04/17/1989 - City Council Specialm
SPECIAL CITY COUNCIL MEETING
MONDAY, APRIL 17, 1989, 7:00 P.M.
EAGAN MUNICIPAL CENTER BUILDING
I. ROLL CALL
II. SPACE NEEDS ANALYSIS REPORT/MAINTENANCE
FACILITY 8 GROUNDS
III. OPT-OUT/MTC BUS SERVICE REPORT
IV. OTHER BUSINESS
V. ADJOURNMENT
IJ
MEMO TO: HONORABLE MAYOR AND CITY COUNCILMEMBERS
FROM: CITY ADMINISTRATOR HEDGES
DATE: APRIL 12, 1989
SUBJECT: SPECIAL CITY COUNCIL MEETING FOR 4-17-89
There are two (2) main topics for City Council consideration. They
include 1) the final results of the Space Needs Analysis for the
maintenance facility and grounds as performed by BRW. The second
item is a presentation and consideration of the OPT -OUT study that
was performed by Strgar-Roscoe-Fausch Consulting Engineers.
SPACE NEEDS ANALYSIS/MAINTENANCE FACILITY & GROUNDS REPORT
The 1989 budget included a Space Needs Analysis for the purpose of
analyzing the City's long term needs for office space, vehicular
storage, cold storage, parking and other considerations. The firm
of BRW was selected to perform the needs analysis. The study takes
into consideration the amount of land that will be needed for
present and future maintenance facilities and other cold s rage
operations. E closed for City Council review on pages
through is a copy of the executive summary. Also
enclosed for your review is a copy of the complete study.
The purpose of the presentation on Monday is to advise the City
Council with the staff and consultants conclusions regarding future
space needs. The need for expanded facilities was identified by
the City Council and staff as one of the top six (6) goals during
our strategic planning effort. By forecasting needs to the year
2010, the City Administrator's office can conclude the findings
into the capital improvement budgeting process.
ACTION TO BE CONSIDERED ON THIS ISSUE: To consider acceptance of
the Maintenance Space Needs Analysis Report and authorize a
feasibility report for the first phase of expansion.
OPT-OUT/MTC BUS SERVICE REPORT
As a part of the legislative session during 1981, OPT -OUT
legislation was approved giving certain cities, mainly third tier
suburbs, the choice to opt out of the MTC Bus Service if they so
desired. There was a requirement that a City Council adopt a
resolution of intent to opt out by a certain date, which would
allow that city to study its options, but in any event, must make
a decision by July 1, 1989 as to whether they will proceed with
formalizing an MTC bus opt -out. The Cities of Prior Lake, Savage,
Burnsville, Rosemount, Apple Valley and Eagan all passed
resolutions to preserve their option to opt out if the results
determined that the City of Eagan could provide as good, or better,
bus service opportunities independent of the MTC bus system
mandate.
During 1988 the:six (6) Cities under a Joint Powers Agreement were
sanctioned by the respective City Councils to hire a consulting
firm to evaluate the Cities' alternatives to the opt out choice.
The RTB agreed to fund the study and the firm of Strgar-Roscoe-
Fausch was retained by the six (b) Cities to perform the study.
Their conclusions were presented to the City
Administrators/Managers for the six (6) communities approximately
two (2) weeks ago. It was determined at that meeting that the
consultants would make•a presentation to each City Council during
the month of April. It is expected that a joint meeting of all six
(6) Cities may be scheduled in early to mid May. Included for your
review is a copy of the executive summ as prepared b the
consultants. Also enclosed on pages through
is a copy of a memo from Kristy Marnin redard'ing the study.
While reviewing the executive summary, it is important to be aware
of the difference.in property tax between the cost for MTC service
and the same service if we elect to contract with MTC or some other
provider is not refundable as a tax credit to the City. However,
that amount can be used to subsidize additional bus service if the
City of Eagan or other communities so desire.
There is no action required on this item at this
will be scheduled as a formal City Council agenda
month of May.
City Administrator
5
time. This item
item during the
IRECUTIVESUMMARY ;
11
2
INTRODUCTION
The report which follows includes the following sections:
o Design Issues: Overall issues and objectives
o Space Regwirements Listing: Detailed listing of the name, size and number of all
current and projected space requirements
o Space Projection Assumptions: Assumptions and analysis which explain the pro-
jected space requirements
o Detailed Space Requirements: .Specific needs, concerns, or proximity rela-
tionships within each fiunctional area
o Site Master Plan: Short and long-range site development recommendations and cost
projections or all maintenance operations.
o Office Addition: Recommended conceptual floor plans for the office addition to
meet current and future space requirements to the Year 2000.
SPACE REQUIREMENTS SUMMARY
The table and comments which follow summarize the overall current and projected space
requirements:
BUILDING TYPE
CURRENT
SQUARE FEET
PROJECTED SQUARE FEET
1990 1995 2000
Office Type Space
11,068
13,610
14,825
15,550
Long Span -High Bay
34,614
36,092 .-
45,300
52,930
Space
Cold Storage
4,800
7,387
14,839
22,453
Salt Storage
2,304
2,304
4,608
6,912
Outside Storage
48,950
80,275
91,615
108,,115
1
o The need for additional office space in the immediate future is greater than
implied by the number above. The low ceiling storage area on the second floor in
the southwest corner is now being used as sub -standard office space. Also, it is
currently underutilized because it is suitable only for staging areas, summer
employee lockers and storage. Therefore, the immediate need is greater than
2,500 gross square feet as indicated above. The demand for office space by the
Year 2000 is 15,550 gross square feet, an increase of about 4,500 gross square
feet. This additional area should be designed and built in one phase because it
is a relatively small increment of space.
o The greatest current office need is more space for administration/conference
space, followed by offices and storage space for the three departments (Streets
and Equipment, Utilities, and Parks Maintenance/Forestry). The lunchroom/
training room and locker facilities are adequate to the Year 2000.
o Long span high -bay areas include heated vehicle storage, vehicle maintenance
bays, and several fabrication functions. The fabrication functions do not
require high -bay space, but are most appropriately located there to provide
flexibility for future growth (unimpeded by walls) and flexibility for seasonal
changes in space needs between the functions located in the high -bay space.
o Long span high -bay space needs are projected to grow by more than 100 percent by
the Year 2000. This growth is primarily in vehicle storage and will likely be
steady in response to overall growth in the City of Eagan. Because this growth
results in such a large increase in the need for heated storage, we have assumed
in this study that one-fourth of all vehicles and equipment assigned to heated
storage can be housed in cold or minimally heated storage. This assumption redu-
ces the amount of heated vehicle storage by about 15,000 square feet by the Year
2000. Although the space is adequate today, new space will be required by 1990
or 1991. Additions to the long span high -bay areas can be designed and
constructed in one or two increments between 1990 and 2000.
o The 15,000 square feet of vehicle storage by the Year 2000 has been added to cold
storage space needs. Other cold storage space needs are projected to grow more
slowly than heated vehicle storage, but the current space is already inadequate.
The current cold storage facility will almost certainly need to be relocated in
the future for better utilization of the site.
o Salt storage is projected to triple in space needs by the Year 2000. The argu-
ments supporting the need for enclosed salt storage are included in the space
projection assumptions section.
2
M
Outside storage is currently and is projected to remain the largest space com-
ponent on the public works site. Outside storage is the single most important
component affecting when site capacity will be reached.
SITE MASTER PLAN
The recommended ultimate development of the site is shown on the site masterplan. The
plan indicates the location of all.existing and future buildings, outside storage,
roadways, parking, and visual screening. Based on the projected growth, site capacity
will be reached between 1995 and 2d00. The plan shows how an additional 2.41 -acre
parcel of land to the west of the site could be utilized to meet the needs of the
maintenance operations well beyond the Year 2000. The approximate total costs for
future development on the site as shown on the master plan are summarized below.
SQUARE APPROXIMATE APPROXIMATE
FUNCTION/BUILDING FEET UNIT COST TOTAL COST
Office Addition/Remodeling
5,994
$55.87/square foot
$334,900
Vehicle Maintenance
1,632
$35/square foot
$ 57,100
Vehicle Storage/Fabrication
17,372
$35/square foot
$608,000
Cold Storage
22,400
$27.50/square foot
$616,000
Salt Storage
4,608
$30/square foot
$138,000
Landscaping
--
--
$ 20,000
Fencing, Regrading, Bins,
--
--
$100,000
Roadways, Miscellaneous
Land Acquisition (contiguous)
108,000
$22,000/acre
$ 55,000
Total
OFFICE ADDITION
$1,929,000
The first priority for site development is the addition of office space. The concep-
tual design expression, footprint, and floor plan layout for the office addition is
illustrated in this section of the study. A one-story addition, is recommended because
it will be less expensive (no elevator or additional fire stairways) and because it
allows a much more functional and convenient layout of spaces than the other alter-
natives which were explored. The one-story alternative totals 3,939 square feet,
which is about 550 square feet less than the space program because of these efficien-
cies.
I
DESIGN ISSUES
1. Visual Screening
It is important that exterior storage be screened from adjacent residential areas and
Yankee Doodle Road.
2. Site Development
Existing utilities and topographic variation will impact the ultimate intensity of
development on the site, without extensive site costs. Topographic variation may also
be viewed as an opportunity to provide visual screening.
3. Site Campus
The maintenance facilities site ,must be planned in total as a "campus" of buildings,
roads, and open storage areas which must relate to each other and allow for future
expansion.
4. After Hours Operation
The ability for vehicles to leave the site quickly after hours is important. The
current locked gate is a problem. It can be solved by installing an automatic door.
Over time, this need will increase, given the trend toward more evening and weekend
work schedules. '
5. Organization of Building Functions
The Maintenance Operations Building is composed of three groups of functions, which
are organized around activities, public contact, and proximity relationships, but not
around administrative departments. These include:
o Office Functions: Reception, administrative staff/files/records storage,
superintendent offices, and conference rooms
o Supervisory and Support Functions: Lunchroom, lockers, supervisor offices,
staging areas, and material storage
o Staff and Crew Functions: Vehicle and equipment maintenance, fabrication areas,
and vehicle and equipment storage
4
6. Growth
We have tried in this study to project growth in staff and space needs based on anti-
cipated growth in the City to the Year 2000 and anticipated changes in operations.
The projected space needs in any particular area may occur earlier or later than the
Year 2000. Flexibility for actual future growth must be considered in the design of
the next addition. Also, growth needs beyond 2000 should be considered in site•
planning.
7. Energy Conservation
Measures for reducing the building energy consumption should be studied during design
and implemented if cost-effective.
8. Life Cycle Cost Considerations
Careful consideration should be given to help reduce the true cost of the building
over its life cycle. This includes space organization to maximize efficiency and to
minimize the number of support staff required, building materials which require low
maintenance, and spaces which are flexible for change and reuse overtime.
9. Interim Operations
Consideration must be given during design to a plan layout for the next addition which
can be.constructed with minimal disruption of ongoing operation of the facility.
5
MEMORANDUM
TO: Tom Hedges, City Administrator
FROM: Kristy Marnin, Planner I
DATE: April 12, 1989
SUBJECT: City Council Workshop - April 17, 1989
Needs Assessment Transit Study
Attached is a copy of the summary report for the Six City Needs
Assessment Transit Study. The Cities of Eagan, Apple Valley,
Burnsville, Prior Lake, Rosemount and Savage have been
participating in a Needs Assessment Transit Study (NATS) since
Summer 1988. The intent of this study was to identify existing and
future transit needs in the six -city area and to evaluate service
options that could be pursued'to meet those needs. A key element
of the evaluation process was to determine whether the communities
collectively or individually should pursue a locally operated
transit system (i.e. "opt -out" of the existing system) or if they
should remain as part of the metropolitan transit system. State
legislation regarding the opt -out program requires that communities
decide by July 1, 1989 whether or not to proceed with replacement
services.
The conclusions of this study are,, in general, that: a) the
existing transit system does not meet all local needs, and b)
replacement transit service options are available to better meet
these local needs without increasing the local transit tax burden.
As such, the recommendations are to: 1) opt -out of the metropolitan
transit system, 2) replace the existing service in 1990, 3) convert
to a trunk and feeder line service in 1991, and 4) expand services
in the future as needs arise.
A point meeting of the six City Councils has been scheduled for
7:30 p.m. on Wednesday, May 17, 1989, at the Apple Valley Community
Center. This meeting will provide the opportunity for feedback
among the cities regarding the study results.
Provided that an opt -out decision is made, a Joint Powers Agreement
between the cities will be necessary. An example of this agreement
is attached. The City Council must take action on the study
recommendations by June 1, 1989, in order to allow time for the
preparation of a service plan prior to the July 1, 1989 deadline.
9
JOINT POWERS AGREEMENT
AN AGREEMENT ESTABLISHING
A SIX -CITY TRANSIT AUTHORITY
FOR THE CITIES OF
APPLE VALLEY, BURNSVILLE, EAGAN, PRIOR LAKE, ROSEMOUNT AND SAVAGE
THIS AGREEMENTis between the cities of Apple Valley, Burnsville,
Eagan, Prior Lake, Rosemount and Savage (hereinafter 'The Cities").
WHEREAS, The Cities are Minnesota municipal corporations, duly
organized and licensed under the laws of the State of Minnesota; and
WHEREAS, The Cities historically have shared common concerns and
interests and have had long and positive working relationships; and
WHEREAS, The
Cities
have previously organized
together
under the
Minnesota Joint Powers
Act,
Minnesota Statules Section
471.59,
to conduct
a "Needs Assessment Transit Study;" and
WHEREAS, the purpose of
the "Needs Assessment Transit Study"
was
to evaluate
the transit needs of
The Cities, evaluate the
level and
cost
of existing
transit service in
The Cities and to
determine
the
feasibility
of establishing a
"Replacement Service
Program,'
also
referred to
as "opt -out program,'
pursuant to Minnesota
Statutes Section
473.388; and
WHEREAS, The Cities have determined that area transit needs are
not being met and a high proportion of area property taxes levied for
transit purposes is not being utilized for area transit service in The
Cities. � l
NOW THEREFORE, The Cities agree as follows:
1, The Cities jointly approve the conclusions and recommendations of
the Assessment Transit Study.
2. The Cities will
jointly
prepare and submit a
six -city
replacement service
,plan" to
the Regional Transit Board
by June
30, 1989.
3. 'Replacement service" will begin on , 1990, and
will consist of the replacement of existing Metropolitan Transit
Commission transit services with similar service, contracted
through the formal public bidding process.
4. The Cities will establish a six -city transit authority," by
separate agreement, for the purpose of planning and governing
transit programs in The Cities.
Adopted this _ day or
1989.
CITY OF APPLE VALLEY
B
Its• Mayor
Attest:
Adopted this _ day of
1989.
CITY OF EAGA'N
Its: Mayor
Attest:
It
Adopted this _ day of
1989:
CITY OF ROSEMOUNT
Its• Mayor
Attest:
Its:
Adopted.this_ day or
1989.
CITY OF BURNSVILLE
B
Its: Mayor
Attest:
Its:
Adopted this _ day of
1989.
CITY OF PRIOR LAKE
Its• Mayor
Attest•
Adopted this _ day of
1989.
CITY OF SAVAGE
By:
Its: Mayor
Attest:.
m
SPECIAL CITY COUNCIL MEETING
MONDAY, APRIL 17, 1989, 7:00 P.M.
EAGAN MUNICIPAL CENTER BUILDING
I. ROLL CALL
II. SPACE NEEDS ANALYSIS REPORT/MAINTENANCE
FACILITY 8 GROUNDS
III. OPT-OUT/MTC BUS SERVICE REPORT
IV. OTHER BUSINESS
V. ADJOURNMENT
IJ
MEMO TO: HONORABLE MAYOR AND CITY COUNCILMEMBERS
FROM: CITY ADMINISTRATOR HEDGES
DATE: APRIL 12, 1989
SUBJECT: SPECIAL CITY COUNCIL MEETING FOR 4-17-89
There are two (2) main topics for City Council consideration. They
include 1) the final results of the Space Needs Analysis for the
maintenance facility and grounds as performed by BRW. The second
item is a presentation and consideration of the OPT -OUT study that
was performed by Strgar-Roscoe-Fausch Consulting Engineers.
SPACE NEEDS ANALYSIS/MAINTENANCE FACILITY & GROUNDS REPORT
The 1989 budget included a Space Needs Analysis for the purpose of
analyzing the City's long term needs for office space, vehicular
storage, cold storage, parking and other considerations. The firm
of BRW was selected to perform the needs analysis. The study takes
into consideration the amount of land that will be needed for
present and future maintenance facilities and other cold s rage
operations. E closed for City Council review on pages
through is a copy of the executive summary. Also
enclosed for your review is a copy of the complete study.
The purpose of the presentation on Monday is to advise the City
Council with the staff and consultants conclusions regarding future
space needs. The need for expanded facilities was identified by
the City Council and staff as one of the top six (6) goals during
our strategic planning effort. By forecasting needs to the year
2010, the City Administrator's office can conclude the findings
into the capital improvement budgeting process.
ACTION TO BE CONSIDERED ON THIS ISSUE: To consider acceptance of
the Maintenance Space Needs Analysis Report and authorize a
feasibility report for the first phase of expansion.
OPT-OUT/MTC BUS SERVICE REPORT
As a part of the legislative session during 1981, OPT -OUT
legislation was approved giving certain cities, mainly third tier
suburbs, the choice to opt out of the MTC Bus Service if they so
desired. There was a requirement that a City Council adopt a
resolution of intent to opt out by a certain date, which would
allow that city to study its options, but in any event, must make
a decision by July 1, 1989 as to whether they will proceed with
formalizing an MTC bus opt -out. The Cities of Prior Lake, Savage,
Burnsville, Rosemount, Apple Valley and Eagan all passed
resolutions to preserve their option to opt out if the results
determined that the City of Eagan could provide as good, or better,
bus service opportunities independent of the MTC bus system
mandate.
During 1988 the:six (6) Cities under a Joint Powers Agreement were
sanctioned by the respective City Councils to hire a consulting
firm to evaluate the Cities' alternatives to the opt out choice.
The RTB agreed to fund the study and the firm of Strgar-Roscoe-
Fausch was retained by the six (b) Cities to perform the study.
Their conclusions were presented to the City
Administrators/Managers for the six (6) communities approximately
two (2) weeks ago. It was determined at that meeting that the
consultants would make•a presentation to each City Council during
the month of April. It is expected that a joint meeting of all six
(6) Cities may be scheduled in early to mid May. Included for your
review is a copy of the executive summ as prepared b the
consultants. Also enclosed on pages through
is a copy of a memo from Kristy Marnin redard'ing the study.
While reviewing the executive summary, it is important to be aware
of the difference.in property tax between the cost for MTC service
and the same service if we elect to contract with MTC or some other
provider is not refundable as a tax credit to the City. However,
that amount can be used to subsidize additional bus service if the
City of Eagan or other communities so desire.
There is no action required on this item at this
will be scheduled as a formal City Council agenda
month of May.
City Administrator
5
time. This item
item during the
IRECUTIVESUMMARY ;
11
2
INTRODUCTION
The report which follows includes the following sections:
o Design Issues: Overall issues and objectives
o Space Regwirements Listing: Detailed listing of the name, size and number of all
current and projected space requirements
o Space Projection Assumptions: Assumptions and analysis which explain the pro-
jected space requirements
o Detailed Space Requirements: .Specific needs, concerns, or proximity rela-
tionships within each fiunctional area
o Site Master Plan: Short and long-range site development recommendations and cost
projections or all maintenance operations.
o Office Addition: Recommended conceptual floor plans for the office addition to
meet current and future space requirements to the Year 2000.
SPACE REQUIREMENTS SUMMARY
The table and comments which follow summarize the overall current and projected space
requirements:
BUILDING TYPE
CURRENT
SQUARE FEET
PROJECTED SQUARE FEET
1990 1995 2000
Office Type Space
11,068
13,610
14,825
15,550
Long Span -High Bay
34,614
36,092 .-
45,300
52,930
Space
Cold Storage
4,800
7,387
14,839
22,453
Salt Storage
2,304
2,304
4,608
6,912
Outside Storage
48,950
80,275
91,615
108,,115
1
o The need for additional office space in the immediate future is greater than
implied by the number above. The low ceiling storage area on the second floor in
the southwest corner is now being used as sub -standard office space. Also, it is
currently underutilized because it is suitable only for staging areas, summer
employee lockers and storage. Therefore, the immediate need is greater than
2,500 gross square feet as indicated above. The demand for office space by the
Year 2000 is 15,550 gross square feet, an increase of about 4,500 gross square
feet. This additional area should be designed and built in one phase because it
is a relatively small increment of space.
o The greatest current office need is more space for administration/conference
space, followed by offices and storage space for the three departments (Streets
and Equipment, Utilities, and Parks Maintenance/Forestry). The lunchroom/
training room and locker facilities are adequate to the Year 2000.
o Long span high -bay areas include heated vehicle storage, vehicle maintenance
bays, and several fabrication functions. The fabrication functions do not
require high -bay space, but are most appropriately located there to provide
flexibility for future growth (unimpeded by walls) and flexibility for seasonal
changes in space needs between the functions located in the high -bay space.
o Long span high -bay space needs are projected to grow by more than 100 percent by
the Year 2000. This growth is primarily in vehicle storage and will likely be
steady in response to overall growth in the City of Eagan. Because this growth
results in such a large increase in the need for heated storage, we have assumed
in this study that one-fourth of all vehicles and equipment assigned to heated
storage can be housed in cold or minimally heated storage. This assumption redu-
ces the amount of heated vehicle storage by about 15,000 square feet by the Year
2000. Although the space is adequate today, new space will be required by 1990
or 1991. Additions to the long span high -bay areas can be designed and
constructed in one or two increments between 1990 and 2000.
o The 15,000 square feet of vehicle storage by the Year 2000 has been added to cold
storage space needs. Other cold storage space needs are projected to grow more
slowly than heated vehicle storage, but the current space is already inadequate.
The current cold storage facility will almost certainly need to be relocated in
the future for better utilization of the site.
o Salt storage is projected to triple in space needs by the Year 2000. The argu-
ments supporting the need for enclosed salt storage are included in the space
projection assumptions section.
2
M
Outside storage is currently and is projected to remain the largest space com-
ponent on the public works site. Outside storage is the single most important
component affecting when site capacity will be reached.
SITE MASTER PLAN
The recommended ultimate development of the site is shown on the site masterplan. The
plan indicates the location of all.existing and future buildings, outside storage,
roadways, parking, and visual screening. Based on the projected growth, site capacity
will be reached between 1995 and 2d00. The plan shows how an additional 2.41 -acre
parcel of land to the west of the site could be utilized to meet the needs of the
maintenance operations well beyond the Year 2000. The approximate total costs for
future development on the site as shown on the master plan are summarized below.
SQUARE APPROXIMATE APPROXIMATE
FUNCTION/BUILDING FEET UNIT COST TOTAL COST
Office Addition/Remodeling
5,994
$55.87/square foot
$334,900
Vehicle Maintenance
1,632
$35/square foot
$ 57,100
Vehicle Storage/Fabrication
17,372
$35/square foot
$608,000
Cold Storage
22,400
$27.50/square foot
$616,000
Salt Storage
4,608
$30/square foot
$138,000
Landscaping
--
--
$ 20,000
Fencing, Regrading, Bins,
--
--
$100,000
Roadways, Miscellaneous
Land Acquisition (contiguous)
108,000
$22,000/acre
$ 55,000
Total
OFFICE ADDITION
$1,929,000
The first priority for site development is the addition of office space. The concep-
tual design expression, footprint, and floor plan layout for the office addition is
illustrated in this section of the study. A one-story addition, is recommended because
it will be less expensive (no elevator or additional fire stairways) and because it
allows a much more functional and convenient layout of spaces than the other alter-
natives which were explored. The one-story alternative totals 3,939 square feet,
which is about 550 square feet less than the space program because of these efficien-
cies.
I
DESIGN ISSUES
1. Visual Screening
It is important that exterior storage be screened from adjacent residential areas and
Yankee Doodle Road.
2. Site Development
Existing utilities and topographic variation will impact the ultimate intensity of
development on the site, without extensive site costs. Topographic variation may also
be viewed as an opportunity to provide visual screening.
3. Site Campus
The maintenance facilities site ,must be planned in total as a "campus" of buildings,
roads, and open storage areas which must relate to each other and allow for future
expansion.
4. After Hours Operation
The ability for vehicles to leave the site quickly after hours is important. The
current locked gate is a problem. It can be solved by installing an automatic door.
Over time, this need will increase, given the trend toward more evening and weekend
work schedules. '
5. Organization of Building Functions
The Maintenance Operations Building is composed of three groups of functions, which
are organized around activities, public contact, and proximity relationships, but not
around administrative departments. These include:
o Office Functions: Reception, administrative staff/files/records storage,
superintendent offices, and conference rooms
o Supervisory and Support Functions: Lunchroom, lockers, supervisor offices,
staging areas, and material storage
o Staff and Crew Functions: Vehicle and equipment maintenance, fabrication areas,
and vehicle and equipment storage
4
6. Growth
We have tried in this study to project growth in staff and space needs based on anti-
cipated growth in the City to the Year 2000 and anticipated changes in operations.
The projected space needs in any particular area may occur earlier or later than the
Year 2000. Flexibility for actual future growth must be considered in the design of
the next addition. Also, growth needs beyond 2000 should be considered in site•
planning.
7. Energy Conservation
Measures for reducing the building energy consumption should be studied during design
and implemented if cost-effective.
8. Life Cycle Cost Considerations
Careful consideration should be given to help reduce the true cost of the building
over its life cycle. This includes space organization to maximize efficiency and to
minimize the number of support staff required, building materials which require low
maintenance, and spaces which are flexible for change and reuse overtime.
9. Interim Operations
Consideration must be given during design to a plan layout for the next addition which
can be.constructed with minimal disruption of ongoing operation of the facility.
5
MEMORANDUM
TO: Tom Hedges, City Administrator
FROM: Kristy Marnin, Planner I
DATE: April 12, 1989
SUBJECT: City Council Workshop - April 17, 1989
Needs Assessment Transit Study
Attached is a copy of the summary report for the Six City Needs
Assessment Transit Study. The Cities of Eagan, Apple Valley,
Burnsville, Prior Lake, Rosemount and Savage have been
participating in a Needs Assessment Transit Study (NATS) since
Summer 1988. The intent of this study was to identify existing and
future transit needs in the six -city area and to evaluate service
options that could be pursued'to meet those needs. A key element
of the evaluation process was to determine whether the communities
collectively or individually should pursue a locally operated
transit system (i.e. "opt -out" of the existing system) or if they
should remain as part of the metropolitan transit system. State
legislation regarding the opt -out program requires that communities
decide by July 1, 1989 whether or not to proceed with replacement
services.
The conclusions of this study are,, in general, that: a) the
existing transit system does not meet all local needs, and b)
replacement transit service options are available to better meet
these local needs without increasing the local transit tax burden.
As such, the recommendations are to: 1) opt -out of the metropolitan
transit system, 2) replace the existing service in 1990, 3) convert
to a trunk and feeder line service in 1991, and 4) expand services
in the future as needs arise.
A point meeting of the six City Councils has been scheduled for
7:30 p.m. on Wednesday, May 17, 1989, at the Apple Valley Community
Center. This meeting will provide the opportunity for feedback
among the cities regarding the study results.
Provided that an opt -out decision is made, a Joint Powers Agreement
between the cities will be necessary. An example of this agreement
is attached. The City Council must take action on the study
recommendations by June 1, 1989, in order to allow time for the
preparation of a service plan prior to the July 1, 1989 deadline.
9
JOINT POWERS AGREEMENT
AN AGREEMENT ESTABLISHING
A SIX -CITY TRANSIT AUTHORITY
FOR THE CITIES OF
APPLE VALLEY, BURNSVILLE, EAGAN, PRIOR LAKE, ROSEMOUNT AND SAVAGE
THIS AGREEMENTis between the cities of Apple Valley, Burnsville,
Eagan, Prior Lake, Rosemount and Savage (hereinafter 'The Cities").
WHEREAS, The Cities are Minnesota municipal corporations, duly
organized and licensed under the laws of the State of Minnesota; and
WHEREAS, The Cities historically have shared common concerns and
interests and have had long and positive working relationships; and
WHEREAS, The
Cities
have previously organized
together
under the
Minnesota Joint Powers
Act,
Minnesota Statules Section
471.59,
to conduct
a "Needs Assessment Transit Study;" and
WHEREAS, the purpose of
the "Needs Assessment Transit Study"
was
to evaluate
the transit needs of
The Cities, evaluate the
level and
cost
of existing
transit service in
The Cities and to
determine
the
feasibility
of establishing a
"Replacement Service
Program,'
also
referred to
as "opt -out program,'
pursuant to Minnesota
Statutes Section
473.388; and
WHEREAS, The Cities have determined that area transit needs are
not being met and a high proportion of area property taxes levied for
transit purposes is not being utilized for area transit service in The
Cities. � l
NOW THEREFORE, The Cities agree as follows:
1, The Cities jointly approve the conclusions and recommendations of
the Assessment Transit Study.
2. The Cities will
jointly
prepare and submit a
six -city
replacement service
,plan" to
the Regional Transit Board
by June
30, 1989.
3. 'Replacement service" will begin on , 1990, and
will consist of the replacement of existing Metropolitan Transit
Commission transit services with similar service, contracted
through the formal public bidding process.
4. The Cities will establish a six -city transit authority," by
separate agreement, for the purpose of planning and governing
transit programs in The Cities.
Adopted this _ day or
1989.
CITY OF APPLE VALLEY
B
Its• Mayor
Attest:
Adopted this _ day of
1989.
CITY OF EAGA'N
Its: Mayor
Attest:
It
Adopted this _ day of
1989:
CITY OF ROSEMOUNT
Its• Mayor
Attest:
Its:
Adopted.this_ day or
1989.
CITY OF BURNSVILLE
B
Its: Mayor
Attest:
Its:
Adopted this _ day of
1989.
CITY OF PRIOR LAKE
Its• Mayor
Attest•
Adopted this _ day of
1989.
CITY OF SAVAGE
By:
Its: Mayor
Attest:.