service expected.
4.
Seven to ten years would be expected from an overlay. The predominant
factor that would limit the serviceable life of the overlay is the exist-
ing alligator cracking. The cracking will reflect through the overlay
in five to seven years and will become a maintenance item several years
after.
H
I — -10-
In addition to the four alternates, the City requested that the economic
and practical feasibility of fabrics be considered in lieu of patch and
repair prior to an overlay. Several brands of the fabrics have been in-
stalled at various locations in Minnesota on an experimental basis and
are being monitored by Mn/DOT. There has been no evidence in Minnesota
to date, that the presence of these fabrics improve the performance of
the pavement. The reported successes have been further south in milder
climates. The installed price of a fabric at this time is equivalent
to a 1, inch Mn/DOT Spec. 2331 overlay. Based on present performance
of fabrics in Minnesota, we do not recommend they be used. For future
reference, a small experimental installation may be justified. If such
an installation would be made, inform Mn/DOT, Office of Research and Engi-
neering Development, which is presently observing the performance of various
fabric applications.
I COST OF ALTERNATES
The unit costs applicable to the various alternates were obtained from
9 various paving contractors in the area and from recent bids. The costs
are listed in Table 4 and the alternate costs in Table 5.
TABLE 4. Unit Costs
I
1
Seal Coat••• Sq. Yd. 47.90 48.90 51.51 49.7¢
• See enclosed specification or use the Bloomington 2341 modified specification.
•• Based on milling 2.6" and replacing with 2331. Use of separate bid items for
removal and replacement is suggested.
•" Costs based on the sweeping to be provided by the City. Sweeping will add
7 to 8 cents per square yard to the cost.
(a) The lower price may be possible by ripping and loading with a 2332 replacement.
TABLE 5. Estimate of Costs by Alternate
Expected Life/
Alternate
Initial Cost
Annual Cost
Quotes
from Contractors
1/$43,000
Patch and Repair with Seal Coat
Item
Unit
A
B C
0
(Average) Overlay
Overlay - lis" 2341
Sq. Yd.
$2.00
$2.00 $4.30
51.65
Overlay (includes an additional
Overlay - 3/4" 2331 mod.*
Remove and Replace"
Sq. Yd.
Sq. Yd.
51.05
51.25 --
51.00
and a part of Jasper)
$183,000
15/512,200
$2.00(a)-5.00
$4.50
54.00
lay and 100: 3/4" overlay)
5132,000
10/513,200
E
F G
H
I
1
Seal Coat••• Sq. Yd. 47.90 48.90 51.51 49.7¢
• See enclosed specification or use the Bloomington 2341 modified specification.
•• Based on milling 2.6" and replacing with 2331. Use of separate bid items for
removal and replacement is suggested.
•" Costs based on the sweeping to be provided by the City. Sweeping will add
7 to 8 cents per square yard to the cost.
(a) The lower price may be possible by ripping and loading with a 2332 replacement.
TABLE 5. Estimate of Costs by Alternate
Expected Life/
Alternate
Initial Cost
Annual Cost
Crack Fill and Seal Coat
$ 43,000
1/$43,000
Patch and Repair with Seal Coat
$109,000
7/515,570
Patch and Repair with 1-3/4"
(Average) Overlay
$266,000
20/$13,300.
Patch and Repair with 3/4"
Overlay (includes an additional
I-1/2" overlay on Garnet, Zircon
and a part of Jasper)
$183,000
15/512,200
Overlay (based on 30; 1-I/2" over-
lay and 100: 3/4" overlay)
5132,000
10/513,200
The annual costs are based on the initial cost divided by the expected years
of service. Factors such as interest rates, salvage value, etc. were not -
considered
-12-
k
SPECIFICATIONS
FOR
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
PROJECT NO. 342
FOR
EAG^ MINNESOTA
1982
BonedAm FILE No. 49229
/(ode w,, 1qmda4" 9 lqddocfa�ed, Yme.
(?s""d4--vq -0.q�
St pa"4 m4mmda&
June 7, 1982
Honorable Mayor S Council
City of Eagan
3795 Pilot Knob Road
Eagan, Mn. 55122
Re: Cedar Grove No. 1 S No. 2
Bituminous Overlay
Project 342
Our File No. 49229
Dear Mayor and Council:
Transmitted herewith is our report for Cedar Grove No. 1 and No. 2, Bituminous
Overlay.
This report discusses existing street conditions within Cedar Grove No. 1 and
No. 2 and presents cost estimates for street rehabilitation.
We will be pleased to meet with the Council, and other interested parties, at
a mutually convenient time to discuss this report.
Yours very truly,
BONESTR00, ROSENE, ANDERLIK 6 ASSOCIATES, INC.
Mark A. Hanson
MAH:li
I hereby certify that this report was prepared
by me or under my direct supervision and that
I am a duly Registered Professional Engineer
under the laws of the State of Minnesota.
Mark A. Hanson
Date: June 7, 1982 Reg. No. 14260
Approved by:
Thomas A. Colbert
Director of Public Works
Date:
0021b
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
SCOPE: This report evaluate existing streets included within Cedar Grove No.
1 and No. 2 and presents improvement considerations in conjunction with their
estimated cost and proposed assessments.
Also included for consideration is construction of concrete curb and gut-
ter in conjunction with a bituminous overlay.
FEASIBILITY AND RECOMMENDATIONS: This project is feasible and is in accor-
dance with requirements for street construction for the City of Eagan. The
project as outlined herein can be carried out as one contract.
Information pertaining to traffic volume, in-place cross section, measured
deflections of the existing pavement, and required granular equivalencies are
presented in a report prepared by Midwest Pavement Management, Inc. titled
"Evaluation of the Pavements in Cedar Grove No. 1 and No. 2."
DISCUSSION: Streets included within Cedar Grove No. 1 and No. 2 have provided
approximately 20 years of service which for the most part is considered to be
the normal life of a bituminous pavement. The existing street condition dic-
tates that it is not cost effective from a maintenance standpoint to apply a
seal coat application at this time. This report proposes to construct a 1-1/2
inch 2341 bituminous overlay for all streets included within Cedar Grove No. 1
and No. 2.
A bituminous overlay must be constructed on stable bituminous surface if
the overlay is to provide an estimated 15 year service life. If an on-going
seal coat program is maintained, the service life could be extended even fur-
ther. Many streets within Cedar Grove No. 1 and No. 2 have deteriorated to a
Page 1.
0021b
point where extensive patching and other considerations must be given prior to
constructing a bituminous overlay.
Streets were therefore, classified into three categories for restoration
purposes. Each category is summarized herein and also shown on each figure
located at the back of this report. Also shown are critical driveways which
additional work will be required to privide proper grade and drainage.
RANDOM CRACKING: These are areas where the existing pavement has experienced
longitudinal and transverse cracking. These cracks are primarily due to the
expansion and contraction of the pavement because of temperature change and
also the age of the existing pavement. The pavement for the most part is
structurally adequate however a bituminous overlay is warranted due to surface
wear and the degradation of the initial pavement properties.
It is recommended in these areas cracks be blown clean and a crack sealer
of emulsified asphalt be applied prior to the bituminous overlay.
MAP CRACKING: These are areas where the existing pavement is ,dl Bib experienc-
ing transverse and longitudinal crack in w ,t "4 are confined
U& smaller areas. The structural strength of the pavement is deteriorating at
a quicker rate, however, it is not cost effective at this time to remove the
existing pavement and patch.
Two alternatives for treatment of this type of cracking are presented
herein which from a cost standpoint are equal. One alternative is to apply
additional thickness of bituminous mixture during the overlay process. How-
ever, due to marginal driveway grades additional work will be required.
Z
rr,o� }O w.e 1441 OveY10.(
The other alternative is to apply a fabric material which isrfairly newlto
JQ
*te uaavk,et-in the northern states. Communities which have utilized fabric ma-
terial on residential streets have been impressed with its performance to
Page 2.
0021b
date. The Minnesota Department of Transportation has utilized the fabric ma-
terial on highways and have not experienced near the success. However, it is
felt due to higher traffic volumes and speeds the fabric material does not
perform nearly as well as on low volume and low speed streets. It is recom-
mended the fabric material be utilized for this project.
MULTIPLE AND ERODED CRACKING: These are areas where the existing pavement has
}o d af'Yfe wLere it' k4s fest a+, St'r✓c+wrd( litre" -4 %*f 6;Nfy q,.,
deterioratedAsu* -'9hPnN the only cost-effective approach from a maintenance
standpoint is to remove the existing pavement. It is therefore recommended in
these areas the remaining pavement be removed and a 2 inch bituminous base
course be constructed prior to the bituminous overlay.
CONCRETE CURB AND GUTTER
Curbing within Cedar Grove No. 1 and No. 2 consists of bituminous curb
which is providing its primary function of containing drainage and traffic and
providing a separation between street and yard. With the proposed bituminous
overlay as outlined herein construction for concrete curb and gutter should be
considered. This construction would involve removal of the existing bitumi-
nous curb and constructing a B618 concrete curb and gutter. Restoration of
boulevard and driveways will be required.
AREA TO BE INCLUDED: The area to be included would be platted lots within
Cedar Grove No. 1, No. 2, and No. 4 as indicated in the preliminary assessment
roll located at the back of this report.
COST ESTIMATES: Detailed cost estimate for bituminous overlay and bituminous
overlay with concrete curb and gutter are presented in the Appendices located
at the back of this report. These costs are summarized as follows:
Page 3.
0021b
Bituminous Overlay $419,400
Bituminous Overlay with Concrete Curb b Gutter $945,590
The total estimated costs presented above include contingencies and all
related overhead. Overhead costs are estimated at 27% and include legal, en-
gineering, administration and bond interest.
ASSESSMENT: Assessments are proposed to be levied against the benefitted
property. A preliminary assessment roll is included at the back of this re-
port. Assessment rates are presented at various percentages of the total
estimated cost per lot. �2 remaining costs will be financed from
Fov- r„p1pase9,
the major street fund for the City of Eagan. 4Cost percentages ase.u�
100%, 50%, or 25% of the total estimated cost per lot c rC
�rese�4�-d ;or wart
w&kk, & assessed`to the benefited property.
based on
REVENUE SOURCES: Revenue sources to cover the cost of this project "Masi"&
each percentage of the assessable rate as presented in the preliminary assess -
o -re
ment roll da as follows:
A. BITUMINOUS OVERLAY
100% Assessable Rate
Street
Street Assessment
Major Street Fund
Project Cost
$419,400
$419,400
Page 4.
0021b
Revenue Balance
$419,400
- 0 -
$419,400 - 0 -
Project Cost Revenue Balance
50% Assessable Rate
Street $419,400
Street Assessment
Major Street Fund
$419,400
25% Assessable Rate
Street $419,400
Street Assessment
Major Street Fund
$419,400
B. BITUMINOUS OVERLAY WITH CONCRETE CURB & GUTTER
100% Assessable Rate
Street
Street Assessment
Major Street Fund
$209,700
209,700
$419,400
$104,850
314,550
$419,400
Project Cost Revenue
$945,590
$945,590
50% Assessable Rate (Bituminous Overlay Only)
Street $945,590
Street Assessment
Major Street Fund
$945,590
Page 5.
0021b
$945,590
- 0 -
$945,590
$735,890
209,700
$945,590
CK1r'
Balance
hdaw�
SCHEDULE
Present Feasibility Report
Public Hearing
Approve Plans 6 Specifications
Open Bid
Award Contract
Construction Completion
Assessment Hearing
First Payment Due with Real Estate Taxes
Page 6.
0021b
Project Cost
Revenue
Balance
25% Assessable Rate (Bituminous
Overlay Only)
Street
$945,590
Street Assessment
$631,040
Major Street Fund
314,550
$945,590
$945,590
- 0 -
The contribution from Major
Street Fund are the
same for both bituminous
overlay and bituminous overlay
with concrete curb and gutter at the 50% and
25% of the assessable rate. It
is assumed all costs
associated
with concrete
curb and gutter construction will be assessed completely to
the benefited
property.
SCHEDULE
Present Feasibility Report
Public Hearing
Approve Plans 6 Specifications
Open Bid
Award Contract
Construction Completion
Assessment Hearing
First Payment Due with Real Estate Taxes
Page 6.
0021b
S
APPENDIX A
COST ESTIMATE
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
PROJECT 342
A) BITUMINOUS OVERLAY
15,000
Sq.yds.
Remove bituminous pavement @ $1.20/sq.yd.
$ 18,000
95
Each
Adjust manhole frame @ $150.00/each
14,250
55
Each
Adjust gate valve boxes @ $70.00/each
3,850
1,900
Ton
2331 Bituminous mixture for patching @ $32.00/ton
60,800
27,000
Sq.yds.
Fabric material in place @ $1.00/sq.yd.
27,000
8,200
Ton
2341 Bituminous wear course @ $11.00/ton
90,200
430
Ton
Bituminous material for mixture @ $180.00/ton
77,400
5,000
Gals.
Bituminous material for tack coat @ $1.20/gal.
6,000
85
Each
Driveway restoration @ $200.00/each
17,000
Total Construction
$314,500
+5% Contingency
15,730
0021b
$330,230
+27% Legal, Engrng., Admin. & Bond Interest 89,170
TOTAL BITUMINOUS OVERLAY ......................... $419,400
Page 7.
I
B) BITUMINOUS OVERLAY WITH CONCRETE CURB b GUTTER
15,000
Sq.yds.
Remove bituminous pavement @ $1.20/sq.yd.
$ 18,000
95
Each
Adjust manhole frame @ $150.00/each
14,250
55
Each
Adjust gate valve boxes @ $70.00/each
3,850
2,900
Ton
2331 Bituminous mixture for patching @ $32.00/ton
92,800
27,000
Sq.yds.
Fabric material in place @ $1.00/sq.yd.
27,000
5,000
Gals.
Bituminous material for tack coat @ $1.20/gal.
6,000
8,200
Ton
2341 Bituminous wear course @ $11.00/ton
90,200
430
Ton
Bituminous material for mixture @ $180.00/ton
77,400
47,200
Lin.ft.
Removing existing bituminous curb @ $0.50/lin.ft.
23,600
47,200
Lin.ft.
B618 concrete curb b gutter @ $4.50/lin.ft.
212,400
430
Each
Driveway restoration @ $200.00/each
86,000
32,000
Sq.yds.
Sodding with 3" topsoil @ $1.80/Sq.yd.
57,600
Total Construction
$709,100
+5% Contingency
_ 35,460
$744,560
+27%
Legal, Engrng., Admin. b
Bond Interest
201,030
TOTAL
BITUMINOUS OVERLAY WITH
CONCRETE CURB ......
$945,590
Page 8.
0021b
APPENDIX B
PRELIMINARY ASSESSMENT ROLL
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
PROJECT 342
A. BITUMINOUS OVERLAY
Cedar Grove No. 1
Block 1, Lots 4-11
Block 2, Lots 13-34
Block 3, Lots 1-19
Block 4, Lots 1-9
Block 5, Lots 1-32
Block 6, Lots 1-20
Block 7, Lots 1-18
Block 8, Lots 1-5
Block 9, Lots 7-19
Block 10, Lots 1-24
Block 11, Lots 1-11
Cedar Pond Park; Lot 10, Block 4
Cedar Grove No. 2
Block 1, Lots 7-30
Block 2, Lots 1-27
Block 3, Lots 1-19
Block 4, Lots 14-27
Block 5, Lots 1-36
Block 6, Lots 1-17
Block 7, Lots 1-52
Block 8, Lots 1-18
0021b
Total Cost
No: of Lots
Per Block
Cost/Lot
8
$ 7,803
$975
22
21,458
975
19
18,532
975
9
8,778
975
32
31,211
975
20
19,507
975
18
17,556
975
5
4,877
975
13
12,680
975
24
23,408
975
11
10,729
975
8
7,803
975
24
$ 23,408
975
27
26,333
975
19
18,532
975
14
13,655
975
36
35,113
975
17
16,581
975
52
50,718
975
18
17,556
975
Page 9.
Cedar Grove No. 4
Block 1, Lots 16-17
Block 3, Lots 7-15
Block 4, Lots 20-39
Block 6, Lots 17, 18, 19
TOTAL ......................
Total Cost
No. of Lots
Per Block
Cost/Lot
2
$ 1,951
$975
9
8,778
975
20
19,507
975
3
2,926
975
430
$419,400
a3
ASSESSED COST
Presented herein are assessed costs per lot for various percentages of the
estimated cost per lot assuming the City's Major Street Fund would absorb the
additional cost. Costs per lot per year and per month assume the assessed
cost would be spread evenly for a 10 year period. The interest rate for bond-
ing purposes is assumed to be 10%.
lyi3f'_y/'T"
Cost/Lot
100% Assessable Rate $975.00
50% Assessable Rate 487.50
25% Assessable Rate 243.75
Page 10.
0021b
C o s r1L ° r/yER2
st/L
ont
$1 2
. 1
3.3
�eST�'ar�M°MrN
w�.
/Syr
I
;=
8 or
8„
y vs
a3
.223
B. BITUMINOUS OVERLAY WITH CONCRETE CURB & GUTTER
Cedar Grove No. 1
Cedar Grove No. 2
No. of Lots
Block
1,
Lots 4-11
8
Block
2,
Lots 13-34
22
Block
3,
Lots 1-19
19
Block
4,
Lots 1-9
9
Block
5,
Lots 1-32
32
Block
6,
Lots 1-20
20
Block
7,
Lots 1-18
18
Block
8,
Lots 1-5
5
Block
9,
Lots 7-19
13
Block
10,
Lots 1-24
24
Block
11,
Lots 1-11
11
Cedar
Pond Park; Lot 10, Block 4
8
Cedar Grove No. 2
Cedar Grove No. 4
Block 1, Lots 16-17 2
Block 3, Lots 7-15 9
Block 4, Lots 20-39 20
Block 6, Lots 17, 18, 19 3
TOTAL ...................... 430
Page 11.
0021b
Total Cost
Per Block
$ 17,592
48,379
41,782
19,791
70,369
43,981
39,583
10,995
28,588
52,777
24,190
17,592
Total Cost
Per Block
$ 52,777
59,374
41,782
30,787
79,166
37,384
114,350
39,583
$ 4,398
19,791
43,982
6,597
$945,590
Cost/Lot
$2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
Cost/Lot
$2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
$2,199
2,199
2,199
2,199
No. of Lots
Block
1,
Lots
7-30
24
Block
2,
Lots
1-27
27
Block
3,
Lots
1-19
19
Block
4,
Lots
14-27
14
Block
5,
Lots
1-36
36
Block
6,
Lots
1-17
17
Block
7,
Lots
1-52
52
Block
8,
Lots
1-18
18
Cedar Grove No. 4
Block 1, Lots 16-17 2
Block 3, Lots 7-15 9
Block 4, Lots 20-39 20
Block 6, Lots 17, 18, 19 3
TOTAL ...................... 430
Page 11.
0021b
Total Cost
Per Block
$ 17,592
48,379
41,782
19,791
70,369
43,981
39,583
10,995
28,588
52,777
24,190
17,592
Total Cost
Per Block
$ 52,777
59,374
41,782
30,787
79,166
37,384
114,350
39,583
$ 4,398
19,791
43,982
6,597
$945,590
Cost/Lot
$2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
Cost/Lot
$2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
$2,199
2,199
2,199
2,199
.( I
ASSESSED COST
Presented herein are assessed costs per lot for various percentages of the
estimated cost per lot assuming the City's Major Street Fund would absorb the
additional cost. Costs per lot per year and per month assume the assessed
cost would be spread evenly for a 10 year period. The interest rate for bond-
ing purposes is assumed to be 10%. The cost/lot for 50% and 25% of the
assessable rate assume all costs associated with concrete curb and gutter con-
struction will be assessed entirely to the benefited property.
100% Assessable Rate
50% Assessable Rate
25% Assessable Rate
0021b
FYf YY,W4
Cost/Lot
$2,199
1,711
1,467
Page 12.
�r yr
Y39
3 V,?'o /88 ar
a93W li�/a7
Cost/Lot
/Month
X9.8
2 0
.8
l OS71OT /INOIV .d
Ii
/
73GS/-
36
;toia
2853
/S
ay vs /3 vs
I 1 10
LA
V;2:
2 P 0!
1 0 ES
34 9
2 le
33 D: :v:..;: 32
12
3 1 13
32 Z 4 31 14
m I I : ;
4 15 16
3111 tu 3 20 3
Is
30 4
x17
29
7
TO 28
a 12
279 10
lz
24 23 22 zl zo 11 14 to
2
CEDAR GROVE No. 1"'`
';:'`
i5y
8 LOT
!
EOUrVALENT
RANDOM CRACKING
4
--j
17
F MAP CRACKING
5
16
or>gA
CEDAR
POND
0
MULTIPLE AND
6
PARK
. .
ERODED CRACKING
15
7
. . . . . . . . .
17
A CRITICAL DRIVEWAY
14
IB
Rl?
FILE No. 49229
EAGAN, MINNESOTA
13
9
16
NNESTROO, ROSENE, AKDERILIK & ASSOC, INC.
C. S A. H.
Ab.
30
CONSM" arimns -T--)
r
1wrm
ALE: I"= 20t
19
or>gA
0
23
12
. .
5
. . . . . . . . .
17
IB
Rl?
9•
16
10
9 lo.
7
Z
CO
w
A
3
1
B
.
10 I
1wrm
ALE: I"= 20t
1 `[ �:' is
i' [i' '!.
_ k ,' J ��
.... _ t( ...„ It
1
1
MIMO TO: HONORABLE MAYOR & CITY COUNCILMEMBERS
FROM: CITY ADMINISTRATOR HEDGES
DATE: JUNE 4, 1982
SUBJECT: INFORMATIONAL
MTC Letters
Enclosed are copies of two letters which were sent to the MTC,
one pertaining to the Cedarvale Shopping Center park & ride site,
and the second letter requesting information as to why an MTC
express route was not designated from St. Paul to the Zoological
Gardens.
I.R. Bond Letter
Also enclosed is a copy of a letter that was prepared for Repre-
sentative Frenzel in response to his request for a position from
the City Council on (1) proposing a minimum tax on municipal bonds,
and (2) restrictive guidelines on industrial revenue bonds.
Journalism Intern
Lisa Flemming, who resides on Diffley Road and has resided in the
City of Eagan all of her life, was selected by the History Committee
to fulfill the internship created by the City Council during the
summer months. The purpose of the internship is to complete the
history document for the City of Eagan as well as prepare that
document. for publication and distribution as a part of the library
dedication late this fall. Lisa has written articles for the Eagan
Chronicle, has just completed her degree from the College of St.
Thomas in journalism, and was agreeable to commit her time through
early fall to the Eagan history project. She will be compensated
at $4.25 an hour which is the bottom of the range for interns,
the internship range is $4.25 - $5.00 per hour depending upon their
experience and level of education completed.
Household and Population Projection Update for the City of Eagan
Enclosed is a copy of a Household and Population Projection Update
for the City of Eagan that was prepared by the Planning Department.
It was startling to me to see the present population projection
of 25,107 as of May 14, 1982. I believe the City Council will
find this report extremely interesting. The report is to be used
as a part of Jack Boarman's work, Tim Erkilla's work and other
projects that are ongoing with the City of Eagan.
June 15, 1982 City Council Tentative Agenda
Enclosed for your information is a rough draft copy of the June
15, 1982 City Council agenda.
_
ityACmInistrator
SEA SLOMOUIST
MAYOR
THOMAS ELAN
CITY. OF EAGAN
JAMES A. SMITH
JERRY THOMAS
THEODORE WACHTER
L%_1P39S PILOT RNOS ROAD -'
COUNCIL MEMBERS
V.("P.01 80X.]1199
!,� 'EAGAN, MINNESOTA'
June 3, 1982
— PHONE 454-8100
LAWRENCE R SCHUMI
CIVIL ENGINEER•
METROPOLITAN TRANSIT
COMMISSION
801 AMERICAN CENTER
BLDG
150 E KELLOGG BLVD
ST PAUL MN 55101
Re: MTC Park & Ride Site/Bus Shelter Propc
Dear Mr. Schumi:
THOMAS HEDGES
CITY ADMINISTRATOR
EUGENE VAN OVERSEKE
CITY CLERK
acent to Cedarvale
In official action that was taken by the Eagan City Council at a regular
meeting held on Tuesday, June 1, 1982, the recommendation of a special
task force, the Cedarvale Transportation Advisory Committee, to request
a park and ride site/bus shelter to be located adjacent to the Cedarvale
Shopping Center in the City of Eagan was approved.
This task force, appointed by our Mayor, Bea Blomquist, was formed late
last summer to investigate the overall transportation needs for the Cedarvale
Shopping Center area which includes some 100 businesses. A study was
made of trunk highways and local streets as well as MTC bus service.
A meeting was held in this office on December 18, 1981 at which time you
were present representing the MTC along with representatives of MnDOT
to discuss the possibility of park and ride facilities in that general area.
It was agreed at that meeting that both representatives of the MTC and
MnDOT would study a number of alternatives to enhance traffic flow and
bus service for the area. These studies were completed and a presentation
was made by Mr. Dick Elasky of MnDOT at the most recent Cedarvale Area
Transportation Committee meeting held on May 19, 1982. At that meeting,
seven (%) proposals concerning park and ride sites were given consideration.
The proposal that was accepted by both the ad hoc committee and City Coun-
cil was proposal number seven which provides- a connection from the Cedar -
vale Shopping Center parking lot between Robert's Drug and Mid America
National Bank to old highway 13 and also a park and ride site immediately
west and adjacent to the Cedarvale Shopping Center parking lot and
described as south of said connection.
It is the understanding of the City of Eagan that the total cost for this
park and ride site to the MTC is approximately $22,000 and that it would
accommodate seventy plus cars per day. The City of Eagan is responsive
to the proposal and therefore is encouraging the MTC to proceed with plans
and specifications for the development of a park and ride site at that
location as soon as possible.
THE LONE OAK TREE ... THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY.
City of
Eagan/Park &
Ride Site
June 3,
1982
Page Two
If you
want more
specific
questions regarding
the use
City of
Eagan once
the turn
contact
this office at
any time.
Sincerely,
rwwoo lf.
Thomas L. Hedge
City Administrator
information regarding the site and/or have
of public right of way to be owned by the
back from MnDOT is completed, feel free to
TLH/hnd
cc: Mayor Bea Blomquist
Cedarvale Area Transportation Committee
Dick Elasky, Assistant District 9 Engineer
Tom Colbert, Director of Public Works
BEA BLOMOUIST
MAYOR
THOMASEGAN
JAMES A. SMITH
JERRY THOMAS
THEODORE WACHTER
COUNCIL MEMBERS
June 3, 1982
JOHN FARRELL
ASST GENERAL MANAGER
TRANSPORTATION
METROPOLITAN TRANSIT
3118 NICOLLET
MINNEAPOLIS MN 5540E
CITY OF EAGAN
MS PILOT KNOB ROAD
P.O. BOK 41199
EAGAN,MINNESOTA '
SS1:]
PHONE 454-8100
COMMISSION
THOMASHEDGES
CITY AOMINISTRATUR
EUGENEVAN OVERBEKE
C1 TY CLERK
Re: Route #57 Service Between Downtown Minneapolis & Minnesota Zoological
Garden
Dear Mr. Farrell:
The City of Eagan is very pleased with action that was taken by the MTC
to establish Route #57 which is an express bus service between downtown
Minneapolis and the Minnesota Zoological Gardens. I was a guest last
Thursday, May 27, 1982, at a function you sponsored in downtown Minne-
apolis announcing the new bus route service. At the City Council meeting
which was held on June 1, 1982, a question was raised by a member of
our City Council as to why an express bus service does not exist between
the City of St. Paul and Minnesota Zoological Gardens similar to that offered
to downtown Minneapolis.
I would like for you to comment on this question to satisfy our curiosity
as to whether such a service is under consideration and, if not, why an
express service has not been considered from that city to the zoological
gardens.
Thank you for your time and we will await a response from your office.
Sincerely,
Bea Blomquist
Mayor
THE LONE OAK TREE ... THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY.
BEA BLOMOUIST
MAYOR
THOMAS ELAN
CITY OF EAGAN
JAMES A. SMITH
on two
JERRY THOMAS
important issues
THEODORE WACHTER
1195 PILOT KNOB ROAD
COUNCIL MEMBERS
P.O. BOK 91199
issue is a minimum
' EAGAN, MINNESOTA
interest and the
5919] .
issue
PHONE 451-8100
June 3, 1982
place
THE HONORABLE BILL FRENZEL'
THE UNITED STATES HOUSE OF REPRE`§iTATIVES
1026 LONGWORTH OFFICE BLDG
WASHINGTON DC 20515
Re: Proposed Congressional Action
THOMASHEDGES
CITY ADMINISTRATOR
EUGENE VAN OVERBEKE
CITY CLERK
Bond Interest to be
auDlect to a minimum fax & Restrictive Use of Industrial & Commercial
Dear Representative Frenzel:
Our City Council
is grateful for your letter
requesting input
on two
very
important issues
affecting economic growth in
our community.
The
first
issue is a minimum
tax on municipal bond
interest and the
second
issue
is the apparent
movement by the United States Congress to
place
heavy
restrictions on the issuance of industrial and
commercial development
bonds
by municipalities.
At our last regular City Council meeting which was held on June 1, 1982,
it was the unanimous position of my fellow City Councilmembers and myself
that municipal bond interest should not be subject to a minimum tax. It
is becoming difficult, in the present economy, to sell municipal bonds at
a favorable interest rate due to the other types of tax incentives that are
available to sophisticated investors. A minimum tax placed on municipal
bond interest could create a problem for our municipality as well as others
to attract competitive bidding, thus receiving higher interest rates for future
municipal bond sales. The City of Eagan is a growth community and has
been extremely active in the municipal bond market. The offerings have
ranged from tax exempt mortgage financing to revenue bonds and assessment
bonds. The ability to sell these bonds at a favorable rate compared with
the current prime rate and other sources of financing is one limited means
of continuing growth and prosperity in our community. Therefore, we appre-
ciate your support in making efforts to defeat a minimum tax which is under
consideration for municipal bond interest.
The City of Eagan has maintained a thorough and sophisticated approach
to the consideration and issuance of industrial revenue bonds in recent
years. During 1979, our City Council deliberated for many meetings on
the development of a policy and criteria document for the consideration
and issuance of industrial development revenue mortgages and bonds. This
policy statement was adopted by the City Council in December of 1979 and
has been used as the guideline to applicants since that date. Our City
Council has received a number of applications in the past three to four
THE LONE OAK TREE ... THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY.
City of Eagan/Representative Bill Frenzel
June 3, 1982
Page Two
years, many of which have been processed and approved, helping to stimu-
late growth and development within the community. The City Council has
also denied industrial development revenue mortgages that were not viewed
to be in the best interest of the City, mainly as related to the comprehen-
sive guide plan. The City Council is extremely conscientious about the
public hearing process, reviewing in considerable detail financial positions
of the applicants, how the particular application relates to the comprehen-
sive guide plan as well as many other public policy issues that vary on
each application. Our City Council is thorough and sensitive to the types
of projects that should be approved under this method of financing. The
Eagan City Council is supportive that guidelines should be placed on the
issuance of industrial and commercial development bonds that curb the worst
"abuses", however, not at the expense of discouraging the consideration
of viable projects. A city council is best suited to determine whether a
specific application for either industrial or commercial financing should
be considered for that specific community. An office building, bowling
alley or shopping center may be extremely important to one community,
and under present economic conditions, the difference as to whether that
commercial use is allowed to develop or not may be whether commercial
revenue financing is granted. There has been some discussion by repre-
sentatives in the United States Congress that commercial revenue financing
be terminated and that only a tax exempt status be offered by a munici-
pality for industrial uses. This approach is not feasible, realising that
many cities do not have the type of industry that is classified as "manu-
facturing" and, therefore, both industrial and commercial development
revenue mortgages should be considered to allow further expansion and
development of worldheadquarters, warehousing, shopping centers, medical
buildings and other types of business activities that help to develop our
communities.
In summary, we are hopeful that legislation will not be adopted that
restricts the issuance of industrial or commercial revenue bonds in our
community due to a few cities which have "abused" the intent of industrial
and commercial revenue bond financing. I would be more than happy to
provide additional information regarding either of the above issues if it
is helpful for legislation you wish to introduce or support. Please contact
our City Administrator, Mr. Tom Hedges, or me at any time. Again, 1
thank you for notifying our City and allowing our City Council to provide
input into the decision making process.
Sincerely,
Bea Blomquist
Mayor
�Q
13
SPECIAL CITY COUNCIL MEETING
JUNE 21, 1982
6:00 P.M..
1. Firefighers' Pension Plan
2. Project 342 "Cedar Grove 1st & 2nd Addition -
Street Reconstruction"
3. Water Treatment Schedule
4. Other Business
5. Adjournment
MEMO TO: HONORABLE MAYOR & CITY COUNCILMEMBERS
FROM: CITY ADMINISTRATOR HEDGES
DATE: JUNE 18, 1982
SUBJECT: SPECIAL CITY COUNCIL MEETING
A special City Council meeting is scheduled for 6:00 p.m., Monday,
June 21, 1982, at the Eagan City Hall. Originally, the special
City Council meeting was scheduled for 7:00 p.m.; however, due
to a conflict with the Volunteer Firefighters, the meeting was
moved up to 6:00 p.m. The Volunteer Firefighters have their regular
Monday night training and a general meeting scheduled at 8:00 p.m.,
and, therefore, it was necessary to move the time schedule for
the meeting from 7:00 to 6:00 p.m.
Enclosed is a copy of the agenda for the special City Council
meeting which has been properly posted.
Firefighters' Pension Plan
Enclosed is a copy of the memorandum to the Finance Committee that
was copied to the City Council approximately two weeks ago that
outlines the various alternatives discussed at a special City Coun-
cil meeting on June 8, 1982. It was the consensus of the City
Council that the IRA, alternative #4, be presented to the Pension
Committee of the Relief Association. Enclosed is a copy of an
excerpt from the League of Minnesota Cities magazine, October,
1981 issue, that addresses the use of IRA accounts for volunteer
ambulance and fire fighers. It is very likely that legislation
will be required in order to work out at transition from a defined
benefit program to an IRA account if selected by the firefighters
and City Council and due to the special intricacies of working
out the required legislation, the City Administrator will await
a consensus before proceeding with a proposed IRA Retirement plan.
There are a number of memorandums and support data regarding pre-
vious discussions to change from a defined benefit program to a
defined contribution or other type of program. There are also
some fact findings from Roger Katzenmaier, Gus Welter and the City
Administrator. The City Council has received this information
in the past. If any member would desire any or all of this informa-
tion copied as resource data, please contact the City Administra-
tor's office.
Agenda Information Memo
June 18, 1982
Page Two
The City Administrator suggested at the last City Council meeting
that the Director of Public Works and City Administrator have time
to address issues that pertain to public works that are under con-
sideration by the City Council. Two (2) specific items were placed
on the agenda, one of which is Project 342, the Cedar Grove 1st
and 2nd Addition Street Construction, and secondly a water treatment
schedule to consider a water treatment plant revised study, survey
and public hearing. Other items to discuss are seal coating, county
road construction and any other items that the City Council may
have questions about.
Project #342
Enclosed is a memorandum and considerable information as it pertains
to a report on the proposed Project #342 Cedar Grove 1st & 2nd
Addition street reconstruction. This information has been prepared
and/or coordinated by the Director of Public Works.
Water Treatment Schedule
The Director of Public Works and City Administrator would like
to discuss the proposed time schedule for reconsideration of the
water treatment plant, the progress of the feasibility report,
a proposed survey to be considered as a City wide newsletter and
time for a public hearing. There is no support information to
send out with this scheduled item. The discussion is basically
proposed as strategy planning with the City Council.
Informative
Mayor Blomquist, City Councilmember Egan and City Administrator
Hedges all attended the League of Minnesota Cities meeting held
in Rochester this week. Mayor Blomquist and City Administrator
Hedges were in attendance on June 16 and 17 and City Councilmember
Egan was present on June 17 and 18. The conference was well
attended by elected and appointed officials from the State of Minne-
sota and both Mayor Blomquist and I were members of the Planning
Conference Committee and received positive input about the quality
of the conference which I believe benefited persons who were in
attendance. The City of Eagan was well represented at the various
sessions. The Director of Finance and Building Inspector were
also present for one day sessions to hear seminars that affect
their respective positions.
OZ �-Yl.
City Administrator
MEMO TO: FINANCE COMMITTEE MEMBERS JIM SMITH & TOM EGAN
FROM: CITY ADMINISTRATOR HEDGES
DATE: MAY 26, 1982
SUBJECT: VOLUNTEER FIREMEN'S RELIEF ASSOCIATION RETIREMENT PLAN
Background
The City Council received a memorandum from the City Administrator pro-
viding a brief history of discussions that have taken place between the
City Council and Volunteer Firemen's Relief Association regarding an increase
or change in the association retirement plan. Also submitted for review
by the City Council on March 23, 1982 was a memorandum prepared by Roger
Katzenmaier addressing an independent study that he performed with Gus
Welter that examined the conversion of the association's retirement program
from a defined benefit plan to a defined contribution plan. The City Council
received the reports and asked the Finance Committee to meet with Mr. Kat-
zenmaier to review the lengthy memorandum. The meeting was scheduled
and held on Tuesday, April 6, 1982. There was a great deal of discussion
by the Finance Committee and Mr. Katzenmaier at that meeting, and as
a result, the Finance Committee desired additional time to study the facts
and prepare a recommendation for the City Council. A follow-up meeting
was held on May 26, 1982 at which time several options were again discussed
and a recommendation considered for review by the City Council at a special
meeting.
Recommendation
The Finance Committee, in studying the information prepared by Mr. Katzen-
maier, in addition to data supplied during the past several months, feels
that there are four (4) options available regarding the Volunteer Firemen's
Association Retirement Program. Those options are as follows:
1. Continue with the defined benefit program.
2. Convert to a defined contribution proposal as previously presented
- by the City Council.
3. Provide a combination of the above two options by requiring a lump
sum benefit only.
4. Convert the existing program to an IRA which allows for cash pay-
ment to each volunteer fireman upon completing one year as a volun-
teer fire fighter and each year thereafter.
The Finance Committee feels a conversion to an IRA plan is a viable and
suitable option to be considered by the City Council.
Retirement Plan
May 26, 1982
Page Two
Action
The City Council has agreed in recent months that the Finance Committee
would be used to provide fact finding; however, the entire City Council
would present and discuss a position as it relates to any change or increase
in the retirement plan for the Volunteer Firemen's Relief Association. it
is therefore the recommendation of the Finance Committee that the City Coun—
cil hold a special City Council meeting and discuss their position. Once
an option is agreed upon, it will then be presented to the pension committee
for further consideration.
ity Administrator
961
STANLEY PESKAR
EDITOR'S:NOTE: The -questions below are
typical of the thousands of Inquiries the
League receives each year. For more
comprehensive treatment of questions,'thel
Information service of the league Is
always available to municipal officials.
PERSONNEL—RETIREMENT
Does the new federal tax law solve
the problem of what to do about a
retirement program for ambulance
and other volunteers?
Apparently yes. Though the state
legislature has not had an opportuni-
ty to conform state tax laws to the
federal laws, it is highly probable it
will do so in the next session.
Whether the state acts or not,
"volunteers" and other city
employees, regardless of whether or
not they have another pension plan,
may annually put up to $2,000 into
an independent retirement account
(IRA), free of federal taxes.'
14
Thus, cities can now determine
how much to pay ambulance or
firefighter= volunteers, make a direct
payment to the volunteer, and let
him or her decide whether to take
the money as current compensation
or put it in an IRA for retirement pur-
poses.
Money placed in IRAs is not tax-
able in the year in which it is receiv-
ed. Therefore, the entire amount can
be invested and can earn a yield up
to the date of retirement. When the
volunteer retires, the payments are
taxable, but presumably the recipient
is in a lower tax bracket at that time
because of lower income and in-
creased exemptions or deductions or
a combination of all three.
The IRA has several advantages for
the volunteer over participation in a
more conventional retirement plan
such as a local relief association.
Since there is no vesting period,
assets are not lost by failure to serve a
minimum period. (Ten years is
typical in most other plans.) Thus,
there is full portability from one com-
munity and job to another. Further,
since the IRA belongs to the
volunteer, it is not subject to
manipulation through benefit for-
mula changes by a board of trustees
or the legislature. Consequently, the
volunteer need not commit valuable
time out of a busy schedule to par-
ticipation in governance of a relief
association. He or she need only
select an IRA plan and determine
THEIN WELL CO., Inc.
Complete Well & Pump Service Since 1893
24 Hr. a Well Drilling a T.V. Well Inspection
Well &Pump . Well Repair s Electric Logging
Service
e Pump Repair a Pump Sales
Clara City, MN .................... 612-847-3207
Spicer, MN.......................612-796-2111
Rochester, MN...................507-288.5554
each year the level of participation
which is appropriate.
The IRA assets are a reserve of cash
available to the volunteer in certain
emergencies before retirement. The
IRA thus provides a ready-made sur-
vivor, disability, and burial benefit to
the extent of funds in the account.
Should volunteers need additional
disability or survivor benefits, these
can be purchased individually or by
the city as part of the compensation
package from an insurance com-
pany.
The IRA also permits selection of a
money manager with an investment
strategy or policy which suits the in-
dividual economic or social goals of
the volunteer rather than the objec-
tives of the relief association trustees
or state legislators. Finally, the use of
current compensation (with
volunteer option to purchase an IRA)
to the volunteer ambulance or fire
service permits city officials (mayor
and clerk) to avoid responsibility for
managing a local relief association,
for preparing, reviewing, and filing
complex financial reports, and for
hassling with an organization which
can be a major political force in the
community.
The new federal law offers a less
complicated way to attract, retain,
and provide security for a citizen
resource which cities may increasing-
ly need to rely upon to provide ser-
vices in these times of contraction of
financial resources.
Footnotes
Those coordinated employees covered by
PERA would be subject to Social Security taxes
and PERA deductions on their IRA contribu-
tion, but it is unlikely that any volunteers
would be paid the minimum $325 per month
required for participation in the coordinated
PERA-Social Security program. Thus, no
federal deductions would be made.
' If the city has a local volunteer fire relief
association, all of the 2% state fire aid must go
to the relief association. If no local relief
association exists, the 2% aid may be used for
equipment, supplies, and buildings, and the
city could put a comparable amount from
other sources into current compensation
which could then be used by individual
firefighters for IRAs. IRAs could also be used to
xgtplcnwnt u>isting relief ts.ociation benefits_
MINNESOTA CITIES
seeks to implement a substantial
governmental interest, directly ad-
vances that interest, and reaches no
further than necessary to accomplish
the given objective.
Though it ruled that the ordinance
was valid in regard to the regulation
of commercial speech, the plurality
held that the ordinance was un-
constitutional in its treatment of non-
commercial speech. Although the or-
dinance included a broad exception.
for on-site commercial billboards, it
permitted no similar exceptions for
non-commercial speech. Justice
White noted that the Supreme
Court's recent free speech cases
have consistently accorded non-
commercial speech a greater degree
of protection than commercial
speech. The city's ordinance effec-
tively inverted this judgment, affor-
ding a greater degree of protection to
commercial than to non-commercial
speech. justice White stated that
although a city may distinguish bet-
ween the relative value of different
categories of commercial speech, it
does not have the same range of
choice in the area of non-
commercial speech to evaluate the
strength of, or distinguish between,
various communicative interests. The
Court held that because some non-
commercial messages could have
been conveyed on billboards
throughout commercial and in-
dustrial zones, the city must similarly
allow billboards conveying other
non-commercial messages in those
zones. The plurality specifically
stated that it was not deciding
whether a total prohibition of out-
door advertising would be consistent
with the First Amendment.
Two justices, concurring in the
judgment but not joining the opin-
ion, stated their belief that this case
in effect presented the total ban
question. The effect of the or-
dinance, they said, was to ban
billboards completely. Their analysis
would allow a city to impose such a
total ban only if it shows that a suffi-
Fast, efficient
and repair of ,%
Bergerson-Caswell is well equipped, not
only for well drilling, but maintenance, too. If
you have a reduced flow from an aging
pump, or if you are starting to pump sand or
other foreign materials, call us for an
analysis of repairs. We can put new life into
existing wells, quickly and economically.
Call (612) 47&3121
Bergerson-Caswell, Inc.
5115 Industrial Street•Maple Plain, MN 55359
ciently substantial governmental in-
terest is furthered by the ban, and
that a more narrowly drawn restric-
tion would not suffice.
The three dissenting justices all
recognized the probable effects of
this holding. The decision arguably
leaves a city wishing to respond to
the hazards posed by billboards a
choice between two equally un-
satisfactory alternatives. One alter-
native is to ban all signs of any kind.
The second is to restrict commercial
signs, but to permit all non-
commercial signs no matter how
numerous, large, damaging to the
environment, or dangerous to
motorists and pedestrians. Con-
fronted with these alternatives, it is
likely that most cities will do nothing.
Cities contemplating action regard-
ing billboards should examine this
decision in determining the scope of
their authority. Metromedia, Inc. v.
City of San Diego (49 L.W. 4925, U.S.
Sup. Ct., 1981).
October 1981 13
TO: HONORABLE MAYOR AND CITY COUNCIIMEMBERS, C/O THOMAS L. HEDGES, CITY
ADMINISTRATOR
FRIM: THOMAS A. COLBERT, DIRECTOR OF PUBLIC WORKS
DATE: JUNE 18, 1982
• o r• n•F 11111F�u •• • •� a r •
In the early fall of 1980, the City Council directed staff to analyze the
streets in the Cedar Grove Additions to evaluate their needs and maintenance
requirements in order to maintain these streets to try to lengthen their ser-
vice life before major reconstruction and replacement became necessary. Sub-
sequently, the staff performed an experimental repair on West Marble Lane
through the intersections of North and South Diamond Drive. The south half
of Marble Lane was reconstructed after removing the deteriorated and fractur-
ed existing bituminous surfacing. A 2" overlay was then placed over this
section of Marine Lane to analyze the difference between removal and replace-
ment prior to an overlay and the effects of just overlaying the existing bit-
uminous. This "test" section has now gone through two winter/spring cycles.
The results indicate that the south half of Marble Lane that was reconstruct-
ed has experienced appmxi+mtely 80% less of reflective cracking through the
2" bituminous overlay. On the north half of Marble Lane, random cracking has
,eared which is a direct reflection of the random cracking that existed
prior to the bituminous overlay. Subsequently, this random cracking will di-
minish the expected additional life that could be provided by this corrective
overlay.
In the summer of 1981, the staff contracted with Midwest Pavement Management
Inc. to perform a detailed analysis of the streets in the Cedar Grove lst and
2nd Addition. Their analysis consisted of traffic counts, traffic distribu-
tion analysis, test core samples, and computerized pavement deflection eval-
uation to determine the existing pavement stability. A copy of that report
is attached for the Council's information. They were asked to evaluate 5
different possible alternatives as recommended by City staff. Their analysis
was then computed and converted to an "expected life/annual cost" relation-
ship as indicated on Page 12 of that report.
During 1981, the City had Professional Services Group Inc. televise the san-
itary sewer lines in the Cedar Grove 1st Addition to try to determine any
potential corrective work that may be required. This closed circuit tele-
vision investigation of the sanitary sewer indicated several areas that need
corrective work due to settlement of pipes, misalignment of pipes, fractured
pipes, protruding services, and extensive root infiltration which will great-
ly increase the potential of sanitary sewer back ups. In addition, during
the spring of 1982, the Public Works Utility Maintenance section performed
an analysis of all sanitary sewer and storm sewer manhole castings and found
that approximately 60% of these are in immediate need of reconstruction and
repair due to deterioration. Based on the results of the televising of the
1st Addition, the staff then contracted during the spring of 1982 with Mid-
west TV Inc. to televise the sewer lines in the 2nd Addition to try and de-
termine if similar corrective work was necessary. The results of this work
Project 342
June 18, 1982
Page two
are not yet immediately available but are anticipated within the next three
weeks.
Subsequent to this pre -investigation work performed by staff, the results of
this information were forwarded to the City's Consulting Engineering film of
Honestroo, Rosene, Anderlik and Associates, Inc. for the preparation of a
feasibility report to estimate the costs of repair and the resulting potential
assessments associated with this work in the let and 2nd Additions. Copies of
this feasibility report are also being forwarded to the Council for their re-
view. Please keep in mind that this feasibility report is in a preliminary
draft stage and is subject to revision after discussion between staff and Coun-
cil.
There are several concerns that have not been specifically addressed in the
feasibility report that staff would like to bring to the Council's attention
to receive further direction on before additional work is performed. These
are summarized as follows:
1. Possible replacement of deteriorated blacktop curbing with concrete curb
and gutter.
2. Required corrective construction to existing sanitary sewer and stone
sewers.
3. Reconstruction of deteriorated manhole casting supports and catch basin
structures.' .
4. Elimination vs. restoration of service drives (Nicols Road and County Road
30) .
5. Assessments against corner lots where only side streets are reconstructed/
upgraded.
6. Potential need of increasing the structural strength of minor "collector"
streets with potential sidewalks/pathways/striped walking lanes due to
the closure of Cedar Elementary School and the potential of increased
busing and/or increased pedestrian traffic through the 2nd Addition to
Rahn Elementary School.
7. Revenue sources: assessments vs. major street trunk fund
8. Consideration of additional stone sewer facilities in certain areas to
increase drainage capabilities.
M. . «y is k, 0 %Ko)
The existing bituminous curbing has been in place for 20+ years and is show-
ing signs of deterioration resulting from extensive weathering, snowplow main-
tenance, etc. With the placement of a proposed 2" bituminous overlay of the
existing surface, these subdivisions will experience decreased curb heights
Project 342
June 18, 1982
Page three
which will decrease the capabilities of confining drainage from major storms
within the street area and will require extensive driveway approach recon-
struction. If the streets were reconstructed with concrete curb and gutter,
it would increase the drainage capabilities and minimize damage resulting
from major storms and would greatly extend the life of the streets in these
subdivisions. However, there is greater cost associated with this improve-
ment as compared to.a repair and maintenance of the existing street surfac-
ing.
REPAIR OF EXISTING SANITARY AND STORM SEWERS
I will be available to discuss in further detail the condition of the exist-
ing sanitary and storm sewers in these Additions at the meeting to be held
between staff and Council to discuss this proposed project. The results of
the first internal televising report indicate that there are several areas
that need reconstruction. This work should be performed prior to any repair
work to the surface to minimize the potential of construction patching in
the future.
An inspection by the Utility Maintenance section indicates that the great
majority of manhole castings for sanitary and storm sewers within these Addi-
tions were placed without adequate grouting and/or support rings. subsequent-
ly, these supports are deteriorated which results in infiltration around these
structures which will create the potential of extensive future patching to
correct these situations in the future.
�iuuuU�Ci'���la��:�i � •: •� .
With the completion of the Cedar Avenue freeway, Nicols Road (County Road 23)
is anticipated to be turned back from the County to the City. The traffic
volumes on this section of road have greatly decreased since the opening of
the Cedar Avenue freeway. Subsequently, where it was once considered a major
arterial, it will be reclassified to a City collector status. Subsequently,
there is a question as to whether the frontage roads along Nicols Road will
be necessary in the future. If not, should extensive reconstruction be per-
formed to these severely deteriorated frontage roads or should they be elimina-
ted and the dollars spent in providing direct driveway connections to existin(*
Nicols Road and returning this frontage area to open space front yard for the
adjacent structures? Presently, there are several houses located north of
Cedar Elementary School which take direct access onto Nicols Road and several
which take direct access by way of a severely deteriorated frontage road. The
staff would recommend that these services drives be eliminated and reconverted
to front yard space with direct driveway connections being made to Nicols Road.
[w•7:4�i. MGM :r.Y.7�-�7uia •ry
Should assessments be spread on a per lot basis equitably throughout the Addi-
tion or should assessments be based on the front food method with corner lots
receiving a greater assessment due to their increased frontage? In addition,
should corner lots that have frontage on streets not to be repaired be assess-
ed for the improvement of the streets adjacent to their side yard areas?
Project 342
June 18, 1982
Page four
With the recent closure of Cedar Elementary School, students in the 1st and
3rd Additions will be transferred to Rahn Elementary School south of the 4th
Addition. Recently, there has been discussion as to whether the students on
the north side of County Road 30 will be bused to Rahn Elementary. If so,
should an internal "collector" street be designated through the 2nd and 4th
Addition for this bus traffic? If so, that designated street should be up-
graded to handle the anticipated heavy traffic loads associated with school
buses. If the busing alternative is not realized, there will be increased
pedestrian traffic through the 2nd and 4th Addition to Rahn Elementary School.
If this is the case, should tyre be consideration given to again designating
a "collector" street in either upgrading this designated street to a wider
width to provide on -street designated walking lanes or should a separate de-
tached sidewalk/pathway be constructed for this anticipated increased pedes-
trian traffic?
Since these streets were constructed in the late 50's and early 60's, they
have been in service for approximately 20+ years. This is the average life
expectancy of a bituminous roadway. In addition, the design standards that
they were constructed to,provide for apprcximately 50% less structural strength
than present day standards. As such, what consideration should be given towards
assessments of benefited properties for not only maintaining these streets but
upgrading then to the structural strength necessary to handle the normal traf-
fic loads associated with residential streets? While a detailed status analy-
sis of the City's major street trunk fund is not yet conplete, preliminary in-
dications are that due to recent major street construction projects (Pilot
Knob Road, Wescott Read, Galaxie Avenue) and required future collector street
construction requirements (Blackhawk Road, County Road 30, etc.), there are
limited construction funds available to undertake a project where a major
anticipated revenue is anticipated to be provided through this fund. In addi-
tion, consideration should be given to potential precedence relating to this
assessment policy and its impact on future needs for other Cedar Grove Addi-
tions (3rd and 4th, etc.) .
ADDITIONAL STORM SEWER CONSTRUCTIM
There are certain area in these two Additions that presently either do not
have adequate storm sewer facilities or the catch basin structures that are
existing are below minimum inlet capacities for the normal 5 -year storm fre-
quency designs. In addition, several of the catch basin grates are of the
old design that have the inlet slats parallel to the curbing which present
a hazard to bicycle traffic. Consideration should be given to potential re-
placement of these castings, upgrading of existing storm sewer facilities
and/or installation of additional storm sewer systems at critical areas.
Project 342
Jame 18, 1982
Page five
As can be seen by several of these areas of concern, the anticipated im-
provement in the Cedar Grove 1st and 2nd Additions enccnipasses more than
just routine maintenance and repair of the existing bituminous surfacing.
I don't believe that routine normal maintenance procedures through the
years could have eliminated or minimized any of these concerns. nue maj-
ority of these concerns relate to the problems associated with streets
that are reaching the end of their original anticipated life expectancy.
Subsequently, staff would appreciate the opportunity to discuss in depth
these concerns with the City Council to receive a defined direction as to
has these problems should be approached.
I will welcane the opportunity to respond to any questions and discuss this
project in further detail with the City Council at their convenience.
spectfull
Resutani.ti�,
Thamas A. Colbert, P.E.
Director of Public Works
TAC/jach
cc - Bill Branch, Superintendent of Streets and Equipment
Joe Connolly, Assistant Superintendent of Utilities
-i
EVALUATION-OFTHE PAVEMENTS
in
CEDAR GROVE NIO. I AND'2,
'for
CITY OF EAGAN
July 1981
QPM in;,.
MIDWEST PAVEMENT MANAGEMENT, IANC.
PAVEMENT MANAGEMENT'CONSULTANTS
Sude 636.155-00 Wayzata Boulevard, Wayzata. Mmta, 1 55 1 3 - 9V .16121.475-9957
Commission Nc-. 0180014-6
SUMMARY
The evaluation of the pavements in Cedar Grove No. 1 and 2 in the City of
Eagan (Figure 1) was conducted to determine what pavement work needs to be
done and what the estimated costs would be.
The evaluation consisted of the following:
• Pavement strength determination with the Road Rater
• A surface condition survey
• Pavement thickness determination
• Heavy Commercial traffic volumes
• Analysis and cost estimates
• Recommendations
RECOMMENDATIONS
The following recommendations are based on lowest cost per year of serviceable
life before structural pavement repairs would be expected.
1. Remove and replace the alligatored and distorted areas. This
represents 19,000 square yards of pavement or 20" of the area.
The estimated unit cost of $4.00 per square yard is based on
removal by milling at $1.50 per square yard and replacement
with 2331 at $2.50 per square yard. It is recommended that
the removal and replacement items be bid separately and that
Mn/DOT Spec. 2332 be available as an alternate for the replace-
ment material which may lower the unit cost for this portion of
the work.
2. Apply a 1z" overlay to Garnet Lane and Drive, Zircon Lane and
that portion of Jasper Drive west of Sandstone Lane. Again
2332 should be allowed as an alternate material for this portion.
3. Overlay the entire area with 3/4" of 2331 modified or Bloomington
2341 modified. This is expected to give 15 to 20 years of service-
able pavement life before structural maintenance would be required,
resulting in the lowest overall per year cost. It is also expected
that the frequency of seal coating would be much lower for the 2331
modified or the Bloomington 2341 modified.
The estimated costs for this work on Cedar Grove No. 1 and 2 would be
5183,000.00 for 86,000 square yards of residential street.
-3-
FIGURE 1
LOCATION OF CEDAR GROVE NO. 1 AND 2
-4-
INTRODUCTION
The City of Egan requested that Midwest Pavement Management, Inc. evaluate
the pavements in Cedar Grove No. 1 and 2 and provide the City with maintenance
recommendations and corresponding cost estimates.
The City does not have information regarding the design and construction of
the pavements in Cedar Grove No. 1 and 2. The pavements have provided approx-
imately 20 years of service and a general improvement is necessary at the time
7 to protect the existing investment and to minimize future pavement failures
and maintenance costs.
Several alternate improvement designs are considered to determine which would
be most beneficial in terms of cost and expected life. The alternates
considered are as follows:
1. Crack filling with seal coat application (single or double)
g2. Patch and repair with seal coat application
3. Patch and repair with bituminous overlay (determine minimum
thickness)
4. Overlay only with recommended bituminous thickness
Also, the economic and practical feasibility of including a filter fabric in
specified locations in lieu of patch and repair prior to overlay was considered.
-5-
THICKNESS OF EXISTING PAVEMENT
To determine the thickness of the existing pavement, eight locations were
sampled by drilling a small (1 inch) hole into the pavement and measuring
the thickness. The bituminous thickness (listed in Table 1) average is
2.56 inches with a coefficient of variation of 19 percent. The aggregate
base averaged 3 inches at the locations sampled, resulting in an average
Granular Equivalent thickness of 8 inches.
(, rsv )
Presr„t �es, fo, f,./ Slrret Ovsp.. stn„�1era� �N4.9 dare
8 Xu.'ACe
12, �6rdx✓/aeEfV'V:/rntae--
f'.- ff-ru vr< i Itr—y +X f21 -
vs 8C�.E e-As6ny =7 sa% Aei,c,eaej
TABLE 1. Measurements of the bituminous layer thickness in Cedar Grove ,, o; ,F,.rs/.leky,,
No. 1 and 2
Bituminous
Point No.
Thickness
Street
(Addn)
1
3.0”
Diamond
(1st)
2
2-3/4"
Opal
(1st)
3
2-1/2"
Zircon
(1st)
4
3"
Diamond
(2nd)
5
311
Sandstone
(2nd)
6
2-1/2"
Amber
(2nd)
7
1-3/4"
Jasper
(2nd)
8
2"
Jasper
(2nd)
Average = 2.56 inches
Standard deviation = 0.48 inch
-6-
l
I
I
TRAFFIC
The streets evaluated are functionally classified as residential. The
volume of traffic for residential streets is normally under 400 vehicles
per day. Of this traffic, only the Heavy Commercial traffic need be con-
sidered for pavement thickness design purposes. The predominant Heavy
Commercial vehicles that travel these streets are garbage trucks, school
buses (Table 2), and City maintenance vehicles. There are between 5 and
7 garbage trucks in Cedar Grove No. 1 and 2 per week. Other Heavy Com-
mercial traffic such as delivery trucks are normally much lighter than
the garbage trucks and school buses. There are no MTC buses on these
residential streets. The accumulation of truck traffic on these streets
results in an approximate Sigma N18 of 30,000 or less over a 20 year period.
This is well within the minimum design section of the Bituminous Pavement
Design Charts in the Mn/DOT Road Design Manual.
TABLE 2. School Bus Routes (All 66-72 passenger) in Cedar Grove No. 1 and 2
��^SSiJ�r .rl [(^n_r 4TfPr `d'�P.� �vf Lu �rC/•.r L�r.i, .0/n: .n'7
1ST ADDITION
Street
Termini
Number of
Routes
Diamond Drive All 1
Garnet Lane Diamond Drive to Topaz Lane 2
Topaz Lane Garnet Lane to Zircon Lane 2
Topaz Lane Co. Rd. 30 to Zircon Lane 1
Zircon Lane All I
2ND ADDITION
Coral Lane
All
2
Diamond Drive
Co. Rd. 30 to
Coral Lane 2
Jasper Drive
Rahn Road to
Sandstone Drive 2
Marble Lane
W. Jct. Diamond
Dr. to Nichols 2
Marble Lane
Sandstone Dr.
to W. Jct. Diamond 2
Dr.
Sandstone Drive
Coral Lane to
Jasper Drive 2
Sandstone Drive
Jasper Drive
to Marble Lane 1
_-7-
THICKNESS DESIGN
IWithin the Mn/DOT Bituminous Pavement Design procedure, the pavement design
is based on the maximum allowable deflection during the spring thaw period.
Table 3 lists the present estimated spring deflection for each of the streets
in Cedar Grove No. 1 and 2. These deflections are calculated from the deflec-
tions measured with the Road Rater using relationships developed by Mn/DOT.
The last column in Table 3 indicates the increase in G.E. recommended to
reduce the deflections to the recommended value. Five of the seven streets
in the 1st Addition indicate a need for an increase in structure while only
three of the nine streets in the 2nd Addition require additional structure.
l
1 TABLE 3. Summary of pavement strength analysis
1 1st ADDITION
0.069
0.070
Diamond Drive
0.061
Measured
Allowable
Additional
0.075
Deflection*
Deflection*
G.E. Required
1
(inches)
(inches)
inches
Diamond Drive
0.079
0.070
2.4
Garnet Lane & Drive
0.096
0.080
4_2
Sapphire Lane
0.067
0.070
Emerald Lane
0.072
0.075
---
Opal Drive
0.092
0.080
3.2
Zircon Lane
0.083
0.070
3.4
Topaz Drive
0.072
0.070
0.6
2ND ADDITION
Marble Lane
0.069
0.070
Diamond Drive
0.061
=__
0.070
Moonstone Drive
0.071
0.075
Amber Drive
0.085
0.080 1.2
Amber Court
0.092
0.085 1_6
Limestone Drive
0.072
0.075
Sandstone Drive
0.075
0.075 ---
Coral Lane
0.075
0.075 ---
Jasper Drive
0.085
0.070 3.9
j The values are expressed as an equivalent Benkelman Beam deflection and
represent the mean plus two standard deviation values.
1 - -8-
SURFACE CONDITION
A surface condition survey of the pavement was conducted to determine the
type and quantity of distress that is present. The type of distress and
the area affected that are relevant to the evaluation are as follows:
Distress Area of Pavement Affected
Alligator Cracking 17,000 sq. yds.
Distortion 4,000 sq. yds.
1 Block Cracking 18,000 sq. yds.
A portion of the alligator cracking and block cracking is formed by very
narrow to hairline cracks. Although these are hard to see, they will become
more dominant in the future and should be considered at this date.
/ Several of the streets evaluated such as Diamond Drive in the 2nd Addition,
have extensive alligator cracking and patching while showing that the strength
was adequate. This type of condition is common in instances where the truck
traffic has provided continued compaction of the aggregate base and upper
portion of the subgrade while causing cracking of the asphalt surface. The
other streets that have higher deflections with minimal surface distress would
show the same response if subjected to increased volume of truck traffic.
1 Removal and replacement of the areas with alligator cracking is normally
recommended to avoid maintenance problems in the future caused by the reflec-
tion of those cracks if overlayed or to avoid the development of potholes.
-9-
EXPECTED PERFORMANCE OF ALTERNATES CONSIDERED
The four alternates considered and their expected life are as follows:
I
D — _10-
Expected Time
to Structured
Alternate Maintenance
1. Crack fill and seal coat 1 year
2. Patch and repair with seal coat 7 - 10 years
3. Patch and repair with overlay 15 - 20 years
4. Overlay 7 - 10 years
The
years of performance before additional maintenance would be required is
described as follows:
1.
One year of performance would be expected for crack fill and seal coat.
There are a number of areas with substantial alligator cracking. Alli-
gator cracks form blocks of bituminous pavement with an average dimension
of 6 inches or less. Crack filling these areas would be very difficult
and do not effectively seal out moisture in these forms of cracking.
The cracks will be present and open the following spring, allowing water
to enter the base and subgrade below resulting in further deterioration
of the pavement.
2.
Seven to ten years of performance would be expected for patch and repair
with seal coat. The controlling factors for this alternate are the
existing block and longitudinal cracking that will slowly continue to
deteriorate and eventually require maintenance. The cold joints surround-
ing all the patch and repair areas also will have some localized deterior-
ation requiring future maintenance. However, it is expected that the
maintenance requirements would not be very extensive.
3.
Fifteen to twenty years would be expected from a patch and repair and .•-
overlay. This alternate would provide service equivalent to what would
be expected from a new pavement. Weathering and spring will be the
dominant factors controlling the length of service expected.
4.
Seven to ten years would be expected from an overlay. The predominant
a
factor that would limit the serviceable life of the overlay is the exist-
ing alligator cracking. The cracking will reflect through the overlay
in five to seven years and will become a maintenance item several years
after.
I
D — _10-
In addition to the four alternates, the City requested that the economic
and practical feasibility of fabrics be considered in lieu of patch and
repair prior to an overlay. Several brands of the fabrics have been in-
stalled at various locations in Minnesota on an experimental basis and
are being monitored by Mn/DOT. There has been no evidence in Minnesota
to date, that the presence of these fabrics improve the performance of
the pavement. The reported successes have been further south in milder
climates. The installed price of a fabric at this time is equivalent
to a 1i inch Mn/DOT Spec. 2331 overlay. Based on present performance
of fabrics in Minnesota, we do not recommend they be used. For future
reference, a small experimental installation may be justified. If such
an installation would be made, inform Mn/DOT, Office of Research and Engi-
neering Development, which is presently observing the performance of various
fabric applications.
I
1 — -11-
I COST OF ALTERNATES
The unit costs applicable to the various alternates were obtained from
various paving contractors in the area and from recent bids. The costs
9s are listed in Table 4 and the alternate costs in Table 5.
8 TABLE 4. Unit Costs
E
E F G H
Seal Coat"- Sq. Yd. 47.94 48.92 51.5f 49.71
' See enclosed specification or use the Bloomington 2341 modified specification.
" Based on milling 2.6" and replacing with 2331. Use of separate bid items for
removal and replacement is suggested.
••• Costs based on the sweeping to be provided by the City. Sweeping will add
7 to 8 cents per square yard to the cost.
(a) The lower price may be possible by ripping and loading with a 2332 replacement.
TABLE S. Estimate of Costs by Alternate
Expected Life/
Alternate
Initial Cost
- Annual Cost
Quotes
from Contractors
1/$43,000
Item
Unit
A
B C D
Overlay - 14" 2341
Sq. Yd.
52.00
$2.00 $4.30 51.65
Patch and Repair with 3/4"
Overlay - 3/4" 2331 mod.*
Sq. Yd.
51.05
51.25 -- 51.00
Remove and Replace"
Sq. Yd.
52.00(a)-5.00
54.50 54.00
E
E F G H
Seal Coat"- Sq. Yd. 47.94 48.92 51.5f 49.71
' See enclosed specification or use the Bloomington 2341 modified specification.
" Based on milling 2.6" and replacing with 2331. Use of separate bid items for
removal and replacement is suggested.
••• Costs based on the sweeping to be provided by the City. Sweeping will add
7 to 8 cents per square yard to the cost.
(a) The lower price may be possible by ripping and loading with a 2332 replacement.
TABLE S. Estimate of Costs by Alternate
Expected Life/
Alternate
Initial Cost
- Annual Cost
Crack Fill and Seal Coat
$ 43,000
1/$43,000
Patch and Repair with Seal Coat
$109,000
7/$15,570
Patch and Repair with 1-3/4"
(Average) Overlay
$266,000
20/$13,300
Patch and Repair with 3/4"
Overlay (includes an additional
1-1/2" overlay on Garnet, Zircon
and a part of Jasper)
$183,000
15/512,200
Overlay (based on 30', 1-I/2" over-
lay and 100'; 3/4" overlay)
$132,000
10/513,200
The annual costs are based on the initial cost divided by the expected years
of service. Factors such as interest rates, salvage value, etc. were not
considered
-12-
k
SPECIFICATIONS
(to"
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
PROJECT NO. 342
FOR
EAG^ MINNESOTA
1982
Sul
FILE No. 49229
/90"OAAWI l?"e-mef lq"44" a Yquocl&�f Ync.
cw""&44q 'Cag4w,"
St PaW4 m4m""&
!I
June 7, 1982
Honorable Mayor b Council
City of Eagan
3795 Pilot Knob Road
Eagan, Mo. 55122
Re: Cedar Grove No. 1 5 No. 2
Bituminous Overlay
Project 342
Our File No. 49229
Dear Mayor and Council:
Transmitted herewith is our report for Cedar Grove No. 1 and No. 2, Bituminous
Overlay.
This report discusses existing street conditions within Cedar Grove No. 1 and
No. 2 and presents cost estimates for street rehabilitation.
We will be pleased to meet with the Council, and other interested parties, at
a mutually convenient time to discuss this report.
Yours very truly,
BONESTR00, ROSENE, ANDERLIK b ASSOCIATES, INC.
Mark A. Hanson
MAH:li
Approved by:
0021b
I hereby certify that this report was prepared
by me or under my direct supervision and that
I am a duly Registered Professional Engineer
under the laws of the State of Minnesota.
A. Hanson
Date: June 7, 1982 Reg. No. 14260
Thomas A. Colbert
Director of Public Works
Date:
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
SCOPE: This report evaluate existing streets included within Cedar Grove No.
1 and No. 2 and presents improvement considerations in conjunction with their
estimated cost and proposed assessments.
Also included for consideration is construction of concrete curb and gut-
ter in conjunction with a bituminous overlay.
FEASIBILITY AND RECOMMENDATIONS: This project is feasible and is in accor-
dance with requirements for street construction for the City of Eagan. The
project as outlined herein can be carried out as one contract.
Information pertaining to traffic volume, in-place cross section, measured
deflections of the existing pavement, and required granular equivalencies are
presented in a report prepared by Midwest Pavement Management, Inc. titled
"Evaluation of the Pavements in Cedar Grove No. 1 and No. 2."
DISCUSSION: Streets included within Cedar Grove No. 1 and No. 2 have provided
approximately 20 years of service which for the most part is considered to be
the normal life of a bituminous pavement. The existing street condition dic-
tates that it is not cost effective from a maintenance standpoint to apply a
seal coat application at this time. This report proposes to construct a 1-1/2
inch 2341 bituminous overlay for all streets included within Cedar Grove No. 1
and No. 2.
A bituminous overlay must be constructed on stable bituminous surface if
the overlay is to provide an estimated 15 year service life. If an on-going
seal coat program is maintained, the service life could be extended even fur-
ther. Many streets within Cedar Grove No. 1 and No. 2 have deteriorated to a
Page 1.
0021b
0
point where extensive patching and other considerations must be given prior to
constructing a bituminous overlay.
Streets were therefore, classified into three categories for restoration
purposes. Each category is summarized herein and also shown on each figure
located at the back of this report. Also shown are critical driveways which
additional work will be required to pr:ivide proper grade and drainage.
RANDOM CRACKING: These are areas where the existing pavement has experienced
longitudinal and transverse cracking. These cracks are primarily due to the
expansion and contraction of the pavement because of temperature change and
also the age of the existing pavement. The pavement for the most part is
structurally adequate however a bituminous overlay is warranted due to surface
wear and the degradation of the initial pavement properties.
It is recommended in these areas cracks be blown clean and a crack sealer
of emulsified asphalt be applied prior to the bituminous overlay.
MAP CRACKING: These are areas where the existing pavement is 419b experienc-
ing transverse and longitudinal cracking WC'. -L` are confined
w smaller areas. The structural strength of the pavement is deteriorating at
a quicker rate, however, it is not cost effective at this time to remove the
existing pavement and patch.
Two alternatives for treatment of this type of cracking are presented
herein which from a cost standpoint are equal. One alternative is to apply
additional thickness of bituminous mixture during the overlay process. How-
ever, due to marginal driveway grades additional work will be required.
fr.or to tC-C 0(2.4Over[u.4
The other alternative is to apply a fabric materials which isvfairly new%to Q
?>..ew.ewt- r«+d.�+-uh teeAl'%+
H4e..savke--in the northern states. Communities which have utilized fabric ma-
terial on residential streets have been impressed with its performance to
Page 2.
0021b
date. The Minnesota Department of Transportation has utilized the fabric ma-
terial on highways and have not experienced near the success. However, it is
felt due to higher traffic volumes and speeds the fabric material does not
perform nearly as well as on low volume and low speed streets. It is recom-
mended the fabric material be utilized for this project.
MULTIPLE AND ERODED CRACKING: These are areas where the existing pavement has
to s Tt4('e wiere & kms lost .+s ftrer.4l: -4 k -A
deterioratedn au e6 the only cost-effective approach from a maintenance
standpoint is to remove the existing pavement. It is therefore recommended in
these areas the \remaining pavement be removed and a 2 inch bituminous base
course be constructed prior to the bituminous overlay.
CONCRETE CURB AND GUTTER
Curbing within Cedar Grove No. 1 and No. 2 consists of bituminous curb
which is providing its primary function of containing drainage and traffic and
providing a separation between street and yard. With the proposed bituminous
overlay as':outlined herein construction for concrete curb and gutter should be
considered. This construction would involve removal of the existing bitumi-
nous curb and constructing a B618 concrete curb and gutter. Restoration of
boulevard and driveways will be required.
AREA TO BE INCLUDED: The area to be included would be platted lots within
Cedar Grove No. 1, No. 2, and No. 4 as indicated in the preliminary assessment
roll located at the back of this report.
COST ESTIMATES: Detailed cost estimate for bituminous overlay and bituminous
overlay with concrete curb and gutter are presented in the Appendices located
at the back of this report. These costs are summarized as follows:
Page 3.
0021b
0
Bituminous Overlay $419,400
Bituminous Overlay with Concrete Curb & Gutter $945,590
The total estimated costs presented above include contingencies and all
related overhead. Overhead costs are estimated at 27% and include legal, en-
gineering, administration and bond interest.
ASSESSMENT: Assessments are proposed to be levied against the benefitted
property. A preliminary assessment roll is included at the back of this re-
port. Assessment rates are presented at various percentages of the total
estimated cost per lot. Of remaining costs will be financed from
For Cayes fs-e r�rroser)
the major street fund for the City of Eagan. Cost percentages aceumedn cam_
of
n /n 100%, 50%, or 25% of the total estimated cost per lot c rC
"4•
1 resd ;ae r,ert
wi4&," assessad<to the benefited property.
bas cd ew
REVENUE SOURCES: Revenue sources to cover the cost of this project 8e1auaing„
each percentage of the assessable rate as presented in the preliminary assess -
o -re
went roll as as follows:
A. BITUMINOUS OVERLAY
100% Assessable Rate
Project Cost Revenue Balance
Street $419,400
Street Assessment $419,400
Major Street Fund - 0 -
$419,400 $419,400 - 0 -
Page 4.
0021b
50% Assessable Rate
Street
Street Assessment
Major Street Fund
25% Assessable Rate
Street
Street Assessment
Major Street Fund
Project Cost Revenue Balance
$419,400
$419,400
$419,400
$419,400
B. BITUMINOUS OVERLAY WITH CONCRETE CURB b GUTTER
100% Assessable Rate
Street
Street Assessment
Major Street Fund
$209,700
209,700
$419,400 - 0 -
$104,850
314,550
$419,400 - 0 -
Project Cost Revenue Balance
$945,590
$945,590
50% Assessable Rate (Bituminous Overlay Onlv)
Street $945,590
Street Assessment
Major Street Fund
$945,590
Page 5.
0021b
$945,590
- 0 -
$945,590 - 0 -
$735,890
209,700
$945,590 - 0 -
Project Cost Revenue Balance
25% Assessable Rate (Bituminous Overlay Only)
Street $945,590
Street Assessment $631,040
Major Street Fund 314,550
$945,590 $945,590 — 0 —
The contribution from Major Street Fund are the same for both bituminous
overlay and bituminous overlay with concrete curb and gutter at the 50% and
25% of the assessable rate. It is assumed all costs associated with concrete
curb and gutter construction will be assessed completely to the benefited
property.
SCHEDULE
Present Feasibility Report
Public Hearing
Approve Plans b Specifications
Open Bid
Award Contract
Construction Completion
Assessment Hearing
First Payment Due with Real Estate Taxes
Page 6.
0021b
APPENDIX A
COST ESTIMATE
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
PROJECT 342
A) BITUMINOUS OVERLAY
15,000
Sq. yds.
Remove bituminous pavement @ $1.20/sq.yd.
$ 18,000
95
Each
Adjust manhole frame @ $150.00/each
14,250
55
Each
Adjust gate valve boxes @ $70.00/each
3,850
1,900
Ton
2331 Bituminous mixture for patching @ $32.00/ton
60,800
27,000
Sq.yds.
Fabric material in place @ $1.00/sq.yd.
27,000
8,200
Ton
2341 Bituminous wear course @ $11.00/ton
90,200
430
Ton
Bituminous material for mixture @ $180.00/ton
77,400
5,000
Gals.
Bituminous material for tack coat @ $1.20/gal.
6,000
85
Each
Driveway restoration @ $200.00/each
17,000
Total Construction
$314,500
+5% Contingency
15,730
$330,230
+27% Legal, Engrng., Admin. & Bond Interest 89,170
TOTAL BITUMINOUS OVERLAY ......................... $419,400
Page 7.
0021b
B) BITUMINOUS OVERLAY WITH CONCRETE CURB & GUTTER
15,000
Sq.yds.
Remove bituminous pavement @ $1.20/sq.yd.
$ 18,000
95
Each
Adjust manhole frame @ $150.00/each
14,250
55
Each
Adjust gate valve boxes @ $70.00/each
3,850
2,900
Ton
2331 Bituminous mixture for patching @ $32.00/ton
92,800
27,000
Sq.yds.
Fabric material in place @ $1.00/sq.yd.
27,000
5,000
Gals.
Bituminous material for tack coat @ $1.20/gal.
6,000
8,200
Ton
2341 Bituminous wear course @ $11.00/ton
90,200
430
Ton
Bituminous material for mixture @ $180.00/ton
77,400
47,200
Lin.ft.
Removing existing bituminous curb @ $0.50/lin.ft.
23,600
47,200
Lin.ft.
B618 concrete curb & gutter @ $4.50/lin.ft.
212,400
430
Each
Driveway restoration @ $200.00/each
86,000
32,000
Sq.yds.
Sodding with 3" topsoil @ $1.80/Sq.yd.
57,600
Total Construction
$709,100
+5% Contingency
35,460
$744,560
+27% Legal, Engrng., Admin. & Bond Interest 201,030
TOTAL BITUMINOUS OVERLAY WITH CONCRETE CURB ...... $945,590
Page 8.
0021b
APPENDIX B
PRELIMINARY ASSESSMENT ROLL
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
PROJECT 342
A. BITUMINOUS OVERLAY
Cedar Grove No. 1
Block 1, Lots 4-11
Block 2, Lots 13-34
Block 3, Lots 1-19
Block 4, Lots 1-9
Block 5, Lots 1-32
Block 6, Lots 1-20
Block 7, Lots 1-18
Block 8, Lots 1-5
Block 9, Lots 7-19
Block 10, Lots 1-24
Block 11, Lots 1-11
Cedar Pond Park; Lot 10, Block 4
Cedar Grove No. 2
Block 1, Lots 7-30
Block 2, Lots 1-27
Block 3, Lots 1-19
Block 4, Lots 14-27
Block 5, Lots 1-36
Block 6, Lots 1-17
Block 7, Lots 1-52
Block 8, Lots 1-18
0021b
Total Cost
No. of Lots
Per Block
Cost/Lot
8
$ 7,803
$975
22
21,458
975
19
18,532
975
9
8,778
975
32
31,211
975
20
19,507
975
18
17,556
975
5
4,877
975
13
12,680
975
24
23,408
975
11
10,729
975
8
7,803
975
24
$ 23,408
975
27
26•,333
975
19
18,532
975
14
13,655
975
36
35,113
975
17
16,581
975
52
50,718
975
18
17,556
975
Page 9.
Cedar Grove No. 4
Block 1, Lots 16-17
Block 3, Lots 7-15
Block 4, Lots 20-39
Block 6, Lots 17, 18, 19
TOTAL .......................
Total Cost
No. of Lots
Per Block
Cost/Lot
2
$ 1,951
$975
9
8,778
975
20
19,507
975
3
2,926
975
430
$419,400
e3
9 -
ASSESSED COST
Presented herein are assessed costs per lot for various percentages of the
estimated cost per lot assuming the City's Major Street Fund would absorb the
additional cost. Costs per lot per year and per month assume the assessed
cost would be spread evenly for a 10 year period. The interest rate for bond-
ing purposes is assumed to be 10%.
100% Assessable Rate
50% Assessable Rate
25% Assessable Rate
SUMMARY
Cost/Lot
$975.00
487.50
243.75
Page 10.
0021b
Cnsr/tor/yBA2
Is yr
106
/4s O°
/07.2s-
775=
S-3 c3
q8 11
z&,'Ll
/Lcft
ont
$1 2
. 1
3.3
�oST� nr�anavru
/ S/-
�0 ��
S.x
yr7
e3
9 -
z23
a
B. BITUMINOUS OVERLAY WITH CONCRETE CURB b GUTTER
Cedar Grove No. 1
Cedar Grove No. 2
Total Cost
No. of Lots
Per Block
Cost/Lot
Block
1,
Lots
4-11
8
$ 17,592
$2,199
Block
2,
Lots
13-34
22
48,379
2,199
Block
3,
Lots
1-19
19
41,782
2,199
Block
4,
Lots
1-9
9
19,791
2,199
Block
5,
Lots
1-32
32
70,369
2,199
Block
6,
Lots
1-20
20
43,981
2,199
Block
7,
Lots
1-18
18
39,583
2,199
Block
8,
Lots
1-5
5
10,995
2,199
Block
9,
Lots
7-19
13
28,588
2,199
Block
10,
Lots
1-24
24
52,777
2,199
Block
11,
Lots
1-11
11
24,190
2,199
Cedar
Pond Park; Lot 10, Block 4
8
17,592
2,199
Cedar Grove No. 2
Total Cost
No. of Lots
Per Block
Cost/Lot
Block
1,
Lots
7-30
24
$ 52,777
$2,199
Block
2,
Lots
1-27
27
59,374
2,199
Block
3,
Lots
1-19
19
41,782
2,199
Block
4,
Lots
14-27
14
30,787
2,199
Block
5,
Lots
1-36
36
79,166
2,199
Block
6,
Lots
1-17
17.
37,384
2,199
Block
7,
Lots
1-52
52
114,350
2,199
Block
8,
Lots
1-18
18
39,583
2,199
Cedar
Grove No. 4
Block
1,
Lots
16-17
2
$ 4,398
$2,199
Block
3,
Lots
7-15
9
19,791
2,199
Block
4,
Lots
20-39
20
43,982
2,199
Block
6,
Lots
17, 18, 19
3
6,597
2,199
TOTAL ......................
430
$945,590
Page
11.
0021b
.r . q
ASSESSED COST
Presented herein are assessed costs per lot for various percentages of the
estimated cost per lot assuming the City's Major Street Fund would absorb the
additional cost. Costs per lot per year and per month assume the assessed
cost would be spread evenly for a 10 year period. The interest rate for bond-
ing purposes is assumed to be 10%. The cost/lot for 50% and 25% of the
assessable rate assume all costs associated with concrete curb and gutter con-
struction will be assessed entirely to the benefited property.
SUMMARY
Cost/Lot
100% Assessable Rate $2,199
50% Assessable Rate 1,711
25% Assessable Rate 1,467
Page 12.
0021b
LOST/�
/Sr - yr
tam r
5'39-
s9
310
;t37
F3� /&/ —
Cost/Lot
/Month
ay vs 13 t5
sl �<
]
a (..
II 10
LA E
74 ;9..Y 1 19 'N` •meq\4:`�F?s%ti 9 9
•g.
z l e �:��: =•K'' I I
Q 77 Iz
72 z
31 z 14 10
71 Ill'`
I]
70 4
29 Y. 6 26 13
27 9 10 ] 9 29 :4 09 //I2 I ` 1 2 '�F.''>tey$L.
13
26 24
12 YO 22 a.a'' IY
2 Z` 24 27 22 21 20 I w
10
19 10
CEDAR GROVE NO. Is _ /e LOT 9 2° ] 9
le O "ig, — — J EOUMALENf 1s e ►
RANDOM CRACKING . .� 4 a.
MAP CRACKING n 9 /� it I la 1e 17 12 11 10 9 ► 47
Ifi
CEDAR POND I iG r> Z CO A
O /
® MULTIPLE ANDa a 2
PARK I n;
ERODED CRACKING " }u. ] I\ 7 H •• • -
2 7
a 7 1 f ] a 9 10 11
♦ CRITICAL DRIVEWAY 14 `��' e � .� 1
tt.F _ 4 O ; ..
FILE No. 49229 I7 `'{,', 9 3
EAGAN, MINNESOTA
BONESTROO, AOSENE, ANDENUK K ASSOC, INC. T C S A. H A6. 30
COI10 [9aaEEa
SI. P.I.
I
SI. AI111wwb
Z
Z
N
O
O
ISCALE: 1"=2od
Z
Z
s:.
CEDAR GROVE NO. 2
RANDOM CRACKING
2 Q:PR40SE1
3
14
Is IB
Il IB 9 20
21 92 23 24
0
A E I
MAP CRACKING
4
MULTIPLE AND
5
27
ERODED CRACKING
35
13
51
4
A CRITICAL DRIVEWAY
It
3
-4
3 W
4
O
7
50
3
IS
3
30
,4 33 4
:11
4 R
15
FILE No 49229
9
494
EAGAN, MINNESOTA
9 k
4U5
13
5
32
15
5
17
47
-
14
6
BoNLSTROO, ROWNE, ANDERUX & AS&Wft•
7
CONSULTIN Dann
46
•
a
30
20
s
19
12
4510
29 a
12
S LE-
!
44
19
IS 17 16 15 14 13 A
W432
21
27
22
24
Zt
ZZ
121
26
20
30
19
ze 29 30
24
ID
Q
39
28
a.sp
13
16 17
LQ
12
3710
9
a
7
SPECIAL CITY COUNCIL MEETING
JUNE 21, 1982
6:00 P.M.
1. Firefighers' Pension Plan
2. Project 342 "Cedar Grove 1st & 2nd Addition -
Street Reconstruction"
3. Water Treatment Schedule
4. Other Business
5. Adjournment
MEMO TO: HONORABLE MAYOR & CITY COUNCILMEMBERS
FROM: CITY ADMINISTRATOR HEDGES
DATE: JUNE 18, 1982
SUBJECT: SPECIAL CITY COUNCIL MEETING
A special City Council meeting is scheduled for 6:00 p.m., Monday,
June 21, 1982, at the Eagan City Hall. Originally, the special
City Council meeting was scheduled for 7:00 p.m.; however, due
to a conflict with the Volunteer Firefighters, the meeting was
moved up to 6:00 p.m. The Volunteer Firefighters have their regular
Monday night training and a general meeting scheduled at 8:00 p.m.,
and, therefore, it was necessary to move the time schedule for
the meeting from 7:00 to 6:00 p.m.
Enclosed is a copy of the agenda for the special City Council
meeting which has been properly posted.
Firefighters' Pension Plan
Enclosed is a copy of the memorandum to the Finance Committee that
was copied to the City Council approximately two weeks ago that
outlines the various alternatives discussed at a special City Coun-
cil meeting on June 8, 1982. It was the consensus of the City
Council that the IRA, alternative #4, be presented to the Pension
Committee of the Relief Association. Enclosed is a copy of an
excerpt from the League of Minnesota Cities magazine, October,
1981 issue, that addresses the use of IRA accounts for volunteer
ambulance and fire fighers. It is very likely that legislation
will be required in order to work out at transition from a defined
benefit program to an IRA account if selected by the firefighers
and City Council and due to the special intricacies of working
out the required legislation, the City Administrator will await
a consensus before proceeding with a proposed IRA Retirement plan.
There are a number of memorandums and support data regarding pre-
vious discussions to change from a defined benefit program to a
defined contribution or other type of program. There are also
some fact findings from Roger Katzenmaier, Gus Welter and the City
Administrator. The City Council has received this information
in the past. If any member would desire any or all of this informa-
tion copied as resource data, please contact the City Administra-
tor's office.
Agenda Information Memo
June 18, 1982
Page Two
The City Administrator suggested at the last City Council meeting
that the Director of Public Works and City Administrator have time
to address issues that pertain to public works that are under con-
sideration by the City Council. Two (2) specific items were placed
on the agenda, one of which is Project 342, the Cedar Grove 1st
and 2nd Addition Street Construction, and secondly a water treatment
schedule to consider a water treatment plant revised study, survey
and public hearing. Other items to discuss are seal coating, county
road construction and any other items that the City Council may
have questions about.
Project #342
Enclosed is a memorandum and considerable information as it pertains
to a report on the proposed Project #342 Cedar Grove 1st & 2nd
Addition street reconstruction. This information has been prepared
and/or coordinated by the Director of Public Works.
Water Treatment Schedule
The Director of Public Works and City Administrator would like
to discuss the proposed time schedule for reconsideration of the
water treatment plant, the progress of the feasibility report,
a proposed survey to be considered as a City wide newsletter and
time for a public hearing. There is no support information to
send out with this scheduled item. The discussion is basically
proposed as strategy planning with the City Council.
Informative
Mayor Blomquist, City Councilmember Egan and City Administrator
Hedges all attended the League of Minnesota Cities meeting held
in Rochester this week. Mayor Blomquist and City Administrator
Hedges were in attendance on June 16 and 17 and City Councilmember
Egan was present on June 17 and 18. The conference was well
attended by elected and appointed officials from the State of Minne-
sota and both Mayor Blomquist and I were members of the Planning
Conference Committee and received positive input about the quality
of the conference which I believe benefited persons who were in
attendance. The City of Eagan was well represented at the various
sessions. The Director of Finance and Building Inspector were
also present for one day sessions to hear seminars that affect
their respective positions.
P&Qz �q4l.
City A
C'
d ministrator -
MEMO TO: FINANCE COMMITTEE MEMBERS JIM SMITH & TOM EGAN
FROM: CITY ADMINISTRATOR HEDGES
DATE: MAY 26, 1982
SUBJECT: VOLUNTEER FIREMEN'S RELIEF ASSOCIATION RETIREMENT PLAN
Background
The City Council received a memorandum from the City Administrator pro-
viding a brief history of discussions that have taken place between the
City Council and Volunteer Firemen's Relief Association regarding an increase
or change in the association• retirement plan. Also submitted for review
by the City Council on March 23, 1982 was a memorandum prepared by Roger
Katzenmaier addressing an independent study that he performed with Gus
Welter that examined the conversion of the association's retirement program
from a defined benefit plan to a defined contribution plan. The City Council
received the reports and asked the Finance Committee to meet with Mr. Kat-
zenmaier to review the lengthy memorandum. The meeting was scheduled
and held on Tuesday, April 6, 1982. There was a great deal of discussion
by the Finance Committee and Mr. Katzenmaier at that meeting, and as
a result, the Finance Committee desired additional time to study the facts
and prepare a recommendation for the City Council. A follow-up meeting
was held on May 26, 1982 at which time several options were again discussed
and a recommendation considered for review by the City Council at a special
meeting.
Recommendation
The Finance Committee, in studying the information prepared by Mr. Katzen-
maier, in addition to data supplied during the past several months, feels
that there are four (4) options available regarding the Volunteer Firemen's
Association Retirement Program. Those options are as follows:
I. Continue with the defined benefit program.
2. Convert to a defined contribution proposal as previously presented
by the City Council.
3• Provide a combination of the above two options by requiring a lump
sum benefit only.
4. Convert the existing program to an IRA which allows for cash pay-
ment to each volunteer fireman upon completing one year as a volun-
teer fire fighter and each year thereafter.
The Finance Committee feels a conversion to an IRA plan is a viable and
suitable option to be considered by the City Council.
Retirement Plan
May 26, 1982
Page Two
Action
The City Council has agreed in recent months that the Finance Committee
would be used to provide fact finding; however, the entire City Council
would present and discuss a position as it relates to any change or increase
in the retirement plan for the Volunteer Firemen's Relief Association. It
is therefore the recommendation of the Finance Committee that the City Coun—
cil hold a special City Council meeting and discuss their position. Once
an option is agreed upon, it will then be presented to the pension committee
for further consideration.
CLQ �L4
L-tty Administrator
`61
STANLEY PESKAR
EDITOR'S NOTE: The questions below are
typical of the thousands of Inquiries the
League receives each year. For more
comprehensive treatment of quesdomi, the
information service of the league Is
always available to municipal officials.
PERSONNEL—RETIREMENT
Does the new federal tax law solve
the problem of what to do about a
retirement program for ambulance
and other volunteers?
Apparently yes. Though the state
legislature has not had an opportuni-
ty to conform state tax laws to the
federal laws, it is highly probable it
will do so in the next session.
Whether the state ads or not,
"volunteers" and other city
employees, regardless of whether or
not they have another pension plan,
may annually put up to $2,000 into
an independent retirement account
(IRA), free of federal taxes.'
14
Thus, cities can now determine
how much to pay ambulance or
firefighter' volunteers, make a direct
payment to the volunteer, and let
him or her decide whether to take
the money as current compensation
or put it in an IRA for retirement pur-
poses.
Money placed in IRAs is not tax-
able in the year in which it is receiv-
ed. Therefore, the entire amount can
be invested and can earn a yield up
to the date of retirement. When the
volunteer retires, the payments are
taxable, but presumably the recipient
is in a lower tax bracket at that time
because of lower income and in-
creased exemptions or deductions or
a combination of all three.
The IRA has several advantages for
the volunteer over participation in a
more conventional retirement plan
such as a local relief association.
Since there is no vesting period,
assets are not lost by failure to serve a
minimum period. (Ten years is
typical in most other plans.) Thus,
there is full portability from one com-
munity and job to another. Further,
since the IRA belongs to the
volunteer, it is not subject to
manipulation through benefit for-
mula changes by a board of trustees
or the legislature. Consequently, the
volunteer need not commit valuable
time out of a busy schedule to par-
ticipation itt governance of a relief
association. He or she need only
select an IRA plan and determine
THEIN WELL CO., Inc.
Complete Well & Pump Service Since 1893
24 Hr. a Well Drilling a T.V. Well Inspection
Well rice Pump
Service a Well Repair a Electric Logging
a Pump Repair a Pump Sales
Clara City, MN .................... 612-847-3207
Spicer, MN ....................... 612.796-2111
Rochester, MN...................507.288-5554
each year the level of participation
which is appropriate.
The IRA assets are a reserve of cash
available to the volunteer in certain
emergencies before retirement. The
IRA thus provides a ready-made sur-
vivor, disability, and burial benefit to
the extent of funds in the account.
Should volunteers need additional
disability or survivor benefits, these
can be purchased individually or by
the city as part of the compensation
package from an insurance com-
pany.
The IRA also permits selection of a
money manager with an investment
strategy or policy which suits the in-
dividual economic or social goals of
the volunteer rather than the objec-
tives of the relief association trustees
or state legislators. Finally, the use of
current compensation (with
volunteer option to purchase an IRA)
to the volunteer ambulance or fire
service permits city officials (mayor
and clerk) to avoid responsibility for
managing a local relief association,
for preparing, reviewing, and filing
complex financial reports, and for
hassling with an organization which
can be a major political force in the
community.
The new federal law offers a less
complicated way to attract, retain,
and provide security for a citizen
resource which cities may increasing-
ly need to rely upon to provide ser-
vices in these times of contraction of
financial resources.
Footnotes
Those coordinated employees covered by
PERA would be subject to Social Security taxes
and PERA deductions on their IRA contribu-
tion- but it is unlikely that any volunteers
would be paid the minimum $725 per month
required for participation in the coordinated
PERA-Social Security program. Thus, no
federal deductions would be made.
' If the city has a local volunteer fire relief
association, all of the 2% state fire aid must go
to the relief association. If no local relief
association exists, the 2% aid may be used for
equipment, supplies, and buildings, and the
city could put a comparable amount from
other sources into current compensation
which could then be used by individual
firefighters for IRAs. IRAs could also be used to
supptcmcnl i-v4ing relief association benefits.
MINNESOTA CITIES
TO: HONORABLE MAYOR AND CITY COUNCIINEZ�9BEF6, C/O THOMAS L. HEDGES, CITY
40 1 111111 AT6][r*TI.TFR9
DATE: JUNE 18, 1982
RE: PRO= 342, CEDAR GROVE 1ST AND 2ND ADDITION - STREET RECCNSTRUCTION
In the early fall of 1980, the City Council directed staff to analyze:the
streets in the Cedar Grove Additions to evaluate their needs and maintenance
requirements in order to maintain these streets to try to lengthen their ser-
vice life before major reconstruction and replacamnt became necessary. Sub-
sequently, the staff performed an experimental repair on West Marble Lane
through the intersections of North and South Diamond Drive. The south half
of Marble lane was reconstructed after ramving the deteriorated and fractur-
ed existing bituminous surfacing. A 2" overlay was then placed over this
section of Marble Lane to analyze the difference between removal and replace-
ment prior to an overlay and the effects of just overlaying the existing bit-
uminous. This "test" section has now gone through tiro winter/spring cycles.
The results -indicate that the south half of Marble lane that was reconstruct-
ed has experienced.approximately 80% less of reflective cracking through the
2" bituminous overlay. On the north half of Marble Lane, random cracking has
reappeared which is a direct reflection of the random cracking that existed
prior to the bituminous overlay. Subsequently, this random cracking will di-
minish the expected additional life that could be provided by this corrective
overlay.
In the summer of 1981, the staff contracted with Midwest Pavement Management
Inc. to perform a detailed analysis of the streets in the Cedar Grove lst and
2nd Addition. Their analysis consisted of traffic counts, traffic distribu-
tion analysis, test core samples, and computerized pavement deflection eval-
uation to determine the existing pavement stability. A copy of that report
is attached for the Council's information. They were asked to evaluate 5
different possible alternatives as recommended by City staff. Their analysis
was then computed and converted to an "expected life/annual cost" relation-
ship as indicated on Page 12 of that report.
During 1981, the City had Professional Services Group Inc. televise the san-
itary sewer lines in the Cedar Grove 1st Addition to try to determine any
potential corrective work that may be required. This closed circuit tele-
vision investigation of the sanitary sewer indicated several areas that need
corrective work due to settlement of pipes, misalignment of pipes, fractured
pipes, protruding services, and extensive root infiltration which will great-
ly increase the potential of sanitary sewer back ups. In addition, during
the spring of 1982, the Public Works Utility Maintenance section performed
an analysis of all sanitary sewer and storm sewer manhole castings and found
that approximately 60% of these are in immediate need of reconstruction and
repair due to deterioration. Based on the results of the televising of the
1st Addition, the staff then contracted during the spring of 1982 with Mid-
west TV Inc. to televise the sewer lines in the 2nd Addition to try and de-
tennine if similar corrective work was necessary. The results of this -,vrk
Project 342
Jame 18, 1982
Page two
are not yet immediately available but are anticipated within the next three
weeks.
Subsequent to this pre -investigation work performed by staff, the results of
this information were forwarded to the City's Consulting Engineering firm o£
Bonestroo, Rosene, Anderlik and Associates, Inc. for the preparation of a
feasibility report to estimate the costs of repair and the resulting potential
assessments associated with this work in the 1st and 2nd Additions. Copies of
this feasibility report are also being forwarded to the Council for their re-
view. Please keep in mind that this feasibility report is in a preliminary
draft stage and is subject to revision after discussion between staff and Coun-
cil.
There are several concerns that have not been specifically addressed in the
feasibility report that staff would like to bring to the Council's attention
to receive further direction on before additional work is performed. These
are summarized as follows:
1. Possible replacement of deteriorated blacktop curbing with concrete curb
and gutter.
2. Required corrective construction to existing sanitary sewer and storm
sewers.
3. Reconstruction of deteriorated manhole casting supports and catch basin_
structures.
4. Elimination vs. restoration of service drives (Nicoll Road and County Road
30) .
5. Assessments against corner lots where only side streets are reconstructed/
upgraded.
6. Potential need of increasing the structural strength of minor "collector"
streets with potential sidewalks/pathways/striped walking lanes due to
the closure of Cedar Elementary School and the potential of increased
busing and/or increased pedestrian traffic through the 2nd Addition to
Rahn Elementary School.
7. Revenue sources: assessments vs. major street trunk fund
B. Consideration of additional storm sewer facilities in certain areas to
increase drainage capabilities.
MYLACEMENT CF BITUTINMS CURBING
The existing bituminous curbing has been in place for 20+ years and is show-
ing signs of deterioration resulting from extensive weathering, snowplow main-
tenance, etc. with the placement of a proposed 2" bituminous overlay of the
existing surface, these subdivisions will experience decreased curb heights
Project 342
June 18, 1982
Page three
which will decrease the capabilities of confining drainage from major storms
within the street area and will require extensive driveway approach recon-
struction. If the streets were reconstructed with concrete curb and gutter,
it would increase the drainage capabilities and minimize image resulting
from major storms and would greatly extend the life of the streets in these
subdivisions. However, there is greater cost associated with this improve-
ment as compared to a repair and maintenance of the existing street surfac-
ing.
I: 71•. •: • 7/.• M4 i\IM d. :\i• N:N x.171:
I will be available to discuss in further detail the condition of the exist-
ing sanitary and storm sewers in these Additions at the meeting to be held
between staff and Council to discuss this proposed project. The results of
the first internal televising report indicate that there are several areas
that need reconstruction. This work should be performed prior to any repair
work to the surface to minimize the potential of construction patching in
the future.
An inspection by the Utility Maintenance section indicates that the great
majority of manhole castings for sanitary and storm sewers within these Addi-
tions were placed without adequate grouting and/or support rings. Subsequent-
ly, these supports are deteriorated which results in infiltration around these
structures which will create the potential of extensive future patching to
correct these situations in the future.
171 Iu11Ud Y •i •i 71:d / •1 � : \I .
With the congpletion of the Cedar Avenue freeway, Nicols Road (County Road 23)
is anticipated to be turned back fran the County to the City. The traffic
volumes on this section of road have greatly decreased since the opening of
the Cedar Avenue freeway. Subsequently, where it was once considered a major
arterial, it will be reclassified to a City collector status. Subsequently,
there is a question as to whether the frontage roads along Nicols Road will
be necessary in the future. If not, should extensive reconstruction be per
foamed to these severely deteriorated frontage mads or should they be e]iminI
ted and the dollars spent in providing direct driveway connections to existinc*
Nicols Road and returning this frontage area to open space front yard for the
adjacent structures? Presently, there are several louses located north of
Cedar Elementary School which take direct access onto Nicols Road and several
which take direct access by way of a severely deteriorated frontage road. The
staff would recommend that these services drives be eliminated and reconverted
to front yard space with direct driveway connections being made to Nicols Road.
Should assessments be spread on a per lot basis equitably throughout the Addi-
tion or should assessments be based on the front food method with corner lots
receiving a greater assessment due to their increased frontage? In addition,
should corner lots that have frontage on streets not to be repaired be assess-
ed for the improvement of the streets adjacent to their side yard areas?
Project 342
June 18, 1982
Page four
WOW •Db N N V SM Vol 0
with the recent closure of Cedar Elementary School, students in the 1st and
3rd Additions will be transferred to Rahn Elementary School south of the 4th
Addition. Recently, there has been discussion as to whether the students on
the north side of County Road 30 will be bused to Rahn Elementary. If so,
should an internal "collector" street be designated through the 2nd and 4th
Addition for this bus traffic? If so, that designated street should be up-
graded to handle the anticipated heavy traffic loads associated with school
buses. I£ the busing alternative is not realized, there will be increased
pedestrian traffic through the 2nd and 4th Addition to Rahn Elementary School.
If this is the case, should tyre be consideration given to again designating
a "collector" street in either upgrading this designated street to a wider
width to provide on -street designated walking lanes or should a separate de-
tached sidewalk/pathway be constructed for this anticipated increased pedes-
trian traffic?
REVENUES: ASSESSMENTS VS. TRUNK FUND
Since these streets were constructed in the late 50's and early 60's, they
have been in service for approximately 20+ years. This is the average life
expectancy of a bituminous roadway. In addition, the design standards that
they were constructed to,provide for approximately 50% less structural strength
than present day standards. As such, what consideration should be given towards
assessments of benefited properties for not only maintaining these streets but
upgrading them to the structural strength necessary to handle the normal traf-
fic loads associated with residential streets? Mile a detailed status analy-
sis of the City's major street tank fund is not yet complete, pmli=. ary in-
dications are that due to recent major street construction projects (Pilot
Knob Road, Wescott Road, Galaxie Avenue) and required future collector street
construction requirements (Blackhawk Road, County Road 30, etc.), there are
limited construction funds available to undertake a project where a major
anticipated revenue is anticipated to be provided through this fund. In addi-
tiai, consideration should be given to potential precedence relating to this
assessment policy and its impact on future needs for other Cedar Grove Addi-
tions (3rd and 4th, etc.).
ADDITIONAL STORM SEWER
There are certain areas in these two Additions that presently either do not
have adequate storm sewer facilities or the catch basin structures that are
existing are below minimum inlet capacities for the normal 5 -year storm fre-
quency designs. In addition, several of the catch basin grates are of the
old design that have the inlet slats parallel to the curbing which present
a hazard to bicycle traffic. Consideration should be given to potential re-
placement of these castings, upgrading of existing storm sewer facilities
and/or installation of additional storm sewer systems at critical areas.
Project 342
June 18, 1982
Page five
As can be seen by several of these areas of concern, the anticipated im
provement in the Cedar Grove 1st and 2nd Additions enccnpasses more than
just routine maintenance and repair of the existing bituminous surfacing.
I don't believe that routine normal maintenance procedures through the
years could have eliminated or minimized any of these concerns. The maj-
ority of these concerns relate to the problems associated with streets
that are reaching the end of their original anticipated life expectancy.
Subsequently, staff would appreciate the opportunity to discuss in depth
these concerns with the City Council to receive a defined direction as to
how these problems should be approached.
I will welcome the opportunity to respond to any questions and discuss this
project in further detail with the City Council at their convenience.
spectfull
LL
REsuils[uittedi�
Thomas A Colbert, P.E.
Director of Public Vbrks
TAC/jack
cc - Bill Branch, Superintendent of Streets and Equipment
Joe Connolly, Assistant Superintendent of Utilities
EVALUATION OF THE.PAVEMENTS
in
CEDAR GROVE NO. 1AND 2
for
CITY OF PAGAN.
July 19,81
MIDWEST PAVEMENT ;MANAGEMENT, INC.
PAVEMENTMANAGEMENTCONSULTANTS
Swte:6so.:i 5500 Waynta awev'wd vv , a"=.'MmewtaiE6391 (612) 475-9957
Commission 0180014-6
The evaluation of the pavements in Cedar Grove No. 1 and 2 in the City of
Eagan (Figure 1) was conducted to determine what pavement work needs to be
done and what the estimated costs would be.
The evaluation consisted of the following:
• Pavement strength determination with the Road Rater
• A surface condition survey
• Pavement thickness determination
• Heavy Commercial traffic volumes
• Analysis and cost estimates
e Recommendations
RECOMMENDATIONS
The following recommendations are based on lowest cost per year of serviceable
life before structural pavement repairs would be expected.
1. Remove and replace the alligatored and distorted areas. This
represents 19,000 square yards of pavement or 20`� of the area.
The estimated unit cost of $4.00 per square yard is based on
removal by milling at $1.50 per square yard and replacement
with 2331 at $2.50 per square yard. It is recommended that
the removal and replacement items be bid separately and that
Mn/DOT Spec. 2332 be available as an alternate for the replace-
ment material which may lower the unit cost for this portion of
the work.
2. Apply a 1',' overlay to Garnet Lane and Drive, Zircon Lane and
that portion of Jasper Drive west of Sandstone Lane. Again
2332 should be allowed as an alternate material for this portion.
3. Overlay the entire area with 3/4" of 2331 modified or Bloomington
2341 modified. This is expected to give 15 to 20 years of service-
able pavement life before structural maintenance would be required,
resulting in the lowest overall per year cost. It is also expected
that the frequency of seal coating would be much lower for the 2331
modified or the Bloomington 2341 modified.
The estimated costs for this work on Cedar Grove No. 1 and 2 would be
5183,000.00 for 86,000 square yards of residential street.
-3-
FIGURE 1
LOCATION OF CEDAR GROVE NO. 1 AND 2
-4-
INTRODUCTION
g The City of Egan requested that Midwest Pavement Management, Inc. evaluate
the pavements in Cedar Grove No. 1 and 2 and provide the City with maintenance
recommendations and corresponding cost estimates.
The City does not have information regarding the design and construction of
the pavements in Cedar Grove No. 1 and 2. The pavements have provided approx-
imately 20 years of service and a general improvement is necessary at the time
I to protect the existing investment and to minimize future pavement failures
and maintenance costs.
Several alternate improvement designs are considered to determine which would
be most beneficial in terms of cost and expected life. The alternates
considered are as follows:
1. Crack filling with seal coat application (single or double)
1 2. Patch and repair with seal coat application
3. Patch and repair with bituminous overlay (determine minimum
thickness)
4. Overlay only with recommended bituminous thickness
Also, the economic and practical feasibility of including a filter fabric in
specified locations in lieu of patch and repair prior to overlay was considered.
I
— -5-
THICKNESS OF EXISTING PAVEMENT
To determine the thickness of the existing pavement, eight locations were
sampled by drilling a small (1 inch) hole into the pavement and measuring
the thickness. The bituminous thickness (listed in Table 1) average is
2.56 inches with a coefficient of variation of 19 percent. The aggregate
base averaged 3 inches at the locations sampled, resulting in an average
Granular Equivalent thickness of 8 inches.
(/ rAe
PYrSr„ / �rs'i �an fia/ Srrrrt Der.9w SfaN acV ciS (a X /`
12..S 116rSMr14r cfv, v,/rnY(G.G
for Sf YVcivlc./ Itrrns f/, lit
vs 9" 4i.e.. er.sAal _J Se% Jef,c,c.,cr
TABLE 1. Measurements of the bituminous layer thickness in Cedar Grove
No. 1 and 2
Bituminous
Point No.
Thickness
Street
(Addn)
1
3.0"
Diamond
(1st)
2
2-3/4"
Opal
(1st)
3
2-1/2"
Zircon
(1st)
4
3"
Diamond
(2nd)
5
3"
Sandstone
(2nd)
6
2-1/2"
Amber
(2nd)
7
1-3/4"
Jasper
(2nd)
8
2"
Jasper
(2nd)
Average = 2.56 inches
Standard deviation = 0.48 inch
-6-
f
1
TRAFFIC
The streets evaluated are functionally classified as residential. The
volume of traffic for residential streets is normally under 400 vehicles
per day. Of this traffic, only the Heavy Commercial traffic need be con-
sidered for pavement thickness design purposes. The predominant Heavy
Commercial vehicles that travel these streets are garbage trucks, school
buses (Table 2), and City maintenance vehicles. There are between 5 and
7 garbage trucks in Cedar Grove No. 1 and 2 per week. Other Heavy Com-
mercial traffic such as delivery trucks are normally much lighter than
the garbage trucks and school buses. There are no MTC buses on these
residential streets. The accumulation of truck traffic on these streets
results in an approximate Sigma N18 of 30,000 or less over a 20 year period.
This is well within the minimum design section of the Bituminous Pavement
Design Charts in the Mn/DOT Road Design Manual.
TABLE 2. School Bus Routes (All 66-72 passenger) in Cedar Grove No. 1 and 2
AO -E,114 0.rf>r $I$2 we 10 C�COOr L—�F'nr .6- nSrn51 ?
IST ADDITION
Street
Termini
Number of
Routes
Diamond Drive All 1
Garnet Lane Diamond Drive to Topaz Lane 2
Topaz Lane Garnet Lane to Zircon Lane 2
Topaz Lane Co. Rd. 30 to Zircon Lane 1
Zircon Lane All 1
2ND ADDITION
Coral Lane
All
2
Diamond Drive
Co. Rd. 30 to
Coral Lane 2
Jasper Drive
Rahn Road to
Sandstone Drive 2
Marble Lane
W. Jct. Diamond
Dr. to Nichols 2
Marble Lane
Sandstone Dr.
to W. Jct. Diamond 2
Dr.
Sandstone Drive
Coral Lane to
Jasper Drive 2
Sandstone Drive
Jasper Drive
to Marble Lane 1
-7-
THICKNESS DESIGN
Within the Mn/DOT Bituminous Pavement Design procedure, the pavement design
is based on the maximum allowable deflection during the spring thaw period.
Table 3 lists the present estimated spring deflection for each of the streets
in Cedar Grove No. 1 and 2. These deflections are calculated from the deflec-
tions measured with the Road Rater using relationships developed by Mn/DOT.
The last column in Table 3 indicates the increase in G.E. recommended to
reduce the deflections to the recommended value. Five of the seven streets
in the 1st Addition indicate a need for an increase in structure while only
three of the nine streets in the 2nd Addition require additional structure.
y TABLE 3. Summary of
pavement strength
analysis
1 1st ADDITION
Measured
Allowable
Additional
Deflection*
Deflection*
G.E. Required
(inches)
inches
(inches)
Diamond Drive
0.079
0.070
2.4
Garnet Lane & Drive
0.096
0.080
4_2
Sapphire Lane
0.067
0.070
Emerald Lane
0.072
0.075
---
Opal Drive
0.092
0.080
3.2
Zircon Lane
0.083
0.070
3.4
Topaz Drive
1
0.072
0.070
0.6
2ND ADDITION
Marble Lane
0.069
0.070
---
Diamond Drive
1
0.061
0.070
Moonstone Drive
0.071
0.075
Amber Drive
0.085
0.080
1.2
Amber Court
0.092
0.085
1_6
Limestone Drive
0.072
0.075
Sandstone Drive
0.075
0.075
---
Coral Lane
0.075
0.075
---
Jasper Drive
0.085
0.070
3.9
* The values are expressed as an equivalent Benkelman Beam deflection and
represent the mean plus two standard deviation values.
- -8-
' SURFACE CONDITION
A surface condition survey of the pavement was conducted to determine the
type and quantity of distress that is present. The type of distress and
the area affected that are relevant to the evaluation are as follows:
1 Distress Area of Pavement Affected
Alligator Cracking 17,000 sq. yds.
Distortion 4,000 sq. yds.
{ Block Cracking 18,000 sq. yds.
r A portion of the alligator cracking and block cracking is formed by very
D narrow to hairline cracks. Although these are hard to see, they will become
a more dominant in the future and should be considered at this date.
Several of the streets evaluated such as Diamond Drive in the 2nd Addition,
have extensive alligator cracking and patching while showing that the strength
was adequate. This type of condition is common in instances where the truck
traffic has provided continued compaction of the aggregate base and upper
portion of the subgrade while causing cracking of the asphalt surface. The
other streets that have higher deflections with minimal surface distress would
show the same response if subjected to increased volume of truck traffic.
Removal and replacement of the areas with alligator cracking is normally
recommended to avoid maintenance problems in the future caused by the reflec-
tion of those cracks if overlayed or to avoid the development of potholes.
-9-
I EXPECTED PERFORMANCE OF ALTERNATES CONSIDERED
The four alternates considered and their expected life are as follows:
H
I — -10-
Expected Time
to Structured
Alternate Maintenance
1. Crack fill and seal coat 1 year
2. Patch and repair with seal coat 7 - 10 years
3. Patch and repair with overlay 15 - 20 years
4. Overlay 7 - 10 years
The
years of performance before additional maintenance would be required is
described as follows:
1.
One year of performance would be expected for crack fill and seal coat.
There are a number of areas with substantial alligator cracking. Alli-
gator cracks form blocks of bituminous pavement with an average dimension
of 6 inches or less. Crack filling these areas would be very difficult
and do not effectively seal out moisture in these forms of cracking.
The cracks will be present and open the following spring, allowing water
1
to enter the base and subgrade below resulting in further deterioration
of the pavement.
2.
Seven to ten years of performance would be expected for patch and repair
with seal coat. The controlling factors for this alternate are the
existing block and longitudinal cracking that will slowly continue to
deteriorate and eventually require maintenance. The cold joints surround-
ing all the patch and repair areas also will have some localized deterior-
ation requiring future maintenance. However, it is expected that the
maintenance requirements would not be very extensive.
3.
Fifteen to twenty years would be expected from a patch and repair and,--
nd --overlay.
overlay.This alternate would provide service equivalent to what would
be expected from a new pavement. Weathering and spring will be the
dominant factors controlling the length of service expected.
4.
Seven to ten years would be expected from an overlay. The predominant
factor that would limit the serviceable life of the overlay is the exist-
ing alligator cracking. The cracking will reflect through the overlay
in five to seven years and will become a maintenance item several years
after.
H
I — -10-
In addition to the four alternates, the City requested that the economic
and practical feasibility of fabrics be considered in lieu of patch and
repair prior to an overlay. Several brands of the fabrics have been in-
stalled at various locations in Minnesota on an experimental basis and
are being monitored by Mn/DOT. There has been no evidence in Minnesota
to date, that the presence of these fabrics improve the performance of
the pavement. The reported successes have been further south in milder
climates. The installed price of a fabric at this time is equivalent
to a 1, inch Mn/DOT Spec. 2331 overlay. Based on present performance
of fabrics in Minnesota, we do not recommend they be used. For future
reference, a small experimental installation may be justified. If such
an installation would be made, inform Mn/DOT, Office of Research and Engi-
neering Development, which is presently observing the performance of various
fabric applications.
I COST OF ALTERNATES
The unit costs applicable to the various alternates were obtained from
9 various paving contractors in the area and from recent bids. The costs
are listed in Table 4 and the alternate costs in Table 5.
TABLE 4. Unit Costs
I
1
Seal Coat••• Sq. Yd. 47.90 48.90 51.51 49.7¢
• See enclosed specification or use the Bloomington 2341 modified specification.
•• Based on milling 2.6" and replacing with 2331. Use of separate bid items for
removal and replacement is suggested.
•" Costs based on the sweeping to be provided by the City. Sweeping will add
7 to 8 cents per square yard to the cost.
(a) The lower price may be possible by ripping and loading with a 2332 replacement.
TABLE 5. Estimate of Costs by Alternate
Expected Life/
Alternate
Initial Cost
Annual Cost
Quotes
from Contractors
1/$43,000
Patch and Repair with Seal Coat
Item
Unit
A
B C
0
(Average) Overlay
Overlay - lis" 2341
Sq. Yd.
$2.00
$2.00 $4.30
51.65
Overlay (includes an additional
Overlay - 3/4" 2331 mod.*
Remove and Replace"
Sq. Yd.
Sq. Yd.
51.05
51.25 --
51.00
and a part of Jasper)
$183,000
15/512,200
$2.00(a)-5.00
$4.50
54.00
lay and 100: 3/4" overlay)
5132,000
10/513,200
E
F G
H
I
1
Seal Coat••• Sq. Yd. 47.90 48.90 51.51 49.7¢
• See enclosed specification or use the Bloomington 2341 modified specification.
•• Based on milling 2.6" and replacing with 2331. Use of separate bid items for
removal and replacement is suggested.
•" Costs based on the sweeping to be provided by the City. Sweeping will add
7 to 8 cents per square yard to the cost.
(a) The lower price may be possible by ripping and loading with a 2332 replacement.
TABLE 5. Estimate of Costs by Alternate
Expected Life/
Alternate
Initial Cost
Annual Cost
Crack Fill and Seal Coat
$ 43,000
1/$43,000
Patch and Repair with Seal Coat
$109,000
7/515,570
Patch and Repair with 1-3/4"
(Average) Overlay
$266,000
20/$13,300.
Patch and Repair with 3/4"
Overlay (includes an additional
I-1/2" overlay on Garnet, Zircon
and a part of Jasper)
$183,000
15/512,200
Overlay (based on 30; 1-I/2" over-
lay and 100: 3/4" overlay)
5132,000
10/513,200
The annual costs are based on the initial cost divided by the expected years
of service. Factors such as interest rates, salvage value, etc. were not -
considered
-12-
k
SPECIFICATIONS
FOR
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
PROJECT NO. 342
FOR
EAG^ MINNESOTA
1982
BonedAm FILE No. 49229
/(ode w,, 1qmda4" 9 lqddocfa�ed, Yme.
(?s""d4--vq -0.q�
St pa"4 m4mmda&
June 7, 1982
Honorable Mayor S Council
City of Eagan
3795 Pilot Knob Road
Eagan, Mn. 55122
Re: Cedar Grove No. 1 S No. 2
Bituminous Overlay
Project 342
Our File No. 49229
Dear Mayor and Council:
Transmitted herewith is our report for Cedar Grove No. 1 and No. 2, Bituminous
Overlay.
This report discusses existing street conditions within Cedar Grove No. 1 and
No. 2 and presents cost estimates for street rehabilitation.
We will be pleased to meet with the Council, and other interested parties, at
a mutually convenient time to discuss this report.
Yours very truly,
BONESTR00, ROSENE, ANDERLIK 6 ASSOCIATES, INC.
Mark A. Hanson
MAH:li
I hereby certify that this report was prepared
by me or under my direct supervision and that
I am a duly Registered Professional Engineer
under the laws of the State of Minnesota.
Mark A. Hanson
Date: June 7, 1982 Reg. No. 14260
Approved by:
Thomas A. Colbert
Director of Public Works
Date:
0021b
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
SCOPE: This report evaluate existing streets included within Cedar Grove No.
1 and No. 2 and presents improvement considerations in conjunction with their
estimated cost and proposed assessments.
Also included for consideration is construction of concrete curb and gut-
ter in conjunction with a bituminous overlay.
FEASIBILITY AND RECOMMENDATIONS: This project is feasible and is in accor-
dance with requirements for street construction for the City of Eagan. The
project as outlined herein can be carried out as one contract.
Information pertaining to traffic volume, in-place cross section, measured
deflections of the existing pavement, and required granular equivalencies are
presented in a report prepared by Midwest Pavement Management, Inc. titled
"Evaluation of the Pavements in Cedar Grove No. 1 and No. 2."
DISCUSSION: Streets included within Cedar Grove No. 1 and No. 2 have provided
approximately 20 years of service which for the most part is considered to be
the normal life of a bituminous pavement. The existing street condition dic-
tates that it is not cost effective from a maintenance standpoint to apply a
seal coat application at this time. This report proposes to construct a 1-1/2
inch 2341 bituminous overlay for all streets included within Cedar Grove No. 1
and No. 2.
A bituminous overlay must be constructed on stable bituminous surface if
the overlay is to provide an estimated 15 year service life. If an on-going
seal coat program is maintained, the service life could be extended even fur-
ther. Many streets within Cedar Grove No. 1 and No. 2 have deteriorated to a
Page 1.
0021b
point where extensive patching and other considerations must be given prior to
constructing a bituminous overlay.
Streets were therefore, classified into three categories for restoration
purposes. Each category is summarized herein and also shown on each figure
located at the back of this report. Also shown are critical driveways which
additional work will be required to privide proper grade and drainage.
RANDOM CRACKING: These are areas where the existing pavement has experienced
longitudinal and transverse cracking. These cracks are primarily due to the
expansion and contraction of the pavement because of temperature change and
also the age of the existing pavement. The pavement for the most part is
structurally adequate however a bituminous overlay is warranted due to surface
wear and the degradation of the initial pavement properties.
It is recommended in these areas cracks be blown clean and a crack sealer
of emulsified asphalt be applied prior to the bituminous overlay.
MAP CRACKING: These are areas where the existing pavement is ,dl Bib experienc-
ing transverse and longitudinal crack in w ,t "4 are confined
U& smaller areas. The structural strength of the pavement is deteriorating at
a quicker rate, however, it is not cost effective at this time to remove the
existing pavement and patch.
Two alternatives for treatment of this type of cracking are presented
herein which from a cost standpoint are equal. One alternative is to apply
additional thickness of bituminous mixture during the overlay process. How-
ever, due to marginal driveway grades additional work will be required.
Z
rr,o� }O w.e 1441 OveY10.(
The other alternative is to apply a fabric material which isrfairly newlto
JQ
*te uaavk,et-in the northern states. Communities which have utilized fabric ma-
terial on residential streets have been impressed with its performance to
Page 2.
0021b
date. The Minnesota Department of Transportation has utilized the fabric ma-
terial on highways and have not experienced near the success. However, it is
felt due to higher traffic volumes and speeds the fabric material does not
perform nearly as well as on low volume and low speed streets. It is recom-
mended the fabric material be utilized for this project.
MULTIPLE AND ERODED CRACKING: These are areas where the existing pavement has
}o d af'Yfe wLere it' k4s fest a+, St'r✓c+wrd( litre" -4 %*f 6;Nfy q,.,
deterioratedAsu* -'9hPnN the only cost-effective approach from a maintenance
standpoint is to remove the existing pavement. It is therefore recommended in
these areas the remaining pavement be removed and a 2 inch bituminous base
course be constructed prior to the bituminous overlay.
CONCRETE CURB AND GUTTER
Curbing within Cedar Grove No. 1 and No. 2 consists of bituminous curb
which is providing its primary function of containing drainage and traffic and
providing a separation between street and yard. With the proposed bituminous
overlay as outlined herein construction for concrete curb and gutter should be
considered. This construction would involve removal of the existing bitumi-
nous curb and constructing a B618 concrete curb and gutter. Restoration of
boulevard and driveways will be required.
AREA TO BE INCLUDED: The area to be included would be platted lots within
Cedar Grove No. 1, No. 2, and No. 4 as indicated in the preliminary assessment
roll located at the back of this report.
COST ESTIMATES: Detailed cost estimate for bituminous overlay and bituminous
overlay with concrete curb and gutter are presented in the Appendices located
at the back of this report. These costs are summarized as follows:
Page 3.
0021b
Bituminous Overlay $419,400
Bituminous Overlay with Concrete Curb b Gutter $945,590
The total estimated costs presented above include contingencies and all
related overhead. Overhead costs are estimated at 27% and include legal, en-
gineering, administration and bond interest.
ASSESSMENT: Assessments are proposed to be levied against the benefitted
property. A preliminary assessment roll is included at the back of this re-
port. Assessment rates are presented at various percentages of the total
estimated cost per lot. �2 remaining costs will be financed from
Fov- r„p1pase9,
the major street fund for the City of Eagan. 4Cost percentages ase.u�
100%, 50%, or 25% of the total estimated cost per lot c rC
�rese�4�-d ;or wart
w&kk, & assessed`to the benefited property.
based on
REVENUE SOURCES: Revenue sources to cover the cost of this project "Masi"&
each percentage of the assessable rate as presented in the preliminary assess -
o -re
ment roll da as follows:
A. BITUMINOUS OVERLAY
100% Assessable Rate
Street
Street Assessment
Major Street Fund
Project Cost
$419,400
$419,400
Page 4.
0021b
Revenue Balance
$419,400
- 0 -
$419,400 - 0 -
Project Cost Revenue Balance
50% Assessable Rate
Street $419,400
Street Assessment
Major Street Fund
$419,400
25% Assessable Rate
Street $419,400
Street Assessment
Major Street Fund
$419,400
B. BITUMINOUS OVERLAY WITH CONCRETE CURB & GUTTER
100% Assessable Rate
Street
Street Assessment
Major Street Fund
$209,700
209,700
$419,400
$104,850
314,550
$419,400
Project Cost Revenue
$945,590
$945,590
50% Assessable Rate (Bituminous Overlay Only)
Street $945,590
Street Assessment
Major Street Fund
$945,590
Page 5.
0021b
$945,590
- 0 -
$945,590
$735,890
209,700
$945,590
CK1r'
Balance
hdaw�
SCHEDULE
Present Feasibility Report
Public Hearing
Approve Plans 6 Specifications
Open Bid
Award Contract
Construction Completion
Assessment Hearing
First Payment Due with Real Estate Taxes
Page 6.
0021b
Project Cost
Revenue
Balance
25% Assessable Rate (Bituminous
Overlay Only)
Street
$945,590
Street Assessment
$631,040
Major Street Fund
314,550
$945,590
$945,590
- 0 -
The contribution from Major
Street Fund are the
same for both bituminous
overlay and bituminous overlay
with concrete curb and gutter at the 50% and
25% of the assessable rate. It
is assumed all costs
associated
with concrete
curb and gutter construction will be assessed completely to
the benefited
property.
SCHEDULE
Present Feasibility Report
Public Hearing
Approve Plans 6 Specifications
Open Bid
Award Contract
Construction Completion
Assessment Hearing
First Payment Due with Real Estate Taxes
Page 6.
0021b
S
APPENDIX A
COST ESTIMATE
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
PROJECT 342
A) BITUMINOUS OVERLAY
15,000
Sq.yds.
Remove bituminous pavement @ $1.20/sq.yd.
$ 18,000
95
Each
Adjust manhole frame @ $150.00/each
14,250
55
Each
Adjust gate valve boxes @ $70.00/each
3,850
1,900
Ton
2331 Bituminous mixture for patching @ $32.00/ton
60,800
27,000
Sq.yds.
Fabric material in place @ $1.00/sq.yd.
27,000
8,200
Ton
2341 Bituminous wear course @ $11.00/ton
90,200
430
Ton
Bituminous material for mixture @ $180.00/ton
77,400
5,000
Gals.
Bituminous material for tack coat @ $1.20/gal.
6,000
85
Each
Driveway restoration @ $200.00/each
17,000
Total Construction
$314,500
+5% Contingency
15,730
0021b
$330,230
+27% Legal, Engrng., Admin. & Bond Interest 89,170
TOTAL BITUMINOUS OVERLAY ......................... $419,400
Page 7.
I
B) BITUMINOUS OVERLAY WITH CONCRETE CURB b GUTTER
15,000
Sq.yds.
Remove bituminous pavement @ $1.20/sq.yd.
$ 18,000
95
Each
Adjust manhole frame @ $150.00/each
14,250
55
Each
Adjust gate valve boxes @ $70.00/each
3,850
2,900
Ton
2331 Bituminous mixture for patching @ $32.00/ton
92,800
27,000
Sq.yds.
Fabric material in place @ $1.00/sq.yd.
27,000
5,000
Gals.
Bituminous material for tack coat @ $1.20/gal.
6,000
8,200
Ton
2341 Bituminous wear course @ $11.00/ton
90,200
430
Ton
Bituminous material for mixture @ $180.00/ton
77,400
47,200
Lin.ft.
Removing existing bituminous curb @ $0.50/lin.ft.
23,600
47,200
Lin.ft.
B618 concrete curb b gutter @ $4.50/lin.ft.
212,400
430
Each
Driveway restoration @ $200.00/each
86,000
32,000
Sq.yds.
Sodding with 3" topsoil @ $1.80/Sq.yd.
57,600
Total Construction
$709,100
+5% Contingency
_ 35,460
$744,560
+27%
Legal, Engrng., Admin. b
Bond Interest
201,030
TOTAL
BITUMINOUS OVERLAY WITH
CONCRETE CURB ......
$945,590
Page 8.
0021b
APPENDIX B
PRELIMINARY ASSESSMENT ROLL
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
PROJECT 342
A. BITUMINOUS OVERLAY
Cedar Grove No. 1
Block 1, Lots 4-11
Block 2, Lots 13-34
Block 3, Lots 1-19
Block 4, Lots 1-9
Block 5, Lots 1-32
Block 6, Lots 1-20
Block 7, Lots 1-18
Block 8, Lots 1-5
Block 9, Lots 7-19
Block 10, Lots 1-24
Block 11, Lots 1-11
Cedar Pond Park; Lot 10, Block 4
Cedar Grove No. 2
Block 1, Lots 7-30
Block 2, Lots 1-27
Block 3, Lots 1-19
Block 4, Lots 14-27
Block 5, Lots 1-36
Block 6, Lots 1-17
Block 7, Lots 1-52
Block 8, Lots 1-18
0021b
Total Cost
No: of Lots
Per Block
Cost/Lot
8
$ 7,803
$975
22
21,458
975
19
18,532
975
9
8,778
975
32
31,211
975
20
19,507
975
18
17,556
975
5
4,877
975
13
12,680
975
24
23,408
975
11
10,729
975
8
7,803
975
24
$ 23,408
975
27
26,333
975
19
18,532
975
14
13,655
975
36
35,113
975
17
16,581
975
52
50,718
975
18
17,556
975
Page 9.
Cedar Grove No. 4
Block 1, Lots 16-17
Block 3, Lots 7-15
Block 4, Lots 20-39
Block 6, Lots 17, 18, 19
TOTAL ......................
Total Cost
No. of Lots
Per Block
Cost/Lot
2
$ 1,951
$975
9
8,778
975
20
19,507
975
3
2,926
975
430
$419,400
a3
ASSESSED COST
Presented herein are assessed costs per lot for various percentages of the
estimated cost per lot assuming the City's Major Street Fund would absorb the
additional cost. Costs per lot per year and per month assume the assessed
cost would be spread evenly for a 10 year period. The interest rate for bond-
ing purposes is assumed to be 10%.
lyi3f'_y/'T"
Cost/Lot
100% Assessable Rate $975.00
50% Assessable Rate 487.50
25% Assessable Rate 243.75
Page 10.
0021b
C o s r1L ° r/yER2
st/L
ont
$1 2
. 1
3.3
�eST�'ar�M°MrN
w�.
/Syr
I
;=
8 or
8„
y vs
a3
.223
B. BITUMINOUS OVERLAY WITH CONCRETE CURB & GUTTER
Cedar Grove No. 1
Cedar Grove No. 2
No. of Lots
Block
1,
Lots 4-11
8
Block
2,
Lots 13-34
22
Block
3,
Lots 1-19
19
Block
4,
Lots 1-9
9
Block
5,
Lots 1-32
32
Block
6,
Lots 1-20
20
Block
7,
Lots 1-18
18
Block
8,
Lots 1-5
5
Block
9,
Lots 7-19
13
Block
10,
Lots 1-24
24
Block
11,
Lots 1-11
11
Cedar
Pond Park; Lot 10, Block 4
8
Cedar Grove No. 2
Cedar Grove No. 4
Block 1, Lots 16-17 2
Block 3, Lots 7-15 9
Block 4, Lots 20-39 20
Block 6, Lots 17, 18, 19 3
TOTAL ...................... 430
Page 11.
0021b
Total Cost
Per Block
$ 17,592
48,379
41,782
19,791
70,369
43,981
39,583
10,995
28,588
52,777
24,190
17,592
Total Cost
Per Block
$ 52,777
59,374
41,782
30,787
79,166
37,384
114,350
39,583
$ 4,398
19,791
43,982
6,597
$945,590
Cost/Lot
$2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
Cost/Lot
$2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
$2,199
2,199
2,199
2,199
No. of Lots
Block
1,
Lots
7-30
24
Block
2,
Lots
1-27
27
Block
3,
Lots
1-19
19
Block
4,
Lots
14-27
14
Block
5,
Lots
1-36
36
Block
6,
Lots
1-17
17
Block
7,
Lots
1-52
52
Block
8,
Lots
1-18
18
Cedar Grove No. 4
Block 1, Lots 16-17 2
Block 3, Lots 7-15 9
Block 4, Lots 20-39 20
Block 6, Lots 17, 18, 19 3
TOTAL ...................... 430
Page 11.
0021b
Total Cost
Per Block
$ 17,592
48,379
41,782
19,791
70,369
43,981
39,583
10,995
28,588
52,777
24,190
17,592
Total Cost
Per Block
$ 52,777
59,374
41,782
30,787
79,166
37,384
114,350
39,583
$ 4,398
19,791
43,982
6,597
$945,590
Cost/Lot
$2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
Cost/Lot
$2,199
2,199
2,199
2,199
2,199
2,199
2,199
2,199
$2,199
2,199
2,199
2,199
.( I
ASSESSED COST
Presented herein are assessed costs per lot for various percentages of the
estimated cost per lot assuming the City's Major Street Fund would absorb the
additional cost. Costs per lot per year and per month assume the assessed
cost would be spread evenly for a 10 year period. The interest rate for bond-
ing purposes is assumed to be 10%. The cost/lot for 50% and 25% of the
assessable rate assume all costs associated with concrete curb and gutter con-
struction will be assessed entirely to the benefited property.
100% Assessable Rate
50% Assessable Rate
25% Assessable Rate
0021b
FYf YY,W4
Cost/Lot
$2,199
1,711
1,467
Page 12.
�r yr
Y39
3 V,?'o /88 ar
a93W li�/a7
Cost/Lot
/Month
X9.8
2 0
.8
l OS71OT /INOIV .d
Ii
/
73GS/-
36
;toia
2853
/S
ay vs /3 vs
I 1 10
LA
V;2:
2 P 0!
1 0 ES
34 9
2 le
33 D: :v:..;: 32
12
3 1 13
32 Z 4 31 14
m I I : ;
4 15 16
3111 tu 3 20 3
Is
30 4
x17
29
7
TO 28
a 12
279 10
lz
24 23 22 zl zo 11 14 to
2
CEDAR GROVE No. 1"'`
';:'`
i5y
8 LOT
!
EOUrVALENT
RANDOM CRACKING
4
--j
17
F MAP CRACKING
5
16
or>gA
CEDAR
POND
0
MULTIPLE AND
6
PARK
. .
ERODED CRACKING
15
7
. . . . . . . . .
17
A CRITICAL DRIVEWAY
14
IB
Rl?
FILE No. 49229
EAGAN, MINNESOTA
13
9
16
NNESTROO, ROSENE, AKDERILIK & ASSOC, INC.
C. S A. H.
Ab.
30
CONSM" arimns -T--)
r
1wrm
ALE: I"= 20t
19
or>gA
0
23
12
. .
5
. . . . . . . . .
17
IB
Rl?
9•
16
10
9 lo.
7
Z
CO
w
A
3
1
B
.
10 I
1wrm
ALE: I"= 20t
1 `[ �:' is
i' [i' '!.
_ k ,' J ��
.... _ t( ...„ It
1
1
MIMO TO: HONORABLE MAYOR & CITY COUNCILMEMBERS
FROM: CITY ADMINISTRATOR HEDGES
DATE: JUNE 4, 1982
SUBJECT: INFORMATIONAL
MTC Letters
Enclosed are copies of two letters which were sent to the MTC,
one pertaining to the Cedarvale Shopping Center park & ride site,
and the second letter requesting information as to why an MTC
express route was not designated from St. Paul to the Zoological
Gardens.
I.R. Bond Letter
Also enclosed is a copy of a letter that was prepared for Repre-
sentative Frenzel in response to his request for a position from
the City Council on (1) proposing a minimum tax on municipal bonds,
and (2) restrictive guidelines on industrial revenue bonds.
Journalism Intern
Lisa Flemming, who resides on Diffley Road and has resided in the
City of Eagan all of her life, was selected by the History Committee
to fulfill the internship created by the City Council during the
summer months. The purpose of the internship is to complete the
history document for the City of Eagan as well as prepare that
document. for publication and distribution as a part of the library
dedication late this fall. Lisa has written articles for the Eagan
Chronicle, has just completed her degree from the College of St.
Thomas in journalism, and was agreeable to commit her time through
early fall to the Eagan history project. She will be compensated
at $4.25 an hour which is the bottom of the range for interns,
the internship range is $4.25 - $5.00 per hour depending upon their
experience and level of education completed.
Household and Population Projection Update for the City of Eagan
Enclosed is a copy of a Household and Population Projection Update
for the City of Eagan that was prepared by the Planning Department.
It was startling to me to see the present population projection
of 25,107 as of May 14, 1982. I believe the City Council will
find this report extremely interesting. The report is to be used
as a part of Jack Boarman's work, Tim Erkilla's work and other
projects that are ongoing with the City of Eagan.
June 15, 1982 City Council Tentative Agenda
Enclosed for your information is a rough draft copy of the June
15, 1982 City Council agenda.
_
ityACmInistrator
SEA SLOMOUIST
MAYOR
THOMAS ELAN
CITY. OF EAGAN
JAMES A. SMITH
JERRY THOMAS
THEODORE WACHTER
L%_1P39S PILOT RNOS ROAD -'
COUNCIL MEMBERS
V.("P.01 80X.]1199
!,� 'EAGAN, MINNESOTA'
June 3, 1982
— PHONE 454-8100
LAWRENCE R SCHUMI
CIVIL ENGINEER•
METROPOLITAN TRANSIT
COMMISSION
801 AMERICAN CENTER
BLDG
150 E KELLOGG BLVD
ST PAUL MN 55101
Re: MTC Park & Ride Site/Bus Shelter Propc
Dear Mr. Schumi:
THOMAS HEDGES
CITY ADMINISTRATOR
EUGENE VAN OVERSEKE
CITY CLERK
acent to Cedarvale
In official action that was taken by the Eagan City Council at a regular
meeting held on Tuesday, June 1, 1982, the recommendation of a special
task force, the Cedarvale Transportation Advisory Committee, to request
a park and ride site/bus shelter to be located adjacent to the Cedarvale
Shopping Center in the City of Eagan was approved.
This task force, appointed by our Mayor, Bea Blomquist, was formed late
last summer to investigate the overall transportation needs for the Cedarvale
Shopping Center area which includes some 100 businesses. A study was
made of trunk highways and local streets as well as MTC bus service.
A meeting was held in this office on December 18, 1981 at which time you
were present representing the MTC along with representatives of MnDOT
to discuss the possibility of park and ride facilities in that general area.
It was agreed at that meeting that both representatives of the MTC and
MnDOT would study a number of alternatives to enhance traffic flow and
bus service for the area. These studies were completed and a presentation
was made by Mr. Dick Elasky of MnDOT at the most recent Cedarvale Area
Transportation Committee meeting held on May 19, 1982. At that meeting,
seven (%) proposals concerning park and ride sites were given consideration.
The proposal that was accepted by both the ad hoc committee and City Coun-
cil was proposal number seven which provides- a connection from the Cedar -
vale Shopping Center parking lot between Robert's Drug and Mid America
National Bank to old highway 13 and also a park and ride site immediately
west and adjacent to the Cedarvale Shopping Center parking lot and
described as south of said connection.
It is the understanding of the City of Eagan that the total cost for this
park and ride site to the MTC is approximately $22,000 and that it would
accommodate seventy plus cars per day. The City of Eagan is responsive
to the proposal and therefore is encouraging the MTC to proceed with plans
and specifications for the development of a park and ride site at that
location as soon as possible.
THE LONE OAK TREE ... THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY.
City of
Eagan/Park &
Ride Site
June 3,
1982
Page Two
If you
want more
specific
questions regarding
the use
City of
Eagan once
the turn
contact
this office at
any time.
Sincerely,
rwwoo lf.
Thomas L. Hedge
City Administrator
information regarding the site and/or have
of public right of way to be owned by the
back from MnDOT is completed, feel free to
TLH/hnd
cc: Mayor Bea Blomquist
Cedarvale Area Transportation Committee
Dick Elasky, Assistant District 9 Engineer
Tom Colbert, Director of Public Works
BEA BLOMOUIST
MAYOR
THOMASEGAN
JAMES A. SMITH
JERRY THOMAS
THEODORE WACHTER
COUNCIL MEMBERS
June 3, 1982
JOHN FARRELL
ASST GENERAL MANAGER
TRANSPORTATION
METROPOLITAN TRANSIT
3118 NICOLLET
MINNEAPOLIS MN 5540E
CITY OF EAGAN
MS PILOT KNOB ROAD
P.O. BOK 41199
EAGAN,MINNESOTA '
SS1:]
PHONE 454-8100
COMMISSION
THOMASHEDGES
CITY AOMINISTRATUR
EUGENEVAN OVERBEKE
C1 TY CLERK
Re: Route #57 Service Between Downtown Minneapolis & Minnesota Zoological
Garden
Dear Mr. Farrell:
The City of Eagan is very pleased with action that was taken by the MTC
to establish Route #57 which is an express bus service between downtown
Minneapolis and the Minnesota Zoological Gardens. I was a guest last
Thursday, May 27, 1982, at a function you sponsored in downtown Minne-
apolis announcing the new bus route service. At the City Council meeting
which was held on June 1, 1982, a question was raised by a member of
our City Council as to why an express bus service does not exist between
the City of St. Paul and Minnesota Zoological Gardens similar to that offered
to downtown Minneapolis.
I would like for you to comment on this question to satisfy our curiosity
as to whether such a service is under consideration and, if not, why an
express service has not been considered from that city to the zoological
gardens.
Thank you for your time and we will await a response from your office.
Sincerely,
Bea Blomquist
Mayor
THE LONE OAK TREE ... THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY.
BEA BLOMOUIST
MAYOR
THOMAS ELAN
CITY OF EAGAN
JAMES A. SMITH
on two
JERRY THOMAS
important issues
THEODORE WACHTER
1195 PILOT KNOB ROAD
COUNCIL MEMBERS
P.O. BOK 91199
issue is a minimum
' EAGAN, MINNESOTA
interest and the
5919] .
issue
PHONE 451-8100
June 3, 1982
place
THE HONORABLE BILL FRENZEL'
THE UNITED STATES HOUSE OF REPRE`§iTATIVES
1026 LONGWORTH OFFICE BLDG
WASHINGTON DC 20515
Re: Proposed Congressional Action
THOMASHEDGES
CITY ADMINISTRATOR
EUGENE VAN OVERBEKE
CITY CLERK
Bond Interest to be
auDlect to a minimum fax & Restrictive Use of Industrial & Commercial
Dear Representative Frenzel:
Our City Council
is grateful for your letter
requesting input
on two
very
important issues
affecting economic growth in
our community.
The
first
issue is a minimum
tax on municipal bond
interest and the
second
issue
is the apparent
movement by the United States Congress to
place
heavy
restrictions on the issuance of industrial and
commercial development
bonds
by municipalities.
At our last regular City Council meeting which was held on June 1, 1982,
it was the unanimous position of my fellow City Councilmembers and myself
that municipal bond interest should not be subject to a minimum tax. It
is becoming difficult, in the present economy, to sell municipal bonds at
a favorable interest rate due to the other types of tax incentives that are
available to sophisticated investors. A minimum tax placed on municipal
bond interest could create a problem for our municipality as well as others
to attract competitive bidding, thus receiving higher interest rates for future
municipal bond sales. The City of Eagan is a growth community and has
been extremely active in the municipal bond market. The offerings have
ranged from tax exempt mortgage financing to revenue bonds and assessment
bonds. The ability to sell these bonds at a favorable rate compared with
the current prime rate and other sources of financing is one limited means
of continuing growth and prosperity in our community. Therefore, we appre-
ciate your support in making efforts to defeat a minimum tax which is under
consideration for municipal bond interest.
The City of Eagan has maintained a thorough and sophisticated approach
to the consideration and issuance of industrial revenue bonds in recent
years. During 1979, our City Council deliberated for many meetings on
the development of a policy and criteria document for the consideration
and issuance of industrial development revenue mortgages and bonds. This
policy statement was adopted by the City Council in December of 1979 and
has been used as the guideline to applicants since that date. Our City
Council has received a number of applications in the past three to four
THE LONE OAK TREE ... THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY.
City of Eagan/Representative Bill Frenzel
June 3, 1982
Page Two
years, many of which have been processed and approved, helping to stimu-
late growth and development within the community. The City Council has
also denied industrial development revenue mortgages that were not viewed
to be in the best interest of the City, mainly as related to the comprehen-
sive guide plan. The City Council is extremely conscientious about the
public hearing process, reviewing in considerable detail financial positions
of the applicants, how the particular application relates to the comprehen-
sive guide plan as well as many other public policy issues that vary on
each application. Our City Council is thorough and sensitive to the types
of projects that should be approved under this method of financing. The
Eagan City Council is supportive that guidelines should be placed on the
issuance of industrial and commercial development bonds that curb the worst
"abuses", however, not at the expense of discouraging the consideration
of viable projects. A city council is best suited to determine whether a
specific application for either industrial or commercial financing should
be considered for that specific community. An office building, bowling
alley or shopping center may be extremely important to one community,
and under present economic conditions, the difference as to whether that
commercial use is allowed to develop or not may be whether commercial
revenue financing is granted. There has been some discussion by repre-
sentatives in the United States Congress that commercial revenue financing
be terminated and that only a tax exempt status be offered by a munici-
pality for industrial uses. This approach is not feasible, realising that
many cities do not have the type of industry that is classified as "manu-
facturing" and, therefore, both industrial and commercial development
revenue mortgages should be considered to allow further expansion and
development of worldheadquarters, warehousing, shopping centers, medical
buildings and other types of business activities that help to develop our
communities.
In summary, we are hopeful that legislation will not be adopted that
restricts the issuance of industrial or commercial revenue bonds in our
community due to a few cities which have "abused" the intent of industrial
and commercial revenue bond financing. I would be more than happy to
provide additional information regarding either of the above issues if it
is helpful for legislation you wish to introduce or support. Please contact
our City Administrator, Mr. Tom Hedges, or me at any time. Again, 1
thank you for notifying our City and allowing our City Council to provide
input into the decision making process.
Sincerely,
Bea Blomquist
Mayor
�Q
13
SPECIAL CITY COUNCIL MEETING
JUNE 21, 1982
6:00 P.M..
1. Firefighers' Pension Plan
2. Project 342 "Cedar Grove 1st & 2nd Addition -
Street Reconstruction"
3. Water Treatment Schedule
4. Other Business
5. Adjournment
MEMO TO: HONORABLE MAYOR & CITY COUNCILMEMBERS
FROM: CITY ADMINISTRATOR HEDGES
DATE: JUNE 18, 1982
SUBJECT: SPECIAL CITY COUNCIL MEETING
A special City Council meeting is scheduled for 6:00 p.m., Monday,
June 21, 1982, at the Eagan City Hall. Originally, the special
City Council meeting was scheduled for 7:00 p.m.; however, due
to a conflict with the Volunteer Firefighters, the meeting was
moved up to 6:00 p.m. The Volunteer Firefighters have their regular
Monday night training and a general meeting scheduled at 8:00 p.m.,
and, therefore, it was necessary to move the time schedule for
the meeting from 7:00 to 6:00 p.m.
Enclosed is a copy of the agenda for the special City Council
meeting which has been properly posted.
Firefighters' Pension Plan
Enclosed is a copy of the memorandum to the Finance Committee that
was copied to the City Council approximately two weeks ago that
outlines the various alternatives discussed at a special City Coun-
cil meeting on June 8, 1982. It was the consensus of the City
Council that the IRA, alternative #4, be presented to the Pension
Committee of the Relief Association. Enclosed is a copy of an
excerpt from the League of Minnesota Cities magazine, October,
1981 issue, that addresses the use of IRA accounts for volunteer
ambulance and fire fighers. It is very likely that legislation
will be required in order to work out at transition from a defined
benefit program to an IRA account if selected by the firefighters
and City Council and due to the special intricacies of working
out the required legislation, the City Administrator will await
a consensus before proceeding with a proposed IRA Retirement plan.
There are a number of memorandums and support data regarding pre-
vious discussions to change from a defined benefit program to a
defined contribution or other type of program. There are also
some fact findings from Roger Katzenmaier, Gus Welter and the City
Administrator. The City Council has received this information
in the past. If any member would desire any or all of this informa-
tion copied as resource data, please contact the City Administra-
tor's office.
Agenda Information Memo
June 18, 1982
Page Two
The City Administrator suggested at the last City Council meeting
that the Director of Public Works and City Administrator have time
to address issues that pertain to public works that are under con-
sideration by the City Council. Two (2) specific items were placed
on the agenda, one of which is Project 342, the Cedar Grove 1st
and 2nd Addition Street Construction, and secondly a water treatment
schedule to consider a water treatment plant revised study, survey
and public hearing. Other items to discuss are seal coating, county
road construction and any other items that the City Council may
have questions about.
Project #342
Enclosed is a memorandum and considerable information as it pertains
to a report on the proposed Project #342 Cedar Grove 1st & 2nd
Addition street reconstruction. This information has been prepared
and/or coordinated by the Director of Public Works.
Water Treatment Schedule
The Director of Public Works and City Administrator would like
to discuss the proposed time schedule for reconsideration of the
water treatment plant, the progress of the feasibility report,
a proposed survey to be considered as a City wide newsletter and
time for a public hearing. There is no support information to
send out with this scheduled item. The discussion is basically
proposed as strategy planning with the City Council.
Informative
Mayor Blomquist, City Councilmember Egan and City Administrator
Hedges all attended the League of Minnesota Cities meeting held
in Rochester this week. Mayor Blomquist and City Administrator
Hedges were in attendance on June 16 and 17 and City Councilmember
Egan was present on June 17 and 18. The conference was well
attended by elected and appointed officials from the State of Minne-
sota and both Mayor Blomquist and I were members of the Planning
Conference Committee and received positive input about the quality
of the conference which I believe benefited persons who were in
attendance. The City of Eagan was well represented at the various
sessions. The Director of Finance and Building Inspector were
also present for one day sessions to hear seminars that affect
their respective positions.
OZ �-Yl.
City Administrator
MEMO TO: FINANCE COMMITTEE MEMBERS JIM SMITH & TOM EGAN
FROM: CITY ADMINISTRATOR HEDGES
DATE: MAY 26, 1982
SUBJECT: VOLUNTEER FIREMEN'S RELIEF ASSOCIATION RETIREMENT PLAN
Background
The City Council received a memorandum from the City Administrator pro-
viding a brief history of discussions that have taken place between the
City Council and Volunteer Firemen's Relief Association regarding an increase
or change in the association retirement plan. Also submitted for review
by the City Council on March 23, 1982 was a memorandum prepared by Roger
Katzenmaier addressing an independent study that he performed with Gus
Welter that examined the conversion of the association's retirement program
from a defined benefit plan to a defined contribution plan. The City Council
received the reports and asked the Finance Committee to meet with Mr. Kat-
zenmaier to review the lengthy memorandum. The meeting was scheduled
and held on Tuesday, April 6, 1982. There was a great deal of discussion
by the Finance Committee and Mr. Katzenmaier at that meeting, and as
a result, the Finance Committee desired additional time to study the facts
and prepare a recommendation for the City Council. A follow-up meeting
was held on May 26, 1982 at which time several options were again discussed
and a recommendation considered for review by the City Council at a special
meeting.
Recommendation
The Finance Committee, in studying the information prepared by Mr. Katzen-
maier, in addition to data supplied during the past several months, feels
that there are four (4) options available regarding the Volunteer Firemen's
Association Retirement Program. Those options are as follows:
1. Continue with the defined benefit program.
2. Convert to a defined contribution proposal as previously presented
- by the City Council.
3. Provide a combination of the above two options by requiring a lump
sum benefit only.
4. Convert the existing program to an IRA which allows for cash pay-
ment to each volunteer fireman upon completing one year as a volun-
teer fire fighter and each year thereafter.
The Finance Committee feels a conversion to an IRA plan is a viable and
suitable option to be considered by the City Council.
Retirement Plan
May 26, 1982
Page Two
Action
The City Council has agreed in recent months that the Finance Committee
would be used to provide fact finding; however, the entire City Council
would present and discuss a position as it relates to any change or increase
in the retirement plan for the Volunteer Firemen's Relief Association. it
is therefore the recommendation of the Finance Committee that the City Coun—
cil hold a special City Council meeting and discuss their position. Once
an option is agreed upon, it will then be presented to the pension committee
for further consideration.
ity Administrator
961
STANLEY PESKAR
EDITOR'S:NOTE: The -questions below are
typical of the thousands of Inquiries the
League receives each year. For more
comprehensive treatment of questions,'thel
Information service of the league Is
always available to municipal officials.
PERSONNEL—RETIREMENT
Does the new federal tax law solve
the problem of what to do about a
retirement program for ambulance
and other volunteers?
Apparently yes. Though the state
legislature has not had an opportuni-
ty to conform state tax laws to the
federal laws, it is highly probable it
will do so in the next session.
Whether the state acts or not,
"volunteers" and other city
employees, regardless of whether or
not they have another pension plan,
may annually put up to $2,000 into
an independent retirement account
(IRA), free of federal taxes.'
14
Thus, cities can now determine
how much to pay ambulance or
firefighter= volunteers, make a direct
payment to the volunteer, and let
him or her decide whether to take
the money as current compensation
or put it in an IRA for retirement pur-
poses.
Money placed in IRAs is not tax-
able in the year in which it is receiv-
ed. Therefore, the entire amount can
be invested and can earn a yield up
to the date of retirement. When the
volunteer retires, the payments are
taxable, but presumably the recipient
is in a lower tax bracket at that time
because of lower income and in-
creased exemptions or deductions or
a combination of all three.
The IRA has several advantages for
the volunteer over participation in a
more conventional retirement plan
such as a local relief association.
Since there is no vesting period,
assets are not lost by failure to serve a
minimum period. (Ten years is
typical in most other plans.) Thus,
there is full portability from one com-
munity and job to another. Further,
since the IRA belongs to the
volunteer, it is not subject to
manipulation through benefit for-
mula changes by a board of trustees
or the legislature. Consequently, the
volunteer need not commit valuable
time out of a busy schedule to par-
ticipation in governance of a relief
association. He or she need only
select an IRA plan and determine
THEIN WELL CO., Inc.
Complete Well & Pump Service Since 1893
24 Hr. a Well Drilling a T.V. Well Inspection
Well &Pump . Well Repair s Electric Logging
Service
e Pump Repair a Pump Sales
Clara City, MN .................... 612-847-3207
Spicer, MN.......................612-796-2111
Rochester, MN...................507-288.5554
each year the level of participation
which is appropriate.
The IRA assets are a reserve of cash
available to the volunteer in certain
emergencies before retirement. The
IRA thus provides a ready-made sur-
vivor, disability, and burial benefit to
the extent of funds in the account.
Should volunteers need additional
disability or survivor benefits, these
can be purchased individually or by
the city as part of the compensation
package from an insurance com-
pany.
The IRA also permits selection of a
money manager with an investment
strategy or policy which suits the in-
dividual economic or social goals of
the volunteer rather than the objec-
tives of the relief association trustees
or state legislators. Finally, the use of
current compensation (with
volunteer option to purchase an IRA)
to the volunteer ambulance or fire
service permits city officials (mayor
and clerk) to avoid responsibility for
managing a local relief association,
for preparing, reviewing, and filing
complex financial reports, and for
hassling with an organization which
can be a major political force in the
community.
The new federal law offers a less
complicated way to attract, retain,
and provide security for a citizen
resource which cities may increasing-
ly need to rely upon to provide ser-
vices in these times of contraction of
financial resources.
Footnotes
Those coordinated employees covered by
PERA would be subject to Social Security taxes
and PERA deductions on their IRA contribu-
tion, but it is unlikely that any volunteers
would be paid the minimum $325 per month
required for participation in the coordinated
PERA-Social Security program. Thus, no
federal deductions would be made.
' If the city has a local volunteer fire relief
association, all of the 2% state fire aid must go
to the relief association. If no local relief
association exists, the 2% aid may be used for
equipment, supplies, and buildings, and the
city could put a comparable amount from
other sources into current compensation
which could then be used by individual
firefighters for IRAs. IRAs could also be used to
xgtplcnwnt u>isting relief ts.ociation benefits_
MINNESOTA CITIES
seeks to implement a substantial
governmental interest, directly ad-
vances that interest, and reaches no
further than necessary to accomplish
the given objective.
Though it ruled that the ordinance
was valid in regard to the regulation
of commercial speech, the plurality
held that the ordinance was un-
constitutional in its treatment of non-
commercial speech. Although the or-
dinance included a broad exception.
for on-site commercial billboards, it
permitted no similar exceptions for
non-commercial speech. Justice
White noted that the Supreme
Court's recent free speech cases
have consistently accorded non-
commercial speech a greater degree
of protection than commercial
speech. The city's ordinance effec-
tively inverted this judgment, affor-
ding a greater degree of protection to
commercial than to non-commercial
speech. justice White stated that
although a city may distinguish bet-
ween the relative value of different
categories of commercial speech, it
does not have the same range of
choice in the area of non-
commercial speech to evaluate the
strength of, or distinguish between,
various communicative interests. The
Court held that because some non-
commercial messages could have
been conveyed on billboards
throughout commercial and in-
dustrial zones, the city must similarly
allow billboards conveying other
non-commercial messages in those
zones. The plurality specifically
stated that it was not deciding
whether a total prohibition of out-
door advertising would be consistent
with the First Amendment.
Two justices, concurring in the
judgment but not joining the opin-
ion, stated their belief that this case
in effect presented the total ban
question. The effect of the or-
dinance, they said, was to ban
billboards completely. Their analysis
would allow a city to impose such a
total ban only if it shows that a suffi-
Fast, efficient
and repair of ,%
Bergerson-Caswell is well equipped, not
only for well drilling, but maintenance, too. If
you have a reduced flow from an aging
pump, or if you are starting to pump sand or
other foreign materials, call us for an
analysis of repairs. We can put new life into
existing wells, quickly and economically.
Call (612) 47&3121
Bergerson-Caswell, Inc.
5115 Industrial Street•Maple Plain, MN 55359
ciently substantial governmental in-
terest is furthered by the ban, and
that a more narrowly drawn restric-
tion would not suffice.
The three dissenting justices all
recognized the probable effects of
this holding. The decision arguably
leaves a city wishing to respond to
the hazards posed by billboards a
choice between two equally un-
satisfactory alternatives. One alter-
native is to ban all signs of any kind.
The second is to restrict commercial
signs, but to permit all non-
commercial signs no matter how
numerous, large, damaging to the
environment, or dangerous to
motorists and pedestrians. Con-
fronted with these alternatives, it is
likely that most cities will do nothing.
Cities contemplating action regard-
ing billboards should examine this
decision in determining the scope of
their authority. Metromedia, Inc. v.
City of San Diego (49 L.W. 4925, U.S.
Sup. Ct., 1981).
October 1981 13
TO: HONORABLE MAYOR AND CITY COUNCIIMEMBERS, C/O THOMAS L. HEDGES, CITY
ADMINISTRATOR
FRIM: THOMAS A. COLBERT, DIRECTOR OF PUBLIC WORKS
DATE: JUNE 18, 1982
• o r• n•F 11111F�u •• • •� a r •
In the early fall of 1980, the City Council directed staff to analyze the
streets in the Cedar Grove Additions to evaluate their needs and maintenance
requirements in order to maintain these streets to try to lengthen their ser-
vice life before major reconstruction and replacement became necessary. Sub-
sequently, the staff performed an experimental repair on West Marble Lane
through the intersections of North and South Diamond Drive. The south half
of Marble Lane was reconstructed after removing the deteriorated and fractur-
ed existing bituminous surfacing. A 2" overlay was then placed over this
section of Marine Lane to analyze the difference between removal and replace-
ment prior to an overlay and the effects of just overlaying the existing bit-
uminous. This "test" section has now gone through two winter/spring cycles.
The results indicate that the south half of Marble Lane that was reconstruct-
ed has experienced appmxi+mtely 80% less of reflective cracking through the
2" bituminous overlay. On the north half of Marble Lane, random cracking has
,eared which is a direct reflection of the random cracking that existed
prior to the bituminous overlay. Subsequently, this random cracking will di-
minish the expected additional life that could be provided by this corrective
overlay.
In the summer of 1981, the staff contracted with Midwest Pavement Management
Inc. to perform a detailed analysis of the streets in the Cedar Grove lst and
2nd Addition. Their analysis consisted of traffic counts, traffic distribu-
tion analysis, test core samples, and computerized pavement deflection eval-
uation to determine the existing pavement stability. A copy of that report
is attached for the Council's information. They were asked to evaluate 5
different possible alternatives as recommended by City staff. Their analysis
was then computed and converted to an "expected life/annual cost" relation-
ship as indicated on Page 12 of that report.
During 1981, the City had Professional Services Group Inc. televise the san-
itary sewer lines in the Cedar Grove 1st Addition to try to determine any
potential corrective work that may be required. This closed circuit tele-
vision investigation of the sanitary sewer indicated several areas that need
corrective work due to settlement of pipes, misalignment of pipes, fractured
pipes, protruding services, and extensive root infiltration which will great-
ly increase the potential of sanitary sewer back ups. In addition, during
the spring of 1982, the Public Works Utility Maintenance section performed
an analysis of all sanitary sewer and storm sewer manhole castings and found
that approximately 60% of these are in immediate need of reconstruction and
repair due to deterioration. Based on the results of the televising of the
1st Addition, the staff then contracted during the spring of 1982 with Mid-
west TV Inc. to televise the sewer lines in the 2nd Addition to try and de-
termine if similar corrective work was necessary. The results of this work
Project 342
June 18, 1982
Page two
are not yet immediately available but are anticipated within the next three
weeks.
Subsequent to this pre -investigation work performed by staff, the results of
this information were forwarded to the City's Consulting Engineering film of
Honestroo, Rosene, Anderlik and Associates, Inc. for the preparation of a
feasibility report to estimate the costs of repair and the resulting potential
assessments associated with this work in the let and 2nd Additions. Copies of
this feasibility report are also being forwarded to the Council for their re-
view. Please keep in mind that this feasibility report is in a preliminary
draft stage and is subject to revision after discussion between staff and Coun-
cil.
There are several concerns that have not been specifically addressed in the
feasibility report that staff would like to bring to the Council's attention
to receive further direction on before additional work is performed. These
are summarized as follows:
1. Possible replacement of deteriorated blacktop curbing with concrete curb
and gutter.
2. Required corrective construction to existing sanitary sewer and stone
sewers.
3. Reconstruction of deteriorated manhole casting supports and catch basin
structures.' .
4. Elimination vs. restoration of service drives (Nicols Road and County Road
30) .
5. Assessments against corner lots where only side streets are reconstructed/
upgraded.
6. Potential need of increasing the structural strength of minor "collector"
streets with potential sidewalks/pathways/striped walking lanes due to
the closure of Cedar Elementary School and the potential of increased
busing and/or increased pedestrian traffic through the 2nd Addition to
Rahn Elementary School.
7. Revenue sources: assessments vs. major street trunk fund
8. Consideration of additional stone sewer facilities in certain areas to
increase drainage capabilities.
M. . «y is k, 0 %Ko)
The existing bituminous curbing has been in place for 20+ years and is show-
ing signs of deterioration resulting from extensive weathering, snowplow main-
tenance, etc. With the placement of a proposed 2" bituminous overlay of the
existing surface, these subdivisions will experience decreased curb heights
Project 342
June 18, 1982
Page three
which will decrease the capabilities of confining drainage from major storms
within the street area and will require extensive driveway approach recon-
struction. If the streets were reconstructed with concrete curb and gutter,
it would increase the drainage capabilities and minimize damage resulting
from major storms and would greatly extend the life of the streets in these
subdivisions. However, there is greater cost associated with this improve-
ment as compared to.a repair and maintenance of the existing street surfac-
ing.
REPAIR OF EXISTING SANITARY AND STORM SEWERS
I will be available to discuss in further detail the condition of the exist-
ing sanitary and storm sewers in these Additions at the meeting to be held
between staff and Council to discuss this proposed project. The results of
the first internal televising report indicate that there are several areas
that need reconstruction. This work should be performed prior to any repair
work to the surface to minimize the potential of construction patching in
the future.
An inspection by the Utility Maintenance section indicates that the great
majority of manhole castings for sanitary and storm sewers within these Addi-
tions were placed without adequate grouting and/or support rings. subsequent-
ly, these supports are deteriorated which results in infiltration around these
structures which will create the potential of extensive future patching to
correct these situations in the future.
�iuuuU�Ci'���la��:�i � •: •� .
With the completion of the Cedar Avenue freeway, Nicols Road (County Road 23)
is anticipated to be turned back from the County to the City. The traffic
volumes on this section of road have greatly decreased since the opening of
the Cedar Avenue freeway. Subsequently, where it was once considered a major
arterial, it will be reclassified to a City collector status. Subsequently,
there is a question as to whether the frontage roads along Nicols Road will
be necessary in the future. If not, should extensive reconstruction be per-
formed to these severely deteriorated frontage roads or should they be elimina-
ted and the dollars spent in providing direct driveway connections to existin(*
Nicols Road and returning this frontage area to open space front yard for the
adjacent structures? Presently, there are several houses located north of
Cedar Elementary School which take direct access onto Nicols Road and several
which take direct access by way of a severely deteriorated frontage road. The
staff would recommend that these services drives be eliminated and reconverted
to front yard space with direct driveway connections being made to Nicols Road.
[w•7:4�i. MGM :r.Y.7�-�7uia •ry
Should assessments be spread on a per lot basis equitably throughout the Addi-
tion or should assessments be based on the front food method with corner lots
receiving a greater assessment due to their increased frontage? In addition,
should corner lots that have frontage on streets not to be repaired be assess-
ed for the improvement of the streets adjacent to their side yard areas?
Project 342
June 18, 1982
Page four
With the recent closure of Cedar Elementary School, students in the 1st and
3rd Additions will be transferred to Rahn Elementary School south of the 4th
Addition. Recently, there has been discussion as to whether the students on
the north side of County Road 30 will be bused to Rahn Elementary. If so,
should an internal "collector" street be designated through the 2nd and 4th
Addition for this bus traffic? If so, that designated street should be up-
graded to handle the anticipated heavy traffic loads associated with school
buses. If the busing alternative is not realized, there will be increased
pedestrian traffic through the 2nd and 4th Addition to Rahn Elementary School.
If this is the case, should tyre be consideration given to again designating
a "collector" street in either upgrading this designated street to a wider
width to provide on -street designated walking lanes or should a separate de-
tached sidewalk/pathway be constructed for this anticipated increased pedes-
trian traffic?
Since these streets were constructed in the late 50's and early 60's, they
have been in service for approximately 20+ years. This is the average life
expectancy of a bituminous roadway. In addition, the design standards that
they were constructed to,provide for apprcximately 50% less structural strength
than present day standards. As such, what consideration should be given towards
assessments of benefited properties for not only maintaining these streets but
upgrading then to the structural strength necessary to handle the normal traf-
fic loads associated with residential streets? While a detailed status analy-
sis of the City's major street trunk fund is not yet conplete, preliminary in-
dications are that due to recent major street construction projects (Pilot
Knob Road, Wescott Read, Galaxie Avenue) and required future collector street
construction requirements (Blackhawk Road, County Road 30, etc.), there are
limited construction funds available to undertake a project where a major
anticipated revenue is anticipated to be provided through this fund. In addi-
tion, consideration should be given to potential precedence relating to this
assessment policy and its impact on future needs for other Cedar Grove Addi-
tions (3rd and 4th, etc.) .
ADDITIONAL STORM SEWER CONSTRUCTIM
There are certain area in these two Additions that presently either do not
have adequate storm sewer facilities or the catch basin structures that are
existing are below minimum inlet capacities for the normal 5 -year storm fre-
quency designs. In addition, several of the catch basin grates are of the
old design that have the inlet slats parallel to the curbing which present
a hazard to bicycle traffic. Consideration should be given to potential re-
placement of these castings, upgrading of existing storm sewer facilities
and/or installation of additional storm sewer systems at critical areas.
Project 342
Jame 18, 1982
Page five
As can be seen by several of these areas of concern, the anticipated im-
provement in the Cedar Grove 1st and 2nd Additions enccnipasses more than
just routine maintenance and repair of the existing bituminous surfacing.
I don't believe that routine normal maintenance procedures through the
years could have eliminated or minimized any of these concerns. nue maj-
ority of these concerns relate to the problems associated with streets
that are reaching the end of their original anticipated life expectancy.
Subsequently, staff would appreciate the opportunity to discuss in depth
these concerns with the City Council to receive a defined direction as to
has these problems should be approached.
I will welcane the opportunity to respond to any questions and discuss this
project in further detail with the City Council at their convenience.
spectfull
Resutani.ti�,
Thamas A. Colbert, P.E.
Director of Public Works
TAC/jach
cc - Bill Branch, Superintendent of Streets and Equipment
Joe Connolly, Assistant Superintendent of Utilities
-i
EVALUATION-OFTHE PAVEMENTS
in
CEDAR GROVE NIO. I AND'2,
'for
CITY OF EAGAN
July 1981
QPM in;,.
MIDWEST PAVEMENT MANAGEMENT, IANC.
PAVEMENT MANAGEMENT'CONSULTANTS
Sude 636.155-00 Wayzata Boulevard, Wayzata. Mmta, 1 55 1 3 - 9V .16121.475-9957
Commission Nc-. 0180014-6
SUMMARY
The evaluation of the pavements in Cedar Grove No. 1 and 2 in the City of
Eagan (Figure 1) was conducted to determine what pavement work needs to be
done and what the estimated costs would be.
The evaluation consisted of the following:
• Pavement strength determination with the Road Rater
• A surface condition survey
• Pavement thickness determination
• Heavy Commercial traffic volumes
• Analysis and cost estimates
• Recommendations
RECOMMENDATIONS
The following recommendations are based on lowest cost per year of serviceable
life before structural pavement repairs would be expected.
1. Remove and replace the alligatored and distorted areas. This
represents 19,000 square yards of pavement or 20" of the area.
The estimated unit cost of $4.00 per square yard is based on
removal by milling at $1.50 per square yard and replacement
with 2331 at $2.50 per square yard. It is recommended that
the removal and replacement items be bid separately and that
Mn/DOT Spec. 2332 be available as an alternate for the replace-
ment material which may lower the unit cost for this portion of
the work.
2. Apply a 1z" overlay to Garnet Lane and Drive, Zircon Lane and
that portion of Jasper Drive west of Sandstone Lane. Again
2332 should be allowed as an alternate material for this portion.
3. Overlay the entire area with 3/4" of 2331 modified or Bloomington
2341 modified. This is expected to give 15 to 20 years of service-
able pavement life before structural maintenance would be required,
resulting in the lowest overall per year cost. It is also expected
that the frequency of seal coating would be much lower for the 2331
modified or the Bloomington 2341 modified.
The estimated costs for this work on Cedar Grove No. 1 and 2 would be
5183,000.00 for 86,000 square yards of residential street.
-3-
FIGURE 1
LOCATION OF CEDAR GROVE NO. 1 AND 2
-4-
INTRODUCTION
The City of Egan requested that Midwest Pavement Management, Inc. evaluate
the pavements in Cedar Grove No. 1 and 2 and provide the City with maintenance
recommendations and corresponding cost estimates.
The City does not have information regarding the design and construction of
the pavements in Cedar Grove No. 1 and 2. The pavements have provided approx-
imately 20 years of service and a general improvement is necessary at the time
7 to protect the existing investment and to minimize future pavement failures
and maintenance costs.
Several alternate improvement designs are considered to determine which would
be most beneficial in terms of cost and expected life. The alternates
considered are as follows:
1. Crack filling with seal coat application (single or double)
g2. Patch and repair with seal coat application
3. Patch and repair with bituminous overlay (determine minimum
thickness)
4. Overlay only with recommended bituminous thickness
Also, the economic and practical feasibility of including a filter fabric in
specified locations in lieu of patch and repair prior to overlay was considered.
-5-
THICKNESS OF EXISTING PAVEMENT
To determine the thickness of the existing pavement, eight locations were
sampled by drilling a small (1 inch) hole into the pavement and measuring
the thickness. The bituminous thickness (listed in Table 1) average is
2.56 inches with a coefficient of variation of 19 percent. The aggregate
base averaged 3 inches at the locations sampled, resulting in an average
Granular Equivalent thickness of 8 inches.
(, rsv )
Presr„t �es, fo, f,./ Slrret Ovsp.. stn„�1era� �N4.9 dare
8 Xu.'ACe
12, �6rdx✓/aeEfV'V:/rntae--
f'.- ff-ru vr< i Itr—y +X f21 -
vs 8C�.E e-As6ny =7 sa% Aei,c,eaej
TABLE 1. Measurements of the bituminous layer thickness in Cedar Grove ,, o; ,F,.rs/.leky,,
No. 1 and 2
Bituminous
Point No.
Thickness
Street
(Addn)
1
3.0”
Diamond
(1st)
2
2-3/4"
Opal
(1st)
3
2-1/2"
Zircon
(1st)
4
3"
Diamond
(2nd)
5
311
Sandstone
(2nd)
6
2-1/2"
Amber
(2nd)
7
1-3/4"
Jasper
(2nd)
8
2"
Jasper
(2nd)
Average = 2.56 inches
Standard deviation = 0.48 inch
-6-
l
I
I
TRAFFIC
The streets evaluated are functionally classified as residential. The
volume of traffic for residential streets is normally under 400 vehicles
per day. Of this traffic, only the Heavy Commercial traffic need be con-
sidered for pavement thickness design purposes. The predominant Heavy
Commercial vehicles that travel these streets are garbage trucks, school
buses (Table 2), and City maintenance vehicles. There are between 5 and
7 garbage trucks in Cedar Grove No. 1 and 2 per week. Other Heavy Com-
mercial traffic such as delivery trucks are normally much lighter than
the garbage trucks and school buses. There are no MTC buses on these
residential streets. The accumulation of truck traffic on these streets
results in an approximate Sigma N18 of 30,000 or less over a 20 year period.
This is well within the minimum design section of the Bituminous Pavement
Design Charts in the Mn/DOT Road Design Manual.
TABLE 2. School Bus Routes (All 66-72 passenger) in Cedar Grove No. 1 and 2
��^SSiJ�r .rl [(^n_r 4TfPr `d'�P.� �vf Lu �rC/•.r L�r.i, .0/n: .n'7
1ST ADDITION
Street
Termini
Number of
Routes
Diamond Drive All 1
Garnet Lane Diamond Drive to Topaz Lane 2
Topaz Lane Garnet Lane to Zircon Lane 2
Topaz Lane Co. Rd. 30 to Zircon Lane 1
Zircon Lane All I
2ND ADDITION
Coral Lane
All
2
Diamond Drive
Co. Rd. 30 to
Coral Lane 2
Jasper Drive
Rahn Road to
Sandstone Drive 2
Marble Lane
W. Jct. Diamond
Dr. to Nichols 2
Marble Lane
Sandstone Dr.
to W. Jct. Diamond 2
Dr.
Sandstone Drive
Coral Lane to
Jasper Drive 2
Sandstone Drive
Jasper Drive
to Marble Lane 1
_-7-
THICKNESS DESIGN
IWithin the Mn/DOT Bituminous Pavement Design procedure, the pavement design
is based on the maximum allowable deflection during the spring thaw period.
Table 3 lists the present estimated spring deflection for each of the streets
in Cedar Grove No. 1 and 2. These deflections are calculated from the deflec-
tions measured with the Road Rater using relationships developed by Mn/DOT.
The last column in Table 3 indicates the increase in G.E. recommended to
reduce the deflections to the recommended value. Five of the seven streets
in the 1st Addition indicate a need for an increase in structure while only
three of the nine streets in the 2nd Addition require additional structure.
l
1 TABLE 3. Summary of pavement strength analysis
1 1st ADDITION
0.069
0.070
Diamond Drive
0.061
Measured
Allowable
Additional
0.075
Deflection*
Deflection*
G.E. Required
1
(inches)
(inches)
inches
Diamond Drive
0.079
0.070
2.4
Garnet Lane & Drive
0.096
0.080
4_2
Sapphire Lane
0.067
0.070
Emerald Lane
0.072
0.075
---
Opal Drive
0.092
0.080
3.2
Zircon Lane
0.083
0.070
3.4
Topaz Drive
0.072
0.070
0.6
2ND ADDITION
Marble Lane
0.069
0.070
Diamond Drive
0.061
=__
0.070
Moonstone Drive
0.071
0.075
Amber Drive
0.085
0.080 1.2
Amber Court
0.092
0.085 1_6
Limestone Drive
0.072
0.075
Sandstone Drive
0.075
0.075 ---
Coral Lane
0.075
0.075 ---
Jasper Drive
0.085
0.070 3.9
j The values are expressed as an equivalent Benkelman Beam deflection and
represent the mean plus two standard deviation values.
1 - -8-
SURFACE CONDITION
A surface condition survey of the pavement was conducted to determine the
type and quantity of distress that is present. The type of distress and
the area affected that are relevant to the evaluation are as follows:
Distress Area of Pavement Affected
Alligator Cracking 17,000 sq. yds.
Distortion 4,000 sq. yds.
1 Block Cracking 18,000 sq. yds.
A portion of the alligator cracking and block cracking is formed by very
narrow to hairline cracks. Although these are hard to see, they will become
more dominant in the future and should be considered at this date.
/ Several of the streets evaluated such as Diamond Drive in the 2nd Addition,
have extensive alligator cracking and patching while showing that the strength
was adequate. This type of condition is common in instances where the truck
traffic has provided continued compaction of the aggregate base and upper
portion of the subgrade while causing cracking of the asphalt surface. The
other streets that have higher deflections with minimal surface distress would
show the same response if subjected to increased volume of truck traffic.
1 Removal and replacement of the areas with alligator cracking is normally
recommended to avoid maintenance problems in the future caused by the reflec-
tion of those cracks if overlayed or to avoid the development of potholes.
-9-
EXPECTED PERFORMANCE OF ALTERNATES CONSIDERED
The four alternates considered and their expected life are as follows:
I
D — _10-
Expected Time
to Structured
Alternate Maintenance
1. Crack fill and seal coat 1 year
2. Patch and repair with seal coat 7 - 10 years
3. Patch and repair with overlay 15 - 20 years
4. Overlay 7 - 10 years
The
years of performance before additional maintenance would be required is
described as follows:
1.
One year of performance would be expected for crack fill and seal coat.
There are a number of areas with substantial alligator cracking. Alli-
gator cracks form blocks of bituminous pavement with an average dimension
of 6 inches or less. Crack filling these areas would be very difficult
and do not effectively seal out moisture in these forms of cracking.
The cracks will be present and open the following spring, allowing water
to enter the base and subgrade below resulting in further deterioration
of the pavement.
2.
Seven to ten years of performance would be expected for patch and repair
with seal coat. The controlling factors for this alternate are the
existing block and longitudinal cracking that will slowly continue to
deteriorate and eventually require maintenance. The cold joints surround-
ing all the patch and repair areas also will have some localized deterior-
ation requiring future maintenance. However, it is expected that the
maintenance requirements would not be very extensive.
3.
Fifteen to twenty years would be expected from a patch and repair and .•-
overlay. This alternate would provide service equivalent to what would
be expected from a new pavement. Weathering and spring will be the
dominant factors controlling the length of service expected.
4.
Seven to ten years would be expected from an overlay. The predominant
a
factor that would limit the serviceable life of the overlay is the exist-
ing alligator cracking. The cracking will reflect through the overlay
in five to seven years and will become a maintenance item several years
after.
I
D — _10-
In addition to the four alternates, the City requested that the economic
and practical feasibility of fabrics be considered in lieu of patch and
repair prior to an overlay. Several brands of the fabrics have been in-
stalled at various locations in Minnesota on an experimental basis and
are being monitored by Mn/DOT. There has been no evidence in Minnesota
to date, that the presence of these fabrics improve the performance of
the pavement. The reported successes have been further south in milder
climates. The installed price of a fabric at this time is equivalent
to a 1i inch Mn/DOT Spec. 2331 overlay. Based on present performance
of fabrics in Minnesota, we do not recommend they be used. For future
reference, a small experimental installation may be justified. If such
an installation would be made, inform Mn/DOT, Office of Research and Engi-
neering Development, which is presently observing the performance of various
fabric applications.
I
1 — -11-
I COST OF ALTERNATES
The unit costs applicable to the various alternates were obtained from
various paving contractors in the area and from recent bids. The costs
9s are listed in Table 4 and the alternate costs in Table 5.
8 TABLE 4. Unit Costs
E
E F G H
Seal Coat"- Sq. Yd. 47.94 48.92 51.5f 49.71
' See enclosed specification or use the Bloomington 2341 modified specification.
" Based on milling 2.6" and replacing with 2331. Use of separate bid items for
removal and replacement is suggested.
••• Costs based on the sweeping to be provided by the City. Sweeping will add
7 to 8 cents per square yard to the cost.
(a) The lower price may be possible by ripping and loading with a 2332 replacement.
TABLE S. Estimate of Costs by Alternate
Expected Life/
Alternate
Initial Cost
- Annual Cost
Quotes
from Contractors
1/$43,000
Item
Unit
A
B C D
Overlay - 14" 2341
Sq. Yd.
52.00
$2.00 $4.30 51.65
Patch and Repair with 3/4"
Overlay - 3/4" 2331 mod.*
Sq. Yd.
51.05
51.25 -- 51.00
Remove and Replace"
Sq. Yd.
52.00(a)-5.00
54.50 54.00
E
E F G H
Seal Coat"- Sq. Yd. 47.94 48.92 51.5f 49.71
' See enclosed specification or use the Bloomington 2341 modified specification.
" Based on milling 2.6" and replacing with 2331. Use of separate bid items for
removal and replacement is suggested.
••• Costs based on the sweeping to be provided by the City. Sweeping will add
7 to 8 cents per square yard to the cost.
(a) The lower price may be possible by ripping and loading with a 2332 replacement.
TABLE S. Estimate of Costs by Alternate
Expected Life/
Alternate
Initial Cost
- Annual Cost
Crack Fill and Seal Coat
$ 43,000
1/$43,000
Patch and Repair with Seal Coat
$109,000
7/$15,570
Patch and Repair with 1-3/4"
(Average) Overlay
$266,000
20/$13,300
Patch and Repair with 3/4"
Overlay (includes an additional
1-1/2" overlay on Garnet, Zircon
and a part of Jasper)
$183,000
15/512,200
Overlay (based on 30', 1-I/2" over-
lay and 100'; 3/4" overlay)
$132,000
10/513,200
The annual costs are based on the initial cost divided by the expected years
of service. Factors such as interest rates, salvage value, etc. were not
considered
-12-
k
SPECIFICATIONS
(to"
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
PROJECT NO. 342
FOR
EAG^ MINNESOTA
1982
Sul
FILE No. 49229
/90"OAAWI l?"e-mef lq"44" a Yquocl&�f Ync.
cw""&44q 'Cag4w,"
St PaW4 m4m""&
!I
June 7, 1982
Honorable Mayor b Council
City of Eagan
3795 Pilot Knob Road
Eagan, Mo. 55122
Re: Cedar Grove No. 1 5 No. 2
Bituminous Overlay
Project 342
Our File No. 49229
Dear Mayor and Council:
Transmitted herewith is our report for Cedar Grove No. 1 and No. 2, Bituminous
Overlay.
This report discusses existing street conditions within Cedar Grove No. 1 and
No. 2 and presents cost estimates for street rehabilitation.
We will be pleased to meet with the Council, and other interested parties, at
a mutually convenient time to discuss this report.
Yours very truly,
BONESTR00, ROSENE, ANDERLIK b ASSOCIATES, INC.
Mark A. Hanson
MAH:li
Approved by:
0021b
I hereby certify that this report was prepared
by me or under my direct supervision and that
I am a duly Registered Professional Engineer
under the laws of the State of Minnesota.
A. Hanson
Date: June 7, 1982 Reg. No. 14260
Thomas A. Colbert
Director of Public Works
Date:
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
SCOPE: This report evaluate existing streets included within Cedar Grove No.
1 and No. 2 and presents improvement considerations in conjunction with their
estimated cost and proposed assessments.
Also included for consideration is construction of concrete curb and gut-
ter in conjunction with a bituminous overlay.
FEASIBILITY AND RECOMMENDATIONS: This project is feasible and is in accor-
dance with requirements for street construction for the City of Eagan. The
project as outlined herein can be carried out as one contract.
Information pertaining to traffic volume, in-place cross section, measured
deflections of the existing pavement, and required granular equivalencies are
presented in a report prepared by Midwest Pavement Management, Inc. titled
"Evaluation of the Pavements in Cedar Grove No. 1 and No. 2."
DISCUSSION: Streets included within Cedar Grove No. 1 and No. 2 have provided
approximately 20 years of service which for the most part is considered to be
the normal life of a bituminous pavement. The existing street condition dic-
tates that it is not cost effective from a maintenance standpoint to apply a
seal coat application at this time. This report proposes to construct a 1-1/2
inch 2341 bituminous overlay for all streets included within Cedar Grove No. 1
and No. 2.
A bituminous overlay must be constructed on stable bituminous surface if
the overlay is to provide an estimated 15 year service life. If an on-going
seal coat program is maintained, the service life could be extended even fur-
ther. Many streets within Cedar Grove No. 1 and No. 2 have deteriorated to a
Page 1.
0021b
0
point where extensive patching and other considerations must be given prior to
constructing a bituminous overlay.
Streets were therefore, classified into three categories for restoration
purposes. Each category is summarized herein and also shown on each figure
located at the back of this report. Also shown are critical driveways which
additional work will be required to pr:ivide proper grade and drainage.
RANDOM CRACKING: These are areas where the existing pavement has experienced
longitudinal and transverse cracking. These cracks are primarily due to the
expansion and contraction of the pavement because of temperature change and
also the age of the existing pavement. The pavement for the most part is
structurally adequate however a bituminous overlay is warranted due to surface
wear and the degradation of the initial pavement properties.
It is recommended in these areas cracks be blown clean and a crack sealer
of emulsified asphalt be applied prior to the bituminous overlay.
MAP CRACKING: These are areas where the existing pavement is 419b experienc-
ing transverse and longitudinal cracking WC'. -L` are confined
w smaller areas. The structural strength of the pavement is deteriorating at
a quicker rate, however, it is not cost effective at this time to remove the
existing pavement and patch.
Two alternatives for treatment of this type of cracking are presented
herein which from a cost standpoint are equal. One alternative is to apply
additional thickness of bituminous mixture during the overlay process. How-
ever, due to marginal driveway grades additional work will be required.
fr.or to tC-C 0(2.4Over[u.4
The other alternative is to apply a fabric materials which isvfairly new%to Q
?>..ew.ewt- r«+d.�+-uh teeAl'%+
H4e..savke--in the northern states. Communities which have utilized fabric ma-
terial on residential streets have been impressed with its performance to
Page 2.
0021b
date. The Minnesota Department of Transportation has utilized the fabric ma-
terial on highways and have not experienced near the success. However, it is
felt due to higher traffic volumes and speeds the fabric material does not
perform nearly as well as on low volume and low speed streets. It is recom-
mended the fabric material be utilized for this project.
MULTIPLE AND ERODED CRACKING: These are areas where the existing pavement has
to s Tt4('e wiere & kms lost .+s ftrer.4l: -4 k -A
deterioratedn au e6 the only cost-effective approach from a maintenance
standpoint is to remove the existing pavement. It is therefore recommended in
these areas the \remaining pavement be removed and a 2 inch bituminous base
course be constructed prior to the bituminous overlay.
CONCRETE CURB AND GUTTER
Curbing within Cedar Grove No. 1 and No. 2 consists of bituminous curb
which is providing its primary function of containing drainage and traffic and
providing a separation between street and yard. With the proposed bituminous
overlay as':outlined herein construction for concrete curb and gutter should be
considered. This construction would involve removal of the existing bitumi-
nous curb and constructing a B618 concrete curb and gutter. Restoration of
boulevard and driveways will be required.
AREA TO BE INCLUDED: The area to be included would be platted lots within
Cedar Grove No. 1, No. 2, and No. 4 as indicated in the preliminary assessment
roll located at the back of this report.
COST ESTIMATES: Detailed cost estimate for bituminous overlay and bituminous
overlay with concrete curb and gutter are presented in the Appendices located
at the back of this report. These costs are summarized as follows:
Page 3.
0021b
0
Bituminous Overlay $419,400
Bituminous Overlay with Concrete Curb & Gutter $945,590
The total estimated costs presented above include contingencies and all
related overhead. Overhead costs are estimated at 27% and include legal, en-
gineering, administration and bond interest.
ASSESSMENT: Assessments are proposed to be levied against the benefitted
property. A preliminary assessment roll is included at the back of this re-
port. Assessment rates are presented at various percentages of the total
estimated cost per lot. Of remaining costs will be financed from
For Cayes fs-e r�rroser)
the major street fund for the City of Eagan. Cost percentages aceumedn cam_
of
n /n 100%, 50%, or 25% of the total estimated cost per lot c rC
"4•
1 resd ;ae r,ert
wi4&," assessad<to the benefited property.
bas cd ew
REVENUE SOURCES: Revenue sources to cover the cost of this project 8e1auaing„
each percentage of the assessable rate as presented in the preliminary assess -
o -re
went roll as as follows:
A. BITUMINOUS OVERLAY
100% Assessable Rate
Project Cost Revenue Balance
Street $419,400
Street Assessment $419,400
Major Street Fund - 0 -
$419,400 $419,400 - 0 -
Page 4.
0021b
50% Assessable Rate
Street
Street Assessment
Major Street Fund
25% Assessable Rate
Street
Street Assessment
Major Street Fund
Project Cost Revenue Balance
$419,400
$419,400
$419,400
$419,400
B. BITUMINOUS OVERLAY WITH CONCRETE CURB b GUTTER
100% Assessable Rate
Street
Street Assessment
Major Street Fund
$209,700
209,700
$419,400 - 0 -
$104,850
314,550
$419,400 - 0 -
Project Cost Revenue Balance
$945,590
$945,590
50% Assessable Rate (Bituminous Overlay Onlv)
Street $945,590
Street Assessment
Major Street Fund
$945,590
Page 5.
0021b
$945,590
- 0 -
$945,590 - 0 -
$735,890
209,700
$945,590 - 0 -
Project Cost Revenue Balance
25% Assessable Rate (Bituminous Overlay Only)
Street $945,590
Street Assessment $631,040
Major Street Fund 314,550
$945,590 $945,590 — 0 —
The contribution from Major Street Fund are the same for both bituminous
overlay and bituminous overlay with concrete curb and gutter at the 50% and
25% of the assessable rate. It is assumed all costs associated with concrete
curb and gutter construction will be assessed completely to the benefited
property.
SCHEDULE
Present Feasibility Report
Public Hearing
Approve Plans b Specifications
Open Bid
Award Contract
Construction Completion
Assessment Hearing
First Payment Due with Real Estate Taxes
Page 6.
0021b
APPENDIX A
COST ESTIMATE
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
PROJECT 342
A) BITUMINOUS OVERLAY
15,000
Sq. yds.
Remove bituminous pavement @ $1.20/sq.yd.
$ 18,000
95
Each
Adjust manhole frame @ $150.00/each
14,250
55
Each
Adjust gate valve boxes @ $70.00/each
3,850
1,900
Ton
2331 Bituminous mixture for patching @ $32.00/ton
60,800
27,000
Sq.yds.
Fabric material in place @ $1.00/sq.yd.
27,000
8,200
Ton
2341 Bituminous wear course @ $11.00/ton
90,200
430
Ton
Bituminous material for mixture @ $180.00/ton
77,400
5,000
Gals.
Bituminous material for tack coat @ $1.20/gal.
6,000
85
Each
Driveway restoration @ $200.00/each
17,000
Total Construction
$314,500
+5% Contingency
15,730
$330,230
+27% Legal, Engrng., Admin. & Bond Interest 89,170
TOTAL BITUMINOUS OVERLAY ......................... $419,400
Page 7.
0021b
B) BITUMINOUS OVERLAY WITH CONCRETE CURB & GUTTER
15,000
Sq.yds.
Remove bituminous pavement @ $1.20/sq.yd.
$ 18,000
95
Each
Adjust manhole frame @ $150.00/each
14,250
55
Each
Adjust gate valve boxes @ $70.00/each
3,850
2,900
Ton
2331 Bituminous mixture for patching @ $32.00/ton
92,800
27,000
Sq.yds.
Fabric material in place @ $1.00/sq.yd.
27,000
5,000
Gals.
Bituminous material for tack coat @ $1.20/gal.
6,000
8,200
Ton
2341 Bituminous wear course @ $11.00/ton
90,200
430
Ton
Bituminous material for mixture @ $180.00/ton
77,400
47,200
Lin.ft.
Removing existing bituminous curb @ $0.50/lin.ft.
23,600
47,200
Lin.ft.
B618 concrete curb & gutter @ $4.50/lin.ft.
212,400
430
Each
Driveway restoration @ $200.00/each
86,000
32,000
Sq.yds.
Sodding with 3" topsoil @ $1.80/Sq.yd.
57,600
Total Construction
$709,100
+5% Contingency
35,460
$744,560
+27% Legal, Engrng., Admin. & Bond Interest 201,030
TOTAL BITUMINOUS OVERLAY WITH CONCRETE CURB ...... $945,590
Page 8.
0021b
APPENDIX B
PRELIMINARY ASSESSMENT ROLL
CEDAR GROVE NO. 1 AND NO. 2
BITUMINOUS OVERLAY
PROJECT 342
A. BITUMINOUS OVERLAY
Cedar Grove No. 1
Block 1, Lots 4-11
Block 2, Lots 13-34
Block 3, Lots 1-19
Block 4, Lots 1-9
Block 5, Lots 1-32
Block 6, Lots 1-20
Block 7, Lots 1-18
Block 8, Lots 1-5
Block 9, Lots 7-19
Block 10, Lots 1-24
Block 11, Lots 1-11
Cedar Pond Park; Lot 10, Block 4
Cedar Grove No. 2
Block 1, Lots 7-30
Block 2, Lots 1-27
Block 3, Lots 1-19
Block 4, Lots 14-27
Block 5, Lots 1-36
Block 6, Lots 1-17
Block 7, Lots 1-52
Block 8, Lots 1-18
0021b
Total Cost
No. of Lots
Per Block
Cost/Lot
8
$ 7,803
$975
22
21,458
975
19
18,532
975
9
8,778
975
32
31,211
975
20
19,507
975
18
17,556
975
5
4,877
975
13
12,680
975
24
23,408
975
11
10,729
975
8
7,803
975
24
$ 23,408
975
27
26•,333
975
19
18,532
975
14
13,655
975
36
35,113
975
17
16,581
975
52
50,718
975
18
17,556
975
Page 9.
Cedar Grove No. 4
Block 1, Lots 16-17
Block 3, Lots 7-15
Block 4, Lots 20-39
Block 6, Lots 17, 18, 19
TOTAL .......................
Total Cost
No. of Lots
Per Block
Cost/Lot
2
$ 1,951
$975
9
8,778
975
20
19,507
975
3
2,926
975
430
$419,400
e3
9 -
ASSESSED COST
Presented herein are assessed costs per lot for various percentages of the
estimated cost per lot assuming the City's Major Street Fund would absorb the
additional cost. Costs per lot per year and per month assume the assessed
cost would be spread evenly for a 10 year period. The interest rate for bond-
ing purposes is assumed to be 10%.
100% Assessable Rate
50% Assessable Rate
25% Assessable Rate
SUMMARY
Cost/Lot
$975.00
487.50
243.75
Page 10.
0021b
Cnsr/tor/yBA2
Is yr
106
/4s O°
/07.2s-
775=
S-3 c3
q8 11
z&,'Ll
/Lcft
ont
$1 2
. 1
3.3
�oST� nr�anavru
/ S/-
�0 ��
S.x
yr7
e3
9 -
z23
a
B. BITUMINOUS OVERLAY WITH CONCRETE CURB b GUTTER
Cedar Grove No. 1
Cedar Grove No. 2
Total Cost
No. of Lots
Per Block
Cost/Lot
Block
1,
Lots
4-11
8
$ 17,592
$2,199
Block
2,
Lots
13-34
22
48,379
2,199
Block
3,
Lots
1-19
19
41,782
2,199
Block
4,
Lots
1-9
9
19,791
2,199
Block
5,
Lots
1-32
32
70,369
2,199
Block
6,
Lots
1-20
20
43,981
2,199
Block
7,
Lots
1-18
18
39,583
2,199
Block
8,
Lots
1-5
5
10,995
2,199
Block
9,
Lots
7-19
13
28,588
2,199
Block
10,
Lots
1-24
24
52,777
2,199
Block
11,
Lots
1-11
11
24,190
2,199
Cedar
Pond Park; Lot 10, Block 4
8
17,592
2,199
Cedar Grove No. 2
Total Cost
No. of Lots
Per Block
Cost/Lot
Block
1,
Lots
7-30
24
$ 52,777
$2,199
Block
2,
Lots
1-27
27
59,374
2,199
Block
3,
Lots
1-19
19
41,782
2,199
Block
4,
Lots
14-27
14
30,787
2,199
Block
5,
Lots
1-36
36
79,166
2,199
Block
6,
Lots
1-17
17.
37,384
2,199
Block
7,
Lots
1-52
52
114,350
2,199
Block
8,
Lots
1-18
18
39,583
2,199
Cedar
Grove No. 4
Block
1,
Lots
16-17
2
$ 4,398
$2,199
Block
3,
Lots
7-15
9
19,791
2,199
Block
4,
Lots
20-39
20
43,982
2,199
Block
6,
Lots
17, 18, 19
3
6,597
2,199
TOTAL ......................
430
$945,590
Page
11.
0021b
.r . q
ASSESSED COST
Presented herein are assessed costs per lot for various percentages of the
estimated cost per lot assuming the City's Major Street Fund would absorb the
additional cost. Costs per lot per year and per month assume the assessed
cost would be spread evenly for a 10 year period. The interest rate for bond-
ing purposes is assumed to be 10%. The cost/lot for 50% and 25% of the
assessable rate assume all costs associated with concrete curb and gutter con-
struction will be assessed entirely to the benefited property.
SUMMARY
Cost/Lot
100% Assessable Rate $2,199
50% Assessable Rate 1,711
25% Assessable Rate 1,467
Page 12.
0021b
LOST/�
/Sr - yr
tam r
5'39-
s9
310
;t37
F3� /&/ —
Cost/Lot
/Month
ay vs 13 t5
sl �<
]
a (..
II 10
LA E
74 ;9..Y 1 19 'N` •meq\4:`�F?s%ti 9 9
•g.
z l e �:��: =•K'' I I
Q 77 Iz
72 z
31 z 14 10
71 Ill'`
I]
70 4
29 Y. 6 26 13
27 9 10 ] 9 29 :4 09 //I2 I ` 1 2 '�F.''>tey$L.
13
26 24
12 YO 22 a.a'' IY
2 Z` 24 27 22 21 20 I w
10
19 10
CEDAR GROVE NO. Is _ /e LOT 9 2° ] 9
le O "ig, — — J EOUMALENf 1s e ►
RANDOM CRACKING . .� 4 a.
MAP CRACKING n 9 /� it I la 1e 17 12 11 10 9 ► 47
Ifi
CEDAR POND I iG r> Z CO A
O /
® MULTIPLE ANDa a 2
PARK I n;
ERODED CRACKING " }u. ] I\ 7 H •• • -
2 7
a 7 1 f ] a 9 10 11
♦ CRITICAL DRIVEWAY 14 `��' e � .� 1
tt.F _ 4 O ; ..
FILE No. 49229 I7 `'{,', 9 3
EAGAN, MINNESOTA
BONESTROO, AOSENE, ANDENUK K ASSOC, INC. T C S A. H A6. 30
COI10 [9aaEEa
SI. P.I.
I
SI. AI111wwb
Z
Z
N
O
O
ISCALE: 1"=2od
Z
Z
s:.
CEDAR GROVE NO. 2
RANDOM CRACKING
2 Q:PR40SE1
3
14
Is IB
Il IB 9 20
21 92 23 24
0
A E I
MAP CRACKING
4
MULTIPLE AND
5
27
ERODED CRACKING
35
13
51
4
A CRITICAL DRIVEWAY
It
3
-4
3 W
4
O
7
50
3
IS
3
30
,4 33 4
:11
4 R
15
FILE No 49229
9
494
EAGAN, MINNESOTA
9 k
4U5
13
5
32
15
5
17
47
-
14
6
BoNLSTROO, ROWNE, ANDERUX & AS&Wft•
7
CONSULTIN Dann
46
•
a
30
20
s
19
12
4510
29 a
12
S LE-
!
44
19
IS 17 16 15 14 13 A
W432
21
27
22
24
Zt
ZZ
121
26
20
30
19
ze 29 30
24
ID
Q
39
28
a.sp
13
16 17
LQ
12
3710
9
a
7